HomeMy WebLinkAbout20201051 Ver 1_MODIFICATION_20201120Strickland, Bev
From: Phil May <phil.may@carolinaeco.com>
Sent: Friday, November 20, 2020 2:17 PM
To: Roden Reynolds, Bryan K CIV (USA); Johnson, Alan
Cc: Stout, Patrick (William); Tafilaku, Melissa L. (TafilakuML@bv.com)
Subject: [External] Union County 853 Zone Improvements
Attachments: 853W_StreamlmpactTable_revised.pdf, Union_PCN_Fig5_lmpactlndex.pdf,
Union_PCN_Fig5_lmpactSites.pdf
External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
report.spam@nc.gov
Bryan & Alan,
In response to comments regarding some of the stream crossings on the above project, Black & Veatch has reviewed
each crossing and adjusted where riprap vs matting will be used. Basically, a couple of stream channels were shifted
from temporary to permanent -no loss impacts and vice versa for matting/riprap and we zeroed out Bearskin Creek as it
will be bored due to WRC concerns on aquatic species.
Please see the attached for your continued review of the project impacts:
- Stream impact table — revised accordingly with yellow highlights showing the changed information
- Impact Index Map
- Impact Site Maps
No changes to the original wetland impacts in the PCN have occurred. The revised engineering plans are available at the
link below— please let me know if that doesn't work.
https://carolinaeco-my.sharepoint.com/:b:/p/phil may/Eegnu6S7UuxM16bo5SgwEcYBglvbS-
ZeiHMchTxa7ph9 Q?e=S2Tfb0
Please let us know if you have any questions or need additional information.
Thanks
Phil
Phil May
Senior Scientist/Vice President
CAROLINA ECOSYSTEMS, INC.
(919) 606-1065
PO Box 41
Lewisville NC 27023
3040 NC Hwy 42 West
Clayton NC 27520
Stream Impacts
Impact Number
3a. Reason for impact
3b. Impact type
3c. Type of Impact
3d. S. name
3e. Stream Type
3f. Type of Jurisdiction
3g. S. width
3h. Impact length
S 1
Pipeline Installation and Boring
Temporary
Stablization
SE
Intermittent
Corps
2
47
S2
Pipeline Installation and Boring
Permanent
Rip Rap Fill
SE
Intermittent
Corps
2
44
S3
Pipeline Installation
Permanent
Rip Rap Fill
SF
Intermittent
Corps
6
98
S4
Pipeline Installation
Permanent
Stablization
Stewarts Creek
Perennial
Corps
7
32
S5
Pipeline Installation
Permanent
Rip Rap Fill
SH
Intermittent
Corps
4
58
S6
Pipeline Installation
Temporary
Stablization
SI
Intermittent
Corps
6
27
S7
Pipeline Installation
Permanent
Rip Rap Fill
SK
Perennial
Corps
5
30
S8
Pipeline Installation
Temporary
Stablization
Si
Intermittent
Corps
3
225
S9
Pipeline Installation
Temporary
Stablization
Si
Intermittent
Corps
3
36
S 10
Pipeline Installation
Permanent
Rip Rap Fill
Si
Intermittent
Corps
3
0
S 11
Pipeline Installation
Permanent
Rip Rap Fill
Dry Fork
Perennial
Corps
12
33
S 12
Pipeline Installation
Permanent
Rip Rap Fill
SN
Perennial
Corps
5
43
S 13
Pipeline Installation
Permanent
Bore and Jack
Bearskin Creek
Perennial
Corps
15
0
S 14
Pipeline Installation
Temporary
Stablization
SQ
Intermittent
Corps
2
76
S 15
Pipeline Installation
Permanent
Rip Rap Fill
SQ
Intermittent
Corps
2
0
*Highlighted values indicate changes from the original April 11, 2020 submittal
Total Temporary Stream Impacts:
411
Total Permanent (No Loss) Stream Impacts:
338
Total Stream Impacts:
749
V
KWER PR
_10 RP
RD
kx
L
4 , Erna,
A—
�LbN
V
LN
k 5 N
'I t
te.
al
eke J.)
V,
cc) at
Z
'UEP RP
C
yr
to
_J C\V_: Acres
rvo l� F�/G r LfJ
J
RH Is'
v
il C1 ub
ia
TT 7efib,
f
i qOUND ABLE RP
riarwoo'd,
cai
Finedell L
A,
n rue Ai rpvm-
7N,
7
Impact Locations
46 7,
Impact Site 1 Sl, S2, W1
Impact Site 2 - S3
Impact Site 3 - S4
Impact Site 4 - S5, W2
Impact Site 5 - S6
Z
Impact Site 6 - S7, W3
cv �O
Impact Site 7 - S8
Impact Site 8 - S9, S10
Impact Site 9 - S 11
Impact Site 10 - W4
Impact Site 11 - S12
Impact Site 13 - 514, S15
N Project Limits of Disturbance 853W Zone Improvements
t7%CAROLINA Union County, NC
WECOSYSTEMS 0101111== Miles Impact Site
0 0.25 0.5 Bakers (2013), Matthews (2013), Monroe (2013), Figure 5.0:
November 2020 and Waxhaw (2013) US Geological Impact Site Index Map
Survey 1:24000 Quadrangle Map
WI: Temporary Impacts: 2686 Sq. ft. (0.062 acres) It
W1: Permanent (Conversion) Impacts: 690 Sq. ft. (0
S 1: Temporary Impacts: 47 linear feet
S2: Permanent (No Loss) Impacts: 44 linear feet /
✓ r
It
It
It
Ifr,
It It �r
i
r
It
r
It It
/ It It
It
It i
N Map Date: November 2020 853W Zone Improvements
w� Construction Limits � Wetlands
p1 Feet 'v Proposed Waterline Alignment • Permanent (Comersion)Welland Impacts Revised: Union County, NC
V�G ECOSY TE ® Permenant (No Loss) Stream Impact • Temporary Wetland Impacts
VECOSYSTEMS 0 20 40 �Temporary Stream Impact /Ss/I'Contours Revised:
Figure 5.1:
Stream Channels
Revised: Impact Site 1
i
I
S3: Permanent Impact: 98 linear feet
N Map Date: November 2020 853W Zone Improvements
w� Construction Limits � Wetlands
p1 Feet 'v Proposed Waterline Alignment • Permanent (Comersion)Welland Impacts Revised: Union County, NC
V�G ECOSY TE ® Permenant (No Loss) Stream Impact • Temporary Wetland Impacts
VECOSYSTEMS 0 20 40 �Temporary Stream Impact /Ns/I'Contours Revised:
Figure 5.2:
Stream Channels
Revised: Impact Site 2
i
i
i
i
i
. I
i
_ S4: Permanent (No Loss) Impact: 32 linear feet
v
N Map Date: November 2020 853W Zone Improvements
w� Construction Limits � Wetlands
p1 Feet 'v Proposed Waterline Alignment • Permanent (Com"'ion)Welland Impacts Revised: Union County, NC
V�G ECOSY TE ® Permenant (No Loss) Stream Impact • Temporary Wetland Impacts
VECOSYSTEMS 0 20 40 �Temporary Stream Impact /�s/ I'Contows Revised: Figure 5.3•
Stream Channels
Revised: Impact Site 3
W2: Temporary Impact: 4017 Sq. ft. 0( 092 acres) �V /
W2: Permanent (Conversion) Impact: 662 Sq. ft. (0.015 acres
S5: Permanent (No Los mpact: 58 linear f�f `
i
I
I
I
I
I
I
I
I
I
I
I
I
our
N Map Date: November 2020 853W Zone Improvements
w� Construction Limits � Wetlands
p1 Feet 'v Proposed Waterline Alignment • Permanent (Comersion) Wetland Impacts Revised: Union County, NC
[[G CAROLI NA ®Permenant (No Loss) Stream Impact •Temporary Wetland Impacts
VECOSYSTEMS 0 20 40 �Temporary Stream Impact /Ns/I'Contours Revised:
Figure 5.4:
Stream Channels
Revised: Impact Site 4
/
�--
i i
S6: Temporary Impact: 27 linear feet
/
/
/
/
N Map Date: November 2020 853W Zone Improvements
w� Construction Limits � Wetlands
p1 Feet 'v Proposed Waterline Alignment • Permanent (Conversion)Welland Impacts Revised: Union County, NC
��6 ECOSY TE ®Permenant (No Loss) Stream Impact • Temporary Wetland Impacts
VECOSYSTEMS 0 20 40 �Temporary Stream Impact /Ns/I'Contours Revised: Figure5.5'
Stream Channels
Revised: Impact Site 5
1 I
I W3: Permanent (Conversion) Impact: 1484 Sq. ft. (0.034 acres)
J S7: Permanent (No LossLImpact: 30 linear feet
IMF
J
J
I
►Imr"p'act Site 7�MatchiLine
r
M
N Map Date: November 2020 853W Zone Improvements
w� Construction Limits � Wetlands
p1 Feet 'v proposed Waterline Alignment • Permanent (Comersion)Welland Impacts Revised: Union County, NC
V�G ECOSY TE ® Permenant (No Loss) Stream Impact • Temporary Wetland Impacts
VECOSYSTEMS 0 20 40 �Temporary Stream Impact /�s/ I'Contours Revised: Figure 5.6'
Stream Channels
Revised: Impact Site 6
1
1
1
1 �1
.1
:1
Rama
1 1
1 :1 'Fi r r
:1
1 :1
1 / S8: Temporary Impact: 225 linear feet
1 :1
O ► -�1
1 �1
• ► 1
1
. 1
1
1
1
1
N Map Date: November 2020 853W Zone Improvements
w� Construction Limits � Wetlands
p Feet 'v Proposed Waterline Alignment • Permanent (Conversion) Wetland Impacts Revised: Union County, NC
�G CAROLI NA ® Permenant (No Loss) Stream Impact • Temporary Wetland Impacts
VECOSYSTEMS 0 20 40 �Temporary Stream Impact /ss/I'Contows Revised:
Figure 5.7:
Stream Channels
Revised: Impact Site 7
r—
t CAROLINA
VECOSYSTEMS
I
0
N
1
0
Lftftft -ftft
20
I
:1 Feet
40
S9: Tdmporar� Impact: 36 linear feet
1
l�
1
I
Map Date: November 2020
Construction Limits Wetlands
Proposed Waterline Alignment • Permanent (Conversion) Wetland Impacts Revised:
Permenant (No Loss) Stream Impact • Temporary Wetland Impacts
Temporary Stream Impact /�s/ I'Contours Revised:
Stream Channels
Revised:
853W Zone Improvements
Union County, NC
Figure 5.8:
Impact Site 8
{i J
511: Permanent (No Loss) Impact: 33 linear feet
l
N Map Date: November 2020 853W Zone Improvements
w� Construction Limits � WeUands
p1 Feet 'v Proposed Waterline Alignment • Permanent (Comersion)Wetland Impacts Revised: Union County, NC
V�G ECOSY TE ® Permenant (No Loss) Stream Impact • Temporary Wetland Impacts
VECOSYSTEMS 0 20 40 �Temporary Stream Impact /�s/ I'Contows Revised: Figure 5.9•
Stream Channels
Revised: Impact Site 9
i
/
/
/
W4: Temporary Impact: 1452 Sq. ft. (0.03�3es)
W4: Permanent (Conversion) Impact: 383 Sq. ft. (0.009 acres)
/
/
/
/
/
/
i
/
/
fA
1
N Map Date: November 2020 853W Zone Improvements
w� Construction Limits � Wetlands
p1 Feet 'v Proposed Waterline Alignment • Permanent (Conversion)Welland Impacts Revised: Union County, NC
V�G ECOSY TE ® Permenant (No Loss) Stream Impact • Temporary Wetland Impacts
VECOSYSTEMS 0 20 40 �Temporary Stream Impact /Ns/I'Contours Revised:
Figure 5.10:
Stream Channels
Revised: Impact Site 10
M-,qq"wj
512: Permanent (No Loss) Impact: 43 linear
►q
1
0
N Map Date: November 2020 853W Zone Improvements
w� Construction Limits � Wetlands
p1 Feet 'v Proposed Waterline Alignment • Permanent (Commion) Wetland Impacts Revised: Union County, NC
��G CAROLI NA ®Permenant (No Loss) Stream Impact •Temporary Wetland Impacts
VECOSYSTEMS 0 20 40 �Temporary Stream Impact rContours Revised:
Figure 5.11:
Stream Channels
Revised: Impact Site 11
�G CAROLINA
VECOSYSTEMS
Feet
20 40
/
/
/
/
/
/
/
/
/
/
/
/
1
/ 000
.40
�i
i
/
/
/
/
/
/
/
/
/
/ 514: Temporary Impact: 76 linear feet
/
/
/
Construction Limits � Wetlands
Proposed Waterline Alignment • Permanent (Conversion) Wetland Impacts
Permenant (No Loss) Stream Impact • Temporary Wetland Impacts
Temporary Stream Impact ^/ I'Contours
Stream Channels
Map Date: November 2020
Revised:
Revised:
Revised:
853W Zone Improvements
Union County, NC
Figure 5.13:
Impact Site 13