Loading...
HomeMy WebLinkAbout20180007 Ver 2_I-3802B permit cmpletion forms_20201125 PAT MCCRORY Governor DONALD R. VAN DER VAART Secretary Environmental JAY ZIMMERMAN Quality DWR Director NCDWR Project No.: 1)-10[ — 1 Q14-( County: )t..kik Applicant: Ino- SJc Project Name: T-� � fJv?�c,•ks Date of Issuance of 401 Water Quality Certification: _._1 - 4G '2-0. ...l.6........_._. Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules,and any subsequent modifications,the applicant is required to return this certificate to the 401 Transportation Permitting Unit,North Carolina Division of Water Resources, 1617 Mail Service Center,Raleigh,NC,27699-1617. This form may be returned to NCDWR by the applicant,the applicant's authorized agent,or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification \ CA.lt s S ,hereby state that,to the best of my abilities, due care and diligence was use II�th o e ation of the construction such that the construction was observed to be built within substantial compliance a intent of the 401 Water Quality Certification and Buffer Rules,the approved plans and specifications nd otl r supporting materials. 11 '' Signature: Date: J� � llJv_. Agent's Certification I, ,hereby state that,to the best of my abilities,due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules,the approved plans and specifications,and other supporting materials. Signature: Date: Engineer's Certifkatioir Partial Final I, ,as a duly registered Professional Engineer in the State of North Carolina,having been authorized to observe(periodically, weekly, full time)the construction of the project for the Permittee hereby state that,to the best of my abilities,due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules,the approved plans and specifications, and other supporting materials. Signature _ Registration No. Date Nothing Compares State of North Carolina I Environmental Quality 1611 Mail Service Center I Raleigh,North Carolina 27699.1611 919-707-9000 Action ID Number: SAW-2016-02325 County: Rowan Permittee: North Carolina Department of Transportation Philip Harris III Project Name: NC DOT I-85 reconstruction /widening Exit 68 to SR 1308 Div 9 Rowan Co. TIP I-3802B Date Verification Issued: November 21,2016 Project Manager: John Thomas Upon completion of the activity authorized by this permit and any mitigation required by the permit, sign this certification and return it to the following address: US ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Attn: John Thomas Raleigh Regulatory Field Office 3331 Heritage Trade Drive, Suite 105 Wake Forest,NC 27587 Please note that your permitted activity is subject to a compliance inspection by a U. S. Army Corps of Engineers representative. Failure to comply with any terms or conditions of this authorization may result in the Corps suspending, modifying o• revoking the authorization and/or issuing a Class I administrative penalty, or initiating other appropriate legal action. I hereby certify that the work authorized by the above referenced permit has been completed in accordance with the terms and condition of the said permit, and required mitigation was completed in accordance with the permit conditions. Signat c f Pe tte ate