Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW6200704_Calcs_20201125
ENGINEERING - SURVEYING - DESIGNING - DRAFTING Larry King & Associates, R.L.S., P.A. P. (910) 483-4300 vwwv.LKandA.com F. (910) 483-4052 Stormwater Wet Pond Design Criteria Project Name: P19-028 Cypress Point Outlet: Infil. Basin 1 Calculate Runoff Coefficient A= 9.00 acres Ai= 3.70 acres la= 0.41 Rv=0.05+0.9*la Rv= 0.42 392,177 sf Watershed area 161,093 sf Impervious area Impervious fraction Runoff Coefficient Calculate Runoff Volume Re aired to be Controlled Rd= 1 in Design storm rainfall depth (typically 1" or 1.5") V=3630*Rd*Rv*A WQV= 13,716 cf Volume of runoff that must be 3.78 Ac in controlled for specified design storm Proposed C Total Area= 392,177 sf Imp Area = 161,093 sf Pery Area = 231,084 sf Comp C= 0.55 c value 0.9 0.3 SC-1A ENGINEERING - SURVEYING - DESIGNING - DRAFTING Larry King &Associates, R.L.S., P.A. P. (910) 483-4300 www.LKandA.com F. (910) 483-4052 Anti -Flotation Sizing Calculations Project Name: P19-028 Cypress Point Outlet: Infil. Basin 1 Min. Surface Area Required for Infiltration System SA=FS*(DV*12) / (K+T) SA= Required Surface Area (sf) FA= Factor of Safety 2 DV= Design Volume (cf) K= Infiltration Rate T= Max Dewatering Time (hrs) 60 hr DA= 1.6 ac 68,691 sf Water Quality Volume Required (by Simple Method) VQV (DV)= 13,716 cf Ksat= 2.0 in/hr Surface Area Required to Achieve 3 Day Drawdown SA= 5309 sf Drawdown Time for WQV (Main Basin Area) T= 55.1 hr SA= 5,769 sf Drawdown Time Below Overflow (Main Basin Area) T= 55.6 hr SA= 5,769 sf DV= 13,846 cf SC-1 C Infil Basin 1.gpw Hydraflow Hydrographs by Intelisolve Hydrograph Return Period Recap i Wednesday, Nov 25 2020, 10:20 AM Summary Report ............ ---- ....... ____ ................a... .......... ................... ....... .................. ... 2 ydroraphi Reports ........................................................................................................... 3 Hydrograph No. 1, Rational, Basin 1-Post........................................................................ 3 Hydrograph No. 2, Reservoir, Basin 1 - Post.................................................................... 4 PondReport................................................................................................................. 5 Hydrograph No. 3, Rational, Basin 1 - Pre....................................................................... 6 SummaryReport..., ... ........ . ....... ............... ............................................... ........ ....... ......... .... 7 ydrogiraphReports ........................................................................................................... 8 Hydrograph No. 1, Rational, Basin 1-Post........................................................................ 8 Hydrograph No. 2, Reservoir, Basin 1 - Post.................................................................... 9 PondReport .................... ........................................................................................... 10 Hydrograph No. 3, Rational, Basin 1 - Pre...................................................................... 11 S�ummary Report ...... ..............................,.......................................................................... 12 HydrographReports ......................................................................................................... 13 Hydrograph No. 1, Rational, Basin 1-Post...................................................................... 13 Hydrograph No. 2, Reservoir, Basin 1 - Post.................................................................. 14 PondReport ......................... ...................................................................................... 15 Hydrograph No. 3, Rational, Basin 1 - Pre..................................................................... 16 y Hyd. Hydrograph Inflow Peak Outflow (efs) Hydrograph No. type Hyd(s) — ..®._._._ _........._ _ description (origin) 1-Yr 2-Yr 3-Yr 5-Yr 10-Yr 25-Yr 50-Yr 100-Yr 1 Rational 17.17 ------- ------- ------- 27.20 30.71 ------- 35.87 Basin 1-Post 2 Reservoir 1 13.96 ------- ------- ------- 25.68 29.44 ------- 34.71 Basin 1 - Post 3 Rational ------- 17.17 ------- ------- ------- 27.20 30.71 ------- 35.87 Basin 1 - Pre Proj. file: Infil Basin 1.gpw Wednesday, Nov 25 2020, 10:20 AM Hydraflow Hydrographs by Intelisolve Hyd. Hydrograph Peak Time Time to Volume Inflow Maximum Maximum Hydrograph No. type flow interval peak hyd(s) elevation storage description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 Rational 17.17 1 47 64,122 ---- ------ ------ Basin 1-Post 2 Reservoir 13.96 1 61 63,330 1 128.35 29,619 Basin 1 - Post 3 Rational 17.17 1 15 15,451 ---- ------ ------ Basin 1 - Pre Infil Basin 1.gpw Return t Period: 1 Year Wednesday, I i i I i Nov 25 2020, 10:20 AM Hydraflow Hydrographs by Intelisolve Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 1 Basin 1-Post Hydrograph type = Rational Storm frequency = 1 yrs Drainage area = 9.000 ac Intensity = 3.468 in/hr OF Curve = River Bluff.IDF Basin 1-Post Wednesday, Nov 25 2020, 10:20 AM Peak discharge = 17.17 cfs Time interval = 1 min Runoff coeff. = 0.55 Tc by User = 15.00 min Asc/Rec limb fact = 3.11/5.19 Hydrograph Volume = 64,122 cuft Q (cfs) Hyd. No. 1 -- 1 Yr Q (cfs) 18.00 _... ...... .... 4 ...... _ w ..... ... --- m 18.00 15.00 ... ... 15.00 12.00 r....._,,..m ..�.... ............_w...� _...... -�.._ _. 12.00 -- o i i _._ 9.00 - - _ ��.mm...... -. - _.e�_ _..e n. 9.00 6.00 .....m........ . ........ _.. � � ._..�__... �, � ..m....... ..._..._ 6.00 /j/ 3.00 ..w .... ....m _ - -- - _. _ , m m... ... . .............. . 3.00 0.00 _.., ... _ .. _ w.. -..__ 0.00 0.0 0.2 0.3 0.5 0.7 0.8 1.0 1.2 1.3 1.5 1.7 1.8 2.0 2.2 Hyd No. 1 Time (hrs) 3 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 2 Basin 1 - Post Hydrograph type = Reservoir Storm frequency = 1 yrs Inflow hyd. No. = 1 Reservoir name = Basin 1-Post Storage Indication method used Basin 1 - Post Wednesday, Nov 25 2020, 10:20 AM Peak discharge = 13.96 cfs Time interval = 1 min Max. Elevation = 128.35 ft Max. Storage = 29,619 cuft Hydrograph Volume = 63,330 cuft 4 Pond Report 5 Hydraflow Hydrographs by Intelisolve Wednesday, Nov 25 2020, 10:20 AM Pond No. 1 - Basin 1-Post Pond Data Pond storage is based on known contour areas. Average end area method used. Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cult) Total storage (cult) 0.00 125.00 6,872 0 0 1,00 126.00 8,211 7,542 7,542 2.00 127.00 9,860 9,036 16,577 3.00 128.00 8,747 9,304 25,881 4.00 129.00 12,696 10,722 36,602 5.00 130.00 14,080 13,388 49,990 Culvert / Orifice Structures Weir Structures [A] [B] [C] [D] [A] [B] [C] [D] Rise (in) = 0.00 0.00 0.00 0.00 Crest Len (ft) = 25.00 0.00 0.00 0.00 Span (in) = 0.00 0.00 0.00 0.00 Crest El. (ft) = 128.00 0.00 0.00 0.00 No. Barrels = 0 0 0 0 Weir Coeff. = 2.60 0.00 0.00 0.00 Invert El. (ft) = 0.00 0.00 0.00 0.00 Weir Type = Broad --- --- --- Length (ft) = 0.00 0.00 0.00 0.00 Multi -Stage = No No No No Slope (%) = 0.00 0.00 0.00 0.00 N-Value = .000 .000 .000 .000 Orif. Coeff. = 0.00 0.00 0.00 0.00 Multi -Stage = n/a No No No Exfiltration = 2.000 in/hr (Contour) Tailwater Elev. = 0.00 ft Note: Culvert/Orifice outflows have been analyzed under inlet and outlet control. Stage (ft) Stage / Discharge Stage (ft) 5.00 - 5.00 4.00 a „ 3.00 - 3.00 2.00 - ................ ...... 2.00 1.00 _ __........n..�_............................�.�......M`.._........ 1.00 0.00 _._............... ...a......... . ... ..... ........... .. 0.00 0.00 20.00 40.00 60.00 80.00 100.00 120.00 140.00 160.00 180.00 200.00 ... •- Total Q Discharge (cfs) Hydrograph Plot Hydraflow Hydrographs by Intelisolve Wednesday, Nov 25 2020, 10:20 AM Hyd. No. 3 Basin 1 - Pre Hydrograph type = Rational Peak discharge = 17.17 cfs Storm frequency = 1 yrs Time interval = 1 min Drainage area = 9.000 ac Runoff coeff. = 0.55 Intensity = 3.468 in/hr Tc by User = 15.00 min OF Curve = River Bluff.IDF Asc/Rec limb fact = 1/1 Q (cfs) 18.00 - 15.00 - 12.00 - 31Z1Z 0.00 0.0 0.1 -m. - -. Hyd No. 3 Hydrograph Volume = 15,451 cuft Basin 1 - Pre Hyd. No. 3 --1 Yr Nill 0.2 0.3 0.3 0.4 Q (cfs) 18.00 15.00 12.00 11 3.00 0.00 0.5 Time (hrs) 6 � , III � � �'' r, M-., : ; i:. �•� - '° ��'� ....... ..._.... .... ----- Hyd. Hydrograph Peak Time Time to Volume Inflow l I Maximum Maximum Hydrograph p No. a type flow interval peak h p yd(s) elevation storage description (origin) (cfs) (min) } (min) (cuft) (ft) (cuft) 1 Rational 27.20 1 47 101,580 ---- ------ ------ Basin 1-Post 2 Reservoir 25.68 1 51 100,336 1 128.53 31,567 I Basin 1 - Post 3 I Rational 27.20 1 15 24,477 ---- 1 i I I I � I i l j i i ------ ------ �I Basin 1 - Pre i I Infil i i i I i Basin 1.gpwm i i f m ... Return Period: 10 Year I I Wednesda y, Nov 25 2020, 10:20 AM Hydraflow Hydrographs by Intelisolve Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 1 Basin 1-Post Hydrograph type = Rational Storm frequency = 10 yrs Drainage area = 9.000 ac Intensity = 5.494 in/hr OF Curve = River Bluff.IDF Q (cfs) 28.00 24.00 20.00 16.00 12.00 4.00 Basin 1-Post Hyd. No. 1 -- 10 Yr Wednesday, Nov 25 2020, 10:20 AM Peak discharge = 27.20 cfs Time interval = 1 min Runoff coeff. = 0.55 Tc by User = 15.00 min Asc/Rec limb fact = 3.11 /5.19 Hydrograph Volume = 101,580 cuft Q (cfs) 28.00 24.00 20.00 16.00 12.00 t3 We 4.00 0.00 _11 i i 1 a. ... . . . w I. �l ..- ....... 1 ...- "I J_. 0.00 0.0 0.2 0.3 0.5 0.7 0.8 1.0 1.2 1.3 1.5 1.7 1.8 2.0 2.2 Hyd No. 1 Time (hrs) 8 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Wednesday, Nov 25 2020, 10:20 AM Hyd. No. 2 Basin 1 - Post Hydrograph type = Reservoir Peak discharge = 25.68 cfs Storm frequency = 10 yrs Time interval = 1 min Inflow hyd. No. = 1 Max. Elevation = 128.53 ft Reservoir name = Basin 1-Post Max. Storage = 31,567 cuft Storage Indication method used. Hydrograph Volume = 100,336 cult Basin 1 - Post Q (cfs) Q (cfs) Hyd. No. 2 -- 10 Yr 28.00 _..- - —m. n...... ..... _...... w...._ .._w_ _. ._.. 28.00 24.00 ................. - -- - — __ . m m.............. -..-- - m........ — 24.00 20.00 .. �.�.� ... , w .� _.. �._._ __.�.... m ....�. _ ... 20.00 16.00 .. ............ . . ...- 16.00 12.00 .. . _ ...... .. . .......... . .. ... ..... .............. . .... - 12.00 8.00 - - -... -- ---- __ _..... - - - — 8.00 4.00 - .. .............. ....w.. . .................................. _..... --- - m ... _ .......... _...-- -- .... ............ ........ — _ 4.00 ..w. 0.00 0.00 -,..�� w.��� ...,��...p...--...,,...�,�wrv�.� .�.nw.� .� ....:.��. �.�,,,,,,-. ��. ..�,-...__,�,-,�rvn rv.�.�..µ..M.M. M..M.. ,,�,�,.,,. „�.� w 0.0 1.7 3.3 5.0 6.7 8.3 10.0 11.7 13.3 15.0 16.7 . �_..-m. Hyd No. 2 ... ,,,. Hyd No. 1 Time (hrs) 9 Pond Report 10 Hydraflow Hydrographs by Intelisolve Wednesday, Nov 25 2020, 10:20 AM Pond No. 1 - Basin 1-Post Pond Data Pond storage is based on known contour areas. Average end area method used. Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cult) 0.00 125.00 6,872 0 0 1,00 126.00 8,211 7,542 7,542 2.00 127.00 9,860 9,036 16,577 3.00 128.00 8,747 9,304 25,881 4.00 129.00 12,696 10,722 36,602 5.00 130.00 14,080 13,388 49,990 Culvert / Orifice Structures [A] [B] [C] [D] Rise (in) = 0.00 0.00 0.00 0.00 Span (in) = 0.00 0.00 0.00 0.00 No. Barrels = 0 0 0 0 Invert El. (ft) = 0.00 0.00 0.00 0.00 Length (ft) = 0.00 0.00 0.00 0.00 Slope (%) = 0.00 0.00 0.00 0.00 N-Value = .000 .000 .000 .000 Orif. Coeff. = 0.00 0.00 0.00 0.00 Multi -Stage = n/a No No No Stage (ft) 5.00 4.00 3.00 2.00 1.00 0.00 0.00 20.00 40.00 60.00 Total Q Weir Structures [A] [B] [C] [D] Crest Len (ft) = 25.00 0.00 0.00 0.00 Crest El. (ft) = 128.00 0.00 0.00 0.00 Weir Coeff. = 2.60 0.00 0.00 0.00 Weir Type = Broad --- --- --- Multi-Stage = No No No No Exfiltration = 2.000 in/hr (Contour) Tailwater Elev. = 0.00 ft Note: Culvert/Orifice outflows have been analyzed under inlet and outlet control. Stage / Discharge Stage (ft) 5.00 4.00 3.00 2.00 1.00 0.00 80.00 100.00 120.00 140.00 160.00 180.00 200.00 Discharge (cfs) Hydrograph Plot Hydraflow Hydrographs by Intelisolve Wednesday, Nov 25 2020, 10:20AM Hyd. No. 3 Basin 1 - Pre Hydrograph type = Rational Peak discharge = 27.20 cfs Storm frequency = 10 yrs Time interval = 1 min Drainage area = 9.000 ac Runoff coeff. = 0.55 Intensity = 5.494 in/hr Tc by User = 15.00 min OF Curve = River Bluff.IDF Asc/Rec limb fact = 1/1 Q (cfs) Hydrograph Volume = 24,477 cuft Q (cfs) 28.00 -- _ �_._ .,m ....e_..emm�.�w.�...... ............._ ._....._....._�_.__....__ _._._. _ 28.00 24.00 ..... .._ .._..- ---- - ^'-_ �.__..m _ .m 24.00 20.00 mw _. _.. _ 20.00 16.00 ...---- - 16.00 C Yryi J 12.00 7� _ a ��._, ......... _ _....... ...... �.._� _ 12.00 8.00 __.__e._ .. __..._._. �� ...�... .... __.... 8.00 4.00 _ m..........._ ....... W......... - - ---- - ----- _. . 4.00 0.00 0 00 0.0 Basin 1 - Pre Hyd. No. 3 -- 10 Yr 0.1 0.2 0.3 0.3 0.4 0.5 Hyd No. 3 Time (hrs) 12 Hyd. Hydrograph Peak Time Time to Volume Inflow Maximum Maximum Hydrograph No. type flow interval peak hyd(s) elevation storage description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 Rational 35.87 1 47 133,964 ---- ------ ------ Basin 1-Post 2 Reservoir 34.71 1 49 132,330 1 128.65 32,855 Basin 1 - Post 3 Rational 35.87 1 15 32,280 ---- ------ ------ Basin 1 - Pre In iil Basin 1.gpw Return Period: 100 Year Wednesday, Nov 25 2020, 10:20 AM Hydraflow Hydrographs by Intelisolve Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 1 Basin 1-Post Hydrograph type = Rational Storm frequency = 100 yrs Drainage area = 9.000 ac Intensity = 7.246 in/hr OF Curve = River Bluff.IDF Basin 1-Post Wednesday, Nov 25 2020, 10:20 AM Peak discharge = 35.87 cfs Time interval = 1 min Runoff coeff. = 0.55 Tc by User = 15.00 min Asc/Rec limb fact = 3.11 /5.19 Hydrograph Volume = 133,964 cuft Q (cfs) Q (cfs) Hyd. No. 1 -- 100 Yr 40.00 - ......... . , ....... m . ........... .........---....- ----- -- m .._ 40.00 i 30.00 m_,.m, , .w.._... 30.00 i ._.20.00 P r I 10.00........ -_..... ............. ---- - __ ...., ....... __......... _..... ..... --- -- 10.00 0.00 - ............. . . . .. ...... 0.00 0.0 0.2 0.3 0.5 0.7 0.8 1.0 12 1.3 1.5 1.7 1.8 2.0 2.2 Hyd No. 1 Time (hrs) 13 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Wednesday, Nov 25 2020, 10:20 AM Hyd. No. 2 Basin 1 - Post Hydrograph type = Reservoir Peak discharge = 34.71 cfs Storm frequency = 100 yrs Time interval = 1 min Inflow hyd. No. = 1 Max. Elevation = 128.65 ft Reservoir name = Basin 1-Post Max. Storage = 32,855 cuft Storage Indication method used. Hydrograph Volume = 132,330 cuft Q (cfs) 40.00 30.00 20.00 10.00 1.5 Hyd No. 2 3.0 Basin 1 - Post Hyd. No. 2 -- 100 Yr 4.5 6.0 .- Hyd No. 1 7.5 9.0 10.5 12.0 13.5 Q (cfs) 40.00 20.00 10.00 j_ 0.00 15.0 Time (hrs) 14 Pond Report 15 Hydraflow Hydrographs by Intelisolve Wednesday, Nov 25 2020, 10:20 AM Pond No. 1 - Basin 1-Post Pond Data Pond storage is based on known contour areas. Average end area method used. Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cult) Total storage (cuft) 0.00 125.00 6,872 0 0 1.00 126.00 8,211 7,542 7,542 2.00 127.00 9,860 9,036 16,577 3.00 128.00 8,747 9,304 25,881 4.00 129.00 12,696 10,722 36,602 5.00 130.00 14,080 13,388 49,990 Culvert / Orifice Structures Weir Structures [A] [B] [C] [D] [A] [B] [C] [D] Rise (in) = 0.00 0.00 0.00 0.00 Crest Len (ft) = 25.00 0.00 0.00 0.00 Span (in) = 0.00 0.00 0.00 0.00 Crest El. (ft) = 128.00 0.00 0.00 0.00 No. Barrels = 0 0 0 0 Weir Coeff. = 2.60 0.00 0.00 0.00 Invert El. (ft) = 0.00 0.00 0.00 0.00 Weir Type = Broad --- --- --- Length(ft) = 0.00 0.00 0.00 0.00 Multi -Stage = No No No No Slope (%) = 0.00 0.00 0.00 0.00 N-Value = .000 .000 .000 .000 Orif. Coeff. = 0.00 0.00 0.00 0.00 Multi -Stage = n/a No No No Exfiltration = 2.000 in/hr (Contour) Tailwater Elev. = 0.00 ft Stage (ft) 5.00 - 4.00 - 3.00 - 2.00 - 1.00 - 0.00 0.00 Note: Culvert/Orifice outflows have been analyzed under inlet and outlet control. Stage / Discharge 20.00 Total Q 40.00 60.00 80.00 Stage (ft) 5.00 4.00 3.00 2.00 1.00 0.00 100.00 120.00 140.00 160.00 180.00 200.00 Discharge (cfs) Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 3 Basin 1 - Pre Hydrograph type = Rational Storm frequency = 100 yrs Drainage area = 9.000 ac Intensity = 7.246 in/hr OF Curve = River Bluff.IDF Q (cfs) 40.00 9111If 20.00 10.00 Wednesday, Nov 25 2020, 10:20 AM Peak discharge = 35.87 cfs Time interval = 1 min Runoff coeff. = 0.55 Tc by User = 15.00 min Asc/Rec limb fact = 1/1 Hydrograph Volume = 32,280 cuft Basin 1 - Pre Hyd. No. 3 -- 100 Yr 0.1 0.2 0.3 0.3 0.4 Hyd No. 3 Q (cfs) 40.00 30.00 rm 10.00 0.00 0.5 Time (hrs) 16 Tcable Infil Basin 2.gpw Hydraflow Hydrographs by Intelisolve Wednesday, Nov 25 2020, 10:20 AM Hydrograph et rn Period Recap .......... .................................... .... ......................... 1 -Year SummaryReport.................................................................,.......................... ......... HydrographReports ........................................................................................................... 3 Hydrograph No. 1, Rational, Post Dev .............. ...... 3 Hydrograph No. 2, Reservoir, Basin 2 - Post.................................................................... 4 Hydrograph No. 3, Rational, Pre Dev............................................................................... 5 1 - Year SummaryReport .............................................................................................,.................... 6 HydrographReports ..........____ ........................................................................................... .. Hydrograph No. 1, Rational, Post Dev ........................ Hydrograph No. 2, Reservoir, Basin 2 - Post.................................................................... 8 Hydrograph No. 3, Rational, Pre Dev............................................................................... 9 90111a _ SummaryReport .......................................... .................. ...................................................... ...... 10 HydrographReports ......................................................................................................... 11 Hydrograph No. 1, Rational, Post Dev............................................................................ 11 Hydrograph No. 2, Reservoir, Basin 2 - Post.................................................................. 12 Hydrograph No. 3, Rational, Pre Dev............................................................................. 13 III Hydrograph Inflow Peak Outflow (cfs) Hydrograph No. type Hyd(s) —_............ .......�_..... __ R_ _._ description (origin) 1-Yr 2-Yr 3-Yr 5-Yr 10-Yr 25-Yr 50-Yr 100-Yr 1 Rational ------- 31.59 ------- ------- ------- 50.58 57.33 ------- 67.31 Post Dev 2 Reservoir 1 26.43 ------- ------- ------- 47.53 54.50 ------- 64.52 Basin 2 - Post 3 Rational ------- 31.59 ------- ------- ------- 50.58 57.33 ------- 67.31 Pre Dev Proj. file: Infil Basin 2.pw Wednesday, 1- Nov 25 2020, 10:20 AM Hydraflow Hydrographs by Intelisolve Hyd. Hydrograph Peak Time Time to Volume Inflow Maximum Maximum Hydrograph No. type flow interval peak hyd(s) elevation storage description (origin) (cfs) (min) (min) (tuft) (ft) (tuft) 1 Rational 31.59 1 53 133,984 ---- ------ 1 ------ Post Dev 2 Reservoir 26.43 1 67 118,532 1 122.54 57,515 Basin 2 - Post 3 Rational 1 I 1 31.59 I( 1 19 i 36,017 ---- ------ ------ Pre Dev I I i I i f Infil f(I Basin 2.gpw 1 return Period: 1 t f Year Wednesday, I 1 i i Nov 25 2020, 10:20 AM Hydraflow Hydrographs by Intelisolve Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 1 Post Dev Hydrograph type = Rational Storm frequency = 1 yrs Drainage area = 19.020 ac Intensity = 3.076 in/hr OF Curve = River Bluff.IDF Q (cfs) 35.00 30.00 25.00 20.00 15.00 10.00 AM Post Dev Hyd, No. 1 -- 1 Yr Wednesday, Nov 25 2020, 10:20AM Peak discharge = 31.59 cfs Time interval = 1 min Runoff coeff. = 0.54 Tc by User = 19.00 min Asc/Rec limb fact = 2.79/4.65 Hydrograph Volume = 133,984 cult Q (cfs) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 0.00 ...... I I-. --------------- L 0.00 0.0 0.2 0.3 0.5 0.7 0.8 1.0 1.2 1.3 1.5 1.7 1.8 2.0 2.2 2.3 2.5 Time (hrs) ......�.�...�..�..... Hyd No. 1 3 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Wednesday, Nov 25 2020, 10:20 AM Hyd. No. 2 Basin 2 - Post Hydrograph type = Reservoir Peak discharge = 26.43 cfs Storm frequency = 1 yrs Time interval = 1 min Inflow hyd. No. = 1 Max. Elevation = 122.54 ft Reservoir name = Infil Basin 2 Max. Storage = 57,515 cuft Storage Indication method used. Basin 2 - Post Hydrograph Volume = 118,532 cuft Q (cfs) Hyd. No. 2 -- 1 Yr Q (cfs) 35.00�--- _..........._....._ ..... .................. ..._..... ..... 35.00 30.00 ------30.00 rye., I 25.00 m 25.00 20.00 _� .... _.._ �. ._.�.. ...... _----. ...m,.m,��.. 20.00 15.00 15.00 10.00 _. - -- - ,....... 10.00 I h ......... .. ..... —_ ...__ _ ..._.An.�.. ..... _...—._ 5.00 z— w 0.00 ��..� ��� .� .... 0.0 0.3 0.7 1.0 1.3 1.7 2.0 2.3 2.7 3.0 Time (hrs) �.�..................... Hyd No. 2 .,,,o„.,. Hyd No. 1 4 5 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Wednesday, Nov 25 2020, 10:20 AM Hyd. No. 3 Pre Dev Hydrograph type = Rational Peak discharge = 31.59 cfs Storm frequency = 1 yrs Time interval = 1 min Drainage area = 19.020 ac Runoff coeff. = 0.54 Intensity = 3.076 in/hr Tc by User = 19.00 min OF Curve = River Bluff.IDF Asc/Rec limb fact = 1/1 Q (cfs) Hydrograph Volume = 36,017 cuft Q (cfs) 35.00 _. mm_9.. ....m .............. .......... . ......... _..... _......... .......... __.......... 35.00 30.00 ------ ....... 30.00 om° 25.00 .....mm ............. .._. 25.00 �Q 20.00 __._ ..- _ .....fi......... . ........-__..... - �._ _, ...m.,... —.._-. - _ _ 20.00 u� 15.00:.............. ..... 15.00 d k 10.00 .. ......._. ... -- 10.00 . � Y m ww 5.00 ................. ........ ---.._ ._._. ..-.--..._.._ ..._.._........ 5.00 o^ W� 0.00 _... w ,......�... ____.......m w, 0 00 0.0 Pre Dev Hyd. No. 3 --1 Yr 0.1 0.2 0.3 0.3 0.4 0.5 0.6 Hyd No. 3 0.7 Time (hrs) ,,, LKIVALM Hyd. Hydrograph Peak Time Time to Volume Inflow Maximum Maximum Hydrograph No. type flow interval peak hyd(s) elevation storage description (origin) (cfs) (min) (min) (cult) (ft) (cuft) 1 Rational 50.58 1 53 214,507 ---- ------ ------ Post Dev 2 Reservoir 47.53 1 58 198,816 1 122.81 62,634 Basin 2 - Post 3 Rational 50.58 1 19 57,663 ---- ------ ------ Pre Dev Infil Basin 2.gpw Return Period: 10 Year Wednesday, Nov 25 2020, 10:20 AM Hydraflow Hydrographs by Intelisolve Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 1 Post Dev Hydrograph type = Rational Storm frequency = 10 yrs Drainage area = 19.020 ac Intensity = 4.925 in/hr OF Curve = River Bluff.IDF Q (cfs) 60.00 10.00 Wednesday, Nov 25 2020, 10:20 AM Peak discharge = 50.58 cfs Time interval = 1 min Runoff coeff. = 0.54 Tc by User = 19.00 min Asc/Rec limb fact = 2.79/4.65 Hydrograph Volume = 214,507 cuft Post Dev Hyd. No. 1 -- 10 Yr --- _ _ ........n, ...,.�....... ......... ..... ......... d ....... ... ... .... .f ..... ... ... ..........--- — --- ---- -- - �n _.�....__._... _..._..__..... ®...... -_____ _.. Q (cfs) 60.00 50.00 40.00 30.00 20.00 0.00 - - 0.00 0.0 0.2 0.3 0.5 0.7 0.8 1.0 1.2 1.3 1.5 1.7 1.8 2.0 2.2 2.3 2.5 Hyd No. 1 Time (hrs) 7 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 2 Basin 2 - Post Hydrograph type = Reservoir Storm frequency = 10 yrs Inflow hyd. No. = 1 Reservoir name = Infil Basin 2 Storage Indication method used Q (cfs) 60.00 50.00 40.00 20.00 10.00 Basin 2 - Post Hyd. No. 2 --10 Yr Wednesday, Nov 25 2020, 10:20 AM Peak discharge = 47.53 cfs Time interval = 1 min Max. Elevation = 122.81 ft Max. Storage = 62,634 cuft Hydrograph Volume = 198,816 cuft Q (cfs) 60.00 50.00 40.00 30.00 20.00 10.00 0.00 . _ p -... -. �.... 0.00 0.0 0.3 0.7 1.0 1.3 1.7 2.0 2.3 2.7 3.0 Hyd No. 2 °- ...• w.° Hyd No. 1 Time (hrs) 8 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 3 Pre Dev Hydrograph type = Rational Storm frequency = 10 yrs Drainage area = 19.020 ac Intensity = 4.925 in/hr OF Curve = River Bluff.IDF Pre Dev Wednesday, Nov 25 2020, 10:20 AM Peak discharge = 50.58 cfs Time interval = 1 min Runoff coeff. = 0.54 Tc by User = 19.00 min Asc/Rec limb fact = 1/1 Hydrograph Volume = 57,663 cuft Q (cfs) Hyd. No. 3 --10 Yr Q (cfs) 60.00 .�............ .......... . -- _ ........ 60.00 50.00 - m.m.............. —_ _ 50.00 40.00 . ._.................. ---- _...__ � . �....... ...... — -� ��k � ......... .. _ ..........� .... 40.00 30.00 20.00 _ ........... ... ---- m.M. _.__. : _.._ 20.00 10.00 _.. ..... .... ....... 10.00 EMI 0.00 . . ....... ........ __..._ m, _ ...... ..... , mm o...... 0.00 0.0 0.1 0.2 0.3 0.3 0.4 0.5 0.6 0.7 11-111,11,11, Hyd No. 3 Time (hrs) 9 'UTOOSTITr Me Hyd. Hydrograph Peak Time Time to Volume Inflow Maximum Maximum Hydrograph No. type flow interval peak hyd(s) elevation storage description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 Rational 67.31 1 53 285,430 ---- ------ ------ Post Dev 2 Reservoir 64.52 1 57 269,539 1 122.99 66,192 Basin 2 - Post 3 it I i Rational 67.31 1 19 76,729 ---- ------ ------ Pre Dev I Infil Basin 2.gpw Return Period: 100 Year Wednesday, Nov 25 2020, 10:20 AM L Hydraflow Hydrographs by Intelisolve Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 1 Post Dev Hydrograph type = Rational Storm frequency = 100 yrs Drainage area = 19.020 ac Intensity = 6.553 in/hr OF Curve = River Bluff.IDF Q (cfs) 70.00 Me 99l 50.00 40.00 10.00 Wednesday, Nov 25 2020, 10:20 AM Peak discharge = 67.31 cfs Time interval = 1 min Runoff coeff. = 0.54 Tc by User = 19.00 min Asc/Rec limb fact = 2.79/4.65 Hydrograph Volume = 285,430 cuft Post Dev Hyd. No. 1 -- 100 Yr R� r� M„w o .__....,m ........ .......,, _......__,,......m ..n_........ .., . ..., v ................._._. a Q (cfs) 70.00 50.00 40.00 30.00 20.00 10.00 0.00 _.-....-.1-- ... .w._..._... - _ ...._._....,..Wm_._.µ.µ_ .11-.w-L 0.00 0.0 0.2 0.3 0.5 0.7 0.8 1.0 1.2 1.3 1.5 1.7 1.8 2.0 2.2 2.3 2.5 �....�................ Hyd No. 1 Time (hrs) 11 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Wednesday, Nov 25 2020, 10:20AM Hyd. No. 2 Basin 2 - Post Hydrograph type = Reservoir Peak discharge = 64.52 cfs Storm frequency = 100 yrs Time interval = 1 min Inflow hyd. No. = 1 Max. Elevation = 122.99 ft Reservoir name = Infil Basin 2 Max. Storage = 66,192 cuft Storage Indication method used. Hydrograph Volume = 269,539 cuft Basin 2 - Post Q (cfs) Q (cfs) Hyd. No. 2 -- 100 Yr 70.00 ........ 70.00 60.00 -- ----.._.. - ._ ._.�....... ... �._ __ m__, m,.,e,..m 60.00 �µ^ 50.00 50.00 ��z I 40.00 - _ - ..._ ��... ........ °��.. - - ----. _ .._............ _ .. -- - 40.00 30.00 _ .:..... _ �.__._....-,... _w....... 30.00 20.00 -- _,.` ........ ---- - 20.00 10.00 .... _. _... _.._ ..... .._..._ - - - - --_ - ........ ..... ....... --- - --- - _ ..._..... 10.00 wµ OAp 0.00 -,m -rorvrvry . -� - 0.0 0.3 0.7 1.0 1.3 1.7 2.0 2.3 2.7 3.0 Time (hrs) ... m..�....°°°. Hyd No. 2 ���,�,,�,,,,. Hyd No. 1 12 13 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 3 Pre Dev Hydrograph type = Rational Storm frequency = 100 yrs Drainage area = 19.020 ac Intensity = 6.553 in/hr OF Curve = River BIuff.IDF Q (cfs) Wednesday, Nov 25 2020, 10:20 AM Peak discharge = 67.31 cfs Time interval = 1 min Runoff coeff. = 0.54 Tc by User = 19.00 min Asc/Rec limb fact = 1/1 Hydrograph Volume = 76,729 cuft Q (cfs) .... -- _.. .... _.......-. -- � I ... -- - - ..m 60.00 __ _ m._,.......... 60.00 � 50.00 ........� 50.00 �r 40.00 --._ _............... ...---- _..................�„k �.. 40.00 �en.n.......... ........ h 30.00 d _. " ...... _... ..M 30.00 20.00 ...... — — _.................... ..... _.__ { ..... — 20.00 n kk j 10.00 _..�.. _ �,__ ..........m .. -- 0.00 m. .... 0 00 0.0 Pre Dev Hyd. No. 3 -- 100 Yr 0.1 0.2 0.3 0.3 0.4 0.5 0.6 Hyd No. 3 0.7 Time (hrs)