Loading...
HomeMy WebLinkAbout20000007 Ver 1_Approval Letter_20040209W Ar ? ? Michael F. Easley, Governor Q ? 0 ( William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources ` 1?-- Alan W. Klimek, P. E. Director - Division of Water Quality Coleen H. Sullins, Deputy Director Division of Water Quality February 9, 2004 WETLANDS 1401 GROUP Mr. Bob Bostic 11950 Hwy 601 FE,? 2 6 2004 Midland, NC 28107 MATE f-3 SUBJECT: Approval of 401 Water Quality Certifica ion and Additional Conditions Construct sill for Shoreline Stabilization DWQ Project # 000007 (Mod #42-00) Carteret County Dear Mr. Bostic: You have our approval, in accordance with the attached conditions (WQC # 3400) to conduct the following activity adjacent to your property on the 500 Block of Oak Hammock Road in Harkers Island, Carteret County. This approval allows you to: 1. Fill 4100 square feet of open water for the purpose of constructing a 410' long granite sill with a bottom width of 10' and a top height that extends 0.5' above the normal high water elevation. This structure will include two drop down areas with 5' bottom widths and a small amount of granite placed landward of each drop-down feature; 2. Place 300 cubic yards of sand behind the sill, increasing the substrate elevation of the 10,250 square foot area by 6"; 3. Plant marsh species in 10,250 square feet of filled area. This approval is only valid for the purpose and design that you described in your completed CAMA application received by the Division of Water Quality (DWQ) on January 13, 2004. After reviewing your application, we have determined that General Water Quality Certification Number 3400 covers this activity. This Certification allows you to use your CAMA Permit when the NC Division of Coastal Management issues it. Please keep in mind that there may be additional Federal, State or Local regulations applicable to your project, such as (but not limited to) Sediment and Erosion Control, Non-Discharge and Water Supply Watershed regulations and Coastal Stormwater. In addition, this approval will expire when the accompanying CAMA Permit expires unless otherwise specified in the General Certification. This approval is only valid for the purpose and design that you described in your completed CAMA Major Permit application received by the Division of Coastal Management on January 8, 2004. If you change or modify your project, you must notify the Division (DWQ) in writing and you may be required to send us a new application for a new certification. If the property is sold, the new owner must be given a copy of the Certification and approval letter and is thereby responsible for complying with all conditions. If total wetland fills for this project (now or in the future) exceed one acre, compensatory mitigation may be required as described in 15A NCAC 2H.0506 (h). For this approval to be valid, you must follow the conditions listed in the attached certification and the additional conditions listed on the following page: N. C. Division of Water Quality 127 Cardinal Drive Extension (910) 395-3900 Customer Service Wilmington Regional Office Wilmington, NC 28405 (910) 350-2004 Fax 1 800 623-7748 ?_ ??? bE7 Page Two Mr. Bostic DWQ Project # 000007 February 9, 2004 1. Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return the attached certificate of completion to this office and a copy to the 401/Wetlands Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650; 2. No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the CAMA Major Application. All construction activities, including the design, installation, operation, and maintenance of sediment and erosion control Best Management Practices, shall be performed so that no violations of state water quality standards, statutes, or rules occur; 3. Sediment curtains shall be installed around the project area during construction. Please notify this Office at the number listed below if any problem arises during the construction of the project that may affect water quality. If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition conforming to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This certification and its conditions are final and binding unless you ask for a hearing. This letter completes the review of the DWQ Permit #000007 (Mod #42-00) under Section 401 of the Clean Water Act. If you have any questions, please telephone Noelle Lutheran or Rick Shiver at 910-395- 3900. Sincerely, Alan W. Klimek, P.E., Director Division of Water Quality Attachments: GC # 3400 Certificate of Completion cc: Coastal Federation - Tracy Skrabal Corps of Engineers Wilmington Field Office - Henry Wicker WiRO- Noelle Lutheran 401/Wetland Unit, Central Office - Cyndi Karoly CAMA - Tere Barrett CAMA Raleigh - Doug Huggett Central Files WQC #3400 CAMA PERMIT CERTIFICATION GENERAL CERTIFICATION FOR PROJECTS ELIGIBLE FOR CORPS OF ENGINEERS GENERAL PERMIT NUMBER 198000291 (ISSUED TO THE NORTH CAROLINA DIVISION OF COASTAL MANAGEMENT AND RIPARIAN AREA PROTECTION RULES (BUFFER RULES) This General Certification is issued in conformity with requirement of Section 401, Public Laws 92-500 and 95-217 of the United States and subject to the North Carolina Division of Water Quality Regulations in 15 NCAC 2H, Section .0500 and 15 NCAC 2B .0200 for the discharge of fill material as described in General Permit 198000291 and for the Riparian Area Protection Rules (Buffer Rules) in 15A NCAC 2B .0200. This Certification replaces Water Quality Certification Number 3025 issued on September 6, 1995, Water Quality Certification Number 3112 issued on February 11, 1997, Water Quality Certification Number 3274 issued June 1, 2000 and Water Quality Certification Number 3371 issued March 18, 2002. This WQC is rescinded when the Corps of Engineers re-authorizes Regional General Permit 0291 or when deemed appropriate by the Director of DWQ. The State of North Carolina certifies that the specified category of activity will not violate applicable portions of Sections 301, 302, 303, 306 and 307 of the Public Laws 92-500 and 95-217 if conducted in accordance with conditions hereinafter set forth. Conditions of Certification: 1. Activities authorized by CAMA major permits require written concurrence from the Division of Water Quality as well as compliance with all conditions of this General Certification; 2. Activities authorized by Coastal Area Management Act (CAMA) Minor or General Permits do not require written authorization from the Division of Water Quality as long as they comply with all other conditions of this General Certification; 3. In accordance with North Carolina General Statute Section 143-215.3D(e), any request for written concurrence for a 401 Water Quality Certification must include the appropriate fee. If a project also requires a CAMA Permit, one payment to both agencies shall be submitted and will be the higher of the two fees. The fee shall be collected and distributed between the two agencies in accordance with agreements reached between the Division of Water Quality and the Division of Coastal Management; 4. In accordance with 15A NCAC 21-1.0506 (h) compensatory mitigation may be required for impacts to 150 linear feet or more of streams and/or one acre or more of wetlands. In addition, buffer mitigation may be required for any project with Buffer Rules in effect at the time of application for buffer impacts resulting from activities classified as "allowable with mitigation" within the "Table of Uses" section of the Buffer Rules or require a variance under the Buffer Rules. A determination of buffer, wetland and stream mitigation requirements shall be made for any Certification for this Nationwide Permit. The most current design and monitoring protocols from DWQ shall be followed and written plans submitted for DWQ approval as required in those protocols. When compensatory mitigation is required for a project, the mitigation plans must be approved by DWQ in writing before the impacts approved by the Certification occur. The mitigation plan must be implemented and/or constructed before any permanent building or structure on site is occupied. In the case of public road projects, the mitigation plan must be implemented before the road is opened to the travelling public; WQC #3400 5. Compensatory stream mitigation shall be required at a 1:1 ratio for not only perennial but also intermittent stream impacts that require application to DWQ in watersheds classified as ORW, HQW, Tr, WS-1 and WS-II unless the project is a linear, publicly- funded transportation project, which has a 150-foot per-stream impact allowance; 6. Impacts to any stream length in the Neuse and Tar-Pamlico River Basins (or any other major river basins with Riparian Area Protection Rules [Buffer Rules] in effect at the time of application) requires written concurrence from DWQ in accordance with 15A NCAC 26.0200. New development activities located in the protected 50-foot wide riparian areas (whether jurisdictional wetlands or not) within the Neuse and Tar- Pamlico River Basins shall be limited to "uses" identified within and constructed in accordance with 15A NCAC 2B .0200. All new development shall be located, designed, constructed, and maintained to have minimal disturbance to protect water quality to the maximum extent practicable through the use of best management practices. Activities listed as "exempt" from these rules do not need to apply for written concurrence under this Certification; 7. All sediment and erosion control measures placed in wetlands or waters shall be removed and the original grade restored after the Division of Land Resources has released the project; 8: If an environmental document is required, this Certification is not valid until a Finding of No Significant Impact (FONSI) or Record of Decision (ROD) is issued by the State Clearinghouse; 9. That appropriate sediment and erosion control practices which equal or exceed those outlined in the most recent version of the "North Carolina Sediment and Erosion Control Planning and Design Manual" or the "North Carolina Surface Mining Manual" whichever is more appropriate (available from the Division of Land Resources (DLR) in the DENR Regional or Central Offices) shall be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices in order to assure compliance with the appropriate turbidity water quality standard; 10. Measures shall be taken to prevent live or fresh concrete from coming into contact with freshwaters of the state until the concrete has hardened; 11. Additional site-specific conditions may be added to projects which have applied for CAMA major permits which are proposed under this Certification in order to ensure compliance with all applicable water quality and effluent standards; 12. When written concurrence is required, the applicant is required to use the most recent version of the Certification of Completion form to notify DWQ when all work included in the 401 Certification has been completed; 13. Concurrence from DWQ that this Certification applies to an individual project shall expire three years from the date of the cover letter from DWQ or on the same day as the expiration date of the corresponding General Permit 198000291, whichever is sooner. Non-compliance with or violation of the conditions herein set forth by a specific fill project shall result in revocation of this Certification for the project and may result in criminal and/or civil penalties. WQC #3400 The Director of the North Carolina Division of Water Quality may require submission of a formal application for individual certification for any project in this category of activity that requires written concurrence under this certification, if it is determined that the project is likely to have a significant adverse effect upon water quality or degrade the waters so that existing uses of the wetland or downstream waters are precluded. Public hearings may be held for specific applications or group of applications prior to a Certification decision if deemed in the public's best interest by the Director of the North Carolina Division of Water Quality. Effective date: March 2003 DIVISION OF WATER QUALITY By Alan W. Klimek Director WQC 9 3400 DTQ P_rofect No.: Applicant: Project Name: Date of Issuance of 401 Water Quality Certification: County: Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 40I/Wetlands Unit, North Carolina Division of Water Quality, 1621 Mail Service Center, Raleigh, NC, 27699-1621. This form may be returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification I, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Agent's Certification Date: I, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: Engineer's Certification Partial Final I, , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project,for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature Date Mail to: 401 Wetlands Contact NC Dept. of Environment and Natural Resources 127 Cardnal Drive Ext. Wilmington, NC 28405-2004 Registration No.