Loading...
HomeMy WebLinkAbout310434_30 day poa_20201130II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: TQ line m = 240.9 lb PAN 2. Structure ID: line m = lb PAN 3. Structure ID: line m = lb PAN 4. Structure ID: line m = lb PAN 5. Structure ID: line m = lb PAN 6. Structure ID: line m = lb PAN In. lines 1 +2+3+4+5+6= 240.9 lb PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. o. tract # p. field # q. crop r. acres s. remaining IRR- 2 PAN balance (lb/acre) t. TOTAL PAN BALANCE FOR FIELD (lbs.) column r x s u. application window' 6163 pct small grain 8.20 18.61 152.6 10/1-3/1 61631 h1 small grain 1.57 50.00 78.5 10/1-3/1 6163 h2 small grain 0.79 50.00 39.5 10/1-3/1 6163 h3 small grain 0.50 50.00 25.0 10/1-3/1 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 295.6 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = 240.9 lb. PAN PoA (30 Day) 2/21 /00 x. Crop's remaining PAN balance (line v from section III) = y. Overall PAN balance (w - x) = 295.6 Ib. PAN -55 Ib. PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. NARRATIVE: Irrigation onto existing spray fields will continue as weather and field conditions permit. Additional land is available for pumping if needed. PoA (30 Day) 2/21/00 PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 31-434 County: Duplin Facility Name: Tripp Quinn Certified Operator Nar Tempan Tripp Quin Operator Number: 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 Lagoon Name/ID: TQ Spillway(Y or N): N Level(inches): 17 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Bolume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated. *Attach a complete schedule with corresponding animal units and dates fro depopulation *if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: 11/24/2020 I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Tripp Quinn Phone: 910-385-4125 Facility Owner/Manager (print) Date: Facility Owner/Manager (signature) PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD 1_ TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1_ Structure Name/Identifier (ID)_ 1 TQ 2_ Current liquid volume in 25 yr_/24 hr_ storm storage 8. structural freeboard a_ current liquid level according to marker b_ designed 25 yr_/24 hr_ storm 8. structural freeboard c_ line b - line a (inches in red zone) _ d_ top of dike surface area according to design (area at below structural freeboard elevation) ft2 e_ line c/12 x line d x 7.48 gallons/ft 3 3_ Projected volume of waste liquid produced during draw down period f_ temporary storage period according to structural design I 1801days g_ volume of waste produced according to structural design I 58023 Ift3 17.0I inches 1 9.5' inches 2.5 inches h_ current herd # 1760 I certified herd # 1760 actual waste produced = current herd # x line g certified herd # i_ volume of wash water according to structural design j_ excess rainfall over evaporation according to design k_ (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period 49413 I 77002 gallons 58023 ft3 OI 28824 I ft3 ft3 108269 gallons I_ current waste analysis dated 1'1/2/2020 1 1.301lbs/1000 gal_ m_ ((lines e + k)/1000) x line 1 = REPEAT SECTION 1 FOR EACH WASTE STRUCTURE ON SITE_ (Click on the next Structure tab shown below) 240.9 Ibs_ PAN PoA (30 Day) 2/21/00