HomeMy WebLinkAbout20200285 Ver 2_PreFiling Email 30-Day Clock Reached Email_20201125Strickland, Bev
From: laserfiche@ncdenr.gov
Sent: Wednesday, November 25, 2020 12:01 AM
To: brownenvgrp@gmail.com
Cc: Goss, Stephanie
Subject: Pre -Filing Time Clock has been reached for High Gate 3 Crossing - 20200285 Ver 2
Attachments: DWR Pre -Filing Meeting Request Form.pdf
The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for High Gate 3
Crossing that you submitted on 10/25/2020. The ID number for that project is 20200285, Version 2.
Your Pre -Filing Meeting Request has now reached the 30 calendar days' requirement and your application can now be
accepted.
When you submit your application please upload a copy of the attached document in this email.
This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as
responses are not monitored.
ID#* 20200285
Version* 2
Regional Office* Raleigh Regional Office - (919) 791-4200
Reviewer List* Stephanie Goss
Pre -Filing Meeting Request submitted 10/25/2020
Contact Name *
Contact Email Address*
Project Name*
Project Owner*
Project County*
Owner Address:
Wyatt I brown
brownenvgrp@gmail.com
High Gate 3 Crossing
Everland Lee LLC, Creech NC, LLC
Johnston
Street Address
242 Batten Farm Road
Address Line 2
aty
Selma
Rbstal / Zip Code
27576
Is this a transportation project?* r Yes r No
State / Frovince / Region
North Carolina
Country
United States
Type(s) of approval sought from the DWR:
r- 401 Water Quality Certification - F- 401 Water Quality Certification -
Regular Express
W Individual Permit r- Modification
r- Shoreline Stabilization
Does this project have an existing project ID#?*
r Yes r No
Please list all existing project ID's associated with this projects.*
20200285, SAW-2020-00395
Do you know the name of the staff member you would like to request a meeting with?
Rick Trone, or Stephanie Goss
Please give a brief project description below.*
High Gate is a phased single home S/D located on Shotwell Road and
Covered Bridge road in Clayton, NC. The original PCN for a crossing, a NW
29, was submitted on 2/21/2020. Due to time delays in obtaining the
requested additional information the permit had not been approved in late
summer when it was discovered a non permitted BMP was installed 2 years
earlier. I had no knowledge of the BMP.
The Corps of Engineers determined an after the fact permit must be
obtained for the installed BMP before the previously submitted NW 29
could be permitted. So I submitted a PCN for the BMP a NW 39 and we
obtained the 401 for the BMP on October 13, 2020 (DWR #20-1143). We
expect to receive the 404 soon. We discovered the wetland impact for the
BMP combined with the wetland impact for the previously submitted
(2/21/20) NW 29 exceeds 0.50 acres. Thus the previously submitted NW29
is now required to be an Individual Permit so I withdrew the previously
submitted NW 29 on 10/9/20. This request for is for an Individual Permit for
the original NW 29. Martin Richmond is assisting me on this project but I am
the authorized agent. If you feel an office meeting is needed I'll be glad to
meet with you.
Don't hesitate to contact me if any questions.
thank you
Wyatt Brown
Please give a couple of dates you are available for a meeting.
Please attach the documentation you would like to have the meeting about.
Creech Farm Buffer Determination (identical
1.09MB
letter went to Creech NC LCC).pdf
401 20-1143 High Gate
903.34KB
BMP 401_Johnston.pdf
Highgate Development (4).pdf
1.69MB
Roadway Xing Map (4).pdf
513.59KB
Water Line Xing Map (3).pdf
370.34KB
Wetland Impact Map (2).pdf
1.08MB
PCN Submitted.pdf
516.24KB
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
• I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing
meeting request.
• I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an
application.
Signature
Submittal Date 10/25/2020