HomeMy WebLinkAbout310434_30 day poa_20201130II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24
HR. STORM STORAGE ELEVATIONS IN ALL WASTE
STRUCTURES FOR FACILITY
1.
Structure ID: TQ
line m =
240.9 lb PAN
2.
Structure ID:
line m =
lb PAN
3.
Structure ID:
line m =
lb PAN
4.
Structure ID:
line m =
lb PAN
5.
Structure ID:
line m =
lb PAN
6.
Structure ID:
line m =
lb PAN
In. lines 1 +2+3+4+5+6= 240.9 lb PAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD.
o. tract #
p. field #
q. crop
r. acres
s. remaining IRR-
2 PAN balance
(lb/acre)
t. TOTAL PAN
BALANCE FOR
FIELD (lbs.)
column r x s
u. application window'
6163
pct
small grain
8.20
18.61
152.6
10/1-3/1
61631
h1
small grain
1.57
50.00
78.5
10/1-3/1
6163
h2
small grain
0.79
50.00
39.5
10/1-3/1
6163
h3
small grain
0.50
50.00
25.0
10/1-3/1
'State current crop ending application date or next crop application beginning date for available
receiving crops during 30 day draw down period.
v. Total PAN available for all fields (sum of column t) = 295.6 lb. PAN
IV. FACILITY'S PoA OVERALL PAN BALANCE
w. Total PAN to be land applied (line n from section II) = 240.9 lb. PAN
PoA (30 Day) 2/21 /00
x. Crop's remaining PAN balance (line v from section III) =
y. Overall PAN balance (w - x) =
295.6 Ib. PAN
-55 Ib. PAN
Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and
haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN
based on new information. If new fields are to be included as an option for lowering lagoon level, add these
fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to
another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the
receiving facility.
NARRATIVE:
Irrigation onto existing spray fields will continue as weather and field conditions permit. Additional land is
available for pumping if needed.
PoA (30 Day) 2/21/00
PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
Facility Number: 31-434 County: Duplin
Facility Name: Tripp Quinn
Certified Operator Nar Tempan Tripp Quin Operator Number:
1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways; and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways.
Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5
Lagoon Name/ID: TQ
Spillway(Y or N): N
Level(inches): 17
2. Check all applicable items
Liquid level is within the designed structural freeboard elevations of one or more structures.
Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are
within acceptable ranges.
X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A
30 day Plan of Action is attached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations. Bolume and PAN content of waste
to be pumped and hauled is reflected in section III tables. Included within this plan is a list
of the proposed sites with related facility numbers, number of acres and receiving crop
information. Contact and secure approval from the DWQ prior to transfer of waste to a site
not covered in the facility's CAWMP.
Operation will be partially or fully depopulated.
*Attach a complete schedule with corresponding animal units and dates fro depopulation
*if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3. Earliest possible date to begin land application of waste: 11/24/2020
I hereby certify that I have reviewed the information listed above and included within the
attached Plan of Action, and to the best of my knowledge and ability, the information is
accurate and correct.
Tripp Quinn Phone: 910-385-4125
Facility Owner/Manager (print)
Date:
Facility Owner/Manager (signature)
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
1_ TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1_ Structure Name/Identifier (ID)_
1 TQ
2_ Current liquid volume in 25 yr_/24 hr_ storm storage 8. structural freeboard
a_ current liquid level according to marker
b_ designed 25 yr_/24 hr_ storm 8. structural freeboard
c_ line b - line a (inches in red zone) _
d_ top of dike surface area according to design
(area at below structural freeboard elevation) ft2
e_ line c/12 x line d x 7.48 gallons/ft 3
3_ Projected volume of waste liquid produced during draw down period
f_ temporary storage period according to structural design I 1801days
g_ volume of waste produced according to structural design I 58023 Ift3
17.0I
inches
1 9.5' inches
2.5 inches
h_ current herd # 1760 I certified herd #
1760
actual waste produced = current herd # x line g
certified herd #
i_ volume of wash water according to structural design
j_ excess rainfall over evaporation according to design
k_ (lines h + i + j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
49413 I
77002 gallons
58023 ft3
OI
28824 I
ft3
ft3
108269 gallons
I_ current waste analysis dated 1'1/2/2020 1 1.301lbs/1000 gal_
m_ ((lines e + k)/1000) x line 1 =
REPEAT SECTION 1 FOR EACH WASTE STRUCTURE ON SITE_
(Click on the next Structure tab shown below)
240.9 Ibs_ PAN
PoA (30 Day) 2/21/00