Loading...
HomeMy WebLinkAboutNCC205449_NOT Closeout Documents_20201125North Carolina Department of Environmental Quality Land Resources: Systel Building, 225 Green Street, Suite 714, Fayetteville, NC 28301-5094 (910) 433-3300 Blackbridge Subdivision Phase Two County: Cumberland Project: Lots 36 & 37 River basin: Cape Fear Person financially responsible: Caviness Land Development, Inc. - Watson G Project N: CUNME-2019-172 Caviness, President Address: 639 Executive Place, Suite 400, Fayetteville, NC 28305 1. Project Location: Low Oak Ct/Long Lake Dr, Rockfish Pictures: No 2. Weather and soil conditions: Dry, workable soils 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes 5. Violations: 6. Is the site in compliance with the NPDES Permit? Yes Describe: Initial inspection: No If no, check violations below: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): No one Inspection report: Sent Report 9. Corrective action needed: Title: Date given/sent: January 13, 2020 10. Comments: Permanent ground cover sufficient to restrain erosion has been established and SPCA requirements have been met. No additional SPCA self -inspections are required, however NPDES self -monitoring must continue until termination of coverage under the NPDES General Stormwater Permit for Construction Activities has been submitted by the permittee via an electronic Notice of Termination (e-NOT). Please retain a copy of this inspection report to submit along with the Notice of Termination. Link to access the Notice of Termination (e-NOT): http s://deq.nc.gov/abouVdivisions/energy-mineral-land-re sources/energy-mineral-land-permits /stormwater-permits/construction-sw Reported by: Melissa Joyner Others present: Date of inspection: January 10, 2020 Time arriving on site: 3:00 PM Time leaving site: 3:10 PM cc: