Loading...
HomeMy WebLinkAboutWI0100106_MISCELLANEOUS DOCS_20150417Rogers, Michael From: Andrew W. Alexander <andy@blecorp.com> Sent: Friday, April 17, 2015 2:19 PM To: Rogers, Michael; Davidson, Landon; Moore, Andrew W Cc: Nisbeth, Ben (blecorp) Subject: UIC Permit W10100106- Injection Event Record 2015 - Milkco/Andrei Attachments: UIC Permit W10100106 Injection Event Record 2015 Milkco Andrex.pdf Hello Gents, have attached the Injection Event Record for the subject permit. The well installation records for IW-1 and IW-3 have already been submitted to the DENR. This is the 5th injection event at the site and was performed in April 2015. As I discussed with Michael yesterday, injection volumes slightly exceeded our target of 25,000 gallons per well (by 1,000 and 496 gallons) due to the batching process. I understand that the DENR does not consider the slight overage an issue. Thirty (30) day monitoring in both injection areas will be performed on or about May 14th. Thanks and please contact me if you have any questions. --Andy From: Andrew W. Alexander [mailto:andy@blecorp.com] Sent: Wednesday, April 01, 2015 3:48 PM To: Rogers, Michael; Davidson, Landon; Moore, Andrew W Cc: Nisbeth, Ben (blecorp) Subject: UIC Permit W10100106- Notice of Injection April 6, 2016 - Milkco/Andrex Hello Michael, Andrew, and Landon, This email is notice of intent to inject milk solution into injection wells IW-1 and IW-3 at the former Andrex property (UIC Permit W10100106) beginning April 6, 2015. Injection will be performed in accordance with the Permit and the DENR approved 2015 Injection Plan. An Injection Event Record will be prepared and submitted as required after the injection event is complete. Actual start date and time will be dependent upon milk solution availability and weather. DENR inquiry into the up to date project schedule should be made via telephone to Ben Nisbeth of BLE at 828-545-3414. It's anticipated that up to 2 weeks will be required to complete the injection event. This detailed email notice is made as a substitute for the verbal notice specified in the permit. If this email notice is not sufficient, please contact me and verbal notice will be provided. Thanks, --Andy Andrew W. Alexander, P.G., RSM . Bunnell-Lammons Engineering, Inc. (BLE) 6004 Ponders Court Greenville, South Carolina 29615 (864) 288-1265 (voice) (864) 288-4430 (fax) (864) 201-5530 (cell) andy(a)-blecorp.com www.blecorp.com OIL' 13 This electronic transmission contains information from the consulting firm of Bunnell-Lammons Engineering, Inc., that may be confidential or privileged. The information is intended solely for the recipient. Use by any other party is not authorized. If you are not the intended recipient, be aware that any . disclosure, copying, distribution, or use of the contents of this information is prohibited. If you received this transmission in error, please notify us immediately by telephone (864-288-1265) or by email (info a)blecoro.com). Thank you for your. cooperation. 2 INJECTION EVENT RECORD North Carolina Department of Environment and Natural Resources — Division of Water Quality Permit Number WT.() l 00t V& 1. Permit Information YV1. MJ,(,0 Permittee �vtwtG� �vtdy�X J-vsc�u$'iYtU� l�r�. �aGi�t� Facility Name ISO `)tAVVViUJ Rk Mnt\ L- r G ZS�ot� Facility Address 2. Injection ""� Contractor Information ))u.Vtt3c - ""OAS GGY+ >r1t+l Injection Contractor / Company Name Street Address W4 `C.nA.VS Cufir Gfem\1414- Isc— 2A (0155 City State Zip Code no - 17,05' Area code — Phone number 3. Well Information Number of wells used for injection Well names T "J -F—W " 3 Were any new wells installed during this injection event? 91 Yes ❑ No If yes, please provide the following information; Number of Monitoring Wells Number of Injection Wells 2— Type of Well Installed (Check applicable type): ❑ Bored N Drilled ❑ Direct -Push ❑ Hand -Augured ❑ Other (specify) Please include hvo copies ofform GTV I b for each well installed Were any wells abandoned during this injection event? ❑ Yes ® No If yes, please provide the following information: Number of Monitoring Wells Number of Injection Wells Please includee tivo copies of the GTV--30 for each well abandoned. 4. Injectant Information 1.4 ac ISc 561� Pen Injectant Type Concentration If the injectant is diluted please indicate the source dilution fluid. k3af Total Volume Injected 131 ,41tv Volume Injected per well "( 000 JA11,0-w Injection History Injection dates) 4' 6' 1;j Ar, 4.1$ . 15 . Injection number (e.g. 3 of 5) Is this the last injection at this site? ❑ Yes ® No I DO HEREBY CERTIFY THAT ALL THE INFORMATION ON THIS FORM IS CORRECT TO THE BEST OF MY KNOWLEDGE AND THAT THE INJECTION WAS PERFORMED WITHIN THE STANDARDS LAID OUT IN THE PERMIT. � �• IS• IS fS GN Ti, E OF INJECTION CONTRACTOR DATE PRINT NAME OF PERSON PERFORMING THE INJECTION Submit the original of this form to the Division of Water Quality within30 days of injection. Form UIC-IER Attn: UIC Program, 1636 Mail Service Center, Raleigh, NC 27699-1636, Phone No..919-733-3221 Rev. 07/09 Bunnell-Lammons Engineering, Inc. 6004 Ponders Court Greenville, South Carolina 29615 Phone (864) 288-1265 FAX (864) 288-4430 LETTER OF TRANSMITTAL TO: Division of Water Resources Information Processing Unit 1617 Mail Service Center Raleigh, North Carolina 27699-1617 CC: Mr. Keith Collins — Milkco, Inc. —1 Copy DWR UIC Program (Raleigh) —1 Copy DWR WQROS (Asheville) —1 Copy Buncombe County — Environmental Health Division —1 CoPy Mr. Ben Nisbeth, PG — BLE Asheville - PDF via Email DATE: March 25, 2015 RE: Milkco / Former Andrex Industries Corp. GW-1 forms for IW-1 and IW-3 UIC Permit No. WI0100106 WE ARE SENDING YOU: ® Attached ❑ Under separate cover via: U.S. MAIL ❑ Report ❑ Prints ❑ Change order ❑ Letter ❑ Other ❑ W.A.S. ❑ Plans ❑ Samples ❑ Proposal ® Well Construction Record Forms GW-1 THESE ARE TRANSMITTED AS CHECKED BELOW: ❑ For approval ❑ For your use E As required ❑ Other Number of copies: As specified above. REMARKS: I have enclosed subject documents as required in the UIC permit. ❑ Application ❑ Specifications RECEIVED/DENRI. , A , ❑ For revic i G nfnt15 44/ Andrew W. Ale nder, P.G. Senior Hydrogeologist e:\awa projects\andrex milkco\phase42 injection and monitoring 2015\injection well boring logs\transmittal iw-1 and iw-3 form gw-1 andrex milkco.doc WELL CONSTRUCTION RECORD This form can be used for single or multiple wells For Internal Use ONLY: 1. Well Contractor Information: John Gorman Well Contractor Name 3485-A NC Well Contractor Certification Number Bunnell-Lammons Engineering, Inc. Company Name 2. Well Construction Permit #: U I C #W 10100106 List all applicable well permits (i.e. County, State, Variance, Injection, etc.) 3. Well Use (check well use): Water Supply Well: ❑Agricultural ❑Municipal/Public ❑Geothermal (Heating/Cooling Supply) ❑Residential Water Supply (single) ❑Industrial/Commercial ❑Residential Water Supply (shared) Non -Water Supply Well: ❑Aquifer Recharge ❑Aquifer Storage and Recovery ❑Aquifer Test ❑Experimental Technology ❑Geothermal(Closed Loop) ❑Geothermal (Heating/Coolin2 ❑Recovery 0Groundwater Remediation ❑Salinity Barrier ❑Stormwater Drainage ❑Subsidence Control ❑Tracer ❑Other (explain under #21 1 4. Date Well(s) Completed: 3-16-15 Well ID# IW-1 5a. Well Location: Milkco, Inc. (Former Andrex) #07022-03-11 Facility/Owner Name Facility ID# (if applicable) 180 Deaverview Road, Asheville, NC 28806 Physical Address, City, and Zip Buncombe 9667 County Parcel Identification No. (PIN) 5b. Latitude and Longitude in degrees/minutes/seconds or decimal degrees: (if well field, one lat/long is sufficient) 35.58010 . N 82.61418 W 6. Is (are) the well(s): ©Permanent or ❑Temporary 7. Is this a repair to an existing well: ❑Yes or 1?INo Ifthis is a repair, fill out known well construction information and explain the nature ofthe repair under #21 remarks section or on the back of this form. 8. Number of wells constructed: One For multiple injection or non -water supply wells ONLY with the same construction, you can submit one form. 9. Total well depth below land surface: 55 For multiple wells list all depths if different (example- 3@200' and 2@100') 10. Static water level below top of casing: 47 Ifwater level is above casing, use 10 14.;WATER 'ZONES FROM TO DESCRIPTION 50 ft. 50 ft• water -bearing fracture ft. ft. 15.OUTER CASING for mulfi-cased wells OR LINER if a licable FROM TO DIAMETER THICKNESS MATERIAL 0 ft- 47 ft- 6 in Sch40 PVC 16. INNER CASING ORTUBING(geothermal closed -loop) FROM TO DIAMETER THICKNESS MATERIAL, ft. ft. is ft. ft. in. 17. SCREEN FROM TO DIAMETER SLOT SIZE THICKNESS MATERIAL ft. ft. in. It. ft. in. 18. GROUT FROM TO MATERIAL EMPLACEMENT METHOD & AMOUNT 0 ft. 2 0 ft. cement gravity -- 2 bags 2 ft. 44.5 ft. bentonite gravity -- 25 bags ft. ft. .19. SAND/GRAVEL PACK if applicable) FROM TO MATERIAL EMPLACEMENT METHOD 44.5 ft- 46.5 ft' pea gravel I gravity 46.5 ft' 55 ft #3 stone I gravity 20: DRILLING LOG attach additional sheets if necessary)- - TO DESCRIPTION color,hardness, soillmck e, rain size, etc.) 6 ft. red-brn mic f-m sandy SILT w/ some clay F 10 ft. red-brn mic silty f-m SAND (residuum) 16 ft. rock seam (PWR) 16 • 32 ft. red-brn mic silty f-m SAND 32 ft. 44 ft. brn mic silty f-m SAND w/ rock fragments (PWR) 44 ft. 55 ft. bedrock ft. ft. 21. REMARKS - 22. Certification: Signature of Certified Well Contractor 3-18-15 Date By signing this form, I hereby certify that the well(s) was (were) constructed in accordance with 15A NCAC 02C .0100 or 15A NCAC 02C .0200 Well Construction Standards and that a copy ofthis record has been provided to the well owner. 23. Site diagram or additional well details: You may use the back of this page to provide additional well site details or well construction details. You may also attach additional pages if necessary. SUBMITTAL INSTUCTIONS 24a. For All Wells: Submit this form within 30 days of completion of well construction to the following: Division of Water Resources, Information Processing Unit, 1617 Mail Service Center, Raleigh, NC 27699-1617 11. Borehole diameter: (in.) 24b. For Injection Wells ONLY: In addition to sending the form to the address in 24a above, also submit a copy of this form within 30 days of completion of well 12. Well construction method: air hammer construction to the following: (i.e. auger, rotary, cable, direct push, etc.) Division of Water Resources, Underground Injection Control Program, FOR WATER SUPPLY WELLS ONLY: 1636 Mail Service Center, Raleigh, NC 27699-1636 13a. Yield (gpm) Method of test: 24c. For Water Supply & Injection Wells: Also submit one copy of this form within 30 days of completion of 13b. Disinfection type: Amount: well construction to the county health department of the county where constructed. Form GW-1 North Carolina Department of Environment and Natural Resources - Division of Water Resources Revised August 2013 WELL CONSTRUCTION RECORD This form can be used for single or multiple wells For Internal Use ONLY: 1. Well Contractor Information: John Gorman Well Contractor Name 3485-A NC Well Contractor Certification Number Bunnell-Lammons Engineering, Inc. Company Name 2. Well Construction Permit #: U I C #W 10100106 List all applicable well permits (Le. County, State, Variance. Injection, etc.) 3. Well Use (check well use): Water Supply Well: ❑Agricultural ❑Municipal/Public ❑Geothermal (Heating/Cooling Supply) ❑Residential Water Supply (single) ❑Industrial/Commercial ❑Residential Water Supply (shared) ❑Irri ation Non -Water Supply Well: ❑Aquifer Recharge ©Groundwater Remediation ❑Aquifer Storage and Recovery ❑Salinity Barrier ❑Aquifer Test ❑Stormwater Drainage ❑Experimental Technology ❑Subsidence Control ❑Geothermal (Closed Loop) ❑Tracer ❑Geothermal (Heating/Cooling Return) ❑Other (explain under #21 1 4. Date Well(s) Completed: 3-18-15 Well ID# IW-3 5a. Well Location: Milkco, Inc. (Former Andrex) #07022-03-11 Facility/Owner Name Facility ID# (if applicable) 180 Deaverview Road, Asheville, NC 28806 Physical Address, City, and Zip Buncombe 9667 County Parcel Identification No. (PIN) 14. WATER ZONES FROM TO DESCRIPTION ft. ft. ft. ft. 15. OUTER CASING for multi cased wells OR LINER if a hcable FROM TO DIAMETER THICKNESS MATERIAL 0 ft' 50 ft 6 i° Sch40 PVC 16. INNER CASING OR TUBING eotbermal closed -loop) FROM TO DIAMETER THICKNESS MATERIAL ft. ft. in. ft. I F. iv 17. SCREEN FROM TO DIAMETER SLOT SIZE THICKNESS MATERIAL ft. ft. in. ft. ft. in. 18. GROUT FROM TO MATERIAL EMPLACEMENT METHOD & AMOUNT 0 rt. 3 ft. cement gravity - 3 bags 3 ft 15 ft• bentonite gravity - 9 bags ft. ft. 19. SAND/GRAVEL PACK if applicable) FROM TO MATERIAL EMPLACEMENT METHOD 15 rt• 50 ft. pea gravel gravity 50 ft- 77 ft. #3 stone gravity 20. DRILLING LOG attach additional sheets if necessary) FROM TO DESCRIPTION (color, hardness, soNrock type, grain sim, etc.) 0 It. 10 ft red-bm mic f-m sandy SILT (fill) 10 ft. 25 ft• red-bm mic f-m sandy SILT (residuum) 25 ft 38 ft• brn mic silty f-m SAND (PWR) 38 ft- 77 ft. brn mic silty f-m SAND (PWR) ft. 77 ft. bedrock ft. ft. ft. ft. 21. REMARKS 5b. Latitude and Longitude in degrees/minutes/seconds or decimal degrees: 22. Certification: (ifwell field, one lat/long is sufficient) 35.57991 N 82.61382 W 4 � roc -- 6. Is (are) the well(s): 101'ermanent or ❑Temporar) 7. Is this a repair to an existing well: ❑Yes or FINo If this is a repair, fill out known well construction information and explain the nature of the repair under #21 remarks section or on the back of this form. 8. Number of wells constructed: One For multiple injection or non -water supply wells ONLY with the same construction. you can submit one form. 9. Total well depth below land surface: 77 For multiple wells list all depths if d(ferent (example- 3@200' and 2@100') 10. Static water level below top of casing: 52 If water level is above casing. use "+" 11. Borehole diameter: 10 (in.) Signature of Certified Well Contractor 3-18-15 Date By signing this form.l het ebv certify that the uell(s) constructed in accordance with 15A NCAC 02C'.0100 or 15A NCAC ( .0?00 W yMuction Standards and that a copy ofthis record has been provided to the hell o}iner. 23. Site diagram or additiaual weltdetails 15 You may use the back of this page Ito Provi a additional well site details or well construction details Yqu may also attach additional pages if necessary. gional SUBMITTAL INSTUCTIONS ' Vnn 24a. For All Wells: Submit this form within 30 days of completion of well construction to the following: Division of Water Resources, Information Processing Unit, 1617 Mail Service Center, Raleigh, NC 27699-1617 24b. For Iniection Wells ONLY: In addition to sending the form to the address in air hammer 24aabove, also submit a copy of this form within 30 days of completion of well 12. Well construction method: construction to the following: (i.e. auger, rotary, cable, direct push, etc.) Division of Water Resources, Underground Injection Control Program, FOR WATER SUPPLY WELLS ONLY: 1636 Mail Service Center, Raleigh, NC 27699-1636 13a. Yield (gpm) Method of test: 24c. For Water Supply & Injection Wells: Also submit one copy of this form within 30 days of completion of 13b. Disinfection type: Amount: well construction to the county health department of the county where constructed. Form GW-I North Carolina Department of Environment and Natural Resources - Division of Water Resources Revised August 2013