HomeMy WebLinkAbout20200901 Ver 2_PreFiling Email 30-Day Clock Reached Email_20201126Strickland, Bev
From: laserfiche@ncdenr.gov
Sent: Thursday, November 26, 2020 12:01 AM
To: josselyn@bfec.org
Cc: Homewood, Sue
Subject: Pre -Filing Time Clock has been reached for Headwaters Mixed -Use Development -
20200901 Ver 2
Attachments: DWR Pre -Filing Meeting Request Form.pdf
The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for Headwaters
Mixed -Use Development that you submitted on 10/26/2020. The ID number for that project is 20200901, Version 2.
Your Pre -Filing Meeting Request has now reached the 30 calendar days' requirement and your application can now be
accepted.
When you submit your application please upload a copy of the attached document in this email.
This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as
responses are not monitored.
ID#* 20200901
Version* 2
Regional Office* Winston-Salem Regional Office - (336) 776-9800
Reviewer List* Sue Homewood
Pre -Filing Meeting Request submitted 10/26/2020
Contact Name * Josselyn Lucas
Contact Email Address* josselyn@bfec.org
Project Name* Headwaters Mixed -Use Development
Project Owner* Headwaters of the New River, LLC
Project County* Watauga
Owner Address: Street Address
PO Box 1967
Address Line 2
aty
State / Province / Region
Blowing Rock
North Carolina
Fbstal / Zip Code
Country
28607
United States
Is this a transportation project?* r Yes r No
Type(s) of approval sought from the DWR:
W 401 Water Quality Certification - F 401 Water Quality Certification -
Regular Express
r- Individual Permit r- Modification
r- Shoreline Stabilization
Does this project have an existing project ID#?*
r Yes r No
Do you know the name of the staff member you would like to request a meeting with?
Please give a brief project description below. *
The purpose of this project is to develop mixed -use residential housing
facilities and associated storage and parking areas. Currently, the plan is
to build a single one -bedroom and three two -bedroom cottages, as well as
six smaller "tree houses" for a total of ten residential units. Plans also
include a future commercial space, which will likely be used for storage.
Parking spaces will also be added to the existing parking area on -site. An
existing bridge which crosses the Middle Fork New River will have its
footings repaired as part of this project. A 40 foot existing culvert on UT1
will be replaced with a 65 foot culvert, and .02 acres of wetland will be filled
as part of the parking area expansion and associated drainage pipe
installation. A variety of equipment will be used during the construction of
this project and may include dump trucks, skid steers, track hoes, back
hoes, and other heavy equipment.
Please give a couple of dates you are available for a meeting.
11 /19/2020
10/15/2020
Please attach the documentation you would like to have the meeting about.
Combined Headwaters Report Reduced.pdf 7.67MB
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
• I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing
meeting request.
• I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an
application.
Signature
Submittal Date 10/26/2020