HomeMy WebLinkAbout20201310 Ver 1_Catawba Buffer Form_20201124Strickland, Bev
From: MARINE CONSTRUCTION OF HICKORY <marineconl @embargmail.com>
Sent: Tuesday, November 24, 2020 9:00 AM
To: Perez, Douglas J
Cc: Johnson, Alan
Subject: [External] Re: 0 Bible Camp Lane (DWR #20-1310)
Attachments: Amber Tramble Catawba Buffer.pdf
ar"r-TrExternal email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
ELort.spam@nc.gov
Good morning Douglas.
I have attached the Catawba Buffer form for 0 Bible Camp Lane - Lot 90 (Amber Tramble).
ID # 20201310
The same applies to this job as your prior request. I did not see a place to include on the online submission.
Thanks,
Yvette
From: "Douglas J Perez" <doug.perez@ncdenr.gov>
To: "marineconl" <marineconl@embarqmail.com>
Cc: "Johnson, Alan" <alan.johnson@ncdenr.gov>
Sent: Monday, November 23, 2020 10:14:45 AM
Subject: 0 Bible Camp Lane (DWR #20-1310)
Hello,
I am emailing you today about your shoreline stabilization application. First, I would ask that you please read, fill out &
sign, and return to me the Catawba Riparian Buffer Form. I have attached it here in two formats. Please fill out
whichever one works best for you. Second, I am concerned about the number of trees you say you will impact. 20 4"-6"
is just too much and that is not something we can authorize without significant justification. If you could clarify this, that
would be most appreciated.
Sincerely,
Doug Perez
DWR
DiviAlon of Witter Resources
Doug Perez— Environmental Specialist
NC Dept. of Environment & Natural Resources (NCDENR)
Division of Water Resources - Water Quality Regional Operations
1
610 East Center Ave., Suite 301, Mooresville, NC 28115
Phone: (704) 235-2162 Fax: (704) 663-6040
E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be
disclosed to third parties unless the content is exempt by statute or other regulation.
Tony Gaines
Marine Construction Company
1173 Shiloh Church Rd.
Hickory, N.C. 28601
(828) 495-3040 (828) 312-8202
marineconl@embarqmaii.com
CATAWBA RIPARIAN BUFFER NOTIFICATION FORM
Project Name/address: Amber Tramble — 0 Bible Camp Ln Taylorsville NC 28681 County: Al
, - I
Owner:
Ilei r_:
Print Signature —-T--� c�
Contractor/agent: Tony Gaines �
Print Signature
The approval is for the purpose and design described in your application. Impacts not indicated in the
application is a violation of the Buffer Rule. Site specific work should be provided in the application. [15A NCAC
02H .0506 and 15A NCAC 02B .0243(8)]
Trees are not allowed to be removed from Zone 1 of the Buffer (within 30 ft of the full pond elevation), unless
approved. Exception, those trees that are severely undermined along the immediate shoreline can be removed.
Minimal shaping and sloping along the immediate shoreline is allowed. [15A NCAC 02B .0243(6)]
Benching and grading in the buffer is not allowed. Excessive disturbance of ground cover. [15A NCAC 02B .0243
(6)]
Beaches, impervious patios, impervious walkways, etc. are not allowed in the buffer unless specifically approved
by the Division. There are limitation on size for decks. [15A NCAC 02B .0243(4) and (6)]
Work to be conducted from land must indicate an access and indicate any trees that are to be removed. The
work corridor should be described. The approved access corridor shall be restored. Staging, spoil, construction
material must be outside the buffer. [15A NCAC 02H .0502 and 15A NCAC 02B .0243 (4), (6), (8)]
Stormwater cannot be piped or channeled for direct discharge to the lake. All constructed stormwater
discharges must be at the natural elevation and discharged prior to entering the buffer directed as diffuse or
sheet flow at non -erosive velocities to the lake. [15A NCAC 02B .0243(5), (6)]
Acknowledgement of Notification
I, Amber Tramble , hereby state that I have been informed of the Catawba
Riparian Buffer Rule. Any work conducted in the buffer, not specifically stated in the application and approved
by the Division of Water Resources (DWR), is a violation and subject to enforcement. Due diligence will be
taken such that the construction will be built within substantial compliance and intent of the 401 Water
Quality Certification and Buffer Rules, the approved plan(s) and specification(s), and other supporting
materials.ZY
Date:
Signature (owner):