HomeMy WebLinkAbout490030_Compliance Evaluation Inspection_20201110(Type of Visit: QsCompliance Inspection O Operation Review O Structure Evaluation 0 Technical Assistance
Reason for Visit: (14outine ® Complaint ® Follow-up ® Referral ® Emergency 0 Other ® Denied Access
Date of Visit: �� Arrival Time: Departure Time: County: Region:
Farm Name: Owner Email:
Owner Name:
Mailing Address:
Physical Address:
Facility Contact:
Title:
Phone:
Onsite Representative: s Integrator:
Certified Operator:
Back-up Operator:
Location of Farm:
Latitude:
Phone:
Certification Number:
Certification Number:
Discharges and Stream Impacts
1. Is any discharge observed from any part of the operation?
Discharge originated at: ❑ Structure ❑ Application Field ❑ Other:
a. Was the conveyance man-made?
b. Did the discharge reach waters of the State? (If yes, notify DWR)
c. What is the estimated volume that reached waters of the State (gallons)?
d. Does the discharge bypass the waste management system? (If yes, notify DWR)
2. Is there evidence of a past discharge from any part of the operation?
3. Were there any observable adverse impacts or potential adverse impacts to the waters
of the State other than from a discharge?
Longitude:
❑ Yes Ed No ❑ NA ❑ NE
[:]Yes
®No
❑ NA
® NE
❑ Yes
❑ No
❑ NA
❑ NE
[:]Yes [:]No ❑ NA ❑ NE
[—]Yes Fg/No ❑ NA ❑ NE
❑ Yes Eg No ® NA ❑ NE
Page I of 3 21412015 Continued
Facility Number: � _ - Date of Inspection:-.°
24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes [n/No ❑ NA ❑ NE
25. Is the facility out of compliance with pennit conditions related to sludge? If yes, check ❑ Yes QNo ❑ NA ❑ NE
the appropriate box(es) below.
❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels
❑ Non -compliant sludge levels in any lagoon
List structure(s) and date of first survey indicating non-compliance:
26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes No ❑ NA ❑ NE
27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes ❑ No al A ❑ NE
Other Issues
28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ElYes ❑'No ®NA ®NE
and report mortality rates that were higher than normal?
29. At the time of the inspection did the facility pose an odor or air quality concern?
If yes, contact a regional Air Quality representative immediately.
30. Did the facility fail to notify the Regional Office of emergency situations as required by the
permit? (i.e., discharge, freeboard problems, over -application)
31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below.
❑ Application Field ❑ Lagoon/Storage Pond ❑ Other:
32. Were any additional problems noted which cause non-compliance of the permit or CAWMP?
33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative?
34. Does the facility require a follow-up visit by the same agency?
® Yes ❑ 'lo ❑ NA ❑ NE
F
® Yes [:JNo ❑ NA ❑ NE
❑ Yes [:]No ❑ NA ❑`NE
[:]Yes ❑ {No
® Yes MNo
® Yes No
❑NA ®NE
❑NA ®NE
❑NA ®NE
Reviewer/Inspector Name:, = = �� Phone 't
Reviewer/Inspector Signature:Date: '2- )
Page 3 of 3 21412015
Facility plumber: - Date of Inspection: ` V '
Waste Collection & Treatment
4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? Yes
a. If yes, is waste level into the structural freeboard? Yes
Structure 1 Structure 2 Structure 3 Structure 4
Identifier: be,45C L N L�
Spillway?: _
Designed Freeboard (in): t 1
Observed Freeboard (in): 1
5. Are there any immediate threats to the integrity of any of the structures observed?
(i.e., large trees, severe erosion, seepage, etc.)
6. Are there structures on -site which are not properly addressed and/or managed through a
waste management or closure plan?
Structure 5
No NA NE
No NA ® NE
Structure 6
® Yes No ®NA NE
Yes No NA NE
If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR
7. Do any of the structures need maintenance or improvement?
Yes
No
NA
NE
8. Do any of the structures lack adequate markers as required by the permit?
Yes
1
O No
NA
NE
(not applicable to roofed pits, dry stacks, and/or wet stacks)
9. Does any part of the waste management system other than the waste structures require
Ej Yes
1 e
,No
® NA
NE
maintenance or improvement?
Waste Application
10. Are there any required buffers, setbacks, or compliance alternatives that need
Yes
' No
® NA
NE
maintenance or improvement?
1. j
11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ® Yes No ® NA NE
Excessive Pending Hydraulic Overload Frozen Ground ® Heavy Metals (Cu, Zn, etc.)
PAN PAN > 10% or 10 lbs. Total Phosphorus Failure to Incorporate Manure/Sludge into Bare Soil
Outside of Acceptable Crop Window Evidence of Wind Drift Application Outside of Approved Area
12. Crop Type(s):
13. Soil Type(s):
14. Do the receiving crops differ from those designated in the CAWMP?
Yes
No
NA
Ej NE
15. Does the receiving crop and/or land application site need improvement?
Yes
No
NA
0 NE
16. Did the facility fail to secure and/or operate per the irrigation design or wettable
® Yes
f No
® NA
® NE
acres determination?
17. Does the facility lack adequate acreage for land application?
® Yes
Eallo
® NA
® NE
18. Is there a lack of properly operating waste application equipment?
Yes
s
No
NA
® NE
Required Records & Documents
19. Did the facility fail to have the Certificate of Coverage & Permit readily available?
® Yes
Eg No
® NA
® NE
20. Does the facility fail to have all components of the CAWMP readily available? If yes, check
® Yes
4o
® NA
® NE
the appropriate box.
®WUP ®Checklists ® Design ® Maps ® Lease Agreements ®Other:
21. Does record keeping need improvement? If yes, check the appropriate box below. ® Yes No ® NA ® NE
Waste Application Ej Weekly Freeboard Waste Analysis Soil Analysis Waste Transfers Weather Code
Rainfall Ej Stocking Crop Yield 120 Minute Inspections El Monthly and 1" Rainfall Inspections / Sludge Survey
22. Did the facility fail to install and maintain a rain gauge? [:]Yes < No ® NA �NE
] E
23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ® Yes ® No ® NA
Page 2 of 3 21412014 Continued