Loading...
HomeMy WebLinkAboutNCC200534_NOT Closeout Documents_20201125North Carolina Department of Environmental Quality Land Resources: Systel Building, 225 Green Street, Suite 714, Fayetteville, NC 28301-5094 (910) 433-3300 County: Moore Project: Brookwood Phase IA - Lot 17 River basin: Cape Fear Person financially responsible: Caviness Land Development, Inc. - Watson G Project #: MOORE-2020-038 Caviness, President NCC200534 Address: 1041 B Robeson Street, Fayetteville, NC 28305 1. Project Location: Enfield Drive, McNeill Pictures: No 2. Weather and soil conditions: sunny/workable soils 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes 5. Violations: Initial inspection: No If no, check violations below: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): Inspection report: Sent Report 9. Corrective action needed: Title: Date given/sent: November 25, 2020 10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is in compliance with the SPCA and released. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities should be requested by the permittee via a Notice of Termination_ Please note that this correspondence must be uploaded as part of completing the Notice of Termination process. Reported by: Penny Markle Others present: Date of inspection: November 24, 2020 Time arriving on site: 1:00 PM Time leaving site: 1:20 PM cc: No