Loading...
HomeMy WebLinkAbout20201438 Ver 1_B6053_Permit Drawings_20201120_20201130 it I STAT [ 4 11 ' STATE STATE PROJECT REFERENCE NO. N® SHEETS NITI—i SH[]E]ET `Il"®�f`AL IF ( e. �� i �• I it I e� _ - _ ���� B-6053 � City L I fTl I t ��/' IN IIII �, IC .���� ��. S STATE PROJ.NO. F.A.PROJ.NO. DESCRIPTION - 11 ��YY ------------ ;-__; t 344 48754. 1 . 1 N/A P.E. / R/W / UTI L a�\Jd - Halstead Blvd Ext \r��pr 'S�a 414 PERMIT DRA WING . Le �O �� �,��� III oCd ° WesleyIIIII 0 \ Dr �c t� Ntl ... --- ... .. -------------- . . . PROJECT a6� qra�sPlilli LOCA TION:Bridge No. 690034 on Providence Road over Knobbs Creek UNLESS ALL SIGNATURES COMPLETED �� co Cyr �, �" BUS Tributary in Elizabeth City DOCUMENT�����M� �P PROJECT END 17 �� � . .. SITE PROJECT 41 ■11 (IV') % 0 111L'-'s-s:il.------ ..• • . ....• . . i . . • . . LOCATION 'So ,git TYPE OF WORK: DRAINAGE PAVING, AND 07464/0411flurt la � 4 STRUCTURE cl- tr) <5,_!,,,,,,, heilo,‘ ram ' ti. u hes Blvd\c, VT SH 9I NM 121:1 ,© c;) • • tf) ll0 cs. 6, (11414 VICINITY MAP(NOT TO SCALE) �d,� OFF SITE DETOUR • • • S• C...) OPENWETLANDSTREAMIMPACTS PERMIT FINT4 See Sheet IA For Index of Sheets lSee Sheet lB For Conventional Symbols 0 L4 4 \ , M+ M\ ,---- -z-- \-9-R-M — — _____ \ \-- d-S-- N-61-mo--T-- \_L___ \ (BEGIN PROJECT B-6053 z END PROJECT 6-6053 \ '1 \ BEGIN BRIDGEEND BRIDGE _______ L______ 4,---- —L— POC STA. 10 + 65.00 G N G o —L— POC STA. 13 + 35.00 (/) —L— POT STA. 11 + 75.33 ///ILPOTSTA12 + 22.67 / \ �— 1IWNON Sr z. 11W\O\ Sr —N _ — VV-�-B (/) '�Ss, \ --- r F S S PROVIDENCE ROAD PROVIDE\CE ROAD 23.5' PAVED ROADWAY I , I I 23.5' PAVED ROADWAY TO BONNER DR. I TO US 17 c I S HUGHES BLVD. u - -1 — u < Il 1 — — — — — JS NONMIT L 0 �S NONMI T >y - / W�B - --- / ( -- /Ln o — / ( Lo rn — � W � � IW{ ON — W� , b�Lg—� �� / �' / i m 4r z I -\/ ._ 'D u Y I a(, \, . L n CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS OF METHOD 2. • •Eitoi THIS PROJECT IS WITHIN THE MUNICIPAL BOUNDARIES OF ELIZABETH CITY. J c °' PROJECT LENGTHRK AftHYDRAULICS E c) GRAPHIC SCALES DESIGN DATA RUMMEL, KLEPPER & KAHL, LLP ENGINEER 0 8601 SIX FORKS ROAD, SUITE 700 RALEIGH, NORTH CAROLINA 27615 NC LICENSE NO. F-0112 ADT = 500* 1-888-521-4455 OR 919-878-9560 O� �0��� 20 0 20 40 T - 7 ° LENGTH ROADWAY TIP PROJECT B-6053 = 0.042 mi �, 1 i i jIIIt.t �0 LENGTH STRUCTURE TIP PROJECT B-6053 = 0.009 mi FOR Q� 440 PLANS V = 30 MPH TOTAL LENGTH TIP PROJECT B-6053 = 0.051 mi DIVISION OF HIGHWAYS �� n7 20 0 20 40 * TTST = 3.5% DUAL 3.5% 2018 STANDARD SPECIFICATIONS SIGNATURE: P.E. C a ROADWAY j ' " Scott D. Blevins, P.E. 'V o F U N C CLASS = RURAL RIGHT OF WAY DATE: PROJECT ENGINEER DESIGN , Q PROFILE (HORIZONTAL) ENGINEER + QOQ� o LOCAL August 2020 Scott A. Beasley, E.I.T. © o s��° o U 4 0 4 8 LETTING DATE: PROJECT DESIGN ENGINEER P �I G3 p �uci) liii . - SUBREGIONAL TIER February1, 2021 Amanda Boone, P.E. u o PROFILE (VERTICAL) CITY OF ELIZABETH CITY P.E. n' u � J J� SIGNATURE: . \. 1, cr PROJECT REFERENCE NO. SHEET NO. - -L- B-6053 04 PI Sto l0+62.28 PI Sto 11+27.23 PI Sto 13+13.86 PI Sta l4+18.34OPEN T R E T DSTREAM IMPACTS PERMIT , SHEET NO. A = I.06' /5.9" (LT) A = I° 3/' 31.7" (RT) A = 0° 4/' 02.9" (LT) A = 3°16' 29.2" (LT)J � � ROADWAY DESIGN HYDRAULICS D = 2 0/, 28.5�� D = 2° 0/� 28.5�� D = 2° 0/� 28.5�� D = 2°26' /7.2�� r SITE 1 I ENGINEER ENGINEER L = 54.55' L = 75.35' L = 33.79' L = 134.32' s, TEMPORARY STREAM R = 2 830.00' R = 2,830.00' R = 2,830.00' R = 2,350.00' IMPACTS S F /0.0 2 AC • PERMIT DRAWING = = = =90' T = �� (607 , 58 LF) �_ �! SE NC SENC SE NC SE EXIST. SITE 4 DOSHEN, JOSHUA PERMANENT OPEN WATER CLASS I I BRE DB 758 IPG 20 LLC �\p(?4, SI-lEET 2 OF 7 SITE 2 DB 1339 PG 578 ti SITE 2 PIN: 89130907 I 7 IMPACTS (167 SF / 0.01 AC) RIPRAP W/ DB 758 PG 314 SITE 6 m TEMPORARY WETLA GEO FAB DB 608 PG 511 IMPACTS (280 SF / < 0.01 AC TEMPORARY OPEN WATER DB 607 PG 286 / PERMANENT OPEN WATER ) IMPACTS (1 ,051 SF /0.03 AC) PIN: 89130907512'1 IMPACTS (32 SF / < 0.01 AC) BE PROJECT B-6053 P (TYP.) -L- PO Sta. O + 65.00 ( DOCUMENT NOT CONSIDERED FINAL J -L- PT Sto. 11+64.90 \� 8j - UNLESS ALL SIGNATURES COMPLETED -L- PRC Sto. 10+89.55 �' \w �/ I \ 32" PINE INV 15" OUT= 3. 15' :' SEWER\UM OUSE EX1STING W J 3I 8 i -&-S- *NM-1-T-- L--- A/ISTING R/W� 7�59. 18 CONC AD Aw��n�mw MK N46 56' i? 4"W - S47 ,18'7o69"E �' * _ .. a+t ,10i V L- PC Sto° I2+96.96 - M , . , s -L- PT Sta. 13+30.75 (Ni ro -L- OT Sta. l�• %�.00 _ _ _ / irradlwalIN:� �� �..��o�� _. .. --- L PC Sto. I3+5T16 7- - i a-- z 1 main' �r. IWNON SP -N , WEB w SIDEWALK r,� S'�' ; OP GREU TL-2 %R. -- ' S� .}. ' I' .4' GREU TL-2 J� - �! is TB 1, T-11 TB o►S: �_� TIT �B TB '�`�T �TB - TB TB s P OVIDENCE ROAD 1 \ (Ni1 :Pr IIP PROVIDENCE ROAD o ° N PAVED ROADWAY 23.5' PAVED ROADWAY S 47 /2 2/.9 E I -L- °/ .-4I 1 - - - or 46 47' 06•1" E o 23°5 UTILIT BORE ' "' 01 I �� 0 1 W S 47 28 09.0 E o TE P. O RKPAD_._-_._._.__- --- �� 1 ___ _ -- ---MIF• • A I--- 'yi► . �_ TR_ �...; ;- _ .� 'NW. I F TB TE TB TB TB Wes _ I cMP i5• TB /TB� TB TB . B TB �As � ARPPDX. BORL`!,�, GR U TL-2 _ 4. -irol'-'.- ' .--4 i '- ---.. _ GREU TL-2-4 ''---------- " -- � � PIT FOOTPRINT �!Y;�►,��i�,�,►,��P�������ti, i�ti�Ys��i�~� .;�� C IP- F \ � � �' � 91' SITE 3 vii-virfpxywaswir 0P1 %!iy�i 1,00 ���100TEMPORAR OPEN WATER _------ ,O.,O.,O� M�.0.. (TYP.) ��c, ►,�����~-�--` o � �_�; ��� _ - ND PROJECT B-6053 N IMPACTS ,639 SF /0.04 AC) r � ITE ' � -L- POC Sta. 13 0 Z ( - MAN TWET gel DENOTES PERMANENT - - W.LFF543. 0 1114I ez WL LB = -- IMPACTS IN SURFACE 347" 17' I'E EXISTING R/W - / _i ��/ I AST AC) �, �, �� �, - WAT E R SITE 3 �' �' �' ��� `' - \I . 4. SII DENOTES TEMPORARY P Y I2 TEMPORARY WETLAND SITE 5 `� w SE4 31 PERM ENT EN ATER w IMPACTS IN SURFACE IMPACTS (29 SF / < 0.01 AC) PERMANENT OPEN WATER IMPACTS (90 SF / < 0.01 AC) RANHORN, THOMAS L & RHONC ` WATER IMPACTS (491 SF /0.0 2 AC) 4Nv / DB 515 PG 53 PIN: 89 1309062879 12 DENOTES TEMPORARY / \ 7 z ay / / IMPACTS IN WETLANDS J TBM-✓ BENCH TIE MAGA/AIL IN '01 :0 0-9 _ N: 937038.0990 Ea 28/046�.2i. 'It -L- STA ,✓4+53.64 OFFSE 2 G i ' ELEV.6.6/' CL BRIDGE STA. 11 + 99 L GP ELEV. 6.1' 1@44.5' (18:' COREb SLAB) SKEW = 90o I c PI = 11+40.00 Pl - l2+70. th 01 EL = 5.30' I Pl = ?+05.00 EL = 5.58' I VC = 45 EL = ' S.46 VC = ' = VC = 85' K = 2 BEGIN GRADE K 30 END GRADE c I & MILLING I I K - 27 ' MlllING " " END MILLING ► ► ■ 8 EL.5.08 ST A.l2+ 3.25 8 M I /NG STA.//+52.4.3 FEMA 100-YR MI / ING l.5.78' Q 0" T. ✓.5" 0" TO 1.5" 111111111 /PROPOSED m6% =o - (- -` i Am _ ■■■■■■■■■■■ -GRAD Nommum E _ l+)1 T r _ - - 4cyp - - + • I I - . _ • r I - - -aTla 4 _ 1111111111 -/ / 1.a4 GROUN cyi BRIDGE HYDRAULIC DAtA 0 III/► A ps - ,. ; , • ■. _ ■■■■■■■■■■■ 0 ,� DESIGN DR CHARGE = 5/0 C S 1111111111 +, "A 1 . HW r '. _ ■■■■■■■■■■■ YEAR Fj PENCY = 100 of Yh'S -� r 0 -4 BRIDGE100 ir III i00 YEAR MM ELEVATION 6.9 F 4 > OVERTOPPING FREQUENCY = 5+ Y, S W -GALV• NIZED STEEL OVERTOPPING _DISCHARGF = 570 CFS OVERTOPPIN ELEVATION ORMALWATG R R/-A E ELLV = 2.9 FT H SHEE � PILES Q Kr Cc P:(919)878 9 (i0 w 8601 Six Forks Road,Forurr 1,5uite 703 EL Raleigh,North aroll a 276'5 3960 v) NC License No.,-C.1'2 o Engineers I Construction Managers I Planners I Scientists o www.rkk.com c\ c ON�] Responsive I'eppleII Cr$a iv!So,uto s !!! �NIC ` 10 11 12 13 PROJECT REFERENCE NO. SHEET NO. 0- - -L- B-6053 04 PI Sto 10+62.28 PI Sto 11+27.23 PI Sto 13+13.86 PI Sto 14+18.34 T R ET D T R E I P T E R I , SHEET NO. co A _ I.06' 15.9" (LT) A = l° 3/' 3/.7" (RT = 0° 4/' 02.9" (LT) A = 3°l6' 29.2" (LT) �� �� �� �� f► ROADWAY DESIGN HYDRAULICS D = 2° 0/ 28.5 D = 2° 0/ 28.5 D = 2° 0/ 28°5 D = 2°26' /7°2 SITE 1 f ;'" ENGINEER ENGINEER L = 54.55' L = 75°35' L = 33.79' L = 134.32' N k TEMPORARY STREAM i T = 27°28' T = 3768' T = 16.90' T = 67.18' P ___ R = 2830.00' R - _ - `2,830.00 R 2,830.00 R 2,350.00 \ IMPACTS (607 SF /0.02 AC, 58 LF) , � � � � PERMIT DRAWING I SE NC SE NC SE NC SE EXIST. SITE 4 '\ ♦ CLASS II I BRECK AND I AYLOR, LLC o��' SHEET 3 OF 7 DOSHEN, JOSHUA PERMANENT OPEN WATER DB 758 PG 320 °A- SITE 2 DB 1339 PG 578 SITE 2 PIN: 891309071335 RIPRAP W/ DB 758 PG 314 IMPACTS (167 SF / 0.01 AC) SITE 6 ; ; ____ TEMPORARY WETLA ; TEMPORARY OPE I WATER-- DB 60 8PG 286 / PERMANENT/'bPEtI , ' I < GEO FAB `�/�4TER IMPACTS (280 SF / 0.01 AC) PIN. 89130907512 ,-' IMPACTS---41 05-1_--%F- /0 03---AC)--- _ /�< Q.Q1 AC) ♦ - ___ _-_ _ �� .. IMPACTS (32 , SE PROJECT -6053 - T , ''sF 1 •. \ - - -_-- ' ' ♦ • ' 1 1 ' ;' -L-- PO eta. 10 65: 4 - - + ; ; ; `, ? ', DOCUMENT NOT CONSIDERED FINAL , f S ALL SIGNATURES COMPLETED > - __ Sto. l 9O L y PT l 64, 1 � � , 1 --_Y- '� UNLESS - TY ------ -L- PR-C--Sto° l0±89.5 ; ; ; ; `'1 32 PIN EWER UM- OUST' ; ; I - ---- 11 INV I5" OUT= 5' / 1 \ E 3r l's :c 's ��"fSTING- _ �! �I +59. 1;8 -----: ! f's s ► �:. _ . UXJST1i�� R/W � 1146 � _4 W ; . 1 \ 5 CONIC FAD, .� , a 1 ; o' - L �I�`\ ‘, \ \, \ \ : - ;sieldi, t 0 " "AO Aar ---------- ) ,,, QI- - - p - % Sto. 75et1 \♦ _ :II' Pfi Sao �4O � � 1-_ �`+ii�i r -- ---- - ---__ r . , 1, 11 , \\ - PJ t�. � y i �i(/) ' �! ►_ ��ir rim� �S �1 ° Z ` � --- � d _ j'�_ _-------- --- �_.__ -�- ___----=-i=�'. � �\ \ '`� ;; , ', ---- - �q1�4�.��t�1��11��`1�L���.!����iQ�_4�S��~�`�~s��~- __ --- 6�----- -------- ; 'w -- , N W� 111 --.fix ---- __ _ 171 _ 7/ sIDEwALL_K _-- , _ � TB- --- -ram----- ��____ ---_ =:>_7:r; fay►' -,�� - _=er g TB Pca;-- _ _ ___________________________= gym®..., __ _ y - _ -_-- ----- T __i r / -� F ,s„Ls y`� .� 'jl `' JJ PROVIDENCE ROAD P OVIDENCE ROA© \ c� \ I 23°�' PA -ED ROADWAY S 47° l2' 2I.9°`,E ------ -_S I _/ - A i I- c 46° 47' 06.1" `�' 1- 23°5' PAVED ROADWUTILIT BORE -- - 5 �� ,,,, o W S 47 28 09• .0 E Mo rCI �/i - . FTYP. __ _ - -- -- - _____________ -�- ��- ..� -� sue:-- _ _ �� - - �� iTB 4 1 T TB - B--------------- -----T�- I ----- TB - - - . _ _ _`- ==I 1: #��r. i a,� ` �, -e - 5'41' -- - --- ------ -BOR_ -------------� -- �-"�1. �rr.�- _ _ a� el :ea s.--- --- ---- - -- - - ��Q �► �TyS�Q �_ - ��d�� rrr__ - \SITS �, s--------------------------- ----------- ----- -- --------------------------------- ��� ~'��'����°ales'- N PRO. ECT 05TY#'TEAtY .E# _ _ _ , ,,M�C� 0- � �VA� _ v�__ � � � � �_ � � _ - --------------------------------- B-Efi 3- -- i" ---- '4� - I 'E IMPACTS 639 S-F / .04\ AC - Z C S#a " - - 1 -7 ;; 7___- --- DENOTES PERMANENT -------- --------- ------------------------------------- --- W - � M W�`T 1 ` ��� �a � ,..,. W .AWL AN ' S IN SURFACE WATER w Pxi 7r1vG �� + ___ ---- ;AC) - OF T m i �1 . ter, �� -------- 1 - �, y __ 5 SITE 3 __ ;;' 24 DENOTES TEMPORARY - �_ ��y \ 1 ;�I 1 1 w, s54 31 PERM ENT �.� ; WATER IMPACTS IN SURFACE TEMPORARY WETLAND-----:---- SITE 5 „ , , 1 ` �MPAE�S 2 9 S F / 4:�i AC PERMANENT OPEN WATER I M PAC '9 '(,9 0 `, F;'/ 0;01 ; A ) : RANHORN, THOMAS L & RHONC WATER N. IMPACTS (491 SF /0.02 AC) m PIN: 89 1309062879 DENOTES TEMPORARY 1 COW ,\ 1 1 , 1 1 T , /17> �' ` �%'\` ;; '; / IMPACTS IN WETLANDS 1 TBM-✓ BENCH TIE MAGMA/L IN '011 :• 0-9 _ N: 937038.0990 Ea 28/046 i.2 i. 'it -L- STA /4+53.64 OFFSE 25 ELEV,6.6/' I CL BRIDGE STA. 11 + 99 L GP ELEV. = 6.1' I 1 1@44.5' (18 ' COREb SLAB) SKEW = 90° PI = 11+40_00 Pl - 12+70. th I I EL = 5.30' I PI = 2+05.00 EL = 5-°58' I 0-1 VC = 45' EL = ' S.46' VC = ' 30 = IC K = 2 BEGIN GRADE K END GRADE ° I & MILLING II K - 27 ' MIllING 3 8 EL.5.08' END MILLING = T IF ► = ST A.l2+33.25 l.5.78' 8 M/l /NG STA 11+52,43 FF. 100-YR MU / /NG Q 0" • ✓.5" ' 0" TO l.5 111111111 PROPOSED m6% _o - ( -__ _ _ ■■■■■■■■■■■ �17ADC l+)1Tr _ - - umnim 4 - - _ r I - - - + • ••• 4 �. ► _ 1111111111 - 1.a4 GROUN 11111111 CD C I AT BRIDGE HYDRAULIC DA) A 3 z DESIGN 1=1I1F11i lr DES GN DR CHARGEY = 5- /0 C S 1111111111 +' �A A HW r _ ■■■■■■■■■■■ l00 YEAR DISCHARCE - 000 C' SI _4 i I'S YEARS 1 F1 PEQUENCY = /00 YRS -4 s_ BRIDGE 00 YEAR HW ELEVATION 6.9 F >> OVERTOPPING FREQUENCY = 5+ Y S W -GALV•• NIXED STEEL OVERTOPPING _DISCHARGF = 570 CFS OVERTOPPING ELEVATION ORMALWAT H R/-AE ELLV = 2.9 FT H SHEE � PILES ci P:(919)878-9 60 w 8601 Six Forks Road,Forum 1,5uite 700 Raleigh,North arolira 276 5-3960 NC License No.F-C.1'2 in o Engineers I Construction Managers I Planners 1 Scientists o www.rkk.com c\ c 0 s_-, Responsive Teeple 1 Cr$a>tive�So,uto s !!! _` 10 11 12 13 0 2.5 5 PROJ. REFERENCE NO. SHEET NO. N ludiuul B-6053 X -1 CD 75 70 65 60 55 50 45 40 35 30 25 20 15 10 $ 0 5 10 15 20 25 30 35 40 45 50 55 6-0 65 70 Permit Drawing . . . Sheet 4 of 7 . . . • I 0 . 020 p . o2o -------,5 I . , . A ,- _. . . . 508 --..., - :7 • • S-.-S . 2 . 6 ., ____________„... 11 - - 25 .0O 4 0. 0200 . 020 : . .89-1_ *•, --- -- - - . 5 - S5 _ _ 008 5 - . $ . 4 .24 S . S . 4 .18 ---________, ,- 0 __ 0 0 ____ __________ ,--- (D CD CZ 11 + 00. 00 = ___________________ _ ._ -a E • - 0. 023 . 7a) CD 0 ,-- r e --#1..-J''`''' _ ___ _ . __ -- -1 U ( ---I------------------- t__ s _______ __ 0 10 + 75 . 00 AI I A II 5frit____ __________I • • 5 - --- S. S . 4.23 5008 S . S . .2 0 __ ____ ___-- 10 + 65 . 00 I BEGIN PROJECT — nt rSewer WaderSa to 10 + 65 . 00 = Ternpo-ra-i ' = ,a ee Pad T x -� - - ________________ __-_ ,----- 5 . 0 9 ___-______ ___ -- ^ m 1 0 + 50 . 00 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED can ' ' I II II II II II II Note: Approximate quantities only. Unclassified Excavation, Borrow Excavation, Shoulder - o / Borrow, Fine Grading, Clearing and Grubbing, Breaking of Existing Pavement, and o 0 / Removal of Existing Pavement will be paid for at the contract lump sum price for "Grading." = ro— ro ■ I � � 75 70 65 60 55 50 45 40 35 30 25 20 15 10 5 0 5 10 15 20 I : 25 30 35 40 45 F� 60 65� • ° 0 2.5 5 PROJ. REFERENCE NO. SHEET NO. CO (, ludiuul B-6053 X -2 75 70 65 60 55 50 45 40 35 30 25_ 20 15 10 $ 0 5 10 15 20 25 30 35 40 45 50 52 60 65 70 75 • . • - •• • 0. 020 0 . 020 • ■ -�.--- _ _ :_________ _\`2 - Permit Drawing . 5 :7 • _. ,- Sheet 5 of 7 o -- ------------ ___ -------- -- S . S . 1 .46• SS . 1 . 68 n ■ " -• . . a) • ' 12 + 50 . • : O . .— - . 00 • • co • • CD • . . • C • . . •• * . • • 0_ • • O • • • CD • • 0 . 020• 0 . 020T . . " 5 �- - \ 5 • • �.' - �\ --- •- • • ,i \ / T ���\ ■ •• , \ / -S •■ • _ 6 . 02 \ / \ o ----- ---- _ - GALVANIZED STEEL—L� - - ---------__ -------- ----_ - n • • • SHEET PILES • • ;• •• 12 + 25 . 00 • • • • • •• • . . END BRIDGE • • • • 12 + 21 .25 I I 0 .020 0 . 020 \ .5 / \ / \ / \ / \ 6 26 1 o ` n ----------_ _ -- ------------ o - I , -�' -- ___ _____ -5 12 + 00 . 00 BEGIN BRIDGE 11 + 76 . 75 • • • • • 0. 020 0 .020 5 • - 5 -• /r�� `- t \7- • 5 • / ♦� ■ • /--, _` • • • L 600 o __ GALVANIZED STEEL `� _ _ n SHEET PILES ' ---- ----- - -- ----- • O -5 11 + 75 . 00 - -0 • cr) • • • = . • c - • • : * 0 - • az - 00.020 0 . 020L CD `L V ■ XI ■ �. CC __ -_ --- -� --- -------- S.S. 0 . 6$ S . S . 0 . 93 --- ------- ----�___ ------- -------- • • • ■ ---- • 11 50.00 I - ■ f ■ . • O�� ■ I ■ 0 • • - 75 70 65 60 55 50 45 40 35 30 25: 20 15 10 5 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 co0 2.5 5 PROJ. REFERENCE NO. SHEET NO. CO N ludiuul B-6053 X -3 11 75 70 65 60 55 50 45 40 35 30 25 20 15 10 $ 0 5 10 15 20 25 30 35 40 45 50 52 613 65 70 Permit Drawing Sheet6of7 -- ---------------- n -- -- -- , ------- � � 35 n 13 + 50 . 00 END PROJECT 13 + 35 . 00 0 .022 0.021 __ H____111 5 `� -� 4.417. --- —--- - _____8 1 - II" _ ___ S.S. 4 . 68 S . S . 3 . 64 a 5 . 78 as 13 + 35 . 00 an, CD 0_ 0 . 02T0 . 021 __ p421 7 4I5 I I I \ 5 . 73 ♦♦ __— _ _— —/I S. S . 4 .44 S .S . 3 . 80 0___----—�- ------------- -------___ ----------. __ 13 + 25 . 00 0. 020 0 . 020 :5 78. -.1- _ 4. 3g . IIII / ♦\♦♦♦♦__ ice. - .________ • - --. ___ S.S. 4 .22 S . S . 4 .20 ____________ -- -----------------� ----- I 5 o b ---- ---------------- n n 13 + 00 . 00 0. 020 0 . 020 1 I I ♦ S . S . - ik _____. ____ _ ' ____________ 0 1 _______ , _____ ___ ________ -0 __________ __ ______ 1 ,,, 1 .4 S 1 . 78 . 0co 12 + 75 . 00 Li (,-, L, O 0 _i . _ c\i3 ,-0, - � 75 70 65 60 55 59 45 40 35 30 25 20 15 10 5 0 5 10 15 20 I 25 30 35 40 45 50 55 60 65 70 75 OPEN WATER, WETLAND AND STREAM IMPACTS WETLAND OPEN WATER SURFACE WATER IMPACTS Existing Existing Permanent Temp. Permanent Temp. Permanent Temp. Channel Channel Natural Site Station Structure Fill In Fill In Fill In Fill In SW SW Impacts Impacts Stream No. (From/To) Size / Type Wetland Wetland Open Water Open Water impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft) 1 -L- 11 +86 to 12+20 LT Stream Crossing 0.014 58 Sheet Piles 2 -L- 9+83 to 10+60 LT Temp. Fill Slope 0.006 0.024 3 -L- 9+83 to 10+60 RT Temp. Fill Slope 0.001 0.038 4 -L- 11 +11 to 11 +86 LT Fill Slope 0.004 5 -L- 11 +11 to 11 +86 RT Fill Slope 0.011 6 -L- 12+20 to 12+78 LT Fill Slope 0.001 7 -L- 12+20 to 12+78 RT Fill Slope 0.001 0.002 TOTALS*: <0.01 <0.01 0.02 0.07 0.02 58 *Rounded totals are sum of actual impacts NOTES: NC DEPARTMENT OF TRANSPORTATION Existing Bridge is two spans; 1 @ 15.75' and 1 @ 15.75' for a total length of 31 .50'. The bridge consists of at timber DIVISION OF HIGHWAYS floor on timber joists with timber caps and piles. The existing bridge is 25.5' wide, out to out, and is skewed 90 degrees to the road. November 20, 2020 Proposed Bridge is one span; 1 @ 44.50' for a total length 45.00'. The bridge consists of 18" cored slab units on steel H-piles with Pasquotank County and sheet pile walls (bridge opening between sheet pile walls is 36.00'. The propsed bridge is 30.0' wide, out to out, and is skewed B-6053 90 degrees to the road. Revised 2016 09 09 SHEET 7 OF 7