November 16, 2020
LETTER OF APPROVAL WITH MODIFICATIONS
XTRA Properties, LLC
ATTN: Richard Essick
158 Lucent Lane
Mooresville, NC 28117
RE: Project Name: Camp Joel Subdivision
Acres Approved: 6.00
Project ID: DAVID-2021-014
County: Davidson
City: Lexington
Address: Hege Drive
River Basin: Yadkin-PeeDee
Stream Classification: C
Submitted By: LaBella Associates
Date Received by LQS: October 23, 2020
Plan Type. New
Dear Mr. Essick:
This office has reviewed the subject erosion and sedimentation control
plan. We find the plan to be acceptable and hereby issue this Letter of
Approval. The enclosed Certificate of Approval must be posted at the job
site. This plan shall expire three (3) years following the date of approval,
if no land -disturbing activity has been undertaken, as is required by Title
15A NCAC 413.0129.
As of April 1, 2019, all new construction activities are required to
complete and submit an electronic Notice of Intent (NOI) form requesting
a Certificate of Coverage (COC) under the NCG010000 Construction
Stormwater General Permit.
rac�rt Cp.
ww,samxm---- —'o�rp
North Carolina Department of Environmental Quality f Division of Enemy, Nhneral and Land Resources
Winston-Salem Regional Offke f 450 West Hanes M l Road, Sw'te 300.1 Winston-Saim North Carolina 27103
336.77Ck9800
Letter of Approval with Modifications
XTR.A Properties, LLC
November 16, 2020
Page 2 of 4
This form MUST be submitted prior to the commencement of any land
disturbing activity on the above named project The NOI form may be
accessed at deq.nc.gov/NCG01. Please direct questions about the N01
form to Annette Lucas at Annette.lucas@ncdenr.goy or Paul Clark at
Paul. clarkC7ncdenr.gov. After you submit a complete and correct NDI
Form, a COC will be emailed to you within three business days. Initially,
DEMLR will not charge a fee for coverage under the NCG01 permit.
However, a $100 fee will soon be charged annually. This fee is to be sent
to the DEMLR Stormwater Central Office staff in Raleigh.
Title 15A NCAC 4B .0118[a] and the NCG01 permit require that the
following documentation be kept on file at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCG01 permit and the COC, once it is received.
3. Records of inspections made during the previous 30 days.
Also, this letter gives the notice required by G.S.113A-61.1(a) of our right
of periodic inspection to ensure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance -
oriented, requiring protection of existing natural resources and adjoining
properties. If, following the commencement of this project, the erosion
and sedimentation control plan is inadequate to meet the requirements
of the Sedimentation Pollution Control Act of 1973 (North Carolina
General Statute 113A-S 1 through 66), this office may require revisions to
the plan and implementation of the revisions to insure compliance with
the Act.
Acceptance and approval of this plan is Conditioned upon your
compliance with Federal and State water quality laws, regulations, and
rules. In addition, local city or county ordinances or rules may also apply
to this land -disturbing activity. This approval does not supersede any
other permit or approval.
Letter of Approval with Modifications
XTRA Properties, LLC
November 16, 2020
Page 3 of 4
Please note that this approval is based in part on the accuracy of the
information provided in the Financial Responsibility Forth, which you
provided. This permit allows for a land -disturbance, as called for on the
application plan, not to exceed the approved acres. Exceeding the
acreage will be a violation of this permit and would require a revised
plan and additional application fee. You are requested to file an
amended form if there is any change in the information included on the
form. In addition, it would be helpful if you notify this office of the
proposed starting date for this project. Please notify us if you plan to
have a preconstruction conference. Your cooperation is appreciated.
Sincerely,
ack Dalton
Assistant Regional Engineer
Land Quality Section
Enclosures: Certificate of Approval
NCGOS Fact Sheet
Modifications Required for Approval
cc: LaBella Associates WSRD
ATTN: Paul Stimpson
939 Burke Street, Suite H
Winston-Salem, NC 27101
Letter of Approval with Modifications
XTRA Properties, LLC
November 16, 2020
Page 4 of 4
MODIFICATIONS REQUIRED FOR APPROVAL
Project Name: Camp Joel Subdivision
Project ID: DAVID-2021-014
County- Davidson
1. Be advised the 7/14-day soil stabilization requirements apply to any section
of the project where land -disturbing activities have temporarily or
permanently ceased and shall supersede any less stringent stabilization
requirement on the plans. [G.S. 143-215.1
2. Additional measures may be required - The applicant is responsible for the
control of sediment on -site. If the approved erosion and sedimentation
control measures prove insufficient, the applicant must take those
additional steps necessary to stop sediment from leaving this site. 115A
NCAC 46 .0115]
Ref: G.S. 113A-54.1 through G.S. 113A-57
Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504
General Permit N C G 010000 NPDES for Construction Activities