Loading...
HomeMy WebLinkAbout20201635 Ver 1_Pre-Filing Meeting Request_20201029ID#* 20201635 Version* 1 Regional Office* Mooresville Regional Office - (704) 663-1699 Reviewer List* Alan Johnson Pre -Filing Meeting Request submitted 10/29/2020 .................................................................................................................................................................................................................................................................................................... Contact Name * Dave Homans / Helen Simonson Contact Email Address* Project Name* Project Owner* Project County* dhomans@smeinc.com Ardrey Kell Sidewalk Project City of Charlotte Mecklenburg Owner Address: Street Address Ardrey Kell Road at Tom Short Road Address Line 2 aty State / Frovince / Region Charlotte NC Rbstal / Zip Code Country 28277 USA Is this a transportation project?* r Yes r No Type(s) of approval sought from the DWR: W 401 Water Quality Certification - F 401 Water Quality Certification - Regular Express r- Individual Permit r- Modification r- Shoreline Stabilization Does this project have an existing project ID#?* r Yes r No Do you know the name of the staff member you would like to request a meeting with? Alan Johnson Please give a brief project description below. The Ardrey Kell Sidewalk project involves the construction of —1/2 mile of sidewalk along the northwest side of Ardrey Kell Road between Tom Short Road and an existing section of sidewalk. The project is expected to require some minor fill to roadside wetland areas. Project plans are attached. Please give a couple of dates you are available for a meeting. 11 /13/2020 11 /12/2020 11 /16/2020 Please attach the documentation you would like to have the meeting about. Ardrey Kell Sidewalk Final Submital 12.95MB Package.pdf pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature Submittal Date 10/29/2020 11/1/2018 Engineering Services PLAN SUBMITTAL COVERSHEET DATE 10/09/2020 PROJECT NAME Ardrey Kell Sidewalk PROJECT LOCATION Located on Ardrey Kell Rd. between Tom Short Rd. and Providence Rd. % PLAN COMPLETION FINAL SUBMITTAL INCLUDES:  COMPLETE PLANS PACKAGE  MILESTONE CHECKLIST  CURRENT COST ESTIMATE  SPECIAL PROVISIONS (100% REVIEW ONLY) CONSULTANT Andrew Davis. EI CONSULTANT PM Andrew Dodds, PE CONSULTANT QA/QC ENGINEER Andrew Dodds, PE LOCATION MAP NTS Project Name: Ardrey Kell Sidewalk Project Number: PMES191608Project Features: Curb & Gutter Pedestrian Signals Concrete Sidewalk PMES191608 Construction Plans of Proposed INDEX OF SHEETS NCDOT 2018 STANDARD SPECIFICATIONS VICINITY MAP NTS Cover Sheet .............................................................................. 1 Signal Plans ............................................................................. SIG1 General Notes and Details ...................................................... 2-2A Plan & Profile .......................................................................... 4-8 Erosion Control ...................................................................... EC1-EC3 Traffic Control ........................................................................ TCP1 Pavement Markings GENERAL SERVICES Ardrey Kell Sidewalk Typical Sections and Storm Drainage Summary.................. 3-3B Pavement Marking & Signing Plan ....................................... PM1-PM3 TOTAL SHEETS 36 Ardrey Kell Rd. -L- SR3632 POSTED SPEED: 45 MPH Begin Project Sta. 10+00.00 -L- End Project Sta. 34+95.62 -L- PROJECT LENGTH = 0.47 MILESTom Short Rd.SR3628POSTED SPEED:35 MPHARDREY KE L L R D .ARDREY KELL RD.TOM SHORT RD..SITE Wheel Chair Ramps FINAL PLANSFOR CONSTRUCTION PLANS PREPARED BY: Landscape Management CLT Water CDOT - Implementation Engineering Services Construction Administration Contract Administration FOR CITY ENGINEER GENERAL SERVICES ____________ RECOMMENDED Horz. Profile ............ Vert. Profile ............. Plan View ................. GRAPHIC SCALES 6020 40 6020 40 124 8 Cross Section ........... 155 10 Storm Water Services Planning, Design & Development Utility Coordination 600 East Fourth Street Charlotte, North Carolina 28202 Phone: (704) 336-2291 Fax: (704) 336-6586 GENERAL SERVICES PLANNING & DESIGN GROUP CITY OF CHARLOTTE CDOT - Design PE SEAL Record Drawings Friday, October 9, 2020 3:29:28 PM SURVEY PREPARED BY: CITY OF CHARLOTTE SURVEY-MAPPING-GIS FROM THE LOCALIZED COORDINATE SYSTEM DEVELOPED FOR THIS PROJECT IS BASED ON STATE PLANE COORDINATES ESTABLISHED BY: NCGS MONUMENT OR CONTROL POINT WITH NAD 83(2011) STATE PLANE COORDINATES OF NORTHING:479,376.37 EASTING: 1,457,140.43 ELEVATION NAVD: THE AVERAGE COMBINED GRID FACTOR USED ON THIS PROJECT (GROUND TO GRID) IS: 0.99985097 VERTICAL DATUM: NAVD 88 ALL LINEAR DIMENSIONS ARE LOCALIZED HORIZONTAL DISTANCES. DATE RANGE OF SURVEY:03/19/2019 TO 03/26/2019 Grading Cross Sections ......................................................................... X1-X16 Storm Sewer Pipe Profiles ............................................................................. 9 OFSHEETNO.DATEBYDESCRIPTIONPlans Prepared By:29 GENERAL NOTESAND DETAILS600 East Fourth StreetCharlotte, North Carolina 28202Phone: (704) 336-2291Fax: (704) 336-6586GENERAL SERVICESPLANNING & DESIGN GROUPCITY OF CHARLOTTEAPPROVED BYPREPARED BYCHECKED BYDATEJOB NO.SCALEK:\ENGINEERING SERVICES\PROJECT FILES\PMES191608 Ardrey Kell Sidewalk\Drawings\CAD\Sheet Set\S2-General Notes & Details.dwg Monday, October 12, 2020 2:29:27 PMARDREY KELL SIDEWALKABBREVIATIONSGENERAL NOTES GENERAL NOTES STANDARDS Proposed Sidewalk Bridging Tree Roots .................................. CONVENTIONAL SIGNS Proposed Rip Rap Ditch .............................................................. Proposed Asphalt Pavement ........................................................ Proposed Pavement Removal ...................................................... Proposed Gravel ........................................................................... Tree Protection ............................................................................. Guy Wire ........................................................... Accessible Ramp Domes ...................................................................... Existing Water Meter ............................................ Existing Drop Inlet................................................ Existing Utility Pole ................................................ Existing Gas Valve ................................................ Existing Sanitary Sewer Manhole ....................... Existing Water Valve ............................................ Existing Storm Drain Manhole ............................ Proposed Storm Drain Manhole .......................... Existing Telephone Manhole ................................ Existing Catch Basin ............................................. Proposed Catch Basin ........................................... Existing Light Pole ................................................. Proposed Drop Inlet............................................... Existing Fire Hydrant ............................................ Iron Pin .................................................................... Proposed Light Pole ............................................... Proposed Utility Pole .............................................. Proposed Telephone Manhole .............................. Existing Electric Manhole .................................... Proposed Electric Manhole .................................. Proposed Fire Hydrant .......................................... Existing Tree ......................................................... Proposed Sanitary Sewer Manhole ..................... Proposed Curb & Gutter, Conc. Drive, Sidewalk ................... Asphalt Milling ............................................................................ Sidewalk Cross Slope Transition ................................................ Existing Storm Drainage ................................ Proposed Property Line ................................. Existing Property Line ................................... Existing Gas Line ............................................ Existing Underground Telecommunications. Existing Sanitary Sewer .................................. Proposed Storm Drainage .............................. Existing Water Line ........................................ Temporary Construction Easement .............. Existing Underground Electric ...................... Sidewalk/Utility Easement ............................. Storm Drainage Easement ............................. Maintained as R/W Line ................................ Utility Easement .............................................. CONVENTIONAL SIGNS Slope Stake Fill line ........................................ Slope Stake Cut line ........................................ Conservation Easement .................................. Existing Easement ........................................... Proposed Gas Line .......................................... Proposed Water Line ...................................... Proposed Sanitary Sewer ................................ Existing Overhead Utilities............................. Existing Overhead Electric ............................ Existing Overhead Telephone ........................ Existing Underground Cable TV.................... Existing Underground Fiber Optic................ Existing Overhead Fiber Optic....................... Proposed Underground................................... Proposed Overhead.......................................... Existing Guardrail........................................... Proposed Guardrail......................................... Existing Fence................................................... Proposed Fence................................................. Silt Fence........................................................... Proposed Safety Rail........................................ Railroad Tracks............................................... Creek/Ditch....................................................... Proposed Water Valve .......................................... Post Construction Controls Easement ..........PRELIMINARYDo Not Use For Construction CURB RAMPDETAILS2A9OFSHEETNO.DATEBYDESCRIPTIONPlans Prepared By:600 East Fourth StreetCharlotte, North Carolina 28202Phone: (704) 336-2291Fax: (704) 336-6586GENERAL SERVICESPLANNING & DESIGN GROUPCITY OF CHARLOTTEK:\ENGINEERING SERVICES\PROJECT FILES\PMES191608 Ardrey Kell Sidewalk\Drawings\CAD\Sheet Set\S2A- WCR Details.dwg Monday, October 12, 2020 9:28:07 PMAPPROVED BYPREPARED BYCHECKED BYDATEJOB NO.SCALERAMP NOTES ARDREY KELL SIDEWALKWCR DETAIL 1 WCR DETAIL 2 SR#3632ARDREY KELL RD.ARDREY KELL RD.TOM SHORT RD.PRELIMINARYDo Not Use For Construction 3TYPICAL SECTIONOFSHEETNO.DATEBYDESCRIPTIONPlans Prepared By:600 East Fourth StreetCharlotte, North Carolina 28202Phone: (704) 336-2291Fax: (704) 336-6586ENGINEERING & PROPERTY MANAGEMENTPLANNING & DESIGN GROUPCITY OF CHARLOTTEAPPROVED BYPREPARED BYCHECKED BYDATEJOB NO.ARDREY KELL SIDEWALKSCALESR3632PRELIMINARYDo Not Use For Construction9 3A9TYPICAL SECTIONOFSHEETNO.DATEBYDESCRIPTIONPlans Prepared By:600 East Fourth StreetCharlotte, North Carolina 28202Phone: (704) 336-2291Fax: (704) 336-6586ENGINEERING & PROPERTY MANAGEMENTPLANNING & DESIGN GROUPCITY OF CHARLOTTEAPPROVED BYPREPARED BYCHECKED BYDATEJOB NO.ARDREY KELL SIDEWALKSCALESR3632PRELIMINARYDo Not Use For Construction DRAINAGE STRUCTURE TABLE STORM DRAINAGE PIPE TABLE NO.DATEBYDESCRIPTIONDRAINAGEOFSHEETSUMMARY TABLEPlans Prepared By:600 East Fourth StreetCharlotte, North Carolina 28202Phone: (704) 336-2291Fax: (704) 336-6586GENERAL SERVICESPLANNING & DESIGN GROUPCITY OF CHARLOTTE3B9APPROVED BYPREPARED BYCHECKED BYDATEJOB NO.SCALEK:\ENGINEERING SERVICES\PROJECT FILES\PMES191608 Ardrey Kell Sidewalk\Drawings\CAD\Sheet Set\S3-Typical Sections & Drainage Summary.dwg Friday, October 9, 2020 3:25:08 PMARDREY KELL SIDEWALKPRELIMINARYDo Not Use For Construction ARDREY KELL RD. SR3632 (100' PUBLIC R/W)TOM SHORT RD. SR3628(70' PUBLIC R/W)PLAN & PROFILE49OFSHEETNO.DATEBYDESCRIPTIONPlans Prepared By:600 East Fourth StreetCharlotte, North Carolina 28202Phone: (704) 336-2291Fax: (704) 336-6586ENGINEERING & PROPERTY MANAGEMENTPLANNING & DESIGN GROUPCITY OF CHARLOTTEAPPROVED BYPREPARED BYCHECKED BYDATEJOB NO.ARDREY KELL SIDEWALKSCALESR3632PRELIMINARYDo Not Use For ConstructionSTA. 10+00 to 15+50 ARDREY KELL RD. SR3632 (100' PUBLIC R/W)PLAN & PROFILESTA. 15+50 to 21+0059OFSHEETNO.DATEBYDESCRIPTIONPlans Prepared By:600 East Fourth StreetCharlotte, North Carolina 28202Phone: (704) 336-2291Fax: (704) 336-6586ENGINEERING & PROPERTY MANAGEMENTPLANNING & DESIGN GROUPCITY OF CHARLOTTEAPPROVED BYPREPARED BYCHECKED BYDATEJOB NO.ARDREY KELL SIDEWALKSCALESR3632PRELIMINARYDo Not Use For Construction ARDREY KELL RD. SR3632 (100' PUBLIC R/W)PLAN & PROFILESTA. 21+00 to 26+5069OFSHEETNO.DATEBYDESCRIPTIONPlans Prepared By:600 East Fourth StreetCharlotte, North Carolina 28202Phone: (704) 336-2291Fax: (704) 336-6586ENGINEERING & PROPERTY MANAGEMENTPLANNING & DESIGN GROUPCITY OF CHARLOTTEAPPROVED BYPREPARED BYCHECKED BYDATEJOB NO.ARDREY KELL SIDEWALKSCALESR3632PRELIMINARYDo Not Use For Construction ARDREY KELL RD. SR3632 (100' PUBLIC R/W)PLAN & PROFILESTA. 26+50 to 32+0079OFSHEETNO.DATEBYDESCRIPTIONPlans Prepared By:600 East Fourth StreetCharlotte, North Carolina 28202Phone: (704) 336-2291Fax: (704) 336-6586ENGINEERING & PROPERTY MANAGEMENTPLANNING & DESIGN GROUPCITY OF CHARLOTTEAPPROVED BYPREPARED BYCHECKED BYDATEJOB NO.ARDREY KELL SIDEWALKSCALESR3632PRELIMINARYDo Not Use For Construction ARDREY KELL RD. (100' PUBLIC R/W)PLAN & PROFILESTA. 32+00 to 34+96 89OFSHEETNO.DATEBYDESCRIPTIONPlans Prepared By:600 East Fourth StreetCharlotte, North Carolina 28202Phone: (704) 336-2291Fax: (704) 336-6586ENGINEERING & PROPERTY MANAGEMENTPLANNING & DESIGN GROUPCITY OF CHARLOTTEAPPROVED BYPREPARED BYCHECKED BYDATEJOB NO.ARDREY KELL SIDEWALKSCALESR3632PRELIMINARYDo Not Use For Construction Monday, October 12, 2020 1:33:04 PMSTORM PIPEPROFILES99OFSHEETNO.DATEBYDESCRIPTIONPlans Prepared By:600 East Fourth StreetCharlotte, North Carolina 28202Phone: (704) 336-2291Fax: (704) 336-6586ENGINEERING & PROPERTY MANAGEMENTPLANNING & DESIGN GROUPCITY OF CHARLOTTEAPPROVED BYPREPARED BYCHECKED BYDATEJOB NO.ARDREY KELL SIDEWALKSCALESR3632PRELIMINARYDo Not Use For Construction TRAFFIC CONTROLNOTESTC1TC1PRELIMINARYDo Not Use For ConstructionOFSHEETNO.DATEBYDESCRIPTIONPROJECT NOTESGENERAL NOTES CONSTRUCTION PHASING DETAIL A Plans Prepared By:600 East Fourth StreetCharlotte, North Carolina 28202Phone: (704) 336-2291Fax: (704) 336-6586GENERAL SERVICESPLANNING & DESIGN GROUPCITY OF CHARLOTTEK:\ENGINEERING SERVICES\PROJECT FILES\PMES191608 Ardrey Kell Sidewalk\Drawings\CAD\Sheet Set\S5(TCP)- Traffic Control Plan.dwg Monday, October 12, 2020 2:07:17 PMAPPROVED BYPREPARED BYCHECKED BYDATEJOB NO.SCALEPORTABLE SIGN BLOCKING SIDEWALK UNACCEPTABLE ALTERNATIVE OPTION IS TO PLACE SIGN BEHIND SIDEWALK WHEN POSSIBLE, OTHERWISE, MAY NEED TO POST MOUNT SIGN WITH 7' MINIMUM VERTICAL CLEARENCE FROM SIDEWALK SURFACE PORTABLE SIGN IN SIDEWALK ACCEPTABLE ARDREY KELL SIDEWALK ARDREY KELL RD. (100' PUBLIC R/W)TOM SHORT RD.(70' PUBLIC R/W)ARDREY KELL RD. (100' PUBLIC R/W)PAVEMENT MARKINGPLANPM1PM3OFSHEETNO.DATEBYDESCRIPTIONPlans Prepared By:600 East Fourth StreetCharlotte, North Carolina 28202Phone: (704) 336-2291Fax: (704) 336-6586ENGINEERING & PROPERTY MANAGEMENTPLANNING & DESIGN GROUPCITY OF CHARLOTTEAPPROVED BYPREPARED BYCHECKED BYDATEJOB NO.ARDREY KELL SIDEWALKSCALESR3632PRELIMINARYDo Not Use For Construction ARDREY KELL RD. (100' PUBLIC R/W) ARDREY KELL RD. (100' PUBLIC R/W)PAVEMENT MARKINGPLANPM2PM3OFSHEETNO.DATEBYDESCRIPTIONPlans Prepared By:600 East Fourth StreetCharlotte, North Carolina 28202Phone: (704) 336-2291Fax: (704) 336-6586ENGINEERING & PROPERTY MANAGEMENTPLANNING & DESIGN GROUPCITY OF CHARLOTTEAPPROVED BYPREPARED BYCHECKED BYDATEJOB NO.ARDREY KELL SIDEWALKSCALESR3632PRELIMINARYDo Not Use For Construction ARDREY KELL RD. (100' PUBLIC R/W)PAVEMENT MARKINGPLANPM3PM3OFSHEETNO.DATEBYDESCRIPTIONPlans Prepared By:600 East Fourth StreetCharlotte, North Carolina 28202Phone: (704) 336-2291Fax: (704) 336-6586ENGINEERING & PROPERTY MANAGEMENTPLANNING & DESIGN GROUPCITY OF CHARLOTTEAPPROVED BYPREPARED BYCHECKED BYDATEJOB NO.ARDREY KELL SIDEWALKSCALESR3632PRELIMINARYDo Not Use For Construction EROSION CONTROLPLANEC1EC3OFSHEETNO.DATEBYDESCRIPTIONPlans Prepared By:600 East Fourth StreetCharlotte, North Carolina 28202Phone: (704) 336-2291Fax: (704) 336-6586ENGINEERING & PROPERTY MANAGEMENTPLANNING & DESIGN GROUPCITY OF CHARLOTTEAPPROVED BYPREPARED BYCHECKED BYDATEJOB NO.ARDREY KELL SIDEWALKSCALESR3632PRELIMINARYDo Not Use For Construction EROSION CONTROLPLANEC2EC3OFSHEETNO.DATEBYDESCRIPTIONPlans Prepared By:600 East Fourth StreetCharlotte, North Carolina 28202Phone: (704) 336-2291Fax: (704) 336-6586ENGINEERING & PROPERTY MANAGEMENTPLANNING & DESIGN GROUPCITY OF CHARLOTTEAPPROVED BYPREPARED BYCHECKED BYDATEJOB NO.ARDREY KELL SIDEWALKSCALESR3632PRELIMINARYDo Not Use For Construction EROSION CONTROLPLANEC3EC3OFSHEETNO.DATEBYDESCRIPTIONPlans Prepared By:600 East Fourth StreetCharlotte, North Carolina 28202Phone: (704) 336-2291Fax: (704) 336-6586ENGINEERING & PROPERTY MANAGEMENTPLANNING & DESIGN GROUPCITY OF CHARLOTTEAPPROVED BYPREPARED BYCHECKED BYDATEJOB NO.ARDREY KELL SIDEWALKSCALESR3632PRELIMINARYDo Not Use For Construction CABLE TO 07-1567 (ARDREY KELL AT REA RD) 24 FIBERS IN 2 BUFFER TUBES Cisco Ethernet Switch Detail inside traffic controller #3165 ,® ID:1577 =t Group ID: E9 m.r m •-o.sw� REVISED BY AMB 9/14/2OD9 F RENSED BY AMB 9/14/2009 F4 Sheet 4 CABLE TO 07-1566 (ARDREY KELL RD AT PROVIDENCE RD) 24 FIBERS IN 2 BUFFER TUBES 21 22 1 \ \ C I� \-III / 42 71 E DETAIL SCALE: 1 "=10' / ° I 81 0 O O� �v PO o� O �v 11 42 / 2-1.25" INTERCONNECT CONDUIT / 24 FIBER / / C3, / O 71 2-2" / i 1 C4-' / D\ \ \ I \ 24 \\ \ \ 2 61 \ 22 \\\� V \ \\ 23 \ o 1Oo A:) \ PBI ' P138a. \ \ \ \\ \ \\ \ 2-�, G \ \ \ \ \ \\ \\ \ \ H \ \ \ \\ \\ \ \ DROP CABLE /' l�3-1.25" INTERCONNECT CONDUIT KELL TOMSHORT TO TOM SHORT RD / / 24 FIBER SIGNAL Sic INV 0715n NOTES 1. UNUSED FIBERS COILED AND STORED IN SPLICE TRAY. 2. UNUSED BUFFER TUBES TO BE LEFT COILED AND STORED IN SPLICE / TRAY. 3. TERMINATE BUFFER TUBES TO PATCH PANEL AS SHOW 4. FIBER INTERCONNECT CENTER/PATCH PANEL RACKS ARE SCHEMATIC ONLY. / DETAIL SCALE: 1 "=10' 0 30 60 SCALE : 1 "=30' UNLESS OTHERWISE NOTED. \\\\ �,A C ARD �9•� SEAL . 045226 SIGNAL PHASING SIGNAL SEQUENCE Ring Configuration 5;6;a;7;8;b RING 1 PHASE 1 PHASE 2 PHASE 3 PHASE 4 = CONTROLLER TYPE: SIGNAL ID R/W OTH R/W OTH R/W OTH R/W OTH 2070 EOS NUMBER 21,22 G Y R 31 , a 4 1 NOT 5 NOT 41,42 G Y Y USED USED PB21,PB22 I dp- DW AR P641,P642 FpW DW AR RING 2 PHASE 5 PHASE 6 PHASE 7 PHASE 8 - a - - - - - - - -- SIGNAL ID QR W OTH R/W OTH R/W OTH R/W OTH _j NUMBER / 61,62 G Y R 3 7 71 14 81,82 G Y Y 71 OL D d PB61,PB62 FpW DW AR 4 ��� 8 P681,PB82 FDW DW AR b MIN_ RECALL- - MIN_ RECALL_ OVERLAP —PHASE OL—A/—+— OL—B/ 3+4 OL—C/—+— OL—D/ 7+8 OVERLAP - PHASE FYA FYA SIGNAL ID R/W OTH R/W OTH R/W OTH R/W OTH J NUMBER L, 31a PULLBOX ID 71a1 1 1 1 1 1 1 3�A_ I <� SIZE: PULLBOX TYPE: ® RED ARROW a YELLOW ARROW 10 13"x24"x12" LOOP / GREEN ARROW -3j FLASHING YELLOW ARROW 0 17"x30"x24" FIBER OPTIC Q 24"x36"x24" CONTROLLER / FIBER ® 30"x48"x36" CONTROLLER Q5 24"x24"x12" CONTROLLER © 36"x36"x12" CONTROLLER NOTE: PULLBOX MATERIAL MUST MEET OR EXCEED THE 1998 CDOT TRAFFIC SIGNAL SPECIFICATIONS. SIGNAL HEAD ID ® 0 31a,71a O 0 31a,71a �O 31a,71a LU 0 PB61,PB62 21,22 0 31,71 PB81,PB82 41,42 61,62 81,82 SIGN ID A. J R2-1- 45 B G H W13-1 24" x 30" W1-10R R10-3D-L R10-3D-R 24" x 24" 30" x 30" 9" x 12" 9" x 12" ST�IRGfQSSSN' NUN FOP STARTCAD:SSING WATCH FOR TURNING VECHICLES TM.s ooN T sraaT FNISICMSSNG F STARTED � HIIJG Y)11 GT11T FlNISHCACSSPG iSWED ®TO ooxT noss o R1_osG M O R10-15R 30" x 30" N P R10-3b R10-3b CLEARANCE INTERVALS Phase 1 2 3 4 5 6 7 8 % Grade -1.6% 3.1 % 0.8% 5.8% 0.8% 3.1 % Distance 72 125 93 113 111 142 Approach Speed (mph) 35 25 45 35 30 35 Yellow 4.0 3.1 4.4 3.5 3.5 3.7 All Red 1.5 3.3 1.5 2.3 2.6 2.8 Total Clearance 5.5 6.4 5.9 5.8 6.1 6.5 TRAFFIC VOLUMES am ' Rd Out In Telai qz1_31 976 11,a27 504 1 ae ,2 D PIM 711111 Lpll Pads 9MR01986:00 AM 9Rdr1lO19 06:45 PM m Llgi is & Peels 0 MBdfumS ,�.,.. FIG Vg Fl T f- Left Ttml HIM Peds 1016 1358 2752 2 16 10 29 0 7 , 2791 21 4671 5178 8848 fit 54 115 /7a 6288 99T6 Out In Tolal DETECTOR INFORMATION DETECTOR AMP. SIZE / 0 AMP. DELAY DISABLE COMMENTS: NUMBER NO. ZONE TYPE 0 21 3 6X6 2 N 130' FROM STOP BAR 22 4 6X25 2 N @STOP BAR (LT) 23 1 6X25 2 N 65' FROM STOP BAR (L 43 2 6X25 4 N ®STOP BAR (LT) 42 7 6x6 4 N 130' FROM STOP BAR 71 8 6x25 7 D 65' FROM STOP BAR (L 62 5 6x6 6 N 130' FROM STOP BAR 61 6 6x25 6 N @STOP BAR 63 11 6x25 6 N ®STOP BAR LT 31 15 6x25 3 D ®STOP BAR (LT) 81 16 6x6 8 N 130' FROM STOP BAR 24 17 6x25 2 N ©STOP BAR NOTE: ALL STOPBAR LOOPS EXTEND 5' BEYOND THE STOPBAR UNLESS OTHERWISE NOTED. ALL LOOPS RECEIVE THREE TURNS. LEGEND PROPOSED DESCRIPTION EXISTING 17 CONTROL BOX m METER PEDESTAL v PULL BOX o ❑� STEEL POLE ®❑ MAST ARM PED PEDESTAL UTILITY POLE ANCHOR ♦► SIGNAL HEAD �► VIDEO CAMERA OPTICOM ee-I OBSERVATION CAM ee-I Q DETECTOR ----- CONDUIT ----- ----- INTERCONNECT -- EDGE OF PVMT. - - - - CURB & GUTTER TUBULAR MARKER 0 Ardrey Kell 8802 C. �Ardrey Kell Roo D. T Tr ® GROUND SIGN OVERHEAD SIGN DOUBLE YELLOW STOP BAR T WHITE SKIP *Tom Short R 00 E. - - WHITE MINI PAVEMENT ARROW Tom Short R 00 F. PROPERTY LINE - - - ROW PLAN NOTES 1. ALL PAVEMENT MARKING DIMENSIONS ARE APPROXIMATE. 2. SIGNAL WILL BE INSTALLED IN ACCORDANCE WITH THE MAY 1998 CDOT TRAFFIC SIGNAL SPECIFICATIONS AND THE PROJECT SPECIAL PROVISIONS. 3. PED SIGNALS WITH PUSHBUTTONS WILL BE LABELED "PB" (FOR EXAMPLE PB21, PB22) 4. COUNTDOWN PEDESTRIAN SIGNALS SHALL COUNT DOWN FLASHING DON'T WALK ONLY. # 1 BY: 1 DATE: 1 SH 11/09 2 NS 3/11 3 RA 4/12 4 TGS 3/5/2014 5 KC 3/16 6 MLB 07/17/2019 7 DMB 9/2019 8 DMB 10/2019 9 DMB 12/2019 REVISION: RECORD PLAN ADDED PEDS, FYA #31 &71 LOOPS 43,61,62,63 RECORD PLAN - TGS BORDER, STREET SIGNS, VOLUMES RECORD PLAN - MLB OBSERVATION CAMERA RECORD PLAN - DMB ADDED PED PHASES 2, 4 CITY OF CHARLOTTE DEPARTMENT OF TRANSPORTATION 600 E. 4TH ST. CHARLOTTE, NC 28202 704 336-4119 FAX: 704 336-4400 ARDREY KELL ROAD AND TOM SHORT ROAD SIGNATURE DATE [DESIGNED BY: INS DATE: 4/02 JAPPROVED BY: GJ NCDOT# 10-1829 UNIT ID: 28044 SIGNAL ID:01577 CROSS SECTIONSTA. 11+50 to 12+50 X1K:\ENGINEERING SERVICES\PROJECT FILES\PMES191608 Ardrey Kell Sidewalk\Drawings\CAD\Sheet Set\X-SECTIONS4REAL.dwg Monday, October 12, 2020 2:15:46 PMOFSHEETNO.DATEBYDESCRIPTIONPlans Prepared By:600 East Fourth StreetCharlotte, North Carolina 28202Phone: (704) 336-2291Fax: (704) 336-6586ENGINEERING & PROPERTY MANAGEMENTPLANNING & DESIGN GROUPCITY OF CHARLOTTEAPPROVED BYPREPARED BYCHECKED BYDATEJOB NO.SCALEX16ARDREY KELL SIDEWALKPRELIMINARYDo Not Use For Construction CROSS SECTIONSTA. 13+00 to 14+00 X2K:\ENGINEERING SERVICES\PROJECT FILES\PMES191608 Ardrey Kell Sidewalk\Drawings\CAD\Sheet Set\X-SECTIONS4REAL.dwg Monday, October 12, 2020 2:16:01 PMOFSHEETNO.DATEBYDESCRIPTIONPlans Prepared By:600 East Fourth StreetCharlotte, North Carolina 28202Phone: (704) 336-2291Fax: (704) 336-6586ENGINEERING & PROPERTY MANAGEMENTPLANNING & DESIGN GROUPCITY OF CHARLOTTEAPPROVED BYPREPARED BYCHECKED BYDATEJOB NO.SCALEX16ARDREY KELL SIDEWALKPRELIMINARYDo Not Use For Construction CROSS SECTIONSTA. 14+50 to 15+50 X3K:\ENGINEERING SERVICES\PROJECT FILES\PMES191608 Ardrey Kell Sidewalk\Drawings\CAD\Sheet Set\X-SECTIONS4REAL.dwg Monday, October 12, 2020 2:16:16 PMOFSHEETNO.DATEBYDESCRIPTIONPlans Prepared By:600 East Fourth StreetCharlotte, North Carolina 28202Phone: (704) 336-2291Fax: (704) 336-6586ENGINEERING & PROPERTY MANAGEMENTPLANNING & DESIGN GROUPCITY OF CHARLOTTEAPPROVED BYPREPARED BYCHECKED BYDATEJOB NO.SCALEX16ARDREY KELL SIDEWALKPRELIMINARYDo Not Use For Construction CROSS SECTIONSTA. 16+00 to 17+00 X4K:\ENGINEERING SERVICES\PROJECT FILES\PMES191608 Ardrey Kell Sidewalk\Drawings\CAD\Sheet Set\X-SECTIONS4REAL.dwg Monday, October 12, 2020 2:16:31 PMOFSHEETNO.DATEBYDESCRIPTIONPlans Prepared By:600 East Fourth StreetCharlotte, North Carolina 28202Phone: (704) 336-2291Fax: (704) 336-6586ENGINEERING & PROPERTY MANAGEMENTPLANNING & DESIGN GROUPCITY OF CHARLOTTEAPPROVED BYPREPARED BYCHECKED BYDATEJOB NO.SCALEX16ARDREY KELL SIDEWALKPRELIMINARYDo Not Use For Construction CROSS SECTIONSTA. 17+50 to 18+50X5K:\ENGINEERING SERVICES\PROJECT FILES\PMES191608 Ardrey Kell Sidewalk\Drawings\CAD\Sheet Set\X-SECTIONS4REAL.dwg Monday, October 12, 2020 2:16:47 PMOFSHEETNO.DATEBYDESCRIPTIONPlans Prepared By:600 East Fourth StreetCharlotte, North Carolina 28202Phone: (704) 336-2291Fax: (704) 336-6586ENGINEERING & PROPERTY MANAGEMENTPLANNING & DESIGN GROUPCITY OF CHARLOTTEAPPROVED BYPREPARED BYCHECKED BYDATEJOB NO.SCALEX16ARDREY KELL SIDEWALKPRELIMINARYDo Not Use For Construction CROSS SECTIONSTA. 19+00 to 20+00X6K:\ENGINEERING SERVICES\PROJECT FILES\PMES191608 Ardrey Kell Sidewalk\Drawings\CAD\Sheet Set\X-SECTIONS4REAL.dwg Monday, October 12, 2020 2:17:01 PMOFSHEETNO.DATEBYDESCRIPTIONPlans Prepared By:600 East Fourth StreetCharlotte, North Carolina 28202Phone: (704) 336-2291Fax: (704) 336-6586ENGINEERING & PROPERTY MANAGEMENTPLANNING & DESIGN GROUPCITY OF CHARLOTTEAPPROVED BYPREPARED BYCHECKED BYDATEJOB NO.SCALEX16ARDREY KELL SIDEWALKPRELIMINARYDo Not Use For Construction CROSS SECTIONSTA. 20+50 to 21+50X7K:\ENGINEERING SERVICES\PROJECT FILES\PMES191608 Ardrey Kell Sidewalk\Drawings\CAD\Sheet Set\X-SECTIONS4REAL.dwg Monday, October 12, 2020 2:17:16 PMOFSHEETNO.DATEBYDESCRIPTIONPlans Prepared By:600 East Fourth StreetCharlotte, North Carolina 28202Phone: (704) 336-2291Fax: (704) 336-6586ENGINEERING & PROPERTY MANAGEMENTPLANNING & DESIGN GROUPCITY OF CHARLOTTEAPPROVED BYPREPARED BYCHECKED BYDATEJOB NO.SCALEX16ARDREY KELL SIDEWALKPRELIMINARYDo Not Use For Construction CROSS SECTIONSTA. 22+00 to 23+00 X8K:\ENGINEERING SERVICES\PROJECT FILES\PMES191608 Ardrey Kell Sidewalk\Drawings\CAD\Sheet Set\X-SECTIONS4REAL.dwg Monday, October 12, 2020 2:17:31 PMOFSHEETNO.DATEBYDESCRIPTIONPlans Prepared By:600 East Fourth StreetCharlotte, North Carolina 28202Phone: (704) 336-2291Fax: (704) 336-6586ENGINEERING & PROPERTY MANAGEMENTPLANNING & DESIGN GROUPCITY OF CHARLOTTEAPPROVED BYPREPARED BYCHECKED BYDATEJOB NO.SCALEX16ARDREY KELL SIDEWALKPRELIMINARYDo Not Use For Construction CROSS SECTIONSTA. 23+50 to 24+50X9K:\ENGINEERING SERVICES\PROJECT FILES\PMES191608 Ardrey Kell Sidewalk\Drawings\CAD\Sheet Set\X-SECTIONS4REAL.dwg Monday, October 12, 2020 2:17:46 PMOFSHEETNO.DATEBYDESCRIPTIONPlans Prepared By:600 East Fourth StreetCharlotte, North Carolina 28202Phone: (704) 336-2291Fax: (704) 336-6586ENGINEERING & PROPERTY MANAGEMENTPLANNING & DESIGN GROUPCITY OF CHARLOTTEAPPROVED BYPREPARED BYCHECKED BYDATEJOB NO.SCALEX16ARDREY KELL SIDEWALKPRELIMINARYDo Not Use For Construction CROSS SECTIONSTA. 25+00 to 26+00X10K:\ENGINEERING SERVICES\PROJECT FILES\PMES191608 Ardrey Kell Sidewalk\Drawings\CAD\Sheet Set\X-SECTIONS4REAL.dwg Monday, October 12, 2020 2:18:01 PMOFSHEETNO.DATEBYDESCRIPTIONPlans Prepared By:600 East Fourth StreetCharlotte, North Carolina 28202Phone: (704) 336-2291Fax: (704) 336-6586ENGINEERING & PROPERTY MANAGEMENTPLANNING & DESIGN GROUPCITY OF CHARLOTTEAPPROVED BYPREPARED BYCHECKED BYDATEJOB NO.SCALEX16ARDREY KELL SIDEWALKPRELIMINARYDo Not Use For Construction CROSS SECTIONX11K:\ENGINEERING SERVICES\PROJECT FILES\PMES191608 Ardrey Kell Sidewalk\Drawings\CAD\Sheet Set\X-SECTIONS4REAL.dwg Monday, October 12, 2020 2:18:16 PMOFSHEETNO.DATEBYDESCRIPTIONPlans Prepared By:600 East Fourth StreetCharlotte, North Carolina 28202Phone: (704) 336-2291Fax: (704) 336-6586ENGINEERING & PROPERTY MANAGEMENTPLANNING & DESIGN GROUPCITY OF CHARLOTTEAPPROVED BYPREPARED BYCHECKED BYDATEJOB NO.SCALEX16ARDREY KELL SIDEWALKPRELIMINARYDo Not Use For ConstructionSTA. 26+50 to 27+50 CROSS SECTIONSTA. 28+00 to 29+00X12K:\ENGINEERING SERVICES\PROJECT FILES\PMES191608 Ardrey Kell Sidewalk\Drawings\CAD\Sheet Set\X-SECTIONS4REAL.dwg Monday, October 12, 2020 2:18:31 PMOFSHEETNO.DATEBYDESCRIPTIONPlans Prepared By:600 East Fourth StreetCharlotte, North Carolina 28202Phone: (704) 336-2291Fax: (704) 336-6586ENGINEERING & PROPERTY MANAGEMENTPLANNING & DESIGN GROUPCITY OF CHARLOTTEAPPROVED BYPREPARED BYCHECKED BYDATEJOB NO.SCALEX16ARDREY KELL SIDEWALKPRELIMINARYDo Not Use For Construction CROSS SECTIONSTA. 29+50 to 30+50 X13K:\ENGINEERING SERVICES\PROJECT FILES\PMES191608 Ardrey Kell Sidewalk\Drawings\CAD\Sheet Set\X-SECTIONS4REAL.dwg Monday, October 12, 2020 2:18:46 PMOFSHEETNO.DATEBYDESCRIPTIONPlans Prepared By:600 East Fourth StreetCharlotte, North Carolina 28202Phone: (704) 336-2291Fax: (704) 336-6586ENGINEERING & PROPERTY MANAGEMENTPLANNING & DESIGN GROUPCITY OF CHARLOTTEAPPROVED BYPREPARED BYCHECKED BYDATEJOB NO.SCALEX16ARDREY KELL SIDEWALKPRELIMINARYDo Not Use For Construction CROSS SECTIONSTA. 31+00 to 32+00 X14K:\ENGINEERING SERVICES\PROJECT FILES\PMES191608 Ardrey Kell Sidewalk\Drawings\CAD\Sheet Set\X-SECTIONS4REAL.dwg Monday, October 12, 2020 2:19:01 PMOFSHEETNO.DATEBYDESCRIPTIONPlans Prepared By:600 East Fourth StreetCharlotte, North Carolina 28202Phone: (704) 336-2291Fax: (704) 336-6586ENGINEERING & PROPERTY MANAGEMENTPLANNING & DESIGN GROUPCITY OF CHARLOTTEAPPROVED BYPREPARED BYCHECKED BYDATEJOB NO.SCALEX16ARDREY KELL SIDEWALKPRELIMINARYDo Not Use For Construction CROSS SECTIONSTA. 32+50 to 33+50X15K:\ENGINEERING SERVICES\PROJECT FILES\PMES191608 Ardrey Kell Sidewalk\Drawings\CAD\Sheet Set\X-SECTIONS4REAL.dwg Monday, October 12, 2020 2:19:16 PMOFSHEETNO.DATEBYDESCRIPTIONPlans Prepared By:600 East Fourth StreetCharlotte, North Carolina 28202Phone: (704) 336-2291Fax: (704) 336-6586ENGINEERING & PROPERTY MANAGEMENTPLANNING & DESIGN GROUPCITY OF CHARLOTTEAPPROVED BYPREPARED BYCHECKED BYDATEJOB NO.SCALEX16ARDREY KELL SIDEWALKPRELIMINARYDo Not Use For Construction CROSS SECTIONSTA. 34+00 to 34+50 X16K:\ENGINEERING SERVICES\PROJECT FILES\PMES191608 Ardrey Kell Sidewalk\Drawings\CAD\Sheet Set\X-SECTIONS4REAL.dwg Monday, October 12, 2020 2:19:30 PMOFSHEETNO.DATEBYDESCRIPTIONPlans Prepared By:600 East Fourth StreetCharlotte, North Carolina 28202Phone: (704) 336-2291Fax: (704) 336-6586ENGINEERING & PROPERTY MANAGEMENTPLANNING & DESIGN GROUPCITY OF CHARLOTTEAPPROVED BYPREPARED BYCHECKED BYDATEJOB NO.SCALEX16ARDREY KELL SIDEWALKPRELIMINARYDo Not Use For Construction 1 Rev Date: 10/29/2018 Project Name: Consultant: Project Number: Project Manager: ENGINEERING SERVICES GUIDELINES AND PLAN DEVELOPMENT MILESTONE CHECKLISTS The following guidelines have been established to aid the Engineer/Designer/Manager in understanding the design process as it relates to Engineering Services work. These guidelines are meant to be used as the minimum criteria by which design activities occur while realizing that each project is unique and may require special considerations. Design Plan Milestone Checklists Projects are recommended to the following Plan Development Milestones: I. 25% Plans Review (Client Department Review for “Large” Projects) II. 50% Plans Review (Preliminary Plans – Core & Support Team Review) III. 75% Plans Review (Preliminary Plans – Core & Support Team Review) IV. 90% Plans Review (Preliminary Plans – Core & Support Team Review) V. Final Plans (Core & Support Team Review) Following are Outlines of each Milestone with: A. General Overview B. Required Submittals C. Plan Checklist Ardrey Kell Sidewalk In House Design Kory Hedrick, PEPMES191608 2 Rev Date: 10/29/2018 I. 25% Plans Review Submittal Date: Designer: Review Date: Reviewer: Note: Survey should be field verified prior to beginning 25% plans to assure it is correct and no improvements have been installed since survey was received. All review plans submitted must be 24” X 36” Black-Line (Originals or PDFs). Each sheet should have a “Plans Prepared By:” block and have the stamping “Preliminary Plans – Do Not Use for Construction,” until the final plan set is issued. Field visit to verify survey A. General Overview This milestone has been set to ensure the Project Design is proceeding according to IPDS Project Plan, preset design criteria, and sound engineering judgment. At this milestone, conceptual designs should have evaluated multiple alternatives (if applicable) to determine the most cost-effective Preliminary Horizontal and Vertical Alignments based on the client’s initial scope of work, design criteria and approved design exceptions. If not, the design should not proceed with plan production with cutting sheets. With the conceptual design approved, proceed with preparing plans. The 25% Plans Review should include the following: B. Required Submittals (Place a Check Mark, or N/A) Design Assumptions or Design Criteria Listing of Required Permits or Special Reviews (i.e. Phase I Environmental Site Assessment, Historical Agency Review, NCDOT Encroachment Agreement, Water Quality Permit, Erosion Control Permit, etc. Verification of Correspondence with Pertinent Utility Companies Control Point Calculations for Projects with a Resurfacing Grade Vertical Clearance Calculations Preliminary Pavement Design Engineer’s Estimate Project Construction Plans (Approx. 25% Completion) Andrew Davis, EI1/8/2020 N/A 3 Rev Date: 5/7/19 C. 25% Plans Checklist (Place a Check Mark, or N/A) Note: All plans submitted must be 24” X 36” Black-Line (Originals or PDFs). Each sheet should have a “Plans Prepared By:” block and have the stamping “Preliminary Plans – Do Not Use for Construction”. 1. Title Sheet (Use City of Charlotte Standard Cover Sheet) Vicinity Map is “complete” and “accurate” (Includes at least two major streets and an intersection) (Show North Arrow inside vicinity map) Legend of Conventional Symbols Used (Make sure Lines and Symbols are “accurately” shown) Index of Sheets (Varies per Project) Suggested Layout: -- Sheet 1 Title Sheet -- Sheet 2, 2A, 2B, etc (2 Series) General Notes, Standard Abbreviations & Various Details (including ramp details) -- Sheet 3, 3A, 3B, etc (3 Series) Typical Sections, Drainage Summary -- Sheets 4 thru XX Plan & Profile Sheets -- Sheets TCP1 thru TCPxx Traffic Control Plans -- Sheets PM1 Thru PMxx Pavement Marking & Signing Plans -- Sheets EC1 thru ECxx Erosion Control Plans -- Sheets SP1 thru SPxx Construction Staking Plans -- Sheets SIG1 thru SIGxx Signal Plans -- Sheets UC1 thru UCxx Utility Construction Plans -- Sheets UBO1 thru UOxx Utilities By Others Plans -- Sheets X1 thru Xxx Cross-Sections Sheets Project Name & Project Number (Place in two locations) As a heading under the City logo (centered at the top of the sheet) Vertically along the Right-Hand Border Project Features (Type of work such as: Grading, Storm Drainage, Concrete Curb & Gutter, Paving, etc. Place under Project Name & Number in heading. Standard Specification Date (Most current publication) (NCDOT Standard Specifications for Roads & Structures) Signature Block entitled “Recommended for Construction” with signature space for project stakeholders (unsigned at this point) Signature Block containing City Engineer’s approval signature & date (unsigned at this point) 4 Rev Date: 5/7/19 Location Map Shows Project Layout on numbered superimposed sheets to include the following: Project Alignment for all Proposed Construction (include Stations for -L- lines, -Y- lines, detours, etc.) Existing Roads and Streets affected by construction (both those that are part of the project and those not part of project) Show Major Proposed Work with Shading (do not show any associated text or other details) Street Names, Route Numbers, Survey Line Names & Numbers Alignment Equality Stations Streams and Rivers Railroads City Limits Beginning and Ending Stations for the Project North Arrow List of Graphical Scales used for the Project Design designation is shown 2. Typical Sections (to be shown in the “2 Series” of sheets) Provide Typical Roadway Section(s). Include road name, construction alignment reference identification and stations. Label pavement types, curb & gutter, sidewalk, etc…. to match items listed in the Preliminary Material Schedule. 3. Plan Sheets In general, show Existing Features with dashed and/or “screened” lines and proposed features with heavier solid lines and/or shading. Use City of Charlotte layering standards. Sheets are ½ Plan (at the bottom of sheet) and ½ Profile (at the top of the sheet) unless project lends itself to separate plan and profile sheets. The Horizontal Scale should be 1” = 20’ and the Vertical Scale should be 1” = 4’. Any variance from these scales should be approved by the Program Manager. Existing Planimetric Features relative to project (field verified by designer) Streets, roads, driveways, sidewalks (names, labels, etc.) Houses, buildings, garages, sheds (names, labels, etc.) Fences, walls (labels) Trees, shrubs, woods lines, etc. (type and size if pertinent) Utilities (above and below ground) (type, size & mat’l if known) Storm Drainage Facilities (size, type, and invert elevations) Property Lines, Exist. R/W Lines, Exist. Permanent Easement Lines (Show Monumentation found with label – ex. ½” EIP) Property Owner Information (use City of Charlotte standard parcel block info.) Railroads (show tracks to scale)(label ownership) Bodies of water (rivers, creeks, streams, lakes, ponds, etc.) (give name, width, direction of flow, etc.) Any other existing features relative to project N/A N/A N/A 5 Rev Date: 5/7/19 Survey Information (shown at the correct location on the plansheet) Survey Control Points (symbol, point name, material, N,E, Elev.) (ex. TP-2 (60d Nail) with N, E, and Elev.) Survey Benchmarks (symbol, name, alignment reference, and Elev.) (ex. BM-2 (-L- Sta 10+53 34’ Rt.) (Elev. = 750.56’) North Arrow (related to specific survey datum – i.e. NAD83 etc.) Datum Description (Place Block on Plansheet #4) Proposed Features Horizontal Alignment(s) Proposed Design/Construction Alignment(s) to include: Heavy solid line(s) showing Proposed Alignment (Designate with -L-, -Y- or multiple with –L1-, -Y1-, etc.) Beginning and Ending Stations (with Coordinates) (ex. -L- POT Sta. 10+00.00) (N = , E = ) Equality Stations (with Coordinates) (ex. -L- POC Sta. 13+26.54 = -Y- POT Sta. 10+85.63) (N = , E = ) Event Point Stations (i.e. PC, PT, PCC, PRC, PINC, etc.) Bearings and Distances on Tangents Horizontal Curve Data (Show in Curve Info. Box) (Number each curve and provide delta angle, radius, length of curve, and tangent length)(Optional: chord distance, chord bearing) Proposed Improvements such as curb and gutter, sidewalk, driveways, etc. (show with appropriate line weight and shading). Labeling is not necessary at this milestone. Drainage improvements should not be shown – these are not detailed enough at this milestone) Match Lines (reference station number and sheet number) 4. Profile Sheets In general, show Existing Features with dashed and/or “screened” lines and Proposed Features with heavier solid lines and/or shading. Use City of Charlotte layering standards. Sheets are ½ Plan (at the bottom of sheet) and ½ Profile (at the top of the sheet) unless project lends itself to separate plan and profile sheets. The Horizontal Scale should be 1” = 20’ and the Vertical Scale should be 1” = 4’. Any variance from these scales should be approved by the Program Manager. Existing Features Dashed Line(s) labeled Existing Grade along -L-, -Y-, etc. (show existing centerline elevations every 25’) Existing Drainage or Utility Structures and Pipes (show to scale) (label size, type, material, and top/rim and invert elevations) 6 Rev Date: 5/7/19 Survey Information (shown at the correct location on the sheet) (show benchmarks with name, setting, alignment reference, and elevation) (ex. BM-2 (Railroad Spike set in the base of 32” Oak) -L- Sta. 10+53 34’ Rt. Elev. = 750.56’ (NAVD88) Proposed Features Vertical Alignment(s) (Show on a project by project basis) Proposed Design/Construction Alignments to include: Heavy solid line(s) labeled “Proposed Grade” (designate with -L-, -Y- or multiple with –L1-, -Y1-, etc.) Label proposed grades along grade line, PVC, PVT, and PVI Stations and Elevations Vertical Curves – label PVI station/elevation, K value, algebraic difference in grade, length of curve, low/high point station/elevation Proposed Elevations every 25’ 5. Cross-Sections Sheets In general, show Existing Features with dashed and/or “screened” lines and Proposed Features with heavier solid lines and/or shading. Use City of Charlotte layering standards. Scale should be 1” = 5’ (Horizontal and Vertical) (Any variance from this scale should be approved by the Program Manager) Show Existing Ground Line (give existing elevation at construction alignment location(s)) Show critical cross sections as identified by the Project Manager (locations with large obstacles such as trees, signs, retaining walls, or locations with high cut/fill lines) 6. General “Preliminary Plans- Do Not Use for Construction” is noted on all sheets. Same project number is shown on all sheets. Date plans printed shown in the title block. 7 Rev Date: 5/7/19 II. 50% Plans Review Submittal Date: Designer: Review Date: Reviewer: A. General Overview Note: A cursory review of previous milestone reviews should be completed prior to proceeding with the next milestone review to ensure changes and additions have been updated or corrected. At this point, the design should be checked for constructability, utility conflicts and compliance with Storm Water Services design requirements. To meet this milestone requirement, a concept drainage (plan view only) should be completed with preliminary spread calculations and inlet locations with pipe layout and slopes. In addition, a written phasing for traffic control should be reviewed by CDOT to ensure the project can be constructed without temporary widening or overnight lane closures. Utility conflicts, above ground and underground, should be highlighted and discussed with the Utility Coordinator. Throughout the project limits, cut and fill lines should be imported to identify tree and environmental impacts as well as potential retaining wall or guardrail locations. B. Required Submittals (Place a Check Mark, or N/A) Geotechnical Report (if applicable) Summary of concerns noted in the Phase I ESA document (if applicable) Storm Drainage Topo Map for proposed inlet locations and inlet calculation spreadsheet 50% Engineer’s estimate Project Construction Plans (approximately 50% complete) C. 50% Plans Checklist (Place a Check Mark, or N/A) 1. Title Sheet (Use City of Charlotte Standard Cover Sheet) (complete per 25% Plans) Design designation data is shown. 2. Details (to be shown in the “2 Series” of sheets) Update General Notes for Erosion Control Sheets and Traffic Control Sheets. Delete Pavement Degradation Fee notes that do not apply. Provide Details for retaining walls and non-standard catch basins or culvert improvements. Provide Details for other non-standard items not covered under NCDOT Specifications. Label Detail sheets with description of details included on sheet within title block. N/A N/A 1/9/20 Andrew Davis, EI 8 Rev Date: 5/7/19 3. Plan Sheets Label proposed Improvements such as curb and gutter, sidewalk, driveways, etc. (show with appropriate line weight and shading) 9 Rev Date: 5/7/19 Label pavement widths and taper/transitions. Label utility poles to be relocated “by others.” Highlight above ground and underground utilities that are in conflict with the proposed improvements. Label proposed concept drainage system with material, length, slope and class of pipe. Import cut/fill lines and show retaining wall limits if determined necessary. Label tree removal and required tree protection. Show pavement removal with appropriate hatching Show accessible ramp locations with crossings Show superelevation at correct plan location(s) (if applicable) Show guard rail and retaining wall location(s) (if applicable) 4. Profile Sheets (No Change from the 25% review.) 5. Traffic Control (Written Phasing Scheme only) List by phase the proposed approach to accommodating the traffic control during the life of the project. Phases should be consistent with general construction guidelines and practices. Show proposed detours if required. 6. Cross-Sections Sheets Show Proposed Ground Line (templates with no labeling at this point). Add daylight lines for Cut/Fill slopes. Provide proposed elevation at construction alignment location(s). Show proposed retaining wall or guardrail locations. Sections should be shown at min. 50’ increments (25’ increment are required for projects < 1 mile and all sidewalk projects along the construction alignment(s) (i.e. 10+00, 10+50, 11+00, etc.). Label alignment designation and station. Check to ensure sight distance requirements have been met per the design criteria at intersections and major entrances with large traffic volumes. N/A N/A N/A N/A N/A 10 Rev Date: 5/7/19 75% Plans Review Submittal Date: Designer: Review Date: Reviewer: A. General Overview Note: Survey should be field verified again prior to beginning 75% plans to assure no improvements have been installed since survey was received and last field visit occurred. A cursory review of previous milestone reviews should be completed prior to proceeding with the next milestone review to ensure changes and additions have been updated or corrected. For this review, mark-ups/comments from utility companies as well as Storm Water Services should be incorporated into the project design. The project design at this milestone should include storm drainage (horizontal and vertical) with identified pipe sizes and minimum slopes. In addition, a traffic control plan (both written phasing and associated diagrams), and a pavement marking plan. In addition to the detailed plans, an updated engineer’s estimate should be prepared. Any required permits should be identified at this milestone and plans should be prepared for appropriate submittals (NCDEQ, NCDOT, Water Quality, Etc.). Project grading limits should be checked for area disturbed. If the area exceeds one acre, an erosion control permit is required. If there are changes in the approved budget or schedule, a Change Control Document should be prepared to inform the Client and Project Team. Field visit to verify survey B. Required Submittals (Place a Check Mark, or N/A) Updated 75% engineer’s estimate Storm Drainage Topo Map for proposed pipe system and pipe calculation spreadsheet ROW/easement quantities (spreadsheet) Project Construction Plans (approximately 75% complete) C. 75% Plans Checklist (Place a Check Mark, or N/A) 1. Title Sheet Design designation data is shown. 2. Typical Sections & Details (to be shown in the “2 and 3 Series” of sheets) All necessary dimensions shown on pavement, subgrade, shoulders, slopes, centerline, medians, sidewalks, utility strips, curb & gutter, etc. Milling limits shown (if applicable) All slopes shown on pavement, shoulders, subgrade, hinge point grading, ditches, cut & fills. N/A N/A 11 Rev Date: 5/7/19 All grade points shown. All variable limits shown. Provide Details for retaining walls, non-standard catch basins, and culvert improvements. (update from previous milestone reviews). Provide Details for special ditches (lateral and berm ditches). Provide alignment, station, offset, and quantities such as drainage ditch excavation, rip rap, and filter fabric. (Note: Project Manager may choose to show this information on the plan sheets.) Provide Details for other non-standard items not covered under NCDOT Specifications. Some that may be considered are sidewalk taper, pipe trench detail for storm drainage pipe, and pavement overlay or wedging. 3. Plan Sheets Show the limits of construction by placing slope-stake lines on the plans. (lines should be designated as cut or fill by linetype) Show berm and lateral ditches if required. Insert corresponding ditch details. Proposed drainage. (cross-pipes, storm sewer systems, and driveway pipes) Label all pipes with size and material. Show and label pipe inlet and outlet devices such as headwalls, endwalls, flared-end sections, false sumps, rip rap and filter fabric requirements and quantities. Label drainage structure numbers. Label radii measured to face of curb. Label proposed utility poles to be relocated “by others” at the specified locations indicated by utility companies. Guardrail shown & labeled Show and label signal items to be installed by roadway contractor (ped bases, pull boxes, conduit, etc.) Retaining walls shown & labeled Ramps shown accurately on plan sheet with station labels (details not yet created) 4. Profile Sheets Show curb line grades if different from proposed design-line grade line. Label proposed edge of pavement elevations for left and right lip lines. Show proposed lateral ditches with beginning, ending, and PVI stations and elevations. Label proposed lateral ditch grades. Update proposed drainage. Make sure drainage structure number corresponds with that shown in plan view. 12 Rev Date: 5/7/19 5. Erosion Control Plans Preferred scale 1”=40’. Erosion Control Notes & Legend Key. (Use symbology consistent with the Erosion & Sediment Control Planning & Design Manual: https://deq.nc.gov/about/divisions/energy-mineral-land-resources/energy- mineral-land-permit-guidance/erosion-sediment-control-planning-design-manual) Erosion Control measures shown on plan view. Erosion control plan must be sufficient to obtain plan approval and required erosion permits from NCDEQ. Erosion Control Details - if standard, refer to standard number. Temporary Wattle Check Dam/Inlet Protection Temporary Silt Fence Temporary and Permanent Seeding Specifications Other 6. Traffic Control/ Pavement Marking Plan Standard Traffic Control General Notes & Project Notes modified per project. Traffic control phasing is consistent with general construction practices. Traffic control custom phase drawings and/or CDOT WATCH diagrams correctly referenced per written phasing. Pavement Marking Plan preferred scale 1”=40’. Legend matches NCDOT pavement marking schedule. Legend matches plan view symbology. 7. Cross-Sections Sheets Label cut & fill slopes and varying pavement cross slopes. Label pertinent proposed elevations such as lip elevations and grade break point elevations. Show berm and lateral ditches. Show additional critical cross-sections at driveways and other critical areas such as drainage inlets. Label any non-typical existing or proposed features such as retaining walls, buildings, headwalls, channel changes, etc. 8. Utility Construction Plans Include in the construction set as separate plans if needed due to plan sheet clutter 13 Rev Date: 5/7/19 90% Plans Review Submittal Date: Designer: Review Date: Reviewer: A. General Overview Note: A cursory review of previous milestone reviews should be completed prior to proceeding with the next milestone review to ensure changes and additions have been updated or corrected. This review milestone precedes preparing plats and easement exhibits for real estate acquisition. For this review, final mark-ups/comments from utility companies as well as Storm Water Services should be incorporated into the project design. The project design at this milestone should include updated drainage (horizontal and vertical), traffic control, and pavement marking plans. In addition to the detailed plans, an updated engineer’s estimate should be prepared with an updated real estate cost. All required permit applications should be prepared at this point along with any required fees with check requests submitted. B. Required Submittals (Place a Check Mark, or N/A) Final Pavement Design Calculation and typical sections modified. Final drainage map with spreadsheets and calculations for pipe system and inlet design Updated 90% engineer’s estimate Permit Applications along with check requests (May include NCDEQ Erosion Control, NCDOT encroachment, Municipal Agreement, Water Quality Permit) Ramp Calculations Project Construction Plans (approximately 90% complete). C. 90% Plans Checklist (Place a Check Mark, or N/A) 1. Title Sheet Design designation data is shown. 2. Typical Sections& Details (to be shown in the “2 and 3 Series” of sheets) Update the pavement/material schedule to incorporate the final pavement design. Ramp & curb return details Drainage structure table N/A N/A 14 Rev Date: 5/7/19 3. Quantities Summary Sheet(s) (if applicable) Drainage Summary (Standard NCDOT or City formats) 4. Plan Sheets Show curb return elevations (if necessary). Label elevation on plan at 10’ increments along lip of curb or shown on a curb return profile on a separate sheet Check to ensure all proposed work is clearly indicated. Such items overlooked to this point might include: fence relocations/additions, tree removal/protection & trimming needs, sign relocations/removal/additions, pipes to be removed/plugged/extended/, sealing abandoned wells, driveway reconnections, driveway pipes, etc. Show final storm drainage and labeled. Right-of-way & Easement lines, and Parcel numbers shown with standard parcel block information (check to make sure this matches plats/exhibits) Check to ensure no property has been landlocked with proposed improvements Areas to remain undisturbed with the right-of-way clearly marked 5. Profile Sheets Finalize proposed drainage. Label all pipes (parallel and cross-pipes) with size, material, length, slope, and class of pipe. Provide top/rim and invert elevations for all drainage structures. Label NCDOT or LDSM standards required (i.e. NCDOT Std. 840.01). Curb return profiles (if necessary) 6. Erosion Control Plans Narrative (if necessary) Construction Sequence (if necessary) Check to ensure all erosion control measures are contained within existing or proposed right-of-way and easements 7. Traffic Control/ Pavement Marking Plan Update plan sheets per comments from 75% review 8. Cross-Sections Sheets Show volumes for embankments, unclassified excavation, and known undercut excavation on each cross-section. 15 Rev Date: 5/7/19 Provide dimensions as needed (required on NCDOT streets). 9. Utility Construction Plans Check to ensure only work to be performed by the contractor is indicated with heavy lines and text Show other pertinent plan information with background or gray-scale symbology 10. Utilities By Others Plans Include in the construction set as separate plans if needed due to plan sheet clutter Check to ensure only work to be performed by others (not the contractor) is indicated with heavy lines and text Show other pertinent plan information with background or gray-scale symbology 16 Rev Date: 5/7/19 Final Plans Review Submittal Date: Designer: Review Date: Reviewer: A. General Overview This milestone review has as its purpose to finalize construction plans, engineer’s estimate, project special provisions, and any other items necessary to submit to Bid Phase. It incorporates review comments from the 90% plans review and external reviews such as NCDOT Encroachment Agreement. Prior to this review, right-of-way and easement needs have been determined and incorporated into the plans, plats and exhibits have been prepared, and Real Estate Phase is well underway. Coordination has occurred for landscaping needs, traffic signal work, and utility relocations. The project budget and schedule have been updated to reflect any IPDS Change Controls. This review should present a clear picture of the project design with all necessary details for successful construction. B. Required Submittals (Place a Check Mark, or N/A) Submit Permit Applications (May include Erosion Control, NCDOT encroachment, Municipal Agreement, Water Quality Permit). Final Engineer’s Estimate (all computations included) Written Project Special Provisions Listing of Right-of-Way and Easement Areas (via Spreadsheet) Final Project Construction Plans with signed/sealed mylar cover sheet and final review stamp on remaining sheets C. Final Plans Checklist (Place a Check Mark, or N/A) 1. Title Sheet Updated Index of Sheets Project Stakeholder signatures under the “Recommended for Construction” block City Engineer’s approval signature 2. Details (to be shown in the “2 and 3 Series” of sheets) Standard General Notes shown on Sheet 2 & updated to show project specific Sheet references List of Standard Drawings pertinent to project (NCDOT or CMLD) 9/29/20 Andrew Davis,EI Andrew Dodds, PE N/A 17 Rev Date: 5/7/19 3. Plan Sheets All cross-reference notes are correct All utility relocations/adjustments labeled and clearly identified as work the contractor is to perform or as work to be done by others 4. Profile Sheets All cross-reference notes are correct if separate plan & profile sheets 5. Traffic Control Plans Update to reflect any changes from 90% review or to address any access issues 6. Pavement Marking Plans Clearly denote markings to be removed (include line item(s) & quantities in engineer’s estimate) Check for any temporary markings needed (include line item(s) & quantities in engineer’s estimate) Check for the need of permanent pavement markers (raised or snowplowable) Reference Standard Drawings (if applicable) Clearly identify signs to be installed by the contractor & signs to be installed by others 7. Construction Staking Plans Provide all necessary information for staking not contained elsewhere in the construction plans (Note: This information may be provided at a later date if required and not be included at this milestone.) 8. Signal Plans Include in the construction plans if the contractor is to perform any of this work N/A PROJECT: ARDREY KELL SIDEWALK NUMBER: PMES191608 EST. BY: Full name (Andrew Davis,EI DATE: 10/1/2020 CHECK BY: Full name (Andrew Dodds,PE DATE: MO/DA/YEAR Item# Section CIC Item Description Quantity Unit Unit Price Amount 1 800 10800.000 Mobilization 1 LS $57,400.00 $57,400.00 2 226 10226.101 Undercut Excavation 103 CY $50.00 $5,150.00 3 SP-1 10226.001 Comprehensive Grading 1 LS $496,400.00 $496,400.00 SP-3 80135.000 Select Material 50 TN $35.00 $1,750.00 310 10310.005 15" R.C. Pipe Culverts, Class V 185 LF $100.00 $18,500.00 4 310 10310.004 15" R.C. Pipe Culverts, Class IV 404 LF $80.00 $32,320.00 5 310 10310.542 15" Precast Concrete Endwall 3 EA $2,500.00 $7,500.00 310 10310.54 15" Precast Concrete Endwall (Cast in Place) 2 EA $2,500.00 $5,000.00 6 840 10840.022 Masonry Drainage Structures 6 EA $1,600.00 $9,600.00 7 840 10840.355 Frame with Grate (all types) 6 EA $700.00 $4,200.00 8 607 10607.059 Milling Asphalt Pavement, 0.0" to 3.0"5580 SY $10.00 $55,800.00 9 610 10610.101 Asphalt Concrete Base Course, Type B 25.0C 757 TN $100.00 $75,700.00 10 610 10610.201 Asphalt Concrete Intermediate Course, Type I 19.0C 215 TN $125.00 $26,875.00 11 610 10610.451 Asphalt Concrete Surface Course, Type S 9.5C 205 TN $110.00 $22,550.00 12 620 10620.000 Asphalt Binder for Plant Mix 71 TN $600.00 $42,600.00 13 846 10846.052 2' 6" Concrete Curb and Gutter 3440 LF $35.00 $120,400.00 14 848 10848.000 4 " Concrete Sidewalk or pad 1750 SY $50.00 $87,500.00 15 SP-5 10848.101 Concrete Wheelchair/Accessible Ramps 50 SY $150.00 $7,500.00 16 1205 11205.050 Thermoplastic Pavement Marking Double Lines, 4", 120 mils 5900 LF $3.00 $17,700.00 17 1205 11205.000 Thermoplastic Pavement Marking Lines, 4", 120 mils 522 LF $2.00 $1,044.00 18 1205 11205.043 Thermoplastic Pavement Marking Lines, 6", 120 mils 2400 LF $2.00 $4,800.00 19 1205 11205.045 Thermoplastic Pavement Marking Lines, 8", 120 mils 750 LF $3.00 $2,250.00 20 1205 11205.044 Thermoplastic Pavement Marking Lines, 24", 120 mils 70 LF $12.00 $840.00 21 1205 11205.185 Thermoplastic Pavement Marking Symbols, Left-Turn Arrow 3 EA $250.00 $750.00 SP-6 80010.000 Safety Rail, Metal CLDS 50.04 540 LF $70.00 $37,800.00 22 1705 11705.000 Signal Cable (16 AWG - 4 Conductor)810 LF $2.25 $1,822.50 23 1715 11715.004 Unpaved Trenching (2-2" SCH80)165 LF $10.00 $1,650.00 24 1725 11725.002 Inductive Detection Loops 480 LF $8.00 $3,840.00 25 SP-7 11726.000 Lead-In Cable 1620 LF $2.00 $3,240.00 26 SP-8 81786.000 16" Pedestrian Signal Head 4 EA $650.00 $2,600.00 27 SP-9 81783.000 10 foot Metal Base/Pole/Cap for Pedestrian Signal 4 EA $900.00 $3,600.00 28 SP-9 81782.000 Concrete Foundation for 10 foot Metal Base/ Pole/Pedestrian Signal 4 EA $1,200.00 $4,800.00 29 SP-10 81779.000 Install APS Pedestrian Pushbutton Detector & Sign {City Supplied)8 EA $150.00 $1,200.00 30 1716 11716.001 Junction Box (13"x24"x12" PC, TRAFFIC SIGNAL logo)3 EA $550.00 $1,650.00 31 SP-11 90000.000 Place New Conduit in Existing Pull Box 8 EA $250.00 $2,000.00 32 1716 Remove Existing Junction Box 2 EA $100.00 $200.00 #REF!SP-12 81779.000 APS Pedestrian Pushbutton Detector & Sign {City Supplied)8 EA $353.00 $2,824.00 #REF!SP-13 80001.000 Traffic Control 1 LS $33,500.00 $33,500.00 Subtotal $1,204,855.50 10.0% Construction Contingency $120,485.55 10.0% Inflation 1 yr period $120,485.55 Engineer's Estimate $1,445,826.60 SAY $1,446,000.00 Notes and Assumptions: Bid Cost Estimate