Loading...
HomeMy WebLinkAbout20200941 Ver 1_WILL RESUBMIT_20201116Strickland, Bev From: Jim Mason <james.mason@threeoaksengineering.com> Sent: Monday, November 16, 2020 1:59 PM To: Roden Reynolds, Bryan K CIV (USA) Cc: Nathan Howell; Johnson, Alan; Michael Wood; Nancy Oberle Subject: [External] RE: SAW-2018-00566 (Final Notice of Incomplete Pre -Construction Notification) • ' External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to ort.s am nc. ov Bryan - Thank you for the response. We will re -compile the PCN package with all of the updated material and will re -submit to you and Alan via email in the near future. Thanks and have a great day, Jim James Mason, MS, PWS Senior Environmental Scientist/Project Manager Three Oaks Engineering 324 Blackwell Street, Suite 1200 Durham, NC 27701 919-732-1300 (office) 704-604-8358 (mobile) iames.mason(@threeoakseneineerine.com www.threeoaksengineering.com From: Roden Reynolds, Bryan K CIV (USA) <Bryan.K.Roden Reynolds@usace.army.mil> Sent: Monday, November 9, 2020 1:03 PM To: Jim Mason <james. mason @threeoaksengineering.com> Cc: Nathan Howell <nathan.howell@threeoaksengineering.com>; Johnson, Alan <alan.johnson@ncdenr.gov>; Michael Wood <michael.wood@threeoaksengineering.com>; Nancy Oberle <nancy.oberle@threeoaksengineering.com> Subject: RE: SAW-2018-00566 (Final Notice of Incomplete Pre -Construction Notification) Please resubmit the revised PCN directly to me and do not go through the e-filing process. Thanks, Bryan Roden -Reynolds, PWS Regulatory Project Manager U.S. Army Corps of Engineers Wilmington District Charlotte Regulatory Field Office 8430 University Executive Park Drive Charlotte, NC 28262 Office: (704)510-1440 From: Jim Mason <james. mason @threeoaksengineering.com> Sent: Monday, November 9, 2020 12:59 PM To: Roden Reynolds, Bryan K CIV (USA) <Bryan.K.Roden Reynolds@usace.army.mil> Cc: Nathan Howell <nathan.howell@threeoaksengineering.com>; Johnson, Alan <alan.iohnson@ncdenr.gov>; Michael Wood <michael.wood@threeoaksengineering.com>; Nancy Oberle <nancy.oberle@threeoaksengineering.com> Subject: [Non-DoD Source] RE: SAW-2018-00566 (Final Notice of Incomplete Pre -Construction Notification) Bryan - I just forwarded you 2 emails from Alan regarding the project. Both are in relation to the October 8, 2020 email that Alan sent. The first is our email response to Alan on October 20, 2020 with the original PJD information, with his follow-up email about revising the cover sheet of the Environmental Impacts package. The second is an email from Alan about locating the restoration plan that we submitted. I had cc'ed you on our October 20, 2020 response to Alan, but I did not realize that you were not cc'ed on his response emails to us. I have forwarded Alan's remaining questions to the City and the prime regarding stormwater and updating the cover sheet on the impacts package, but we had not re -submitted anything to you and NCDWR yet since we were waiting on your response to the questions that Alan had asked you in the October 8, 2020 email. We wanted to make sure that we covered everything that both of you requested all at once to make sure everything was addressed and to minimize the number of submissions that we sent. We can definitely compile an updated PCN with all of the updated information. Would an emailed version with attachments be acceptable or would you like us to re -submit through the electronic version? Thanks, From: Roden Reynolds, Bryan K CIV (USA) <Bryan.K.Roden Reynolds@usace.army.mil> Sent: Monday, November 9, 2020 12:19 PM To: Jim Mason <*ames. mason @threeoaksengineering.com> Cc: Nathan Howell <nathan.howell@threeoaksengineering.com>; Johnson, Alan <alan.iohnson@ncdenr.gov>; Michael Wood <michael.wood@threeoaksengineering.com>; Nancy Oberle <nancy.oberle@threeoaksengineering.com> Subject: RE: SAW-2018-00566 (Final Notice of Incomplete Pre -Construction Notification) Mr. Mason, The Corps does not have any record of you responding to the state's (Alan Johnson) comments dated October 8, 2020. At this point with all the back and forth and all the revisions associated with all the comments, I recommend you provide the Corps and the State, via email, a final revised PCN with updated construction drawings so the Corps and State can review the most up to date project proposal. Thanks, Bryan Roden -Reynolds, PWS Regulatory Project Manager U.S. Army Corps of Engineers Wilmington District Charlotte Regulatory Field Office 8430 University Executive Park Drive Charlotte, NC 28262 Office: (704)510-1440 From: Jim Mason <6ames. mason @threeoaksengineering.com> Sent: Monday, November 9, 2020 11:43 AM To: Roden Reynolds, Bryan K CIV (USA) <Bryan.K.Roden Reynolds@usace.army.mil> Cc: Nathan Howell <nathan.howell@threeoaksengineering.com>; Johnson, Alan <alan.iohnson@ncdenr.gov>; Michael Wood <michael.wood@threeoaksengineering.com>; Nancy Oberle <nancy.oberle@threeoaksengineering.com> Subject: [Non-DoD Source] RE: SAW-2018-00566 (Final Notice of Incomplete Pre -Construction Notification) Bryan - I hope that you are doing well. I was emailing to follow up on the emails below regarding the additional items that you requested for the Albemarle Corporate Center PCN. I wanted to see if you had any questions regarding these items or if you required any additional information. If you could email me back when you have an opportunity it would be much appreciated. Thanks and have a great day, 011 James Mason, MS, PWS Senior Environmental Scientist/Project Manager Three Oaks Engineering 324 Blackwell Street, Suite 1200 Durham, NC 27701 919-732-1300 (office) 704-604-8358 (mobile) lames.mason@threeoaksengineering.com Blocked Blockedwww.threeoakseneineerine.com From: Jim Mason Sent: Friday, October 2, 2020 1:02 PM To: 'Roden Reynolds, Bryan K CIV (US)' <Bryan.K.RodenReynolds@usace.army.mil> Cc: Nathan Howell <nathan.howell@threeoaksengineering.com>; 'Johnson, Alan' <alan.iohnson@ncdenr.gov>; Michael Wood <michael.wood@threeoaksengineering.com>; Nancy Oberle <nancy.oberle@threeoaksengineering.com> Subject: RE: SAW-2018-00566 (Final Notice of Incomplete Pre -Construction Notification) Bryan- Attached are the updated Roadway Plans and Grading and Erosion Control Plan mentioned in my previous email. Again, please let me know if you have any questions or require any additional information. Thanks and have a great day, Jim From: Jim Mason Sent: Friday, October 2, 2020 12:59 PM To: 'Roden Reynolds, Bryan K CIV (US)' <Bryan.K.RodenReynolds@usace.army.mil> Cc: Nathan Howell<nathan.howell@threeoaksengineering.com>; Johnson, Alan <alan.iohnson@ncdenr.gov>; Michael Wood <michael.wood@threeoaksengineering.com>; Nancy Oberle<nancy.oberle@threeoaksengineering.com> Subject: RE: SAW-2018-00566 (Final Notice of Incomplete Pre -Construction Notification) Bryan - Attached are the items that you requested for the Albemarle Corporate Center permit application. These include: 1) Pond Drainage Plans for Ponds PE and PF 2) A Preliminary Stream and Riparian Area Restoration Plan, which includes information for the items listed in your original email 3) An ORM Upload Sheet for all features associated with the project As stated in the PCN, we had not completed the Schweinitz's sunflower surveys for the project. Those surveys have since been completed and I have also attached the survey memo outlining the results of the survey and the Biological Conclusion for the species. Additionally, based on comments from NCDWR, Chambers realized that the 10-foot countersunk rip -rap pad at three sites had not been accounted for in the original plans. Therefore, I have also included an updated set of Permit Drawings (file named "Environmental Impacts 9.28.20-compressed") and a comparison of Stream Impact Changes between the PCN and the updated drawings. These changes are also reflected in the Roadway Plans and Grading and Erosion Control Plan, which I will also send to you shortly in a separate email (due to file size). All three sets of drawings also incorporate changes requested by NCDWR. I will be responding to Alan in a separate email identifying what changes were made based on his requests and will cc you on that email. Please let me know if you have any questions or require any additional information. Thanks and have a great day, 011 James Mason, MS, PWS Senior Environmental Scientist/Project Manager Three Oaks Engineering 324 Blackwell Street, Suite 1200 Durham, NC 27701 919-732-1300 (office) 704-604-8358 (mobile) lames.mason@threeoaksengineering.com Blocked Blockedwww.threeoakseneineerine.com goEfRo From: Roden Reynolds, Bryan K CIV (US) <Bryan.K.Roden Reynolds@usace.army.mil? Sent: Tuesday, September 29, 2020 7:38 AM To: Jim Mason <*ames. mason @threeoaksengineering.com> Cc: Nathan Howell<nathan.howell@threeoaksengineering.com>; Johnson, Alan <alan.iohnson@ncdenr.gov> Subject: SAW-2018-00566 (Final Notice of Incomplete Pre -Construction Notification) Mr. Mason and Mr. Howell, It has been over 30 days since the Notice of Incomplete Pre -Construction Notification was sent. If the previously requested information (see attachment) is not provided within a reasonable timeframe (i.e. next 15 days) we will proceed with administratively canceling the request. Thanks, Bryan Roden -Reynolds, PWS Regulatory Project Manager U.S. Army Corps of Engineers Wilmington District Charlotte Regulatory Field Office 8430 University Executive Park Drive Charlotte, NC 28262 Office: (704)510-1440