HomeMy WebLinkAboutNCC201554_Notice of Termination_20201124Action History (UTC-05:00) Eastern Time (US & Canada)
Subrrit by Anonymous User 11/24/2020 3:16:56 PM (NOT Submittal)
Approve by Georgoulias, Bethany 11/30/2020 10:11:28 AM (NOT Request Review- NCC201554)
• The task was assigned to Georgoulias, Bethany. The due date is: November 27, 2020 5:00 PM
11 /24/2020 3:17 PM
1 �
NORTH CAROLINA
Enrlronmenral Quallly
Certificate of NCC201554
Coverage (COC) Enter the Certificate of Coverage Nmber
No.*
Information associated with this permit
Project Name
ASU Justice Hall Demolition
Address
189 Stadium Drive, Boone, NC, NC
County
Watauga
Latitude
36.2130
Longitude
-81.6820
Permittee Listed
Choate Construction Company
Legally Responsible
Jay Merando
Individual
NC Reference No.
NCG01-2020-1554
E&SC Plan ID
WATAU-2020-005
Original NOI
24457
Tracking No.
Date COC Issued
5/4/2020
Prior Rescission
Cate populates only if COCwas already rescinded at tirre of subrrittal.
Date
Reason for Rescission/Termination Request:
Reason for F Project Closed -Out
Termination of r Sale (Another Owner/Operator will apply for a new COC)
Coverage * O Mistake or Invalid Coverage
r Other
Addional Mxe inforrration about the basis of this request, if needed.
Explanation
Supporting Upload Supporting Docurrentation if applicable.
Documentation Mist beFDFforrrat
Project Close-out Information:
Final Close-out 11/19/2020
Inspection Approval
Project Close-out WATAU-2020-005 ASU Justice Hall Demolition
Approval 75.2KB
closure report 11-19-2020.pdf
Documentation
Mast be FL7Fforrrat
North Carolina General Statute 143-215.66 (1) provides that:
Anyperson who knowinglymakes any false statement, representation, or certification in anyapplication, record, report, plan, or other
documentfiled or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement
of a material fact in a rulemaking proceeding or contested case underthis Article; or who falsifies, tampers with, or knowingly renders
inaccurate any recording or monitoring deice or method required to be operated or maintained under this Article or rules ofthe
Commission implementing this Article shall be guiltyofa Class 2 misdemeanor which mayinclude a fine not to exceed ten thousand
dollars ($10,000).
17 I, as an authorized representative, hereby request rescission of coverage under
the NPDES Stormwater Permit for the subject facility. I am familiar with the
information contained in this request and to the best of my knowledge and
belief such information is true, complete and accurate.
*This form must be signed by a responsible corporate officer that owns or operates the construction activity, such as a
president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B,
Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B,
Item (6) of that permit.
Signature
Type Name* Jay Merando
Title * Project Manger
Organization* Choate Construction Company
Date * 11 /24/2020
Email for jmerando@choateco.com
Confirmation *
Contact Telephone* 678-467-2668
NOT Certification Sharp_20201124_143849.pdf 345.06KB
Form Mast be PDF Forrrst
Is this COC Already Ensure this CCChas not been rescinded since subrrittal!
Rescinded?
Original Permittee CCd on Wification BTails
Email jmerando@choateco.com
Original Site Contact CCd on Notificaiton Bmils
Email tthompson@choateco.com