Loading...
HomeMy WebLinkAbout20100623 Ver 1_More Info Received_20100805 i0- R-3 &WOu f4 @ Ed) AUG n 20;0 ?M1fPOEt SR?A? BR,4rdq{ 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individual) list all open water impacts below. 4a. Open water impact number Permanent (P) or Temporary (T) 4b. Name of waterbody (if applicable) 4c. Type of impact 4d. Waterbody type 4e. Area of impact (acres) 01 moose one choose Z J,? ??i2 Lt9s 02 - Choose one Choose 03 - Choose one Choose 04 - Choose one Choose 4f. Total open water impacts 4g. Comments: 5. Pond or Lake Constriction If pond or lake construction proposed, then complete the chart below. 5a. Pond ID number 5b. Proposed use or purpose of pond 5c. Wetland Impacts (acres) 5d. Stream Impacts (feet) 5e. Upland (acres) Flooded Filled Excavated Flooded Filled Excavated P1 Choose one P2 Choose one 5f_ Total: 5g. Comments: 5h. Is a dam high hazard permit required? ? Yes ? No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If an impacts require mitigation, then you MUST fill out Section D of this form. 6a. Project is in which protected basin? ? Neuse ? Tar-Pamlico ? Catawba ? Randleman ? Other: 6b. Buffer Impact number - Permanent (P) or Temporary 6c. Reason for impact 6d. Stream name D 6e. Buffer mitigation required? 6f. Zone 1 impact (square feet 6g. Zone 2 impact (square feet B1 - Yes/No B2 - l U11 G f) Yes/No B3 - ,, _ 4 Liu Yes/No B4 - ViETiq'dUSANp QUALITY YesNo 65 - Yes/No B6 - Yes/No 6h. Total Buffer Impacts: 61. Comments: Page 5 of 10