Loading...
HomeMy WebLinkAboutWQ0042073_Application (FTSE)_20201201.1 YR (on of Water Resources �E i Vt l State of North Carolina DEQJ WR Department of Environmental Quality 7 �1 ,�(l�l99pp Division of Water Resources A VA0& .0300 — FAST TRACK SEWER SYSTEM EXTENSION APPLICATION INSTRUCTIONS FOR FORM: FTA 04-16 & SUPPORTING DOCUMENTATION This application is for sewer exteoons`in oFt nggrav setVers, pump stations and force mains, or any combination that has been certified by a professional engineer and the applicant that the project meets the requirements of 15A NCAC 02T and the Division's Minimum Design Criteria and that plans, specifications and supporting documents have been prepared in accordance with, 15A NCAC 02T, 15A NCAC 02T .0300, Division policies and good engineerine practices. While no upfront engineering design documents are required for submittal, in accordance with 15A NCAC 02T .0305(b), design documents must be prepared prior to submittal of a fast track permit application to the Division. This would include plans, design calculations, and project specifications referenced in 15A NCAC 02T .0305 and the applicable minimum design criteria. These documents shall be available upon request by the Division. Projects that are deemed permitted (do not require a permit from the Division) are explained in 15A NCAC 02T.0303. NC Dept of Enviroouiental Quality Projects not eligible for review via the fast track process (must be submitted for full technical review): Projects that require an environmental assessment in accordance with 15A NCAC IC .0100; Projects that do not meet any pail of the minimum design criteria (MDC) document;OCT' 2 0 202U ➢ Projects that involve a variance from the requirements of 15A NCAC 2T; Pressure sewer systems utilizing septic tank -effluent pumps (STEPS) or simplex grinder pumps ➢ STEP or simplex grinder pumps connecting to pressurized systems (e.g. force mains); kaleig h Regional Office ➢ Vacuum sewer systems. General — When submitting an application, please use the following instructions as a checklist in order to ensure all required items are submitted. Adherence to these instructions and checking the provided boxes will help produce a quicker review time and reduce the amount of requested additional information. Failure to submit all required items will necessitate additional processing and review time, and may result in return of the application. Unless otherwise noted, the Applicant shall submit one original and one copy of the application and supporting documentation. A. One Original and One Copy of Application and Supporting Documents ® Required unless otherwise noted B. Cover Letter (Required for All Application Packages): ® List all items included in the application package, as well as a brief description of the requested permitting action. r0 Be specific as to the system type, number of homes served, flow allocation required, etc. ➢ If necessary for clarity, include attachments to the application form. C. Application Fee (All New and Major Modification Application Packages): ® Submit a check or money order in the amount of $480.00 dated within 90 days of application submittal. ➢ Payable to North Carolina Department of Environmental Quality (NCDEQ) D. Fast Track (Form: FTA 04-16) Application (Required for All Application Packages): ® Submit the completed and appropriately executed application. ➢ If necessary for clarity or due to space restrictions, attachments to the application may be made. ❑ If the Applicant Type in Item I.2 is a corporation or company, provide documentation it is registered for business with the North Carolina Secretary of State. ❑ If the Applicant Type in Item 1.2 is a partnership or d/b/a, enclose a copy of the certificate filed with the Register of Deeds in the county of business. ❑ The Project Name in Item II.1 shall be consistent with the project name on the flow acceptance letters, agreements, etc. ❑ The Professional Engineer's Certification on Page 5 of the application shall be signed, sealed and dated by a North Carolina licensed Professional En ineer. ❑ The Applicant's Certification on Page 5 of the application shall be signed in accordance with 15A NCAC 02T .0I06(b). Per 15A NCAC 02T .0106(c), an alternate person may be designated as the signing official if a delegation letter is provided from a person who meets the criteria in 15A NCAC 02T .0106(b). INSTRUCTIONS FOR FORM: FTA 04-16 & SUPPORTING DOCUMENTATION Page I of3 E. Flow Tracking/Acceptance Form (Form: FTSE 04-16) (If Applicable): ❑ Submit the completed and executed FTSE form from the owners of the downstream sewers and treatment facility. D Multiple forms maybe required where the downstream sewer owner and wastewater treatment facility are different. D The flow acceptance indicated in form FTSE must not expire prior to permit issuance and must be dated less than one year prior to the application date. D Submittal of this application and form FTSE indicates that owner has adequate capacity and will not violate G.S. 143- 215.67(a). D Intergovernmental agreements or other contracts will not be accepted in lieu of a project -specific FTSE. F. Site Maps (All Application Packages): ® Submit an 8.5-inch x 1 I -inch color copy of a USGS Topographic Map of sufficient scale to identify the entire project area and closest surface waters. D Location of the project (gravity sewer, pump stations & force main) D Downstream connection points and permit number (if known) for the receiving sewer ® Include a street level map (aerial) showing general project area so that Division staff can easily locate it in the field. G. Existing Permit (All Modification Packages): ❑ Submit the most recently issued existing permit. ❑ Provide a list of any items within the permit the Applicant would like the Division to address during the permit modification (i.e., permit description, flow allocation, treatment facility, etc.). H. Power Reliability Plan (Required if portable reliability option utilized for Pump Station): ❑ Per 15A NCAC 02T .0305(h)(1), submit documentation of power reliability for pumping stations. D This alternative is only available for average daily flows less than 15,000 gallons per day D It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant and is compatible with the station. The Division will accept a letter signed by the applicant (see 15A NCAC 02T .0106(b)) or proposed contractor, stating that "the portable power generation unit or portable, independently -powered pumping units, associated appurtenances and personnel are available for distribution and operation of this pump station." D If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided in the case of a multiple station power outage. (Required at time of certification) I. Certificate of Public Convenience and Necessity (All Application Packages for Privately -Owned Public Utilities): ❑ Per 15A NCAC 02T .0115(a)(1) provide the Certificate of Public Convenience and Necessity from the North Carolina Utilities Commission demonstrating the Applicant is authorized to hold the utility franchise for the area to be served by the sewer extension, or ❑ Provide a letter from the North Carolina Utilities Commission's Water and Sewer Division Public Staff stating an application for a franchise has been received and that the service area is contiguous to an existing franchised area or that franchise approval is expected. J. Operational Agreements (Applications from HOA/POA and Developers for lots to be sold): ❑ Home/Property Owners' Associations ❑ Per 15A NCAC 02T .0115(c), submit the properly executed Operational Agreement (FORM: HOA). ❑ Per 15A NCAC 02T .0115(c), submit a copy of the Articles of Incorporation, Declarations and By-laws. ❑ Developers of lots to be sold ❑ Per 15A NCAC 02T .0115(b), submit the properly executed Operational Agreement FORM: DEV . For more information, visit the Division's collection systems website INSTRUCTIONS FOR FORM: FTA 04-16 & SUPPORTING DOCUMENTATION Pare 2 of 3 THE COMPLETED APPLICATION PACKAGE INCLDING ALL SUPPORTING INFORMATION AND MATERIALS, SHOULD BE SENT TO THE APPROPRIATE REGIONAL OFFICE: REGIONAL OFFICE ADDRESS COUNTIES SERVED Asheville Regional Office 2090 US Highway 70 Avery, Buncombe, Burke, Caldwell, Cherokee, Water Quality Section Swannanoa, North Carolina 28778 Clay, Graham, Haywood, Henderson, Jackson, (828) 296-4500 Macon, Madison, McDowell, Mitchell, Polk, (828) 299-7043 Fax Rutherford, Swain, Transylvania, Yancey Fayetteville Regional Office 225 Green Street Suite 714 Anson, Bladen, Cumberland, Harnett, Hoke, Water Quality Section Fayetteville, North Carolina 28301-5094 Montgomery, Moore, Robeson, Richmond, (910) 433-3300 Sampson, Scotland (910) 486-0707 Fax Mooresville Regional Office 610 E. Center Avenue Alexander, Cabarrus, Catawba, Cleveland, Water Qualitv Section Mooresville, North Carolina 28115 Gaston, Iredell, Lincoln, Mecklenburg, Rowan, (704) 663-1699 Stanly, Union (704) 663-6040 Fax Raleigh Regional Office 1628 Mail Service Center Chatham, Durham, Edgecombe, Franklin, Water Quality Section Raleigh, North Carolina 27699-1628 Granville, Halifax, Johnston, Lee, Nash, (919) 791-4200 Northampton, Orange, Person, Vance, Wake, (919) 788-7159 Fax Warren, Wilson Washington Regional Office 943 Washington Square Mall Beaufort, Bertie, Camden, Chowan, Craven, Water Quality Section Washington, North Carolina 27889 Currituck, Dare, Gates, Greene, Hertford, Hyde, (252) 946-6481 Jones, Lenoir, Martin, Pamlico, Pasquotank, (252) 975-3716 Fax Perquimans, Pitt, Tyrrell, Washington, Wayne Wilmington Regional Office 127 Cardinal Drive Extension Brunswick, Carteret, Columbus, Duplin, New Water Quality Section Wilmington, North Carolina 28405 Hanover, Onslow, Pen (910) 796-7215 (910) 350-2004 Fax Winston-Salem Regional Office 450 W. Hanes Mill Road Alamance, Allegheny, Ashe, Caswell, Davidson, Water Quality Section Suite 300 Davie, Forsyth, Guilford, Rockingham, Randolph, Winston-Salem, North Carolina 27105 Stokes, Surry, Watauga, Wilkes, Yadkin (336) 776-9800 INSTRUCTIONS FOR FORM: FTA 04-16 & SUPPORTING DOCUMENTATION Page 3 of 3 State of North Carolina DWR Department of Environmental Quality Division of Water Resources 15A NCAC 02T .0300 — FAST TRACK SEWER SYSTEM EXTENSION APPLICATION Dtvlsion of Water Resources FTA 04-16 & SUPPORTING DOCUMENTATION Application Number: n, be completed by DWR) All items must be completed or the aonlication will be returned 1. APPLICANT INFORMATION: I. Applicant's name: Town of Angier (company, municipality, HOA, utility, etc.) 2. Applicant type: ❑ Individual ❑ Corporation ❑ General Partnership ❑ Privately -Owned Public Utility ❑ Federal ❑ State/County ® Municipal ❑ Other 3. Signature authority's name: Jimmy Cook per 15A NCAC 02T 0106(b) Title: Public Works Director 4. Applicant's mailing address: P.O. Box 278 City: Angier State: NC Zip: 27501-_ 5. Applicant's contact information: Phone number: (919) 331-6708 Email Address: jcook angiecorg If. PROJECT INFORMATION: I. Project name: Neill's Pointe 2. Application/Project status: ® Proposed (New Permit) ❑ Existing Permit/Project If a modification, provide the existing permit number: W000_ and issued date: _ If new construction but part of a master plan, provide the existing permit number: WQ00_ 3. County where project is located: Harnett 4. Approximate Coordinates (Decimal Degrees): Latitude: 35:514201' Longitude:-78.762486' 5. Parcel ID (if applicable): 0674-01-64347 0674-11-1816: 0674-19-5217 (or Parcel ID to closest downstream sewer) III. CONSULTANT INFORMATION.- 1. Professional Engineer: Mike Zaccardo License Number: 022321 Firm: Timmons Group Mailing address: 5410 Trinity Road, Ste 102 City: Raleigh State: NC Zip: 27607-_ Phone number: 219 532-3281 Email Address: Mike.ZaccardoL@,timmons.com IV. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION: 1. Facility Name: North Harnett Regional W WTP Permit Number: NCO021636 Owner Name: Harnett County Public Utilities V. RECEIVING DOWNSTREAM SEWER INFORMATION (if different than WWTF): I. Permit Number(s): WQ_ Downstream (Receiving) Sewer Size: _ inch System Wide Collection System Permit Number(s) (if applicable): WQCS00183 Owner Name(s): Town of Angier FORM: FTA 04-16 Page 1 of 5 VI. GENERAL REQUIREMENTS 1. If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached? []Yes [:]No ®N/A 2. If the Applicant is a Developer of lots to be sold, has a Developer's Operational Agreement (FORM- DEV) been attached? ❑ Yes [:]No ®N/A 3. If the Applicant is a Home/Pro ererty Owners' Association has an Operational Agreement (FORM HOA) been attached? ❑ Yes ❑No ®N/A 4. Origin of wastewater: (check all that apply) ® Residential Owned ❑ Retail (stores, centers, malls) ❑ Car Wash ❑ Residential Leased ❑ Retail with food preparation/service ❑ Hotel and/or Motels ❑ School / preschool / day care ❑ Medical / dental / veterinary facilities ❑ Swimming Pool /Clubhouse ❑ Food and drink facilities ❑ Church ❑ Swimming Pool/Filter Backwash ❑ Businesses / offices / factories [I Nursing Home El Other (Explain in Attachment) 5. Nature of wastewater: 100 % Domestic/Commercial % Commercial _ % Industrial (See 15A NCAC 02T 0103(20)) �Is there a Pretreatment Program in effect? ❑ Yes ❑ No 6. Hasa flow reduction been approved under 15A NCAC 02T .0114(f)? []Yes ❑ No ➢ If yes, provide a copy of flow reduction aooroval letter 7. Summarize wastewater generated by project: Establishment Type (see 02T.0114(f)) Daily Design Flow °" No. of Units Flow Residential 360 gal/day 208 74,880 GPD gal/ GPD gal/ GPD gall GPD gal/ GPD gal/ GPD Total 74,880 GPD a See 15A NCAC 02T 01 14(b) (d) (e)(1) and (e)(2) for caveats to wastewater design flow rates (i.e., minimum flow per dwelling; proposed unknown non-residential development uses; public access facilities located near high public use areas; and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in G.S. 42A-4). b Per 15A NCAC 02T .0I 14(c), design flow rates for establishments not identified [in table 15A NCAC 02T.01141 shall be determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data. 8. Wastewater generated by project:,7-4.880 GPD (per 15A NCAC 02T .0114) ➢ Do not include future flows or previously permitted allocations If permitted flow is zero, indicate why: ❑ Pump Station or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line ❑ Flow has already been allocated in Permit Number: ❑ Rehabilitation or replacement of existing sewer with no new flow expected ❑ Other (Explain): _ FORM: FTA 04-16 Page 2 of 5 VIL GRAVITY SEWER DESIGN CRITERIA (If Applicable) - 02T .0305 & MDC (Gravity Sewers': I. Summarize gravity sewer to be permitted: Size (inches) Length (feet) Material 8 9,298 DI, C-900 & SDR-35 PVC 'w Section 11 & Ill of the MDC for Permitting of Gravity Sewers contains information related to design criteria ➢ Section III contains information related to minimum slopes for gravity sewer(s) Oversizing lines to meet minimum slope requirement is not allowed and a violation of the MDC VIII. PUMP STATION DESIGN CRITERIA (If Applicable) — 02T .0305 & MDC (Pump Stations/Force Mains': COMPLETE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT 1. Pump station number or name: 2. Approximate Coordinates (Decimal Degrees): Latitude: . 0 Longitude: - 3. Design flow of the pump station: _ millions gallons per day (firm capacity) 4. Operational point(s) of the pump(s): _ gallons per minute at _ feet total dynamic head (TDH) 5. Summarize the force main to be permitted (for this Pump Station): Size (inches) Length (feet) Material 6. Power reliability in accordance with 15A NCAC 02T 0305(h'(I ): ❑ Standby power source or pump with automatic activation and telemetry - 15A NCAC 02T .0305(h)(1)(B); ➢ Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day ➢ Must be permanent to facility Or if the pump station has an average daily flow less than 15,000 gallons per day: ❑ Portable power source with manual activation, quick -connection receptacle and telemetry - 15A NCAC 02T .0305(h)(1)(C) or ❑ Portable pumping unit with plugged emergency pump connection and telemetry - 15A NCAC 02T .0305(h)(1)(C): ➢ It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant (draft agreement) and is compatible with the station. ➢ If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided in the case of a multiple station power outage. FORM: FTA 04-16 Page 3 of 5 IX. SETBACKS & SEPARATIONS — (02B .0200 & 15A NCAC 02T .0305(f)): 1. Does the project comply with all separations found in 15A NCAC 02T .0305(f) & (e,) ® Yes [—]No 15A NCAC 02T.0305(f) contains minimum senarations that shall he nrnviderl fnr cewrr c to - Setback Parameter* Separation Required Storm sewers and other utilities not listed below (vertical) 24 inches Water mains vertical -water over sewer including in benched trenches) 18 inches Water mains horizontal 10 feet Reclaimed water lines vertical - reclaimed over sewer 18 inches Reclaimed water lines horizontal - reclaimed over sewer) 2 feet **Any private or public water supply source, including any wells, WS-I waters of Class I or Class 11 impounded reservoirs used as a source of drinking water 100 feet **Waters classified WS (except WS-I or WS-V), B, SA, ORW, HQW, or SB from normal high water or tide elevation and wetlands see item IX.2 50 feet **Any other stream, lake, impoundment, or ground water lowering and surface drainage ditches 10 feet Any building foundation 5 feet Any basement 10 feet Top slope of embankment or cuts of 2 feet or more vertical height 10 feet Drainage systems and interce for drains 5 feet Any swimming pools 10 feet Final earth grade vertical 36 inches r 15A NCAC 02T 030560 contains alternatives where separations in 02T.0305(f) cannot be achieved. ➢ **Stream classifications can be identified using the Division's NC Surface Water Classifications webna e If noncompliance with 02T 0305(fl or (e) see Section X of this application 2. Does the project comply with separation requirements for wetlands? (50 feet of separation) ®Yes [—]No ❑ N/A Seethe Division's draft separation requirements for situations where separation cannot be meet D No variance is required if the alternative design criteria specified is utilized in design and construction ➢ As built documents should reference the location of areas effected 3. Does the project comply with setbacks found in the river basin rules per 15A NCAC 02B .0?00? ®Yes []No [--]N/A ➢ This would include Trout Buffered Streams per 15A NCAC 213.0202 4. Does the project require coverage/authorization under a 404 Nationwide or ® Yes ❑ No individual permits or 401 Water Quality Certifications? ➢ Information can be obtained from the 401 & Buffer Permitting Branch 5. Does project comply with 15A NCAC 02T.0105(c)(6) (additional permits/certifications)? ® Yes ❑ No Per 15A NCAC 02T 0105(e)(6), directly related environmental permits or certification applications are being prepared, have been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and sedimentation control plans, stormwater management plans, etc.). 6. Does this project include any sewer collection lines that are deemed "high -priority?" Per 15A NCAC 02T.0402, "high -priority sewer" means "any aerial sewer, sewer contacting surface waters, siphon, or sewer positioned parallel to streambanks that is subject to erosion that undermines or deteriorates the sewer. ❑ Yes E No ❑ N/A ➢ If yes, include an attachment with details for each line, including type (aerial line, size, material, and location). High priority lines shall be inspected by the permittee or its representative at least once every six -months and inspections documented per 15A NCAC 02T.0403(a)(5) or the permitee's individual System -Wide Collection permit. FORM: FTA 04-16 Paee 4 of 5 X. CERTIFICATIONS: 1. Does the submitted system comply with 15A NCAC 02T, the Minimum Design Criteria for the Permitting of Pump Stations and Force Mains (latest version) and the Gravity Sewer Minimum Design Criteria (latest version) as applicable? E Yes ❑ No If No, complete and submit the Variance/Altemative Design Request application (VADC 10-14) and supporting documents for review. Approval of the request is required prior to submittal of the Fast Track Application and supporting documents 2. Professional Engineer's Certification: I. Gill h�, f% name Item I11.1.) that this application for has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications, engineering calculations, and all other supporting documentation to the best of my knowledge. 1 further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer Minimum Design Criteria for Gravity Sewers (latest version), and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains (latest version). Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and have judged it to be consistent with the proposed design. NOTE — In accordance with General Statutes 143-215.6A and 143-215.613, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanorwhich may include a fine not to exceed $10,000, as well as civil penalties up to $25,000 per violation. t t t i North Carolina Professional Engineer's seal, signature, and date: j 3. Applicant's Certification per 15A NCAC 02T .0106(b): name & title Item 1.3.) 1 1 �,ZACGP�Q0`: ..................................................... attest that this application for has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. I understand that any discharge of wastewater from this non - discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties, injunctive relief, and/or criminal prosecution. I will make no claim against the Division of Water Resources should a condition of this permit be violated. I also understand that if all required parts of this application package are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete. NOTE — In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation. Signature: Date: 1L) -6 - 0W iU FORM: FTA 04-16 Page 5 of 5 a a�ve_.a v am a_a State of North Caroltua r Department of Environmental Quality Division:af Water Resources ISA NCAC 02T .0300 -FAST TRACK SEWER SYSTEM EXTENSfON`APAT I DWlslon of Water Resources FTA 04-16 & SUYPORTING IIDCCEQ>fDp WR Application Number: (to be wmpleted by DW t All items must be cam pleted or the a licatiou will be retur ed NOV 2)3 2020 963�ti.- 1. APPLICANT INFORMATION: QRO 1. Applicant's name: Town of Angier (company, municipality, HOA, utility, etc.)�{�k@11A�t4(l€I l 2. Applicant type: El individual ❑ Corporation Q General Partnership ❑ Priv -Owned Public tili6 ❑ Federal ❑ State/County Municipal ❑ Other i 1 3. Signature authority's name: Jimmy Cook per 15A NCAC 02T .01.06(b)IJ Title: Public Works Director DEQIDVVR 4. Applicant's mailing address: P.O. Box 2781311 City: Angie State: NC Zip: 27501-_ �� o 5. Applicanfscontact information: 1{�] � � Phone number: �9) 331-6708 Email Address: jcook a@angiee �'; +,/i; I y n n�,4, n, ;C cm II. PROJECT INFORMATION: w 1. Project name: Neill's Pointe H: 2. Application/Project status: El Proposed (New Permit) El Existing Permit/Project 4 If a modification, provide the existing permit number•. WQOO_ and issued date: if new construction but part of a master plan, provide the existing permit number: W000_ 3. County where project is located: Harnett 4. Approximate Coordinates (Decimal Degrees): Latitude: 35.514201' Longitude:-78.762486' 5. Parcel ID (if applicable): 0674-01-6434: 0674-11-1916: 0674-19-5217 (or Parcel ID to closest downstream sewer) HI. CONSULTANT INFORMATION: L Professional Engineer: Mike Zaccardo License Number: 022321 4357 DAN RYAN BUILDERS NORTH CAROLINA LLC 1331/420 2099 GAITHER RD STE 600 3 ��—cHfccnebgi - ROCKVILLE, MD 20850 DATE Y- THE RALEIGH PERMIT ACCOUNT - - PAY y-(/t /y /y -_r,�) p G. '^ L 1 '.,y L, TO THE �(�1 IC��I nli M l�tt�� �� 1�11,it C'^OriErJt CY� �V�-r-LI 7 �i '' a. J fn $ '�`� yIJ OFFDEn OF bund-td .,DOLLARS ill �.:.. .,� FIFLEI TrIrRD BANK KMC Ec;i� -i,-c—< a�s c-' ex+ Aran FO —C� v Page t of 5 TIMMONS GROUP YOUR VISION ACHIEVED THROUGH OURS. TRANSMITTAL TO: NCDEQ DWR - Raleigh Regional Office 3800 Barrett Drive Raleigh, NC 27609 ❑ ENCLOSED PLEASE FIND: ❑ WE ARE SENDING UNDER SEPARATE COVER: Date: 10/20/2020 Job #: 43829 Project: Neill's Pointe Reference: Copies Sent To: COPIES DATE NUMBER DESCRIPTION 1 1 Fast Track Sewer Application Incl. Flow Acceptance Form/ Certification Statement 1 2 Check for $480 1 3 Project Engineer's Report 1 4 USGS ma pt of -nv; 1 5 Vicinity Map `rat QU'2L THESE ITEMS ARE TRANSMITTED:dicl If enclosures are not as noted, please notify us at once. I`c°ioi,a( Oaice, COMMENTS: Please let us know if you have any questions or require any additional information Thank you, TIMMONS GROUP Sol Moore Project Manager (919) 866-4948 Sol.riosmoore@timmons.com fy ai rn a Oq w m 0) w E 0 V V1 0 E E DEQIDWf State of North Carolina R ��� Department of Environmental Quality Division of Water Resources 5 CAC 02T .0300 — FAST TRACK SEWER SYSTEM EXTENSION APPLICATION ;ter Resources WU�„MSI'y FTA 04-16 &SUPPORTING DOCUMENTATION >avrTr,-17;/)IIt-P=r,rnla,c,F;c.r_ p Application Number: oQ oo —)3 it(,be completed by DWR) All items must be completed or the application will be returned I. APPLICANT INFORMATION: I. Applicant's name: Town of Anuier(company, municipality, HOA, utility, etc.) 2. Applicant type: ❑ Individual ❑ Corporation ❑General Partnership El Privately -Owned Public Utility ❑ Federal ❑ State/County ® Municipal p' El Other 3. Signature authority's name: Jimmy Cook per 15A NCAC 02T 0106(b) Title: Public Works Director 4. Applicant's mailing address: P.O. Box 278 City: Angier State: NC Zip: 27501- 5. Applicant's contact information: Phone number: (919) 331-6708 Email Address: icook.(�ar ier.ore 11. PROJECT INFORMATION: 1. Project name: Neill's Pointe 2. Application Troject status: ® Proposed (New Permit). ❑ Existing Permit/Project If a modification, provide the existing permit number: WQ00_ and issued date: _ If new construction but part of a master plan, provide the existing permit number: WQOO 3. County where project is located: Harnett 4. Approximate Coordinates (Decimal Degrees): Latitude: 35.514201 Longitude:-78.762486' 5. Parcel ID (if applicable): 0674.01-6434:0674-11-1816 0674-19-5217 (or Parcel ID to closest downstream sewer) 111. CONSULTANT INFORMATION: L Professional Engineer: Mike Zaccardo License Number: 022321 Firm: Timmons Group Mailing address: 54-10 Trinity Road, Ste 102 Zip_. 2760_.. DAN RYAN BUILDERS NORTH CAROLINA LLC 2099 GAITHER RD STE 600 ROCKVILLE, MD 20850 THE RALEIGH PERMIT ACCOUNT ,ll ' atyl,nq tK-•c7t. of tny,r F;FTrRE THI ❑ 4211 , iaavzu n DATE --1 0-I _ �("l �/v CHECK pARWR y80.00 DOLLARS a 4yr BRN - pp,,- t9E �p x t ul State of North Carolina Department of Environmental Quality r� Division of Water Resources '-rMI'lon of Wm r area,,,,' Flow Tracking/Acceptance for Sewer Extension Applications (FTSE 04-16) Entity Requesting Allocation: Town of Angier NC Project Name for which flow is being requested: Neill's Pointe More than one FTSE maybe required for a single project ithe owner ofthe WWTP is not responsible for all pump stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. b. C. d. e. f. 9. h. WWTP Facility Name: North Harnett WWTP WWTP Facility Permit #: NCO021636 WWTP facility's permitted flow Aliflows are in MGD Estimated obligated flow not yet tributary to the WWTP WWTP facility's actual avg. flow Total flow for this specific request Total actual and obligated flows to the facility Percent of permitted flow used 1.008 0..3145 _5988 �, L19^ oyPnvironIIIentM Quali'tY .0748 .9881 WIN 98.0% II. Complete this section for each pump station you are responsible for along Proposed wastewater flow. List pump stations located between the project connection point and the WWTP: (A) Design Pump Average Daily Station Firm Flow** (Name or Capacity, * (Firm / pt), Number) MOD MOD (B) (C) (D)=(B+C) (E)=(A-D) Obligated, Approx, Not Yet Total Current Current Avg. Tributary Flow Plus Daily Flow, Daily Flow, Obligated Available MGD MGD Flow Capacity*** The Firm Capacity of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pi) not less than 2.5. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < 0. Downstream Facility Name (Sewer): Town of Angier NHRWWTP Downstream Permit Number: WQS00183, NC0021636 officce Page I of 6 FTSE 04-16 III. Certification Statement: I _Henry James Cook certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature of this form indicates acceptance of this wastewater flow. otgnature -(O rPL40 Page 2 of 6 FTSF. 04_1 A .S p\li.Clem of Envhorimental dlualit,/ State of North Carolina OCT ? 0 20W Department of Environmental Quality Division of Water Resources RVWv1U90-khi) M&eA pttance for Sewer Extension Applications (FTSE 04-16) Entity Requesting Allocation: _Town of Angier Project Name for which flow is being requested: Neill's Point More than one FTSE may be required for a single project if the owner of the WWTP is not responsible for tell ptanp stations along the route ofthe proposed wastewaterflow. 1. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: North Harnett Regional WWTP b. WWTP Facility Permit #: NC0021636 All flows are in MGD c. WWTP facility's permitted flow 7.5 MGD Fuquay-Varina Allocated Flow 2.60 MGD Lillington Allocated Flow 1.20 MGD Angier Allocated Flow 1.008 MGD d. Estimated obligated flow not yet tributary to the WWTP 1.451 MGD FV Obligated Flow NYT 0.684 MGD Lillington Obligated Flow NYT 0.113 MGD HC Obligated Flow NYT 0.339 MGD Angier Obligated Flow NYT 0.315 MGD e. WWTP facility's actual avg. flow 4.814 MGD FV Actual Flow 1.255 MGD Lillington Actual Flow 0.743 MGD HC Actual Flow 2.205 MGD Angier Actual Flow 0.611 MGD f. Total flow for this specific request 0.075 MGD g. Total actual and obligated flows to the facility 6.340 MGD FV Actual Avg. + Obligated Flow 1.939 MGD Lillington Actual Avg. + Obligated Flow 0.856 MGD HC Actual Avg. + Obligated Flow 2.544 MGD Angier Actual + Obligated Flow 1.001 MGD h. Percent of permitted flow used 84.50% I1. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: Page I of 4 FTSE 06-1 (A) (B) (C) (D)=(B+C) (E)=(A-D) Design Obligated, Pump Average Daily Approx. Not Yet Total Current Station Firm Flow** Current Avg. Tributary Flow Plus (Name or Capacity, * (Firm / pf), Daily Flow, Daily Flow, Obligated Available Number) MGD MGD MGD MGD Flow Capacity*** CONTACT TOFV FOR UPSTREAM SLS CAPACITY INFO SLS 120 14.4 5.76 3.021 1.302 4.323 1.437 * The Firm Capacity of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not less than 2.5. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < 0. Downstream Facility Name (Sewer): North Harnett Regional WWTP Downstream Permit Number: NCO021636 111. Certification Statement: I Steve Ward certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature of this form indicates acceptance of tAwastewater flow. Signing Official Date Page 2 of 4 FTSE 06-13 TIMMONS GRQIIJP YOUR VISION ACHIEVED THROUGH Ou��O. tL"iromnontaiQuality PROJECT ENGINEERS' REPORT 1)� ? O Project Name: Neill's Pointe Z�a(�ig. f o z011 a oniG0 Location: Angier, Harnett County, NC PIN: 0674-11-1816; 0674-01-6434; 0674-11-5217 Owners: James E. Barefoot Rebecca B. Everett Aldos Cortez Barefoot III 946 Marguerite Dr. 2012 Nakoma PI. 119 Canterburry Dr. Winston-Salem, NC 27106 Raleigh, NC 27607 Wilmington, DE 19803 Developer: Dan Ryan Builders 3000 RDU Center Dr., Ste. 202 I I III I I Morrisville, NC 27560 O FRS H C �'.. Consultant: Timmons Group `\�� C�..•OIF. ES.' •• �� ;:QP Mike Zaccardo, PE _ T 5410 Trinity Road, Suite 102_— Raleigh, NC 27607 — = Phone: 919-532-3281 EEFt PROJECT DESCRIPTION AND NARRATIVE: The proposed development is located at 1343 Chalybeate Springs Road in Angier, NC. The project proposes the construction of 208 single-family lots. The project is anticipated to generate the following wastewater flows: 208 (3-BEDROOM) UNITS AT 360 GPD = 74,880 GPD TOTAL = 74,880 GPD The proposed gravity sanitary sewer system will consist of approximately 9,298 LF of Ductile Iron, C900 and SDR-35 PVC. The new gravity sanitary sewer system will be owned, operated, and maintained by the Town of Angier, NC. E 0 0 0 M N M M M f`C D Memo To: Trent Allen From: Barbara Dunn cc: Jason Robinson & Ted Cashion Date: 10/27/2020 Re: Fast Track Application Trent, NCDEQ RRO-WQROS RECEIVED OCT 2 8 Z020 WOROS FAY'r1 ,EviLl =`REGIONA.LOFFiCC The attached Fast Track Application and Check were sent to our office. The project is in Harnett County. If you have any questions, please contact Jason Robinson or Ted Cashion at 919-791- 4200.