Loading...
HomeMy WebLinkAbout20200285 Ver 2_PreFiling Email 30-Day Clock Reached Email_20201125Strickland, Bev From: laserfiche@ncdenr.gov Sent: Wednesday, November 25, 2020 12:01 AM To: brownenvgrp@gmail.com Cc: Goss, Stephanie Subject: Pre -Filing Time Clock has been reached for High Gate 3 Crossing - 20200285 Ver 2 Attachments: DWR Pre -Filing Meeting Request Form.pdf The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for High Gate 3 Crossing that you submitted on 10/25/2020. The ID number for that project is 20200285, Version 2. Your Pre -Filing Meeting Request has now reached the 30 calendar days' requirement and your application can now be accepted. When you submit your application please upload a copy of the attached document in this email. This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as responses are not monitored. ID#* 20200285 Version* 2 Regional Office* Raleigh Regional Office - (919) 791-4200 Reviewer List* Stephanie Goss Pre -Filing Meeting Request submitted 10/25/2020 Contact Name * Contact Email Address* Project Name* Project Owner* Project County* Owner Address: Wyatt I brown brownenvgrp@gmail.com High Gate 3 Crossing Everland Lee LLC, Creech NC, LLC Johnston Street Address 242 Batten Farm Road Address Line 2 aty Selma Rbstal / Zip Code 27576 Is this a transportation project?* r Yes r No State / Frovince / Region North Carolina Country United States Type(s) of approval sought from the DWR: r- 401 Water Quality Certification - F- 401 Water Quality Certification - Regular Express W Individual Permit r- Modification r- Shoreline Stabilization Does this project have an existing project ID#?* r Yes r No Please list all existing project ID's associated with this projects.* 20200285, SAW-2020-00395 Do you know the name of the staff member you would like to request a meeting with? Rick Trone, or Stephanie Goss Please give a brief project description below.* High Gate is a phased single home S/D located on Shotwell Road and Covered Bridge road in Clayton, NC. The original PCN for a crossing, a NW 29, was submitted on 2/21/2020. Due to time delays in obtaining the requested additional information the permit had not been approved in late summer when it was discovered a non permitted BMP was installed 2 years earlier. I had no knowledge of the BMP. The Corps of Engineers determined an after the fact permit must be obtained for the installed BMP before the previously submitted NW 29 could be permitted. So I submitted a PCN for the BMP a NW 39 and we obtained the 401 for the BMP on October 13, 2020 (DWR #20-1143). We expect to receive the 404 soon. We discovered the wetland impact for the BMP combined with the wetland impact for the previously submitted (2/21/20) NW 29 exceeds 0.50 acres. Thus the previously submitted NW29 is now required to be an Individual Permit so I withdrew the previously submitted NW 29 on 10/9/20. This request for is for an Individual Permit for the original NW 29. Martin Richmond is assisting me on this project but I am the authorized agent. If you feel an office meeting is needed I'll be glad to meet with you. Don't hesitate to contact me if any questions. thank you Wyatt Brown Please give a couple of dates you are available for a meeting. Please attach the documentation you would like to have the meeting about. Creech Farm Buffer Determination (identical 1.09MB letter went to Creech NC LCC).pdf 401 20-1143 High Gate 903.34KB BMP 401_Johnston.pdf Highgate Development (4).pdf 1.69MB Roadway Xing Map (4).pdf 513.59KB Water Line Xing Map (3).pdf 370.34KB Wetland Impact Map (2).pdf 1.08MB PCN Submitted.pdf 516.24KB pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature Submittal Date 10/25/2020