November 12, 2020
LETTER OF APPROVAL WITH MODIFICATIONS
Bellsouth Telecommunications, LLC CT Corporation System
ATTN: Michael B.-Wiggin 160 Mine -Lake Ct, Ste. 200
One CNN Center, 1424C Raleigh, NC 27615
Atlanta, GA 30303
RE: Project Name: AT&T.Lexington, NC (A01VEC4)
Acres Approved: 2.5
Project ID: DAVID-2021-012
County: Davidson
City: Lexington
Address: Old US Hwy 52 to Happy Hill Rd
River Basin: Yadkin-PeeDee
Stream Classification: C
Submitted By: Apex Companies, LLC and Subsidiaries
Date Received by LQS: October 19, 2020
Plan Type: New
Dear Mr. Wiggin:
This office has reviewed the subject erosion and sedimentation control plan.
We find the plan to be acceptable and hereby issue this Letter of Approval. The
enclosed Certificate of Approval must be posted at the job site. This plan shall
expire three (3) years following the date of approval, .if no land -disturbing
activity has been undertaken, as is required by Title 15A NCAC 413.0129.
As of April 1, 2019, all new construction activities are required to complete and
submit an electronic Notice of Intent (NOI) form requesting a Certificate of
Coverage (COC) under the NCGO10000 Construction Stormwater General
Permit.
D_E North Caroftna Department of Em tronmental (7iiality I DMsion of Energy, m1nerai and land Resources
Winston-Salem Regional Office 1 450 Hanes hIDl Road State 3001 Winston-Saem, North Carolina 27103
33(L776.9800
Letter of Approval with Modifications `
Bellsouth Telecommunications, LLC
November, 12,2020
Page 2 of 4
This form MUST be submitted prior to the commencement of any land
disturbing activity on the above named project. The NOI form may be accessed
at deq.nc.gov/NCG01. Please direct questions about the NOI form to Annette
Lucas at Annette.lucas@ncdenr.gov or Paul Clark at Paul.clark@ncdenr.gov.
After you submit a complete and correct NOI Form, a COC will be emailed to
you 'within three business days. Initially, DEMLR will not charge a fee for
coverage under the NCG01 permit. However, a $100 fee will soon be charged
annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in
Raleigh.
Title 15A NCAC 413.0118(a) and the NCG01 permit require that.the following
documentation be kept on file at the job site: -
1. The approved E&SC plan as well as any approved deviation.
2. The NCG01 permit and the COC, once it is received.
3. Records of inspections made during the previous 30 days.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of
periodic inspection to ensure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance -oriented,
requiring protection of existing natural resources and adjoining properties. If,
following the commencement of this project, the erosion and sedimentation
control plan is inadequate to meet the requirements of the Sedimentation
Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through
66), this office may require revisions to the plan and implementation of the
revisions to insure compliance with the Act. .r .
Acceptance and approval of this plan is conditioned upon your compliance
with Federal and State water quality laws, regulations, and rules. In addition,
local city or county ordinances or rules may also apply to this land -disturbing
activity. This approval does not supersede any other permit or approval.
. Letter of Approval with Modifications
Bellsouth Telecommunications, LLC
November 12, 2020
Page 3 of 4
Please note that this approval is based in part on the accuracy of the
information provided in the Financial Responsibility Form, which you
provided. This permit allows for a land -disturbance, as called for on the
application plan, not to exceed the approved acres. Exceeding, the acreage
will be a violation of this permit and would require a revised plan and
additional application fee. You are requested to file an amended form if there
is any change in the information included on the form. In addition, it would
be helpful if you notify this office of the proposed starting date for this
project. Please notify us if you plan to have a preconstruction conference.
Your cooperation is appreciated.
Sincerely, ._ ...... , .. .
Jack Dalton
Assistant Regional Engineer
Land Quality Section
Enclosures: Certificate of Approval with Modifications
NCG01 Fact Sheet
Modifications Required for Approval
cc: Apex Companies, LLC and Subsidiaries WSRO
ATTN; Carlie Giannioto, Asst. Project Manager
5900 Northwoods Business Parkway, Suite. 59000-0
Charlotte, NC 28269
Letter of Approval with Modifications
Bellsouth Telecommunications, LLC
November 12, 2020
Page 4 of 4
MODIFICATIONS REQUIRED FOR APPROVAL
Project Name: AT&T Lexington, NC (A01VEC4)
Project ID: DAVID-2021-012
County: Davidson
1. Be advised the 7/14-day soil stabilization requirements apply to any section
of the project where land -disturbing activities have temporarily or
permanently ceased and shall supersede any less stringent stabilization
requirement on the plans. [G.S. 143-21S.1]
2. All. potentially affected property.owners must be notified prior to utility
construction even though the activity is covered under an easement.
[6.S.113A-54:1(a1)] .f
3. Additional.measures may be required - The applicant is responsible for the
control of sediment on -site. If the approved erosion and sedimentation
control measures prove insufficient, the applicant must take those additional
steps necessary to stop sediment from leaving this site.
[15A NCAC 413.0115]
Comments:
1. Please do not reference the North Carolina Erosion and Sediment Control
Planning and Design Manual in lieu of including details, installation and
maintenance specifications on your plans. [G.S. 113A-57(3)]
Ref: G.S. 113A-54.1 through G.S. 113A-57
Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504
General Permit NCG 010000 NPDES for Construction Activities