Loading...
HomeMy WebLinkAbout20010087 Ver 1_Certification of Completion_20030924t DWQ Project No.: Ql-0087 County: aldwel I r Applicant: Caldwell Community College and Technical Institute Project Name: Career Center Expansion Facifiry Date of Issuance of 401 Water Quality Certification: June 13. 2002) Certificate of Completion Upon completion of all work approved within dte 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401/Wetlands Unit, North Carolina Division of Watc:r Quality, 1621 Mail Service Center, Raleigh, NC, 27699-1621.This form may be returned to DWQ by the applicant, the applicant's authorized agent. or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification: !> , hereby stale that, to the best of my at?litiee, due cart; and diligence was used in the observation of the construction such that the construction was c)bserved to be built within substantial eomplixnce and intern of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications. and other supporting materials. Signature: _ Agent's Certification I. l 11244S ??`???ereby state that, to the best of my abilities, due care and diligence was used in the observa ion of the construction such that the construction was observed to be built within subswntial compliance and ter; of the 40 ter Qua ity Certification and Buffer Rules. the approved plans and specifications. and other suppo itfg rials. Signature: ate: ' Z -O Xfshis_nrgject was designed by a Cerdited Professiorul 1, ,_, as a duly registered professional (i.e., Engineer. Landscape Architect, Surveyor, etc) in the State of North Carolina, having been authorized to observe (periodically. weekly, full time) the construction of the project, for the Permittee hereby state; that, to the best of my abilities. due care and diligence was used in the observation of the construction. such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications. and other supporting materials. Signature: Registration No. Date T , T :A CL :n i S'r•^g71:'J rTr- ,.on ?Mnp-aT-?,Jr ir Date: