HomeMy WebLinkAboutWQ0002622_Permit (Issuance)_20000731State of North Carolina
Department of Environment
and Natural Resources r'�� ?1 i
Division of Water Quality ' '�" 0i°�J �°�"L)
James B. Hunt, Jr., Governor AUG 7 2000
Bill HolrVan, Secretary FAYETTEVILE
Kerr T. Stevens, Director REC13i. 0;: =oCE
July 31, 2000
Honorable Bobby Strickland, Mayor
Town of Salemburg
P. O. Box 190 r
Salemburg, North Carolina 28385-0190
Dear Mayor Strickland:
4 0IT
•
NCDENR
NORTH CAROLINA DEPARTMENT OF
ENVIRONMENT AND NATURAL RESOURCES
Subject: Permit No. WQ0002622
Town of Salemburg
Salem Pizza
Pressure Sewer Extension
Sampson County
In accordance with your application received June 27, 2000, and additional information
received July 25, 2000, we are forwarding herewith Permit No. WQ0002622 dated July 31, 2000, to
the Town of Salemburg for the construction and operation of the subject wastewater collection
extension. This permit shall be effective from the date of issuance until rescinded, shall void Permit
No. WQ0002622 issued April 8, 1991, and shall be subject to the conditions and limitations as
specified therein.
Permitting of this project does not constitute an acceptance of any part of the plans and
specifications that do not meet 15A NCAC 2H .0200 and the Division of Water Quality's Gravity
Sewer Minimum Design Criteria adopted February 12, 1996 unless specifically mentioned herein.
Division approval is based on the acceptance of the certification provided by a N.C. Professional
Engineer on Page 6 of the subject permit application form. It shall be the permittee's responsibility
to ensure the plans and specifications meet the appropriate design criteria and rules. Failure to
comply may result in penalties in accordance with North Carolina General Statute 143-215.6A — 143-
215.6C, construction of additional facilities, and/or referral of the N.C. Professional Engineer to the
licensing board.
If any parts, requirements, or limitations contained in this permit are unacceptable, you have
the right to request an adjudicatory hearing upon written request within 30 days following receipt of
this permit. This request must be in the form of a written petition, conforming to Chapter 150B of
North Carolina General Statutes, and filed with the Office of Administrative Hearings, 6714 Mail
Service Center, Raleigh, NC 27699-6714. Unless such demands are made this permit shall be final
and binding.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Telephone (919) 733-5083 Fax (919) 715-6048
An Equal Opportunity Affirmative Action Employer 50% recycled/10% post -consumer paper
One set of approved plans and specifications is being forwarded to you. If you need
additional information concerning this matter, please contact Bennie Goetze, Jr., P. E. at (919) 733-
5083 extension 362.
Sinc y
i
.,/,Kerr T. Stevens
cc: Sampson County Health Department
Fayetteville Regional Office, Water Quality Section (Salemburg WWTP)
George Finch/Boney and Associates, P. A.
NORTH CAROLINA
ENVIRONMENTAL MANAGEMENT COMMISSION
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
RALEIGH
WASTEWATER COLLECTION PERMIT
In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as
amended, and other applicable Laws, Rules, and Regulations
PERMISSION IS HEREBY GRANTED TO
Town of Salemburg
Sampson County
FOR THE
construction and operation of a pressure sewer collection system consisting of 2, 25 to 35 GPM pump stations
with duplex pumps, on -site audible and visual high water alarms and approximately 2,608 linear feet of 3-inch
pressure sewer, to serve Salem Pizza and Spell's Paint and Body Shop, and the discharge of 4,125 GPD of
collected commercial wastewater into the Town of Salemburg's existing sewerage system,
and the continued operation of a pressure sewer system consisting of 245 septic tanks with effluent pumps and
high water alarms, approximately 13,150 linear feet of 2-inch pressure sewer, approximately 11,140 linear feet
of 2.5-inch pressure sewer, approximately 14,265 linear feet of 3-inch pressure sewer, approximately 3,455
linear feet of 4-inch pressure sewer, approximately 10,116 linear feet of 6-inch pressure sewer, and 2, 30 GPM
pump stations with duplex pumps and high water alarms to serve the Town of Salemburg and the discharge of
75,000 GPD of collected domestic wastewater into the Town of Salemburg's spray irrigation treatment
facilities,
pursuant to the application received June 27, 2000, and in conformity with the project plan, specifications, and
other supporting data subsequently filed and approved by the Department of Environment and Natural
Resources and considered a part of this permit.
This permit shall be effective from the date of issuance until rescinded and shall be subject to the
following specified conditions and limitations:
This permit shall become voidable unless the facilities are constructed in accordance with the conditions
of this permit, 15A NCAC 2H .0200, the Division of Water Quality's Gravity Sewer Minimum Design
Criteria adopted February 12, 1996, the approved plans and specifications and other supporting data
unless specifically mentioned herein.
2. This permit is effective only with respect to the nature and volume of wastes described in the application
and other supporting data.
The facilities must be properly maintained and operated at all times.
4. The sewage and wastewater collected by this system shall be treated in the Town of Salemburg's
Wastewater Treatment Facility (WQ0002621) prior to being land applied
5. This permit is not transferable. In the event there is a desire for the facilities to change ownership, or
there is a name change of the Permittee, a formal permit request must be submitted to the Division of
Water Quality (Division) accompanied by documentation from the parties involved and other supporting
materials as may be appropriate. The approval of this request will be considered on its merits and may
or may not be approved.
6. Construction of the sewers, pump station(s) and force main shall be scheduled so as not to interrupt
service by the existing utilities nor result in an overflow or bypass discharge of wastewater to the surface
waters of the State.
7. Upon completion of construction and prior to operation of this permitted facility, a certification and a
copy of the record drawings (i.e., as -constructed plans) must be received from a professional engineer
certifying that the permitted facility has been installed in accordance with the Division's Gravity Sewer
Minimum Design Criteria adopted February 12, 1996, 15A NCAC 2H .0200, this permit, and other
supporting materials. If this project is to be completed in phases and partially certified, you shall retain
the responsibility to track further construction approved under the same permit and provide a final
certificate of completion once the entire project has been completed. A copy of the record drawings,
indicating the facilities constructed in the phase being certified, shall be submitted with each partial
certification. Mail the Certification and one (1) copy of the record drawings to the Non -Discharge
Permitting Unit, 1617 Mail Service Center, Raleigh, NC 27699-1617.
A copy of the approved plans and specifications shall be maintained on file by the Permittee for a
minimum of five years from the date of the completion of construction.
Failure to abide by the conditions and limitations contained in this permit or to construct the facilities in
accordance with the conditions of this permit, 15A NCAC 2H .0200, the Division's Gravity Sewer
Minimum Design Criteria adopted February 12, 1996, the approved plans and specifications, and other
supporting data may subject the Permittee to an enforcement action by the Division, in accordance with
North Carolina General Statute 143-215.6A to 143-215.6C.
10. The issuance of this permit does not preclude the Permittee from complying with any and all statutes,
rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and
federal) which have jurisdiction.
11. The Permittee shall provide for the pump station(s) and force main(s) the following items:
a. Pump on/off elevations located so that 2-8 pumping cycles may be achieved per hour in any
centralized pump station serving more than one building.
b. A minimum of 20 gallons of storage capacity above the pump -on activation level at the body shop
and a minimum of 500 gallons of storage capacity above the pump -on activation level at the
restaurant to meet the greater of the permittee response time for service or the longest non -
catastrophic power outage of the previous three years.
c. An air relief valve located at all high points along the force main.
d. A screened vent for the wet well.
e. Fillets located in the wet well(s) at the intersection of the flooring and sidewalls.
f. Three feet of cover (minimum) over the force main or the use of ferrous material where three feet
cannot be maintained.
g. Sufficient devices which will protect the pump station from vandals.
h. Flood protection if the pump station is located below the 100-year flood elevation.
i. Adherence with the following minimum separations:
(i) Storm sewers (vertical) 12 inches
(ii) Water mains (vertical -water over sewer) 18 inches or (horizontal) 10 feet
(iii) In benched trenches (vertical) 18 inches
(iv) Any private or public water supply source, including any WS-I waters or Class I or Class II
impounded reservoirs used as a source of drinking water 100 feet
(v) Waters classified WS (other than WS-I), B, SA, ORW, HQW, or SB [from normal high water
(or tide elevation)] 50 feet
(vi) Any other stream, lake or impoundment 10 feet
(vii) Any building foundation 5 feet
(viii) Any basement 10 feet
(ix) Top slope of embankment or cuts of 2 feet or more vertical height 10 feet
(x) Drainage systems
(I) Interceptor drains 5 feet
(II) Ground water lowering and surface drainage ditches 10 feet
(xi) Any swimming pool 10 feet
(xii) Ferrous sewer pipe with joints equivalent to water main standards, shall be used where these
minimum separations cannot be maintained. The minimum separation shall however not be
less than 25 feet from a private well or 50 feet from a public water supply well;
12. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions,
the Permittee shall take immediate corrective action, including those that may be required by this
Division, such as the construction of additional or replacement wastewater collection facilities.
13. Noncompliance Notification:
The Permittee shall report by telephone to the Fayetteville Regional Office, telephone no. (910) 486-
1541, as soon as possible, but in no case more than 24 hours or on the next working day following the
occurrence or first knowledge of the occurrence of either of the following:
a. Any process unit failure, due to known or unknown reasons, that render the facility incapable of
adequate wastewater transport such as mechanical or electrical failures of pumps, line blockage or
breakage, etc.
b. Any failure of a pumping station or sewer line r.?sulting in a by-pass directly to receiving waters
without treatment of all or any portion of the influent to such station or facility.
Persons reporting such occurrences by telephone shall also file a written report in letter form within five
(5) days following first knowledge of the occurrence. This report must outline the actions taken or
proposed to be taken to ensure that the problem does not recur.
14. The permittee shall maintain on hand for immediate installation a supply of spare, fully operational
pump units of each type used in the pressure sewer system. The number of pumps on hand shall not be
less than 10 percent of the number of installed units or one unit, whichever is greater.
15. Each pump station shall be clearly and conspicuously posted with the telephone number of the
owner/operator of the pressure sewer system and instructions to call the number in the event of high
water alarm activation.
Permit issued this the 31 st day of July, 2000
NORTH C OLINA ENVIRONMENTAL MANAGEMENT COMMISSION
err T. Stevens, Director
Division of Water Quality
By Authority of the Environmental Management Commission
Permit Number WQ0002622
16.
Permit No. WQ0002622
July 31, 2000
ENGINEER'S CERTIFICATION
Partial ' Final
I, , as a duly registered Professional Engineer in the State of
North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the
project,
Project Name Location and County
for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the
observation of the construction such that the construction was observed to be built within substantial
compliance and intent of this permit, the approved plans and specifications, and other supporting materials.
Signature
Date
Registration No.
The above Engineer's Certification must be completed and submitted to the address below with one (1) copy
of the Record Drawings (i.e., as -constructed plans) of the permitted facilities. This project shall not be
considered complete and allowed to operate until this Engineer's Certification and the Record Drawings have
been submitted. Any wastewater flow made tributary to the permitted facilities prior to completion of this
Engineer's Certification shall be considered a violation of the permit and shall subject the Permittee to
appropriate enforcement actions.
NORTH CAROLINA DEPARTMENT OF ENVIRONMENT & NATURAL RESOURCES
DIVISION OF WATER QUALITY
WATER QUALITY SECTION
NON -DISCHARGE PERMITTING UNIT
1617 MAIL SERVICE CENTER
RALEIGH, NORTH CAROLINA 27699-1617