Loading...
HomeMy WebLinkAbout20091105 Ver 1_Site Plan_20100809 SA CITY OF SANFORD NORTH CAROLINA 1z B I G B U F FA LO WASTEWATER TREATMENT PLANT 12 MGD EXPANSION US Army Corps o Engineers Section 404 Permit Application - Nationwide Permit No . 39 NCDENR Division of Water Qua ............... 401 Water Quality Certification Application BIG BUFFALO WASTEWATER TREATMENT PLANT 87 24 N 42 /ee Q 41 421 SANFORD 2 1 o 1 2 4 SCALER MILES LOCATION MAP HAZEN AND SAWYER Environmental Engineers & Scientists 4011 WeslChase Blvd, Raleigh, North Carolina 27607 .................. NO—TFS I THE ORIGINAL STREAM DELINEATION BY WITHERS & RAVENEL IS BEASED ON A REPORT ISSUED ON AUGUST 19, 2005 USING DATA GATHERED DURING A SITE VISIT ON AUGUST 6, 2008 2 PERENNIAL, INTERMI ITENT/UNIMPOR TANI STREAM DETERMINATIONS ARE BASED ON A SITE VISIT WITH ARMY CORPS PERSONNEL AND A REPRESENATIPIL OF AXIOM ENVIRONMENTAL ON SEPTEMBER 16, 2009 3 100-YEAR FLOOD ELEVATIONS ARE BASED ON FEMA FIRM PANEL 3710963500K VAIN AN EFFECTIVE DATE OF FEBRUARY 2, 2007 INTERMITTENT/UNIMPORTANT STREAM 213 FT, (SEE NOTES I & 2) NON-404 DRAINAGE DITCH, NOT CONNING TOWARDS LIMIT 63 FT (SEE NOTE 2) SITE-LE GE N Q NEW EXISTING PERENNIAL STREAM - 59 FT (SEE NOTE 1) BUILDING/STRUCTURE PREVIOUSLY DISTURBED PERENNIAL STREAM 73 FT ASPHALT ROAD (36'GOP CULVERT, SEE NOTE 2) RESURFACED ASPHALT ROAD MORNING 810097.8 .......... CONCRETE CURB 18745521, AND CUTTER CONCRETE STRIP CURB $099412.6 CONCRETE PAD/PAVING EASSNA 18744653 PROPERTY LINE, TV CONCRETE SIDEWALK NORTHING: 8099485 LAB EASTING, 1874422 6 300 CONTOUR Form ISING SPOT ELEVATION NORTHING: 809629-0 PROPERTY LINE EASING, 1574376.4 CONSTRUCTION LIMITS FENCE 100 YEAR FLOODDLAIN, TYP TREELING APPROXIMATE (228,8 NGVD 29, SEE NOTE 3) WATEIT R A'S YARD PIPING BAR 5ANN 1&2 MANHOLE (IRVING CLARIFIER k, YARD/CURB INLET AERCATIC FLARED END SECTION r. STORM DRAIN LINE AEROEGG !;LODGE B INTERMITTENT/UNMIMPORTANT STREAM 'STORAGE CLARIFIER 2 TANK I UNIT BASIN 3 A,4 N6N-404 DRAINAGE DITCH, NOT COOKING TOWRADS LIMIT Ruva 1HUU"' PERENNIAL STREAM SLUDGE PERENNIAL STREAM, PREVIOUSLY DISTRUBED 5 TOWAGE CIPARIFFER 3� INAK 2 Sent COLLECTION/ESIST' IIELIJUNT PUMP 5TATKFN EROSION-CONTROL LEGEND OLD TRITUENr. PUMP'STATION SILT FENCE SCNEfFiS � STABILIZED OUTLET CONTROL FOR SILT FENCE BOY TEMPORARY DIVERSION SWALE OOR A' GRAVEL CONSTRUCTION ENTRANCE/EXIT— 'W. ,A an FILTRATION TUBE CHECK DAM YARDYACURB INLET SEDIMENT CONTROL OVERALL SITE PLAN 1, PRELIMINARY DRAWINGS-NOT RELEASED FOR CONSTRUCTION I.............................................. DESIGNED .............A� CITY OF SANFORD THE SCALE BAR DATE JULY 2010 SITE WORK SHOWN BELOW HAS'BE' 32039-000 .................. DRAWN; ffiZENffiD SOM NORTH CAROLINA MEASURES ONE NUMBER ——--------------- Environmental Engineers&Scientists CIVIL INCH LONG ON CONTRACT DRANFUNO ...............- CHECKEID BIG BUFFALO THE ORIGINAL NUMBER WONDER —z. 4011 WestCho,�e Boulevard., Saito 500 DRAWING 07 20ID 401,14 IT RE-SUFARTRUL MAIN BACK Rcleiqh, North Carolmo 2/60/ WASTEWATER TREATMENT PLANT OVERALL EXISTING CONDITIONS CIO 04 IT Vit..' - SUBMITTAL AD t tcense C-OMI FLAT NUE .......... 7P—PR6�iii EXPANSION TO 12 MOD :j F T£3TA�. L941TS OF DISTIJRBANC E - 27 35 A AREA I AREA EaNLIZATKO4 TANK ' g 3 r r { +' tW � 4 F �Do � m4ERALUN! BLOWER iDO NEAR•ft PLAXA,T5'.'� .. r... ;.�.. .... F .... r.. ...�' r•r CZZ, now lift}... ... 4*.. wa r r - •. % witRA RL _ pry �x SIORACE H TIARA ANK¢_ .IE r sr j p souaC _? lFr* Efr,Y f' 1 I. #taf2 EfiA+rCa 5, . d 0"N tie aLinfl fUr NO f w: 50" 11[ E � (CLAP CRcr E�a.[.EE3IC[r;AmsT -r, >ti ', : , ,.. 4 ,1 t r! +- , l [a '} SACS IktFr.4m :SCREENS • ., .�rvt r AREA 3 AREA 4 n OVERALL SITE PLAN PRELIMINARY DRAWINGS-NOT RELEASED FOR CONSTRUCTION -- EE IE � CITY O S A N F O R NEwA4�BAR SITE 1 CiA"A ...®.. NORTH CAROLINA No EASURES 001 NUMBER .......— ERVtranmental Eftolneers 6 Scisausts ". f SCFEfAs.TS a} Et} #{�IEE... a• ;S'r. F CIVIL WI}RCa14`A xk:#'x CONTRACT QRA G CHECKER AL RUPPoL NUMBER ¢UMKR 4011 v'Xs(a [ F mHillN' , L�$ ; 'C WASTEWATER TREATMENT PLAN` OVERALL PROPOSED CONDITIONSC 0aT ff aS R T RE-SVSAXTCAL 401fX04 PERAr StAKFTTAt --F EXPANSION TO 12 MGM 'ti�tk{;SY{r#$'F• �;'''z#}t.Yt-&i.••%$'st lfr?'a"{Fi%"td'kf e',ry['.r{t{b4,'d':.ant£�3t#fi a'a�: �t3-?strvx,.7-...{•* r RIM - 23725 NEW TREE LIKE. TYP INVERT (IN) - 233.AO INVERT (OUT) w 213.40 RIM - 2500 ------ INVERT IN � 234,60 UJI INVERT (OLT} m 2.34 70 RIM � 24750 INVERT, (IN) = 23380 INVERT (IN) = 236,00 INVERT (OUT) - 233,70 APPROXIMATE LIMITS OF RIM � 24CL50 DISTURBANCE, Typ jwkv (ID) w 231.10 INWITT(OUT) m 23CL9 NEW 6' TALL CHAIN —-—-—- -—-—-— LINK FENCE, TYR -----------7­ SIR � 241 50 INVE A I (IN) = 230,60 11J1111A INVERT(IN)= 212,40 1 7e.' RrP YARD INLET, TYR INVERT (CUT}:- ME RNA v 243,00 CLARIFIER 5 INVERT (IN)m 229,95 [MYER (OU 1) m 22C 85 CURB CU & CUTTER, TYP 7 RIM 243,00 INVERT (IN) = 235.50 p__ 4' AIDE SIDEWALK, TYR i Fox-} RAS PLIVP INVERT (DO T) = C%AO 77, STATION BAY = 242,50 ............. INVERT (IN) m 236,00 CURB INLET. TYR INVERT (QUI) � 235.90 ,RIM = 241J5 7, 42 INVERT(RO = 23300 DENITR(FICATION INVERT`(SIT = 22990 FITTERS INVERT(OUT):= 225 80 _P',Nt n 254,00 INVERT {IN} w 235,95 UY FACILITY =. CLARIFIER 4 INVERT (OUT) = 23580 TROjAN RIM = 24T 50 LNVYRT UVUT� 25700 SlORMINATIER MANHOLE, TYR RIM 243,00 INVERT (DO 7) u 2 V,20 ium rtYPOCHLERITE FACILITY X-vzt 75 ;TEW ASPHALT PAVEMENT- TYR Rim 23900 C3 INVERT (IN)= 227 AD RESURFACED ASPHALT INVERT (DOT) = 27C50 13 PAVEMENT, TYR LABORATORY FILTERS BUILDING TIA RE C06TCADONS MODIFICATIONS RIM 23700 INVERT(IN) : 227 35 INVERT(O}T) 227 23 MAINTENAN MODIFICATIONS _100 YEAR FLOROPLAIN, TYR 3' NOE CONCRETE CHANNEL (228,76 NOVO 79) TO DIRECT STORMWATER FLOW FROM ROADWAY 10 NEW DROP INLET WEST ar-UP FACILITY PARTIA AREA 1L PLAN J'� 40' PRELIMINARY DRAWINGS NOT RELEASED FOR CONSTRUCTION ............. CITY OF SANFORD SITE WORK Awr SCALE OAR SITE JULY 2010 ........ SHOWN EIFUIW HAS 1013 320 39—ow -—---- .................................—— DRAM ffiZEN AND SAWM NORTH CAROLINA MEASURES ONE NuwXR ....................... toviroomentill Engineers a sojeftlists CIVIL RAK 011"ON COMIRAC DRAWN0 BU FALO ............ ---------.............. BIG F THE IN T INERAL NUMBER WINNER 4CIi wvl�,,huw ftO�,qro. SuRt %110 PROPMO CONDITIONS - AREA I DRAWK WASTEWATER TREATMENT PLANT C21 ........... PANSION TO 12 MOD LEV ............ BY APPROVID, EX r REM 244 00 INVERT(IN) G 237.00 INVERT(OUT) 7 235,60 d CURB IRLET� TYTx i 2a35 F V * i i TO RfiTTFQSED T31I}RETENTI{}N: F . CELL, SEE SHEET TTI } 15` MR GERRE55EW CURB �� } FOR SIGRALMATER TO FLOW t ENTR IBORETENTiON CELL w x: t RIM = 245 00 � , d: + n „ ..h.n� w a,f,a.�-.,a_r� .,r +.._}a k ru wv+.; +•,t„ x — R- RIVERT(ONT) 23q E.D ri c .'F5,? NY k PROPOSED SWALE TO INSTALLED WITH '{}TE%TILE LINER DUMP {F2$7TtId STATION # _ 6 " x, k a d , NEW ASPHALT PAWMENT, TYR $m� % t EtEIJAT.i£ATItXs' TANK PROPOSED SWALE TO Mom. INSTALLED WITH GROIEXTIL£ LINER r m hI Lu uj FS d a _ ryjrp _a d RR MO TREE LINE, YR LIMITS OF DISTURBANCE, TYR CURB & RATTER, TYR ERICN q NEW E' TALL CHAIN LINK FENCE, TYR rl T2L7NI# s # 7 12 ALLRA CARBON EiI }V c T BUILDING i E EY Ai TYR t = c 4 , t. [XXA t ..• to � .. " # J, RESURFACES ASPHALT AREA-1 ft PAVEMENT TYS �. AREA-3 AREA-4 ,n PARTIAL PLAN AREA MATCH LINE,SEE PRELIMINARY DRAWtNGS4 NOT RELEASED FOR CONSTRUCTION CITY OF SANFORD ®....._ of cNLo __. RATE JULY 2010 tFSE��A�e�� SITE WORK SHOWN BTt{Iw nas ANT 32435-000 ........ DRAWN NORTH CAROLINA A(CAILARE5 ONI POURER _ ..: .......I Enotortmenlai En NATRI s A STIMIA SIS CIVIL INCH LUNG ON .OsNacT Op o T SIG BUFFALO CHECKER �5' 4011 4 e5t r Is® evaIc n F wile TM DRAWING rtaG Nu�RFP �u�Et t ;I . 3I}5"a0t€�{Rwr IF'-c8erii �s PTA E 2 A TE1/AfE TREATMENT PLANT PROPOSED CONDITIONS AREA C22 t kflj•••• 9 dk 4¢e F {AaiFL Ei eIT[AC Ek7S M en T F,SR, R5 f F v "nrF —SLIED F BY APPROVED EXPANSION T 1 m '.'.'StG:Prn',5;til :�%..}fi'�j#®kx?t 5iv_`}ut•�{t{Frit.n✓.+`t£.%..-,.��tl..,m t*a�Y'am#3..A:,e%?3t"r..y L%tSkS...`{1W�eM1: E:. m MATH UK,SEE 1 INVERT TO*,"+tND FILTER- 733,90 4" RCP INVERT (IN) 733.30 STRIP CURB TO ALLOW FOR SHEET FROM f OAETWAUY, TYr'... INVERT (0071 22560 Am SM0 SsCtEwAF.n.; TYFf A INVERT (M) - 726,50 wASHwAaER t RECLAIM TANK PROPOSED SA33FF FILTER. SEE SKEET 02SLUDGE �x t' STORAV NEXT LT INVERT 23328 ." r"� ... 'Pxia 3 :,. PAVEkAE�iT�T'S'F�.. 7 r ,d� 7)25S 3iSI 100 YEAR FLOODPLAO I't'F J v PROPOSED TREE FINE, C 5 J/ �Zx Sk DG' � F tCUTTER, SkF kTtCf SfCR s . tt7d NEW 5' TALL CHAIN LINK FENCE, Txa a AEROBIC 9 a P #iTVERT 243,01 ':m P SLUDGE APPROXIMATE LIMITS a �� y A STORACI TANK t 10, An F DEPRESSED TO ALLOW CUSS OF DISTURBANCE, TTO '6•f'�f *T'� `v �'� tf` • P ELETW To EKEExTtNt;INLET GINE GENERATOR 1 j SLUDGE ELECTRICAL ................_ y,�r THICKENING BUILDING I STRIP CORE 10 ALLOW FOR SHEET FLOW RESURFACED ASPHALT PAVEMENT. TYR SO STCtR GE AGE T525ISDt TANK 2 "NK [tFECTRfCAL BUILDING i 7 :. .: ... GRIT#tACVClEICtIC; #f5.'{TCF#CATl5�3T5 UJ OLD mFLK[NT w t PUMP. STATION SG £E 3t',5 ARE: ' FINE SGR£CPIS I3511WEt4 RON BOX,. WO# x PARTIAL PLAN — AREA 3 T•> 4W PRELIMINARY DFAWIN -NOT RELEASED FOR CONSTRUCTION . .. .... .. .... .... Reg _..R....m..... CITY OF S A�N F Q R D �P�S AtF RAW f A+E �� ��� <, SITE RC WANN tO W 3243�-dflE ......... DRAWN k NORTH AII IA&SURT` N WINTER T' s Eftvitnn�ssntst Eng6nostc&Scientists INCH k A ry mTtt: Ve EcutE• r It BIG BUFFALO I�i� CktUmDER EB u �.5.n C�ILM1 RF• 6J : THE CFkt�dt#N.. #a R dvtit'�fR F 2S}if� dpt d{}4 iA s i3T#i. kAtS WYt7,I tPwC,'$ I.,�4S, DRA117T.`�.. _._ _n Klima, _ar#P, Co' f _ 6137 WASTEWATER TREATMENT PLANT PROPOSED CONO I — AREA 3 C23 xtI#Js...-' AIT 8y fAk ws" ffkaT F.E .. ' v..." A "''+ E �E � f ; t5.. EXPANSION T 1 GD f,; 3,05v.Sit 3."eI MATCH LINE,SEE P.E sAa 14Gt, CHAIN CE�aK FEtkCG, txl — k— Eat I � 4-, r .. ..... : xt! .,� fix:- ...p::.*ly., itAS ARNO q P STATOR r ........ ................. ...._® .®.._... .. t X ! k•.t t lCe ,rE EfE rr,i;.el.x .t,'w 15" Fit,[ t.vt*:;. r' TEND BASIN I MODIFICA7 S ...... .........:_......... .. ---- Rt*c� m .. S t,r>ia,l4Sh...� FkrFt�i�' IAT END BA,skPi S } SIDEWALK, TYR PAVEMENT, TYE' � {i i7R En : A BL6G ..... 43 A'A S w { a BFdai LiA51N 3 r' r CLARIFROR i R s .....^ ....... rat r 4ErA tSI ::I. >:IMCATIONS ... MOD BASIN A '. *r '. ,..,I . ,,,.�...,;. ,s,.... 3 x 40' NICE DEPRESSES la, _._ CURB FGR FLOW INTO STORM DRAINS t• twt+o-�Akl Ilk cc ,,. STENR CURB SWU BE 441AttED WOOD SOUTH ONE V NARRATOR ROARWAY.TO ALLOW FOR SHEET FLOW FROV PLOT "' _....... �.� .,._........ _....... : .t t..vF T z4k7,- — Fvm 4'. i GEN e ! ! y t . I {}2gAkkk# ! SEDIMENT AND DEBRIS ! SHALL BE REMOVE I} F#P{kP,a1 �. i EXISTING RIP RAP>�C(T E7 �__ �4, .. ®,s,t 3v PA t: LIM115 OF D15TURRANCE, TYR PARTIAL PLAN - AREA ma—KEY PAVEMENT, tYP NEW ASPHALT 1XEiEA1 AREA-2 .' FEA- . t'AARE�A.^4..3: CURB & GUTTER, TOP PRELIMINARY DRAWINGS—NOT RELEASED FOR CONSTRUCTION .. CITY SANFORD HE,GALE BAR , JKY 20t0 ......... gRA ... RVEN�S NORTH AROL.INA ATE w��� MtrA BELOW, E NV*VKR 32039-000 ........ CHECKED tC .... Environmental Engineers &scientists t; t G1 VIA INCH INTO ��PRACP EtRawAC c. ,: {f7...04k3 +dP74 dnA r+tR"43aT —S hli'ttA 5d 011 r.,stM'ti e E4 ,gt-+5rrt S. Ht.:'t1,.�, 13I [:a AB., YPIE T7ftt t AI. R#kiF,=rSCR PFUi,rF(ER RSLFX R I�l I o,a: r, 4[ti wflr ,U V tit F WASTEWATER TREATMENT PLANT PROPOSED CONDITION _ AREA;: DRAWER �.. fQ*� } A{E4f4n§€'ERt6tP 4#It PALL t 5- x ISSUED F By4ci 4 k.txs.rSP t t,=�B EXPANSION TO 12 MQDrw fkc �it4i�.•.. ,,nk =;:x3,.wr.B,YSt.St,}}b..twS+'�kj.#dW.Y_51{R#m'tr.ix iM'R^r,+tnf iv4at{uc {t DOES 0 To CONSTRUCTION OR LAND DISTURBANCE ACDNTSS VISIT SENN UNTIL ALI,EROSION CONTROL Lu VEASIORES HAVE BEEN INSTALLED IN LOCATIONS AS SHOWN 0N INS CONTRACT DBAYINGS Lu SONTRACUER KOTARELL 10 MoNFLAIN ALL CONSIRUCTIR4 TSTFNTRR WINK!LOANS OF DISTURBANCE AS SHOWN ON W CONTRARY DOWNER Lu z I ALI DISTURBER AREAS LEFT EXPOSER SHALL,WITHIN 211 CALENDAR RAYS OF COWNUION OF I;I ANY PHASE Of SSAOINO.BE PLANTED OR 01HERASE AROMATIC)A"� IIALITTSTAMY MOUNT) COVER,DEVICES,CA STRUCTURES SOFINCIENT TO RESTRAIN EROSIOR R. 'AL- BE I'LANTIFT!N� I CA PERMANENT AROUND COVER SUFFICIENT TO RESTRAIN EROSION � OTHERVITS WA NOT INDIAN Tt DAYS FOLLOWS(AMPEEDIRS OF CONSTRUCTION OR DEVELOPMENT,MY THAT PORTION OF THE TRACT NNSTURRED AREA)UPON ATSCH I'DRUAR ArTlAf CONSTROEDIDN WIT,MIN BE TAKEN 5. SO PENCE SHALL ED CLEANED WHEN ETTAVENI VOLUME REACHES 112 Of TNITL VOLUME OF mEACSS D. ALL EROSION CONTROL MEASURES'SHALL REMAIN IN PLACE UNAL CONSTRUCTION IS COMPLETE AND PERMAREN,VURThRON*ESTABLISHED ON ALL LASTURERIC AREAS 7 LLOWTRACTOR SMALL RT-VISETAIE NCIURSED AREAS IN ADCORDAIG TO THE SEENNE,SCHEDULE DO WRAP,*07 AND AS PER WEVOICATION 02910-FINAL ERANNO AND LANDSCAPING A OR CONTRACTOR SMALL PROVIDE ADDITIONAL STABILIZED OUTLETS FOR SILT FENCES(RETAIL A 022724)WHEN EST FENCES ARE LOCATED IN LOW LFING AREAS NOT LAUSIRAlCIT AN PLOT 9 ALL WE TOTS WILL BE INSTALLED ON ACCORDANCE)NOT STAISINFIR IST TO EST AMC Am TIOU00CAS CORY THE tEql.TK OF TONLROAk 44 RALPH PIPE CAN BE INSTALLED IN ONE DA'(S TIME SHALL IS OPEN AT ANY TIME, LNTFI SPIOL MATERIAL MEANS ON THE VPMAA VATE Of' ONO _00Y, TFS FRCOCN POINTS,SHALL BE CAPPED AT END Of'EACH DAn WORK TO PREVENT SEDIMENT SILT PEACE WITH UPON ENTLON11 MEMO$SHALL BE BACKTILVED AT END OF EACH DAYS WORK AND CUTLET CONTROL, TYP ONSPONFOR AREAS SFEIRE,WON TEMPERAROL-H2ORNA DEADLINES Or APPROPRIATE TRIMS CONTRACTOR IS TO ENSURE ANT DEWAITINTS$HALL Of RADT[D THAN OLT PAGE AND 'RON POLLUTION Of NERVOUS OF AN ACCORDANCE RON THE NORT'O CRESSONA SEWSOYTA c 4TROL ACT 11 CONTRACTOR SHALL ENSURES ANY CONSTRUCTION WASTE GENERATED AS:A RESULT OF SiLT FENCE, rCP PROPOSED CONSTRUCTION ERA TO,BE THEPOSOET OF ON A LAAIMLL WIN All ALLOYS AL REFS BY THE UNDPOP OF WA51E MANAGMENT.ALL WASTE SOILS SHALL BE SIOXAPSU)ON SITE,AND CLARIFIED 5 UNDER AIR EARTERON AND SEDIMENT CONTROL PLAN.OR TAKEN LET ATC 10 A SAL A V*POSAL AREA RUN ALL APPUCASLE STATE AXIS LOCAL TETTVITS �,T r7fl X APPROXIMATE LIMITS OF OUSTLJRBIUNCE� TYP ISO YEAR rLOODPLAIN Tyr, (728.76 NONE) 79) RAS IN U&I P STATION DE PARWFICATION FILTERS UP FACILITY AIDA SODIUM HYPOOFILURITE FACTINY t3 a LABORATORY 13 FILTERS SUILGINC MODIRCA-flONS MODIFICATIONS MAINITTNAPI BUILDING YARD INLET SEDIMENT CONTROL, TOP a— CURB INLET SEDIMENT CONTROL, TOA MATCH LINE,SEE C27 PARTIAL PLAN AREA 1 6 40' NOT RELEASED FOR CONSTRUCTION PRELIMINARY DRAWINGS 6 THE SCALE BAR DATE XLY 2010 LESIONS ...........J,PC CITY OF SANFORD ..... ...........-----------------..................--------------- SITE WORK DAN AN ""' "'S WA 32039-000 ——----—--- ................................ DRANK .................. ffiZENMD SAWM NORTH CAROLINA ISEACURES ONE RUBBER ............. EnvifenmeDtai E09ifletrS &$68rdist9 INS"LONG ON CONTRAC DRAWAIR --—--------------....... CHECKED CIVIL ALKNEST BIG BUFFALO THE CANNNXI SAMER ............... E I i4oO,KF ­Ew­ PWI NOR t*ll Wtc��CMAAe Bowevcra S,,_,te !LCO OFIXIBNO, 2 E77tGTD IZ404 PERMIT RE-SUBLVINA 5 LL+S WASTEWATE AREA 1 C25 .............L VS` R TREATMENT PLAIT EROSION Ok SEDIMENTATION CONTROL ILA ------------ ....................... FLAT FILE -V BAR, ISSUE FOR APPROVED INS EXPANSION TO 12MGD V T T No CONSTRUCTION GO LATIN WASKRNANCE ACHIATIES BAY 6TGRN NNft,ALL.ER L7hR:LlNTROL MEASURE'.$HAVE.SEEN'.ONSFALLED IN UA ATRGNS AS S+IUStN GN.THE PONFRACT DRAWINGS. 2 CICATRACTCAL REQUIRED TG MAINTAIN ALL CMS :CSRGN ACTIVITIES ACHAN UNITS TO DISTURBANCE AS SHOWN ON THE CONTRAST DRAW # S ALL(SCURRIED AREAS LEFT EFP 6 FALL '&HVY Ak CALENDAR DAIS Of COMPLETION;OF ANY PHASE OF GRADING,SO PLANTED OR OTHERWISE PROVISO)NTH'TCMAISRANY GIANDA.T:. Ftr.. COVER,DEVICES,DO SHUCILIRES SOFMCONf Tr3.INSER,AIN CALVIN , A PERMANCIT GRCTLTkdL7 COVER SSFFBFD'#ENr to RESTRAwt ER#}SiEA*t.SHALL TIE PtANTEE#OR R ORARAND PROODED WNH.N tT DAYS FOLLOWNO.CGRAFLERNI,€F CLRiST TTv"fR OR C !}sVOCA`VA tT,ON THAT PORTION OF THE TRACT ONSTURBED AREA}UPMN Y'A;TCH FINNED ACTIVE CONAUKICIPP WILL NOT BET N S SILT FENCE SHALL BE EELANtD WHEN SE ENT AMUSE REAOKS I/Z SO TOTAL LAUME OF WASLA M' k E ALL HARBOR CONTROL MEASURES SMALL REMPLI IN PLACE LRNDL,CCRYSIRUCTTON FS COMPLETE AND PEN-' aEaaa WN41ATACIN RS ESTABLISHED Oft'.ALL DISTUREED AREAS.. #f. . . »•., ,. T SONTRAUCIR SMALL RS-ATGETAIE DISTURBED AREAS IN AKCOROINA 10 ORE S EMNG SEt#Cwif x ON DRA,'WAIC 07 AND AS PER SPECIFICATION GDMO- FINAL GRACING,AND LANDSCAPING NG x S .E COSORACIOR SMALL PROVIDE ADDITIONAL STABIVOLIt OUTLETS FRET$'LT FE 'S(DETAE.. r 022724)WHEN SA T FENCES ARE LOCATED IN LOW LYING AREAS NOT ILLUSTRATED ON PLAN + SHEETS. # A ,r R.ALL Ftd'�E> D SMALL BE INIMALLED IS AGGCOVANCE NTH STANDARD SONETtlT ICIRON , _ ? rE DAPE, SPOT THE LENGTH of FRENCH IN 4RAN PIPE CAN Of 44STALCED 19 SITE DAIS ..°A" :{ } ONE SHALL BE OPEN AT ANT TIME,WITH SPI'kL MATERIAL PLACED UP THE.UPHILL VAR OF. A °. : INE TRENON HAWN SHALL BE CAPPED AT ENC OF GASH DAYS WORK 30 PRtVENT=NMNT:. r ` FOUR ENTERING, TRENCH SHALL BE BACAAR=AI END Or EACH DAYS WORK ANIC 04MRBF-D AREAS SEELNET WITH TEMPOWARY SEEKING MAA 'S RF APPR ATE µ,.4-;:.( • y TG THE C04TRACFW U,IN ENSURE ANY DEY+ATERING SHNA BE TOUTER RISC SILT BATS5 AND DISPOSED OF IN ACCORDANCE A#FM THE NCTATH CARQANA 5ELAkzCN9RTREY`J F:.{T{.LiTTTON Cfi,NTRGt ACT ti IF CON RACTOR SHALL ENSURE ANY CHAMPAI :WASTE RENOVATED AS A RESULT OF cF G3 r 7 PINFACEP CONSTRUCTION SHALt. BE ESPGSLL OF N A LANDFILL NTH AkL PTkbdTc RESORTED G Lu# ? BY THE EtRbTBAS OF WASTE MANAGIVENT ALL WASTE SOLS. kt BE SIOCKFALEO ON STE AND 6EJ } S, v CGMATEET S E;..UNDER TH# GK 'AND$GrA N,N CON Y SITE PLAN,CA TAKEN P TO A,SORL jA LI' GSAL.AS",.EA NTH ALL ARzPLRCAFS#.E STATE AND LOCAL PERN(TS. Ld f SILT FERdCE. VR47p+ v - OUTLET CONTROL f TYE' j ? Y SILT FENCE IYP VACUUM TRUCK j) [5L35TF S7ATTE7kd; �p a f. dq w a N SEDIMENY LOG CHECK DAM, TAP TO BE INSTALLED FOLLOWING TREE COMPLETION OF PROPOSED SWALE # 3 MG FLOW v £QUALIZATIOR TANK -ELNURE STRUCTURE aX PROPOSED S1YALE TO INSTALLED WITH (ROTExTILE LITTER # '� CT227L}Ii J r # PROPOSED TREE LINE ITS, I —STOC..KPILEAAYD' # AREA'. � TREE PROTECTION FENEING,T• # TO BE INSTALLED ONCE PROPOSED t ........... ... TREE LINE TIPS BEEN ESTABLISHED EO # AL,LJ#.3 & w SUR CARBON SLOWER FACILITY BUILDING � ELM-C Y K LIMITS OF DISTURBANCE, T°T; TJ�M�EA-� E3 I 6, I �, '� �+ 'As CCJFdSEREJETI{}hd EASTRAEtCE;AExV E m PARTIAL PLAN — AREA 2 MATCH LINE,SEE D 8 = AD' CITY } y a y p# PRELIMINARY DRAWINGS-NOT RELEASED FOR CONSTRUCTION L3ESEGfFET# . V 1 T Y F S A� FA...A":R D. : THE SCALE BAR NAPE JULY 2010 ........ ........ ............. PRAYST P NORTH AROL.INA SITE �I{lRK SHOWN ESL E AN NVMS ADSER' 32t33�—C3CJt7 .... '"' Erl:+Rf 011m R$Ad I NTl RN4BfS&SGLontIsts INCH LAND TT?+ CHE'aREt dT L i NI2AGT p#TA G I r� YL m, «k fa, = =Iri 'L BIG BUFFALO F tRrONAL GAIRE A N EBEN � A, G'?f2{?kkT'.. AGr aER P€R#AtE SJJ TTAL m. S PROJANGA' _.0 5......_ DRAw,NG tt AETj4}A E Ir— TTA, �4iL R RF+ F tt rI fi Tier WASTEWATER TREATMENT' PLANT EROSION > SL 11MENTATI CONTROL �- AREA 3> C 6 Ttc. tkFn. C t.3A rLAT F�tE x RE ""SATE C$ PGA _ APPROVED EXPANSION T IUf l F:},C:.T?1_+.,_ V�:137..5}aa,S.?:YS#s.C.sa1:�aaA,,..�u'Tl,+,,xd;TA :d; +r�.a X.�Ya crr•T+nr_•z.+:ttY', MATCH LINE,SEE 025 I No CONSTROCTION OR LAND DISTURBANCE ACTIVUES MAY DOOR UNTIL ALL EROSION CONTIF(C MEASURES HAVE KEN INSTALLED 4 u. OD, IN USCANONS AS ENRON ON THE CONTRACT(BOARDS U P/EACEWER -.,_LAYDO%N/STOCKPN,E 2 CONTRACTOR REQUIRED TO MAINTAIN ALL CONSTRUCTION ".V 4'. ILDING 'AREA ACTIVITIES ANNIN LATE OF RSWERFANCE AS BRIGHT ON THE, CONTRACT(CLAWINCR, WASSWATER I I ALL*STUBBED AREAS TUFT EXPOSER'PMLJL,Y41HIN 21 WrIGAiv CALENDAR DAYS Or COMPLETION OF ANY PHASE OF ORAMPA BE PLANTED OR OTHERMSE PCOMINTED NNY TEMPORARY DIDDIRAT A! COMM,OVACES,ORs SITTUDIURES FpAFFANOF TO RESTRAIN G4. VOCKEN 4 PERMANENT AROUND DOPEY CIANCIENT, TO RESTRAIN UROVON SLUDGE SHALL BE PLANTED OR OTHERIFRE PR WITHIN 2) PAYS STORAGE FIRLDIANG COMPLETION OF CONSTROCITTAN OR DEKLOPMEN,,ON 4 .......... THAT PORTKA#OF THE TRACT(ICARISOU)AREA)DARK WASi FURTHER AnVE CONSTANCIRIO BILL NOT TE;TAKEN, UMP/BLOWER A-ALL EROSION CONTROL MEASURES SHALL REMAIN IN PLACE ONTO, BUILDING 5 SILT fZATCf SMALL S&CLEATAO WHEN SEGMENT VOUIVE REACHES TO OF IWAL VOLUME OF MEASURE ROSIXTRIXTION IS COMPLETE AND PERMANENT RADIATION IS ESTABLISHED ON ALL 01SURSED AREAS I CONTRARIAN SMALL RE-AUATATE INSTIRRIKY AREAS IN x AERO:,GC ACCORDING TO THE SENAK SCHEINJUE ON'COAXING 02 AMR AS v, SLUDGE PER SPECIFICATION 02910-ANAL(MANOR AND LANTYSCAUNTIC Arl;�l IE STORAGE MODIFICATIONS THE CONTR OVIDE ACTOR SHAYF PR ADDITIONAL STABILIZED OR 4 OVrLETS TO*Sk;FENCES(017144,022724)'AFTER SkT FENCES ARE LCOATED IN LOW LNNS AREAS FAR ILLUSTRATED ON PLAN AVAQUIC SURE DIGESTER 2 MODIFICATIONS STANDARD CONSTRUCTION TIODRINCES ONLY THE tENOTH Or IL ALL PAR ARRY SHALL ME INSTALLED Of ACCONSIMINE WITAT TRENCH IN wmcm WE CAR RE INSTALLED AT ONE DAYS HILL ANA BE OPEN At ANY A<NTH SPOT,LIAITRIAL 1141C) ON THE LLISILLSOC OF THE MIKHAIL WINE ENNA,BE CAPPED At ENO Or EACH DAYS WORK 10 PPEIGNT SEENJENT FROM SLUDGE STORAGE ENTERINC, FRENCH SMALL BE OACKPItED AT END OF EACH TANK I DAYS WEAK AND CASTIOUNTY AREAS SEEDED WITH TEMPORARY M(G)RICATIONS SEEDING MEASURES IF APPROPAhr, A A CIFTHE CONTRACTOR IS TO ENTIRE ANY GEWANUD4C SHALL BE ROUTEU IRAN$III MARC ANN DISPOSED Or AT ACCORDANCE RICH THE NORTH CAROLINA SEDIMENTATION PAUARAN CONFRON, ACT I I I.'WIRACIOP WAIL ENSURE ANY CONSOMIC RON WASTE COASTING AS A REPOLI OF PROP05EO CONSTRUCTION SMALLOEM I DC DISPOSED OF 00 A LANDFILL Am ALI PERMITS ASSUAGE By THICKENING IMF BARNEY Of WASTE MANARMEVI,ALL WASTE CALLS SHALL BUILDING A BE,STOCKPILER ON SITE AMC COACRED UNDER IRS EARTION HOUR AND SERAWAN CONTROL ALTO,ON TAKEN ACT SUE TO A SEA, DISPOSAL AREA ATTH ALL APPLICAUSLE STATE XNA ARM PERMITS STORAGE 100 YEAR TANK 2 FLOCOPLAIN, TYP MO (22a 76 NOVIC 291 R` SIT COLLECTION Al� LLECITOCAL 0 EXIST INFLUENT PUMP STATION IBUILLIINI I MODIFICATIONS —SILT FENCE wilfl GRIT HANDLING OUTLET CONTROL, TYR 4 MODIFICATIONS /* OLD INFLUENT SILT PENCE, I TO FUMP SIA'HON MODIFICATIONS LIM CURB/YARD TRIET SEDIMENT CONTROL, TYP N_ z SCREENINGS AREA -----------....... MODIFICATIM A..... ........ P-COLLIMATE LIMITS P PINE SCREENS ME DISTURBANCE, FYP ..... P, DISTRIERTION BOX MODIFICATIONS, AREA-3 PEREA4 PARTIAL PLAN AREA 3 PRELIMINARY DRAWINGS-NOT RELEASED FOR CONSTRUCTION 6 I ........... THE SCALE BAR DATE JULY 2010 '2 ............................ ............ RESPOND CITY ►OF SANFORD -LON 2" SITE WORK SHOWN RE 4*1 Am 32039-000 ........... ..... DRAWN -------------------n....... MZEN MD MAIM NORTH CAROLINA MEASURES 014E mXqRP ——------ INCH LOPC 00 Environmontall Soloatists CIVIL —F(W—TOACT DRAW;Rc ..................... BIG BUFFALO lUt(NORMAL MURDER MIANICA ............... 40TT INvitchase Rxvewwd suitv I�CW: C_ 7 v—_A1711_CT INATIMoRL __m�._ RGIvID", Now, coroiAa 17607- WASTEWATER TREATMENT PLANT EROSION & SEDIMENTATION CONTROL AREA 3 DOWNS, C27 I to NOR TEV— DATE E 'Is BY AHAwwo EXPANSION TO 12MGD ama j Ito, a v; %.I%VVK x9cK WEEBSe PROPOSED SWALE TO I No CCTNSTRipCTION OR LAND C'SSWIN ANOT ACRINKS MAY SOON 43KIlL ALE ER09ON CON R 14, ;y. INSTALLED MTH GEOTE:XTILE LINER MCA ES HAVE BEEN IN TMAN)IN LOCAPERIS AS SHOWN ON THE ISINTRACI::DRAWINGS D227Ti37'. A CL`RNTRACIOR REMAINED TO MAITABT AIL CONSIRUCDON ACTHAVES WININ kLMNT5 OF DISMATCH LINE,SEE E ALL C STIAEE A$SHAD L E? THE CONSED SAL`DRA CS } IY,227DS.i. 3;.ALL EASR Li}AREAS LEE?EkP65EEi SHAtt,. AtfH3N 2L CALENDAR CAY,"w OF EtXarT.E4ik7ed tk' ANY PRASE Or ALAMO,6E PLANTED OR OTHERWISE PR7VITU D MAIN TEMPORARY AROUND i.. �._ �� m: ,.._ __ _'" .._.•: »_ ,. �„ COVER,DEVICES,OR STRUCIURES SUFFICIENT TLT RESTRAIN EROSION #::$'LHMAF>ENS::C#2E`TRFo-D COVER SUFFICIENT fit RESTRAIN EROSION N SMALL IN PLANTED OR #.: .: .®...... OTHERWISE NRCkDE0 WIFIRN 21 DAYS rOROWNIC COMPLETION OF CONSTRUCTION OR }:s B ` TtEi£iiVTME"TF,t R;HATR'±RJrRTN1N Tar TX.z iRAC=DO TMED,GREAT UPON iw,ACH"`MRTHiR ETAS PUMP STATION :2Et ACTIVE CCRIEfRNCRLEiN WILL NOT LET TAKENT Rt{7Ea<FkCATILYNS 5:.Sa 1 EEFICE tL 6E CLEARED N SEDIMENT POLUME REACHES T12 OF THIN VOLUME OF Lf .. MEASURE {AS RA 1,EROSION N CONTROL D PERMANENT VESETATION RES SIFA REMAIN IS ES ASMSHEIO On IN PLACE COX ALLL DISIVR13ED EASRitE RIgR IS w`iCkIPLETE ROD BASINS 2 CONTRACTOR MALL TF£^YIORTATE ICIIJURTIED AREAS BT ACCORDING TO THE CROAKS.SCHEDULE MODIFICATIONS ON THEMAND:02 AND AS PER SPECIFICAf 02,?1D.-:- FINAL FRAOTAG AND LANDSCAPING 6- SHE CONTRACTOR'SHALL:PROVED IRRATIONAL STABILIZED OUILETS TOP SLI FENCER OETA" u O TCAN MIND VIJ FENCES ARE LVATEO BF LOW 0IRPr AREAS NOT PLUSTRATEts ON PLAN ¢ VICI WHI'35 0" • R#:ALL PIPE HARD 54ALL RC TNSiALLEO At ACCORDANCE MINI STANDARD CCNFSTRUCTFLIN CLARIFIER:I tl TEC*LICUES:.ONLY THE LENGTH OF TRENCH IN WHICH PIPE CAN BE INSTALLED IN(FIT DAYS E#NR BASIN A: SnHE SPAN�E(ARCH AT ANY TIME,FIFTH SPOL MATERIAL PLACED On THE L.ILL SIDE OF MODIFICATIONS : �:. THE TRENCH PIPAC ONIAL BE CARPED AT ENT)or EACH DAYS WIETRT TTI RREVENi SEDPAENF k" ,B E ENTERING TRENCH$HALL SC 6ACRFILLE6 AT END OF EACH EIAY5 W B�:. a LIRBED ARf#S S:,EF7ET}iMTFT TEMPORARY 5CERING MEASLIRLS IF APFRCF"R(ATE �. kfl THE CORTRACIAR TS TO(MOORE ANY EAVATERI G SHALL EEC ROSFIEO "'AT BASS AUD: + LAWYCLOT CP IN ACCOFTEANCE WITH THE NORTH CAR RA SEDIMENTATION POLLUTANT CONTROLR.. I •:..... :: A AkOMIUI i ACT fff CONTROL ki:.CCIUTRACTOR SHALL ENSURE ANY CoNSiRICTIOR WASTE PERERAT'ED AS A REPOLI tR q } ELLTL FACESHERIO CONSTRUCTION MALT.PE SAFNME,CH AT A LAAEK&L WIN ALL PERMITS REQUIRED 6Y THE DIVISION OF WASTE NATORVENT ALL WASIf CUT,$WALL BE STOYF +LED ON SITE AND 4FRi • COVERED UNDER THE€REIHON AND SEOcATEN1 CN ROL,A140L OR T+IEN RIC STE TO A COAL ......... I DISPOSAL AREA AVER AU,:.AMICARKE STATE AND LOCAL PERWTS R EINR BASIN 3 MODIFICATIONS �• CUiRRIYARD INLET SEDIMENT F CONTROL, TYA* CLARIFIER 7 a c C ONR BASIN A Lp TINSDIFIEA11OD5 t A 9LI FENCE I 3 +' {O RH BUT LET NTR P DIL, ?v } CLARIFIER 3. ........LAYE7E}WNJSTVwCKNiLE x " "R D AREA . sV ELITLET PROTECTION I PAD, TYR :,. v�..._,e..n.�,.--...ice, �. •... —• .,�...,...., . _ ,. I CORE/YARD INLET SILT FENCE, TYP APPROXIMATE LIMITS OF SEDIMENT CONTROL, T•MP D223 DISTURBANCE' TYR C2272R T ELAN-KEY Fes_- AREA-T 7AREA-2 r= d PARTIAL PLAN AREA 4ATaEA• A > r� /^ p PRELIMINARY DRAWINGS_NOT RELEASED FOR CONSTRUCTION .... 'v EIESICNi:<.fl i?�R,5...�,.. C IT F S F :... End:. THE SCALE DAR DAiC L�" {�T{� ............ .. .. TE IlVORK. SHOWN FLOOR N AT :JOB LRAYRT E— EN�SUER NORTH ARt LIN AIEASORES,ONE ORDER 32tt39—t M�} Environmental Engineers&Scientists OKM MIND CAN s, CHECKED BIG BUFFALO GIVT� THE ORIGINAL CNCT n�T IAEER u ......... 2 ' ITS I°`StT U E 730(jIRp, ap :V4KRMIT RL SU6AATTAL RRCAE DRAWING �e *:. r 2}E r WASTEWATER TREATMENT PLANT EROSION �r EDMENTATION CONTROL - AREA 4 � I ID 7RB5 #pT D'i..A"ERWT 5SFBw rT-'c. LIA'E-'...._ NL lo,IIn C{:` I}�.T3;. REU RTL � Y 6Y RPPR{ EC EXPANSION TO 12 NC I FLAT F L ,'==s}{x#!G}S�;T .',il,.b 5!3wM•}x4M.v S'S13k;7A,GM.,"r;i$.."d.i.7 _{.i-_#i' #'}+9: 4u;i}.ers3}`. £#.. i SPECIFICATIONS MAT R7AI, PECIFICATIONS COMPACTICAy MISCELLANEIXIS: k; THE NORETENTION SOIL SHALL BE AMENDED WITH MATERIALS 6-. MINIMIZE COMPACTION OF BOTH THE BASE AND THE 11-DO NOT CONSTRUCT THE BIORETENTION FACILITY UNTit.ALL IMPORTED FROM OFF-SITE TO MEET THE CRITERIA OUTLINED MORETENTION AREA.WHEN POSSIBLE, USE EXCAVATORS TO CONTRIBUTING DRAINAGE AREAS HAVE BEEN STABILIZED• BELOW REMOVE ORIGINAL SOIL:IF MORETENTION AREAS ARE EXCAVATED USING A LOADER, THE CONTRACTOR SHOULD USE 12,ALL DEPOSITED SEDIMENT SHALL RE REMOVED FROM THE @IOI2ETENTION SOIL LOW GROUND PRESSURE(_GP}EQUIPMENT(A 6 PSI), SEDIMENT BASIN AND PLACED AT AN APPROVED LOCATION EXISTING 12'RCP 0 1.56% 4'PERFORATED PVC Z... THE SOIL SHALL BE A UNIFORM MIX,FREE OF STONES, ENGINEER SHALL APPROVE EQUIPMENT IN ADVANCE. OUTSIDE THE CONTRIBUTING WATERSHED BEFORE EXCAVATING UNDERDRAIN, TYP v STUMPS,ROOTS OR OTHER SIMILAR OBJECTS LARGER THAN BIGRETENTION: CONTRACTOR SHALL REMOVE SECTION Qf TWO INCHES..NO OTHER MATERIALS OR SUBSTANCES SHALL B.E 7 COMPACTION CAN BE ALLEVIATED AT THE BASE OF THE EXISTING 12' RCP FOR INSTALLATION OF NEW MIXED OR DUMPED WITHIN THE BIORETENTRA AREA THAT MAY NORETENTION FACILITY BY USING A PRIMARY TILLING AS-BUILT CERTIFICATION YhRD INLET.:..APPROXIMATE INVERT INTO NEW BE HARMFUL. TO PLANT GROWTH,OR PROVE A HINDRANCE TO DPERATION SUCH AS A CHISEL PLOW,RIPPER,OR SUBSOILER.. 13..THE MORETENTION CELLS SHALL BE SUBJECT TO AS-BUILT 5.. "yTURE I$.„..BT&2 Z66-,,, THE PLANTING OR MAINTENANCE OPERATIONS. THE PLANTING THESE TILLING OPERATIONS ARE TO REFRACTURE THE SOIL INSPECTION AND SURVEY:.:ANY ELEMENTS THAT ARE NOT SOIL SHALL BE FREE OF NOXIOUS WEEDS:. PROFILE THROUGH THE 12 INCH COMPACTION ZONE.SUBSTITUTE CONSTRUCTED PER THIS PLAN SHALL BE REPAIRED OR REBUILT ....... •••-•'• .........:.... ...... ......... METHODS MUST BE APPROVED BY THE ENGINEER-ROTOTILLERS AT CONTRACTOR'S EXPENSE:: CONTRACTOR SHALT.COORDINATE --15'TO ALLOW OVERL WOE DEPRESSED CURBAND FLOW . THE PLANTING SOIL SHALL BE TESTED AND SHALL MEET THE ARE NOT ACCEPTABLE AS-BUILT INSPECTION AND SURVEY AND SUPPLY INFORMATION B&3 FOLLOWING CRITERIA: TO OWNER AT COMPLETION OF PROJECT INTO BIOREOVERLN CELL Ksot= 2-6 WIND 8. WHEN BACK FILLING THE MORETENTION FACILITY,PLACE SOIL IN PH RANGE= 5:5-6..5 LIFTS 12 TO 18`:.WATER LIFTS LIGHTLY TO ENCOURAGE 14:AS-BUILT TESTING OF BIORETENTION SOILS SHALL BE PHOSPHORUS INDEX= 10-30 NATURAL SETTLEMENT 00 NOT USE HEAVY EQUIPMENT WITHIN PERFORMED BY A LICENSED SOIL SCIENTIST AT CONTRACTOR NVEROS] 26202 Z SOIL FRACTIONS(BY VOLUME): THE 870RETENHON BASIN,HEAVY EQUIPMENT CAN BE USED EXPENSE. SOILS SHALL MEET ALL SOIL SPECIFICATIONS ON EA SAND= 85- 88% AROUND THE PERIMETER OF THE BASIN TO SUPPLY SOILS AND THIS PLAN PRIOR TO APPROVAL OF AS-BUILT PLAN... _ n SILT AND CLAY FINES=8- 12% SAND,GRADE MORETENTION MATERIALS BY HAND OR WITH ORGANIC MATTER 3- 5% LIGHT LGP EQUIPMENT:: _._----------.,..,,e_---4,......--- iRk'EPk{5} �'c2 ad} ( a 2EP 4.. ALL BIORFTENTION AREAS SHALL HAVE A MINIMUM OF ONE UNDERDRAINS SOX[ TEST:EACH TEST SHALL CONSIST OF STANDARD SOIL 9 4'PERFORATED PVC UNDERDRAIN PIPE WILL BE INSTALLED IN m 4.1 VAX TESTS FOR SATURATED HYDRAULIC CONDUCTiViTY(Ksai),PH 26 GRAVEL BEDDING:UNDERDRAIN PIPE SHOULD DE COVERED AND $LCJPE ••• PHOSPHORUS INDEX, AND ORGANIC MATTER:: A TEXTURAL UNDERLAIN INVERT 261 32 UNDERLAIN BY A MINIMUM 2`OF GRAVEL: 262.. ANALYSIS IS REQUIRED FROM THE SITE STOCKPILED 70PSOIL.IF B TOPSOIL IS IMPORTED, THEN A TEXTURE ANALYSIS SHALL BE 10 UNDERDRAIN PIPES SHALL HE CONSTRUCTED AT A MINIMUM 2e7 PERFORMED FOR EACH LOCATION WHERE THE TOP SOIL WAS SLOPE OF 0.57 OBSERVATION WELLS AND CLEAN-OUT PIPES 24'X 36` GRATE INLET(EIL 266 00) EXCAVATED.: MUST BE PROVIDED AT THE END OF ALL UNDERDRAIN PIPES:. t Z6' A SINCE DIFFERENT LABS CALIBRATE THEIR TESTING EQUIPMENT 28 DIFFERENTLY, ALL TESTING RESULTS SHALL COME FROM THE SAME TESTING FACR.ITY. Z64 E6. SCHEDULE OF ELEVATIONS (FT) ADMIN__BUILDING BIO ETENTION ..._, _ CELL I AGAIIN BLDG i SLUDGE PAD 3•m to, MAXIMUM FORDING DEPTH/;I 266.00 I 24500 ,. INLET CREST OF DROP INLET........ ......... 1... ..__ TOP OF BIORETENTION SOIL 26500 24400 ' y ....... ;. TOP OF GRAVEL]SAND 26300 24200 r , BOTTOM OF GRAVEL/SAND 26200 2dt 00 ,: INVERT OUT I 2GI32 23950 24 f 41 tdAR I#i:'£RT 14175 -•-k.: 15`FiCR'05 Ox... COMWE IN4'£R Tt ;H 235.5D C-:,..�_ma_,a®-®_a_A'®_sa_ ®seas®®®......,.,...,_ y 3'MIN GRASS `24• X 36'GRATE INLET `'GRASS SODDED GRAVEL Z4`X S6'CRATE c 1NVFRTSO: 4},<P{T - ( SOD FILTER STRIP FOR SECTION DETAILS CELL FILTER STRIP I INLET £G. 2•T3.TJD}... FOR INVERT ELEVATIONS} CELL I Fk,{}sY F ;R#TAS7WAY ::24'THICK FILL SCML Y INVERT 24a Q5 G:cET .w 4:1 MAX - 12'MIX: ? SEE SPECIFICATIONS c.4.kJPf T P. NG FOR SOIL CRITERIA TILL Z44 4'PERFORATED P1+.... 4 w 6EP3kT � 24; k7NDE; altTS ASN ®®® SLOPE, *To >sM R4 PA RDA NLEW STRUCTUREATERTIGHT CREOUIRED. SAND LAYER CRETE, 2' THICK St{ED SEE PLAN MEW FOR LOCATION, =-2' THICK WASHED GRAVEL IT STRIP r1= qB9 CHOCKING STONE (I'W1D£X 8° THICK}TO BE PLACED BETWEEN FLOW FROM 6'PERFORATED PVC UNOERDRAfN 057 SLOPE WITN AL H 3J8'HOLES t5 E DEPRESSED CO ...,,._ 1 • NS7T STONE ASHED HRORETENT TON MAREAENT 70WARDS TO BLOW OVERLAND FLOW ,4 SPACED ' ON CENNTER INTO ENAITION CEEB. STATION (�.. J .;`OBSERVATION WELLJCLEANOUT DUMP.::STATION BIORETENTION CELL OUTLET PIPE v'U.w eIo 00OOTx cow as �sO.a A,T-,"„"`"*' PaT oo OOo o�aooac000000� 4' PVC PIPE WITH THREADED k0,. CAP THAT IS TO BE INSTALLED WITH CLEANOUT .EXTENDING B' ABOVE GRADE:• GRASSED BIORETENTION CELL SECTION •' 1'= 10'.. PRELIMINARY DRAWINGS-NOT RELEASED FOR CONSTRUCTION S DE 4NESS r CITY SAIL Tt GAL:OWN DATE JULY 2010 ffi.._._.. ........ DRAWN 0A'.�.. NORTH CAROLINA SITE WORK SRO"UELflY Nis 32D�9-000 Environmental Engineers TE Scientists kNCH I.TSNG{JAI GOLD BIG BUFFALO CIVIL THE NAe NAm CONTRACT NIANF R 42E CR 4011 WestChose. Boulevard, Suite SOT 2.. D7 BTO 4kTo 4k}4 PERMaT R£ BrMdITAL kM5 Raleigh, North Cnrolino 27607 WASTEWATER TREATMENT PLANT 810RETENT10N SECTION DETAILS PIRA1 k iD ZOOM dEtl 4O+F P£ I SO3fi�tiTTAt L4SS N(, Licen:e G-0381 FGET PR,E T RET RAiE tSdED F ... BY APPROVED EPAI351CN TO IGO k NOTES: INTERMEDIATE PLAN 24'RCP OUTLET 4'PERFORATED PAC UNDEFORAINS IS 05%WITH 3/8-HOLES SPACED 6'ON CENTER, WRAPPED IN FILTER FABRIC CAPPED CLEANDICITS INSTALLED AT END OF EACH UNDERDRAIN LINE ILLTRABON GBARSSR OUTLET CHAMBER ..... .................... DIVIDING WEIRS SEDIMENTATION CHAMBER FLOW SPUTTER TOP PLAN 1/4. ;'0' 74'RCP INLET L ................ -7...............— -------------- ............. VS.,A,� 244,,� tt V, A.......... ............................ j ..................................... L'I.............................. x C' 1 iAL 1 ANI .................................... ----------------- A v I A N 11 L N A,N ...................................... ...........-------- I I ...................................... .......... ------------ ................................... 24'RON I tl Sm .............. • .................... ................ .:SEDIMENTATION CHAMBER MILE tI DIVIDING WEIR r 24' RCP OUTLET S� ----------- AFIIR/�—AND—�UN-IACF EL 228 5 ........----- ............ CLEARED, RAMPED, COURSE MASONRY BARR CWQRWNC TO 451M o C33 UNDERLIRAN KPfrP 1 4'P RFO RAIL f) .......... .................... 'k'C UNDFru"AN SECTION SECTION ` 2 1/2' = I'D' —tD-j1 1/2', I'D' z ill.1, PRELIMINARY DRAWINGS NOT RELEASED FOR CONSTRUCTION ....................... INCiSmino .......... CITY OF SANFORD THE SCALE- BAR IDALL JULY 2010 ---- -------------- -------- --------------.................................. SITE WORK SHOWN BELOW REACH "Is CAN OW .............Y—, MZENMD SOM NORTH CAROLINA RES(ME NVNBER 32039- .............. .....................—..— Environmental Engineers &Scientists STRECKER —..............— MAL INCH LONG ON CONTRACT UNARM ........— BIG BUFFALO THE ORIGINAL NUVRER WARRIA ......... ..................... 4011 WcmlChose Boulevard, Sui(c 500 �JtAL� PROJ,CNGR..........145 DRAWING INONAG ff-Su koiekjh, North Coroino 27607 L"I-NIL ........... �Lkt-s --------------- WASTEWATER TREATMENT PLANT SAND FILTER SECTIONS AND DETAIL 02 at%' OATE 15SMD FAR NC I cense C-0381 My APPROVED I EXPANSION TO 12MGD ILA3 YiuE 'PAG —.L— ..... .................................................... 11%,dot) %.dA..N zrc,;K