Loading...
HomeMy WebLinkAboutSW6200704_Supplement-EZ Form_20201125SUPPLEMENT-EZ COVER PAGE W QtBMS LOADED FORMS LOADED Cer0cation Statement i certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent wtlth the information provided here. Designer -,III R I M $' ® 1 59 Signatu o De ne Date DRAINAGE AREAS 1 Isthis a high densd ro ect? _2 If sonumber of drainage areas/SC Ms 2 vious rule Is all/part of this project subject to pre 3 versions? No FORIAS LOADED uu DRAINA iE AREAS INFORMATION �o o�� Entlro l 1 4 xy e of SC6v8 5 dotal BL1A m project (sq ft) 48598461093 sf T New BUA on subdivided lots (subject to permitting) ...... 6 (sq ....,,. �, �a n_, m 364000..24000 sf New BUA outside of subdivided lots (subject to ..,.m. 7 ' permitting) (sf) 121984 sf 3709 sf 8 Offsite total area (sq ft) sf sf 9 if site BUA..(sq ft) � e sf sf 10 Breakdown of new BUA outside subdivided lots: m.... .... ,. Parking (sq ft) . Sidewalk .. ®..a. , l gadvvay (sq ft) _ _ 121984 sf.m. .. ..... 37093 sf future (sq ft) sf sf -Other, please specify m the comment box ............. ..�. belo (sq f1) sf sf nfiltrating permeable pavement on New'vided 11 subdl lots (sq ft) sf sf 12 New infiltrating permeable pavement outside of lots fsubdroided (sq m,) sf sf 13 Exisitrig BUA ipe m t�8� �sq ft)t will remain (not subject to sf sf_ 14 .. Existing BUA That is already„permitted (sq) if sf 15Existmg I be removed s k( BUA that wll�, (• q ) sf s f. 16 17 .Percent BUA Design storm (inches) 22 In 43u 1 In 18 g3esNcn volume of SCSI (ou ft) cf 1 cf 19 Calculation method for design volume $ample le Method ADDITIONAL INFORMATION C Please use this space to provide any additional information about the 20 drainage area(s) INFILTRATION SYSTEM 1 Drainage area number 1 2 2 Desi9 n volume of SCM (cu ft) 13716 cf 27690 cf 3 Is the SCM sized to treat the SW from all surfaces at build -out' Y" Yes 4 Is the SCM located away from contain mated soils11 ? No No 5 What are the side slopes of the SCM H U ? p ) 3 1 31... 1 6 Does the SCM have retaining walls, gabion walls or other engineered side slopes? No No 7 Are the inlets, outlets, and receiving stream protected from erosion (10•year storm)? Yes Yes 8 Is there an overflow or bypass for inflow volume in excess of the design volume? Yes Yes fr maintenance? tcleaned Pump 10 I applpcabiemwv IhthefSCM beor out after construction? mm ..pump Yesferred) Yeserred 11 m ®, _ Does the maintenance access comply with General MDC (8)? —..W.... .... _........ Yes .... Yes 12 Does the drainage easement aim d with General ht�C (9 g p y ). .......... ... r,.._.� Yes .................... ......._........... Yes If the SCM is on a siingl1e family lot, does (will?) the plat comply with General-MDC 13 (10)? 14 Is there an OW A,,.. _ reernent� g that complies with General MI�C _ (11�� , ........ Yes...,...... w . .. Yes 15 Is there an O&M Plan that complies with General MDC (12)? Yes Yes 16 Does the SCM follow the device specific MDC? Yes Yes 17 Was the SCM designed by an NC licensed professional? ...........n.M........ Yes Yes INFILTRAT' I SYSTEM,ll' K It0IMOZ]HIJ 18roposed slope of the subgrade surfaoe°/4) 0% 0 19 Are terraces or baffles provided? ' " ®_ T)n_ 4 o _. 20 e' pe ofrtrea ....�. �.e., bay ForNeobay Sails Data ., Was the soil investigated in the footprint and at the elevation of the infiltration _....... ..... .. 21 system? Yes Yes SHWT elevation (fmsl) 118.87 115.91....... 23 Depth to SHWT per soils report (in) 37.00 24 Ground elevation at boring in soils report (fmsi) 128.12 123.08 25 Is a detailed hydrogeologic study attached if the separation is between 1 and 2 feet? Yes Yes „ 26 Sorl infiltration rate ('in1hr) 2.00 0.50 27 Factor of safetyFS ( ) (2 is recommended) f 2.00 2.00 leva#ions .........,.. ... ._ ............. 29 Bottom elevation (fmsl) ....., 125 ft. _ _.... ......... 119 ft 30 �fmsl) elevation Storage 125.ft ..... 119.ft........ 31 S pass elevation I'msl y ( ) 127 ft........ 122 ft m. For Basins Dnl)r 32 Sottom surface area, ftZ: 5769 ft 11033 ft 33 Storage elevation surface area (ft') 8111 ft 17862 ft For Trenches Only . . 34 Length (ft),, g. 35 .. .. _...,..,,., Width (ft) _ ,,, ,,, ., ,. 36 Perforated pipe diameter, if applicable (inches) 37 Nuimberoflaterals .... ._, .... _...-.. 38 m. �e„ .e.m, ;Total length of perforated piping �............. 39 Stone type, if applicable m 40 jStone void ratio (^') ........... T _ .._... ...... ..�.. 41 .........„ P, , m, ... Is stone free of fines? __ _ ..., �. ............... 42 ; is the stone pp wra ed in eotextile fabric? 9 .... 43 Has at least one infiltration port beenprovided? Volu►nes/Drawdown 44 Deslgn volume off SCM (cu ft (hours) ) 13846 c.. 28686 c.... . 46 Time to drawdown use this space to provide any additional 46 Infiltration 1 10:35 AM 11/25/2020