Loading...
HomeMy WebLinkAbout20201438 Ver 1_ePCN Application_20201130 I I DWR Division of Water Resources Pre-Construction Notification (PCN) Form October 26,2020 Ver 3.3 Initial Review Has this project met the requirements for acceptance in to the review process?* 6 Yes ✓ No Is this project a public transportation project?* G Yes r No Change only if needed. BIMS#Assigned* Version#* 20201438 1 Is a payment required for this project?* 6 No payment required ✓ Fee received Reviewing Office* ✓ Fee needed-send electronic notification Washington Regional Office-(252)946-6481 Select Project Reviewer* Garcy Ward:eads\gpward Information for Initial Review 1a.Name of project: B-6053 Replacement of Bridge No.34 On Providence Road 1a.Who is the Primary Contact?* Jinger Hickman(City of Elizabeth City) lb.Primary Contact Email:* 1c.Primary Contact Phone:* jhickman@cityofec.com (252)337-6628 Date Submitted 11/30/2020 Nearest Body of Water Knobbs Creek Basin Pasquotank Water Classification C;Sw Site Coordinates Latitude: Longitude: 36.294312 -76.250410 Pre-Filing Meeting Information ID# Version 20201438 1 Pre-fling Meeting or Request Date* 10/9/2020 Attach documentation of Pre-Filing Meeting Request here:* DWR Pre-Filing Meeting Request Form.pdf 52.16KB A. Processing Information C^U County(or Counties)where the project is located: Pasquotank Is this a NCDMS Project C- Yes f No Is this project a public transportation project?* 6 Yes r No Is this a NCDOT Project?* 6 Yes r No (NCDOT only)T.I.P.or state project number: B-6053 WBS#(2) 48754.1.1 1a.Type(s)of approval sought from the Corps: fJ Section 404 Permit(wetlands,streams and waters,Clean Water Act) r Section 10 Permit(navigable waters,tidal waters,Rivers and Harbors Act) Has this PCN previously been submitted?* C- Yes 6' No lb.What type(s)of permit(s)do you wish to seek authorization? 17 Nationwide Permit(NWP) r Regional General Permit(RGP) r Standard(IP) 1c.Has the NWP or GP number been verified by the Corps? F. Yes CNo Nationwide Permit(NWP)Number: 03-Maintenance Nationwide Permit(NWP)Number: 12-Utility Lines NWP Numbers(for multiple NWPS): 03 and 12 Id.Type(s)of approval sought from the DWR: I7 401 Water Quality Certification-Regular I—'401 Water Quality Certification-Express r Non-404 Jurisdictional General Permit r Riparian Buffer Authorization r Individual Permit le.Is this notification solely for the record because written approval is not required? * For the record only for DWR 401 Certification: F' Yes C' No For the record only for Corps Permit: l' Yes C' No If.Is this an after-the-fact permit application?* C- Yes f No 1g.Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? C Yes ( No 1g.Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? C- Yes r No Acceptance Letter Attachment 1h.Is the project located in any of NC's twenty coastal counties? 6 Yes C No 1i.Is the project located within a NC DCM Area of Environmental Concern(AEC)? C- Yes f No C- Unknown 1j.Is the project located in a designated trout watershed? C Yes 6' No B. Applicant Information Id.Who is applying for the permit? I7 Owner r Applicant(other than owner) le.Is there an Agent/Consultant for this project?* C: Yes C' No 2.Owner Information 2a.Name(s)on recorded deed: City of Elizabeth City 2b.Deed book and page no.: N/A 2c.Responsible party: Jinger Hickman(City of Elizabeth City) 2d.Address Street Address PO Box 347 Address Line 2 Criy State/Province/Region Elizabeth City NC Postal/Zip Corte Country 27907 USA 2e.Telephone Number: 2f.Fax Number: (252)337-6628 2g.Email Address:* jhickman@cityofec.com 4.Agent/Consultant(if applicable) 4a.Name: Matthew Martin 4b.Business Name: RK&K 4c.Address Street Address 8601 Six Forks Road Address Line 2 Forum 1,Suite 700 Criy State/Province/Region Raleigh NC Postal/ZZp Code Country 27615 USA 4d.Telephone Number: 4e.Fax Number: (919)878-9560 4f.Email Address:* mmartin@rkk.com Agent Authorization Letter* Final_Signed_Contract 1.pdf 42.56KB C. Project Information and Prior Project History 1. Project Information lb.Subdivision name: (if appropriate) NA 1c.Nearest municipality/town: Elizabeth City 2. Project Identification 2a.Property Identification Number: 2b.Property size: N/A-City Owned 2.1 2c.Project Address Street Address Address Line 2 l7ty State/Rovince/Region Postal/Zip Code Country 3.Surface Waters 3a.Name of the nearest body of water to proposed project:* Knobbs Creek 3b.Water Resources Classification of nearest receiving water:* C;Sw 3c. What river basin(s)is your project located in?* Pasquotank 3d.Please provide the 12-digit HUC in which the project is located. 03010205 4. Project Description and History 4a.Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* The project area is located around bridge B-6053 on Providence Road approximately 0.10 of a mile west of the intersection with US 17 Business in the town of Elizabeth City in Pasquotank County,North Carolina.The general land use in the vicinity of the project is a residential neighborhood. 4b.Have Corps permits or DWR certifications been obtained for this project(including all prior phases)in the past?* r Yes !' No r Unknown 4d.Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site.(for DWR) USGS_8.5x11.pdf 877.77KB 4e.Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site.(for DWR) 4f.List the total estimated acreage of all existing wetlands on the property: 0.4 4g.List the total estimated linear feet of all existing streams on the property: 120 4h.Explain the purpose of the proposed project:* Bridge No.34 has a sufficiency rating of 17.6 out of 100 and is rated as structurally deficient.The 63-year-old year-old timber structure is approaching the end of its useful life.Bridge No.34 will be replaced on the existing location. 4i.Describe the overall project in detail,including indirect impacts and the type of equipment to be used:* Bridge No.34 will be replaced on the existing location with a new47'-4"-long bridge.The roadway will include two 10'wide lanes and 3'wide shoulders(7'shoulders where guardrail is required).All equipment will be staged in the dry. 4j.Please upload project drawings for the proposed project. B6053 Permit Drawings20201120.pdf 1.97MB B6053 Prelim UC.pdf 1.32MB 5.Jurisdictional Determinations 5a.Have the wetlands or streams been delineated on the property or proposed impact areas?* 6. Yes C- No O Unknown Comments: 5b.If the Corps made a jurisdictional determination,what type of determination was made?* B Preliminary C- Approved C- Not Verified C- Unknown C- N/A Corps AID Number: SAW-2020-00839 5c.If 5a is yes,who delineated the jurisdictional areas? Name(if known): Matthew Martin Agency/Consultant Company: RK&K Other: 5d.List the dates of the Corp jurisdiction determination or State determination if a determination was made by the Corps or DWR USACE jurisdiction determination was completed on June 11,2020. 5d1.Jurisdictional determination upload SAW-2020-00839 Elizabeth City_B6053.pdf 258.99KB 6. Future Project Plans 6a.Is this a phased project?* C Yes 6. No Are any other NWP(s),regional general permit(s),or individual permits(s)used,or intended to be used,to authorize any part of the proposed project or related activity? This is not a phased project. LD. Proposed Impacts Inventory 1. Impacts Summary 1a.Where are the impacts associated with your project?(check all that apply): 7 Wetlands 17 Streams-tributaries r Buffers 17 Open Waters r Pond Construction 2.Wetland Impacts 2a.Site#*(?) 2a1 Reason(?) 2b.Impact type*(?) 2c.Type of W.* 2d.W.name* 2e.Forested* 2f.Type of 2g.Impact Jurisdicition*(?) area* 2 Temporary Fill T Riverine Swamp Forest WA Yes Both 0.006 (acres) 3 Temporary Fill T Riverine Swamp Forest WA Yes Both 0.001 (acres) 7 Fill Slope P Riverine Swamp Forest WA Yes Both 0.001 (acres) 2g.Total Temporary Wetland Impact 2g.Total Permanent Wetland Impact 0.007 0.001 2g.Total Wetland Impact 0.008 2h.Comments: Sites 2 and 3 are temporary impacts associated with fill a temporary fill slope.Site 7 is a permanent impact associated with a permanent fill slope. Removal of any trees is not anticipated however if needed this will be completed by non-mechanized methods. 3.Stream Impacts 3a.Reason for impact(?) 3b.lmpact type* 3c.Type of impact* 3d.S.name* 3e.Stream Type* 3f.Type of 3g.S.width* 3h.Impact (?) Jurisdiction* length* S1 Removal and Sheet pile Temporary Workpad/Causeway UT to Knobbs Creek Perennial Both 25 58 installation Average(feet) (linear feet) 3i.Total jurisdictional ditch impact in square feet: 0 3i.Total permanent stream impacts: 3i.Total temporary stream impacts: 0 58 3i.Total stream and ditch impacts: 58 3).Comments: Temporary impacts shown reflect bent removal and sheet pile installation. 4.Open Water Impacts 4a. Site# 4a1.Impact Reason 4b.Impact type 4c.Name of waterbody 4d.Activity type 4e.Waterbodytype 4f.Impact area 2 Temporary Utility Bore T TA Fill Tributary 0.03 Work pad 3 Temporary Utility Bore T TA Fill Tributary 0.04 Work pad 4 Fill Slope P TA Fill Tributary 0.01 5 Fill Slope P TA Fill Tributary 0.02 6 Fill Slope P TB Fill Tributary 0.01 7 Fill Slope P TB Fill Tributary 0.01 4g.Total temporary open water Impacts: 4g.Total permanent open water impacts: 0.07 0.05 4g.Total open water impacts: 0.12 4h.Comments: Sites 2 and 3 are both temporary utility bore work pad locations.Sites 4,5,6 and 7 are a permanent fill slope.The smallest unit of measure for Open Water impacts provided by the EPCN is one hundredth of a acre.To provide a better understanding of the impacts the are listed to the thousandth on the attached impact table and below. Site 2-Temporary Fill-0.024 acres Site 3-Temporary Fill-0.038 acres Site 4-Permanent Fill-0.004 acres Site 5-Permanent Fill-0.011 acres Site 6-Permanent Fill-0.001 acres Site 7-Permanent Fill-0.002 acres Total Temporary Impact-0.062 acres(Attached impact table rounded total to hundredth 0.07 acres) Total Permanent Impact-0.018 acres(Attached impact table rounded total to hundredth 0.02 acres) Total Open Water Impact-0.080 acres E. Impact Justification and Mitigation 1.Avoidance and Minimization 1a.Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: Limits of disturbance for the project were limited to the areas necessary for construction/ easements.Impacts to Waters of the U.S.were limited to the smallest footprint practicable.There are no deck drains located on the bridge.The existing bridge demolition will follow NCDOT BMP's for bridge demolition work.An offsite detour is being utilized to eliminate any additional wetland and surface water impacts lb.Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: Utilizing BMPs for bridge demolition will capture all components of the old structure.Erosion and Control measures will be placed along the entire project area to reduce soil runoff.A turbidity curtain can be utilized along the banks to capture any siltation that may occur during project construction. The utilization of precast concrete materials,reduces the potential for uncured concrete entering the adjacent waters. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a.Does the project require Compensatory Mitigation for impacts to Waters of the U.S.or Waters of the State? ✓ Yes allo 2b.If this project DOES NOT require Compensatory Mitigation,explain why: The impacts for this project are below both 150 linear feet of stream impacts and below the 1/10th acre of wetland impacts,this project is below the required mitigation thresholds found in regional condition 3.2(pg 28)and general condition 23(pg 9)of Nationwide Permit#3. F. Stormwater Management and Diffuse Flow Plan (required by DWR) 1. Diffuse Flow Plan 1a.Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? ✓ Yes ( No If no,explain why: This project does not take place within one of the NC Riparian Buffer Protection Rule watersheds. 2.Stormwater Management Plan 2a.Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?* ✓ Yes 6 No 2b.Does this project meet the requirements for low density projects as defined in 15A NCAC 02H.1003(2)? 6 Yes r No Comments: This project meets the requirements for a low density project. G. Supplementary Information 1. Environmental Documentation la.Does the project involve an expenditure of public(federal/state/local)funds or the use of public(federal/state)land?* 6 Yes rNo lb.If you answered"yes"to the above,does the project require preparation of an environmental document pursuant to the requirements of the National or State(North Carolina) Environmental Policy Act(NEPAISEPA)?* ✓ Yes r No 1c.If you answered"yes"to the above,has the document review been finalized by the State Clearing House?* ✓ Yes allo Comments:* The activity and impacts are covered by Minimum Criteria Checklist or PCE. 2.Violations(DWR Requirement) 2a.Is the site in violation of DWR Water Quality Certification Rules(15ANCAC 2H.0500),Isolated Wetland Rules(15A NCAC 2H.1300),or DWR Surface Water or Wetland Standards or Riparian Buffer Rules(15A NCAC 2B.0200)?* ✓ Yes f No 3. Cumulative Impacts(DWR Requirement) 3a.Will this project result in additional development,which could impact nearby downstream water quality?* ✓ Yes (cNo 3b.If you answered"no,"provide a short narrative description. This is a single and complete project. 4.Sewage Disposal(DWR Requirement) 4a.Is sewage disposal required by DWR for this project?* ✓ Yes r No (7 N/A 5. Endangered Species and Designated Critical Habitat(Corps Requirement) 5a.Will this project occur in or near an area with federally protected species or habitat?* ✓ Yes 6' No 5b.Have you checked with the USFWS concerning Endangered Species Act impacts?* ✓ yes (7 No 5d.Is another Federal agency involved?* (' Yes r No r Unknown What Federal Agency is involved? Federal Highways Administration 5e.Is this a DOT project located within Division's 1-8? 6 Yes r No 5j.What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? https://wwwfws.gov/raleigh/species/cntylist/pasquotank.html https://www.fisheries.noa a.gov/southea st/co nsu ltations/north-ca roli na Consultation Documentation Upload 6. Essential Fish Habitat(Corps Requirement) 6a.Will this project occur in or near an area designated as an Essential Fish Habitat?* 6 Yes rNo Are there submerged aquatic vegetation(SAy)around the project vicinity?* ✓ Yes 6 No r Unknown 6b.What data sources did you use to determine whether your site would impact an Essential Fish Habitat?* https://www.habitat.noaa.gov/application/efhmapper/indexhtml 7. Historic or Prehistoric Cultural Resources(Corps Requirement) 7a.Will this project occur in or near an area that the state,federal or tribal governments have designated as having historic or cultural preservation status?* ✓ Yes f. No 7b.What data sources did you use to determine whether your site would impact historic or archeological resources?* http://gis.ncdcr.gov/hpoweb/and correspondence wth the State Historic Preservation Office. 7c.Historic or Prehistoric Information Upload B-6053_SHPO.pdf 95.16KB 8. Flood Zone Designation(Corps Requirement) 8a.Will this project occur in a FEMA-designated 100-year floodplain?* 6 Yes rNo 8b.If yes,explain how project meets FEMA requirements: NCFMP issued a letter dated June 19,2020 to the City of Elizabeth City stating that the Flood Study Report for the Providence Road Bridge Replacement Project met FEMA's required guidance for No-Rise Certification. 8c.What source(s)did you use to make the floodplain determination?* https://msc.fema.gov/portal/searchffsearchresultsanchor Miscellaneous Comments The Wildlife Resources Commission has indicated that just downstream from the project area is designated as a spawning area for anadromous fish and that River herring are likely to utilize the portion of the tributary in the project location.A moratorium from February 15 to June 30 is therefore required. Attached is Email communication with Kyle Barns(USAGE).The email confirms the NWP numbers and confirms a"for the record"non-notifying PCN. Miscellaneous attachments not previously requested. USACE_Emails.pdf 261.71KB Signature * IJ By checking the box and signing below,I certify that: • The project proponent hereby certifies that all information contained herein is true,accurate,and complete to the best of my knowledge and belief;and • The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. • I have given true,accurate,and complete information on this form; • I agree that submission of this PCN form is a"transaction"subject to Chapter 66,Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act"); • I agree to conduct this transaction by electronic means pursuant to Chapter 66,Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act"); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature;AND • I intend to electronically sign and submit the PCN form. Full Name: Matthew Martin Signature [Wm Ylexf Ole ttzie Date 11/30/2020