Loading...
HomeMy WebLinkAboutNC0021491_Field Notes_20201130.98 MGD; WW-3 295 Garwood Rd Fees up to date Facility: Mocksville COMPLIANCE EVALUATION INSPECTION Dutchman Creek WWTP NPDES: Permit Effective Dates: 11 /01 /201_4 .to Inspection Date: 11 /30/2020 NCO021491 06/30/2019 (renewal in draft/ received 1/2/19 Inspection Time: am/pm PERMIT Complete copy of current NPDES permit DMRs (Dates: Available SELF -MONITORING PROGRAM 11/19 Lab Data (per DMR dates) Laboratories used for analysis to 10/20 LABORATORY Statesville Analytical Chain of Custody forms (per DMR dates) Available and complete Envirolink field:5212 Influent and/or effluent samplers flow proportional I & E?? "'Both: i- 1 (150ml) every 3 pulses Eff-1(250mL everylses: Field Parameter certification # FLOW MEASUREMENT Yes March 5 2020 Flow meter calibration records 3 influent meters? Calibrated' ----- one e uent meter? Not used currently previous CEI - NOV on March 3 2Q19 chnical serviceE ` effluent and one influent meter not calibrated annually i Flow charts SLUDGE HANDLING DISPOSAL Sludge / Residuals hauling records last cei - suggestion made to track sluda cemoved from digester OPERATION & MAINTENANCE ORC current certification Robert - Back Up certification Dennis Murdock- WW-3 and Todd Robinson - WWA� Process control data (includes field parameters tested and equipment calibrations) Do each aeriation at influent and eff ends; ph at eff end of aeraton; settleomeb Generator Inspection / under load checks weekly testing?? Yes RECORDS & REPORTS Wastewater Annual Report (fiscal or calendar year -- if applicable) available?? Yes Daily Operator's log / ORC visitation log available??? Available Maintenance log Available Inflent 1 in need os service; influent 3 not operablE FACILITY SITE REVIEW Plant visual inspection of treatment units Influent flow not equally split btw trains Influent composite sampler at --9 Solid mssuesarp reSiilt of_BOD; one SIU (ChmQkQn plant got pretreatment online think nov bod arE Gas disinfection and d,-chlf-)r- wnts 02( Long term plan is fot siu to go to coo oomee. Construction projected to be complete Jan 2021 Clarifier 1-2 10; - ; One surface aerator down onduring inspec for Weir not level on cl1 EFFLUENT/RECEIVING WATERS Stream accessible for inspection (at effluent discharge pipe) Dutchman Creek in Yadkin Pee -Dee River Basin Previous CEI (Violation & Concerns -weirs on 1 st clarifier not level Return and waste pum s in clarfier 1 need replaced - circular well in clarifiers has significant sludge build-up; floating sludge and pin fpoc observed - appearence of short-circuiting. (more flow going to 1st aeration basin than other two parallel trains) -has rag screw at influent p/s been repaired? this reportedly contributed to a bypass of 1,500 gallor occurring at bar screens on 12/15/2019. No i Equipment: flow splitter box, mechanical fine screening; grit removal; flow measurements; three aeration ba it 3 secondary clarifiers; chlorination and dechlorination units; sludge recirculation and wasting; aerobic digestor; emergency generator.