Loading...
HomeMy WebLinkAboutNCC201441_NOT Closeout Documents_20201201North Carolina Department of Environmental Quality Land Resources: 943 Washington Square Mall, Washington, NC 27889 (252) 946-6481 County: Chowan Project: Olam Edible Nuts - Parking River basin: Chowan Person financially responsible: Seabrook Enterprises, Inc. - Drew Walton, Plant Project #: CHOWA-2020-002 Engineering Manager Address: 14187 Magnolia St., Blakely, GA 39823 1. Project Location: 130 Peanut Dr., Edenton Pictures: No 2. Weather and soil conditions: 50 degrees, sunny, dry Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): Inspection report: Sent Report 9. Corrective action needed: None. Title: Date given/sent: November 24, 2020 10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional self - monitoring or self -inspections are required. Project is released. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities should be requested by the permittee via a Notice of Termination. Reported by: Scott Graboski Others present: Date of inspection: November 18, 2020 Time arriving on site: 11:00 AM Time leaving site: 11:10 AM cc: