Loading...
HomeMy WebLinkAbout20201051 Ver 1_MODIFICATION_20201120Strickland, Bev From: Phil May <phil.may@carolinaeco.com> Sent: Friday, November 20, 2020 2:17 PM To: Roden Reynolds, Bryan K CIV (USA); Johnson, Alan Cc: Stout, Patrick (William); Tafilaku, Melissa L. (TafilakuML@bv.com) Subject: [External] Union County 853 Zone Improvements Attachments: 853W_StreamlmpactTable_revised.pdf, Union_PCN_Fig5_lmpactlndex.pdf, Union_PCN_Fig5_lmpactSites.pdf External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov Bryan & Alan, In response to comments regarding some of the stream crossings on the above project, Black & Veatch has reviewed each crossing and adjusted where riprap vs matting will be used. Basically, a couple of stream channels were shifted from temporary to permanent -no loss impacts and vice versa for matting/riprap and we zeroed out Bearskin Creek as it will be bored due to WRC concerns on aquatic species. Please see the attached for your continued review of the project impacts: - Stream impact table — revised accordingly with yellow highlights showing the changed information - Impact Index Map - Impact Site Maps No changes to the original wetland impacts in the PCN have occurred. The revised engineering plans are available at the link below— please let me know if that doesn't work. https://carolinaeco-my.sharepoint.com/:b:/p/phil may/Eegnu6S7UuxM16bo5SgwEcYBglvbS- ZeiHMchTxa7ph9 Q?e=S2Tfb0 Please let us know if you have any questions or need additional information. Thanks Phil Phil May Senior Scientist/Vice President CAROLINA ECOSYSTEMS, INC. (919) 606-1065 PO Box 41 Lewisville NC 27023 3040 NC Hwy 42 West Clayton NC 27520 Stream Impacts Impact Number 3a. Reason for impact 3b. Impact type 3c. Type of Impact 3d. S. name 3e. Stream Type 3f. Type of Jurisdiction 3g. S. width 3h. Impact length S 1 Pipeline Installation and Boring Temporary Stablization SE Intermittent Corps 2 47 S2 Pipeline Installation and Boring Permanent Rip Rap Fill SE Intermittent Corps 2 44 S3 Pipeline Installation Permanent Rip Rap Fill SF Intermittent Corps 6 98 S4 Pipeline Installation Permanent Stablization Stewarts Creek Perennial Corps 7 32 S5 Pipeline Installation Permanent Rip Rap Fill SH Intermittent Corps 4 58 S6 Pipeline Installation Temporary Stablization SI Intermittent Corps 6 27 S7 Pipeline Installation Permanent Rip Rap Fill SK Perennial Corps 5 30 S8 Pipeline Installation Temporary Stablization Si Intermittent Corps 3 225 S9 Pipeline Installation Temporary Stablization Si Intermittent Corps 3 36 S 10 Pipeline Installation Permanent Rip Rap Fill Si Intermittent Corps 3 0 S 11 Pipeline Installation Permanent Rip Rap Fill Dry Fork Perennial Corps 12 33 S 12 Pipeline Installation Permanent Rip Rap Fill SN Perennial Corps 5 43 S 13 Pipeline Installation Permanent Bore and Jack Bearskin Creek Perennial Corps 15 0 S 14 Pipeline Installation Temporary Stablization SQ Intermittent Corps 2 76 S 15 Pipeline Installation Permanent Rip Rap Fill SQ Intermittent Corps 2 0 *Highlighted values indicate changes from the original April 11, 2020 submittal Total Temporary Stream Impacts: 411 Total Permanent (No Loss) Stream Impacts: 338 Total Stream Impacts: 749 V KWER PR _10 RP RD kx L 4 , Erna, A— �LbN V LN k 5 N 'I t te. al eke J.) V, cc) at Z 'UEP RP C yr to _J C\V_: Acres rvo l� F�/G r LfJ J RH Is' v il C1 ub ia TT 7efib, f i qOUND ABLE RP riarwoo'd, cai Finedell L A, n rue Ai rpvm- 7N, 7 Impact Locations 46 7, Impact Site 1 Sl, S2, W1 Impact Site 2 - S3 Impact Site 3 - S4 Impact Site 4 - S5, W2 Impact Site 5 - S6 Z Impact Site 6 - S7, W3 cv �O Impact Site 7 - S8 Impact Site 8 - S9, S10 Impact Site 9 - S 11 Impact Site 10 - W4 Impact Site 11 - S12 Impact Site 13 - 514, S15 N Project Limits of Disturbance 853W Zone Improvements t7%CAROLINA Union County, NC WECOSYSTEMS 0101111== Miles Impact Site 0 0.25 0.5 Bakers (2013), Matthews (2013), Monroe (2013), Figure 5.0: November 2020 and Waxhaw (2013) US Geological Impact Site Index Map Survey 1:24000 Quadrangle Map WI: Temporary Impacts: 2686 Sq. ft. (0.062 acres) It W1: Permanent (Conversion) Impacts: 690 Sq. ft. (0 S 1: Temporary Impacts: 47 linear feet S2: Permanent (No Loss) Impacts: 44 linear feet / ✓ r It It It Ifr, It It �r i r It r It It / It It It It i N Map Date: November 2020 853W Zone Improvements w� Construction Limits � Wetlands p1 Feet 'v Proposed Waterline Alignment • Permanent (Comersion)Welland Impacts Revised: Union County, NC V�G ECOSY TE ® Permenant (No Loss) Stream Impact • Temporary Wetland Impacts VECOSYSTEMS 0 20 40 �Temporary Stream Impact /Ss/I'Contours Revised: Figure 5.1: Stream Channels Revised: Impact Site 1 i I S3: Permanent Impact: 98 linear feet N Map Date: November 2020 853W Zone Improvements w� Construction Limits � Wetlands p1 Feet 'v Proposed Waterline Alignment • Permanent (Comersion)Welland Impacts Revised: Union County, NC V�G ECOSY TE ® Permenant (No Loss) Stream Impact • Temporary Wetland Impacts VECOSYSTEMS 0 20 40 �Temporary Stream Impact /Ns/I'Contours Revised: Figure 5.2: Stream Channels Revised: Impact Site 2 i i i i i . I i _ S4: Permanent (No Loss) Impact: 32 linear feet v N Map Date: November 2020 853W Zone Improvements w� Construction Limits � Wetlands p1 Feet 'v Proposed Waterline Alignment • Permanent (Com"'ion)Welland Impacts Revised: Union County, NC V�G ECOSY TE ® Permenant (No Loss) Stream Impact • Temporary Wetland Impacts VECOSYSTEMS 0 20 40 �Temporary Stream Impact /�s/ I'Contows Revised: Figure 5.3• Stream Channels Revised: Impact Site 3 W2: Temporary Impact: 4017 Sq. ft. 0( 092 acres) �V / W2: Permanent (Conversion) Impact: 662 Sq. ft. (0.015 acres S5: Permanent (No Los mpact: 58 linear f�f ` i I I I I I I I I I I I I our N Map Date: November 2020 853W Zone Improvements w� Construction Limits � Wetlands p1 Feet 'v Proposed Waterline Alignment • Permanent (Comersion) Wetland Impacts Revised: Union County, NC [[G CAROLI NA ®Permenant (No Loss) Stream Impact •Temporary Wetland Impacts VECOSYSTEMS 0 20 40 �Temporary Stream Impact /Ns/I'Contours Revised: Figure 5.4: Stream Channels Revised: Impact Site 4 / �-- i i S6: Temporary Impact: 27 linear feet / / / / N Map Date: November 2020 853W Zone Improvements w� Construction Limits � Wetlands p1 Feet 'v Proposed Waterline Alignment • Permanent (Conversion)Welland Impacts Revised: Union County, NC ��6 ECOSY TE ®Permenant (No Loss) Stream Impact • Temporary Wetland Impacts VECOSYSTEMS 0 20 40 �Temporary Stream Impact /Ns/I'Contours Revised: Figure5.5' Stream Channels Revised: Impact Site 5 1 I I W3: Permanent (Conversion) Impact: 1484 Sq. ft. (0.034 acres) J S7: Permanent (No LossLImpact: 30 linear feet IMF J J I ►Imr"p'act Site 7�MatchiLine r M N Map Date: November 2020 853W Zone Improvements w� Construction Limits � Wetlands p1 Feet 'v proposed Waterline Alignment • Permanent (Comersion)Welland Impacts Revised: Union County, NC V�G ECOSY TE ® Permenant (No Loss) Stream Impact • Temporary Wetland Impacts VECOSYSTEMS 0 20 40 �Temporary Stream Impact /�s/ I'Contours Revised: Figure 5.6' Stream Channels Revised: Impact Site 6 1 1 1 1 �1 .1 :1 Rama 1 1 1 :1 'Fi r r :1 1 :1 1 / S8: Temporary Impact: 225 linear feet 1 :1 O ► -�1 1 �1 • ► 1 1 . 1 1 1 1 1 N Map Date: November 2020 853W Zone Improvements w� Construction Limits � Wetlands p Feet 'v Proposed Waterline Alignment • Permanent (Conversion) Wetland Impacts Revised: Union County, NC �G CAROLI NA ® Permenant (No Loss) Stream Impact • Temporary Wetland Impacts VECOSYSTEMS 0 20 40 �Temporary Stream Impact /ss/I'Contows Revised: Figure 5.7: Stream Channels Revised: Impact Site 7 r— t CAROLINA VECOSYSTEMS I 0 N 1 0 Lftftft -ftft 20 I :1 Feet 40 S9: Tdmporar� Impact: 36 linear feet 1 l� 1 I Map Date: November 2020 Construction Limits Wetlands Proposed Waterline Alignment • Permanent (Conversion) Wetland Impacts Revised: Permenant (No Loss) Stream Impact • Temporary Wetland Impacts Temporary Stream Impact /�s/ I'Contours Revised: Stream Channels Revised: 853W Zone Improvements Union County, NC Figure 5.8: Impact Site 8 {i J 511: Permanent (No Loss) Impact: 33 linear feet l N Map Date: November 2020 853W Zone Improvements w� Construction Limits � WeUands p1 Feet 'v Proposed Waterline Alignment • Permanent (Comersion)Wetland Impacts Revised: Union County, NC V�G ECOSY TE ® Permenant (No Loss) Stream Impact • Temporary Wetland Impacts VECOSYSTEMS 0 20 40 �Temporary Stream Impact /�s/ I'Contows Revised: Figure 5.9• Stream Channels Revised: Impact Site 9 i / / / W4: Temporary Impact: 1452 Sq. ft. (0.03�3es) W4: Permanent (Conversion) Impact: 383 Sq. ft. (0.009 acres) / / / / / / i / / fA 1 N Map Date: November 2020 853W Zone Improvements w� Construction Limits � Wetlands p1 Feet 'v Proposed Waterline Alignment • Permanent (Conversion)Welland Impacts Revised: Union County, NC V�G ECOSY TE ® Permenant (No Loss) Stream Impact • Temporary Wetland Impacts VECOSYSTEMS 0 20 40 �Temporary Stream Impact /Ns/I'Contours Revised: Figure 5.10: Stream Channels Revised: Impact Site 10 M-,qq"wj 512: Permanent (No Loss) Impact: 43 linear ►q 1 0 N Map Date: November 2020 853W Zone Improvements w� Construction Limits � Wetlands p1 Feet 'v Proposed Waterline Alignment • Permanent (Commion) Wetland Impacts Revised: Union County, NC ��G CAROLI NA ®Permenant (No Loss) Stream Impact •Temporary Wetland Impacts VECOSYSTEMS 0 20 40 �Temporary Stream Impact rContours Revised: Figure 5.11: Stream Channels Revised: Impact Site 11 �G CAROLINA VECOSYSTEMS Feet 20 40 / / / / / / / / / / / / 1 / 000 .40 �i i / / / / / / / / / / 514: Temporary Impact: 76 linear feet / / / Construction Limits � Wetlands Proposed Waterline Alignment • Permanent (Conversion) Wetland Impacts Permenant (No Loss) Stream Impact • Temporary Wetland Impacts Temporary Stream Impact ^/ I'Contours Stream Channels Map Date: November 2020 Revised: Revised: Revised: 853W Zone Improvements Union County, NC Figure 5.13: Impact Site 13