HomeMy WebLinkAbout20200941 Ver 1_WILL RESUBMIT_20201116Strickland, Bev
From: Jim Mason <james.mason@threeoaksengineering.com>
Sent: Monday, November 16, 2020 1:59 PM
To: Roden Reynolds, Bryan K CIV (USA)
Cc: Nathan Howell; Johnson, Alan; Michael Wood; Nancy Oberle
Subject: [External] RE: SAW-2018-00566 (Final Notice of Incomplete Pre -Construction
Notification)
• ' External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
ort.s am nc. ov
Bryan -
Thank you for the response. We will re -compile the PCN package with all of the updated material and will re -submit to
you and Alan via email in the near future.
Thanks and have a great day,
Jim
James Mason, MS, PWS
Senior Environmental Scientist/Project Manager
Three Oaks Engineering
324 Blackwell Street, Suite 1200
Durham, NC 27701
919-732-1300 (office)
704-604-8358 (mobile)
iames.mason(@threeoakseneineerine.com
www.threeoaksengineering.com
From: Roden Reynolds, Bryan K CIV (USA) <Bryan.K.Roden Reynolds@usace.army.mil>
Sent: Monday, November 9, 2020 1:03 PM
To: Jim Mason <james. mason @threeoaksengineering.com>
Cc: Nathan Howell <nathan.howell@threeoaksengineering.com>; Johnson, Alan <alan.johnson@ncdenr.gov>; Michael
Wood <michael.wood@threeoaksengineering.com>; Nancy Oberle <nancy.oberle@threeoaksengineering.com>
Subject: RE: SAW-2018-00566 (Final Notice of Incomplete Pre -Construction Notification)
Please resubmit the revised PCN directly to me and do not go through the e-filing process.
Thanks,
Bryan Roden -Reynolds, PWS
Regulatory Project Manager
U.S. Army Corps of Engineers
Wilmington District
Charlotte Regulatory Field Office
8430 University Executive Park Drive
Charlotte, NC 28262
Office: (704)510-1440
From: Jim Mason <james. mason @threeoaksengineering.com>
Sent: Monday, November 9, 2020 12:59 PM
To: Roden Reynolds, Bryan K CIV (USA) <Bryan.K.Roden Reynolds@usace.army.mil>
Cc: Nathan Howell <nathan.howell@threeoaksengineering.com>; Johnson, Alan <alan.iohnson@ncdenr.gov>; Michael
Wood <michael.wood@threeoaksengineering.com>; Nancy Oberle <nancy.oberle@threeoaksengineering.com>
Subject: [Non-DoD Source] RE: SAW-2018-00566 (Final Notice of Incomplete Pre -Construction Notification)
Bryan -
I just forwarded you 2 emails from Alan regarding the project. Both are in relation to the October 8, 2020 email that Alan
sent. The first is our email response to Alan on October 20, 2020 with the original PJD information, with his follow-up
email about revising the cover sheet of the Environmental Impacts package. The second is an email from Alan about
locating the restoration plan that we submitted. I had cc'ed you on our October 20, 2020 response to Alan, but I did not
realize that you were not cc'ed on his response emails to us. I have forwarded Alan's remaining questions to the City and
the prime regarding stormwater and updating the cover sheet on the impacts package, but we had not re -submitted
anything to you and NCDWR yet since we were waiting on your response to the questions that Alan had asked you in the
October 8, 2020 email. We wanted to make sure that we covered everything that both of you requested all at once to
make sure everything was addressed and to minimize the number of submissions that we sent.
We can definitely compile an updated PCN with all of the updated information. Would an emailed version with
attachments be acceptable or would you like us to re -submit through the electronic version?
Thanks,
From: Roden Reynolds, Bryan K CIV (USA) <Bryan.K.Roden Reynolds@usace.army.mil>
Sent: Monday, November 9, 2020 12:19 PM
To: Jim Mason <*ames. mason @threeoaksengineering.com>
Cc: Nathan Howell <nathan.howell@threeoaksengineering.com>; Johnson, Alan <alan.iohnson@ncdenr.gov>; Michael
Wood <michael.wood@threeoaksengineering.com>; Nancy Oberle <nancy.oberle@threeoaksengineering.com>
Subject: RE: SAW-2018-00566 (Final Notice of Incomplete Pre -Construction Notification)
Mr. Mason,
The Corps does not have any record of you responding to the state's (Alan Johnson) comments dated October 8, 2020.
At this point with all the back and forth and all the revisions associated with all the comments, I recommend you provide
the Corps and the State, via email, a final revised PCN with updated construction drawings so the Corps and State can
review the most up to date project proposal.
Thanks,
Bryan Roden -Reynolds, PWS
Regulatory Project Manager
U.S. Army Corps of Engineers
Wilmington District
Charlotte Regulatory Field Office
8430 University Executive Park Drive
Charlotte, NC 28262
Office: (704)510-1440
From: Jim Mason <6ames. mason @threeoaksengineering.com>
Sent: Monday, November 9, 2020 11:43 AM
To: Roden Reynolds, Bryan K CIV (USA) <Bryan.K.Roden Reynolds@usace.army.mil>
Cc: Nathan Howell <nathan.howell@threeoaksengineering.com>; Johnson, Alan <alan.iohnson@ncdenr.gov>; Michael
Wood <michael.wood@threeoaksengineering.com>; Nancy Oberle <nancy.oberle@threeoaksengineering.com>
Subject: [Non-DoD Source] RE: SAW-2018-00566 (Final Notice of Incomplete Pre -Construction Notification)
Bryan -
I hope that you are doing well. I was emailing to follow up on the emails below regarding the additional items that you
requested for the Albemarle Corporate Center PCN. I wanted to see if you had any questions regarding these items or if
you required any additional information. If you could email me back when you have an opportunity it would be much
appreciated.
Thanks and have a great day,
011
James Mason, MS, PWS
Senior Environmental Scientist/Project Manager
Three Oaks Engineering
324 Blackwell Street, Suite 1200
Durham, NC 27701
919-732-1300 (office)
704-604-8358 (mobile)
lames.mason@threeoaksengineering.com
Blocked Blockedwww.threeoakseneineerine.com
From: Jim Mason
Sent: Friday, October 2, 2020 1:02 PM
To: 'Roden Reynolds, Bryan K CIV (US)' <Bryan.K.RodenReynolds@usace.army.mil>
Cc: Nathan Howell <nathan.howell@threeoaksengineering.com>; 'Johnson, Alan' <alan.iohnson@ncdenr.gov>; Michael
Wood <michael.wood@threeoaksengineering.com>; Nancy Oberle <nancy.oberle@threeoaksengineering.com>
Subject: RE: SAW-2018-00566 (Final Notice of Incomplete Pre -Construction Notification)
Bryan-
Attached are the updated Roadway Plans and Grading and Erosion Control Plan mentioned in my previous email. Again,
please let me know if you have any questions or require any additional information.
Thanks and have a great day,
Jim
From: Jim Mason
Sent: Friday, October 2, 2020 12:59 PM
To: 'Roden Reynolds, Bryan K CIV (US)' <Bryan.K.RodenReynolds@usace.army.mil>
Cc: Nathan Howell<nathan.howell@threeoaksengineering.com>; Johnson, Alan <alan.iohnson@ncdenr.gov>; Michael
Wood <michael.wood@threeoaksengineering.com>; Nancy Oberle<nancy.oberle@threeoaksengineering.com>
Subject: RE: SAW-2018-00566 (Final Notice of Incomplete Pre -Construction Notification)
Bryan -
Attached are the items that you requested for the Albemarle Corporate Center permit application. These include:
1) Pond Drainage Plans for Ponds PE and PF
2) A Preliminary Stream and Riparian Area Restoration Plan, which includes information for the items listed in your
original email
3) An ORM Upload Sheet for all features associated with the project
As stated in the PCN, we had not completed the Schweinitz's sunflower surveys for the project. Those surveys have since
been completed and I have also attached the survey memo outlining the results of the survey and the Biological
Conclusion for the species. Additionally, based on comments from NCDWR, Chambers realized that the 10-foot
countersunk rip -rap pad at three sites had not been accounted for in the original plans. Therefore, I have also included
an updated set of Permit Drawings (file named "Environmental Impacts 9.28.20-compressed") and a comparison of
Stream Impact Changes between the PCN and the updated drawings. These changes are also reflected in the Roadway
Plans and Grading and Erosion Control Plan, which I will also send to you shortly in a separate email (due to file size). All
three sets of drawings also incorporate changes requested by NCDWR. I will be responding to Alan in a separate email
identifying what changes were made based on his requests and will cc you on that email.
Please let me know if you have any questions or require any additional information.
Thanks and have a great day,
011
James Mason, MS, PWS
Senior Environmental Scientist/Project Manager
Three Oaks Engineering
324 Blackwell Street, Suite 1200
Durham, NC 27701
919-732-1300 (office)
704-604-8358 (mobile)
lames.mason@threeoaksengineering.com
Blocked Blockedwww.threeoakseneineerine.com
goEfRo
From: Roden Reynolds, Bryan K CIV (US) <Bryan.K.Roden Reynolds@usace.army.mil?
Sent: Tuesday, September 29, 2020 7:38 AM
To: Jim Mason <*ames. mason @threeoaksengineering.com>
Cc: Nathan Howell<nathan.howell@threeoaksengineering.com>; Johnson, Alan <alan.iohnson@ncdenr.gov>
Subject: SAW-2018-00566 (Final Notice of Incomplete Pre -Construction Notification)
Mr. Mason and Mr. Howell,
It has been over 30 days since the Notice of Incomplete Pre -Construction Notification was sent. If the previously
requested information (see attachment) is not provided within a reasonable timeframe (i.e. next 15 days) we will
proceed with administratively canceling the request.
Thanks,
Bryan Roden -Reynolds, PWS
Regulatory Project Manager
U.S. Army Corps of Engineers
Wilmington District
Charlotte Regulatory Field Office
8430 University Executive Park Drive
Charlotte, NC 28262
Office: (704)510-1440