Loading...
HomeMy WebLinkAboutNCC202158_NOT Closeout Documents_20201201North Carolina Department of Environmental Quality Land Resources: Systel Building, 225 Green Street, Suite 714, Fayetteville, NC 28301-5094 (910) 433-3300 Blackbridge Subdivision Phase Two Lot County: Cumberland Project: 3 River basin: Cape Fear Person financially responsible: Caviness Land Development, Inc. - Watson G Project #: CUNME-2020-139 Caviness, President NCC202158 Address: 1041 B Robeson Street, Fayetteville, NC 28305 1. Project Location: Narrow Pine Court, Rockfish Pictures: No 2. Weather and soil conditions: Dry, workable soils Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): No one Inspection report: Sent Report 9. Corrective action needed: Title: Date given/sent: November 30, 2020 10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is in compliance with the SPCA and released. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities should be requested by the permittee via a Notice of Termination_ Please note that this correspondence must be uploaded as part of completing the Notice of Termination process. Reported by: Melissa Joyner Others present: Date of inspection: November 25, 2020 Time arriving on site: 10:50 AM Time leaving site: 11:00 AM cc: