HomeMy WebLinkAboutNC0021491_Field Notes_20201130.98 MGD; WW-3
295 Garwood Rd
Fees up to date
Facility:
Mocksville
COMPLIANCE EVALUATION INSPECTION
Dutchman Creek WWTP NPDES:
Permit Effective Dates: 11 /01 /201_4 .to
Inspection Date:
11 /30/2020
NCO021491
06/30/2019 (renewal in draft/ received 1/2/19
Inspection Time: am/pm
PERMIT
Complete copy of current NPDES permit
DMRs (Dates:
Available
SELF -MONITORING PROGRAM
11/19
Lab Data (per DMR dates)
Laboratories used for analysis
to 10/20
LABORATORY
Statesville Analytical
Chain of Custody forms (per DMR dates)
Available and complete
Envirolink field:5212
Influent and/or effluent samplers flow proportional I & E??
"'Both: i- 1 (150ml) every 3 pulses
Eff-1(250mL everylses:
Field Parameter certification #
FLOW MEASUREMENT
Yes March 5 2020
Flow meter calibration records 3 influent meters? Calibrated'
----- one e uent meter? Not used currently
previous CEI - NOV on March 3 2Q19 chnical serviceE `
effluent and one influent meter not calibrated annually i
Flow charts
SLUDGE HANDLING DISPOSAL
Sludge / Residuals hauling records
last cei - suggestion made to track sluda cemoved from digester
OPERATION & MAINTENANCE
ORC current certification Robert -
Back Up certification Dennis Murdock- WW-3 and Todd Robinson - WWA�
Process control data (includes field parameters tested and equipment calibrations)
Do each aeriation at influent and eff ends; ph at eff end of aeraton; settleomeb
Generator Inspection / under load checks weekly testing?? Yes
RECORDS & REPORTS
Wastewater Annual Report (fiscal or calendar year -- if applicable)
available?? Yes
Daily Operator's log / ORC visitation log
available???
Available
Maintenance log Available
Inflent 1 in need os service; influent 3 not operablE
FACILITY SITE REVIEW
Plant visual inspection of treatment units Influent flow not equally split btw trains
Influent composite sampler at --9
Solid mssuesarp reSiilt of_BOD; one SIU (ChmQkQn plant got pretreatment online think nov bod arE
Gas disinfection and d,-chlf-)r- wnts 02(
Long term plan is fot siu to go to coo oomee.
Construction projected to be complete Jan 2021
Clarifier 1-2 10; - ;
One surface aerator down onduring inspec for Weir not level on cl1
EFFLUENT/RECEIVING WATERS
Stream accessible for inspection (at effluent discharge pipe)
Dutchman Creek in Yadkin Pee -Dee River Basin
Previous CEI (Violation & Concerns
-weirs on 1 st clarifier not level Return and waste pum s in clarfier 1 need replaced
- circular well in clarifiers has significant sludge build-up; floating sludge and pin fpoc observed
- appearence of short-circuiting. (more flow going to 1st aeration basin than other two parallel trains)
-has rag screw at influent p/s been repaired? this reportedly contributed to a bypass of 1,500 gallor
occurring at bar screens on 12/15/2019. No
i
Equipment: flow splitter box, mechanical fine screening; grit removal; flow measurements; three aeration ba it
3 secondary clarifiers; chlorination and dechlorination units; sludge recirculation and wasting; aerobic
digestor; emergency generator.