Loading...
HomeMy WebLinkAbout20020717 Ver 1_More Info Letter_20021122State of North Carolina Department of Environment and Natural Resources Raleigh Regional Office Michael F. Easley, Governor William G. (Bill) Ross, Secretary Alan W. Klimek, P.E., Director IN?W2 11,211&1* NCDENR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY November 22, 2002 Certifit-d Mail Return Receipt Requested Mr. Chris Maiewski Central Carolina Homes, LLC Majewski Enterprises, Inc. 2828 Brenfield Drive - ----- SUBJECT: On Hold Notification DWQ # 020717 Central Carolina Homes, LLC Majewski Enterprises, Inc. Covington Meadows Subdivision Wake County Dear Mr. Majewski: On September 11, 2002, and on November 6, 2002, the Division of Water Quality received your application and respective additional/revised information for a 401 Water Quality Certification for a project located along Optimist Farm Road in Wake County. Subsequent to this review and an October 21, 2002, meeting between Mr. Majewski, Scott Mitchell and Tom Norris of Spaulding and Norris, PA., and Raleigh Regional Office and Central Office Staff of the Division of Water Quality, it has been determined that additional information is necessary. Please re-submit your project with the following additions: 1) Impact area # 8: -The plans depict a sewer line impact in Zone II of the Neuse Riparian Buffer. Please indicate why the sewer line impacts cannot be avoided (moved outside of zone 11). -Please depict the building and driveway footprint for lot number 11. It is unclear whether a house and driveway can fit on the subject lot and not impact the buffer. 2) Impact area # 9: -The plans depict a sewer line impact in the Neuse Riparian Buffer. Please indicatewhy this impact cannot be avoided (moved outside of the buffer). -Mitigation for sewer line impacts associated with non-perpendicular crossing (zone I and zone II) will be required (please see below mentioned buffer mitigation item). 1628 Mail Service Center, Raleigh, NC 27699-1628 Telephone (919) 571-4700 FAX (919)571-4700 An Equal Opportunity Affirmative Action Employer 500/6 recycled/10% post-consumer paper 3) Crossing area #3: -With respect to the initial 20-foot wide road crossing and the impacts to the buffer by an access road being located within the buffer zone, please provide a plan that depicts the extent, scope, and methods of stream and buffer restoration. (This should include plant species, an implementation and monitoring plan, and a schedule) 4) Please provide plans that clearly depict how stormwater will be addressed. The Neuse Riparian buffer Rules require diffuse flow prior to stormwater entering into the buffer. 5) If a no practical alternative decision cannot be reached by DWQ, subsequent to a review of your response item number 2 (above), the Riparian Zone impacts to area number 9 that have occurred due to the sewer line crossing, (depicted on the Covington Meadows Subdivision Wetland and NRB Impact Analysis plan dated August, 26, 2002) will require mitigatinn Sz ecifirally, the ijm arts of only he non--perpendicular ppAstion of the sewer line crossing (that includes zone I and zone H impacts) will be required to be mitigated. (Note: You may wish to make a navment into the Rin rian Riff .r Restoration Fund administered by the NC Wetlands Restoration Program (WRP) to meet this mitigation requirement. As such, your response should clearly indicate your intentions with respect to how you propose to address Please provide' the requested information and if you have any questions, please contact Mr. Steve Mitchell or myself at (919) 571-4700. This project will remain on hold as incomplete in accordance with 15 A NCAC 2H.0505(c) until this information is received. S' erel Kenneth Schuster Regional Water Quality Supervisor cc: Amanda Jones, USACE Raleigh Regulatory Field Office Wetlands/401 Unit - file copy Danny Smith, Central 401/Wetlands Unit Wake County RRO - Ken Schuster Scott Mitchell, Spaulding and Norris, PA, 972 Trinity Road, Raleigh, NC 27607