Loading...
HomeMy WebLinkAbout20201634 Ver 1_Pre-Filing Meeting Request_20201029ID#* 20201634 Version* 1 Regional Office* Mooresville Regional Office - (704) 663-1699 Reviewer List* Alan Johnson Pre -Filing Meeting Request submitted 10/29/2020 .................................................................................................................................................................................................................................................................................................... Contact Name * Dave Homans / Helen Simonson Contact Email Address* Project Name* Project Owner* Project County* Owner Address: dhomans@smeinc.com Water Oak SDIP Charlotte Stormwater Services Mecklenburg Street Address 4735 Water Oak Road Address Line 2 oty Charlotte Postal / Zip Code 28211 Is this a transportation project?* r Yes r No State / Province / Region NC Country USA Type(s) of approval sought from the DWR: W 401 Water Quality Certification - F 401 Water Quality Certification - Regular Express r- Individual Permit r- Modification r- Shoreline Stabilization Does this project have an existing project ID#?* r Yes r No Do you know the name of the staff member you would like to request a meeting with? Alan Johnson Please give a brief project description below. The Water Oak Storm Drainage Improvement Project will Involve storm system upgrades, culvert replacements, minor channel modifications, and channel daylighting to a storm drainage system over an approximately 115 acre watershed in the Cotswold neighborhood of Charlotte. The project is expected to be authorized under Regional General Permit 201600163 and Water Quality Certification 4147 for impacts associated with Charlotte Stormwater Services storm drainage improvement projects. Precise impacts have not been finalized, but 99% project designs have been completed, and are attached. Please give a couple of dates you are available for a meeting. 11 /19/2020 11 /20/2020 11 /23/2020 Please attach the documentation you would like to have the meeting about. WaterOakPlanSet 99% Submittal 2020-09- 35.57MB 25.pdf pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature Submittal Date 10/29/2020 INDEX OF SHEETS I I PE SEAL I CONVENTIONAL SIGNS CoverSheet......................................................................................... 1 General Notes and Details................................................................. 2 Storm Drainage Summary Table ................................................. 3-3C Plan& Profile................................................................................ 4-20 Details........................................................................................... D1-D2 Pavement Plans...................................................................... PP1-PP2 Traffic Control Plans ...................................................... TCP1-TCP6 Pavement Marking Plan ............................................................... PM1 Structural Details................................................................... SDI-SD8 Erosion Control................................................................. EC1-EC14 CrossSections............................................................................. X1-X4 Sidewalk Ramp Details ............................................. RAMP1-RAMP3 CLTWater Utility Plans ............................................................ U1-U7 TOTAL SHEETS 70 VICINITY MAP NTS SURVEY PREPARED BY: CITY OF CHARLOTTE SURVEY-MAPPING-GIS FROM THE LOCALIZED COORDINATE SYSTEM DEVELOPED FOR THIS PROJECT IS BASED ON STATE PLANE COORDINATES ESTABLISHED BY: MULKEY GPS CONTROL POINT 104 WITH NAD 83(2011) STATE PLANE COORDINATES OF NORTHING:521744.6487 EASTING:1466826.6343 ELEVATION 667.006 THE AVERAGE COMBINED GRID FACTOR USED ON THIS PROJECT (GROUND TO GRID) IS: 0.99984382 VERTICAL DATUM: NAVD 88 ALL LINEAR DIMENSIONS ARE LOCALIZED HORIZONTAL \ DISTANCES. DATE RANGE OF SURVEY:02/15/2011 TO 10/22/201IJ PLANS PREPARED BY: if NV5 ENGINEERS & CONSULTANTS, INC. 7500 E. INDEPENDENCE BLVD, STE 100 CHARLOTTE, NC 28227 P:704.537.7300 www.NV5.corr CHARLOTTE,. ENGINEERING & PROPERTY MANAGEMENT Construction Plans of Proposed Water Oak Storm Drainage Improvement Project Project No. 671-12-007 Proiect Features: THIS PROJECT CONSISTS OF: GRADING, DRAINAGE PIPE & STRUCTURES, PAVING, CONCRETE WORK, CHANNEL IMPROVEMENTS & UTILITY RELOCATIONS NAD 83 / B'A�D 8R Walker oad _.) LOCATION MAP NTS Knowrrharg below. Call beWe you a1% 2018 NCDOT STANDARD SPECIFICATIONS GRAPHIC SCALES Plan View ................. 60 20 40 60 Horz. Profile ............ 4 8 12 Vert. Profile ............. 5 10 15 Record Drawings 99% DESIGN SUBMITTAL PREUM NARY PLANS DO NOT USE FOR CONSTRUC ION RECOMMENDED FOR CONSTRUCTION Contract Administration Storm Water Construction Landscape Management Utility Coordinator CDOT - Design CDOT - Implementation CLTWater Storm Water - Water Quality Existing Property Line ................................... - - - - Maintained as R/W Line ................................ — — — Existing Structures ......................................... Proposed Edge of Pavement .......................... Fence................................................................ x Sanitary Sewer Easement ............................... _ SSE SSE - Temporary Construction Easement ............. e e Sidewalk/Utility Easement ........................... SUE SUE Storm Drainage Easement ............................ Permanent Utility Easement .......................... - PUE Existing Easement .......................................... E Existing Gas Line ........................................... Existing Water Line ....................................... Existing Sanitary Sewer ................................ Existing Underground Telecommunications SDE SDE PUE G G W W SS SS UT UT Existing Underground Electric ..................... UE UE Proposed Underground Utility ...................... uu UU Proposed Overhead Utility ............................. oU oU Proposed Water Line ...................................... w w Proposed Sanitary Sewer ............................... SS SS Existing Storm Drainage Proposed Storm Drainage ............................. Existing Tree° • Existing Shrub ......................................................................................... ExistingWater Meter............................................................................. WM ❑ WV ExistingWater Valve............................................................................. >a ExistingGas Valve................................................................................. GV >a Existing Sanitary Sewer Manhole S Proposed Sanitary Sewer Manhole ....................................................... S Existing Storm Drain Manhole Proposed Storm Drain Manhole........................................................... • Existing Telephone Manhole T ................................................................. Proposed Telephone Manhole T ............................................................... Existing Telephone Handhole ............................................................... H H Existing Electric Manhole E Proposed Electric Manhole E ExistingCatch Basin.............................................................................. Proposed Catch Basin............................................................................ Proposed Double Catch Basin............................................................ 0 ExistingLight Pole................................................................................. ProposedLight Pole................................................................................ ExistingUtility Pole.................................................................................a GuyWire............................................................................................ --< Proposed Utility Pole...............................................................................W IronPin.................................................................................................... O ExistingFire Hydrant............................................................................ . 6- ProposedFire Hydrant.......................................................................... ExistingDrop Inlet..................................................................................0 ProposedDrop Inlet................................................................................ ❑� Accessible Ramp ................................................................................... wcR TreeProtection............................................................................. \--/ Proposed Guardrail................................................................... SiltFence..................................................................................... Proposed Curb & Gutter, Cone. Drive, Sidewalk Proposed Asphalt Mill and Replace .......................................... 0 0 Proposed Rip Rap Ditch............................................................. ProposedGravel........................................................................... o Proposed Full Depth Asphalt Replacement ................................ ® 'All �h CHARLOTTE ENGINEERING & PROPERTY MANAGEMENT APPROVED Bid Set No. NC License # F-1333 formerly CALYX Engineers & Consultants Cross Section ........... Storm Water Project Manager CITY ENGINEER DATE GENERAL NOTES PROPOSED CURB ELEVATIONS: THE CONTRACTOR SHALL SET AND ADJUST PROPOSED CURB ELEVATIONS AS NECESSARY TO ENSURE PROPER LONGITUDINAL GRADE FOR DRAINAGE. THE CONTRACTOR SHALL RETAIN EXISTING PAVEMENT, UNLESS OTHERWISE NOTED. DRIVEWAYS AND SIDEWALKS: PROPOSED DRIVEWAY ENTRANCE DIMENSIONS ARE FROM EXPANSION JOINT TO EXPANSION JOINT. MATCH REPLACEMENT MATERIALS TO THE EXISTING SURFACE ACCORDINGLY: • CONCRETE - SIX INCH PORTLAND CEMENT CONCRETE (3600 PSI). • ASPHALT - (COMMERCIAL) TWO INCH SF9.5B COURSE AND FOUR INCH 119.013 INTERMEDIATE COURSE. (RESIDENTAL) TWO INCH SF9.5B COURSE AND FOUR INCH AGGREGATE BASE (ABC) COURSE. • GRAVEL - SIX INCH INCIDENTAL STONE (UNLESS OTHERWISE NOTED ON THE PLANS). SIDEWALK SHALL BE FOUR INCHES THICK, AND SIX INCHES THICK AT DRIVEWAY CROSSINGS, PER CITY STD. NO. 10.22. CROSS SLOPES ON SIDEWALKS SHALL NOT EXCEED 2.0%. RUNNING SLOPES ALONG SIDEWALKS SHALL NOT EXCEED 5.0%, OR THE ADJACENT ROADWAY SLOPE AS MEASURED AT THE GUTTER PAN, WHICHEVER IS GREATER. A TURNING SPACE (LANDING) SHALL BE PROVIDED AT ALL LOCATIONS WHERE A PEDESTRIAN MIGHT TURN TO CHANGE DIRECTION OF TRAVEL. THE LANDING SHALL BE A MINIMUM OF 4 FEET BY 4 FEET, UNLESS NOTED BY THE ENGINEER. TYPICALLY LANDING DIMENSIONS WILL MATCH SIDEWALK WIDTH. THE LANDING ALSO SHALL NOT EXCEED 2.0% SLOPE MEASURED PERPENDICULAR TO THE ROADWAY. THE LANDING ALSO SHALL NOT EXCEED 2.0% OR ADJACENT ROADWAY SLOPE, WHICHEVER IS GREATER, MEASURED PARALLEL TO THE ROADWAY. A CROSS SLOPE TRANSITION PANEL MAY BE REQUIRED WHERE PROPOSED SIDEWALK MEETS EXISTING SIDEWALK WITH A CROSS SLOPE GREATER THEN 2.0%. THE TRANSITION PANEL SHALL NOT EXCEED 2.0% ON THE SIDE OF THE PROPOSED SIDEWALK AND/OR RAMP, AND SHALL MATCH THE EXISTING CROSS SLOPE ON THE SIDE OF THE EXISTING SIDEWALK. DRAINAGE STRUCTURES: GRADES, ELEVATIONS AND LOCATIONS SHOWN ARE APPROXIMATE. AS DIRECTED BY THE ENGINEER, THEY MAY BE ADJUSTED TO ACCOMMODATE UNFORESEEN CONDITIONS. STATIONS, OFFSETS AND ELEVATIONS REFER TO THE CENTER OF DROP INLETS, MANHOLES AND JUNCTION BOXES, AND THE MIDPOINT OF THE LIP FOR CATCH BASINS. PIPE AND BOX CULVERT LENGTHS ARE REPORTED IN THE CONSTRUCTION DOCUMENTS FROM CENTER OF STRUCTURE TO CENTER OF STRUCTURE, INCLUDING TRANSITIONS, HORIZONTAL AND VERTICAL BENDS. ALL PIPES SHALL BE RCP CLASS III, UNLESS OTHERWISE NOTED. WEEP HOLES ARE TO BE CONSTRUCTED AS DIRECTED BY THE ENGINEER. IF REQUIRED, WEEP HOLES ARE TO BE CONSTRUCTED IN THE BOTTOM 3 OF THE STRUCTURE. ATTACH HARDWARE CLOTH (ALUMINUM OR GALVANIZED STEEL NO. 4 WIRE REINFORCEMENT) TO THE OUTSIDE OF THE STRUCTURE WITH HEAVY DUTY CONSTRUCTION ADHESIVE OVER THE WEEP HOLE. PLACE A POROUS FABRIC BAG FILLED WITH ONE CUBIC FOOT OF NO. 78M STONE AT EACH WEEP HOLE AGAINST THE HARDWARE CLOTH. THERE WILL BE NO SEPARATE PAYMENT FOR THIS WORK. UTILITIES: UTILITIES ARE ILLUSTRATED FOR INFORMATION PURPOSES ONLY. THE CITY WILL NOT BE HELD RESPONSIBLE FOR THE ACCURACY OF UTILITY LOCATIONS, SIZES, DEPTHS, OR FOR COMPLETENESS OF UTILITY INFORMATION. PRIOR TO CONSTRUCTION AND VIA THE CITY UTILITY COORDINATOR AND CITY INSPECTOR, THE CONTRACTOR SHALL NOTIFY AND MEET WITH ALL UTILITIES AFFECTED TO DETERMINE UTILITY LOCATIONS. THE CONTRACTOR SHALL PROTECT ALL UTILITIES FROM DAMAGE CAUSED BY HIS OPERATIONS OR THOSE OF HIS AGENTS. THE CONTRACTOR SHALL HOLD THE CITY HARMLESS FOR ANY THIRD -PARTY INCONVENIENCE CREATED BY WORK OF HIS OWN FORCES OR THAT OF HIS AGENTS. ANY DAMAGES INCURRED SHALL BE THE CONTRACTORS FINANCIAL RESPONSIBILITY. AS NEEDED, THE CONTRACTOR SHALL ADJUST/RELOCATE THE SANITARY SEWER AND WATER LINES ONLY. ALL OTHER ADJUSTMENTS/RELOCATIONS WILL BE PERFORMED BY THE VARIOUS UTILITY OWNERS. VIA THE CITY UTILITY COORDINATOR AND CITY INSPECTOR, THE CONTRACTOR SHALL COORDINATE WORK WITH UTILITY OWNERS SO AS NOT TO ADVERSELY AFFECT THE PROJECT SCHEDULE. THE CITY WILL NOT BE HELD RESPONSIBLE FOR ANY DELAYS OR DISRUPTIONS TO THE WORK SCHEDULE OF OTHER UTILITY OWNERS. THE CONTRACTOR SHALL STAY A MINIMUM OF 5 FEET AWAY FROM ALL UTILITY POLES. FOR UTILITY LOCATES CALL NORTH CAROLINA ONE -CALL @ 1-800-632-4949. WARNING: OVERHEAD UTILITIES. UNLESS OTHERWISE NOTED FOR RELOCATION, THE CONTRACTOR IS TO WORK UNDER ALL EXISTING OVERHEAD UTILITIES. THE CONTRACTOR SHALL ADJUST ALL WATER VALVES, WATER METER BOXES AND WATER VAULTS TO FINISHED GRADE. WATER METERS LOCATED IN SIDEWALKS OR CONCRETE DRIVEWAYS SHALL BE INSTALLED WITHIN CONCRETE BOXES. GAS LINES WILL BE ADJUSTED/RELOCATED AS NEEDED BY PIEDMONT NATURAL GAS. VIA THE CITY UTILITY COORDINATOR AND CITY INSPECTOR, THE CONTRACTOR SHALL CONTACT PIEDMONT NATURAL GAS AT LEAST TWO WEEKS PRIOR TO CONSTRUCTION. EXISTING SANITARY SEWER AND WATER LINE: THE CONTRACTOR SHALL USE CARE WHEN WORKING AROUND SANITARY SEWERS AND WATER LINES. SHOULD THE CONTRACTOR DAMAGE EXISTING SEWER OR WATER LINES, HE SHALL IMMEDIATELY REPLACE THE LINE AT HIS EXPENSE WITH DUCTILE IRON PIPE. THE CONTRACTOR SHALL REPLACE SANITARY SEWER AND/OR WATER LINE, WITH A MINIMUM TEN FOOT SECTION OF DUCTILE IRON PIPE WHEN DRAINAGE PIPE COMES WITHIN TWO FEET OF SAID LINES, VERTICALLY OR HORIZONTALLY. SUBSURFACE PLANS NO SUBSURFACE PLANS ARE AVAILABLE ON THIS PROJECT. THE CONTRACTOR MAY MAKE HIS OWN INVESTIGATION TO DETERMINE SUBSURFACE CONDITIONS. MAIL BOXES: THE CONTRACTOR SHALL RELOCATE ALL MAIL BOXES AS REQUIRED BY SECTION 107-11 OF THE NCDOT STANDARD SPECIFICATIONS FOR ROADS AND STRUCTURES. COORDINATE THIS WORK WITH THE U.S. POSTAL SERVICE. FENCES: THE CONTRACTOR SHALL REMOVE AND RESET FENCES AS NOTED ON THE PLANS AND/OR AS DIRECTED BY THE ENGINEER. GENERAL NOTES TREES, SHRUBS, AND HEDGES: THE CONTRACTOR SHALL REMOVE TREES, SHRUBS, AND HEDGES WITHIN THE LIMITS OF DISTURBANCE UNLESS SHOWN ON THE PLANS TO BE PROTECTED AND THOSE THAT FALL WITHIN THE TREE PROTECTION BARRIERS. WHEN ROOT PRUNING IS NECESSARY, CUT ROOTS CLEANLY USING A DISC TRENCHER OR OTHER APPROVED METHOD IN ACCORDANCE WITH SECTION 01000 OF THE CITY OF CHARLOTTE LANDSCAPE CONSTRUCTION STANDARDS. PRUNING SHALL BE PER THE LATEST STANDARD OF THE LANDSCAPE CONSTRUCTION STANDARDS MANUAL (TYP.) USE PLYWOOD FORMS WHEN TREE ROOTS ARE ADJACENT TO PROPOSED CURB & GUTTER OR SIDEWALK. USE CLD STD. 40.11 FOR BRIDGING TREE ROOTS. TREES SPECIFIED BY THE PLANS TO HAVE ASPHALT CURBING MUST USE CLD STD. 40.13. TREE PROTECTION SHALL BE IN ACCORDANCE WITH CLD STD. 40.02 AND WITH SECTION 1000 OF THE CITY OF CHARLOTTE LANDSCAPE CONSTRUCTION STANDARDS. WHEN THE TREE IS CLOSE TO THE WORK AREA TREE PROTECTION CLD STD. 40.12 SHALL BE USED. CONTRACTOR SHALL OBTAIN APPROVAL FROM THE CITY PRIOR TO REMOVING ANY TREES. IN ADDITION, ALL TREES LOCATED WITHIN THE LOD THAT ARE TO REMAIN AFTER CONSTRUCTION SHALL BE INSPECTED BE THE CITY TO VERIFY THEY ARE SUITABLE TO REMAIN. FOLLOWING CONSTRUCTION STAKING THE PROJECT TEAM (CONTRACTOR, CITY INSPECTOR, CITY ARBORIST AND CONSULTANT, IF APPLICABLE) WILL HOLD AN ON -SITE MEETING TO ENSURE THE LIMITS OF DISTURBANCE AND THAT TREES PROPOSED FOR PROTECTION ARE CLEARLY IDENTIFIED. THE TEAM WILL WALK THE PROJECT AREA AND AGREE ON THE TREES TO BE PROTECTED AND THOSE TO REMOVE, DISCUSS PROPOSED CONSTRUCTION ACTIVITIES, AND IDENTIFY ANY ADDITIONAL TREES TO PROTECT THAT WERE NOT ORIGINALLY MARKED AS SUCH. THE CONTRACTOR WILL BE GIVEN APPROVAL FOR TREE REMOVAL, IN WRITING, AFTER APPROPRIATE TREE PROTECTION HAS BEEN INSTALLED AND BEFORE ANY CLEARING OR REMOVAL CAN BEGIN. THERE WILL BE NO ADDITIONAL PAYMENT FOR TREE PROTECTION INSTALLED AROUND ADDITIONAL TREES IDENTIFIED FOR PROTECTION. THE CONTRACTOR ASSUMES RESPONSIBILITY FOR "IN -KIND" REPLACEMENT OF TREES DAMAGED THAT HAVE BEEN MARKED FOR PROTECTION OR NOT MARKED FOR REMOVAL. TOLERANCE: STRUCTURES INCLUDING STORM DRAIN PIPE, STORM STRUCTURES, SEWER PIPE, AND RETAINING WALLS SHALL HAVE A TOLERANCE OF ±0.10 FEET. STRUCTURES INCLUDING RISERS, WEIRS, AND ORIFICES, SHALL HAVE A TOLERANCE OF ±0.05 FEET. STREAM IMPROVEMENT STRUCTURES SHALL HAVE A VERTICAL TOLERANCE OF ±0.10 FEET, AND A PLANIMETRIC TOLERANCE OF ±0.50 FEET, SIDE SLOPES: LIMITS OF PROPOSED SLOPES ARE INDICATED IN THE PLANS, DETAILS AND STANDARD DRAWINGS. THE MAXIMUM SLOPE SHALL NOT EXCEED A 3:1 (HORIZONTAL TO VERTICAL) UNLESS DESIGNATED BY THE ENGINEER. A CUT SLOPE OF 2:1 MAXIMUM WILL BE USED ONLY AS DIRECTED BY THE ENGINEER. EROSION CONTROL: THE CONTRACTOR SHALL INSTALL AND MAINTAIN EROSION CONTROL DEVICES IN ACCORDANCE WITH THE APPROPRIATE CITY AND STATE EROSION AND SEDIMENT CONTROL ORDINANCES AND CHARLOTTE STORM WATER SERVICE RGP #163/GC #4100 OR APPLICABLE PERMIT DOCUMENT. THE CONTRACTOR SHALL PREVENT STANDING WATER DUE TO CONSTRUCTION. DISTURBED AREAS SHALL BE SEEDED AND MULCHED AT THE DIRECTION OF THE ENGINEER. THE CONTRACTOR SHALL FOLLOW THE EROSION CONTROL MEASURES SHOWN ON SHEETS EC-1 THROUGH EC-10. ACCESSIBLE RAMPS AND DEPRESSED CURB: THE CONTRACTOR SHALL CONSTRUCT 6-INCH THICK CONCRETE ACCESSIBLE CURB RAMPS AT INTERSECTIONS IN ACCORDANCE WITH THE LATEST REVISIONS FOR ACCESSIBLE CURB RAMPS DETAILS, "PROPOSED ACCESSIBILITY GUIDELINES FOR PEDESTRIAN FACILITIES IN THE PUBLIC RIGHT-OF-WAY" (PROWAG), CONSTRUCTION PLANS & NCDOT STANDARD DRAWINGS. RUNNING SLOPES ALONG CURB RAMPS SHALL NOT EXCEED 8.3%, BUT SHALL NOT REQUIRE THE RAMP LENGTH TO EXCEED 15 FEET, UNLESS OTHERWISE DIRECTED BY THE ENGINEER. ALL PANELS OF THE RAMP MUST EQUAL THE SAME PERCENTAGE. FLARES SHALL BE 10.0% MAXIMUM SLOPE (WHERE APPLICABLE), UNLESS OTHERWISE DIRECTED BY THE ENGINEER. RAMP CROSS SLOPE SHALL NOT EXCEED 2.0%, OR THE ADJACENT ROADWAY SLOPE AS MEASURED AT THE GUTTER PAN, WHICHEVER IS GREATER. A TURNING SPACE (LANDING) SHALL BE PROVIDED AT ALL LOCATIONS WHERE A PEDESTRIAN MIGHT TURN TO CHANGE DIRECTION OF TRAVEL. THE LANDING SHALL BE A MINIMUM OF 4 FEET BY 4 FEET, UNLESS NOTED BY THE ENGINEER. TYPICALLY LANDING DIMENSIONS WILL MATCH SIDEWALK WIDTH. THE LANDING SHALL NOT EXCEED 2.0% SLOPE MEASURED PERPENDICULAR TO THE ROADWAY. THE LANDING ALSO SHALL NOT EXCEED 2.0% OR ADJACENT ROADWAY SLOPE, WHICHEVER IS GREATER, MEASURED PARALLEL TO THE ROADWAY. SAWCU TS: THE CONTRACTOR SHALL SAWCUT EXISTING ASPHALT AND/OR CONCRETE SURFACES PRIOR TO REMOVAL UNLESS OTHERWISE DIRECTED BY THE ENGINEER. SAW CUT WIDTH SHALL BE 1 FOOT MINIMUM FROM THE EXISTING EDGE OF PAVEMENT. SAW CUT PAVEMENT SHALL BE REPLACED AS WELL AS ADDITIONAL PAVEMENT REQUIRED TO TIE-IN TO FACE OF PROPOSED CURB AND GUTTER. TRAFFIC CONTROL: TRAFFIC CONTROL SHALL BE IN ACCORDANCE WITH THE MOST CURRENT EDITION OF THE "WORK AREA TRAFFIC CONTROL HANDBOOK" (WATCH) AND THE TRAFFIC CONTROL PLANS ON SHEETS TCP-1 TO TCP-6. ENVIRONMENTAL PERMITTING: 401 /404 JURISDICTIONAL AREA(S) HAVE BEEN PERMITTED UNDER CHARLOTTE STORM WATER SERVICES RGP #163/GC #4100, OR APPLICABLE PERMIT DOCUMENT. THE CONTRACTOR SHALL FOLLOW ALL APPLICABLE PERMIT REQUIREMENTS. BY CITY ORDINANCE, THE DISCHARGE OF STORMWATER POLLUTANTS TO THE STORM WATER SYSTEM OR WATER BODIES IS PROHIBITED. ABBREVIATIONS ABAND..........................ABANDONED A.D...............................ALGEBRAIC DIFFERENCE ASPH ............................ ASPHALT APPROX........................ APPROXIMATELY B/C...............................BACK OF CURB BIT.................................BITUMINOUS BM.................................BENCH MARK BRG...............................BEARING BST_ ... ......................BITUMINOUS SURFACE TREATMENT CB.................................CATCH BASIN C&G..............................CURB AND GUTTER CL.................................CLEARANCE C/L FENCE...........................CHAIN LINK FENCE CMP..............................CORRUGATED MTL PIPE CONC............................CONCRETE CONST..........................CONSTRUCTION DB.................................DEED BOOK DCB...............................DOUBLE CB DI..................................DROP INLET DIA................................DIAMETER DW.................................DRIVEWAY DIM................................DIMENSION E................................... EAST/EASTI N G EA................................. EACH ELEV..............................ELEVATION EOP...............................EDGE OF PAVEMENT ESMT.............................EASEMENT EXIST.............................EXISTING F/C...............................FACE OF CURB FES...............................FLARED END SECTION FH.................................FIRE HYDRANT FOC...............................FIBER OPTIC CABLE GV.................................GAS VALVE HORIZ............................HORIZONTAL INT................................INTERSECTION INV................................INVERT IP..................................IRON PIN SET L................................... LENGTH LF..................................LINEAR FOOTAGE LT.................................. LEFT lb..................................POUND LP.................................LIGHT POLE MAX___________ ... ...MAXIMUM MIN................................MINIMUM MONO............................MONOLITHIC mph..............................MILES PER HOUR MTL...............................METAL N...................................NORTH/NORTHING NTS.........................NOT TO SCALE 0/H........................OVER HEAD OC...........................ON CENTER PAVT .......................PAVEMENT PC...........................POINT OF CURVATURE PERM ....................... PERMANENT PG ...........................PAGE PI............................POINT OF INT PK...........................PK NAIL SET PP...........................POWER POLE PROP ....................... PROPOSED PSE .........................PERM SW ESMT PT___ ... ... ......POINT OF TANGENCY PVI ..........................POINT OF VERT INT PUE .........................PERM UTILITY ESMT r..............................RADIUS RT...........................RIGHT RCP.........................REINFORCED CONC PIPE RELOC..................... RELOCATE R/W.........................RIGHT OF WAY S............................. SOUTH SD...........................STORM DRAIN SF...........................SQUARE FOOT S/R FENCE.............SPLIT RAIL FENCE SS...........................SANITARY SEWER STA......................... STATION STD.........................STANDARD SW...........................SIDEWALK TAN ......................... TANGENT TCE .........................TEMP CONST ESMT TEMP.......................TEMPORARY THH.........................TELEPHONE HANDHOLE TP...........................TRAVERSE POINT T/W........................TEST WIRE TYP.........................TYPICAL U/G.........................UNDER GROUND VC...........................VERTICAL CURVE VERT........................VERTICAL W............................. WEST W/........................... WI TH WM ..........................WATER METER W VAULT.....................WATER VAULT WV ........................... WATER VALVE 60p .........................SIXTY PENNY NAIL SET ................................ FOOT ................................INCH SECTION E: GROUND STABILIZATION (FROM NCGO1 - GROUND STABILIZATION) Required Ground Stabilization Timeframes Stabilize within this Site Area Description many calendar Timeframe variations days after ceasing land disturbance (a) Perimeter dikes, swales, ditches, and 7 None perimeter slopes (b) High Quality Water 7 None (HQW) Zones (c) Slopes steeper than If slopes are 10' or less in length and are 3:1 7 not steeper than 2:1, 14 days are allowed -7 days for slopes greater than 50' in length and with slopes steeper than 4:1 -7 days for perimeter dikes, swales, (d) Slopes 3:1 to 4:1 14 ditches, perimeter slopes and HQW Zones -10 days for Falls Lake Watershed -7 days for perimeter dikes, swales, (e) Areas with slopes ditches, perimeter slopes and HQW Zones flatter than 4:1 14 -10 days for Falls Lake Watershed unless there is zero slope Note: After the permanent cessation of construction activities, any areas with temporary ground stabilization shall be converted to permanent ground stabilization as soon as practicable but in no case longer than 90 calendar days after the last land disturbing activity. Temporary ground stabilization shall be maintained in a manner to render the surface stable against accelerated erosion until permanent ground stabilization is achieved. BASE SURVEY DATA W E� E� PLANIMETRIC DATA PROVIDED BY AVIOIMAGE MAPPING SERVICES VIA AERIAL MAPPING TECHNIQUES DATED "10-11-2012". SUPPLEMENTAL FIELD SURVEY PROVIDED BY MULKEY DATED "8-23-2012" INCLUDING STORM DRAINAGE, UTILITIES, STREAMS, PROPERTIES, TREES, OBSCURED AREAS, AND PAVEMENT DTMS. ALL COORDINATES BASED ON NAD 83 AND NAVD 88. STANDARDS ' a 0 z� � > THE STANDARDS CONTAINED ON THE PLANS AND SPECIFICATIONS AND THE LATEST :DM - VERSIONS THERETO ARE APPLICABLE TO THIS PROJECT AND BY REFERENCE ARE zozN CONSIDERED A PART OF THESE PLANS. NCDOT ROADWAY STANDARDS AND THE 0. ONO o .21 LATEST CHARLOTTE LAND DEVELOPMENT STANDARDS SHALL BE USED. z� a wwUj m Z w ti z co x > Z W0Lq a �aQ� >Lo= Z I- U a z w PRELMNARW PLANS 00 NOr USE ran CONSMN1M0N w ❑ I 0 >� � a N a H m Q N - J ? Z U ❑ � � w a ❑ x Q v v x _ w o � m 0 o r ❑ ❑ i z _ w 0 a a Drainage Structure Table STATION w Co z w = W J U O J O_ U O J z U - O w O H 0 O > z - z O Q i W > Z O z - > z z O Q i W > Z QUANTITIES FOR DRAI NAG E STRUCTURES TOTAL L.F. FOR QUANTITY SHALL BE COL "A" + (1.3 X COL. "B") z_ Q w 0 in z_ Q w 0 U) ao z Q w 0 U) N CLASS III R.C. PIPE UNLESS NOTED OTHERWISE) CLASS IV R.C. PIPE N O o o (n O o O 00 o m U N O o o (n O o O 00 o m U FRAME GRATES AND HOOD STANDARD 840.03 MASONRY DRAINAGE STRUCTURE Lo o 00 � z_ < Co = U Q O = z W p U Co 00 ao Co 00 O U Z J J Q o z W M 0 U) O U z 0 m W J Co O 0 M CDN o U)N 0 U z W 2 Q LL z Q H Q O J w � U) LL J U Co U (n Q U W M X LL J U Co U Of U) Q U W X � Lo o 00 o cn O 00 (n o Z 7 00 p � W Q O W � LL o Z Of O o 00 cn Q W p }Lo N O O o 00 cn Q W p CD 00 T U cn W Q z 0 Q w d N No 00 o U) W Q 2 H W Q LL N 00 6 0 � W Q � �, O 2 H W Q LL 00 o U) � Q (D O = ~ W < U- Z N M o 00 O O 00 o m � U _ N (M 0 00 O O 00 o m (o o 00 O 0 U Z O z Q W m U_ LL Q U ( o 00 O 0 U Z O z Q W m U_ LL Q W > OU 06 W Q � = 2 `' o 00 0 H cn m Co U O 06 00 ~ o U Z Co O N U1 o U N N p N � U Co o U) U Co U U LL O 0 LL o O _ } w Of U U) o Q 0 Z Q (n z O Z ABBREVIATIONS C.B.............. CATCH BASIN D.I............... DROP INLET J.B............... JUNCTION BOX M.H............... MAN HOLE o L(j O Q LLB d L.F. STD.834.01 OR STD.838.11 (UNLESS NOTED OTHERWISE) A B = H o Lo = W o > Co p Q o 12" 15" 18" 24" 30" 36" 42" 48" 54" 12" 15" 18" 24" 30" 36" 42" 48" 54" TYPE OF GRATE LL R.C.P. C.S.P. E F G REMARKS 87+16.92 12 CL 3 760.53 1 1 1 12 3 4 756.78 755.58 12 87+04.92 12 CL 4 760.95 1 0.4 1 1 12 4 6 755.58 755.04 109 0+14.23 12 CL 5 760.38 1 1 1 12 5 6 756.50 755.08 15 85+96.47 12 CL 6 761.00 1 1.2 1 1 12 6 7 754.79 754.22 113 84+83.72 12 CL 7 761.52 1 2.3 1 1 12/11 7 9 754.22 753.31 128 1+19.37 11 CL 8 760.10 1 1 1 11 8 9 755.50 753.56 19 83+55.40 11 CL 9 760.38 1 2.6 1 1 11 9 12 752.81 750.27 168 0+26.50 11 CL 10 754.62 1 1 1 11 10 12 751.62 751.02 19 0+00.00 11 CL 11 754.59 1 2 1 11 12 752.08 751.51 8 81+87.47 11 CL 12 755.17 1 0.4 1 1 11 12 13 749.77 749.41 72 81+14.99 11 CL 13 753.97 1 1 1 11 13 15 749.41 745.95 100 80+14.79 11 CL 15 753.33 1 2.4 1 1 11 15 16 745.95 744.82 22 79+92.27 11 CL 16 753.52 1 3.7 1 1 11 16 17 744.82 744.56 52 79+39.96 11 CL 17 752.18 1 2.6 1 1 11/10 17 22 744.56 736.25 147 1+12.33 10 CL 20 744.37 1 1 1 10 20 21 741.37 740.87 59 0+53.12 10 CL 21 743.87 1 1 1 10 21 22 740.62 739.87 53 77+92.94 10 CL 22 743.12 1 1.9 1 1 10 22 23 736.25 735.50 36 77+56.78 10 CL 23 742.83 1 2.3 1 1 10 23 24 735.50 734.64 172 75+84.50 10 CL 24 740.05 1 1.1 1 1 10 24 25 733.98 733.25 40 75+44.47 10 CL 25 738.75 1 1.0 1 1 10 25 26 732.75 730.83 161 73+83.38 10 CL 26 735.58 1 4.4 1 1 10/9 26 36 726.23 725.56 78 131+66.88 20 CL 28 733.89 1 1 1 20 28 29 729.41 726.62 30 131+37.29 20 CL 29 733.21 1 1.6 1 1 20 29 30 726.62 726.17 88 130+49.00 20 CL 30 731.48 1 0.3 1 1 20 30 33 726.17 726.05 25 130+00.00 20 CL 31 731.83 1 1 1 20 31 33 728.83 727.30 25 130+24.50 20 CL 33 730.73 1 1 1 73+05.45 9 CL 36 734.15 1 4.1 1 1 9 36 37 725.06 724.18 175 71+30.56 9 CL 37 730.36 1 1.2 1 1 9 37 38 724.18 723.49 136 69+94.93 9 CL 38 729.70 1 1.2 1 1 9 38 40 723.49 718.40 127 0+18.05 9 CL 38A 728.41 1 1 1 9 38A 38 723.58 723.49 18 TOTAL 30 34.7 0 0 0 0 0 427 294 168 641 239 438 0 0 0 0 0 0 0 0 0 0 0 15 0.00 4 11 2 0 0 0 0 1 1 0 0 2 2 3 0.00 0 1 3 0 0 0.00 1 0.00 7 7 0.0 1 0 0 0 KC, �iINOT USE F0+ R com& TRUCgK61►]N W O O Z O0 �F- > p 3 CO i. GC _ U7 W zUti OU W N � ^yr ICI W M ZNO ww Z 01 m m ' Li W W ✓�i U .0 Li >�=ti J z O F- a x r w Q w Ll O a � 9, m:� I= [I1 y � o N o w � w x a v - a v o % N Z A} x Q W 1 a CL i U w a a r.T.1 x O � � a M 0 N Drainage Structure Table STATION (If LU Co z w = W J U O J O_ � U O J z U - Z O H w O H 0 O > z - z O > W > Z O z - > z z O > W > Z QUANTITIES FOR DRAI NAG E STRUCTURES TOTAL L.F. FOR QUANTITY SHALL BE COL "A" + (1.3 X COL. "B") Z_ Q w 0 in Lo Z_ Q w 0 U) 00 Z Q w 0 U) N CLASS III R.C. PIPE UNLESS NOTED OTHERWISE) CLASS IV R.C. PIPE N O o o (n O O 00 00 o m U N O o o (n O O 00 00 o m U FRAME GRATES AND HOOD STANDARD 840.03 MASONRY DRAINAGE STRUCTURE Lo o 00 � z_ < Co = U Q O = ~ Z W 0 U E Co 00 ao Co 00 O U Z J J Q o z W M ao 0 U) O o z 0 Co � W J O 0 M CDN o U) 0 U z W 2 Q LL o Q W H Q Of O J w W LL J U CoCoQ U T (n Q U W M X LL J U U (n Q U W co X � Lo o 00 o cn O 00 o (n o Z 7 00 p � W O W Of LL o Z N Of O o 00 o H U) Q W p }Lo N O O o 00 o H U) Q W p CD 00 T U cn W O Q z 0 Q w d N No 00 o U) W < Q U' 2 H W Q Of LL N 00 0 � W Q � �, O H 2 H W Q � LL 00 o cn � Q (D O _ >~ > W U- Z N (M o 00 O M O 00 o m � U _ N (M 0 00 O M O 00 o m o o 00 O 0 U Z U z < Q W m U_ LL Q U o o 00 O 0 U Z U z < Q W m U_ LL Q ao W > OU 06 W 2 Q � = ch CD 0000 0 cn m Co } o m ao ~ o U Z Co O N cn U N N p N � U Co o U) U Co U U LL O LL o O _ } w Of U 0 Q 0 Z Q (n z O Z ABBREVIATIONS C.B.............. CATCH BASIN D.I............... DROP INLET J.B............... JUNCTION BOX M.H............... MAN HOLE o L(j = O Q LLB d L.F. STD.834.01 OR STD.838.11 (UNLESS NOTED OTHERWISE) A B = H o Lo = W 0 LU > O Co p Q o 12" 15" 18" 24" 30" 36" 42" 48" 54" 12" 15" 18" 24" 30" 36" 42" 48" 54" TYPE OF GRATE LL R.C.P. C.S.P. E F G REMARKS 11+64.43 9 CL 39 725.42 1 1 1 9 39 40 721.40 720.40 164 68+67.49 9 CL 40 723.78 1 0.4 1 1 9 40 42 718.40 716.50 33 0+14.55 9 CL 41 723.69 1 1 1 9 41 42 720.21 718.75 15 68+34.54 9 CL 42 724.38 1 2.9 1 1 8/9 42 54 716.50 714.91 165 0+71.85 19 CL 49 717.78 0.7 19 49 50 714.95 711.01 39 0+33.08 19 CL 50 715.21 1 1 1 19 50 52 711.01 710.91 20 1+20.44 19 CL 51 715.21 1 1 1 19 51 52 712.04 710.91 20 1+00.00 19 CL 52 715.05 1 1.7 1 1 19 52 53 708.35 707.95 13 0+00.00 19 CL 53 711.95 1 66+69.16 8 CL 54 721.57 1 2.2 1 1 8 54 55 714.41 713.84 108 65+60.94 8 CL 55 719.83 1 1.5 4.913 1 8 55 56 713.34 713.04 59 65+01.74 8 CL 56 720.64 1 2.6 4.8 1 8 56 58 713.04 709.90 125 0+14.96 8 CL 57 718.84 1 1 1 8 57 58 714.65 713.15 15 63+76.34 8 CL 58 719.43 1 4.5 6.875 1 8 58 59 709.90 709.56 68 63+08.20 8 CL 59 718.84 1 4.3 2.275 1 8 59 60 709.56 708.73 173 61+35.36 8 CL 60 717.32 1 3.6 4.8 1 7/8 60 61 708.73 708.26 94 60+41.14 7 CL 61 717.40 1 4.4 6.857 1 7 61 62 708.26 707.27 177 58+64.27 7 CL 62 716.49 1 4.2 4.735 1 7 62 63 707.27 706.65 98 00+13.48 7 CL 62A 715.10 1 1 1 7 62A 62 710.44 710.27 13 57+66.62 7 CL 63 714.91 1 3.2 6.313 1 7 63 65 706.65 702.07 189 120+45.41 7 64 711.27 1 1 1 7 64 65 706.34 705.07 45 55+77.53 7 CL 65 710.51 1 3.4 2.21 1 7 65 85 702.07 701.79 56 7 68 89 707.73 702.21 214 124+80.52 18 CL 71 721.79 1 1 1 18 71 72 719.06 714.29 99 123+82.02 18 CL 72 717.02 1 1 1 18 72 73 714.29 714.18 22 00+70.87 18 CL 75 715.02 1 1 1 18 75 77 712.02 709.03 71 121+85.40 18 CL 77 714.94 1 1.2 1 1 18 77 78 708.42 707.50 9 121+76.22 18 CL 78 714.35 1 1.9 1 1 18 78 79 707.50 707.32 35 121+40.96 18 CL 79 714.00 1 1.7 1 1 18/7 79 79A 707.32 707.15 34 121+06.61 7 CL 79A 712.42 1 0.3 1 1 7 79A 64 707.15 706.34 61 101+71.35 6 CL 80 710.31 1 2 1 TOTAL 28 44.0 0 0 0 0 0 394 361 0 0 0 198 121 983 0 121 0 0 0 0 0 0 56 15 4.49 5 10 4 0 0 1 1 0 0 0 0 1 1 0 19.25 0 0 2 2 1 20.05 0 0.00 5 0 0.7 1 0 0 0 F-1 F- 77 DO�iINOT USE F0+ R C�ON1►� TRucaIN<►]N W O O � Q O � ZUc OU W" N � y ICI �000 z N w w Z O m 'm wow LLw ^y QI W WOJU2 �U Oro -Y Lc�oati �� z ti U a z w z O F- a x r w Q w Ll O a m� y � o N o w � w x a v - a v o °� m Z % x Q w a i Q0 U CL w o a a a r.T.1 x O � � a M � N Drainage Structure Table STATION (If LU Co z w = W J U O J O_ � U O J z U - Z O H w O H 0 O > z - z O > W > Z O z - > z z O > W > Z QUANTITIES FOR DRAI NAG E STRUCTURES TOTAL L.F. FOR QUANTITY SHALL BE COL "A" + (1.3 X COL. "B") Z_ Q w 0 in Lo Z_ Q w 0 U) 00 Z Q w 0 U) � N CLASS III R.C. PIPE UNLESS NOTED OTHERWISE) CLASS IV R.C. PIPE N O o o (n O O 00 00 o m U N O o o (n O O 00 00 o m U FRAME GRATES AND HOOD STANDARD 840.03 MASONRY DRAINAGE STRUCTURE Lo o 00 � z_ < Co = U Q O = ~ Z W 0 U E Co 00 ao Co 00 O U Z J J Q o z W M ao 0 U) O o z 0 Co � W J Co O 0 M CDN o U)N 0 U z W 2 Q LL o Q W H Q Of O J w W LL J U CoCoQ U T (n Q U W M X LL J U U (n Q U W � X Lo o 00 o cn O 00 o (n o Z 7 00 p � W O W Of LL o Z Of O o 00 o H U) Q W p }Lo N O O o 00 o H U) Q W p CD 00 T U cn W O Q z 0 Q LUj d N No 00 o U) W < Q U' 2 H W Q Of LL N 00 0 � W Q � �, O H 2 H W Q LL 00 o cn � Q (D O _ >~ > W U- Z N (M o 00 O M O 00 o m � U _ N (M 0 00 O M O 00 o Co o o 00 O 0 U Z U z < Q W m U_ LL Q U o o 00 O 0 U Z U z < Q W m U_ LL Q ao W > OU 06 W 2 Q � = ch CD 0000 0 cn m Co } o m ao ~ o U Z Co O N cn 0 U N N p N � 0 U Co o U) U Co U U LL O LL o O _ } w Of U 0 Q 0 Z Q (n z O Z ABBREVIATIONS C.B.............. CATCH BASIN D.I............... DROP INLET J.B............... JUNCTION BOX M.H............... MAN HOLE o L(j = O Q LLB 0- L.F. STD.834.01 OR STD.838.11 (UNLESS NOTED OTHERWISE) A B = H o Ln = W 0 LU > O Co p Q o 12" 15" 18" 24" 30" 36" 42" 48" 54" 12" 15" 18" 24" 30" 36" 42" 48" 54" TYPE OF GRATE LL R.C.P. C.S.P. E F G REMARKS 6 80 81 706.44 704.54 40 101+31.26 6 CL 81 708.94 1 1 1 6 81 82 704.54 702.61 86 100+45.36 6 CL 82 706.29 1 1 1 6 82 84 702.61 701.69 25 00+36.56 6 CL 83 705.45 1 1 1 6 83 84 702.45 701.94 37 100+20.84 6 CL 84 704.94 1 1 1 6 84 88 701.19 699.32 21 55+21.85 7 CL 85 709.11 1 2.3 2.275 1 7/6 85 86 701.79 699.70 137 53+85.14 6 CL 86 705.95 1 1.2 2.275 1 6 86 87 699.70 698.48 25 53+60.64 6 CL 87 704.73 1 1.2 2.275 1 6 87 88 698.48 696.82 25 53+35.57 6 CL 88 704.58 1 5.0 1.1 1 5.2 6/5 88 96 693.45 692.91 83 52+52.40 5 CL 96 702.09 1 4.2 1 5.2 5 96 105 692.91 689.90 146 111+03.19 5 CL 101 698.73 13.6 PROP. HEADWALL 5 101 102C 691.81 691.43 20 5 101 102 691.31 690.93 20 00+16.28 5 CL 102B 700.61 1 3.6 1 1 5 102B 102A 691.75 691.70 10 00+06.19 5 CL 102A 699.62 1 2.8 1 1 5 102A 102C 691.70 691.50 6 110+83.42 5 CL 102 699.22 1 4.6 1 1 5 102 103 689.67 689.39 56 110+83.42 5 CL 102C 699.22 1 4.6 1 1 5 102C 103A 690.17 689.89 56 110+27.33 5 CL 103 699.32 1 4.9 1 1 5 103 108 689.39 689.25 27 110+27.33 5 CL 103A 699.32 1 4.9 1 1 5 103A 108 689.89 689.75 27 51+06.19 5 CL 105 699.92 1 5.0 2.275 1 5 105 106 689.90 689.58 64 50+41.29 5 CL 106 699.51 1 4.9 2.228 1 5 106 108 689.58 689.25 36 110+00.00 5 CL 108 694.67 9.2 PROP HEADWALL 108 00+16.00 17 CL 110 690.90 1 0.7 1 1 17 110 111 685.15 685.00 8 00+00.00 17 CL 111 686.59 1 00+33.62 16 CL 113 692.61 1 1 1 16 113 114 689.61 688.80 34 45+15.82 16 CL 114 692.73 1 1 1 00+29.79 16 CL 115 685.07 1 1 1 16 115 116 682.07 681.17 30 42+24.64 16 CL 116 684.66 1 1 1 16 116 118 680.52 676.85 111 41+14.02 16 CL 118 681.25 1 1 1 16 118 119 676.35 675.57 76 40+37.87 16 CL 119 680.16 1 1 1 16 119 122 675.57 674.60 24 01+30.82 16 CL 120 681.40 1 1 1 16 120 121 678.40 676.86 97 00+33.93 16 CL 121 679.86 1 2 1 16 121 122 676.61 675.10 34 40+13.39 16 CL 122 679.41 1 0.3 1 1 16 122 123 674.10 674.06 8 TOTAL 27 50.3 1 0 0 0 0 177 271 100 8 8 103 103 329 0 37 25 21 0 0 0 0 187 16 11.33 4 10 9 0 0 0 0 0 0 0 0 0 0 0 0.00 0 0 0 0 2 0.00 0 0.00 5 1 0.0 1 1 0 33 111111111 MINN' III!, DO�iINOT USE F0+ R com& TRUCgK61►]N W O .. O c z CDo F cn z O � i,.l 0] _ GC Gn W z U N CD 2: CAVo00 �ZN O L V U O w w z CC W U W ti L L Z Z � r o �' a m U Z W J W O fj� p LC) O Q ti > Lc x z O F- a x r w Q w Ll O a m� [I1 1 y � m p N p w � w x a v - a v p % °� m Z x Q w a CL i U o: a a r.T.1 x 0 a M 0 N Drainage Structure Table STATION (If LU m W W = W J U O J QLL U O J z U - Z O H w W O H 0 O > z - z O > W > Z O z - > z z O > W > Z QUANTITIES FOR DRAI NAG E STRUCTURES TOTAL L.F. FOR QUANTITY SHALL BE COL "A" + (1.3 X COL. "B") Z_ Q LU in LO Z_ Q Tf 0 U) 00 Z Q Of 0 � � N CLASS III R.C. PIPE UNLESS NOTED OTHERWISE) CLASS IV R.C. PIPE N O o o (n O O 00 0 (n m U N O o o (n O O 00 0 (n m U FRAME GRATES AND HOOD STANDARD 840.03 MASONRY DRAINAGE STRUCTURE LO o 00 � z_ < 00 = U Q O = ~ Z W 0 Y U E m 00 00 co 00 O U Z J J o z W M 0 07 O o z 0 m � W m O 0 M CDN o 07 0 U z W 2 Q LL o Q W H Q Of O J w W LL J U m U 0' (n Q U W M X LL J U m U (n Q U W � X Ln o 00 o cn O ao 0 (n o Z 7 00 p 07 w Q O W 2 Of U- 0 Z N 0' O 0 00 o H o7 Q W 0 }Lo N 0' O 0 00 o H 07 Q W o CD 00 T U cn W O Q z 0 Q w 0_ N No 00 o o7 W < Q U' 2 H W Q Of LL N 00 0 07 w Q Of �, O H 2 H W Q LL 00 o cn � Q (D O > > _ >~ > W 2 Z N (M o 00 O M O 00 0 H m � U _ N (M 0 00 O M O 00 0 H m o o 00 O 0 U Z U z < Q W m U LL Q U o o 00 O 0 U Z U z < Q W m U LL Q W > OU 06 W 2 Q U- = ch CD 0000 0 H cn m m } o m ao ~ o U Z Cl) O N U) 0 U N N p N 0 U co o 07 U m U U LL O LL o O _ } w Of U 0 Q 0 Z Q U) z O Z ABBREVIATIONS C.B.............. CATCH BASIN D.I............... DROP INLET J.B............... JUNCTION BOX M.H............... MAN HOLE o Ln = O Q W LLB 0_ L.F. STD.834.01 OR STD.838.11 (UNLESS NOTED OTHERWISE) A B = H 0 p Ln = w 0 LU > co 0 Z Q o 12" 15" 18" 24" 30" 36" 42" 48" 54" 12" 15" 18" 24" 30" 36" 42" 48" 54" TYPE OF GRATE R.C.P. C.S.P. E F G REMARKS 40+05.39 16 CL 123 677.50 1 34+68.65 15 CL 124 680.70 1 1 1 1 15 124 125 677.26 672.80 150 33+18.67 15 CL 125 676.24 1 1 1 1 15 125 126 672.80 670.29 83 32+35.58 15 CL 126 673.75 1 1 1 1 15 126 127 670.29 669.28 48 31+87.36 15 CL 127 672.71 1 1 1 1 15 127 129 669.28 668.62 53 01+76.35 15 CL 128 673.35 1 1 1 1 15 128 129 669.53 668.62 176 31+33.91 15 CL 129 672.17 1 1 1 1 15 129 130 668.12 667.97 29 31+04.49 15 CL 130 671.66 1 1 1 15 130 134 667.97 667.52 91 10+65.90 4 CL 131 674.49 1 1 1 4 131 132 670.95 670.21 39 10+26.91 4 CL 132 673.75 1 1 1 4 132 RCBC 669.96 668.89 24 2+62.37 4 CL 132A 673.57 6.1 4 132A 132B 669.00 668.08 68 4 132A 133 667.00 666.81 11 1+94.17 4 CL 132B 673.68 6.1 02+51.86 4 CL 133 673.29 1 1 1 Precast opening in RCBC for CB 4 133 134B 666.81 666.44 31 30+13.78 15 CL 134 672.91 1 0.4 1 1 15 134 134B 667.52 667.45 14 30+00.00 4/15 CL 134B 673.55 1 1 1 Precast opening in RCBC for CB 4 134B 132B 666.44 666.08 27 19+79.63 14 CL 136 694.50 1 1 1 1 14 136 137 690.77 688.50 125 18+54.98 14 CL 137 692.28 1 1 1 1 14 137 140 688.50 688.07 27 00+68.52 14 CL 138 692.25 1 1 1 14 138 139 689.00 688.49 38 00+30.11 14 CL 139 691.74 1 1 1 14 139 140 688.49 688.07 30 18+28.37 14 CL 140 692.05 1 1 1 1 14 140 140B 688.07 686.78 184 16+44.24 14 CL 140B 691.17 1 1 1 1 13/14 140B 141 686.78 681.16 155 14+89.35 13 CL 141 684.66 1 1 1 1 13 141 145 681.16 670.50 199 00+33.84 13 CL 142 677.67 1 0.1 1 1 13 142 143 672.54 672.37 34 00+00.00 13 CL 143 677.26 1 1 1 12+90.64 13 CL 145 674.96 1 1 1 1 13 145 146 670.50 667.20 149 11+46.24 13 CL 146 670.86 1 1 1 1 13 146 147 667.20 666.79 30 11+11.77 13 CL 147 670.99 1 1 1 13 147 148 666.79 663.75 50 10+61.74 13 CL 148 670.59 1 1.9 1 1 13 148 150 663.75 662.77 64 09+79.00 13 CL 149 664.87 1 09+98.33 13 CL 150 665.93 1 1 1 13 150 149 662.77 662.37 20 TOTAL 26 2.4 0 0 0 0 0 559 806 193 105 0 0 0 0 0 0 149 0 0 0 0 0 0 12 0.00 4 10 11 0 0 0 1 0 0 68 69 0 0 0 0.00 0 0 0 0 0 0.00 0 0.00 14 1 0.0 0 1 13 12.2 ALL SHEET TOTAL 111 131 1 0 0 0 0 1557 1732 461 754 247 739 224 1312 0 158 174 21 0 0 0 0 243 58 15.81 17 41 26 0 0 1 2 1 1 68 69 3 3 3 19.25 0 1 5 2 3 20.05 1 0 31 9 0.7 3 2 13 45.4 DO�iIN©T USE F0+ R C N& TRUCgK61►]N W O ., o 0 z CD0 pQ vi 01 > � 01 :E!Z PIZ t:i G Z U ti h OCA U W N � 0 00 Z N ` CD U O W WCD .�.I L W I- LL x (3 z HO M a Q Z WLq J W O = O _ L(7O Q ti _ E > Lc) Z I-Ud z o z O F- a x r w Q w Ll O a m� Ln y � 0] Q 0 N o w N � w x a v - a v o °� m N Z C) % x } Q w 1 a i U CL w o: a a a r.T.1 x 0 a M � N \\ \ \R�RAP PLAN R \ MECKLENBURG COUNTY / \ \ NOTE: 0 20 40 PID#163-083-12 / \\ \ 4833 STAFFORD CIRCLE 1, SEE WATER AND SEWER PLANS AND PROFILES, SHEETS U1-U5. SS \ \\ \ \ \ DB 30532 PG 692 / 2. CONTRACTOR MAY CHOOSE TO HAVE A ROUND OPENING IN TOP OF 10 30 RCBC WITH A CURB INLET ADAPTER FOR CB 133 AND 134B, SCALE. 1 "=20' O El C,G' 15" YRE // • REMOVE 77 LF 18 qA 25 6 / /� \ P // WATER OAKPID#1NC PARTNERS, LLC 0 \ \ \\ CR \/ MECP D 163 R0830UNTY / 5 RC / 4909 WATER OAK RD. \ 4815 STAFFORD CIRCLE �- c� // Q 15 DB 29726 PG 50 p I i S \ \ T�� �O / DB 30572 PG 962 �O �� MAGNOLIA Ci � \ ASS S \ \\ e�\\\\\ / r \ °`�F �O // 18" TREE ff - \ \ o \ \ \\\\� \\\ / J ��� //i MATCH�INE SHEET 1 5 ° \ / SEE HEET 15 P / / FOOFFL� / A J' EXIS ING POLE TO MOVED X CB (REMOV DU NG CONSTRUCTION S LID=675.20' RF_LOCATE'• E=672.95' EX c_ (REMOVE) AN REINSTALLED AFTER \ NW INV=668.55' k Q / / NW V-668.56 RATE=673.29' \ \\ \ RE OVE 281 LF �P / S IN 6�7.54' INV=669.02' - \ 15" C. MYRTL O �EX SSMH \\\ J Q J _ SE INV=668.21' o / S NITAR CO TRUCTION BY OTHERS. \ /j /� L D=672.08 SS \ \ / EWER. cS o 0 NW INV=661.65' \q \ O_ 12" C. YRTLE / �TI PLA Q�00 S INV=668.84' / / Z W is7 p RI P 8" HOLLY / �9 SE I\rW 661.48' RI RA EX, 2-42" RCP 5 - \ EX Di (REMOVE) / - / / / > z \ GRATE=670.11 g" HOLLY / / 12" SYCAMO / 30 W INV=665.3u / fL4" C. MYR E 18 C. MYRTLE / ZQ \ \\\ SS S5 1 e M YRfitF / / / / / ��� > (5)2PLAR SE INV=665.19' (D E // E ° U rif �O S SEE DETAIL 1, �/ / / 4 ° ? m < APPRg E 12" C. MYRTLE NSI 1�6� O SHEET / j // ~✓ z w \ \ \ \ \ \ I LDS 0+� OL9 / / o z v 5 - - 42 Rc 34 U w c� 42" RCP � - � �,�' PINE � 6" C. MYRTLE Nt / / 8- 1` - F. S - - _ - _ �� B / 8" PINE i.1 Z cV ` \ \ ( CP IFZE/ / / - - - - / - -!� - - - so 0 LF -7'X5' - \ pPPROX a U Cc, m \ > \ S \Lu \ \ Q2 " C E D R / / _ - - - - - _ _ - - - - - 1 6 8 LF 7'_X 3 ' - - - s - - R C6 3 // ti PINE \ W w z ti M \ \ \\\ E 12 " C . YRTL I / / / / / / O - _ - - - -SS- - - - - - -RC �136 - - 1' X5 - A P / / R ( V E------- 4 X R P l l z Lj Lj 0 c \ p /��Jt. CP RE ) 134 Q 12" BIR H 15 PINE WOVEN I IREISP�IT \ z-U z a 9 / / / / / RG 2 C J SSA �c,S C,Uv SS� 10" ASH 42" RCP a N 1� RK SILL \ a j o = J / ° 12' EAR / 1 { i / Q� MYRTLE ) s PROP, NONSTANDARD DWALL SHEEj\D2 \ ` 664.1 1. `-'� / / �n0 ) SS ° °o _ ) SSA. 2+ 2.37 \ z I� v a z 0 ) O SEE SHEET U4 FOR PROP ,/X S0�` °°oo\°C 'i RCg SJ�=666.-12'- TOP=673.57_ \� / JMYRTL SEAR PROFILE 12"SC 2 oA ss It OV RCBC INV IN 667, 0 \ a ATE=6 E °° 10+00. \ 669.1; 7'X3' RCBC INV IN 669`e0 \ \ \ 12" CED V=666.63' Cp° ��, 34S \ S O �CO°o� INSTALL 46 LF tout s " CEDA 24 ASH °S NW INV=666.48' uC t� \. ' TRANSITION FROM EX. )PE 0 PROP, BANK OF 2:1 LOPE. INSTALL �s GRADE BANK AFTER REMOVING NV=664. \ E e t, INV-666. Og� a HANDRAIL A EX. 42" RCPs AND PLACE 14 EX FEsE V) 3 AK �,�L/X S Q� ° 2 ASH 132 \ / �A �o LIVE STAKES, TEM�9R R MATTING &SEEDING. SEE HEET D1 FOR \ ( DETAIL. 5Lg - \ \ TONS CLASS I RIPRAP KEYED 's. 1 PINE E SSMH CLDS 50.04A&B IN) 10'X18'X1,5' OVER 16 SY \ oA \ ° 99 \\\ P ANITA SE R ° ° _673.82' SEE SHEET U4 R PAP WATER RELOCA I \ KEYED IN NCDOT TYPE II `sS \ \ MANHOL SEE ET U4 SW INV=668.17' ls" i REPLACE 2�Y 0 EXIST DRIVEWAY \ GEOTEXTILE FABRIC S \ \\\ ° 18 PINE O Ci `�F' ELOCATE GAS 13 5 9 �S- f .27A _ Q \ \ \ �o BY OTHERS 0 BEVEL CURB HEIGHT TO Z 0 AT DDRKEWAY LOCATI. z r \ \ \\ \ CURB TRANSITION \ \ ° \ \� �� \ S SDE TRANSITI 31 CLDS 10.30 a� LT \ r \ \ \ \ / CLDS 10.3 REPLACE 108 LF OF �' v \ \ \ \ \\ SEED TAIL 1, E REPLACE 127 LF VALLEY CURB \ w \ RADLEY s HENS ro Q sJ \ \ GUTTER CLDS 7B Q \ \ ` IIDp163-OS 29 �y\ \ \ \ R \\ / 494d1CHARMAPE �@VE fti \ \ SHEET D1 VALLEY CURUTTER O I`' �� \ \ \ DB 3i�53 PG 4 \ ��y�sb S� \ \ G' / CLDS 10.L7B CONCl/ / YARD LIGH ' \ \ SQ� PROP, N TANDARD H WALL \ ° ° TON CLASS 'I' I S 1+94.17 J� I \� 1' SAW CUT FOR CURB gRIANCLAIR E RIPRAP 6'X22'X1,5' 'J �jg6=673,68 ^ \ \, REPLACEMENT (TYP) \ > b ASS \ \ \ SQ OVER 74 SY KEYED I �7'X5' RCBC INV T = 666.08 \ \ I '� \ \ \ 63-082-10 IN NCDOT TYPE II / & 4742 EMORY � WIFE SHARON LAIR DEC pa PID 1 QQ 27 GEOTEXTIL FABRIC / 7'X3' RCBC OUT = 668.08 / ` \ / DB 23180 PG 984 \ \ r \ \ \ "Yy \ \ \ S ECKL#163- G- -10 II \ \ \ \ PID�/163-083-10 � F- \ \ \ \ \ \ \ \ DB 311EMORY LN. 390 PG 499 / / \ 1SBD \ \ \ \ EX SSMH \ \ \ \ ID=672.62' + \ \ \ �� \� PROPOSED CHANNEL © / \ \� \ o \ \ N 1 V-662.30" \ \ SW=662.82 °FS's\ \\� \ GRADING, SEE SHEET' \ SE INV=662.19' G��279Q° \ \�/\\� 6a INSTALL LIVE STAK % TEMP Y C 1 \ MATTING & SE G. SEE SH T OR B. WAYNE CLAY DETAIL. \ \ \\ PID#163-083-09 \ \ \ / O 4743 EMORY LN. O�G GAF \\�\ \ \\ • ��\ DB 6202 PG 915 BST o EMORY LAN CENTERLINE ELEV.=673. 4 SKEW= 76' 132A PROP, ' RCBC 686 i LENGTH AL NG = 252.53 LF ¢ 0 684 1348 133 _ B Of 00 00 co 1326 to ao 00 N ai to to + 132 131 t0 to m m m to to to N It N 680 to w � z to rn z z z u v1 a' to °' to z¢ 00 0 � ~ z Z 00 > > Li oi �- Xto II Om II F= >> z o - to z z a. 0 co > o 678 �Q�m-- atV aam0 w tnmm F�+Lq t7II- O� IIF cn 'o > z0 �� m m o� r�> o� N> Z+n UU ���^> O zU ONE c)aoO+� 0 z rl m m m� m N U m~ n U d d U Ld Q a m?- +> m Q n z 0 0 0 m z oN ¢ to oQa'n' W U o. z z z w ca m w 676 to U~+ ° A -+ r,, o U -- �O�-rn w m w w EXISTING az� II Lo dU t0 dU 0 X X da Zt/1�rn i� .0 6 GROUND w 0 C) X X o w Q _� X ��� � X d � I� n 00 - F X EXISTING 0 0- z tf1 w L2 _ 3 o U m d N� n Il ddN �IddVl w I- N�rl GROUND z1n��� ✓ W L Q PROPOSED -- 674 0 x a --Li -- --- --- 7X3' RCBC N v F PROPOSED � 672 / 7'X5' RCBC GAS ........._.._......... o w _ - - - - - TOP OF PIP=671.11 MAN, SEE UTILITY RELOCATION w _ - TEST HOLE 10 13/2014 PLANS, SHEET U4 (TO BE RELOCATE BY OTHERS) f w TIE I ROP, 18" INV I - EXISTING 2-42 670 7'x3' RCBC STA. 2+24,2 RCP _ P 1. (REMO E) - - - - - RCP � SEE DETAIL SHEET SD2 - 9 % 668 TIE IN PROP. 30" INV. IN = 567.45 _....,...,_..._.........._...._. _....._..........__...._......._.__..._...__.... .._..__...._...._._...._. _...._..._ ._._._._._. - - - - - N LF 1 0 PROP 70X35' R BC STA. 2+20.64 PR RCP 4 46% m } o 0 SEE DETAIL SHEET SD2 I SL PE = 1.0% of = " w a 7 1- -L,- M N 666 a ¢ \ PROP. CHANNEL SLOPE = 1.2% o o IR O P OP. 68 LF 7' X 5', 68 LF 7' w v o 664 v ELEVATION OF BOTTOM OF 3' BE CH DETAIL SHEET D1 0 x 3' RCBC 0 1.36% 0 ate¢Ld Li Ln RELOCATE EX. 8" SANITARY 0 N N 1' H GH CONC. SILL SEWER, SEE UTILITYRELOCATION [I LOW I�IPLANS SHEET U4 662 25' PACING O.C. PROPOSED 2" GAS LINE 0 20 40 5 �•/ BY OTHERS Iwj MCI 660 SED-8" ANI R W PROPOSE 6" DI WATER LINE 10 30 Q O ENCASEMENT, SEE UTILITYRELOCATION PLANS, SHEET U4 HORIZ SCAL : 1"=20' 658 c a 0 5 10 656 VERT SCAL : 1 "=5' 654 W Q w EMO Y LANE 0+00-1 +65.90 O 652 a U AVERT TA. O+OD TO 3+1. 05 PPELMNAPY PLANS 648 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 DO NOT USE FOR CONSTRUCTION o N _ _ O � �I I I I I O DANIEL RYAN AND SPOUSE, \ ERIN RYAN / [� r l 111/ V PID�/157-1s2-s2 WHITBY POND HOMEOWNERS' o I / I COo hhhhhh N 4736 WATER OAK ROAD ASSOCIATION. INC. o / / / J y I DB 28791 PG 554 PID#157-182-57 4517 NIGHT HERON LN. BR I l I DB 24262 PG 339 QUALITY'PROPERTIES ASSET REMOVE RE A NJN / I 40POED HEADWALL/TO MANAG��#EEE &7- COMPANY l O S Fp I I I I WALL t o / m EXI Til;1G-R AINI I; V�iALL 4513 NIGHT-F182RQN6LN. a I I°� / • a LQ I l POND STRUCTURE DB 26589 PG 3'9.1 I / ✓ I I - lI - - �- - - I I I �I I I 1 EX TOP GRATE=701.06' / I a IPI / / UM FENCE \ III SSMH / / I I I I I I 1 / / / ./ I I I y I / LID-702.63 �l _ _/ / III I II II ' � ST r ,- I I 1 DIAMETER ORIFIC00.06' / / g / m INV=699.73' _ _ / 4" DIAMETER ORIFICE=697.86' Utility Owner DUKE POWER Sto. I a / I I I eSi II 1 1 M� OLIA Z / I / REPLACE POLE z C I l l I NV=699.60' 15" INV OUT=692.16' > Description Height ft. ^+ � 1 "(SYCA ORE / 9y a FEm= II I? E 4TINq C 1 \ Attachment ®Duke Energy ft. ❑Time Warner —ft. V / Heights ❑Bell South —ft. ❑Other _fi. TION 1 \ I I I I I�T - I S \o\ \ \ 100 / \ / / Q 1 I II / ❑CDOT —ft. ❑Other —ft. > �`1 I KNOWN - --- o I Proposed III II I I I \ \ �� / C SYCA 0 / P Utility Owner DUKE POWER Sio. I TALL 61 F �F \ RETAIN �� / 6„ „ I I Grade —ft. CUTft. FILL c r B T I Description UTILITY POLE Height ft. \ \ RWAL �- - - - - - I dNDRAIL \�/6 /I / Remarks REMOVE EXISTING POLE AND I \ L x. G L Aiiochmeni®Duke Energy ft. ❑Time Warner —ft. \ �/ �� /� 6"' IRCH He hts ❑Bell South _ft. ❑Other — ft. a \ \ \ I L C DS 50.04A& \ � � / AG'NjdLIA / / m / REPLACE WITH A TALLER POLE m I� g q \ �� \ I R F'L'AC �Y-9F / � � � o I � I I / / ❑CDOT _ ft. ❑Other _ ft. o FQo 1t�3� n PROTECT BRICK WALL AND GATE Proposed ONC.= EW,SL_ / / -0 O�€'NCE RATE=7 J Grade ft. CUTft. FILL O NW INV- POWER POLE (2) & OH UTILITY z O 0 f \ Remarks \ 1 l I )} f 6 A MA / 1 / © TORM DRAINAGE EASEMENT 3 \ pCL \ PILLAR /. . PI AR I \ 0 l\ I MAGNO / WALL �\ - - --_ 0 - - - - - _ - LAR. 6 MAGNOLIA y & LINES TO BE REMOVED � j WALL _ P �� - - MAGNOLIA 6 C y WALL _S,- \ \ PILL PILLAR LLAR PILLAR l S GNOLI / �� 697 Q PI PILLAR "�OSCAPEASE �/E Uj Z i Q_ � PIL I l 9 PILLAR T Z OE OEM - OE OE _OE - OE E OE covc A 4 F F © PILLAR - - 2 REPLACE F Q o - S 011 15"Cc)P �-D_ WALL PILLAR 15' STORM � CONC STD '� J J � LU / / / ! O E L CE 2 6 O 102� TOP=696.14 - - -Pit-6AR DRAINAGE EASE NT i�.r w OE - B-7& GUTTER- TICr MOVE) _- - -AR PI & Lq o z c� � l 1 ` _0 ad UoN — ADA P DP LDS 1 7 OEcovc TO 02B i �SCA UT U Q � � 'EX.IN�=69i. (KENO -VET- � �`\- -n `�Y+4LL PIL A�A S ^� YCAMORE a — \ - Z CD ro N O O C� / / ��� / SYCA OR 6 C7 CONC\OL� LLA a U O m T ��✓✓ 6" SYCOE RE S M 0 LT \— \ - — t� w Q u ~ w -T - UT �JT UT \ 1Q2A �� \ -- DOE a e \ OE � OE _ '� 0 0 Lq \ \ BST \ \ \ „RCP 10 102 ` \(� - _ \ EX DOUBLE CB x - ----- 4 U� - —S-iV�A O-BE Z w J � �> \ EX DOUBLE C GRATE=699.25' T a w 0 0 Y 1 4" STL CB(REMOVE) (REMOVE) 105 i \ ABANDONED G G\ G G G G \ o / 54"RCP HBRS z ti v a z Y S INV=691.63 G G BST G� - �� T U ���� —� G G_ G ` N Sharon n A m i t Road ( 0 Public R S"A"W/ CUT F CURB '^/ ��x RE -MOVE I Sh a W EPLACEMENT YP W W W f° 55 G96 \ 1 G NSTA LEDQB 0 HERS G sE v= G —'SEE SHEET U FOR W e _ s VAL L \ \ \ covc � O� ON :� _: D 11 a i -, �c RERLACEMEN u �� I�j� �/1/ 1 �O _ v V `7 REMOVE U n O / V dr I e S IS REPLACE 85 F a- urn O / /� GR TE=699.3 ' U y \ REPLACE 57 LF OF 2'-6' CKJRB /SE INV=689.92'-- \ / OF 2'-6" CURB / & GUTTE 'I00 _ G \ / BST &GUTTER "� REMOVE 20 LF 15" RCP - _ LIDX702.o� / 8" TCP CLDS 10 7� - \/ CLDS 10.17A / ss ss ss ss ss S &TIE TO PROP, CB 106 _ _ - / LS / / s SS \ \ NE INV=697.41' Z / \ / W W - W 0� T 1 3A —~SS SE 81 T ` T �4" DI r----- a ----- �-- ---- --- --- - - a - ---- BS -103 _ O EX SSMH \ \ _ N O O LIEX SS 05' RETAIN a \ T 4J —IW�NaL6 .65' - - LS - -BST - - - TCP _ 99 w /LT UT �— UT UT - - ----- �1 W C \c \ CONCaCONC _� —_ =� 24" D\ jVl� �< OlL \ \ \ I c�a —_ / N �e o \ I I 0 20 40 \ \ \ SEE S�II EET U FOR PAP WAT REL O-CATtON i o G� oo — X 10 30 RETAIN N _ \ / LACE 80 SY OF / z Ica ONC SI�DWALK UtilityOwner DUKE POWER SCALE: 1 = 20 INST L 8 LF Q�F / 1 m Description NEW POLE Height ft. \ EX CB / / I HAN AIL / / EX INV=68 - I w PEN E D CP (, Attachment ®Duke Energy—ft. []Time Warner _ft. cSp� GRATE V=698.2 LA c \ \ I _ I I / I CLDS �0.04cB ) C o T / 1 ASH E VE Z Heights []Bell South — ft. []Other _ft. \ N NV-698.21' Q 50 TONS ❑CDOT _ ft. ❑Other _ft. \ E \ I SEE EIC2 FOR CO STRUCTION �EEN�RA�CE#�HUL Go CLASS '_ RIPRAP Proposed U�ROAD. ROAD SH LJ BE N TALER USE BY 0 3 30'x2 x1.5' Grade ft. CUTft. FILL \ \ o es� I I (UTILITIES FOR R OCATI0N I WQRK, ,� 20 M o 1nw Remarks NEW POLE z % � I EE SHEE 17 FO� OVE 60 SY KEYED IN J \ / I ' ) I I/� TREAM IMPROVEkENTS / G TEXTILEE IIB I IHAF�LOT E MASONIVVVC TE \\PLEI AS OCIATION nd �/ D N - _ - _ _ - - \ UE _ _ _ NOTE: P+D#16�3-° 2-2 0 PROPOSED POLE BY OTHERS UE�- _ _ \ SEE WATER AND SEWER PLANS / I I ` / 5�0 N.I SHpRON AMIY R 2 WATER OAK NCARTNERS, L UE4 STUCCO yygLL - _ _ - = N - \ L) 12 35 G 1 s J In & OVERHEAD EL CTRIC �#163-082-22 - AND PROFILES, SHEETS U1 U5. / I o / I I / x CLF / 4909 WATER OAK R — UE_ �- �s ) J 1 0 TO BE VED BY OTHER DB 29726 P 0 � MATCHLINE SHEET 17 2i o 03 0) CO OK,� 00 (n N EXISTING GROUND 00 to rn rn to M II _ � II 1 O0 O ri II � O It O+rN Z O= m t +C'4 � � 00 00 O 00 O ° 101 o��zz ao��ZZZ m a.0) oQ�: o¢�= � U � - W 0 F_ w o O rn tO z 0 W IT IT o_ z (40 It It 3 a, I• I 0f 1 rn( �wIn II n 0 103 1 2 a ^. 102A l O8 0 N Oi . co = z W _z 0 fY 0 ''`1 W 06 5 to II to -, to 00 704 N O� +b 01 to 01 00 N > > O t0 to N 41 O O O O t0 II ty N Z II tpt0, O� cr,F NUS Z Z z t0 0) t° O �M > > 704 O O UNDERGROUND m O+ Z Z O mEX O+ O� z 0 w o,, t N O t00 000 000 N ^ Do fl) to F O M II O _ m� 0+ N Z pp 2 + O z 0 o o z + TELEP ONE U t10 O U 6>> d Z UI to rn N I O II to to Z J tb O M. O O, > In Q O n >>> O Z Z EXISTING ROUND Z O ?� F O N N O N Z Q Q '" ^ U 01 >> O o p o° O �t0Lf) _Z_Z_Z a0 t0-- --- OJ+= II II W It z0 mIt+N-o �0��� �O I-OOZ _Z 0 O Z Q O 2 F O) EXISTING �-- Z O W d' O - to to 0- Z F- W x_ x > Q II : N Cr It O O Q a -- EX. 4" STEEL U H -------- li >> >> O+ 2 O W Q. Z t/I 0! a U~- X �'/ w w o G S MAIN 0 Z N to to ------ In to -- d O \ 0 to to t0 tD 0 0 Z N rn rn ----- D a 0 O Z Z d 0 Z Z -� GROUND Z Z II II O0Q 700 z tOo co GROUND--A$APE TO --------- ---------- c� o a ¢ a : - w o d _� _ _ _ a Z to 00 00 --� _ \ 700 pa 0 _ fYW�ON a0W a0 a0 - Z�I�» \ in y o = II w ----- - _ - -Ln �UF a.U� 00 w 1 ---- 2 t!1 Z 3 N Z 2 /� EX. 1 "DIP ------------_ _ EX 2 - E _ - --"--- Z PROP, TELE Lk _ -------- ------------------ -- ATER LINE -- I o�O - w 0 0 , O - PROPOSED 4" WATE MAINLLJ H Q _ --_ (0 BE Ex. 2" \ \ ------- / EX. 30" RCP N � �N \ = U TELE LINE % ------------ ---------- - -- GROUND TO BE S PPORTED) I \ LLJw w I o _______________ � Q � p `v w i� GA LINE _ _____------------------------------------------ � / EX. 0.2' _ -- (0 BE REMOVED) PROP• 4" ELE LINE \\ I N / EX. 24' DIP - ------------------------------------------------------ // / WATER MAIN ------ =s=-_____ --- "- � X 24" GAS LINEEXL F" 696 / (T BE _______<______' _ = O1 WATER LINE TELE LINE \ \ 696 a L TO BE GA LINE W ----- EX. 15" RCP r .a / R�LOCATED) (T BE EX. 30' RCP ABANDONED _ _ - I (TO BE REMOVED) Q EXISTING STREA J CENTERLINE / _ _ _ — - EXISTING CHAN— EXIS ING 692 w CHANNEL �/ _ _ _ _ l — — = — — — _ _ — 692 o m } ca n 4 LF 15" RCP @ 0.85% O U a O � PROP. 146 LF 54„ / Il _ _ _ a _z RCP % w _ _ „ = RCP 0 1.95% 10 LF 15' J Q 688 = PROP. 3 LF 54 PROP. 64 LF 54" RCP C� 0.50% PROP. 11 F w 20 LF 4 Cn RCP 0.51 56 LF 48" 688 Q THIS SHE J PROPOSED RCP 0 0.50% 1 PROPOSED 83 LF TOTAL = CHANNEL 56 LF 42 6 LF 15' RCP 0 3.23% r , CHANNEL 54" RCP 0,65% � RCP 0 0.50% �.T.' RCP 0 0 50% 0 20 40 EX. 8" TCP SANI ARY O M O 684 SEWER ICI REPLACE W DIP EX. 8" SANITARY � � O [� EX. 8" TCP SANITARY SE ER O 01 t0 O O SEWER SEE SHEET U3 REPLACE W/ DIP to to II 10 30 REPLACE W/ DIP SEE SHEET U3 o O PROP. 24" DIP SEE SHEET U3�_27 LF 42" o 0o N II II j HORIZ SCALE: 1"=20' a VAILK MAIN � Z WA ER MAIN RCP 0.50% m CO + ai > > > 0 5 10 �o(DZzz A 680 0oQM- : : 680 0 114 VERT SCALE: 1 "=5' WAS � S ARON 5 STA. 0 00 — 0 18 O 676 676 � a 0+00 0 50 p..� MAIN 50+00.00 — 52+6 .66 CUEVE T STA. 1 9+57.66 — 111 3.19 PPELMNAPY PLANS 672 DO NOT USE FOR CONSTRUCTION 67 W o 51 +00 52+00 52+50 110+00 110+50 11 1 +00 y N MATCHLINE SHEET 5— ASHLEY R - OCA X.. PID#15 182- 1 i WAL E 5 DUEL RYA POU E, / /€X � d �T� ET I -�`� ER° TO 4740 WATE ROD_ 3 SIDE' INN LID=710.17' S Roa \ W GANG 8 / PLANT 11 1 0 �ON TH S. �31094 P _�i / i O_ N 2 SE INV=705.06' \ O SIGN I 1 /� S / M M ��� Off 287A 91 PGK55 AD -3n SS EX (REMOVE) LP \ \ /LT O / / GRATE=/ 1, C �' / SE INV=706.54' D b 0 1 11 M/ i S RELOCATE GAS BY�5 r vq � \1 P QST 6D1 / 30 / 0 HERS 10�+71.3 / • o S O N ° i / EPLA�E � � �� S _��,/ / / 0 OSED 2" l 2S APARTMENT C / SE SILJi WALK tea' s C�NCR E PR P G / tC ^� .. R �tY1 D TAIL G� I a- GAS MAIN TO C y / W / k� UtilityOwner DUKE ENERGY Ei ''' ,_ = '''�- 2'-6" CURB & _STD .�cP � .GR•''M Sto. SS B BE INSTALLED Rcl ,a8'� y Description NEW POLE Hei nt tt. 63 S GUTTER 1\ ?� c A p 9 \- CL 1�7A / END 4" GAS / THERS n GpN Attachment ®Duke Energy ft. ❑Time Warner —ft. C53 ca �� \ O� / / MAIN/BEGIN `J ' °'. 80 1�� �� RETAIN / ON WATER 4909 WATER OAK RD LLC Heights ❑CDOTSouth —ft. ❑Other tt' VA AS �11 Q6 / GAS BY OTHERS+�Q 15» R / CON RACTOR T08 1 9 � C EX SSM VVGIIVII G SAPS AT LID=704. G Proposed NW INv=69',.96 REPLACE 1Q ° R�;.- TAP R CURB INT EX. / DOG DB 29726 PG 50 P _ Grade ft. CUT ft. FILL �� s NE INV=69&16' I 4E E DI S »ft 81 PAVEMENT PLANTER a "�$' sue. (REMO ) QSTATION Remarks EXISTING DUKE ENERGY POLE TO BE SW -697,66' y U / EWER PI E, GP ( 708.94 2S APARTMENT \ REPLACED WITH NEW 50/2 POLE (WITH NO 11 O - PC 35O \n n- s / 1 I _,,.. _ E INV=705.44' �_ / GUY WIRES SET 12' DEPTH J 11U, O / \ z I \\ / Bs SS c) PA S / n \ I O 1= \ / //\ / 1 ✓ 82 / - I I z LU 6 U O O PR P ED 4u"1 S 8 4 / / / I c~n z .. - w Lri n / S GAS M IN 1U0 s ° LUG / R LACE) D I OF \ P z o NCDOT 40.71 HAL11 DRIV WAY I l Lr, J J c BE I LLE / EY CB EM�GE� / CLD 710 1 25 BY OS TE-704' zn "w 53+35.62-1 / 02.59' 100 m ' _ 0 \ l ® o z cv r / / / �/ AVERS 100+00.00 n . cQ 0+00.0 3s ✓ \ / Gd o ao o / / // // 11 / soy PROPOS D / \ I I 6i �" `n w U C, O / PAVER / 1� �. REPLACE RAMP. SE-€-- � / a w a z c.� � �x SMH (RETAIN) � I / SIDEWALK R P ETAIL SAS MAIN TO INSTALL 150�LF-0�2'-6" ` z � w I` � X uD=7o4.9s' ° r SHEETS-' BE INSTALLED / / z K co CURB &GUTTER I / cD - Ln NW INv=7oo.os' c� / BY OTHERS I �� z w o � SE INV=700.95' CLDS 10.17A (Z w - - - - _ _ �' FILL W/ PLOWABLE RI 1 0 CY) / N // / / 11 SW INV=699.78' G \ I / > o = w BST / C BST RGP PLUG I / Z I- U a z �Ln ✓ / / / / / / a�/ AV sL 9oz � / / 9 'S NCDOT 840.71 / f \ \ 1� EX ce(REMOVE REMOVE 2 LF 15" RCP I I \ GRATE=704.73' / \ I PLCC�RL/SE INV=702.51 O5' MAPLE00� 2 POST/ / / % I REPLACE 93 SY PAVE S / / / C / / LP C ° PLU AND FILL' 86 ' OF CONCRETE o / � / / % � / / WITH I 0 �. ° SIDEWALK P E Q / 24 / / / / / Si WITHI LP / FLOWABLE/FIL d E 4 / / / 2 POST �pL BST / N ERS / I I (1,7 CY) I I I REPLACE 169 LF OFF 36I 0 op E / / � � LP / - 2'-6' CURB & LIE—� / / / / / P ( ®� PLANTER �� / \ ° o N GUTTER Z ° JOHN R VELLIE STEPS CLDS 10.1 7A PID#1bb7-183 10 I Z / LP ( PAVERS RET IN/ c �_ / 4735 W1�SER OAK RD I UE /L\GONG C \ ®Ile 89 N:30100 PG 170 / (�jLIGHDSCAP EX. UNDERGROUND TELEPHONE COPPER CABLE FROM EAST OF U0 Z WATER OAK ROAD TO 45' WEST OF WALKER ROAD TO FBE �oO eR FOR @ X CB(RE IN� o ABANDONED BY OTHERS. BORE UNDER�A T��R OAK ANKERA -GRAT 705.33' (� ; ° AND INSTALL 504 LF OF COPPEAIBLE TO BE BY / \ ter 0 PAVERS AL ` \ / W IN 702.21' V CD �OAD THERS. I O - -/ �� a C OD G I I DECK — —RCT — — 36" \ I RCP — — \ E X D I / / — — — — — — — — — — GRA E=705.54' DUKE ENERGY \ RETAIN — 6 PLANT[ / / NE IN - 72' \ — \ I Utility Owner Sign. Description NEW POLE Height ft. / J S INV=69&62' PROFILE FOR p. ° OI I AttochmentEDuke Energy ft, ❑Time Warner—ft. —W7t� —f� — — STRUCTURES ° I Heights ❑Bell South —ft, []Other —ft. 1 18" - �- - - - - j- _ / 68 TO 89 ON I `° / ❑COOT —it. ❑Other —tt. I / BRADFOR / — — — _\ \ SHEET 7. I \ I Proposed p / / C _ Grade ft. CUT ft. FILL PAVERS i / RETAIN C NEW POLE & DOWN GUY, RELOCATED APPROX 0 2 40 /J q \ � o / �\ �'•.,� Remarks I �t BRADFORD �� I ONC `� / ° PEAR /� �- \ I'° o a 20' FROM EX. POLE I I — 1 REPLACE 91 LF F ° / ( o 2'-6" CURB & Q ° GAS TO/BE ABANDONED BY OTHERS- 10 - 30 I I z ONc�GUTTER �' O EXISTING POLE AND SCALE: 1'-20'=5_ CLDS 10.17A t DOWN GUY TO BE 1 Q \ PAVE coN \ \ \ \ o REMOVED BY OTHERS. l\� N /) /�/ GUMBALL TREE TO - 1\�\ � BST \ -+ - - - - P L A \ �n - - IR I M�1 \ L \ \ Ijr�TO UTILITY WORK.21 / PAVERS � pLANTER' / � / �,• O I MATCHLINE SHEET 7i�i oCIA EX. 4" STEEL EX. 2" PLASTIC GAS LINE GAS MAIN PROPOSED 4" GAS LINE (TO BE ABANDONED) (TO 13E EX. 6 DI ---- EX. 15 RC ED) i\+, WATER MAIN (PLUG FILL) EX. 12' DI EX. 8" TCP SA ITARY EX. 4" STEEL WATER MAI 706 EX. , STEEL SEWER GAS MAIN --__ _ 706 712 $ 82 EX. 2" PLASTIC712 712 GA MAIN -- W 01 O GAS LINE N TO BE ABA �D) N n TOP OF PIPE=70 .30 + 84 to ' 01 84 01 tD TEST HOLE 10-2 14 0 0) AB NDONED) - _ - I o o o II II EXISTING GROUND (TO BE RELOCATE BY _ o 7 83 o y -- ------ - _ LO _ o rn OTHERS WATER MAIN __------____-- - _ -- --' W N + M 00 M II II H m C,4 Z o -___ N O O _ II - ---- - ----- = o rn rn 0 m 6CIrn z z o O F z z - - Ex. 15 REMOVED1- - o n II 0 L 702 --- I - ---------------- 702 708 a u ao - a o - - __-- TO B 708 o co LO D 708 ------ ----- --- ---- = Z Z Z p O O r, Z Z ? a U - _ - - - _ — — — - - 11 ----------------- ------------- -_----------- W _ - —_ - ---------- -- --- ------------- -- ---- - - ----- a O O - - - z rr °° c° _ E 15RRc OVEDi _ _ `° °�° °° o+ U O a z -- ------------------- ----- z - - - - _ ------ -- -- -- - _ LAS --- — — — - - --- PTO - - - _ -------- -- ---- -- --- J BE E _ _ - EX. 2' P TIC O� O O Z ao ,� z z a ---- ------------ = G — - - - -�_-- — — _ -- -- AS LINE O O � � to ---- ---- --- „ 00 Z ---- --------------------------------- LY O � - It — - — — — — ��__ II tl Z VI LY N - - ---------- - ---- 4 d Z to � N 0 - - _ = - - — - Z II - > o � r1 698Ln ------- 5 �� ag% ~ 698 704 m > 0 704 704 N PRP,N l� _ _ _ _ _ - ___ ________ o� o m �w w LLJ _ _ N ; > d m = Q . 2y v RC O _ =f - -- _ - - -- PROS B� LF 1 a N z = s 3 w w cn PRO CP' O t. - _ _ - - 25% v `r? o C 15"LIj g4 R 2 ai PRO LF 1S^ __---_-_____ O a U w N v z ®6 6 THIS SHEET P 2 ® 3 �5 _ _ _ - o N 0 80 RCP- ►V 1. 9% EXISTING GRO ND F � Cd o co 1 137 LF TOTAL ,N 694 ad O1 • Ui a 694 700 _ - _ P___--- a 700 700 a� - __ - ago+rnzo o w co II m y rn z o ,,� LO O O M II U !p � LO > > Q yi�� EX. 8" TCP U Q > > s Q �CO11) m���ZO ao�ozz Q20�Gp1� l.zz 72 LF THIS SHEET p ^ di tp U O M>> O O Q o SEWER LINE d O U F ®�9 � p EX. 8" TCP SANITARY Q 8 LF TOTAL 54" o ��� ooQoz- azcn��n�n im LO a z cn REPLACEW/ DIP R CP 0 0,65% z L'' rn o 0D z z W U 81 PROPOSED 4" GAS LINE o =a0+0'n--o a.ztnwLnLn 86 690 r7 > > > 696 696 696 } U ul O^ZZZ pa J a l + 87 O a� O d'O,� ' w a a- ztntn��NL0L0 54450 w HORIZ SCALE: 1 "=20' w r O �w A VERT SCALE: 1 "=5' WAS � WATER OAK B ISTA, 0+00 - 0+36,56 C) MAIN STA. 52+ 63 66 - 54+ 50, 00 WATER OAK A STA. 100+ 0 .00 - 1 1 + 71. 35 0+ 0 0+50 oo �..� a STRUCTURE 89 TO PPEL8 ON SHE T 7 M NAPY PLANS 6 52+50 53+00 53+50 54+00 100+00 101+00 101+75 DO NOT USE FOR CONSTRUCTION `p o N MATCHLINE SHEET 6 \ BST REPLACE 210 LF OF SHED CONC D o I \ / &GUTTER \ ��]CLCURB --ARS 10.17A — \ / -A � � � m SHED � � C�cEj \ I \ \ REPLA E 152 LF SAS TO BE TEMP. CONSTRUCTION EA__ M NT (q \ SHED x� 4 l SET 0 20 �40 \ OF 2'- "CURB & G R IID cn". D I A`gANDONED AREA SHALL ONLY BE USED BT y a, \ \ I HHHH Q 0 HER$/ PROPERTY OWNER FOR TEMP. CLDS 1 17A / I I FEN \ \\ O I PARKING ACCESS. D � j / Utility Owner DUKE POWER-- Sto. piCKEj � / \ I REPLACE 196 SY Descripii n NEW-POCE Height f . 3 ° \ - xn 10 � 30 OF CONCRETE At me Duke Energy. ft. ❑Time Warner —ft. 4' 1CKET I I \ IX / SCALE: 1� 7- \ I n I I INSTALL TEMPORARY DRIVEWAY Heghts ❑Bell South _ft. ❑0ther — ft. \ \ r \ � '� D• ❑CDOT _ft. ❑Other _Ti. \ --� \ GR�FEL_DBIVE CLDS 10.25A I Proposed P ANTER \ / OVE HEAD UTILIT S TO o_ \ - - - - - _ 141 SY� /J Grade _ft. CUT ft. FILL \ BE I TALLIED B \ RE CATE WM I INSTALL 160 LF \ ; TEMP. CONSTRUCTION I / \ 00 I Remarks NEW POLE OTFi� a \ ; pb PL TER FENCING I ) \ o ---REPLACE 36 LF o \ \ \ \ / II° m PLANTER 72 / OF 4' CHAIN LINK 1 I I DECK PRO OSED NEW I — — — FENCE Z I \ s I SEICE LINE TO 62 `� z�_� BRICK RWALL� x / -ENTRY c NC N SHARON MITY TO \ IO I LIMITS A —St I LL� BY � �--\O � � Z o I= LID=70 M 7' i ( ID L OTHER PLANTER z I z o 0 \ r C � °o I . NE I�v =70 . 7' � W � I LI SAY ANN NAGELE AND HUSBAN Z n �,L I \ �V=70 ANDREW ROBERT NAGELE I I I RELOCATE X. EPLACE 32 LF �- c� LU > — (L F 3' WOVEN z SW 70 .6 D I I PID#157-183-11 I I \ cI) z I O 8+ 9a�j627 N. 29830 AMITY RD. ` REPLACE 72 LF 3 I � I SHED 12I' MAPLE Op �QQ-._._._._. ._._._ DB 29830 PG 243 ED �Q PLANTER IRE FENCE I \I D Q I )O v"Q0 CD OF 4' CHAIN LANK _ m �1' SAW CUT FOR CURB o. � I I � I FP Old DACE SDE SDE SDE SDE S DE FENCE 5DE SDE I $, z Lu \ 1 < Oo OU CLOTHES SDE L - O Z cN REPLACEMENT (TYP.) \ \ D _ Q O,,O�Q � / ���0 1 CONC U SHED � d \0 SDE CLOTHES 24" APLE I L 61 � U w N BST \ I n '° D O �JL/O V O O� 0 O I OU —SDE LINE I 62 \ / „ o I 20" MAPL O Z 0N0 00 m II \ \ o AK °°°° / 9 E I . / 54 RCP w w z ti M °D cf)� I �G +' D T- �, SD \ 0�30" MAPLE 59+00 � a w Q � w (R,E WOVE) D- ° '•D - • D-� D D ° P \ Itil Z w I` li X REPLACE 58 SY OF 5'-6„- \ O�K FMB ° • ° D CONC ° ° D D D D D D ° ° �- %L4 RC _ 0 i.5 z L( )U g CONCRETE SIDEWALK (� �� °° \ ° —12 TREE 18" MAPLE �8� ^~ Z w JO ° •D 10�8 ' D° -'D D 'D ° D• D ° • D ' D, D• D ''D - +0 \ PRO OSED D D /58 18" MAPLE U w RETAIN (� 65 D D D D �, D D 18"RCP 1 I i I a o Lc o \ GAS MAIN �a�i Q �° D D 7�1J • o D E- -11I D D E -- ---- — E PLUG E --- E---- ------ E --- --PLU — >�_ I � c � D". fyS E � NOD�T� 7� — PLANTER — IA4�—�/ 36" CMP NCDZ�T 840.71 18" 0 TALLED — — ---j - R&D- AC D-E-I �c THERS MAPS '®—------�2E�L&EE$------ --- — D`�' _ svc E o ® E �E E C\ �D EXISTINGIP T _ FP EX DI o MAPLE a 48' APLE EX OTCB 61A 24' / REM94 Y OTHERS. _ �' � LUG (REMOVE) ® o 6, P I o REMOVE) DsD. I AK SDE SDE SDE SDE SDE _ ~ D NCDOT 840�71 GRATE=715.10' "TREE RIVgc FE IN ALL 55 LF FP SEONV71710.84 J \ \ I \ I OU . AN ILL \ nd 6r PLANTER f - c I SE INV=709.78' ^� 48 S I OF I. MPORARY — PATH I I \ , a W/F 0 A �E FILL OU 18" PINE —� 1� AP ROX API I ET ENCE I F \ D Pu ELO E GAS LINE PR 164 LF OF 18 CIPP A A \ OAK \�\ (14nC ) Ex c(�2EM VE) D 0 Y TH RS FP f Z - — o / LI G C�4 2.0% x PE TMANEN I� WATER OAK NC PARTNERS, LLC �/ \ \ (GRATE-711.27' \ CD 8" C. MYRTLE Ds S INV= 40' `c - I GARAGE 68 I DsD. Utility Owner U E OwER Sta. I / 3 ' LE ° m FENCE IS R ET PLUG AND F►I�L WITH FLOWABLE I �C C/0 CO D#163 PARTNERS LLC I D E POLE PLUG AND FILL WITH I x� CONC I FILL (45 CY I z PID#163-082-22 — Description Height 2N ER SHED a J I 4909 WATER OAK r ° / I �° D I Attachment uke E ergy ft. ❑Time Warner _ ft. I CONC FLOWABLE FILL (13 CY) r NC 0 O DB 29726 PG 50 cPP LUG AND FILL / CONCI FD- Heights B II o lh _fi. ❑Other ft. / - I ip I STEPS �4" CA S — — — — TH FLOWABLE ❑G 0-T — ft. ❑Ocher t. EXISTING SERVICE CONC f / (RETAIN) 36' — — — — — — — IFILL (1.0 CY) Pr sed P) LI TO �-T7�MOV D \ EX SMH CL I RGP° ° 36" CP_` — — —�- 24" R Grode fi CUT ft. FILL / BY 0 I / I X L \/D=711.13' P CF IN -703.93' // j 4 ° / RemorksnN OLE I I I I I Q STEPS / I W IN�oz962 TAIN // I I / \c� SV I: LUG NCDOT 840.71 \ ( I STEPS L, / I _ I / REMOVE 12 LF 15" RCP GAZEBO Lu L I covc I STEPS cove x I II I -i Ex ce ( ETAIN) � o / 22 I I R�ETAIN � coNc RELOCATE WM 1SBD // C EX MH ILL O RAYMOND FIELD & WIFE r BST � GRA 710.73' ) I \ OAK I I T LID= 11.27 ,s I I A 2SBD I o cn PLUG NCDOT 840.71 BETTY D. FIELD � S INV 704.12' I ° REPLACE 118 SY OF I / 818 WALKER RD. 2SBD m CMENDY LOGODMANR O 1 I C5� A CONCRETE SIDEWALK CONC DB 3690 PG 999 I I PID 157-183-1a X 4808 WALKER RD. I T I< / III / °p I / LOUELLA ALLEN HEFNER I DB 28731 PG 809 ❑ I 20 2SBD r I I I 40 AK/Q \ I 635 NIDSHARON AMITY RD. / II STEPS \ I /� D DB 3357 PG 442 I I F I ° ti II}f O PLU AND FI WITH FLO ABLE FI L ® I Y _ wl TAM AM RAT( I n C I LL J ES UB S X/ o nI - a // HEATHER MARIE HAGEMAN I n Q - )� (3.3 CY) (9 ; / PID#157-183-15 I LLC J CONC I / 4800 WALKER RD. I I I L_ I BSTI m I IRO DB 31669 PG 286 I I I Z HVAC P�/// III I Ij POST O/ oN I I�I LU I, k I EX DI // 5 GRATE=7=706 1 12f4 TAIN II II � / O 9 �•® I I z_ I �r— NW INV=706.1L Fr C MATCHLINE SHEET 18 MATCHLINE SHEET 18i�i o 65 63 � tOo EX. CB ..... r y = to ,� (TO BE REMOVED) ^ N N O ^ ^ O M m ^0 to H - - - - - - - ONO m 00 00 O Z O EX. DI .... ------ ^ ^ ^ > > (TO BE REMOVED) 716 O II II EXIST NG GROUND a o ^ --- --- PROP. -- �O~—In� 85 m � + �n ? ? o= o_ z rn � � � __---- ---- a o N o> z z------- -- ------ -- . -- o a z of ---------------------- 0— _ \ O� ^ II-------- -------- ------------- _----- 71 2 II � - m + - EX. 12" DI - U 00 � O) > > WATER MAIN Z Z EX. MH — — — — — EX.4"STEEL ao�^m-- r(TO BE REMOVED) -----__ — --- _—�_- G A S MAIN O O Q _ J — — — — — E X , 36" C M — TOP OF PIPE=706.32 ft 0 ZlnO �N-_----- ---- --__ _----- — PLUG__&_tILL ------ — -- ---- EST HOLE 10-13-2014 _ _ _-- ---_ __------- j (TO BE RELOCATED BY OTHERS) EX 6 CMP — — — — — 5 0 708 ----- r-- PLUG &--— —� N __--_ _--- --_ EX. 36------- — --_— w _ ----- (2 9 LF TO BE REMO D) — — — — — — — — — w — — z m w - _ _ - — — _ --- — — — — — — — — PROP. 177 LF 54 PROP, JB ---- ---- --- — — — — — — — — — — — — — — F 54" RCP 0.56% W MH - w ~ ------ ------ — — — — — — b x a ------ - — — — — — — v w -- ------------------------------ _ — — — — ---- — — — — RCP 63% N NCDOT 840.32 N A ---- --- — — — — — — — — ^ STA. 60+41,14 x _z _--------------------- ------ ------------------- _ to N o^ TOP ELEV=717.4 704 J------------- -- ------ -- ------------- -- --- N c II II ,� _ a 1 Q" INV IN o 00 to » o ------ - - ------------------ - ---- PROP. 189 LF ono 54" INV IN = 708.26 -w1 ------------ RCP @ 2.42% MAIN S T 5 4+ 5 .0 0— 6+ 4 4.0 0 0 o Q a o Ln^ z z^ 54" INV OUT = 08.26 Q 0'UH - - v PROP. 56 LF 54" RCP -IV 0 0.50% a z rn a o 700 55+00 55+50 56400 56 50 57 00 57 50 58 00 58 50 62 59 00 59 50 60 00 0 C } o 0 z 54 50 9 EXISTING GROUND N j ¢ O EX. 4" STEEL __--------- _ EXISTING GRO ND U w 01 GAS MAIN 62 + TO B A 64 - 00 ^ N N PROP, 72 LF t° ^oto o __ _---- II ^ ^ _____ N �, a 2 a ^ EX. R I EX. 1 " RCP O ^ _ ^ THIS SHEET 716 65 ^ ^ o wnrER MAIN II 708 O II II O II 137 LF TOTAL o No o Uri II (TO B REMOVED) ^ IIF ^ O 54" RCP-IVO 1.53% o o ^ ^ z D o II ____-- _ OO1 z o CO_ Op ^ ^ II U00 N > mI z O _—_—_ OmOcfl L0 z n O O II II U ci > > __-- _--- 718 O E_ > Z o rrj > O w O _ O O-- EXISTING ^ Z Z i m 00 O L Z O 0' U m m GROUND -- - ------ ---� —� o O O Q !>D O U 1 N o > > > a z 0 U �' 4 LF CONTRACTOR TO FILL EX. W U _ O0 � > W I� 1 ,� a-zfn0'� In 712 a o ^ z z _ a z 704 RCPP022.59% CB TO NEW INVERT — W U H q0 It ---- ^ O 0 Z to W O O o z tr1 ---- __--- — w j� > = _ I z c . o CO 714 RE AIN EX.rn a w U � Z � 18" RCP !� y ICI o EX. 3 " CMP _ Z RET AIN EX l0 x x a- 708 — -- — 700 36 �F�13.a%- - - -_- - -------- -- U A �CD CD __ ___ ------- __ ii - ------- 61 LF °� z z 0 2 40 45 LF 18" 1 g" RCP 1.32% 1 3 PROP®2 g0% I o z z 'Lj 704 — — — — _ _ = JII�J 696 0 o ma > 10 30 PROP. 13 LF OF - U z HORIZ SCA E: 1 "=20' RCP @ 0,50% Z Z x x 0 10 = O' - w (Y a- w J o_ EX. 36' CM x x x 89 Z 706 a w w w I� 700 692 SHARON A STA.1 0+00.00 — 1 21 . 975 9 SHARON B PRO ICE VERT SC LE: 1"=5' PPELMNAPY PLANS 120+00 120+50 121+00 DO NOT USE FOR CONSTRUCTION o N �Z W U J _z J U Q y �o 1 / \ GLENN MOLNAR & SPOUSE SHARON MOLNAR DBRD157-13LEPAII TH 807LN. DB 27371 PG 651 \ / / CONC/\ 1SBD co9�c / gcz El STEPS � REMOVE 35 LF� LF OFO�O�(C 2 1 24" CMP Y� URi6.,-�c \� G�TER I Ln Cb SHED \ �4S : N — L� m m EX Fr— `I I I: p ICONC/ 1 \ LID=745.79' \ O; ° w I \ NE INV=740.08 —\ CONC \ �: Z \/j L ll 1 \ MADELINE GUADIANA AND SPOUSE, ® I \ I EDWARD GUADIANA © © q O x I I I I \ \ PID�/157-131-20 / / ;o y \ CONC 1SBD 810 JUDITH CT. \� \ \ \ I 60' 0 CONTRACTOR\TO INSTALL DB 32660 PG 653 Q REMOVE/ 32 LF \ 78 LF OF TEMPORARY PET FENCE GS / UNTIL PERMANENT FENCE \ FP © 15" R / III \ m \ �- — \ \ • „A I I IS RESET I '-�U�TR NSyTION z 7+92.�= 1 14 JESSE GORE HELMS, JR. \ \ > 9J I x o @CLDS 10�/ I +00.0 0 -0 S & WIFE RAINEY MOOSE HELMS CONTRACTOR TO CONTACT CITY ARBORIST j / VC \ w n> 809 JUDITH CT. n REPLACE 12 L`F TO ENSURE LIMBS OF 4" OR LES UP40 A y \ 0 GB ((RE VE) DB 2669 PG 602 �I OF 6 WOOD P IVACY FENCE _EIGI�F OF 15' ARE PRUNED PRO R)' F { g v GRATE-743.12' EQUIPMENT ACCESS PRIOR WORK N TH / co SE INV=741.78' I I - �� F /III o _ CURB TRANSITIO I Iw m REPLACE 103 LF ® \ W _ .36 E < SEE SHEET 11 II OF 6' WOOD PRIVACY FENCE CONTRACTOR TO CONTACT CI Y ARBORIST \ "' / - BEVEL CURB-HEf1 G 0 E SHED e f PRIOR TO EXCAVATION TO EN UF* ROOTS c> II --�1 �$RLVA� - - _8" OAK \ ` 4' WW SPLIT I I =SDE 36 AK ARE PRUNED WITH AIR-SPAD Q 3 o K o \ , �" ,, TI N E 1s" RCP — — — —�_ RAIL FFNCF — — CDS 10.17 PRAPSD-E— DF— © e �Q 2'� E/ x�DAE ---__- T_�_ I �� SDE GRAVEL / 1 REPLACE 80 LF OF Y E E E _ / > E_ \ PLANTER ® RETAIN TI 30"RCP x O n 1s°" RCP I o-�I I O \ 4' BLA' ALUMINUM FENCE PROPOSED DI 8"P PL P - — — E E — stz — — — — m z � \ (RE I 23 REPLAE GRAVEL W/ 13 SY OF m J 1 19 9 c� M � ® © � APPROX. I / . PRIVACY FENCE c� a LOCATION 24 E n / / � 1 x"� � o � � COf�CR TE DRIVEWAY I x Iic BLIND JB SDE SDE E ® E TRANSI ION CLDIS 110.27A l h 1 Ex CB (RE ) r 1 (REMOVE) „P FfLF / 36" MAPLE / o pq� SD S E ®� CLDS 10.30 '� 1 I GRATE=735.58' / INV=740.08' —` SDE m I I I NW INV-732.66 24"TREE REMOVE) © GRATEX E- SDE REMOVE Z / SW INV=732.34' SDE _ REPLACE 8 LF OF DO NOT ( ) cn I \ I SDE E B 3 REPLACE 26 LF 4' PICKET FENCE I DISTURB ® SE INV=741 I 1 cA 3 P OF 6' WOOD PRI CY F CE HVAC CO BS 0 x I 36"RC J \ I i W - - 74+ 0 — — — — — B — — — — B x �a / �i REPLACE 23 LF OF do m� III / \ MICHAEL SCOgTD FARMER s' MAPLE REMOVE 125 LF x ,�' 15" RCP CONC 2' VALLEY CURB TRANSITION CONC & WIFE MARGARET /— z 26 ; �SDE 2 / © CURB & GUTTER A > 21 CLDS 10.30 MCALEER FARMER Utility Description EXISTING POLE Sto / / `sp i 3 `J DE SDE ( ° ( CLDS 10.17E & 10.19 m z III / svc f PID#157-132-03 Height ft. w \ cJ l.� J o REPLACE 177 LF OF 815 JUDITH CT. Attochment ®Duke Energy ft. ❑Time Worner _ ft. �x O Q SDE ��^^--�� NV- 36.61' / J O �� SDE MAP oo I CONC m I CONC 2' VALLEY DB 7578 PG 801 Heights ❑Bell South _ ft. ❑Other _ ft. J I ' SDE SDE / o �BD CON SUPPORT LINE o om / f CURB & GUTTER ❑CDOT —ft. ❑Other _ ft Q �G \ /� / A / DURING o Proposed \ PLANTER �Q / < CONSTRUCTION. A /� \ CLDS 10.17E / Grade ft. CUTft. FILL j 1 R CURB TRANSITION REMOVE 160 LF x> SET POLE 4' DEEPER / CLDS 10.30 GRAVEL 0VL / < / /O FP / \ O Remorks / _( \ F PLANTER � 24" RCP i m �, U'_ z ❑ z x c LLJ / ® 3 FP POST / "' ELAINE POSTON I I Q a C7 SVC m I o W / BROOKS REVOCABLE I © I III g 0\ / � — Q / CONTRACTOR 0 CONTACT CITY ARBORIST TRUST DB 29833 PG 747 Q X \ W/LT _ - J I THOMAS RAY KEITH PRIOR TO E VATION TO ENSURE ROOTS / PID#157-131-19 _ © � Q - © & WIFE MACIE E. KEITH / 1116 JUDITH CT. I ©® S / C 4' CLi x — OE _ _ — PLANTE�2 / PID#157-131-14 / G ARE PRUNE ITH AIR -SPADE. Svc v / �E- I / I 8 3 B27D39EPGTH4LLN. / SWING c� v -0` 14 CLF x x ® / x / 0 Q CUT FOR CURB 4' cLF \ m ®I / l / SHrD BST � r r REPLAC T (TYR) n SHE l E \ SUPPORT GAS DURING" o \ E CONSTRUCTION BY OTHERS SBD / CON I II II� BST 748 Q REPLACE 2 LF OF 6' WOOD PRIVACY FENCE CONC CONTRA TO INSTALL TEMPORARY PET F . CE \ NTIL PERMANEhLT-FEfdC� \ IS RESET i \ (RETAIN) TOP=737.56 APPROX. INV=736.41 LOCAT (RETAII BLIN JB� 18" AS n m� PLANTER z� rn x SHED x w rn ^ 24 co M 25 rnNC,4 ^ 744 II ^ W II II ~ N o u OCOLOZ� 00 oo - o MN 26 mo N to � GRADPROPE DRAIN d z o o Lo O II F E (STING GROUND ^^= Z Z — — r7 � 00 Z m m * + U? — O r O 0_' 0 Q U - — O cD 0_ Z VI 0' M W) _ ---------- --_ 740 U 00 Pq L j>>_ F^K1 Z Z 0- Z V1 M M __--- — 0- O ^ EX. 2" GAS _ ------- / a z V10: in -- -------- — — — --- EXLOPEN END I _ --~--- — — — _ _ — — (TOBE REMOVED) }U} 736 d7 EX. 2" PVC WATER i-- — _ — ------ �p -- — — w -------- ----- — E REMOVED) --____--- TO B LU --- -- — T Ln LU — — _ — — PROP. 40 LF 0„ 732 = _ — RCP @ 1.82% EX. 24" CMP REMOVED) PROP. 161 LF 36" (TO BE RCP 0 1. 9% 728 74 50 75 00 75 50 76 00 PROP. 35 LF THIS 724 SHEET ­2 IF TOTAI 36" RCP 0 0.867. 73+50 74+00 rn a0 Ln 20 22 N U) ^ 21 00 0 v ^ 748 0Cq1 tN0 n n ^ XISTING GROUND II r+) M _ II II Z^^ ^ O M r M II N O� IIF O0 II II F m00+r) Oi,rj^ � 00 0m�+� aNM Oj mltON Z Z Z 00 on m o^�nZzz a0 ^zz 00 Z ao 0ao0o o0<m- - WU- -Ln 744 77 a-z(n�04D ----azcnO� ---------- ---EX?J' GAS ---- 740 ----- ----------- -;s�tF-- a-E--- --------PR P. 59 LF 15" ---------- ---PR ---------------------- --------- EX. 8" SANITARY TA. SEWER JUDITH 00+ 00 - 1 + 12.33 736 n qq /01 ,- / EIP � O URB TRANSITION CLD 10.30 0 20 40 \ \ x o \ + 555 JANf� WILLIAMS LAND < \ I III C 157-1 2-04 m 10 30 C� BE L CURB HEIGHT, 0 4352 WA ER RD \ z ZE A N DR\ AY DB 6ap G 454 m SCALE: 1 "= 20' Lu x 0 / / C/) i DECIg POOL / / (A/G) / J w O LO PROPOSED- 23 Ui 1.25" GAS ^LINE Do ^ u o^ u� Z mC)L U O — ^ N > > ^ z Z PVC WATER 0_ ) ^ TOP OF PIPE=739.9 O 0 Q s : TEST HOLE W Z N O O 10-2-2014 -----_---' --I �'� UPPORTED1 EX. OPEN END .-.... _ — — X 15 RCP REMOVED) — — — — — — T� BE F_ — _ — EX. 8"_ (TO BE REMOVED) _ 1_ - — SANITARY — — — — SEWER EX. 6" DIP WATER (ABANDONED) T P OF PIPE-74OL34 TEST HOLE 10-2-2014 PROP. 36 LF 30" 172 LF 30" RCP 0 2.07% 0.50% 1 MAIN SIA. 73+ 4 f . 72 76+50 77+00 7 + 53.7g 77+50 `W O o E z(D a .. � > cn z y �m i.r U) w OU Z cV G d WQ W �Zw nlU IZ OO � w z c'7 Uj 0 Ld z c,� Z - Ln a LU o LO z EX. 1 4" GAS — 746 (0 BE REMOVED) ad ` 742 Li ' LLj to J � wj F TN`S SHEET 738 O PRO � 147 L� 65% TOT- �rP N 00 N O + 1, O N to M II �jM^ z^^ u It� ZZZO ^ >>> ^ U o Z Z Z UF�: g X g000 ZO w — M M 78+00 734 0 N 0 � N Ca w w m F a m o U � w w Q x a U LU x a. w w I I l X r Q U O 0 20 40 10 30 HORIff SCALE. 1"-20' 0 5 10 W WAS � VERT SCALE: 1 "=5' a/ 78 50 PPELMNAPY PLANS DO NOT USE FOR CONSTRUCTION W O w O / / / x I / JONATHAN E SMITH AND EDNA HARTNESS PID157-132-14 I I 3 DOUGLAS�C DDOZIER PID#157-132-13 JUNE 5- ALLRED DOTSON , PID 157-132-12 HARTNESS STFp S \ I Q I • E� O a fdl 801 HARTNESS AVE. DB 1728 PG 76 O 809 HARTNESS AVE. DB 27547 PG 550 815 AVE. DB 4485 PG 178 FF (/ b _ - o I \\ I / I ram© 9� / Io G ®� ®—�— WILLIAM C TURNER I I Q I x J (� _ �C �� `-W O \/ I� x GI PI10 W 1 ER 10 4310 WALKER RD. I I / x O \ I z-� I L DB 29293 PG 94 G / I ,m ITOP=76&75' O-L,2LAMI' I� x I m O O O Ex OTCB (REMOVE) l ) CONCRETEI "II SEE IINV=759.03 I I x C �I Q I o Fz zo 0 asEX I I PL / SSMH < LID=760.70' " o WIM I INSTALL 18 LF 8" DI SEWER, F"C 3 0 j O ? MATCH EX. LINE GRADE © 4 WM GRAVEL x I CONCRETE / I YGUY r eC u) w o z N "o — SS �S— S� S T G SS SW INV=754.93' S / NE INV=754.81' `J SIDE ® — _ 1 ;" PL - Q SDE t a ? I — �� �'i I �� ADA PAD Q EX SSMH / LID=759.89' SW INV=752.11' ao w N CD y CD a w w z m z o w ti L X O SS - S U, �� SS L SS S J� 0 Z5 z m J — O7 +00 — _� — REMO 18 LF OF 12' RCP �Sf C'1$"RCP AN$ I TALL 15" RCP o _U +00 6 15„ 87+0 SS SS Hartness SS Avenue's e u e SS S S \ I� zw0 w o CD > O = J Hartness Avenue � (30' Public R/W) — zl1_va z2 _ % _—— — — O � � � 00 1 — 9 F w�� W OE W W W — � W W W OOE 12' P W DE 2 W _UNK N N W W W W W W 85+96.47- 0+00. 0 " W e W W W PP87+04.92 T W WW W W 6" PVC W W // W �W 2" (ABAND PLACE) - _ 760 W W I � \ 0 � WU Q / �OSTpOsTOST WN-E \ 10 POST POST POSTPOSTpostT OS rl �E OE W/L OE W/LT OE EIP09L wM _� — 760 o \ �-OE rn OF10 OE 0�REMOVE 25� 12" RCP / �- OE OE OEUNDER P/ GUYI O s\— I I I o I r VEMENT AND INSTALL PLUG AT EDGE 0 PAVEMENT NCDOT 840.71 I I I zl o o o x -9 I RWALL o a c� I BST I G z m CONCIn IT aE \ U ' 1 �_ — — 760 r \ 3 I I I I I CONC. Y s VC 7 \ I I IP ` / \ / ^ O \ ` STEPPING STONES VVV S G I I & WIFE POLLYUGHTONK. HAUGHRTON PID SS AV 810 HARTNESS AVE. DB 2041 PG 71 x ` DECK / \ r + 00 CONC. 1SBD KENT PHARR BURKE PID#157-132-15 800 HARTNESS AVE. DB 7139 PG 206 1 I \ 1SBD J ✓ I CHRISTOPHER M MILLER AND WIFE ROBIN G MILLER/ PID#157-132-08 —4320 WALKER RD. / \ / Q p STEPS I D618 PG 437 O Z / _ EX SSMH F 1 LID=760.58' SE ATE — —v=754.oa' CONC x — hi MATCHLINE SHEET 11i�i oCIA 768 768 ii o O 0 o N N N a1 00 rn + Lo ^ EXISTING GROUr D ( 7 + Lo Sao ^ 00 Ln 6 0 11 LoLo ^ n N n It II 5LC _v 764 oC'oN Z F II m II II OO OD m't M 764 pipto>> z z mCo� Z _o 00to>>> EXISTING G OUND 0�0O+ Zo 0 NO» Lo n O 00t0> +t�> ^ z > Z ODQMt Wc�F_a0ao = do 00 i.zzz F°oNzz 0 d ^z 0 �c�F�= = F°°+O Fo(D ---------- -- — -- �----------------------- — ------ -------- `r`ra n� �� az W——— o 760 ------- ---------zV) - __— _\ a z v1 F 760 .� >1 N a W W EX. 2" WATER TOP OFHol PIPE _ 58.74 _ TOP TEST EX. 2" OF PIPE=758.01 HOLE 10-02-2014 GAS w = s 3 m ca w o U W x m Ld w w Q o N U w 756 LLJ z EX. 6' TOP OF TEST HOLE WATER PIPE 758.15 10-02-2014 PROP. RCP 15 LF 15" 10.00% 756 w x F OP. 109 LF 15" Ex. s" SANITARY E. (R g s p� .w1 U Q P 1 L 1 RCP 0 10,00% 8" SANITARY SEWER PLACE W/ DI) - 0.50% SEWER o PROP. 83 LF THIS SHEET RCP 0 0.50% Aa oa 752 128 LF TOTAL 0.71% o p z j O C r J U L L O � a d O i A o~w � WAS MAH STA. 8 + 00.00 87+ 16.92 HARTNESS B STA. 0+ 00 — 0+ 14.23 a � 00 PPELMNAPY PLANS DO NOT USE FOR CONSTRUCTION W N w O 84+00 84+50 85+00 85+50 86+00 86+50 87+00 87+50 0+00 0+25 �••j N FF\ TONS CLASS 'I' RIPRAP,_ \ a I N 68 0 20 40 6'x11'xO.4' 150 J I REPLACE 73 LF F I ° I \ \ PID#185-071-14 \ \ \ � GEORGE F STRUSE rT, \\ I � CAROLYN A ff��ELSON \ � \ \ \ GS O 2Q \PID#185-071�1.2 `� \ 4834 ADDISON DR. 0 ER 4 SY KEYED IN NCDOT \\\\ \ \ / 3 x ( 2' U TER a�10 ADDISON DR. \ \ BOBBY-JOE HAIRSTON AND a \ I O I D S \ DB 27621 PG 645 1 TYPE II GEOTEXTILE ABRIC \ 24' RGP O O \ BRIAN KEITH CAPRON AND I S I \ Dg g88 111 \ I _ WIFE EDIT# 15 -0VIS71 HAIRS N \ 1 Q 30 m FE LIPD#185A07AN1oAPRON \ \ \ PID�{185- 1-12 \ O \ \ I \ I 4900 ADDISO DR. \ \ \ SCALE: 1 "=20 O / I 4918 ADDISON DR. I \ \ DB 20018 PG9 ROTECT HEDGES DB 17282 PG 67 covc. CUR CONC. \ 1 RIP -RAP w� ooD REE OT REMOVED RELOCATE WA R I \ CONC. I NOTE: SEE SHEET D1 FOR a WIFE FR BROWN AND TRAN ONS \ HARSH SINGHAL AND OFFSET CB -MODIFIED I WIFE PRANCES BROWN \ I PRESENT \ \ 10" HARDWOOD METER BEHIND I \� FR M 2' VA�tE \ \ N \ \ WIFE SNKITA S. JAI \ \ PID�{1 5-071-08 BRIAN KEITH O�N SIDEWALK I PID 185-071-13 4934 DDISON DR. IFE LINDA CHAP �� PIDg185-071 C&G TO 2'6" STD. s� I I \ l 4" \ \ �/ DETAIL. DB 20680 PG 563 _ DD�TT_ �� INV=66(�0/" A� �S REPLACE 27 SY I I C&G s I \ 4842 ADDISON DR. \ DB 17282 6 3 \ \ / MCA OF SIDEWALK \ DB 29239 PG 722 \ TOP=667.50 \ \ / / �Ug kl� PEE I \ 1 \ \ \ \ \ \ \ ° < �- 66007 z _vv (" 1__/ \1, '1� - \ E".. 1\ I\ ___1 MBO y 11+ 0 I / N1 ALL BLOC / 2" PL \—. W CONC K\� _ �RWALLeLoc� \ \ (� G T \ ��� Q CONC 2' 1 n� CON \ 1(1 — EX HW 148 / TOP=670.21' 147 / / U o 0 CURB ,TRANSITION / z L) EX CB �RELOCA�TE T\ \ EX SSMH/ EX SSMH CLDS 1 t � > / GRATE=669.78' A SHOWN} BY S\ > / LID=672.64' / REMOVE AND REPLACt16 SY OF /� d I s Oo Drive (6 D' Public R / V V) / � LID=682.77' EX BLIND BOTTOM \ \ 2'. NW INV=666.04' BST •• SS BST OF BOX=660.07' \ \ \ \ �Co / / / SE INV=665.91' / /EXIST CONCRETE DRIVEWAY / / NW INV=676.27' / JUN^TTION BOX /PIP Z p 10.27ASE INV=674.65' (KtMOVE) J J c s�o \ � CLDS ------ - - // - 18" DIP SS SS SS SS SS SS \ SS \� SS\ O SS SS — SS S SS S SS SS �SS S _ S� BST SS R6�IOVEt�X 5 SS SS it cn w \ LIDLA X 670. 9' SSMH\ \ \ AW T FOR CURBS INV=660.19' \ 8" TC z U 1 \ EX HW �n \ \ 6� \ 1 + \ C) GRATE s8EX b,, REMOVE w cN. \ WNW INV=664.69' \ 12�`QQ < S 13+00 A ) \ �S F�EpAACEMEN� (TRIP`) \ TOP=670. \ J NNW INV=657.73' C ` 145 5 +OQ 6i pap \ \ NV 0.60 < 18"RCP - IV \ \ \ \ \ NE INV=681.58'� 141 \ LJJ z N \ SE INV=657.39' \ \ \ \ \ O� _ --a�-- ---------------fl-- - ---- _ — w a w o m a - 18 RCP z m -� —� .. ° Z w o 'w ten_ M M 12" DI M— —� SS o_ �— \ \ \ 1 M fl M M zu;0`m Ica a a w CD U i in -in _ L ° 10 1 W > LO 5' PRIVAC' FENCE - CD INSTALL 10 LF\ \ s� O \ 1 z ti U a z 4' WOOD FENCE \ \ 1 � 8" DI SEWER PIPS- \ \ \ ��\\ O — CU-RB- TR�idSllit6NS �Tt9M� � � � \ �\ � nn� PC 350 \ 2' VALLI<Y-C — 2 fi' \ \ CONC. 4�1 �' Z J -� S — \ MAPL =STD. C&G — — S \ // UR TR Sl l f� I Q, \ S FfIPR P / _ \ \ \ PROTECT \ \ PRO ECT RE OCATE GAS � � CL 1 0 4 P \ \ ° � � / \ \ � \ � BELOW STORM REPLACE 47 LF / 2 AGNOLI/� Z R P 1 F F \ \ Y OTHERS OF 2' VALLEY P4UG U E �CE 95 L 0 2 \ \ PLANTER CURB & GUTTER tJ�D0 840.71 S L VALLEY CURB & GUTTER FNUIG SHOULD OAK CLDS 10.176 �1QT BEGIN Q CLDS 10.17� I \ I TQjUCH WL CURB TRAItlSITION \ FI PROPOSED \ ✓ � '`�=��� °- REPLACE 90 LF OF `� REPLACE 23 L RIP -RAP \ SS / L PRESENT 2'-V FRB-W-G"v�R _ CLDS 10.30 \ \ / F DIRT \ II \ I I FIBER BY \\ \\� CLDS 10.17A\ j/ `�� \ OF 2' VALLEY \\ \ \ I GUTTER Il OTHERS \ 1 \ \\\\\ _ MB II \s O� CLDS 10.17B I� \\ \\\\ J \ a O —+, I O II \ \ SSEITG \ S•oA \ �� \\\\� ` \ Q' � 9<< \ �BST� S I I Q \ ° ° \ \ \\ � \ � \p ROCK \ Y� � � � J� \ \ I I PID�/163-081-10 \ \ \ \ \ RIPRAP\ \ \ \�\�\ 1 \\ PATIO 1 ��' \ I DBEE2 DD P6R15R \ �� 4833 ADDISON DR. PP \ J \ \ BIRDHOUSE O \ \ _ I \ �NEE \ �� \ \ STE S PLANTER\ s II \ n `� s 0 � � \ � o CD � II \ SHED cNPN�N� \ \ 9 \\ IP P \ \ S � � MAGN IN I \ r, ��� STEPS \ \ \ 0 \ 1 REPLACE L OF 1 1seD l � � I VALLEY CUR & EX CB (REMOVE) w ECK GU ER II GRATE=677.26 I� POSSIB F SE INV=6" �'' ) �,a� URIED� d \ \ \ CLDS '1 .17B q \ 0<9 \ n� \\ \ \\ \ STEPS \ \ \a \ \ \ 18" PIN ° ° \ o \ \ \ \\\\ \\\ D I p\ 18" PIN\XDE \ \ PLANTE 142 CONTTOR z 1a`OAK 0 G GPI/O I DETERMINE CHRISTOPHER W. MARCIANI \ \ \ 6" E \ \ \ � �� R � INVERT F 2 \\Y & WIFE STEPHANIE MORSE-MARCIANI o XISTING 15" RCP \ CRB TRANSITION 4865DSTAFFORBD CIRCLE � � \ CLDS 10.30 \ � � °. 143 2 \ / MA AND TIE 0 CB DB 23120 PG 180 � \ � as \ n \ \ \ \\ \ \ 8" PINE \ j \ �\\ 18" AGNO IA nva o v CIA 684 684 'I LLJ l 145 LLJ 0----/- c=n 680 n EXISTING GROUND EX. 3" 'EL 111 680 U -_-TOP OF PIPE 677.87 z TEST HOLE 10 13-2014 m FO J V) C'0 I D - (TO BE RELO ATE U 01 m to II p p N^ > /----- N II F_ 10 Q > rn� a��Lj�`0 z w o0`°zo 0 676 Lrl147 1, 6 146 O `�' o ao ao _--- - O _ > > 676 "' 148 tD (D cfl � M � W - a _ co z - w ca m w M m � cfl - g L 0 a o m ,a w II U co PROP 5.36 a v1 00 00 _ s 3 p w to I O^ II ~ � II / x o � mourn- co u _ --- - N RCP w OPOS a v w to°n' z U 00 ± o> ro z 0 __----- LINE TO BE z F PROP. 15 cmu 00 0+ o > > a o z o w ± > > _- RELOCATED BY PROP. 26 LF THIS SHEET x 672 GROUND I. z 00 Q a m to ? z -- a o m U �' on _ OTHERS 155 L TOTAL 672 o a 149 : c�i c0i 'v : a z v1 N _ a 0 v1 °3 N ------ ----- - 18 R P 3.63% o I� fV to d Z 0 � N --- ----- tfl --- - ----15400 -- --------------- --- 14400 14 50 "1 to 13 50 Q N to II to o II = ad o Aa oa _ _ LASS N )_ 668 to N z + > > IV 18 680 0 o X ¢ o t: O + > d II - - / EX. 2" STEEL PRO - m J N rn Z w F // GAS LINE RCP 2.22% EXISTING GROUND pp v CC d N - / TOP OF PIPE=667.90 d 0 W N N O O Q: "Joe_ TEST HOLE 10-13-201 ^ w a Q EX. 8" SANITARY i�_Z LLJ 664 5 % SEWER 676 PROP @ g 0$ --PROP. 30 LF RCPOOOF 1.36%CP REPLACE W/ DIP Ex- 15 UNKN WN1 F_ PROP. 64 LF 24„ BEpREMO D� w � i RCP (p � W TO O V PROP. 20 LF- 660 24" RCP 0 672 o ~ PROP. ^ OQ// 15" RCP to F� O Ej PN EX. 0 0.50% II 0 0 20 40 i R9 LF 15 g6% 9000 F U i RCP m O� M to O z 656 668 N ao o to z z H 0 Z SCALE: 130 20' F w tD w U azv1�0 5 10 o II � mtocm z o 142 W UFo,-» W A co z z �'' O I� 1 o � VE T SCALE: 1 "= 5' J 652 664 Q� az1n� 99A" P OEI�E STA. 9�63. 5 15 15.67 , 3 a 648 660 STAEEOPD STA. 0+0 - 0+ 3.84 PPELMNAPY PLANS 10+00 10+50 11+00 11+50 12+00 12+50 13+00 0+00 0+25 DO NOT USE FOR CONSTRUCTION o N O7 FF\ TONS CLASS 'I' RIPRAP,_ \ a I N 68 0 20 40 6'x11'xO.4' 150 J I REPLACE 73 LF F I ° I \ \ PID#185-071-14 \ \ \ � GEORGE F STRUSE rT, \\ I � CAROLYN A ff��ELSON \ � \ \ \ GS O 29 \PID#185-071�1.2 `� \ 4834 ADDISON DR. 0 ER 4 SY KEYED IN NCDOT \\\\ \ \ / 3 x ( 2' U TER a�10 ADDISON DR. \ \ BOBBY-JOE HAIRSTON AND a \ I O I D S \ DB 27621 PG 645 1 TYPE II GEOTEXTILE ABRIC \ 24' RGP O O \ BRIAN KEITH CAPRON AND I S I \ Dg g88 111 \ I _ WIFE EDIT# 15 -0VIS71 HAIRS N \ 1 30 m FE LIPD#185A07AN1oAPRON \ \ \ PID�{185- 1-12 \ O \ \ I \ I 4900 ADDISO DR. \ \ \ SCALE: 1 "=20 O / I 4918 ADDISON DR. I \ \ DB 20018 PG9 ROTECT HEDGES DB 17282 PG 67 covc. CUR CONC. \ 1 RIP -RAP w� ooD REE OT REMOVED RELOCATE WA R I \ CONC. I NOTE: SEE SHEET D1 FOR a WIFE FR BROWN AND TRAN ONS \ HARSH SINGHAL AND OFFSET CB -MODIFIED I WIFE PRANCES BROWN \ I PRESENT \ \ 10" HARow000 METER BEHIND I \� FR M 2' VA�tE \ \ N \ \ WIFE SNKITA S. JAI \ \ PID�{1 5-071-08 BRIAN KEITH O�N SIDEWALK I PID 185-071-13 4934 DDISON DR. IFE LINDA CHAP �� PIDg185-071 C&G TO 2'6" STD. s� I I \ l 4" \ \ �/ DETAIL. DB 20680 PG 563 _ DD�TT_ �� INV=66(�0/" A� �S REPLACE 27 SY I I C&G s I \ 4842 ADDISON DR. \ DB 17282 6 3 \ \ / MCA OF SIDEWALK \ DB 29239 PG 722 \ TOP=667.50 \ \ / / �Ug kl� PEE I \ 1 \ \ \ \ \ \ \ ° < �- 66007 z _vv (" l__/ \l, '1� - \ E".. 1\ �l I\ ___l MBO y 11+ 0 I / N1 ALL BLOC / 2" PL \—. W CONC K\� _ �RWALLeLoc� \ \ (� G T \ L — ��\ �- ��� CONC 2' 1 n� CON \ 1(1 — EX HW 148 / TOP=670.21' 147 / / U (o 0 CURB ,TRANSITION / z L) EX CB �RELOCA�TE T\ \ EX SSMH/ EX SSMH CLDS 1 t � > / GRATE=669.78' A SHOWN} BY S\ > / LID=672.64' / REMOVE AND REPLACt16 SY OF /� d I s Oo Drive (6 D' Public R / V ) / � LID=682.77' EX BLIND � � Z BOTTOM \ \ 2'. NW INV=666.04' BST •• SS BST OF BOX=660.07' \ \ \ \ �Co / / / SE INV=665.91' / /EXIST CONCRETE DRIVEWAY / / NW INV=676.27' / JUN TION BOX / Z p � 10.27ASE INV=674.65' (KEMOVE) J J c PIP s�o \ � CLDS ------ � - - // - 18" DIP SS SS SS SS SS SS SS SS\ O SS SS - SSLA 8" TC S c SS S SS SS �SS S _ S� BST SS R6�IOVE�t��X S�cC�^--� SS SS it cn aw0 \ EX SSMH \ \ \ \ \ \ IINV=660.19' \ 0 \ \ EX HW \ \ 6� \ 1 + \ GRATE 684.4R'EMOVE) O w N LID=670.19' AW T FOR CURBS �n Z u i- \ WNW INV=664.69' \ 12'`-W < S 13+00 \ �S F�EF,AACEMEN� (TRIP`) \ TOP=670. < \ J NNW INV=657.73' C ` 145 s +00 G� 0 00 \ \ IN V 0.60' < 18"RCP - IV \ \ \ \ \ C) NE INV=681.58'� 141 \ LJJ Z N \ SE INV=657.39' \ \ \ \ \ O� _ --a�-- ----------------- - ---- _ — w a w o m a 18 RCP z m m -� -� .. ° Z w ten_ M Sw" Z Z w I` X M 12" DI M— SS o_ \ \ \ 1 M ° M M zLLi0`m a a woEo Ui _ \ 1 10 _�fl— wl \ I THH° _ L ° 10 1 W �o=� 5' PRIVAC' FENCE - INSTALL_ 10 LF\ \ sx O \ 1 z ti v a z 4' WOOD FENCE \ \ 1 8" DI SEWER PIPS- \ \ \ ��\\ O — —CURB TRidSllit6NSTt9M� \ �\ nn� PC 350 \ 2' VALLEY-C&6�0 -2'C' \ \ CONCp 'IMF. 4)'1 �' Z \ 'MAPL =STD. C&G — - S \ UR TR Sl l f� I FfIPR P / _ \ \ \ PROTECT \ \ PRO ECT RE OCATE GAS � CL 1 0 4 P \ \ ° 0 � / \ \ � \ � BELOW STORM REPLACE 47 LF / 2 AGNOLI/� Z � � REP 1 F F \ \ Y OTHERS OF 2' VALLEY P4UG U \�� 8 t�TAPLE ECE 95 L 0 2 \ \ PLANTER CURB & GUTTER tJ�DO 840.71 S L VALLEY CURB &GUTTER FNUG SHOULD \ 2� 15" OAK CLDS 10.17E �1QT BEGIN � �� � \ / �� � \ CLDS 10.17� � I \ I TQjUCH WL I // ° \\\\\\ \\ \ CURB TRAItlSITION \ FI PROPOSED \ ✓ ' ��� REPLACE 90 LF OF `� REPLACE 23 L RIP -RAP PRESENT 2'-V FRB-W-GUTTER _ CLDS 10.30 \ \ / F DIRT \ II \ I I FIBER BY CLDS 10.17A\ j/ `�� \ � OF 2�' VALLEY \\ GUTTER Il OTHERS \ 1 0�\ ss \ \ \ MB II \s G) CLDS 10.17B I� \\ \\\\ J \ a O II \ \ SSEITG \ S•oA \ �� \\\\� ` \ QO� 9<< \ BST- S II Q \ ° ROCK \ J J� \ \ I I PID#163-081-10 \ \ \ \ \ RIPRAP\ \ \ \�\�\ 1 \\ PATIO 1 ��' \ I DBEE2 DD P6R15R \ �� 4833 ADDISON DR. PP \ J \ \\� \ \\\\ BIRDHOUSE O \ \ _ I \ NEE \ �� \ \ STE S PLANTER\ S II \ n `� I s \ \�\\ 0 � � \ � o \ SHED cNPN�N� \ \ 9 \\ 1P P \ \ S MAGN IN I \ r ��� STEPS \ \ \ 0 \ 1 REPLACE L OF 1SBD l I VALLEY CUR & Ex CB (REMOVE) w EC K GU ER II GRATE=677.26 I� POSSIB F T SE INV=6" �'' ) �,a� URIED1 d \ \ \ CLDS '1 .17B q \ 0<9 \ n� \\ \ \\ \ STEPS \ \ \a \ \ \ 18" PIN ° ° \ \ \ \\\\ \\\ D I p\ 18" PINE \ \ PLANTE 142 CONT T K z DETERMINE � CHRISTOPHER W. MARCIANI E INVERT F 2 \\Y & WIFE STEPHANIE MORSE-MARCIANI o XISTING 15" RCP \ CRB TRADITION 4865DSTAFFORBD CIRCLE � � \ CLDS 10.30 \ � � °. 143 2 \ / MA AND TIE 0 CB \ \ S \1` \\ DB 23120 PG 180 \ \ 15„ R�\ I ° \ 142 as PINE \ j \ �\\ 18" AGNO IA nva o v CIA 684 684 LLJ 145LLJ 0----/- c=n 680 I� EXISTING GROUND EX. 3" 'EL to 680 -TOP OF PIPE 677.87 to z F II - - - TEST HOLE 10 13-2014 m Eo J V) 0 to I - (TO BE RELOCATE c� m tGo o II p O �LjN^ > /----- Ld II j 10 Q > rn� aL�to k - z `` Ll co 0 0 676 147 �. to 146 O `�' o ao ao _--- - O _ > > 676It a 148 � co (D co a _ w ca w M to m � co - 9 L p a w o °' w w II c� to to PROP 5.36 0- v1 w +b +b _ s 3 w � mourn- co u _ --- - N RCP w OPOS a w to °n' z u 00 ± o > * ro z o _----- LINE TO BE F PROP, 15 cm� 00 0+ o > > a o z o w ± ^o > > _- RELOCATED BY PROP, 26 LF THIS SHEET x 672 GROUND I. z o o a a� co z z -- a o m U� -' o o _ OTHERS 155 L TOTAL 672 o a 149 : c�i c�i 'v : a z N _ w v1 °0 N ------ ----- - I. fV 'o a z 1n Q: (V - --- ----- m --- - ----15400 ------------ --- 14 00 14 50 "1 to 13 50 Q cV to II O II = rnLei zo � o Aa oa _ _ LASS N } 668 cnN� z +(D > > IV 18 680 0 o X ¢ o O + > d II - - / EX. 2" STEEL PROP, m J N rn z w F // GAS LINE RCP 2 22% EXISTING GROUND pp v CC d - / TOP OF PIPE=667.90 d (AFx NN p O Q: _-i TEST HOLE 10-13-201 ^ w a mum or: Q EX. 8" SANITARY i�_z 664 5 % SEWER 676 Ll PROP. g 0$ --PROP. 30 LF RCP 24" RCP 0 REPLACE W/ DIP Ex- 15 UNKN WN1 w PROP. 64 LF 24„ Bol)l F_ D� w RCP O W TO o U mclrl PROP. 20 LF- 660 24" RCP 0 672 � oU ~ 15" RCP to Ej PN EX. 0 0.50% II p 0 20 40 i R9 LF 15 g6% O000 I'_ U RCP m of W) to p z 656 668 / / N ao t° z z H0 Z SCALE: 130 20' hZ w azv1w-- 0 5 10 to m�C> z p 142 W u -1, > > W A co z z o � VE T SCALE: 1 "= 5' J 652 664 Q� az1n� 99A" P OEI�E STA. 9�63. 5 15 15.67 , 3 a 648 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 660 STAEEOPD STA. 0+0 - 0+1 1 33.84 PPELMNAPY PLANS 10+00 10+50 11+00 11+50 12+00 12+50 13+00 0+00 0+25 DO NOT USE FOR CONSTRUCTION o N O7 \ X PETER M H6�FF AND CLDS 'ANSITION \ \ \ o 4 C� \ /� \ I \ \ \ 1 0 20 40 I / _ WIFPIDENNIFER HUFF \ \ \ \ \ �� \ r I \ I �� \ \ 1 NEIL H BLISS '\ \ PID#163-081-17 — � I 4824 STA3 ORD1 CIE / \ / � \ \ \ 1 / L 4756 STAFFORD CIRCLE 10 30 128 �'�3 DB 958�G 863 \ � \ � / x \ STEPS DB 12913 PG 776 1SBD 1 � SCALE: 1' =20' 7 O \ REPLACE 3 S l� \ \ OF DRIVEWAY \ \ � � \ \ \ \ FE x \ \ WA / \ \ / • \ \ \ MICHAEL WAYNE THOMAS CLDS 10. A \ \ \ \ / PID#163-081-14 \ \ 4812 STAFFORD CIRCLE 4'C\ �P DB 21884 PG 201 �F ELIZABETH BALLEN( 1' SAW -CUT FOR CURB \ I �� \ Q STEPS \ PAUL DANIEL WOODALL AND GM - e / WIFE MARY VIRGINIA WOODALL �� \ / ELIZABEEAN BAILEY WESTE I PID•163-081-18 / �748 STAFFORD CIRC-CE & HUSBAND HARD D. BALLENGER PID#163-0 \ RE ACEM T (T�J \ '� \ \ 1SBD v STEPS PID#163-081-16 \ \� / 4764 / I 4"PVC DB 29183 P�9 -12 4833 STAFFORD CLE SCOTT ROYLE AND STAFFORD CIRCLE DB 9228 PG 346 \ DB 24724 PG 9 \ Sr \ \ \ \ \ \ \ REPL 532 LF OF \ \ \ \ /\ \ \ I I \ WIFE DAWN 63-081�15 4800 STAFFORD CIRCLE / \ 1 695 1SBD 6g5 I M \\ \ c / \ ST \ CONC 10'1�LLEY B & GI�TTER \ \ \ F,o DB 20952 PG 246 1SBD � / � � STEPS / 1 � � \ \I \ / 0 \ r __ \ _ 1 z o 0 ( \ \ � \ \ \ � \ LAND L LIGHT / I 1 ( J � � � J I_ �_ /I � � / / 1 / � / — 17 �OF�RIVEW�Y— l � � CLDS 0.27A Jr- — � -w �6 � c~n z ¢ o � EIP �G \ \ G/ \ / \ \ \ \ \ \ \ LA P Y/ \ \ x / \ �\/ / / / — I O Z CV o \ EPLACE 2 SY \ \ \ I \ / I N U w N N / � a \/ OF DRIVEWAY \ \ \ CLDS 10.27A \ \ \ \ \ I J \ \ \ STEP \ \ \ \ \ / �� / 1 / / 685 \ 690 E LACE STEP/�S /1 / M a z 00 Lu w w z ti M m \ / � �_ BST S I 60 \ \ \ \ \ LA RE )\ LIGHT \ \ \ \ \ 1 � \ \ sas � � \ / It, _ M N� REPLACE PLANTER / %—M � _ • Ckt c� e a woCr o j OLD 2 I, z v a �- 3zz/ z a \ \ � \ S \ \ \ \ ---SEE SHEET 03-ANQU4 FOR PR01' WATER RELOCATIOf�— � / M M � rd PAVER�MAILBOX AS SO NEMED — / � % M �_ � � D �C 1 \ I\N � _ SS W ' 1 ubI ELT / \ EX CB - \ GR E=671.90 \ REM VE 30 LF 6's 1 \ \ \ \ \ \ \ \ 685 \ —�/ : `� (� \` — SS 8•• PVC -\ 1 A NE 1 =669. (REM0\19 \�\ RE ACE 9 15" �2CIP 15 Y OF DRIVEWAY \ TRANSITION CL 10.27A I I I \ P-L_kCE 16 SY OF \ DRIVEWAY-- ` DLDS — n Sj— J ` / �' �s� �- M _r CD- / SS \ _ \ CLDS 10.30 \ \ \ CUR I \ � 7A \ — i/ _ 124 M / O S MECPLENBURG COUNTY D# 63-083 4815 STAFFORD CIRCLE DB 30572 PG 962 \� EX SSMH LID_672.72' \�E INV=664.19' \ 1TRANSITION \ CLDS 0,30 \ F \ RELOCATE 2" \ \ 68 EX SSMH \ 0 SS \ LID=681.67' \ \ - / �� NW INV=669.97' �� S SE INV-669.92' �= —� t�-ASH o '24 A o SH '_ Z \\ ��j GAS LINE BY I \ \ CURB TRANSITION —= / = 6811 Utility Owner DUKE POWER Description NEW POLE p Sta. ��� Height ft. g M OTHERS \ I \ REMOVE AND RESET CLDS 10.30 \ / _ ��— / / a 19 B1RC - 5» a a' Attochment®Duke Energy ft. Heights []Bell South ❑Time Worner_ft. []Other ALC MAILBOX SS A AND LAMP\ EEDED +�` �/ // / BST SS / �� �� INV=671.58'U EL INVERT BURIED 18" POP �t _ft. ❑CDOT —ft. Proposed GrOde ft. CUTft. —ft. ❑Other —it. 13O ,0 . FILL CURB TRANSITION �%O\ x EX CB (`MOVE) GRATE=671.66' NE INV=668.53' \ Y 680 Ci /� / \ — Remarks SET POLE 4' DEEPER CLDS 10.30 27 ` • MI LA*P M G I� '�G G / / � / 36" RCP _ � _� / / ' / % %_ / / \ _ _ — �� 'BIRr•^H - 71 I REPLACE 62 LF OF 2' VALLEY CURB & GUTTER CLDS 10.176RC ' . - 3+1�0 \' SS �O /// 10°' �� // _ / / .48' - - RCP S �EX SSMH S LID=672.88' a S 125 - -------------- CURB TRANSI ION \ G� / / �/ S / / \ / / / �/ {� // / O \� 0"-� o\\ _ \ o \ 36_RCP 0 15\ r o� w F" Q 8 ^ 12 3 CLDS 10.30 \ d SSi / SE IN 665.53' SS � / 0 12" BIRC / \ o I NV- 71.53' ✓ d�tKT SUPPORT GAS DURING �� \ P�\ / co / / j �� / ss / ✓ BURIED CONSTRUCTION BY `� SS SS 2 POPLAR NV=671.35' \ / / I G OTHERS A (D INVERT BURIED MATCH N E SHEET 4 i �� WATER OAK NC PARTNERS, LLC PID#163-082-22 / I O z / o i'4 09 WATER OAK RD. 49OAK f 30" MA , DB 29726 PG 50 48" APLLOP NOTE: SEE SHEET D1 FOR OFFSET CB -MODIFIED DETAIL. m o a _ 684 684 125 Dom;' y< �, U m n to 680 m ,. L� II II F •ZO _ _ _ _ _ ------ 680 to In 134 U)NO ItII Z to t0 n � 1 Do m r, Owl > > - - - - II to to t° t0 to CO a0 11D toI m U CA LD EL O a 0 O cn - - in if1 _---_-- ---- __________ N a O O (ff129 to > a0 II Z 3 II II w Ui II N -_ - __-to _ - o 676 m Lo U Q z m m+ rn z Z 0_' U M r Z -. m-- p Z II to Z m +co-O I twll M M� ZZ w ;° z p + O❑ K1 Z Z ___���- a- ______-- __ ____- _-_ == -________ ______-_--- _-------- 676 °� Ca N w W Oo+N- O Z ~ m II O w o Q m W W U � - 0- a z to W X O O Q g- O. W U - O M l� a Z to W r1 = O EX. 2" STEEL �1 LINE U >> M Z Z a ct, - - O O+ iy -- LLJ n > > "1 a I,.I > L� to Z - - W O ` ----- to -_-- o_ to o: , , - -_-_ _ _ _ - - ___-- _ _ ------ p , 1511 L F 15" Ii 06 0 + O = s 3 w w Q -- -� co z Z , , __--------- ____ _ - _ _ - 0GAS NLLJ x v LLJ EX2" GAS INE O O cn - RCP 2' a M Z i--- ---- ----- -�\ (TO BE RELOCATED 0- to 0' N M � 00 0_ m to --------` -- --- _-- _ a o ;n _ F 672 PROPOSED 7'X3' �B-1LQTHER -- - - -- /, - �- — ------ ---------- --__ -___-_- -- _____-__-___- _ ___--- LF 15" 8302%rA _ _- o �U) 672 0� � RCBC --- Ex. (TO 5" rcp E REMOVED) (TO BE REMOVED)- 124 —_--__-__- pROP. Q 668 - - - _ _ - __ PROP, 29 LF _ __ 24" ___-- R P. 53 LF 15" --- _ ____ - PR P. 48 ® - LF 15 2.09% TE EX 3" EX. 2" WATER MAIN GAS LINE TOP OF PPE=671.22 - - 668 o O N C x � w a - - - _ RCP 1.23% .70 THOLE 10-2-2014 33 00 33 50 34 00 34 50 PROPOSED 7'X5 PROP. 91 LF 0" RCP 0 0.51 (0 BE RELOCATED RCBC RCP 0 0.50% BY OTHERS)0. PROP, 14 LF 3 RCP @ 0.51 % f1 664 680 a1 680 EX. 8" SANITARY SEWER N1 M � 128 W + of 1 9 N N II w m 676 U Q 00 00 toL0 U) t0 ttD EXISTING GROUND LJ M � 676 O O LU INi II II II O� ZZO ^ M O N ±^ r1i > ^/ O w00 N to a�Otozz- O L)(AlYr° � QI 0 20 40 0 M 672 in o0 v to m L2 2N ---------- ---------- ----------- ---------- -- ------ ----- ---------- 672 �+ FBI O w 10 30 H RIZ SCALE: 1 "=20' 0 5 10 ------------------- - ---------- �I O I�1 668 --------------- ------------------------ _ 1618 ---------- ------- .. . 668LROP. RCP d0.52% a VERT SCALE: 1 "=5' a � STAFFORD "A" STA. "B" PPELMNAPY PLANS FO+00-34+68.65 STAB ORD STA. 0+ 00.00 — 1 + 76. 35 664 DO NOT USE FOR CONSTRUCTION 30+00 30+50 31+00 31+50 32+00 32+50 0+00 0+50 1+00 1+50 � CU B TRANSITI�1 � \ � SHED PROPOSED FIBER OPTIC �� \ / �o / rT, \\ \ \CLD�10.3� J I tP \ � \ \ � +� � \ / DECK U/G TELEPHONE CABLE BY \\ � '•�� \ � \, W \ \ \ \ \\ \ ` I OTHERS. BORE UNDER G SS \� S,�AFFORD CIRCLE. / / �l — 695\ \ \\ \ \ \ \ \ \ \ UI y \ WILLIAM R KAY AND I "1-, F- PLANTER � \ WIFE JOANNA R KAY JG Q REPLACE 17 SY \ PID#163-081-RI ( J \ / I \ PLANTER ❑ \ \ a701 ADDISON DRIVE REPLACE 63 LF OF CONC. I SSMH S \\ \ �� \ OF CONCRETE DRI EWA \ D \ o I DB 28537 PG 478 2' VALLEY CURB & GUTTER LID-694.77' - INV=687.09' 120 \ \ CLDS 10.27A B C \ / CLDS 10.176 C S 10.3 Gj v-688.47' 6 \\ \ \ \ CURB TRSI N NE=686.74' 685 \\ EX C / D S TE 94.28' S \ / �O \ l I �z\ \ I / \ P/ \ ,6/ •S l /' \ \ \ \ \ \ 1SBD L 1SBD / G `��t O INv=IN).3o' \ \ \ \ FRED W ALFORD JR AND O LQ \ S HE T U2�AND U3�R P P \ \ WIFPDg163-081A20 RD v 11 0 4 TAFF R CIRCLE 3 WATER ELOCATION \ \ 730 5 o D C CLE I / \'� \ DB 4869 PG 530 / � o 0 REPLACE 139 OF CONC. e A / c3 o 0 2' VALLEY CU & TTE\ \\ \ \ \ \ / / ' / \ z w LO \ \\\ \ I WILLIAM F GEER AND / ' � > \ \ SS --CtD 1 .17B WIFE PAMELA D GEER / / 114 � z \\ Utility Owner DUKE POWER 1SBD z \ \ y Sto. ( PID#163-081-21 4' WW IT RAIL GM / / \ e� \ Q o � NEW POLE I / / O �� J J �' c \ \� REMOivl�,O'L' .)\ Description Height ft. 4716 STAFFORD CIRCLE / / ,, 1 EE \ \ IDB 6904 PG 51 REPXACE 1 LF OF C ���18" RAltochment ®Duke Energy it. ❑Time Worner _ ft. \ \ `� 1(� Heights ❑Bell South _ ft. ❑Other _ ft, I I I \ _— 2' VP EY C B & GUTTER' X / Ex C (oR `� O Z cN \ \ \\ SS \I ❑CDOT _it. ❑Other —ft. \ \ \ / / �— C DS 10.1 / ���� S / / `� RATE- 92.73' \ \\ W "ooNo \ \ Proposed \ \ / / `///�0 5� / i / E V=688.55' `� Z cN o C TRA SITION Grade it. CUT ft. FILL // \ \ a cr a U o m \\3. \ CL S 10, 3 co Remarks SET POLE 4' DEEPER \ \ \ \ / / i / / Q�G / / /— CU�� \\ G \ rA w 0 w � w EX CH RElol \ \ �/" !A / / / / �" Z I� x / C� 4 15.82 = TRANSITION' — z cr, 678 zz \\ \\\ ��G SS 67s.4s' \I \ \ I I / \ /�� �c' / / /\, +00.00 CLDS \ \ \ w w a 1 P 42 264 \ \ REPLACE 25 SY \ \ \ G695 / / / \ a o 0+0 0 `� \ \ \ I / / RCP 10.30 In o a r- \ \ 121 OF CONCRET RI WAY a� \ \ / / / / / �$ \/ � \ z ti v a z \\\\\ \ Q A Ex CB (R MAP E G \ \ M / 5 / V� RE LACE 1 L LID=679.41' R TRANSITION, \ \� / / / c'/ — I OF CONC. 2 \ 0.30 \ \ \ \ \ \ \ \ I \ 0 REP 12 LF OF CONC. \ / //// / / �_ ALLEY CURB & GOTTER NE INV=676.04' \ 1 \'', PL G \ \ \ \ VALLEY CUR & GUTS _R / / /M / / G VALL CURB CURB TRANSITION15„ \ I ST PS \ /2 / C DS 10.30 6" NCD 840.71 '�/ \ � GUTTCE�YR \ \ � I � \ \ � / CLDS a-6'T7B / / / 0 / \ / r CLDS 10.176 \ �\ \ \ \ \ \ I \ / s , P I CLDS 10.1 B REMOVE 14 LF \\\�� �\\ SS \ \ rv, / � � / 18" RCP .� PLUG &FILL W/PLOWABLE \ \r \e 9 ( ) \ \ \ \ REPLACE SY \ w� //M/�9 �i— ` S �A•• _ M FILL 12 CY 2a� \ s 119 RCp �S \ �J at \ \ I 0 ONCRETE D VEWA�Y �� �/ / / / ° O \ \ \ �\ \ CLDS 1D-27A \ � ACE 47 LF OF—CONC. 18" 7 TONS e9 2' VALLEY CURB & GU M �T / , �GP / cG' S� ��i \ \ C CLASS 'I� RIPRAP = \\\ �67 . 9 M \ \ \ ° -C-LBS 1n 176— / 8'x8'x1.5 & 8 x3 x1.5 EX/REMOVES 6�` \ 31� STEPS \ a. o \� �� / / / o OVER 10 SY KEYED IN \ \ S M M \ \ \ \ TRANSIT / 9 POS\ NCDOT TYPE II \\ \ \\L / j 24" M o \ \ SSMH / GEOTEXTILE FABRIC 678 \ 24., � � � � � �0 3� M 3fl � B f MCA SS __ \ \ M / i / // SS SWIDIN 6868241' �\ \ / COST RELOCATE 1-1/" GAS 30" MA \ \ \ �\ . \ �� EMOVE 1 L OF X. 1 RC ^ PL s / / / _ y k� / / S NE INV=682.24' / 4„ ✓ MAIN BY OTHERS \ �' LIDS68t22' \ A CURB TRANSITION \\\\ \\\ \ \ NW INV=675.12' \ RJ INv=6'2.62' / RETAIN i a" P C \ / 1 \\ \ C�9S 10.30 S yy���=672.58' C ��8" PL� 115 �S`s/ CONC / \ \ WATER OAK NC PARTNERS, LLC S T $40.71 / SSMH S / / ` � \ PID�WATER OAK �\ SS LID=684.69' 4909 WATER OAK RD. \ / \ . 118 /� \ \ SE INV=678.50 // / / LAMP \ \ \ DB 29726 PG 50 \\\ \\\ \ \ / 0 \ / it B \ / // BST \ w \ \\ \ 8 8 S Tf\A/�Cp � (� � ja F� P �� \ \ \ \\ o / �' / / \ 0 / \\ \ \\ REPLACE 140 LF \\ \\\\CUR h NSITIOf� Via. \ -�� "� / INSTALL 16 LF M `� / 0"0 \ \\\ \ \\ \ OF CONC. 2' VALLEY LDS�N 30 AR \ \, / 8" DI SEWERPE� w / �� / \ \ o \\ \ \ CURB & GUTTER \\ A °" CEDAR \���__ \ Ex s 116 PC 3� , / 0 \ \ \ \ CLDS 10.176 \ \\\ D 0 i 0���) \\ \ \ \ \ \\ 74.37 I m I ® \ �� ('1I — t PL�— \ / \ 0 20 40 -SE�WV 2 \\ \\ \ REPLACE GRAVEL W/ 4 SY \ 1 oA I \-�0 6�79 8z EP C F ONC 7 0+00.00 VALL RR &DGUTTER \ \\ \\ OF CONCRE�DRIVEWAY CLDS \\ �j� - I / �( � REMOVE 6 LF O�EX. 1 RCP 10 30 / \ 10.27A \o I IN Z KING / wM0" MA OLi�;�'S 10.176 1s" 1� $ Y gg a, \ \ \\ \ \ \ C I PI D�/1 3-082-0 "MAPLE / AND TIE MH 116 SCALE. 1 '-20' \ 4723 ST FFORD IRCLE 7 7 DB 5 03 PG 17 \ / _ nva Ak mg o v CIA EXISTING GROUND 692 Cq J 1160 1.�`n _--- --- _ -- — — + m00 II �RgTAIN EX. 18" RCP 1 Z II _ _ _ 6 1 a _ _ _ LF 688 TO BE REMO D) CNt° z z _______-- — — — — — — ,n RCP .69% PROP, GR UND LO � � v ago > > _ ---- — — — — — — — � 0000 1 3 a O 2 Z Z __--____-- _ — — — — — — — — � 0i 00 o� o co 118 00to 0���;nXao _ ---- _----- o+ t° a �03> — _ _ _ z 30 n QOo 119 to to II --- --------- EX. 8" NIITARY 11 - 122 n 00 II --- �� II S WER x<� x N to �to� N 684 001 II ^nm 11 o�N __ ----- ---- Z� EX. 8" SANITARY m m`n > H II ^ m N _ _ _ - -�� — — — — — — — IN EX. m + ^ Z Z Z II w O rr1 > > w V1 w N BOO OM II II Q II Um �>> -_--- --- --- Z9PL@Z77% U It01 Zin00 112 �_ a m Ldcj z o m�+ 7 o 0 tO Z Z --- Rc o m 3 o L' i O LLJ > m ? _ O m + — O o ___ — — — _ — — O QM.w . H Z 0 0+ U 0 0> Q s FX „ SANI R Y d' X X p a x a OOQ: lt�ZZZ 0O - 0Zf!1 N __-- -- SEWER 0 N U I a o - - a _-- (TO BE REMOVED) — — _ _ — — — — x a0�o 680 o z to 114 N M __------ — — — — — — 680 a - — — EX. 18 RCP ....... E (TO BE REMOVE ) 111 LF 1 „ RCpp03.32% 43 00 43 50 44400 44450 45400 45 50 v oa 0 676 = — — 676 o } PROP. 76 LF 24" J ca U O PROP, 24 F 24" RC 1 02% EX. 8" SANITARY 00 a d RCP PROPOSED 4" GA LINE BY OTHERS K41 00 41 50 42400 42450 o N EXISTING GROUND + N n m EX. 1-1/4" GAS MAIN 116 � n Q � 0 N O om0 113 TOP OF PI E=675.22 00 t0 TEST HOLE 10-2-2014 �p O 115 �i 698 114 m (TO BE ELOCATED BY It z 00 to `n II t° 11 OTHERS) r to co — u LO co o 00 r , 688 =pil to 11 '0ZZ0 a°,.' ou II ZO N `11 W ��otO z z o > > om 1 2v 00 121 _ aoo�z z m00+Lo U00+CN�zz m'*V) 0 00 w PROP. 8 LF 30' a t°co Wo<�;nXoO o O0`Oz L0 10 noo ��ornto z �/ O RCP t1� 0.50% 684 i ^ I� 11 0 M ao co a z to w 0_ z rn 694 D_ z to w w o o ;n 0 20 40 O ICI O t0 EXISTING U , U H� O O Q O O Z Z t0 _� GROUND 0_ Z Lr) 0' mma°I.' > > >'� m0Ma0 z O 684 tD Z _ _ to EXISTING GROUND V1 aooQ -: Now Z Z HO 1 Z SCALE: 1= 0 a a.UL�;b�bo a� - „ , hZ w o ztn� N �o ooa - -- __ �m O 690 EX. 18" RCP (TO BE REMOVED) I 30 LF 15' I� 0 5 10 °�° 680 PROP 3 02% F 15' fil / _ _ Ex. 3" PROP. 34 L [�] — — EX. 3" WATER MAIN I PROP. 97 LF 15" WATER MAIN m II TO BE RCP 676 RCP 153% (TO BE oa ABANDONED EX BSEWERSANITARY V RT SCALE: 1"= O — ABANDON— 0 = 686 34 �- 15 U O m > EX. 8"SANITARY WEIR 'w 1 99 99 PROP' 4.4 % a O co Z REPLACE W/ DIP S T A E R D CPROFILE RCP EX. 8" SANITARY Z 676 STA. 4 + 05.39 - 42+ 24.64 TAEEORD "D" STA. 0+ 00 1 + 30.8 120 STAEEOR E STAEEOR FIFIEUMNAPY PLANS 672 ST . 0+ 00 0+ 29. 9 682 ST . 0+ 00 0+ 33.62 DO NOT USE FOR CONSTRUCTION W o (D 40+00 40+50 0+00 0+50 1+00 0+00 0+50 0+00 0+50 �j N 695 \ /\ SS \ E \ \ \ \ \ \ 700 \ I 2 GRAVEL CHARLOTV_MA \ / �` IC -TEMP \ s1 F p�S�S$CT�TION P19 63-082-23 \ \ SS e \ \ I \ —_ e \ / J w I BSr I I Ifs 4'x'4 SPLICE I DN,M 50�N. SH2A� PG M68 a \ \\ B SS —� PIT BY OTHERS �� �O UNDERGRO ND_€LE RIC I / BE ABA ED/REMOVED TO \ \ \ \� • O a SS �O �� 695 �� / \\ I �J BY�YHERS \ 0, 10" BIRCH\ \ \ \ \\ - l1'�BAT4K,OF C"NNE-L• tNS-TALL LIVE STAKES, TEMPORARY MATTING & RIPARIAN \\ \ \ 8„ M P 18°° PIE � ESpE 6 �8E— �TAT�-1-04+39--50 TO--WLVERT tSTA° 110+00). SEE SHEET D1 FOR DETAIL. \ \ 90 / \ SINGF OM tee\ e _J / /' \ / cRa �o nj / �o G o. �- p� e nd �� � and a\\\ 8"MAPLE SD \ \ \ ° �y SSMH SS S \ \ \ \ \ 18"M APL Z� J4 \ \ �4DT91.23� E 8„ ASH \ 695 \ \ - SH \ 18" E 6„ NW INV=6 �5=� �_ TING t0 \\ \ \ / \\ / \ _�S / Qj U \6 \ \ \ t*t \ SEW \\ \ \\\\ \\\\ \S \\ I g° BIRC 24 R 13 tGHgT 'pp Wq D \ S� ACCESS ROUTE / 695 I UU UU UU IRCH\ 8„ PI o BNM—` r�GREEM NE\\ 8 g'= HC 8 MAPLE\ E SS AND \ AS \ \ \ \ \ \�� \' ASH ( 6' BI -- \_ \ \ _ _ \ \ \� \ ° gIRCH \ \ \\ QJ / SDE —T e A �CES�Rfl`y',- 10 BIRCH - /- 15 \ \ \\\ \\\\\ \ \\ \ \\ 1 e_ E \ \ \ \` TCP \ �9 \ \ \ \\0 \\ \ \ �S e e 18 AR� O / / \ / / 6" ASH -° \ SO, 10" BEECH W \ EX H 10" MAPLE\� / \ \ 18" OA \ - GUM \ S E \ \ 0 / O \ �E— S /�i - SH E /LID-691.39' 6" ASH SDE �G JL7� SDE pE S S e O o 0 �= \ - �— =—=684.�g �� \ \}10" OAK \ \ \ \\ \ \ ��CH� 680 --a H\�\ _\ \ �1�- \ �E S 'AR DE �SH \\ 690 SDE �8" ASH \ 0 sS SDE / CJ SDE SD / \ 4" ASH 2a �A SDE SDE ,2' ASH MAPLE \ a SDE \ 2 "OAK •• z - w Ln c~I� Z / A � \\{ \ \ 48 11dV=686.58' �R /� \ - - / -\ \ a 108+00 \ W/T o O�\G V —�" OPEN Ems- S�9 \\\� \\\ \ \ EIP g" BIRCH 24 cc 6" BEECH �_ / \�� 10" K O \ 15' POPLARDe 5' ASH / 1 A "BEECH \ ZU \\ �� S 15" POPLAR \\ \ H \ \ 10" BIRCH \\ 8" BIRCH \\ \\\\ \ \ \ { 10" CEDAR N { -- —� \ —= \�V\ ✓ / 12" BEE -CH\ 1 Asl"� �f5" �� \ AS++� AS `o 0e— „�' �— 18" ASH �� �_ _� - _ - S -� �_ / 69 �O e „ \ Qo 7 \ \a 6� i. U w CV p 00 Z N U O m. -- 069 -� C,29 Cp —�/� / a M-ARLE ,�,.,o,�� 0- / r w w LU ti w oLU M LL LL x INV 684.74, \ — — i — L TEMPORAFjN ( � �1 �` /o o , / —SS'— L �tA�LE F - S69 _ _�_ —�_= / \ l� �\ C� a U z c7 Z w S � a > _—_ fLU 36" RC TREAM� — —� N / / CROSSING, 30.14 SE 1 \ \ \ S� DEAL SHEE °� �- S E D S I �� 6 18" M °� S69 — �- x _� \\ - S69 - 10' cLF u� o a 6 > �n = .. z ti v a v o z -- \ s� /Ln x SS E— I x L/ O C O S1P \ \ \ \ \ ( I\ / O2 0�00 /\ C � Ivr \ \ 5" PINE / CIS OQ 1M5AP \ \\ \ / —` /— EX/JB W/MH I E XD=693.44' SSMH I SW INV=687.14' �� J EX CB / LID=694.92' J GRATE=693.11' NW INV=685.32' — SSI SS SS E x S E --------_ SS / ���°^'��{1 \ 6 \ \ \ \ / _ 8 \� l5" PINE QP�L�ANTER 0� BOTTOM 9 \ 8'T�NS 9�\ \ \ V Il EX HW / 0 TOP=69 I OF BOX=�1' NE INV=686.02' / 6" PVC 6" VC / DESTINATION DESTINATION DUMPS INT JB SE INV=685.22' UNKNOWN c UN NOWN x 1) OSI" S E 8 TCP SS SS W W T ZO .55' 2 D PSTERS �- z rn — I oo / _ SEWER AND \ \ \ \ / / INV=6 46' I / / z z R11 WATER LINE %— �L X$�0 RIPRAP O 0 CONC z D - EXISTING Y AGREEMENT \ 1 \ \ YIN RIP RAP Cooj (REMVE) esr zoo P I DB 2126 PG 8 AND 109 \ 1 \ \\\ \ OOD 15" PINE \ G \ z / Utility Owner DUKE POWER I \ \ I y Sto. �o Utility Owner DUKE POWER Sta. `' / Description EXISTING POLE Height ft. I n Description NEW POLE Height ft. C IMPC 69 / Atchment ®Duke nergy ft. ❑Time Warner _ft. Attachment ®Duke Energy ft. ❑Time Warner _ft. BST n lJ I z Qi 8" PINE � / 0 O � 0\ REMOVE 15 LF WATER OAK NC PARTNERS, LLC \ 0 0 eights ❑Bell S uth E 12" MAPLE ❑CDOT ropose Grode ft. CUT ft. ❑Other _ft. Heights ❑Bell South _ft. ❑Other ft. ❑ ther _ft. ❑CDOT _ft. []Other Proposed ft. ILL Grade ft. CUTft. FILL — ft. — ft. p� / EX. 36" RCP / 09 WATER OA 22 4909 WATER OAK RD. \ \ 110 y\ P E I DB 29726 PG 50 / / \\ / e / U _� —�1 Remark POLE T BE _ 1 APL ^ a -- RE OVED Remarks NEW POLE I TENNIS COURT w \ Ebb �� RETAIN / / / \ / o / /� / \\2 NE 2S APARTMENT {D = —I` O POST 12" MAPLE LP o / // \ \ / t 1 m ( I \fin \ / 11 rF- 1 \\\\ \ BST `J III — — II O 0 BST 20 �iT I © 25 I I WATER POAK NC LLC I I C I \ ( I CONC 10 30 �� C C "=20' Dg163-082T 22RS, 4909 WATER OAK RD. DB 29726 PG 50 BST I © \ esr I / —SCALE: 1 .a TLn 110 LO 111 00 Ui Ui 00 "I II �'.. �. 696 In00 o II 1b z to C14 O H (V II _ OHO Z O ). EXISTING GROUND oCn M 10 M t/1N w p HO�t�Z a 0 co - --- �- x _ x x wchww ---------- o 692 fi N > o o a x-� Z azulWw� --- ------ u o N 0 PROP. GROUND -- ----- - u 3 a ULUQ m r x 688 a. / RETAIN EX. _ _ _ d RCP Q 0.71% 684 CD C V m X } PROP, 8 F 36" RCP Q 0. AND FES 4% U U w a a 01 OU TFALL 17A ST 0+ 00 0+ 16 Ln . w w 692 ____--Cn SE DITCH DETAIL A, SHEET D2 [PROPOSED STREAM CENTERLINE -_-,_-�LLJ z , W --------- 0,7% RADE _ U EXISTING SANITAR 8" TCP SEWER -------- _- --- -------- 688 ------ 688 w EXISTING ST CENTERLINE EAM _---- - - - - - - -- ------------- --_-_�� --___/ 684 -_--_--_ _--- 684 _--__--- SEE DITCH DETAIL B, SHEET D2 W A -- ----------- --- 680 �� 680 a/ ----'- 0 BST 0 40 0 4 8 109 50 a CULVERT PROFILE STA. 1 4�20.05 — 109� 7.66 HORZ SCALE: 1"=20' V RT SCALE: 1" t PPELMNAPY PLANS 676 104+20.05 104+50 105+00 105+50 106+00 106+50 107+00 107+50 108+00 108+50 109+00 DO NOT USE FOR CONSTRUCTION W � � N GOAL / ® I I \ M � C � \ � TDEC ,�P\ �, /CD �j O 0 20 40STEPS CURB TRANSITION STEPS \M PID 163-082-10 THRU 163-082-21CLDS 10.30 00 1 71 / LP \ ��o / / / I I I I O I EMORY LN. ¢ 10 30 / • + Q' I 1 � AND DB 210658PG 568 a SCALE: 1 -20 30 3,&- 30 30 - - X - - 6' PRIVACY FENCE \Lc3 — — _� sc 00 �� �� Y� I IIII Io ® REPL�E 114 LF OF 2' \ / / / / I I I I I \ \ a _ III � _ I � VALLEY CURB & G TER C.) I I CLDS 10.17B/ --�_ lo UE I I I II�� �/zo REPLAOE 7 SY U O cD / / PLICE NEW U/G I I I � 1' SAW CUT FROM I I I / \ - Lu OF CONIC DRIVEWAY TELEPHONEx L INTO I I CURB REPLACE E J o \ / �/ 5�� \ \ \\ o z CN CLD 10.27A / / \ c w c. \ I MB vc �o �— / / I EX. COPPE �ABL f 0 I (TYP) �i I I o ` \\ o Qo \ / BE DONE OT RS. / / a U) w L) CD LP \ SHAMIEKA & HUSBAND MALIK DIXON•d 5 I III I I I / / / \ \ \ �\ w p w ~ w I �� /// ` \ 702PCOR NTHIAN PLACE / / /� RE CE 6 SY '; - / I / \ \ DB 29554 PG 571 0 ON C EW LK I I \ / \ a z w 'j EPLACE 112 LF CIF LLJ z I� U a z s 2'-6/" STD. CURBDEC - CHARLES K MOR & / / ul `' O ° "'' GUTTER / I EX. 4 GAS �,Itl TO B CURT" MORTON N C S 10.17A ® — Ex B RETAIN \ / e -r 710 P 57-195-08 � Y TH _703 CORINTHIAN PL GRATE7.09' f AB DONED B 0 ER II II \ , \ / DB 10253 PG 26 > Q / / sw INv=71a� �ti � � REMOVE 5 L 710 — � 2,15 RCP > WCULT Iw.' ¢ // EX MHH°,o PROPOSEDCLDS 10.30 4�7 5"RCP —� - �{ " - Q (FILL ! GAS MAIN LID=714.94' I " / Q 7 - - - - - 123+ — / 1+85 40= w INv=71 8' PLUG ANDo f TO BE— / / cn (REMOVE r' �Sr IGN— _ - 00 X I /0+00.00 / FILL WI I INS ALLED I / / z GRATE=71 .02 0 - - / O a K / FLOWA ° BY OTHERS I I / \ ` / SW INV 14.34' - `I - FILL CONT ACTOR 0 MINIMIZE RENC �I I ~. / r / ~ \ I o AM Ex ce �� — � T - _ _ �_ 1 TO M INTAI TO GU I cary \ \ TOP=71 -03' _- 0� 4 4 ^' Y 4 4 " ° 'I — — — ° _ - - AMAIN AIN 3' FROM EX. GUY. / I I / / _ \ / INV OUT=714.11' °- c' _ \ < CO REPLACE RAMP. SEE \ \ CD �I 18"RCP---------- GP SIDEWALK RAMP \ 78 PL �I FIL WITH DETAIL SHEETS I / ` o oG Nc Ex c FL W BL L 1 o \ \ GRATE= 14 ' '� ( ) I I �`^I a� 25 I I I I ,y \ II / �'X-SSMH \ / - Sly SW INV=712.59' / LID=716.26' _ �p- BST �Q WATER OAK NC PARTNERS, LLC EX CB N INV=709.50' BST �( / C/0 CORTLAND PARTNERS LLC \ \ �Q Q PID#163-082-22 TOP=717.13' I I / E INV=709.47' O� BST Walker Road �^ a o/ \I I / / / 4909 WATER OAK RD. \ \ \ P \ E INV-713.32' I 69 E INV=709.59' / ' N �^ - DB 29726 PG 50 \ TPED W INV=713.15' W W �W//�Z— OE (6 0uWic � O� a NINST LL 18 LF LLJ EDi_ ) _ / 8" DI SEWER, H I o OE T OE/M PC 3 0 Ex SSMtin SS OE OE ONC _ 79 F LID=713.40' -SS SS SS ��9� - 4a MAT H EX• N INV=705.39 / D G G ��� �F � ��- �F LINE &GRADE SW INV=705.30' � CONC � -� " �„ { QUYS r O IP �G ��sr� — — 8' DIP PLUG NCDOTT4OaL —� E P -� I I \ �� DUMPSTER —j C€ 2S APARTMENT \ \ \ Z EIP CONC — — _ s REPLACE RAMP S�� S LK I \ RET IN r�— — CONc- L — RAMP DE AIL SHEETS o R PLACE�50 OF LOUELLA ALLEN HEFNER—L SOLAR 2 6" CURB & GUTTE / \ BST \\ \ PROP 164 L F " IP RAYMOND FIELD & WIFE r A PID#157-183-12 \ T 7 -Ev m BETTY D. FIELD 635 N. SHARON AMITY R . C DS 10.1 A LINING @ 2,0% PID#157-183-13 I DB 3357 PG 442/ _ _REPLACE 51 SY ��(PIL\L\ R M ATCH I -I N E SHEET H EE I / 481 WALKER RD. I \ P OF CONIC SIDEWALK ti / \\ nva MATCHLINE SHEET 7 0 i 732 726 726 'I 0 728 722 722 N 71 of c� 0 00 75 a I� 01 O^ N II N~ Z ^ II ^ > 724 ��°�.' 0 718 0° > II j o ° 5 0 N m 00 _ p m z z Q EXISTING GROUN ~ 718 Pa N H N> O+ >> m'* O O m O w w 00 ^z aop�Nzz U m m EGAS LINE LLJ 73 � 0 pU 0" X in 00 on n Z 0-ZU)0 0-Zt/1 0'U a oN U w UP UF - 1 .4 ^ /�-- --- wa. Z II � ,TEST HOLE 10/02/201 - - - - - - EX. UNDERGROUND 720 CN Ln O N ^ o 714 714 a w o I N N II EXISTING ROUND m N ^ > U CA II O t0 II F- ------------� p 0 II Fch + Z=------� ---- �\ v O O 00 N1 _ O �� - _ /� 716 o 0 o N^ z z __------- Aa oa 7 -7 PRO p55 ` PR P 710 0 Q ¢ 'o if 15' 710 uF _ _ (]] J " RC _ o a RCP 's ` w as 1 ___------- ------------------ �_ 0 $ •2 a L i ~_ EX. 15�� RCP - - - - - - - - RETAIN Ex. - - - - PROP. 22 LF c' N Ex. U/c _ = BE REMOVED) 175 LF 15" 15" RCP � ^ 706 706 712 TELEP � TRGP CLASS IV _ Z EX12" DIP WATER MAIN 0 &50 0 _ - mOMO Z O r/ CN I- N > > "Do Do a0 z z SH ARON "B" STA. 0� 00 0� 70.87 oo¢�. ..� 708 a.Z��� O N� Z ^ II � II 72 PROP. 34 LF POP. 35 LF 18" o ao z z 0 00 0 50 .�j " 00 RCP RCP 0 0.51 % 00 ± rn _ _ O 0 20 40 V zz 10 30 0,50% EX. 8" SANITARY 0 O 't N > >00 SEWER - HORIZ S ALE: 1 "=20' 704 REPLACE W/ DIP a z c~n � w '� +b O 9 LF 18 RCP @ 77 0 5 10 10.00% VERT S ALE: 1"=5' O 700 FF a SH ARON "A" STA. 1 21 +09.75 — 1 24+ 80.5 PPELMNAPY PLANS 696 121+00 121+50 122+00 122+50 123+00 123+50 124+00 124+50 125+00 DO NOT USE FOR CONSTRUCTION o N MATCHLINE SHEET 8 MATCHLINE EET 20 \,- x e f' GARAGE y m \ \ 0 20 40 f 10 W PUE fff I II I \ I I KACEY NEIL SPEARS / 3 "ASH MICHAEL F. LANGEL & WIF PID#1 H. LANGEL PID#157-1 1-02 -x- ® / I \ I I I I I / I I \ AND WIFE, AMY SPEARS as e — I EVIN JOSEPH ALTON & V�FE I I 4526 WIATERI OAK 1RD. I 10 30 I I APID 5 B 1D4L 9N I 48" P L R I I , DB 4618 PG 89 \ GRAVELI 4527 WATER AK RD. I I 939 LI DA LN. I I l I 48" OPLAR I 12" APLE I �Z ? \ SCALE: 1 =20' DB 14037 PG 176 O N / DB 2306 PG 542 c^' x �- It I I \ c I I (RETAIN) I Gdvo BST I ,/ EX INLV 709.68 <v� \ CONC \ I OPEN END r/ cJfn /8" MA LE ¢ I I w I I / Z \ / �`\ C 4" P V�niM -�'�: L /C,�p`m� \ I I � II n — — O DE TIN/� TION "� G PORTABLE / / \ 1 EX [B I \ \ J r — OE ( IN OE\ NKVI7�WM vE CANOPY \ I \\ / I GRATE=731.16' J r NCA —x ee — of OE T RETAIN 46 A— RE AIN II cn = - - - - - - GRATE=716.39' m w/ - / CONC — — — T 43 /-AI�INV-= 86 I Q) HELEN HACKNEY A SS — 15" RCP —9E PID#157-183-24 y \ 4 /) 4� S —G =��— �\ — STL S/ 1 4618 WALKER ROD �/ 4' \ — m a n e EX SSMH \ �7 —G— — — _�� �_ — �_ \ v CONC "< — —J[5-� DB 2544 PG 260 \ LID=715.83DESTINATION15" RCP — AIN)_ _ _ _— _ nBST UN OWN RETAIN— __ — _ /W ,N INV=706.33r GRATE=7EX B 615' CP O S� ST ) E INV=708.76' O EX CB / O / CAR / SW INV=705.71' GRATE=715`Q5' �� BST - NW IN-709.10' / / �ETAIN a �/n e / / /X SM — - _ _ _ z � � PALL N HAN �CEY PORT CLARA S. HATHCOCK SE INV=705.23' S INV=708.16' NE INV 710.93' L 45 —S 0+12.84 0+71.85 LID=729.26' 15" RCP EX SMH w 9- PID#15-183-23— — — \ — — x PID#157-183-25 1+20.44 (REMOVE) SE INV/09.21' / O �u7 > 4628 ALKER RD \ 4608 WALKER RD �`- _� <v 1+00.00 SW INV- 11.25' ( BST NE INV-7/26.54' O 44 LID=731.8� cn z DB 25 05 PG 521 DB 8074 PG 859 _ /� ° \ I C IJ 0 f u b I i C �/W1 ( / SW INV724.84' r / EX SSMH II NW IN729.28' \ Q 52 / / / LID=731.29' SE INV=729.32' / o 0 49 o I I I \ \ NW INV=725.95' 2918' / SE INV=725.83' <SW INV=7 w 1. \ — — \ — — — — — \ 6" DI 51 \ \ \ 12" RCP PLUG AND FILL m z a REPLACE 17 LF OF \ \ W -�_ NV=7��0' \ \ DESTINATION UNKNOWN p z N \__-- a —T / — — — _ 4' METAL FENCE \ — \_ \ \ \ \ WITH PLOWABLE J c.� w N � -- — — —— ) / o L P T o �/ W — �� \ \ �� \ I FILL(0.3 CY) `�z�o ` 1 Sz — �� INSTALL�BJECT ` A o y%a . �� // / V l L ) O I a w w o m \ \ I \ \ \ N x OM3MARKER SIGN / �EIP 3 0 4„ A�H / / / �F�l �'ti l / w� rr' Ln �� z 0 Lu m a z c7 mbu \ \ INSTALL 77 LF F _ / S� I - a Ln a CONC 2'- STD. EE -710. x covc / ��� / 0 I 0 Q I� w Lij o o y / Y 2 4�1I AP L o 7 - r+ / u7 O Q • CURB �c GUTTER " MlMfys/C 4'1 PINE El IN 714. 9' PLANTER ] / / I f / > ti U a z FF— \ I I \ / —— _ — — CLD 10.17A x INV=707.95' I REM L REPLA�E 5 S , - -� I�-----\^1 —�—I f N — / OPEN � /// „ RC OF -6RIV AY ,� o / / / / °�� I Q r�\ I / O /// I /2`LDS 102 ``f- — O 0 Rf �D� EPLACE 52 L OF / I I x7/ / / / / / I z �,n Q I I \ I 4' WOODEN LIT RA 18" MAGNOLIA / / / / J II n � \ / QLAMP> > INSTALL OBE T � .. / — — — FENCE W/ WOVENrl E s" MAGNO IA J I MARKER SIOe I 24" M �E �3 TONS 4LA S I/ RIP R / I �© I \ \ ( 1 MAGx061AMAPL / 4° MA // / 10 X12'X0.5' �0 R 1 $ OM3—L I C PILE KEYED I �4CD T �YF{E / OI I O GED `E FAB C I I / m y I/ Q 1 E i ® I I J / 24 Ho / °o/ 4„ P R ' Q / r / I CON O I \ / r 18" AGNO� / � I / CONC / / / F J CONC / / / / / BRICK WALL n / I O / I PLANTER I / (n / / INS�ALL FIA—NiviiNT/ LF / m 42 cn o / + / P T CONIPLANTER KRISTIL. CLUTTSIr /� / I S /I �FRMAN�NT NCE UIL D K AND SPOUSE, TFI�S J / ftN S r LATE PATIO RANDALL T. CLUTT$ BST ` l / Q 15' K RESET / / / 4600 PID#WATER OAK RD. o I \ �`-� PAUL E. DRYDEN &WIFE / 1 OAK / / DB 30185 PG 516 / KATHLEEN H. DRYDEN / / / / /® \ SLAT,E WALL I ti r 1 f PID#157-182-36 \ 3 / 942 LINDA LN. Om I \ O DB 17936 PG 950 / I 15"Q'AK I / II 2 pa 2SBD I' I / z 1SBD / / I I JWENDY BRANNONKBROOKSE I 4601D#157-1OAKORD. w STEPS CONG I I DB WATER 29144 PG 114 -: — yn I U l l / / OIL CONC I 11 0q \ --- — OE _---�OE z OE c — — PLA TER �Walker Road\--� --- S� I � I / I 1 I `�. RAIL F � � T \� / I _ / 10 �, Lo E R CIA 49 rn I:, +b � 722 722 Ln PROPOSED�� o m GROUND II m 3 Obi O co M EXISTING 52 N ' II 00 Ln O 52 0 Q n Q GROUND 3 co 2 0= N 01 01 O N 0o 0 1 0000 II Z II H�pZ 718 3a`noocool z oNoz II zo 0 0+o�n av1 u u Z� o II +> mco - azo�� o II,n >> o 718 aOQ a00�Z �Z i EX,15'RCP/ m�0�»> m� 'n> c� 00 0 o d MOVEi t' z z z ,� z ao� - - - ao o z cn a z c~n w (RE ___..._.. _.. a / oo M: oo _ a- zcnw��wIt az &E 72 72 o /..... EX. 6" DIP / \�� N 714 WATER MAIN 714 NN (SUPPORT DURING �g u m o m w CONSTRUCTION) / RCR �. - F X 48'�V -s9 ��o F A = U 3 p U � d InI U Lj V1 710 0 PROP 20 LF 15" 710 � GL (REMOV o u o Q v N Z O - v Uuj FpL0>> y 5 0 OMB Z Z 706 PROP. 20 LF 1 o + in in 706 X o 0 PROP. 13 LF 48 0.50% N } > RCP 3.12% 50 u w a � a 702 702 w � � 0 0 40 O w O INDA LANE 19A 0+00.00 0+71 .8 BIND LANE 1 B STA. +00.00 1 +20. 4 HORZ SCALE: 13020' z a - o�w A 0 5 10 VERT SCALE: 1 "=5' C a PPELMNAPY PLANS DO NOT USE FOR CONSTRUCTION W 0+00 0+50 0+75 1+00 1+25 x F / x JOEL L. ADELMAN / AND WIFE, STEPHANIE W. ADELMAN PID#157-131-11 GRASS PLANT ° ' 735 -� / 7 KACEY NEIL SPEARS JOSEPH LINN JR. AND WIFE, AMY B. SPEARS AND WIFE JOYCELYN LINN I \ PID#157-131-02 PID#157-131-01 / 4527 WATER OAK RD, — / x x 3' WWF— x 735 4511 WATER OAK RD. DB 24099 PG 213 \ _� NANAKWASI OKRAH AND WIF �� LAMONICA OKRAHLLJ O 4523 WATER OAK RD. DB 14037 PG 176 — \B 19046 PG 438 0 20 40 / - - 45PID#157-131-2 RD DB 29180 PG 887 6 0 GU 5 ^� 10 30 • CONNECT TA -CROP Ex CB EX. 15" R� -CB w T / — _ _ SCALE: 1' =20' \ W W \ Water `Oak R s (� 1 6 O P LI �� I C R O SW INV=731.64' � �d \ SW \ o / ) T x B (REMOVE) _ — — — _ \ �REPLACE 40 LF 8„ DI SEWER PIPE, PC 350 — — — — _ _ — — — = - — — — — — � — — — — — -- - — �.E;, \ �7 so— — — — — } R STAIN BST G A 33.89' EX SSMH I6 esr \\V SW INV=727.27 -- C!) S INV=730.69' 1+I 88 LID�4.69' �I I _— �I INV=729.64' a 0 a k Road— W -15L"RCP 2 BST RETAIN o (60 P� I I( /W) ���<X — z --- _\_ 1 0� — / CB _ GRATE=729.79' I BST EX SSMH z o(D 0 Z / —--- OE REMOVE 10 LF wv Y W 15 RCP --�— 8" TCPSS 6" DI Z — — — —S— =� — CONC NE INV=726.70' II W INV=726.56'NW LID=730.84' IN27.14' SE INV=727.10' .. M - w Sri Z U OE OE — —I — 6" PM ° ° ` L A ' ° ACE 28 LF OE � J — — — — \ — — co- -— cc 8» TCP // BST F+� Q > / PEIS%+ATlb -OE 0E — o` :o __T PLUG Q� OF o E 0 B &aLGUTTER \ I — — — — — wo // — — _ — SS— �S -- SS SS—r SS 8„ TCP tout SS �' �m z LU U 1- / / _ - NCW 840.71 / _ ABANDON d Utility Owner DUKE PO R St NEW PO 27 LF EX. Description/ �W 15" RCP f I �� OE 0 E / / U wv CL 5-19� OE OE / v R CE I O CONCRE E SIDEWA EIP O/F/ OE OE \ ` PRIVACY FENCE OE (n / O a S / I I I / / — — — — — —SS S — — _ _ — — — — — CONC OE OE © / E— \ �- OE OE a v' o z N c� w c� r] a0 z N w o a U o w w w o l` Y m w k n r f Tim r ft. Attachment i ®Du E e i O a a e t IN PLACE Heights ❑Be Sout � ❑Other — ft. - S l ❑C T —fi. ❑Other —ft. EX INV 0.45' BURIED ft. CUTft. FILL OPEN E LL Q) - I REPL CON E U _- WF1E�CIR RAMP O / SIDEWALK RA 730 / coN tout x / /— / \O30 RETAIN ® / o x �/_< -- 4 DETAIL �/° �— \ ��F 00E �E �\ © / L_L_ W w ti LL x z z U a lz,. (Z' o .4 , a o9r oProposed L0 o = lGrade ztiUa z Remarks GUYWIREA0 BE REMOVED AND CONCRET�4VHEELCHAIR 0- REPL D WITH A SLACK SPAN RAMP. SE StDEWAL AMP DETAIL I I� I SVC S EETS G 0 _ I \ // / BRICK / PLANTER 730 I (� \ �"5 \ / / \ �, BIEETP L1 HIPHAP I I I Ui i c Own DUKE POWER— Sta. I escrip ion NE� POLE -- y�g{.i{ -\ oc- h�trrBn ®Duke-Er2r —_ ft. ❑Ti orner — it. �- gy I ights ❑Bell South Other —it. R ACEI 28 }}SY OF x I ❑ —fi. ❑Other — ft. CON RET SI{�E ALK I I I 0 III / I Q� \ I III 40 � BENJAMIN S. BAXTER & WIFE _ GILLIAN C. BAXTER I / I AN TER I I © I LANTE m— I \ ° I / STEPS \ Q \ Z // °�- v \ (� _ o o= -' \� C POST r l / \ / Prop ed I Gro ft. CUTft. FILL Q�\ I ^ I \ v STEPS ) B I QUEEN CHARLOTTE'S 940 QUEEN CHARLOTTE'S CT. j2 DB 21257 PG 825 � ' \ w � r /_/ BRICK WOOD � I � � - 0 U l Remork NEW POLE 1�A CUT OR URS I I C H T �1 E M E J (T I G �� ; I I I \ / o� ' a = / PATIO DECK 2SFD / �� _ — Q, / \/ �25 \ / I BOA D OF EDUCATION PI #157-134-34 I 440 WATER OAK RD. I D 7025 PG 514 (RETAIN) ) I I EX OTCB W/MH POST \ LID-729.99' / K / I I / I / h / GOAL CONC 2SFD GRAVEL / // / ALLISOt C. ROSENSTOCK ' �1 ' / / \ / o ;25 / �� 1 PLANTER E" Q I I I O J / / FLOW IN=728.82' I/ Ix I E INV=726.22' / °( / ECK I \ Q / _ PID 157-134-78 r u Za/ 4518 WATER OAK RD. ' / — I a Ex c (REMOV INSTALL GRATE=730.73' h 4„ / STAKES, SE INV=7 .05'I I TTI I o MA NG, / SEEDING. LIVE d TEMPORARY 3' AND CKET FE SEE SHEET DB 23764 PG 292 /\ // I I\ PLANTS, STEPS — _` k I \ EX INV=732.02' c I o / O D1 FOR \ I x R I� IN DETAIL. � / U DECK \ 6 -� � THOMAS E. NEWSOME & WIFE ANN M. N M E 30FTR 34 EX IN=�y.45' F 6" B �H _ �� / �� D FENCEPID�/157-134-02 // _ — / 134- � 4524 WATER OAK RD. / DB 4000 PG 167 POST 3 RC \ ! RETAIN \CB �\ - \ 10„ �25 EX INV=718.29 �- R TAIIN R „T IP �� 1 OPEN END \ ✓ GRATE=730.60' I \ � O _ \ \ / � � \ r \ _ _ \ / 2SBD 2SBD \ w � ��� \ \ \ E 8" CMP \ \ DES f TIONI UNK OW\ W I : O I NW Imo/=725.89I� SE INV=725.54' O I _ _ III EE ET \� 3 M=PL€ 48" OAK / \ 15" dr MICHAEL F. LANGEL & WIFE ANITA H. LANGEL 3 PORT ) I / PID�/157-134-01 CANOPIE J 4526 WATER OAK RD. _ \ \ o O O I S+ 2 l O I I � / \ \ / �. DB 4618 PG 89 $�j�_""\ Z \ \ \ _ o RPL NC 1 LF o I 31 TE P R/ 36 SY AM RE sDE I Q� CH /�� K SILL 1 ASHMAPL I aF 8„ 1 \ \ \ I I OF CO�1C -6" g \ \ CI�RB & gUTTEi� T I h ; 0 S R o ROCK SILL -� SEE SHEET D2. \ EASE _ SEE DETAIL \ 10" BIR H \ C �PL\� 48" APL o M 6PLE \ \ l I \ \ CL S 1�.17A Ow ° \ 1 0 I PR ER SHEET 62. CEDAR n" CEDAR_ I �t-rtg \\\ \ (U CONC \ I I / 7 \ POST I \ { Al,O �- E ! — _ nva CIA o 740 ,- rn 'I N r+) LO Ln O 0 to � N ^ II II ^ !b Z Z00 • -- 730 736 1 1b N 33 ^ O r 0 00'4� O n LO0 3 0 `n II t� N t° � N �� a b PO I p tD pt > > +apzz0 00 = - N N z F_ -O ' i II i t00 n EXISTING GROUND 00 - M> C) U� `r 10 Z xxLo ix o* Itap0000 ON II II >> +4 Z O ao�^Z OQ ZVt wLd - 796 _ F- �' > > 00 O - - - - O r- Z F r7 M>> o o a r2 M > > 0 n Z Z 11 Z Vt �- -- -- _-- ----- �P RETAIN �� CL _ - P N a 732 ;n o z z pry ,� Z fn E 11 0 Q - - O -__ Z Vt Uj W �� ------ < M � � _------ -- ---- ----- x. 6" DIP - _ - C SOP Nl�f� 9°J F ° ��, - >1 a O m _-------- - WATER TOP MAIN F PIPE=730.44 - - - - - \ /\ �_ I � TEST OLE 10/2/2014 722 P/�0 C \\ // ��? I _ s b - W w Q I S M O+N _ N r���� 01JJ J ¢ `" II x v w SEWER c S gE� REPLACE W/ DIP �5 w J +�W0 F_o Y w = �� +-�0 oF- F 728 OP P F g0 �p°I° ®9 I �'OP OPE CNS 0 R Y 0 w vt W 0 \� \\\ w 2 cn cn sS29° IS ��P twit °0i718 a N 9Z Q F 15" % ROP PROP, 25 LF 15" RCP 0 0.50% PROP. 88 RCP 0.5 o Y o w U w o Ow 724 LnOw2 LLJ S CN C p N X j w C� '„ i � .rl 9 of o U 0.. 714 720 710 w 30 716 10 HORIZ SCALE: 1"=20' �i p ~ w 0 5 10 � w a O a 712 VERT S ALE: 1 "=5' Z A o~w WAS � CHANNELIMPROV MENTS 0+00-1+11.00 O 08 QUEEN CH ARGOT E STA. 130+ 00.0 — 131 + 89.48 PPELMNAPY PLANS 704 DO NOT USE FOR CONSTRUCTION W o 130+00 130+50 131+00 131+50 131+75 10+00 0+50 1+00 1+50 N N INLET TYPICAL SECTION COCONUT FIBER MATTING KEY IN A MIN. OF 12" BELOW RIPRAP TOE AND EXISTING GROUND FILTER FABRIC CHANNEL ---------------� DEPTH VARIES ------------- ---- 4' — 5' ---- ---------- CLASS-11" �� DIRECTION KEYEDAN LIVE STAKING OF FLOW SEE DETAIL THIS SHEET LIVE STAKING SEE DETAIL ?17 THIS SHEET BENCH CHANNEL VARIES VARIES 9'-11' 3' OUTLET TYPICAL SECTION (STA. 1 +73.15 TO 1 +94,17) EXISTING GROUND CHANNEL -------_ DEPTH VARIES ------------ ------------------------------------------------ ° ° 17 DIRECTION° OF FLOW O 1. 5' °� ce ° ° CLASS I RIP RAP W/ of FILTER FABRIC BENCH CHANNEL VARIES VARIES KEY 9'-113 3' IN 1.5' OUTLET CHANNEL TYPICAL SECTION (STA. 0+18 TO 1 +73.15) APPROXIMATELY 775 CY OF CUT FROM COCONUT FIBER MATTING STA. 0+18 TO KEY IN A MIN. OF 12 1+73.15 BELOW RIPRAP TOE AND FILTER FABRIC EXISTING GROUND CHANNEL ---------__ DEPTH VARIES - ---------- ---- 4' — 5----------- -------------------- CLASS —II REP A P ERD DIRECTION LIVE STAKING OF FLOW SEE DETAIL THIS SHEET LIVE STAKING SEE DETAIL THIS SHEET BENCH CHANNEL VARIES VARIES 9 —11 3' PRECAST CONCRETE BOX CULVERT MIN. 21 SF 7' 3' 4' 3' 5' DIRECTION DIRECTION OF FLOW OF FLOW 6" SILL 1' SILL A/ BACKFILL WITH NATIVE MATERIAL, MIN. 35 SF (28 SF W/ SILLS) SEE NOTE CULVERT TYPICAL AT INLET FACE (LEFT TO RIGHT LOOKING DOWNSTREAM) NOTE: NATIVE MATERIAL CONSISTS OF MATERIAL THAT IS EXCAVATED FROM THE STREAM BED AT THE PROJECT SITE DURING CULVERT CONSTRUCTION. ONLY MATERIAL THAT IS EXCAVATED FROM THE STREAM BED MAY BE USED TO LINE THE LOW FLOW CULVERT BARREL. IF RIP RAP IS USED TO LINE THE HIGH FLOW CULVERT BARREL. NATIVE MATERIAL SHOULD BE PLACED ON TOP TO FILL VOIDS AND PROVIDE A FLAT SURFACE FOR ANIMAL PASSAGE, NATIVE MATERIAL IS SUBJECT TO APPROVAL BY THE ENGINEER AND MAY BE SUBJECT TO PERMIT CONDTIIONS. DETA E 1 EMORY LANE CULVERT CROSSING SURFACE FLOW DIVERSION 6" WASHED STONE STREAM SURFACE FLOW DIVERSION NOTES 1. REMOVE THE STRUCTURE WHEN NO LONGER NEEDED. (NOT TO EXCEED 1 YEAR). 2. AS A MINIMUM, DESIGN THE STRUCTURE TO PASS 2 YEAR PEAK FLOW WITHOUT OVERTOPPING. 3. ENSURE THAT DESIGN FLOW VELOCITY AT THE OUTLET OF THE CROSSING STRUCTURE IS NON -EROSIVE FOR THE RECEIVING STREAM CHANNEL. 4. ADDITIONAL MEASURES MAY BE REQURIED PER THE CITY ENGINEER BASED ON SPECIFIC SITE CONDITIONS. 112 PIPE D A. OR 12" WHICHEVER IS GREATER. RAP GIV VIIVLGfC IV .]ILL rrG `.]LG IVV IL L� PROVIDE PIPE SIZE, INVERTS, SLOPE AND MATERIAL FOR EACH CROSSING. NOT TO SCALE Vb• CITY OF CHARLOTTE CCY� LAND DEVELOPMENT OPMENTTANDARDS 0 CITY OF CHARLOTTE LAND DEVELOPMENT STANDARDS TEMPORARY STREAM CROSSING STD. N0. REV. CII.ARI.OTTT.. INCLUDES CHARLOTTE ETJ 1 30.14 1 5 CHARLOTTE.. INCLUDES CHARLOTTE ETJ TRENCH TO BE BACKFILLED WITH APPROVED SUITABLE MATERIAL AS DIRECTED BY THE ENGINEER MANHOLE FRAME AND COVER J Q 1/2" CEMENT MORTAR TYP, o z PROPOSED SIDEWALK STANDARD FRAME, GRATE AND HOOD /L V-51/" OR PLANTING STRIP - ° SLOPE 1"/FT. a o 8" MIN. ° 12" 12" MINIMUM COVER OR AS SPECIFIED BY UTILITY COMPANY. 24" � �C DOWEL DETAIL SELECT BACKFILL OR / FLOWABLE FILL NOTES 1. PRIOR APPROVAL FROM THE CITY ENGINEER IS REQUIRED. 2. THIS STRUCTURE IS TO ONLY BE USED ON CITY MAINTAINED STREETS AND NOT ON NCDOT STREETS WITHOUT THEIR PERMISSION. EXISTING UTILITY LINE SEE CATCH BASIN DETAIL 6" MIN. ® D 6"CLEAR �2" KEY MIN. E o o E o #4 REBAR DOWEL @ 6" o. c. E 1 SEE DETAIL N11- ° a o SEE APPROPRIATE ROADWAY SECTION 9- 3/4" L 1-1/2" COVER ( TYP. ) #4 REBAR @ 6" O.C. BOTH WAYS ( TYP. ). SEE STEP DETAIL (STD 20.12 OR NCDOT 840.66) OFFSET CATCH BASIN (OLDS 20.34 - MODIFIED) NOT TO SCALE TOP OF BANK INSTALLED LIVE STAKE (SEE DETAIL) TOE OF BANK SQUARE CUT 1 BUDS FACING KEY/ANCHOR MATERIAL AT TOP OF SLOPE. JERAL NOTES LAY BLANKETS LOOSELY AND STAKE OR STAPLE TO MAINTAIN DIRECT CONTACT WITH THE SOIL DO NOT STRETCH. * DIMENSIONS SHOWN ARE MINIMUM, MANUFACTURED PRODUCTS MAY HAVE ADDITIONAL REQUIREMENTS THAT MUST BE MET, SLOPE SURFACE SHALL BE FREE OF ROCKS, SOIL CLODS, STICKS, GRASS. MAT/BLANKETS SHALL HAVE GOOD SOIL CONTACT. THE DETAIL SHOWN IS FOR SLOPE MATTING. FOR CHANNEL OR PIPE OUTFALL MATTING SPECIFICATIONS, PLEASE REFER TO NCESCPDM STANDARD #6.17 AND MANUFACTURER'S GUIDELINES. R FABRIC 4' ABOVE SOURCE WATER. KEY/ANCHOR MATERIAL TO TOE OF SLOPE. EMBANKMENT MATTING DETAIL DIVE STAKING X1 X2 LIVE STAKE, SHOWN WITH LEAF AND ROOT DEVELOPMENT X3 X1 X2 APPROXIMATE BASE FLOW WATER LEVEL — X3 � x/\�\///\ x CROSS SECTION X7 IPWARDS ANGLE CUT 45DEGREES X5 LIVE STAKE DETAIL NOT TO SCALE 30.20 11 EXISTING TREES AND/OR SHRUBS DRIP LINE (SEE NOTE 6) APPROXIMATE BASE FLOW LIVE STAKE, TYP. WATER LEVEL (SEE DETAIL, SHEET 2) PLAN VIEW TOP OF BANK VTOE OF BANK EROSION CONTROL MATTING, IF SPECIFIED (SEE NOTE 1) INSTALLED LIVE STAKE DETAIL VARIABLE VALUES UNIT DESCRIPTION X1 1 FT LIVE STAKE PLACEMENT FROM TOP OF BANK X2 2 FT LIVE STAKE SPACING X3 AT BASE FLOW FT LIVE STAKE SPACING TO BASE FLOW WATER LEVEL X5 30 IN LIVE STAKE LENGTH X6 18 IN DEPTH OF LIVE STAKE INTO GROUND X7 1/-1 2 IN LIVE STAKE DIAMETER NOTES: 1. INSTALL WOVEN COIR FIBER MAT WITH LONG STRAW MULCH BENEATH MAT. 2. INSTALL LIVE STAKES STARTING AT THE BANKFULL ELEVATION ON A 2' BY 2' TRIANGULAR SPACING. 3. DRIVE LIVE STAKES IN AT A RIGHT ANGLE TO THE STREAM BANK USING A DEAD BLOW HAMMER. 4. STAKES SHOULD HAVE A DIAMETER IN THE RANGE OF 0.5" TO 1.5". 5. SEE SPECIAL PROVISIONS FOR LIVE STAKE SPECIES. 6. LIVE STAKES SHALL NOT BE PLACED WITHIN THE DRIP LINE OF ANY EXISTING TREES AND/OR SHRUBS THAT REMAIN ON THE BANKS. 7. LIVE STAKES SHALL BE FASHIONED FROM DORMANT CUTTINGS, INCLUDING: CORNUS AMOMUM (SILKY DOGWOOD) SAMBUCUS EBULUS (ELDERBERRY) CEPHALANTHUS OCCIDENTALIS (BUTTONBUSH) ON SHEET 19 ONLY, LIVE STAKES SHALL INCLUDE A COMBINATION OF THE ABOVE MENTIONED LIVE STAKES AND APPROXIMATELY 50% OF THE LIVE STAKINGS SHALL INCLUDE DORMANT CUTTINGS, FROM WOODY PLANT SPECIES INCLUDING: ACER RUBRUM (RED MAPLE) ULMUS ALATA (WINGED ELM) 8. THE PLAN VIEW ILLUSTRATES A PERPENDICULAR PERSPECTIVE OF EACH SURFACE DEPICTED IN THE CROSS SECTION PRELMNARW PLANS DO NOr USE ran cOmS7GiN100m W O O z(D a - LLJ Ld > �U) Z Q > 3 G� to w z O Z GV U LLJ CV � o 00 N CDa it U) LLJ U O = 0-Z m LLJW I` criM M ZLLJ z� I� rJ � Lax ,� Q p-I 2: LLJ Ej Lu LO CD ¢ ti > Lo z z O a a U w c� w ❑ O z It E!, i ca 0) a 0 yl 0 / a n cn __j m O va- a w F� w w x LuQ z J U / 0 x U � c aco Q a o w o o U rl % r r 0 0 Z N ) O r Lu ❑ w a ❑ w � C / D w a a U � rw V O PLO H w A w �o� A w � �A 0A EDGE OF PAVEMENT No *END RESURFACING I I DIRECTION OF TRAFFIC LIMITS 15' PRIOR I A A TO EDGE OF HUMP 15'* 15'* STREET CENTERLINE DIRECTION OF TRAFFIC I*END RESURFACING B LIMITS 15' PRIOR TO EDGE OF HUMP Pf Plan View B Z C11 A llll - r" A — d VARIES 1 1' MIN TAPER 2' MAX 5' Section A —A CURB I EXISTING PAVEMENT Section B—B 5' 0 TYPE SF9.5A ASPHALT CONCRETE PER NCDOT STD. SPECS (SECT. 610 & 620) TACK COAT PER NCDOT STD. SPECIFICATIONS. (SECT. 605) 12" TYPE SF9.5A ASPHALT CONCRETE PER NCDOT TAPER STD. SPECS (SECT. 610 & 620) SHOULDER (1' MIN) EXISTING PAVEMENT TACK COAT PER NCDOT STD. SPECIFICATIONS. (SECT. 605) Shoulder Detail For Streets Without Curbs EXISTING -------------- GROUND GRADE BANK AS NEEDED AND SHOWN ON PLANS. INSTALL LIVE STAKING AND MATTING SEE DETAIL SHEET D1 Co NOTES: THE ASPHALT PLANT MIX SHALL BE COMPACTED TO A DENSITY OF AT LEAST 94% NOT TO SCALE CffOFCHARLOTTE DE?AUNN OF TRANSPORTATION 600 EAST FOURTH STREET CHARLOTTE, NC 28202 ROAD HUMP 02/10/12 1 STD.NO. TC-001 I SHEET 1 OF 2 DTICH DETAIL A. FOR STA. 104+ 39.50-108+ 00 DIRECTION OF FLOW EXISTING ------------- GROUND EXISTING CHANNEL �•7 DITCH DEPTH VARIES 0.5' MIN. N WS SLOPE: EXISTING (VARIES), SEE PROFILE SHEET 17 TYPICAL PAVEMENT MARKINGS 22' EDGE OF PAVEMENT DIRECTION TRAVEL LANE EXISTING GRO INSTALL LIB AND MATTIl' SEE DETAIL DITCH DETAL B FOR STA. 108+ 00-110+ 00 DIRECTION nF FI n\N CHANNEL DEPTH VARIES LLPRELMNARW PLANS SLOPE: VARIES, SEE PROFILE SHEET 17 EXISTING ------------------------ GROUND CHANNEL FLOW CHANNEL BANK vII BANK ZONE ZONE 3' W 3' IIIIIIIIIIIIII IIIIIIIIIIIII IIIIIIIIIIIIII = III=1 FOOTER III -III ROCK III IIIIIIIIIIIIII D I111�1 III=III=11 IIIIIIIIIII IIIIIIIIIIIIII III IIIIII 11 . III III III=III- _ =III IIIIIIIIIIIIII IIIIIIIIIIIIII IIIIIIIIIIIIII III=III=1 PLAN WELL GRADED MIX CLASS B AND 57 STONE 1.5' DEEP WITH GEO EXTILE TY E 2 (B)-TOP OF TAILINGS ELEV. FLOODPLAI N 3' 3' w 3' 3' SILL, TYPICAL 2' FILTER FABRIC HEADER BOULDER, TYPICAL FOOTER BOULDER, TYPICAL CROSS SECTION (A) -HEADER ROCK ELEV. TOP OF BANK (SEE NOTE 3) WELL GRADED -----____ MIX CLASS B -- AND #57 STONE HEADER VANE SLOPE ROCK 4% GRAVEL TAILINGS WITH GEOTEXTILE TYPE 2 FLOW 2' DROP (MAX) FLOW FILTER SPLASH PAD BOULDER FABRIC PROFILE NOTES: 1. USE AVERAGE ROCK SIZE 2'X2'X1.5' FOR BOULDERS UNDER HEADER ROCK. SOME VARIATION IN HEADER ROCK IS PERMITTED (MIN. 2'X2'X1'). 2. ROCKS SHOULD BE HAND PICKED AND FITTED TO AVOID GAPS. 3. COARSE BACK FILL SHALL BE NATURAL GRAVEL TAILINGS. PLACE COARSE BACKFILL TO FILL ANY GAPS BETWEEN THE VARIOUS STONE SIZES. COARSE BACFILL THICKNESS SHALL BE EQUAL TO THE TOTAL DEPTH OF THE HEADER AND FOOTER BOULDERS. ROCK S DO Nor ��C �0� C�®�1���C�00�1 LLo q tal fit 1 C1) LLJ D c03 PLO n SHEET/ STA. 20/ 0+ 1 1 .3 20/ 0+39.0 20/ 0+71 .5 20/ 0+99.4 4/ 3+09.37 A 724.78 721.94 718.81 715.96 669.22 B 723.10 720.26 717.13 714.28 668.35 X 8 FT 8 FT 8 FT 8 FT 12 FT 0 20° 20° 20° 20° 20° �/�/ 2 2 2 2 8 W O o � z� • • W Lt7 � O Z GV U W CV � 'in a � O � Z N O W U O m mm W WZ('7 W OLuI ~ LLw .-AZW� II BI 1' IN 1' m 1, 11 1` m 11 m I 111 11 1„ I� 11 I 11 IA I I 1\\\ I 7' , _ I , I , I 11 II � I „ I 11 11 � 11 II � I I 11 NI I Ij it 11 p„ I III I I 1 A1tl II I 1 II II II I " 11 71 I r--------------- - - - - - - - - - - - - — - . I I I I I I ' II I I I I it I ' III I III III II III FULL DEPTH REPLACEMENT (32 SY) d ill II III MILL AND RESURFACE (3305 SY) I II Wa I III I III --_- --- oa c/ / III --- NI------------ ------------- III ----__-_---_----- -- ----------------------------__-_-� I FULL DEPTH REPLACEMENT (1774 SY) FULL DEPTH REPLACEMENT (70 SY) // FULL DEPTH REPLACEMENT (8 SY) r FULL DEPTH REPLACEMENT (44 SY) MILL AND RESURFACE (193 SY) LEGEND I I I I I I I I I I I I I 1 1 "" ' AND RESURFACE (205 SY) III III IIIIIIIII Im III I� III IN IIIIII m II III M � ° III II N III III IW n n III III u III IV III III III III II II III II I� III WII III III III II NI �1 II NI II I I MILL AND RESURFACE (191 SY) -------------- ---------- M III III III III III 11 MILL AND RESURFACE (421 SY) IR III qli m III Po AI III pal / FULL DEPTH REPLACEMENT (126 SY) FULL DEPTH REPLACEMENT (130 SY) p j W 1 a m N IA ° 1 a 1 Ai II N III MNI � � III al AI III IN p a, III III al al III IN tll IR II M A, III RI 01 �I III m IN m u q P FULL DEPTH REPLACEMENT (3,138 SY) MILL AND RESURFACE (7,229 SY) ---------- M I III III III III "' VI III III II II III III II III IV III III III III III W III III IV �I III M III III III III III III III M III III III III IN III II NI III III III III III III M W III II II III III II III III IN III I, III III III II III II III III III III III IN °1 II III III III III III IN III III III III III III III VI � II � II IIII IN ' IR lu I III I IW I Ili I 1 I r � 1 1 r \ 11 \ I y L � I \ I 11 I \y, L \ , v FULL DEPTH REPLACEMENT (70 SY: MILL AND RESURFACE (537 SY) FULL DEPTH REPLACEMENT (75 SY) MILL AND RESURFACE (263 SY) o I II � N II � II III I' III III N III II III � II N II III � II NI II II II III IN I II III - III III NI III I II I I II I NI I I I III 1 I II I I I II I I II I III I III I I I i(------------1 f------------� r----- -- - ----- -- -- I I PRELMNARW PLANS DO M07 USE FOR CONSITRNJMON W O o � z(D a .. ui ) > � cn z Qo S� z W O Z 04 y U LiJ CV di z N p p„I wW w z r7 M 'm WSW'` �w tSk J ICI Lu CD It ID to O Q f� > In = Z Q 0.: w Q y.' oa W F-' O z is (I ( a a yl 0 0 / c O O a / y N a CD w-1 II s j m Q LLJ m W w w x w J U U cn 0 O F 1 co o i a w w O i lJ 5- 5- O Z o r w P� L W C7 L w / D Q � a d w � O Ew„IA� W d � W � a W W O 001 o UO o Z rl U � Cn Z Q p �j. y z W O Z (V y U W N N z o � 3. �wUO wUJLU . M'm pwr- J �1 r ti LL > co Sk J ZUJU Lq ^ � ICI J Ln O Q a � LO O_ F-� a a U cn W �1 0.l W F-' d Q O is nva o v NY �I N O_ O_ C, O O O C O O a N O CD 0 1 O s % m O a U LJ m LJ W w x w J U U cn C O F co O O / [xj Q O lJ O O Z LJ `O W O O � WAw � a � N N w cn GENERAL NOTES A) ALL TRAFFIC CONTROL DEVICES SHALL CONFORM TO THE REQUIREMENTS OF THE MOST CURRENT EDITIONS OF THE CHARLOTTE DEPT. OF TRANSPORTATION(CDOT) WORK AREA TRAFFIC CONTROL HANDBOOK(W.A.T.C.H.), THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES(M.U.T.C.D.), THE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION(NCDOT) SUPPLEMENT TO THE M.U.T.C.D., THE NCDOT ROADWAY STANDARD DRAWINGS AND THE CURRENT EDITION OF THE NCDOT STANDARD SPECIFICATIONS FOR ROADS AND STRUCTURES. B) THE CONTRACTOR IS TO NOTIFY CDOT IN WRITING 10 WORKING DAYS IN ADVANCE OF ANY ROAD CLOSURE OR 5 WORKING DAYS PRIOR TO CLOSING ONE OR MORE TRAVEL LANES IN ACCORDANCE WITH THE SECTION "APPROVAL AND NOTIFICATION REQUIREMENT FOR WORK IN THE PUBLIC RIGHT-OF-WAY OF THE W.A.T.C.H. HANDBOOK. C) ALL SIGNAL REVISIONS OR SHIFTS OF SIGNAL HEADS WILL BE THE RESPONSIBILITY OF CDOT; PRIOR TO REVISING TRAFFIC LANES WHICH REQUIRE SIGNAL REVISIONS, THE CONTRACTOR SHALL NOTIFY THE CDOT IMPLEMENTATION SECTION MANAGER (GUS JORDI / 336-7086) OR HIS REPRESENTATIVE A MINIMUM OF 30 CALENDAR DAYS IN ADVANCE. TRAFFIC LANES SHALL NOT BE SHIFTED UNTIL THE REQUIRED SIGNAL REVISION/SHIFT IS COMPLETE AND READY FOR ACTIVATION. ALL COMPLETE RESTRINGS OR NEW TRAFFIC SIGNALS REQUIRE 60 CALENDAR DAYS NOTICE, D) THE CONTRACTOR SHALL BE REQUIRED TO FURNISH, INSTALL, RELOCATE, AND MAINTAIN ALL TRAFFIC CONTROL DEVICES, SIGNS, BARRICADES, WARNING AND/OR CHANNELIZING DEVICES FOR WORK SITES AND DETOUR ROUTES AS SHOWN IN TRAFFIC CONTROL PLANS UNLESS OTHERWISE SPECIFIED BY THE ENGINEER. E) CONSTRUCTION PHASING MAY DICTATE THAT TWO OR MORE TYPICAL W.A.T.C.H, DIAGRAMS OR STANDARDS BE USED IN ONE AREA OF CONSTRUCTION. CHANNELIZING DEVICES ASSOCIATED WITH THESE TYPICALS SHALL BE MOVED, SUPPLEMENTED, CHANGED, OR REMOVED AS NECESSARY TO COMPLY WITH THE CONSTRUCTION PHASING OF THE PLANS. THE LOCATION AND POSITIONING OF THESE DEVICES SHALL BE APPROVED BY THE ENGINEER TO ENSURE THAT THE MOTORIST DOES NOT RECEIVE FALSE INFORMATION WHEN TWO OR MORE TYPICALS AND/OR ROADWAY STANDARD DRAWINGS OVERLAP F) CONTRACTOR SHOULD BE AWARE THAT WHEN THE CONSTRUCTION AREA IS IN OR NEAR A VERTICAL CREST OR HORIZONTAL CURVE, THE WORK AREA SHALL BE EXTENDED SO THAT LANE CLOSURE BEGINS IN ADVANCE OF THE CURVE AND MINIMUM STOPPING SIGHT DISTANCE IS MET. G) OFF -DUTY POLICE OFFICERS MAY BE REQUIRED AS DIRECTED BY THE ENGINEER TO BE PRESENT FOR CONTROLLING TRAFFIC DURING CONSTRUCTION HOURS. H) THE CONTRACTOR SHALL IDENTIFY ALL HAZARDS WITHIN THE LIMITS OF THE PROJECT WITH WELL -MAINTAINED SIGNS, BARRICADES, WARNING AND/OR CHANNELIZING DEVICES, ON CONNECTING ROADS, ALL BARRICADES, SIGNS, WARNING, AND/OR CHANNELIZING DEVICES SHALL BE MOVED, SUPPLEMENTED, CHANGED, OR REMOVED AS REQUIRED DURING THE PROGRESS OF CONSTRUCTION AS APPROVED BY THE ENGINEER. 1) WORK ON THE PROJECT OR ANY SEPARATE ACTIVITY THEREIN SHALL NOT START UNTIL ALL OF THE REQUIRED SIGNS, BARRICADES, WARNING, AND/OR CHANNELIZING DEVICES ARE INSTALLED AND APPROVED BY THE ENGINEER, J) THE CONTRACTOR SHALL CONTACT GUS JORDI, IMPLEMENTATION SECTION MANAGER (704-336-7086) OR REPRESENTATIVE WITH THE CITY OF CHARLOTTE DEPARTMENT OF TRANSPORTATION (CDOT) TWO WEEKS PRIOR TO BEGINNING ANY WORK, K. THE CONTRACTOR MUST MAINTAIN DURING ALL PERIODS OF CONSTRUCTION ACTIVITY THE ABILITY TO FLAG TRAFFIC USING QUALIFIED FLAGGERS WHEN NECESSARY OR REQUIRED L. THE CONTRACTOR SHALL INSTALL TEMPORARY PAVEMENT MARKINGS AND ADDRESS CONFLICTING PAVEMENT MARKINGS IN ACCORDANCE WITH THE SECTION "TEMPORARY TRAFFIC CONTROL ZONE DEVICES" OF THE W.A.T.C.H. HANDBOOK OR AS DIRECTED BY THE ENGINEER. THE CONTRACTOR SHALL MAINTAIN ANY EXISTING PAVEMENT MARKINGS UNLESS OTHERWISE DIRECTED BY THE ENGINEER. M) THE CONTRACTOR SHALL MAINTAIN TWO WAY TRAFFIC ON ALL PORTIONS OF THIS PROJECT UNLESS OTHERWISE SPECIFIED IN THE PLANS, PROJECT NOTES, OR BY THE ENGINEER. FOR ALL APPROVED ROAD AND LANE CLOSURES, THE CONTRACTOR MUST NOTIFY GUS JORDI, IMPLEMENTATION SECTION MANAGER (704-336-7086) OR REPRESENTATIVE A MINIMUM OF TEN WORKING DAYS PRIOR TO THE ROAD CLOSING, AND FIVE WORKING DAYS PRIOR TO A 24-HOUR/PEAK HOUR LANE CLOSURE. N) THE CONTRACTOR WILL BE REQUIRED TO PROVIDE PROPERTY OWNERS AND TENANTS ACCESS TO THEIR PROPERTIES THROUGHOUT THE PROJECT LIMITS, INCLUDING REASONABLE INGRESS AND EGRESS FOR BUSINESSES. SPECIAL ATTENTION SHALL BE PAID TO FIRE HYDRANTS. 0) THE CONTRACTOR IS TO NOTIFY (BY MAIL) ALL PROPERTY OWNERS AND OCCUPANTS WHO HAVE DIRECT ACCESS TO THE ROADWAY WITHIN THE PROJECT LIMITS A MINIMUM OF 5 AND A MAXIMUM OF 10 WORKING DAYS PRIOR TO INSTALLING TRAFFIC CONTROL DEVICES IN FRONT OF THOSE PROPERTIES. NOTIFICATIONS SHOULD INCLUDE CONTACT PERSONS NAME, TELEPHONE NUMBER, EMAIL ADDRESS, AND MAILING ADDRESS. P) THE CONTRACTOR SHALL PATROL THE WORK SITE AT THE BEGINNING AND END OF EACH WORK DAY, AT A MINIMUM, TO ENSURE THAT ALL TRAFFIC CONTROL DEVICES ARE IN PLACE AND FUNCTIONING PROPERLY. CONTRACTOR SHALL ENSURE THAT ALL TRAFFIC CONTROL DEVICES ARE IN PLACE AND FUNCTIONING AT ALL TIMES DURING PERIODS OF CONSTRUCTION INACTIVITY. Q) DURING PERIODS OF INACTIVITY OR AT NIGHT, EQUIPMENT SHALL NOT BE PARKED IN SUCH A MANNER AS TO BLOCK SIDEWALKS, TRAFFIC CONTROL DEVICES, OR THE MOTORISTS' VIEW OF TRAFFIC. EQUIPMENT SHALL BE AT LEAST 10 FEET AWAY FROM THE TRAVEL LANE. EQUIPMENT SHALL NOT BLOCK SIDEWALKS AT ANY TIME UNLESS THE SIDEWALK ITSELF IS UNDERGOING CONSTRUCTION. R) WHENEVER TRAFFIC MUST BE ROUTED ACROSS THE CENTERLINE DURING CONSTRUCTION ACTIVITY, THE TWO OPPOSING DIRECTIONS MUST BE PHYSICALLY SEPARATED. TRAFFIC CONES CAN BE USED FOR THIS PURPOSE DURING DAYLIGHT HOURS; REFLECTORIZED CONES OR DRUMS MUST BE USED AT NIGHT. TRAFFIC SHALL NOT BE ROUTED ACROSS THE CENTERLINE DURING CONSTRUCTION INACTIVITY UNLESS PAVEMENT MARKING CONFLICTS ARE APPROPRIATELY ADDRESSED AND AGREEMENT ON REMOVAL OR NOT IS WORKED OUT WITH THE ENGINEER IN ACCORDANCE WITH THE SECTION "DURATION OF WORK" OF THE W.A.T.C.H. HANDBOOK. IF THE ENGINEER APPROVES TRAFFIC TO CROSS THE CENTER LINE DURING CONSTRUCTION INACTIVITY, ONLY REFLECTORIZED DRUMS MUST BE USED. S) THE CITY ENGINEER OR DIRECTOR OF THE CHARLOTTE DEPARTMENT OF TRANSPORTATION OR THEIR APPOINTED REPRESENTATIVES ARE AUTHORIZED TO STOP ANY WORK WITHIN PUBLIC RIGHT OF WAY THAT DOES NOT FOLLOW THIS TRAFFIC CONTROL PLAN OR REQUIREMENTS OF THE W.A.T.C.H. AND THE M.U.T.C.D, UNTIL SUCH REQUIREMENTS ARE MET. T) ADJACENT LANES TO CONSTRUCTION ZONES MAY REMAIN OPEN IF LATERAL CLEARANCE BETWEEN EDGE OF TRAVEL LANE AND EQUIPMENT IS EQUAL TO OR GREATER THAN 2 FEET (INCLUDING WIDTH OF DRUM). IF A DROPOFF EXISTS WITHIN THE WORK ZONE, CONTRACTOR SHOULD FOLLOW THE SECTION "MISCELLANEOUS CONSIDERATIONS" OF THE W.A.T.C.H. HANDBOOK PERTAINING TO ADJACENT LANE CLOSURES DUE TO DROPOFFS. U) THE CONTRACTOR SHALL FOLLOW THE PHASING AS DESCRIBED HEREIN. THE CONTRACTOR SHALL COMPLETE THE REQUIREMENTS OF EACH CONSTRUCTION PHASE IN SEQUENCE. WHEN A CONSTRUCTION PHASE IS DIVIDED INTO STEPS, THE CONTRACTOR SHALL COMPLETE THE REQUIREMENTS OF EACH STEP IN SEQUENCE UNLESS OTHERWISE SPECIFIED IN THE PLAN OR APPROVED BY THE ENGINEER, (EXAMPLE: THE REQUIREMENTS OF PHASE I SHALL BE COMPLETED BEFORE PROCEEDING TO PHASE 11; THE REQUIREMENTS OF STEP 1 OF PHASE I SHALL BE COMPLETED BEFORE PROCEEDING TO STEP 2 OF PHASE 1). ALL WORK DESCRIBED IN THE PROJECT PHASING SHALL BE PERFORMED BY THE CONTRACTOR, EXCEPT WHERE IT IS SPECIFIED FOR CERTAIN WORK TO BE PERFORMED BY OTHERS, V) THE CONTRACTOR SHALL NOT BE ALLOWED TO STOP TRAFFIC FOR MORE THAN 5 MINUTES AT A TIME IN ANY ONE DIRECTION. W) CONTRACTOR SHALL NOT BE ALLOWED TO WORK ON BOTH SIDES OF THE ROAD SIMULTANEOUSLY WITHIN THE SAME AREA EXCEPT WHERE THE ROADWAY IS DIVIDED BY A RAISED MEDIAN AND PEDESTRIAN TRAFFIC IS MAINTAINED ON AT LEAST ONE SIDE UNIMPEDED. IT WILL BE ACCEPTABLE TO CONSTRUCT BORE PITS ON EACH SIDE OF A ROADWAY FOR BORING UTILITIES UNDER THE ROADWAY UNLESS SUPERCEDED BY ENGINEER TO COMPLY WITH PEDESTRIAN REQUIREMENTS OR LATERAL CLEARANCE FROM TRAVEL LANES. X) THE CONTRACTOR SHALL PAY SPECIAL ATTENTION TO THE SECTION "PEDESTRIAN CONSIDERATIONS" OF THE W.A.T.C.H. PEDESTRIANS MUST NOT BE REROUTED TO CROSS TO THE OTHER SIDE OF THE ROAD UNLESS THE ENGINEER AGREES THAT THERE IS NO ALTERNATE SAFE ROUTE ON THE SAME SIDE OF THE STREET. THE ALTERNATIVE PEDESTRIAN ROUTE IF APPROVED/USED MUST INCLUDE ACCESSIBILITY AND DETECTABLE FEATURES CONSISTENT WITH THE EXISTING PEDESTRIAN FACILITY. Y) THE CONTRACTOR SHALL PAY SPECIAL ATTENTION TO THE SECTION "TEMPORARY TRAFFIC CONTROL ZONE DEVICES" OF THE W.A.T.C.H. NEITHER PORTABLE NOR PERMANENT SIGNS OR SIGN SUPPORT SHOULD OBSTRUCT SIDEWALKS UNLESS THE SIDEWALK ITSELF IS UNDERGOING CONSTRUCTION. A 4' MINUIMUM CLEAR PATH MUST BE MAINTAINED WHEN A PORTABLE SIGN IS TO BE PLACED IN THE EXISTING SIDEWALK OTHERWISE, ROAD SIGNS SHOULD BE MOUNTED ON A POST WITH A MINIMUM VERTICAL CLEARANCE OF 7' FROM THE SURFACE OF THE SIDEWALK. PROJECT NOTES 1. CONTRACTOR SHALL PROVIDE AND INSTALL ALL FINAL PAVEMENT MARKINGS. CDOT SHALL PROVIDE AND INSTALL ALL FINAL SIGNING. (E&PM PM VERIFY WITH CDOT PM ON EVERY PROJECT) 2, CONTRACTOR SHALL ONLY WORK ON ONE CORNER OF AN INTERSECTION AT A TIME. 3. DURING THE HOURS OF 7:00 AM-9:00 AM AND 4:30 PM-6:30 PM MONDAY THRU FRIDAY CONSTRUCTION OR MAINTENANCE WORK WHICH INVOLVES CLOSURE OF A TRAVEL LANE WILL NOT BE ALLOWED ON THOROUGHFARE STREETS EXCEPT FOR EMERGENCY SITUATIONS OR WITH APPROVAL FROM CDOT. 4. THE CONTRACTOR SHALL LIMIT CONSTRUCTION TO ONE STREET AT A TIME, UNLESS OTHERWISE INSTRUCTED BY THE ENGINEER. THE CONTRACTOR SHALL LIMIT CONSTRUCTION TO ONE BLOCK EACH DAY IN ORDER TO DECREASE THE AMOUNT OF BACKFILL. 5. CONSTRUCTION ACTIVITY IN THE VICINITY OF RANDOLPH MIDDLE SCHOOL ALONG JUDITH COURT, WATER OAK ROAD, AND HARTNESS AVENUE SHALL BE COMPLETED BETWEEN JUNE 15, 2018 AND AUGUST 15, 201& NO OTHER CONSTRUCTION ACTIVITY SHALL TAKE PLACE WITHIN THIS AREA OUTSIDE OF THIS TIME PERIOD WITHOUT PRIOR APPROVAL FROM THE CITY. PORTABLE STGN TN SIDEWALK A OCLMTADT Ti PORTABLE SIGN BLOCKING SIDEWAT K T INACCE.PTABT ,F. ALTERNATIVE OPTION IS TO PLACE SIGN BEHIND SIDEWALK WHEN POSSIBLE, OTHERWISE MAY NEED TO POST MOUNT SIGN WITH 7' MINIMUM VERTICAL CLEAHANCE FROM SIDEWALK SURFACE TRAVELWAY I WORK ZONE 1 INCH DETAIL A N. T.S. CONSTRUCTION PHASING PHACF I CTFP 1 USING W.A.T.C.H. DIAGRAMS 1, 2, 19 AND DIAGRAM 1 ON TCP-3, THE CONTRACTOR SHALL SHIFT TRAFFIC AND PLACE LANE CLOSURE SIGNING AND OTHER TRAFFIC CONTROL DEVICES ALONG SHARON AMITY ROAD ON A DAY AS AGREED UPON BY THE ENGINEER. THE CONTRACTOR SHALL COMPLETE ALL WORK ASSOCIATED WITH DRAINAGE STRUCTURES IN THE WORK AREAS SHOWN ON DIAGRAM 1 ON TCP-3 INCLUDING ASPHALT PAVING UP TO BUT NOT INCLUDING THE FINAL LAYER OF SURFACE COURSE. UPON COMPLETION OF WORK, REMOVE ALL SIGNING AND TRAFFIC CONTROL DEVICES AS SHOWN ON DIAGRAM 1. STEP 2: USING W.A.T.C.H. DIAGRAMS 1, 2, 19 AND DIAGRAM 2 ON TCP-3, THE CONTRACTOR SHALL SHIFT TRAFFIC AND PLACE LANE CLOSURE SIGNING AND OTHER TRAFFIC CONTROL DEVICES ALONG SHARON AMITY ROAD ON A DAY AS AGREED UPON BY THE ENGINEER. THE CONTRACTOR SHALL COMPLETE ALL WORK ASSOCIATED WITH DRAINAGE STRUCTURES IN THE WORK AREAS SHOWN ON DIAGRAM 2 ON TCP-3 INCLUDING ASPHALT PAVING UP TO BUT NOT INCLUDING THE FINAL LAYER OF SURFACE COURSE. UPON COMPLETION OF WORK, REMOVE ALL SIGNING AND TRAFFIC CONTROL DEVICES INDICATED ON DIAGRAM 2. CTFP 3- USING W.A.T.C.H. DIAGRAMS 1, 2, 19 AND DIAGRAM 3 ON TCP-4, THE CONTRACTOR SHALL SHIFT TRAFFIC AND PLACE LANE CLOSURE SIGNING AND OTHER TRAFFIC CONTROL DEVICES ALONG SHARON AMITY ROAD ON A DAY AS AGREED UPON BY THE ENGINEER. THE CONTRACTOR SHALL COMPLETE ALL WORK ASSOCIATED WITH DRAINAGE STRUCTURES IN THE WORK AREAS SHOWN ON DIAGRAM 3 ON TCP-4 INCLUDING ASPHALT PAVING UP TO BUT NOT INCLUDING THE FINAL LAYER OF SURFACE COURSE. UPON COMPLETION OF WORK, REMOVE ALL SIGNING AND TRAFFIC CONTROL DEVICES INDICATED ON DIAGRAM 3. CTFD d- USING W.A.T.C.H. DIAGRAMS 1 THROUGH 9, 12, 13, 14B, AND 26 PERFORM ALL WORK ASSOCIATED WITH DRAINAGE STRUCTURES 75-90, 64-65, 68, 96, AND 105 INCLUDING ASPHALT PAVING UP TO BUT NOT INCLUDING THE FINAL LAYER OF SURFACE COURSE. CTr'D r,- USING W.A.T.C.H. DIAGRAMS 2 THROUGH 9 PERFORM ALL WORK ASSOCIATED WITH DRAINAGE STRUCTURES 71-73 ALONG CORINTHIAN PLACE INCLUDING ASPHALT PAVING UP TO BUT NOT INCLUDING THE FINAL LAYER OF SURFACE COURSE. STEP 6: USING THE APPROPRIATE W.A.T.C.H. DIAGRAMS TO ALTERNATELY CLOSE LANES, PLACE THE FINAL LAYER OF SURFACE COURSE AND RESTORE FINAL PAVEMENT MARKINGS THAT WERE REMOVED DURING CONSTRUCTION IN PHASES I. PHASE 11: STEP 1: PERFORM ALL WORK ASSOCIATED WITH DRAINAGE STRUCTURES 54-65 AND 42. FOR WORK IN THE AREA OF THE CUL-DE-SAC AT THE END OF BRANTHAM COURT, USE W.A.T.C.H. DIAGRAM 9. STEP 2: USING W.A.T.C.H. DIAGRAMS 3, 9, AND 26 PERFORM ALL WORK ASSOCIATED WITH DRAINAGE STRUCTURES 39-42 ALONG LINDA LANE. STEP 3: PERFORM ALL WORK ASSOCIATED WITH DRAINAGE STRUCTURES 23-26, 36-38, AND 40, FOR WORK IN THE AREA OF THE CUL-DE-SAC AT THE END OF BRIDLEPATH LANE, USE W.A.T.C.H, DIAGRAM 9 AND 26. DUACC III• CONSTRUCTION ACTIVITY WITHIN PHASE III AND IN THE VICINITY OF RANDOLPH MIDDLE SCHOOL TO BE RESTRICTED BETWEEN JUNE 15 TO AUGUST 15. NO OTHER CONSTRUCTION ACTIVITY SHALL TAKE PLACE WITHIN THIS AREA OUTSIDE OF THIS TIME PERIOD WITHOUT PRIOR APPROVAL FROM THE CITY. STEP 1: USING W.A.T.C.H. DIAGRAMS 1 THRU 9, AND 26 PERFORM ALL WORK ASSOCIATED WITH DRAINAGE STRUCTURES IN THE VICINITY OF RANDOLPH MIDDLE SCHOOL ALONG JUDITH COURT, WATER OAK ROAD, AND HARTNESS. PHASE IV: STEP 1: USING W.A.T.C.H. DIAGRAMS 1, 2, 4, 5, 6 AND 9 PERFORM ALL WORK ASSOCIATED WITH DRAINAGE STRUCTURES IN THE VICINITY OF THE INTERSCTION OF QUEEN CHARLOTTE'S COURT AND WATER OAK ROAD. STEP 2: USING W.A.T.C.H. DIAGRAMS 3 AND 4 PERFORM ALL WORK ASSOCIATED WITH DRAINAGE STRUCTURES 49-52 ALONG LINDA LANE. PHASE V: STEP 1: USING W.A.T.C.H. DIAGRAMS 3 THRU 9, AND 26 PERFORM ALL WORK ASSOCIATED WITH DRAINAGE STRUCTURES ALONG STAFFORD CIRCLE AND EMORY LANE. STEP 2: USING W.A.T.C.H. DIAGRAMS 3 THRU 9, AND 26 PERFORM ALL WORK ASSOCIATED WITH DRAINAGE STRUCTURES ALONG ADDISON DRIVE. STEP 3: REMOVE ALL CONSTRUCTION ZONE SIGNING AND ANY REMAINING TRAFFIC CONTROL DEVICES. PRELNIHARY PLAH51 00 M07 USE FOR CONS UN leiW E� o zCD a ui co > � co z (n w GC OZCN G� i.r U W N o °o z N o ICI W W LU n � X C-' m� W O of O M(Da ti »=. Js z ti c) a z z 0 a. v w Q 5- oa w 0 cb m NY 11 \; �I a a �I o N O Ld Li Ld ~ U z ✓ U U w a Q HLd 01 x cn 01 Z x U �w GL � a w � o o Q ¢ U o i o p z N o U J Ca w = Ca w Q i m o ¢ a o `fl a w O O h�l w WAS w O a TWO—WAY UIIDI✓IOCO WORK ZONE END JWORK ZONE G20- 2C 42"X20" VGI 20-1E 8"X48" 0 -� I LNLJ (�2U ORK -2U W BEGIN WORK ZONE 42"X20" ZONE W20-1E 48"X48" INTERSECTIONS MAJOR ROAD (SEE ABOVE) VZBEGINW20-1E 48"X48" G20-2C END 42"X20" WORK ZONE D CONSTRUCTION LIMITS MINOR ROAD F CONSTRUCTION F Q LIMITS END G20-2C W20-1 EnEG WORK ZONE 42"X20" 4811 X48 MAJOR ROAD (SEE ABOVE) ON INTERSECTION TYPE PROJECTS, SELECT THE MAJOR ROAD BASED ON THE HIGHER ADT, LEGEND STATIONARY SIGN DIRECTION OF TRAFFIC FLOW RECOMMENDED MINIMUM SIGN SPACING POSTED SPEED LIMIT (M.P.H.) 0 P.S.L. _ b0 350' P.S.L. _> 55 500' WORK ZONE G20-1 NEXT XX MILES 42"X20" CIE THIS SIGN TO BE USED ON PROJECTS LONGER THAN 2 MILES THE NUMBER DISPLAYED ON THE SIGN IS TO BE A WHOLE NUMBER ROUNDED UP TO THE NEXT MILE IT'S TO BE LOCATED 1,500 FEET INSIDE OF THE CONSTRUCTION LIMITS PRELIMINARY PLANS 00 l �10� USE FORC�O�I���iNJ(���0 W O p U O o — w Ln (!) U > � cn z C� (n W OzcN Gd i.r U W N �p00 z N O ICI W U O m W W Z C W O li w zz�m ^I U O ° U 2: W J Li O cr 2 LO (D ti > Lo 2 J z I` U d z z 0 a U w Q m w 0 z �I a N a �I o N O 1 3 Q W Li mcn H Ld ~ U z ✓ U U w a Q HLd x v ul z x U �w GL / w m �+ O O Q U 0 0 0 z N o U J ca w = n w Q i WAS w� O N � � W D 71 I WHITE 4 O � N E EDGE D LINE z BOTH SIDES O TEMPORAR APPLY 4" APPLY 4" --A APPLY 4CRASH o WHITE EDGE WHITE EDGE TEMPORAR = YELLOW CUSHION I LINE LINE CRASH DOUBLE �I� 125' 22 BOTH SIDES CENTERLINE 5 CUSHION O BUFFER MERCE APPLY 4" DRUM z TgpER YELLOW DOUBLE I A «_ CENTERLINE o _ ► z o 0 APPLY 4" _� - - _ ----- - rr; W4j 2L �� z YELLOW - _ rr 200' 36 X 36 o F4 L"r, DOUBLEui 1. ✓ ri _ `� Q o 'a CENTERLINE D NEW DOWNST ~ ��s� `� OZuj N 0 PORTABL SIDE WALK TAPER REAM �oNo CONCRETE y 20 W20-5 L a uJuj APPLY 4" �,� A BARRIER , - 0 zz�ti �X WORK SHIIFT 1>S, gvF 36 X 36 z o� WHITE EDGE ,� zw� a way a AREA FER w moQ� J LINE - TAPER o�° � zLO z o Q DRUMS sir R9„-9 • 306 7Pg„P�� NEW 24 X 12 x••. FFE TYPE II � ' : ,�� � y �O , �� 25 W16-7 SIDEWALK BARRICADE W21-4 2 30„ x 18„ SIDEWALK W1 1-2 CLOSED \ RO P� .� PPER • 36" x 36" \ P y z n' 00' N SN P 25' PP�R Z� W11, - 2 DETAL 'ir 0 ZMVRG a 36 x 36 3 w Q 2° 0° 5' 2 � • w W4-2R Q 36" X 36" EXISTING 9 � � 9 9 DIAGRAM 1 CURB &GUTTERW20-o 36" X536" PHASE 1 STEP 1 z �o , W21 -4 NORTHBOUND LANE CLOSURE ALONG N. SHARON AMITY ROAD o cc O D DDy D ;0 Q O O APPLY 4" D Z WHITE EDGE LINE O c D I= APPLY 4" ` r� YELLOW 125 �25' a o DOUBLE BUFFER E APPLY 4" MER IZ CENTERLINE TgpER YELLOW DOUBLE ` y o r CENTERLINE � o m z APPLY 4" =1 - - - - _ -- - _ ~ rr W4-2L z f `,cn a �' 2 „ L YELLOW - - - - _ ,r 00 36 X 36 =�, c x DOUBLE CENTERLINE ➢ ';,- �' 100' rr o�oQ a w � � AREA DOWNSTREAMP� - o APPLY 43611 ,� rya DRUMS y 200, W20 5 L WHITE EDGE SHIFT >>5 eUF X o o o o LINE - w REBUILD SIDEWALK TAPER ER QOQ°Q� P° o w a DRUMS i► 225 � � W21- 4 0\�\ PM\ �� ' y R G PPER r� O z O ' � W WAS wA W4-2R [-+ 36" X 36" DIAGRAM 2 �^ W20-5 R PHASE 1, STEP 2 36" X 36" PRELI�INARY PLANS M NORTHBOUND LANE CLOSURE ALONG N. SHARON AMITY ROAD o0 0 0 0 o a _� 4 00 M07 USCG DR C�ONFRUD00 W R9„—^� J 99 R9-9 D W16— 7p 24X 111 2 24" X 1 2" • 30 x 18 BARRICADEBARRICADE owil3TYPE 11 D Dp8" 36"—� 36" I � W1 1— Z2 • PORTABLED D 36 x 36z rn 3 o CONCRETCD L13 D U BARRIER I 225' D = BUFFER D TH FT _+ z WORK AREA A �pER r 725 , o • • • • z o 0 co z APPLY L.r3 09 1 • m 2SN�FC ER �PP�R ui DGE LINE zuiW DRUM4 1. cN ~ �wYYDWzU uJ F DOUBLE vF APPLY 4 TEMPORARY �� 200, C z� ; } 1�5 8 APPLY 4" YELLOW APPLY 4 CENTERLINE W4-2R ,� CD zwa� �► WHITE DOUBLE CRASH WHITE ED _ DRUMS EDGE LINE CENTERLINE CUSHION LINE 36'' X 36'' a' wLo awa APPLY 4" �oQ ~ J ztic�a z� loo BOTH SIDES WHITE • PP Y 4'9 REMOVE EXISTING CONCRETE EDGE LINE AELLOW MEDIAN IN AREA OF \y DOUBLE PORTABLE CONCRETE BARRIER 00, ' �P� CENTERLINE AND PEDESTRIAN PATH ,`� 1, W20— 5 R 36'' X 36'' S�PR�N DVFF�R DETNL A -A 200 M vF F ER 00 Pz� W21 — 4 200 29-599 ,9 1 1 ' 1 1 ' 2, 59 — 5„ y 'W4-2L w D 36 X 36 EXISTING Q W20-5 L DIAGRAM 3 URB & GUTTER 0 36'' X 36'' z 0 PHASE 1, STEP 3 W21-4 SOUTHBOUND LANE CLOSURE ALONG N. SHARON AMITY ROAD c� cuuJ D DDy a v n O N �I O w 3 Ld Ld O Q w m H ~ U U ~ Q z ✓ w a x cn U t i � z �w U GL / w m w O Q O O / O Q z U w w N ° J Q i % = c C 0. C:: � a d O O � WAS wA � � H a PRELNIHARY PLAHS 00 M07 USE DR CONFRU O �v � DIAGRAM 1 DIAGRAM 2 DIAGRAM 3 SIDEWALK CLOSURE SIDEWALK DETOUR/DIVERSION WORK AREA ON SHOULDER (2- OR MORE FROM PAVEMENT) I SIDEWALK DETOUR W20-1 JILOM L) (OPTIONAL) SIDEWALK DIVERSION/NEW CONSTRUCTION W20 1 NtIOM L atloa 11 JI nn nnnn nn nn nn nnnnnn 0 0 0 0 0 0 0 0 (OPTIONAL) 0 0 0 0 0 o 0 0 0 4 W215 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o o 0 0 0 0 0 0 100, (200') ((200')) SIDEWALK R9-11 0 000000000 D3=o,D o00000000000o s=3�� NVIais3o3d I I • R9-ii m Rg 11 SIDEWALK ET-i T R9 9 01smT 1 I N ItlM3U15 SPECIAL MINIMUM 2­ OM � CLOSED C � THE EDGE OF PAVEMENT. ® ® ® • ® - C. cL R9 9 SmFwAI K aosED zo tR- C. LEGEND TF (40') (OPTIONAL) Q CONES/DRUMS FW W uuuuuuuu� ���� z c g 5'-CONES SIDFWAIK o IIUII TYPE III BARRICADE ��������� R9-11 1 1 c N'~` vw 0 o 10' DRUMS CLOSED OR BARRICADES o o o T SIGNS w z 000000000 000000000 I ® WORK AREA o O a -� 1 I\ w4-zR LEGEND R.1. ARROW PANEL Rono 0) CONES/DRUMS WORK AiirAo NOTE: Z _- TYPE III BARRICADE NOTES: (OPTIONAL) 1. SPACING - 25 M.P.H OR LESS W20 1 WU-3R T SIGNS 1. IN HEAVY PEDESTRIAN ADJACENT LANE AREAS THE MAY NEED TO BE LEGEND (SPACING) - 30 & 35 M_ P H_ ((SPACING)) -40 M.P.H. OR MORE NOTES: CLOSED TO MAINTAIN TRAFFIC. PEDESTRIAN O CONES/DRUMS 2_ IN HEAVY PEDESTRIAN AREAS THE ADJACENT LANE MAY NEEDTO BECLOSEDTO ��� 1_ SPACING - 25 MPH OR LESS (SPACING)-30&35 M_PH_ ® WORK AREA MAINTAIN PEDESTRIAN TRAFFIC. 3 TYPE III BARRICADE REQUIRED ONLY IF WORK ZONE IS LEFT UNATTENDED Rono worxl: W20-I aH ao ((SPACING)) -40 MPH _ OR MORE 2 TYPE III BARRICADE REQUIRED ONLY IF WORK ZONE IS LEFT UNATTENDED H TYPE III BARRICADE OVERNIGHT_ OVERNIGHT_ ARROW PANEL T SIGNS 4. WHEN EXCAVATING WITHIN 4'OF THE EDGE OF PAVEMENT, THE ADJACENT LANE SHOULD BE CLOSED TO TRAFFIC USING OTHERAPPLICABLE DIAGRAMS ® 3_ WHEN EXCAVATING WITHIN 4'OF THE EDGE OF PAVEMENT, THE ADJACENT LANE SHOULD BE CLOSED TO TRAFFIC USING OTHERAPPLICABLE DIAGRAMS UNLESS BRACING OR SHORING IS USED. UNLESS BRACING OR SHORING IS USED. ® WORK AREA 5. IF DIKE LANE IS PRESENT TI IE PROPER CLOSURE IS REQUIRED USING SIGNS ARROW PANEL 4. IF BIKE LANE IS PRESENT THE PROPER CLOSURE IS REQUIRED USING SIGNS ARROW PANEL DISPLAY AND CONES REFER TO DIAGRAM 31. DISPLAY AND CONES REFER TO DIAGRAM 31. (IF USED) 51 52 53 54 55 DIAGRAM 4 DIAGRAM 5 DIAGRAM 6 WORK AREA ON SHOULDER WORK AREA ON SHOULDER WORK AREA IN TRAVEL LANE (MINOR ENCROACHMENT ON PAVEMENT) (MINOR ENCROACHMENT ON PAVEMENT) (MAINTAINING 2-WAY TRAFFIC) DOWNSTREAM 00 a OV1121-4 W5-1 W21-5 � O TAPER BUFFER VARIES TAPER VV5-1 ovauv W21-4 NaoM *-1+14 50' 175' (50') (275') 100' (125') 100 (200') 100' avoa DOWNSTREAM TAPER BUFFER TAPER ((50')) ((275')) (255') ((350')) ((200')) 100' 100, VARIES 125' 100' 100' - - - (200') (200') (200') (225') (125') (200') (200') 0 0 ((350')) ((350')) ((200')) ((325')) ((250')) ((350')) ((350')) (OPTIONAL) • ® • • C C • o C • O C O O • - 10' MINIMUM 10' MINIMUM 10' MINIMUM - 20• (OPTIONAL) - (4p) ((ap )) 20' (40') 10' MINIMUM 4�0)) 2p• k(40') ITAPER 10' MINIMUM BUFFER ((40)) DOWNSTREAM 100, 100' VARIES TAPER (200') (200') (125') (100.) (200') 100' ((350')) ((350')) ((250')) ((150')) ((200')) ((350')) O LEGEND (200') ((350•)) p LEGEND O O � � LEGEND p CONES/DRUMS o°g O CONES/DRUMS R4-7 R4-7 O CONES/DRUMS Vv9-3R wz1-a Ws-1 N21-a �- TYPE III BARRICADE I-- TYPE III BARRICADE H TYPE III BARRICADE I I NOTES: NOTES: NO I ES: T SIGNS T SIGNS 1.SPACING-25M.P.HORLESS T SIGNS 1. SPACING - 25 M.P.H OR LESS (SPACING) - 30 & 35 M_ P H_ 1_ SPACING - 25 MPH OR LESS (SPACING) - 30 & 35 M_P IT ((SPACING))-40M.PH_ORMORE WORK AREA ((SPACING))-40MPH _OR MORE WORK AREA ® WORK AREA 2. TYPE I I I BARRICADE REQUIRED AT ALLTIMES. 2_ TYPE III BARRICADE REQUIREDAT ALLTIMES. 2. TYPE III BARRICADE REQUIRED ONLY IF WORK ZONE IS LEFT UNATTENDED OVERNIGHT. 3 IF CLOSURE IS LONG-TERM (SEE SECTION 17), PAVEMENT MARKING SHALL 8E REVISED 3_ NO ADVANCED SIGNAGE REQUIRED IF 6' OR MORE OF CLEARANCE IS MAINTAINED FROM EDGE OF PAVEMENT ARROW PANEL 3_ NO ADVANCED SIGNAGE REQUIRED IF 6' OR MORE OF CLEARANCE IS MAINTAINED FROM EDGE OF PAVEMENT ARROW PANEL TO MATCH THE TRAFFIC PATTERN_ DRUMS ON CENTERLINE ARE NOT REQUIRED IF PAVEMENT MARKINGS ARE REVISED_ ARROW PANEL 4_ WHEN EXCAVATING WITHIN 4'OF THE EDGE OF VEMENT, THE ADJACENT LANE 4. WHEN EXCAVATING WITHIN 4'OF THE EDGE OF VEMENT, THE ADJACENT LANE 4. WHEN EXCAVATING WITHIN 4'OF THE EDGE OF VEMENT, THE ADJACENT LANE SHOULD BE CLOSED TO TRAFFIC USING OTHERAPPLICABLE DIAGRAMS UNLESS SHOULD BE CLOSED TO TRAFFIC USING OTHERAPPLICABLE DIAGRAMS UNLESS SHOULD BE CLOSED TO TRAFFIC USING OTHERAPPLICABLE DIAGRAMS UNLESS BRACING OR SHORING IS USED. BRACING OR SHORING IS USED. BRACING OR SHORING IS USED. ARROW PANEL ARROW PANEL ARROW PANEL 5. IF BIKE LANE IS PRESENT THE PROPER CLOSURE IS REQUIRED USING SIGNSAND DISPLAY 5. IF BIKE LANE IS PRESENT THE PROPER CLOSURE IS REQUIRED USING SIGNSAND DISPLAY 5. IF BIKE LANE IS PRESENT THE PROPER CLOSURE IS REQUIRED USING SIGNSAND DISPLAY CONES REFER TO DIAGRAM 31. (IF USED) CONES REFER TO DIAGRAM 31. (IF USED) CONES REFER TO DIAGRAM 31. (IF USED) 56 57 58 59 60 61 DIAGRAM 7 DIAGRAM 8 R4-7 DIAGRAM 9 WORK AREA IN CENTER STREET (MAINTAINING 2-WAY TRAFFIC) WORK AREA IN INTERSECTION ' 2 WAY, ONE LANE TRAFFIC (FLAGGER CONTROL) R4-7 VV9-3R - VV21-4 O O R3-2 R4-7 W5-1 pVV21-4 O O DOWNSTREAM SHIFT W21-4 OV3HV r�aoM TAPER BUFFER 50' VARIES 50' TAPER 100' 100' 100' avoa ® 100' 100' 100' (250'25')((350'))()(350') (100') (1150')) (125') (200') ((250')) ((350')) (200') ((350')) U (( )) (( )) R1-1® • T SHIFT TAPER � � eGT A ^FR W20-7;# Vt20-4 W20-1 ® ® TH RU as l2TOp, �� o x 10' MINIMUM 'T�' STREET III W20-1 • �?per, ' � \ ��P a S c, C C C C C .. C • ® ®� A� • ® `S2JJ �� 7� (7FFER t1 (MINA TAPER • • ® a?�o �C 100' 100' 100' • C ` • C C C C C I 10' MINIMUM VV20-4 50' (200')ok ((350')) (200') (200') ((350')) ((350')) 20' I I SHIFT -i- • R1-1 U� W20-7a o (40') ((40')) TAPER SHIFT TAPER BUFFER 1DD' (200') (200') (125') ((350')) ((250')) aono 100100. 100, 50' VARIES 50• (200') (200') (1251 (100') ((350')) ((350')) ((250')) ((150')) DOWNSTREAM ((350')) � n � wokK VV21-4 �- nl irno o .-3R TAPER LEGEND CONES/DRUMS VF& W21-a W5-1 Ra-7 LEGEND R3-2 O CONES/DRUMS LEGEND CONES/DRUMS R3-7R W21-0 HTYPE III BARRICADE K�-/ TYPE III BARRICADE H TYPE III BARRICADE T SIGNS T SIGNS NOTES: SIGNS T ® WORK AREA ® WORK AREA I M.P.H OR LESS (SPACING) - 30 & 35 M_ P H ® WORK AREA Noyes NOTES' (SPACI(SPACNG))5 o MPHPH MORE 1_ SPACING - 25 M_P H OR LESS (SPACING) - 30 & 35 M_PH_ 1_ SPACING - 25 M_PH OR LESS (SPACING) - 30 & 35 M_P H_ 2 'RHFFFR SHAI I FXTFND RACKTO THE RFGINNING OF THE ('.URVF OR HII I TO PROVIDF ADEQUATE SIGHT DISTANCE FOR THE APPROACHING TRAFFIC_ �� FLAGGER ((SPACING)) -40 M_PH_ OR MORE ((SPACING)) -40 MPH _ OR MORE 3. ON LOW VOLUME, RESI DENTIAL STREETS WHERE THERE IS ADEQUATE VISIBILITY, 2. TYPE III BARRICADE REQUIRED ONLY IF WORK ZONE IS LEFT UNATTENDED 2. TYPE III BARRICADE REQUIREDAT ALLTIMES. ASI NGLE FLAGGER POSITIONEDAS SHOWN MAY BE ACCEPTABLE. OVERNIGHT. 3. POLICE OFFICERS ARE REQUIRED TO DIRECT TRAFFICAT SIGNALIZED INTERSECTION. 4. IF WORK IS WITHIN 50' OF AN INTERSECTION SEE DIAGRAM 10 OR 11. 3. PARKING ON BOTH SIDES OF THE STREET MUST BE PROHIBITEDAS NECESSARY TO PROVIDE ADEQUATE TRAFFIC LANES. EMERGENCY NO PARKING SIGNS MAYBE 4. ADDITI ONAL SIGNAGE, AND/OR TRAFFIC CONTROLS SUCH AS TURN PROHIBITIONS 5. IF DIKE LANE IS PRESENT TI IE PROPER CLOSURE IS REQUIRED USING SIGNS OBTAINED FROM THE POLICE DEPARTMENT. AND ADDITIONAL FLAGGERS MAY BE REQUIRED. AND CONES REFER TO DIAGRAM 31. 62 63 64 65 66 67 PRELNIHARY PLAHS 00 M07 USE FOR CONS UN W O O � z� H > Q O � J J 3;� c GC cn W OZCV � Gd it � U W GV mom Z CN O a W U O T wwzti m wj CI Wpw zH-m zLLCD cC ICI 0 �? N zw_J� Lo U uO 1--._ a� CD<O >Lo2 J E ZI`U d z O_ F-' a a U cn W �1 0.l W Q 0 O n1 Cc O �I a a �I o N O Ld W m H Ld LD cn cn w J 0 W 1 m W o o Q Q, N U P� C7 O Z N 0 U J L W = [] Ci] Q i CO C a / 0. c C:: O O V1 O W WAS w O DIAGRAM 12 WORK AREA IN THE THRU LANE (STREET WITH 3 LANES) W3-3R W3-3L (35 MPH (35 MPH OR LESS) OR LESS) V T' R W1-L \ti9-3 W21-4 (OVER (OVER z'F? 35 MPH) 35 MPH) DOWNSTREAM BUFFER TAPER VARIES BUFFER TAPER 100' 100, 125' 100, 100, 100, 100, (125') (225') (125') (200') (200') (200') ((250')) ((325')) ((250')) ((350')) ((350')) ((350')) yf I yf I yf I c c ro- T J I 10' MIMIMUM ® 1Ft C 10, MIMIMUM 20' I� TAPER BUFFER 100, _ I 100' 100' _ 100, (200') ii�lll"' (20i1 (�25') 0 ((350')) ((350')) ((250')) O1 4-3 *W21-4 NOTES_ 1. SPACING - 25 M.P.H OR LESS (SPACI NG) - 30 & 35 M_ P H_ ((SPACING)) -40 M.PH_ OR MORE 2. TYPE III BARRICADE REQUIRED ONLY ID WORK ZONE IS LEFT UNATTENDED OVERNIGHT. 3. IF CLOSURE IS LONG-TERM (SEE SECTION 17), PAVEMENT MARKING SHALL BE REVISED TO MATCH THE TRAFFIC PATTERN_ 4. IF BIKE LANE IS PRESENT THE PROPER CLOSURE IS REQUIRED USING SIGNS AND CONES. REFER TO DIAGRAM 31. 72 DIAGRAM 19 WORK AREA IN HALF OF STREET (4LANES, 2 WAY TRAFFIC) W33R (35 MPH OR OR LESS) W7-R (OVER 35 MPH) DOWNSTREAM SH IFT TAPER BUFFER TAPER 100' 100' 100' BUFFER SHIFT VARIES (225') (125'J 175' TAPER ((325')) ((250, V121 4 TAPER c�useD 125' ARROW PANEL DISPLAY (IF USED) W33L (35 MPH OR LESS) W1-L (OVER _ 35 MPH) MERGE TAPER O O O O O �o O O MI0 <N)IMUM U O �o TAPER BUFFER (40) I I ((40')) <� 1-4*.41L W4-21L NOTES: 1_ SPACING - 25 MPH OR LESS (SPACI NG) - 30 & 35 M_ P H_ ((SPACING)) -40 M.PH_ OR MORE 2_ TYPE III BARRICADE REQUIRED ONLY IF WORK ZONE IS LEFT UNATTENDED OVERNIGHT. 3. IF CLOSURE IS LONG-TERM (SEE SECTION 17), PAVEMENT MARKING SHALL BE REVISED TO MATCH THE TRAFFIC PATTERN_ 4. IF BIKE LANE IS PRESENT THE PROPER CLOSURE IS REQUIRED USING SIGNS AND CONES REFER TO DIAGRAM 31. 5. ARROW PANEL SHALL NOT BLOCK SIDEWALK OR PEDESTRIAN MOVEMENT. 88 R4-7 LEGEND O CONES/DRUMS HTYPE III BARRICADE T SIGNS ® WORK AREA ARROW PANEL 73 \N4-2R W9-3R W21-4 i O ARROW PANEL DISPLAY O ARROW PANEL DISPLAY LEGEND Q CONES/DRUMS HTYPE III BARRICADE T SIGNS ® WORK AREA ARROW PANEL 89 DIAGRAM 13 WORK AREA IN TRAVEL LANE (MULTI -LANE ROADWAY) DOWNSTREAM TAPER ^ BUFFER SHIFT TAPER �O o in, "IKIIKAI IRA NOTES: 1. SPACING - 25 M.P.H OR LESS (SPACI NG) - 30 & 35 M_ P H_ ((SPACING)) -40 M.P.H. OR MORE 2. TYPE III BARRICADE REQU I RED AT ALL TI MES. 3. IF CLOSURE IS LONG-TERM (SEE SECTION 17), PAVEMENT MARKING SHALL BE REVISED TO MATCH THE TRAFFIC PATTERN. 4. USE THIS DIAGRAM IF THE WORKAREA IS WITHIN 350' (625') OF THE INTERSECTION. 5_ IF BIKE LANE IS PRESENT THE PROPER CLOSURE IS REQUIRED USING SIGNS AND CONES REFER TO DIAGRAM 31_ 6. ARROW PANEL SHALL NOT BLOCK SIDEWALK OR PEDESTRIAN MOVEMENT. 74 DIAGRAM 26 DETOUR PLAN FOR CLOSED ROAD (USE FOR MINOR STREETS ONLY) M4-10L R11-2 old R11-2 li (200') (200) (200) ((350')) ((350')) ((350')) 0 H � �p o W20-3 A W20-2 M4-9 M4-9 MI - T K I I END 0 p DETOUR O O M4-8a R11-2 M4-9 M4-9 1 0 nnoT o M4-9-9 ., ❑ o M4-9 OW4-2R V/%, W9-3R W21-4 f ARRUW PANEL DISPLAY 75 M4-10L R11-4 W21-4 M4-9 M4-9La � 10-2 W20-3 U O R1-1 (200') (200') (200') ((350')) ((350')) ((350')) _1 NOTES: 1. SPACING - 25 M.P.H OR LESS � (SPACING) - 30 & 35 M.P.H. ((SPACING))-40 M_PH_ OR MORE R1-1 R1 1 2_ DEPENDING UPON DISTANCE BETWEEN DETOUR POINT AND ROAD -CLOSED POINT ADEQUATE ADDITIONAL WARNING 4_ALLADVANCE WARNING SIGNSAND IS REQUIRED ON APPROACH TO ROAD - DETOUR SIGNS MAYBE SUPPLEMENTED CLOSE BARRICADES (1 TO 3 SIGNS). WITH FLASHERAND/OR FLAGS. 3. DEPENDING ON CONDITIONS, SOME 5. IF BIKE LANE IS PRESENT THE PROPER SIGNS MAY BE REQUIRED ON CROSS CLOSURE IS REQUIRED USING SIGNS STREET APPROACHES. AND CONES REFERTO DIAGRAM 31. 102 (F�►i ((350')) . 0 P M4-9 M4-9 LEGEND �— TYPE III BARRICADE T SIGNS WORK AREA 103 DIAGRAM 14B RIGHT LANE CLOSURE ON FAR SIDE OF INTERSECTION (HIGH VOLUME OF RIGHT -TURN TRAFFIC) R3-5R J 0 W21-4 R3-7R R3-7R +-2R VJ9-3R *1 -4 av3nv � JILOM °` = 2 100'1 loo,100' 100' 11 DOWNSTREAM o (200') (200') (200') (200� TAPER ((350')) ((350')) ((350 3) ((350zzzzi ')) 100, C T • C� ®U t) T 10' MINIMUM 100, (200') vO((350')) V\21-4 NOTES: 1. SPACING - 25 M.P.H OR LESS (SPACI NG) - 30 & 35 M_ P H_ ((SPACING)) -40 M.P.H. OR MORE 2. TYPE III BARRICADE REQU I RED AT ALL T I MES. 3. IF CLOSURE IS LONG-TERM (SEE SECTION 17), PAVEMENT MARKING SHALL BE REVISED TO MATCH THE TRAFFIC PATTERN. 4. USE THIS DIAGRAM IF THE WORKAREA IS WTHIN 350' (625') OF THE INTERSECTION. 5. IF BIKE LANE IS PRESENT THE PROPER CLOSURE IS REQUIRED USING SIGNSAND CONES REFER TO DIAGRAM 31_ 6_ ARROW PANEL SHALL NOT BLOCK SIDEWALK OR PEDESTRIAN MOVEMENT 78 ROAD WORK AHEAD W21-4 ARROW PANEL DISPLAY LEGEND O CONES/DRUMS HTYPE III BARRICADE T SIGNS ® WORK AREA ARROW PANEL 79 PRELNIHARY PLAHS 00 M07 USE FOR CONSMNJM0 W O O � z(D a — W LO J J � c j (n W GC OZCN � Gd it U W GV -el -21pz 00 cv O C/J W U O m cr EL W W w C W O li CD IncC o �? N 2: LLi � Li Q Cr ID m D7 O > Lo J E Z I` U d z O_ F-' a a U cn W �1 t� W E. Q LL C5 >C Cc �I a a �I o N CD 1 3 Q W LLJ mLLJ H Lu t x U cn z U �w GL / w m �+ O O Q n O O / O Q Z N o U J L = [] Q i C j 0. c C:: WAS w � � a H PAVEMENT MARKING SCHEDULE SYMBOL DESCRIPTION PAY ITEM rC 10 FT. - 30 FT WHITE SKIP THERMOPLASTIC (4", 120 MILS) TD 2 ft. - 4 ft. WHITE MINISKIP THERMOPLASTIC (4", 120 MILS) TE WHITE LANE LINE THERMOPLASTIC (4", 120 MILS) r/ YELLOW DOUBLE CENTERLINE THERMOPLASTIC (4", 120 MILS) rr YELLOW GORE LINE THERMOPLASTIC (8", 120 MILS) rY YELLOW DIAGONAL THERMOPLASTIC (12", 120 MILS) r2 WHITE STOP BAR THERMOPLASTIC (24", 120 MILS) UA 8' LEFT TURN ARROW THERMOPLASTIC SYMBOL (90 MILS) TV WHITE CROSSWALK LINE THERMOPLASTIC (8", 120 MILS) MA YELLOW & YELLOW PERMANENT RAISED PAVEMENT MARKERS v O Z- J PRELIMINARY PLANS DO M07 USE FOR CONSMNJM0 W O � o � z� o — w Ln L ME Q o 5 m (n W C� OZN U N L) Gd i.rcn -21p00 z N O uJ U O m �I w Lu m 'm zz�ti �X a Zui0 woCr o �= Lo o a ti »= J� ztic0a z z 0 a. v w Q 5- oa w Q 0 z O Cc 0 E a � NO a i Ca w oLd Lu m W F x cn t U i z � U �w GL / W m �+ O O Q O O / O Ca = [] O O O WASW � � O � � a � � a W , a a -- � i II III I ' / II / I z III \ ,STEPS \ � I II � I II II0 I � 6 J'4s II EXISTING GAS LINE EXISTING WATER LINE \ 00 ss S�. EXISTING SAN. SEWER —PROPOSED DROP INLETS (SEE DRAINAGE PLANS) PROPOSED SINGLE 7' X 3' PRECAST REINFORCED CONC. BOX CULVERT EXISTING 42" RCP TO BE REMOVED �\ ��5 SS �d 31dM110 SS 0 l Wld�� SNd 0100 1N�W35d 6S66.NI 1�68 6 ON 0800-3 NO LOCATION SKETCH NOTES ASSUMED LIVE LOAD= HL 93 3" 0 WEEP HOLES INDICATED TO BE IN ACCORDANCE WITH SECTION 420-11 OF THE 2018 NCDOT STANDARD SPECIFICATIONS. THE ENGINEER SHALL CHECK THE LENGTH OF THE CULVERT BEFORE STAKING IT OUT TO MAKE CERTAIN THAT IT WILL PROPERLY TAKE CARE OF THE FILL. EXISTING TWO 42"RCP TO BE REMOVED. DIMENSIONS FOR WING LAYOUT AS WELL AS ADDITIONAL REINFORCING STEEL EMBEDDED IN BARREL ARE SHOWN ON WING SHEET. THE CONCRETE FOR THE PRECAST UNITS SHALL ATTAIN A MINIMUM COMPRESSIVE STRENGTH AT 28 DAYS OF 5000 P.S.I.. THE CONCRETE FOR THE HEADWALLS, WINGS AND END CURTAIN WALLS SHALL BE CLASS "A" CONCRETE AS PER THE 2018 NCDOT STANDARD SPECIFICATIONS. CAST —IN —PLACE CONCRETE SHALL BE POURED IN THE FOLLOWING ORDER: 1. WING FOOTINGS, AND CURTAIN WALL. 2. HEADWALLS, WING WALLS. ALL PRECAST UNITS SHALL BE PLACED PRIOR TO POURING THE WINGS, END CURTAIN WALLS AND HEADWALLS. THE EXTERIOR PRECAST UNITS SHALL BE SUPPORTED TO ACCOMMODATE UNDERMINING TO PROVIDE FOR THE WING FOOTINGS TO BE POURED TO THE DEPTH AND DIMENSIONS AS SHOWN ON THE PLANS. BEDDING MATERIAL SHALL HAVE A THICKNESS OF AT LEAST 1'—O" BELOW THE BOTTOM OF THE PRECAST UNITS. THE MATERIAL SHALL BE FORMED AND SCREEDED TO THE PROPER ELEVATION AT LEAST 3'-0"BEYOND THE SIDES OF THE PRECAST UNITS. THE PRECAST UNITS SHALL BE CAREFULLY POSITIONED ON THE PREPARED BEDDING MATERIAL, FEMALE END UPGRADE WITH THE MALE END FULLY INSERTED AND EACH JOINT CHECKED FOR ALIGNMENT PRIOR TO JACKING THE UNIT INTO PLACE. SATISFACTORY FITTING AND PROPER GRADE SHALL BE MAINTAINED AS THE WORK PROCEEDS. WHEN ANY PRECAST UNIT IS DAMAGED DURING HANDLING,THE ENGINEER AT HIS DISCRETION SHALL REJECT THE UNIT AS BEING UNFIT FOR INSTALLATION AND THE CONTRACTOR SHALL REMOVE SUCH REJECTED UNIT FROM THE PROJECT. MINOR DAMAGE TO THE UNIT MAY BE REPAIRED BY THE CONTRACTOR WHEN PERMITTED BY THE ENGINEER. CARE SHALL BE TAKEN DURING BACKFILL AND COMPACTION OPERATION TO MAINTAIN ALIGNMENT AND PREVENT DAMAGE TO THE JOINTS. UNITS WHICH BECOME MISALIGNED, SHOW EXCESSIVE SETTLEMENT, OR HAVE OTHERWISE BEEN DAMAGED BY THE CONTRACTOR'S OPERATION SHALL AT THE DISCRETION OF THE ENGINEER BE REMOVED AND REPLACED BY THE CONTRACTOR AT NO COST TO THE CITY OF CHARLOTTE. CONCRETE CHAMFERS ON EXTERIOR LONGITUDINAL EDGES OF THE PRECAST UNITS MAY BE AS PER THE FABRICATORS RECOMMENDATION, HOWEVER ALL WORKMANSHIP SHALL PROVIDE CONCRETE COVER OVER THE WELDED WIRE FABRIC AS SPECIFIED ON THE PLANS AND THE CONCRETE CHAMFERS CHOSEN SHALL IN NO WAY FUNCTIONALLY LESSEN THE DESIGN SHOWN ON THE PLANS. DESIGN EARTH COVER = 1.25 FT FOR PRECAST REINFORCED CONCRETE BOX CULVERT, SEE SPECIAL PROVISIONS. A 3 FOOT STRIP OF FILTER FABRIC SHALL BE ATTACHED TO THE FILL FACE OF EACH WING COVERING THE ENTIRE LENGTH OF THE EXPANSION JOINT. CD FZ z� a Q o J J m y Cnm Cnw CC O Z N U W N Z N p a S.r Qi LuUOae w z co c m '� vi w wpLu-~ �w ❑ Z5 L � waIra 0 = ti J z I__ U d z w z C a 0 z O O N � o APPROX. C EMORY LANE 50'-01, 100'-0" 24'-5" 42'-10" 7' X 3' PRECAST RCBC PROP. 1' CONC. SILL INVERT IN ELEV.669.00 — — — — — — — — — - - — — — - — — - — — - — — - — — - — — -- — — — — — — —------------------------------------------------------ --------- ELEV.670.7 ± 7'X 5'PRECAST2 PROPOSED CHANNEL BED EXISTING RCBC CHANNEL BED INVERT IN ELEV. 667.00 7' X 3' PRECAST RCBC — �INVERT OUT ELEV.668.08 ELEV.672.4 ± EXISTING GROUND LINE PROFILE ALONG C CULVERT 7' X 5' PRECAST RCBC INVERT OUT ELEV. 666.08 FnD al�InO Ego n N 4 �N Do Hr14 USE FOR COG9NNumm a o O cV _ T O N m w m m z m cn F a z W Q i o rl 0. 0. Q m � ao W A 0A W (�I r A n 711-011 + CULVERT SECTION NORMAL TO ROADWAY LENGTH OF CULVERT = 67'-3" 24'-5" 42'-10" APPROX. C EMORY AVE.---'- W1 W1 o IFLOW CAST -IN -PLACE HEADWALL PRECAST CONCRETE BOX UNIT I 90 ° 00,00" N 523586.668 I � � CULVERT E 1465718.847 90 ° 00,00" 2,-0" X 3,-0" 8„ OPENING 2'-0" X 3'-0" o FOR DI M OPENING o oo FOR DI W 2 815/16„ `I N W2 9'-10'/2„ 30'-011/16" PART PLAN - ROOF SLAB PART PLAN - FLOOR SLAB N 523557.613 E 1465780.972 O i rn OPENING TO BE CREATED BY RCBC PRECAST SUPPLIER RIGHT ANGLE SECTION OF CULVERT PRECAST CONCRETE BOXES NOTE: PROVIDE 6"MIMIMUM CLEARANCE BETWEEN MAIN LINE JOINTS AND PIPE OPENING. CONTRACTOR'S ENGINEER SHALL DETERMINE OPENING LOCATION AND ADDITIONAL REBAR SIZE AND PLACEMENT RELATED TO PIPE OPENINGS IN SIDE WALLS. FILL CEMEN NON-Sf GROUT PR, 18" RCI FaWAM PIPE TIE IN DETAIL * 16'-0" END ELEVATION (INLET SHOWN, OUTLET SIMILAR) THIS DIMENSION IS BASED ON AN ASSUMED TOP SLAB THICKNESS OF 10"AND WALL THICKNESS OF 6" AND WILL NEED TO BE ADJUSTED FOR ACTUAL TOP SLAB/WALL THICKNESS. SAW CUT RCP FLUSH WITH INSIDE WALL OF RCBC PROPOSED RCBC SECTION FRORNE08 DEMNMe Do Hr14 USE FOR COG9NNUMON o vo 0 z-� ci � cn z y Cnm Cn W CC O Z N U W N � Z N p a Sr Qi �WUO w c wpw� �w zz�m L� I� W Q Ir Q a` % O = ~ J C ztiUa zw 0 z 0 0 Q m N � U w� rrl�w O Z a rr�l� a PLO CAST -IN -PLACE WING END OF PRECAST UNITS LENGTH OF CULVERT = 67'-3" CAST -IN -PLACE 1'-3" HEADWALL 6" 3" 6" #5G1 CV � � O N #6D1 0, #8S2 SEE VDETAIL "A" FLOW CONST_JT_ SECTION B-B 1" EXP. JT. MAT'L. 1'-0" 3" O WEEP HOLES) C� 10'-0" 0 CTS. #4D2 FIELD BEND -#4D3 (CURTAIN WALL FOR 7' X 3' BOX ONLY) TYPICAL PRECAST UNIT (SHOWING INLET END UNIT) NOTE: NO END UNIT SHALL BE LESS THAN 3'-0". ELEVATION CONST. JT. N ~ J z � B B z a CD ROOF r' F- U Q = u coQ N @ W —z (A� X — N w H @ CULVERT w U o� mw H N Q O H� FLOOR J Q U W I # of of ~ U z z H � of Qo # PLAN - END UNIT (INTERIOR UNIT SHOWN) TYPICAL SECTION PLAN - TYPICAL PRECAST UNIT (INTERIOR UNIT SHOWN) CAST -IN -PLACE HEADWALL 0 I #6D1 C) 1'-0" O.Ce SEE DETAIL "A" AUNCH 1'-0" 1'-3" 611 6„ 3" #5G1 N N —#8S2 1" EXP. JT. MAT'L. HEADWALL OUTLET END ELEVATION SECTION DETAIL DETAIL A STRUCTURAL CONNECTION INSERTS 2 STRUT OR EQUAL; LENGTH = 4 �/2", INSERT WIDTH = 2", DIA. = Y4". NO. REQUIRED 76 END () EXTERIOR UNIT C EXTERIOR ��� INTERIOR PRECAST UNIT T PRECAST UNIT SECTION THRU TOP SLAB (BOTTOM SLAB JOINT SIMILAR) M BAR SCHEDULE BAR NO. SIZE TYPE LENGTH WEIGHT D1 32 6 1 1'-8" 80 D2 28 4 STR 3'-4" 62 D3 14 4 STR 3'-10" 36 D4 32 5 STR 11" 31 D5 6 6 STR 1'-2" 11 D6 6 6 STR 8" 6 G1 4 5 STR 15'-8" 65 S2 6 8 STR 15'-8" 251 TOTAL LBS. 542 LENGTH & WEIGHT OF THESE BARS WILL NEED TO BE ADJUSTED ONCE THE ACTUAL PRECAST BOX WIDTH IS KNOWN. (ASSUMED 6" THICK WALLS) 9" D1 O 2 i/4„ THREADED BAR TYPE WING FILL FA�r #57 STON 0 I SET #57 STONE AND BAGGED STONE AT THE BOTTOM OF THE WEEP HOLES. �Y �Y CD �o a z� .. �cn � cn z < J J m �w CC O z N U W N � W()pc� w w z '� m s vi ;n w p LLI ~ Lw ❑ �z�co Lo zui0 � a w0frO ti LO 0 =Lo J z I-- U d z w ONE CUBIC FOOT OF #78M STONE IN BAG OF POROUS FABRIC SECURELY TIED. USE AT EACH WEEP HOLE. 3" 0 WEEP HOLE ;ULVERT WALL )R WING -'TREAM FACE 6" SQUARE ALUMINUM OR GALVANIZED STEEL WIRE 4 MESH HARDWARE CLOTH 6"MIN. OF COMMERCIAL QUALITY. ANCHOR FIRMLY TO FILL ( TYP.) FACE. VIEW Y-Y WEEP HOLE DETAIL (WINGS ONLY) NOTES: CONTRACTOR IS RESPONSIBLE FOR FIELD DETERMINING THE EXACT LOCATION OF THE PROPOSED STRUCTURES TO INSURE PROPER PLACEMENT OF OPENINGS. CONTRACTOR SHALL SUBMIT "SHOP DRAWINGS" TO THE CITY, FOR APPROVAL. CONTRACTOR'S "SHOP DRAWINGS" SHALL BE SIGNED AND SEALED BY A PROFESSIONAL ENGINEER LICENSED IN THE STATE OF NORTH CAROLINA AND APPROVED BY THE CITY PRIOR TO FABRICATION AND INSTALLATION. CONTRACTOR'S ENGINEER SHALL DETERMINE OPENING LOCATION AND ADDITIONAL REBAR SIZE AND PLACEMENT DUE TO ADDITIONAL LOADS FROM DROP INLET, CATCH BASIN OR MANHOLE AND REDUCED STRUCTURAL SUPPORT RELATED TO OPENINGS IN TOP SLAB. THE CONTRACTOR HAS THE OPTION TO PLACE THE #5 DOWELS WHEN THE PRECAST CULVERT SECTIONS ARE CAST IN LIEU OF THE STRUCTURAL INSERTS. CATCH BASINS TO BE CONSTRUCTED PER NCDOT STD.840.01 #5D4 DOWELS & STRUCTURAL CONNECTION INSERTS (Q)EQ.SPA.-\ (12"O.C. MAX.) A A A < L� `PROPOSED A BOX CULVERT � •• ---------------------------------------------------------------- -------------------- DRAINAGE\\-2'-O" X 3'-0" DRAINAGE STRUCTURE OPENING STRUCTURE WALLS WALLS MI n KI CENTER #5D4 DOWELS IN WALL (7" LENGTH) TO TIE INTO BOX CULVERT #5D4 DOWELS � 7"MAX, CUT AS NECESSARY TO STAY BELOW ASPHALT SURFACE DRAINAGE STRUCTURE TIE-IN TO BOX CULVERT STRUCTURAL CONNECTION INSERTS (TYP.) o (SEE DETAIL A) 0 I OPENING FOR STORM DRAINAGE STRUCTURE AT THE TOP OF THE BOX CULVERT ----PROPOSED BOX BOX CULVERT SECTION A -A H �8-1 B 0 H0 USE FOR COG9NNUMON 0 0 N m w Q m X m m x a W f) p m ¢ o 0. # 2-#4V1 Ca-) 9" FILL FACE ELEV. 698.73—\ 1-#4V1 STR. FACE -----� °------------- 0 ----- B #7G1 1'-0"CTS. EACH FACE —\ 2-#4B1 PLAN 2-#4V1 Cq) 1'-6" STR. FACE 2-#4B3 1'-4". 10001 p �Ar & BOTTOM 0 `4 5Z6 4Z7 I Ln 2-#4V1 Cad 9" FILL FACE 1-#4V1 STR. FACE 3" 0 DRAINS 6" ABOVE 0-) FLOW LINE r11 n ------------------------ - ---' 2-#4B2 2-#4B4 2-#5N1 3-#4V1 0 9" 3-#5N1 2-#5N1 FILL FACE 8-#4V1 Cq) 1'-6" CTS. STR. FACE 3" 14-#4V1 9"CTS. FILL FACE LEFT WING ELEVATION �r ELEVATION CONST. JT. I rn 0 #4H5 In #4H4 #4V2 vi = I #4H3 #4V3 rn U 2 UO W �Li QC~)U -j rn J 2 (n N �QLI l- NN�2 N N @ N N 2 � I ------ - -- -- -- - - - -- 8 SPA. 0 9" FILL FACE 3-V2, 2-V3, 2-V4, 2-V5 4 SPA. (q 1'-6"STR. FA( 2-V2, 1-V3, 1-V4, 1-V5 #4V4 #4V5 #4H2 ------- --------- -- - - -- °4T5 Z" BARS 5-#5N1 4-^5N2 Cd 9" CTS. 09" CTS. FILL FACE FILL FACE RIGHT WING ELEVATION BAR TYPES 3 �/2„ 1 H1 11'-5" H2 6'-7" H3 5'-7" H4 H5 N Z Z 2 11 rn N Ll `1 -J ZS Z2 4'-1" 8" Z3 3'-10'/ 8" Z4 3'-8" 8" Z5 4'-0" 8" Z6 3'-5" 7" Z7 2'-10" 6" HK. 3 ALL BAR DIMENSIONS ARE OUT TO OUT. GENERAL NOTES: BILL OF MATERIAL w O ••i BAR NO. SIZE TYPE LENGTH WEIGHT B1 4 #4 STR 6'-0" 16 B2 4 #4 STR 3'-6" 9 B3 4 #4 STR 5'-5" 14 B4 4 #4 STR 3'-10" 10 G1 6 #7 STR 15'-7" 191 H1 11 #4 1 12'-0" 88 �o a z� -w > Q o z uj J o w N �6o0 z N o a S.r �WUO c a w w z cm'tn ui � w �z-m� w w o a o<o �- inoati �E zz H2 5 #4 1 7'-2" 24 H4 2 #4 1 4'-4" 6 H5 1 #4 1 2'-6" 2 N1 26 #5 2 4'-5" 120 N2 4 #5 2 3'-5" 14 T1 6 #4 STR 20'-7" 82 T2 64 #4 STR 2'-6" 107 T3 2 #4 STR 11'-4" 15 T4 1 #4 STR 10'-0" 7 T5 3 #4 STR 6'-9" 14 V1 33 #4 STR 7'-9" 171 0 s w V2 5 #4 STR 6'-6" 22 V3 3 #4 STR 5'-6" 11 V4 3 #4 STR 4'-6" 9 V5 3 #4 STR 3'-6" 7 Z1 5 #6 3 4'-11" 37 Z2 3 #6 3 4'-9" 21 Z3 3 #6 3 4'-6" 20 Z4 3 #6 3 4'-4" 20 Z5 3 #6 3 4'-8" 21 Z6 3 #5 3 4'-0" 13 Q Z7 3 #4 3 3'-4" 7 REINFORCING STEEL 1082 LBS CLASS A CONCRETE 13.6 CY I USE CLASS "A" CONCRETE. CHAMFER ALL EXPOSED CORNERS 1". ALL DIMENSIONS RELATIVE TO PLACEMENT OF REINFORCING STEEL ARE TO CENTERS OF BARS. PLACE STONE DRAIN CONSISTNG OF ONE (1)CUBIC FOOT OF NUMBER 78M STONE CONTAINED IN A POUROUS FABRIC AT EACH WEEP HOLE. PLACE SUBDRAIN FINE AGGREGATE BENEATH, AROUND AND OVER THE STONE DRAIN SO THE STONE DRAIN IS COMPLETELY COVERED BY A LAYER OF SUBDRAIN FINE AGGREGATE AT LEAST ONE (1)FOOT THICK. WHERE THERE IS MORE THAN ONE WEEP HOLE IN A WING WALL, PLACE A HORIZONTAL DRAIN OF SUBDRAIN FINE AGGREGATE AT LEAST ONE (1)FOOT SQUARE IN CROSS SECTION TO CONNECT ALL STONE DRAINS. PLACE A VERTICAL DRAIN OF SUBDRAIN FINE AGGREGATE AT LEAST ONE (1)FOOT SQUARE IN CROSS SECTION AT EACH WEEP HOLE TO AN ELEVATION OF TWO (2)FEET BELOW THE SURFACE OF THE EMBANKMENT. 10" 2" CLR. 2" CLR. FILL FACE 6-#7G1— #4V1 9" rn 00 #4V1 e 1'-6" 1'-6" 8" #4T2 C3) 6"- CD N -77 D 6-#411 1 31-0" #5N1 e 9" o �i SECTION B—B 10" 2" CLR. -� 2" CLR. I I FILL FACE #4V1 Cad #4V1 C) 9" rn 9" 00 #5N1 @ 9" II #4H1 "Z" BARS ;n #4T3 1 1 #4T4 N 0 8 VARIES SECTION A —A 10" 2" CLR. 2" CLR. II FILL FACE "V" BARS @ 1'-6" „V„ BARS 1 @ 9„ w 9„ I #5N1 e 9„ a m "H" BARS '\Z" BARS I rn#4T5 0 I o 1 Q c\' Z#4T5 ! --i $„ VARIES SECTION C—C FFD, alr" FD' E go F,)) N 4 �N H Do Hr14 USE FOR COG9NNU00H 0 N T 0 N m w Q m X m > a- �m m �- r-- Oi0 WA oA W #41 19 1'-11" 71-Q9/r' F'-1n1 g5/,,,, ELEV. 694.67 3-#4N1 0 8" FILL FACE 2-#4V1 STR. FACE i` 3" 0 DRAIN ' 6" ABOVE `\' FLOW LINE °1 ELEV. ao ;' 688.4 o N P & BOTTOM & BOTTOM SPA. @ 9" Z" BARS IN OP OF FOOTING BAR TYPES 31/2 „ 1 1 H1 4'-11" H2 2'-11" N v z z zrn z 2 env in Z1 3'-5" 6" Z2 3'-0" 6" Z3 2'-7" 6" HK. 3 � ALL BAR DIMENSIONS ARE OUT TO OUT. BILL OF MATERIAL BAR NO. SIZE TYPE LENGTH WEIGHT B1 6 #4 STR 4'-3" 17 B2 6 #4 STR 3'-10" 15 B3 4 #4 STR 4'-7" 12 B4 4 #4 STR 3'-6" 9 B5 2 #4 STR 2'-5" 3 B6 2 #4 STR 2'-1" 3 G1 2 #7 STR 14'-3" 58 G2 2 #7 STR 8'-8" 35 H1 10 #4 1 5'-6" 37 H2 4 #4 1 3'-6" 9 N1 12 #4 2 7'-11" 63 N2 4 #4 2 6'-7" 18 N3 4 #4 2 5'-8" 15 N4 4 #4 2 4'-9" 13 T1 6 #4 STR 16'-10" 67 T2 92 #4 STR 2'-6" 154 T3 6 #4 STR 10'-9" 43 T4 6 #4 STR 5'-3" 21 V1 7 #4 STR 5'-9" 27 V2 2 #4 STR 4'-10" 6 V3 2 #4 STR 3'-11" 5 V4 2 #4 STR 3'-1" 4 Z1 6 #4 3 3'-11" 16 Z2 4 #4 3 3'-6" 9 Z3 4 #4 3 3'-1" 8 B 2-#4V1 Cad 1'-4" 2-#4V1 STR. FACE 2-#4N1 e 8" FILL FACE REINFORCING STEEL 667 LBS #7G1 STR. FACE #7G2 _#4B1 GENERAL NOTES:- CLASS A CONCRETE 9.2 CY 2-#4B1 2-#4B3 2 1-#4V1 STR. FACE USE CLASS "A" CONCRETE. 2-#4B5 CHAMFER ALL EXPOSED CORNERS 1". ALL DIMENSIONS RELATIVE TO PLACEMENT OF REINFORCING STEEL ARE TO CENTERS OF BARS. PLACE STONE DRAIN CONSISTNG OF ONE (1)CUBIC FOOT OF NUMBER 78M STONE CONTAINED oo> IN A POUROUS FABRIC AT EACH WEEP HOLE. PLACE SUBDRAIN FINE AGGREGATE BENEATH, AROUND AND OVER THE STONE DRAIN SO THE STONE DRAIN IS COMPLETELY COVERED BY A LAYER OF SUBDRAIN FINE AGGREGATE AT LEAST ONE (1)FOOT THICK. WHERE THERE IS MORE THAN ONE WEEP HOLE IN A oo 10" 10" WING WALL, PLACE A HORIZONTAL DRAIN OF SUBDRAIN FINE AGGREGATE AT LEAST ONE (1)FOOT SQUARE 2-#4B6 IN CROSS SECTION TO CONNECT ALL STONE DRAINS. PLACE A VERTICAL DRAIN OF SUBDRAIN FINE AGGREGATE AT LEAST ONE (1)FOOT SQUARE IN CROSS SECTION AT EACH WEEP HOLE TO AN ELEVATION --- --- --- I -- --- -- 1A H OF TWO (2) FEET BELOW THE SURFACE OF THE EMBANKMENT. V#4B2T 2-#464 T 7 ----- 2-°462 "--3-°4N1 (a-) 8„ B 44J FILL FACE ELEVATION v� U W N U = ``#4H2 eV)w= —i Qu Q J= D_: Wr' QHM Uo01 C\J I N @ (n N M -#4N1 Ca) 8" FILL FACE CONST. JT. 10" 2-#7 "G" BARS 2" CLR. 5 SPA. @ 9" FILL FACE rn 2" CLR. 2-N2, 2-N3, 2-N4 2 SPA. e 1'-6" STR. FACE FILL FACE 1-V2, 1-V3, 1-V4 #4N1 e 8" #4V2 M #4N#4V3 #4V1 Ca) 1'-4" PIPE NOT 2 � SHOWN #4N3 8„ 1,-6„ #4N4 #4T2 6" M D #4H1ft4-6- - 6- - -L] 11' `� D , � #4T4-L// 1 I"�—#4 "Z" BARS WING ELEVATION 6-#4 "T" BARS � 3,-0" SECTION B—B 10" 2"CLR. 2" CLRL_ .I II FILL FACE—, r 4I "V" BARS "N" BARS C/O C� 9" \xl .- 1 1 g„ H "Z" BARS a 7"H" BARS 1 M #4T4 Lo ! #4T4 8" VARIES SECTION A -A p Ro, a 81 'In" E 0 0 ['111)) N 4 �N � H �8_1 Do Hr14 USE FOR COG9NNumm CD Fz �o a z� ci �Lu > Cnw CC O z N U W N � z � Qi Lu U p w w :Erc� m '� vi wpLu-~ �w E: Fco — co -� LL � zui -i- < a waIra �a �_� % O = ~ J C ztiUa zw I 0 0 N 0 ■ w� r� oA w wAw O ao ao WA oA W CIO \\ \ RAP LANT R \ MECKLENBURG COUNTY P\ PID#163-083-12 / \ \ \ \ 4833 STAFFORD CIRCLE o O DB 30532 PG 692 / SS \ \S\\ \ \\\ \ PROPOSED 18' WIDE CONSTRUCTION ENTRANCE El O 04s , / (CLDS 30.11 A) `i'RE /j • \ S\ \\\ \B6\ ° 28 MECPKLENB RG COUNTY Le \ \ \\ \\ \ \ 3-11 4815 STAFFORD CIRCLE DB 30572 PG 962 �. �� � A C \ f C\ 18" TREEe y- \SS / \ I c� MATCHLINE EC7 ` \ 0O\ / —O C9 op o o \\�0\� \o ss \ \ \\ \\\ \ /\ (Jp�o\O°c o\o o \ ' \ \ \ RT�L \\ �6 c3CD 0 019 \RI P RI RAF\ �\ 8„ HOLLY / O (� 12" C. YRTLE \ / \ \ 1 / / — w Lci \ 052� o O00 °\� \ 0 4" C. MYRTLE 4" C. MYRTLE Q�18—�MYC� / \ /\ \ / Q Q \ \ \ \ \ \\ \ 8" HOLLY / O o \° o \ / 18" C\YRTL) / / / \ Z > \ \ ss ASS\ \ \ \ 1WT'LZT LAR \ 0 J J 1 \ APP�gX E 12" C. MYRTLE o� np oo�j (� o / / / G� n m O O°Ob a'\ \\ 0�9 � /j / it Z o r- \ \ \ \\ 1 — — ° — — — — — 34 1 3 \ 0 w C"! 6 „ C . MYRTLE / / / 8— — — ° o �\� — — — — - / „ B / \ 0 00 N j 670 / �" / o \ 8„ PINE OX it c7 Z N O a \\� \ �Q2" CED / / / / — — — — j �- V\O�O° ° — — — — — r �/ —\ / APPR \ �U OME \ \ \ \ \ A{} / / / / / / — — — — — — / \ PINE X 7 R P\ l \ a W 0 Lu z I ` m w \ \ \\ \ `^'" 1 YRTL / / / / \j — — — °\\ — — — Q 15" PINE vEN WIREISPC1 Z Z Mj LL u \ / / / — ------ 12" BIR H 4' WO z—O AP 15" YCAMORE Z w �— \ C.p /o �j0 fL 10" ASH ASH \ a w O O °' 12'�EBAR / / / Q� MYRTLE 1 O O A AL O J /Ln z R \ \ \ \ TEMP AR 1 \ \ \ \ \ ASS \ \ \ \ 10 M ° / Co MYRTL \ PRO C�10 DS H3005 5 BIRC 0 4 \ \ \ \ \ \ \ \ 12" CE E SQ� S /� CP., I \\\ Q CONC \ \ CEDA 24" ASH sus \ \ \ \ \ \ E 2 \ 2 ASH 1 32 \ \ CONC / \ 1 PINE S� I c,L9 \ \ \ S \ \ \ \ \�18°" PINE 15' \ 13\ \ EIP �'. \\ \ EROSION CONTROL LEGEND \ \ SS \ \ /LT \ \ \ \ \ RADL\S HENS zo \ \ \\ \ \ USE BYPASS PUMPING 00 00 ID�/163-08 2s �,\ \ \ \ \ DURING CULVERT \ LIMITS OF DISTURBANCE 4940`CHARMAPE �ti \ \ c� INSTALL TION AVE \ DB 3 53 PG 4 CONCI SEDIMENT FENCE (SILT FENCE) \ �sb� \S +� \ S� CLDS 3 .22A / / YA CH \ \ \ �Y \ 0� \ \\ °O \ / I ` \\\\\ o / BRIAN C LAIR CHECK DAM \ \ \�� iy�J�S \ \ \ / ° \ \ ,\ \ & WIFE SHARON CLAIR s °� sS S TEMPORARY I ET \ \ \ \ PID#163-082-10 DEc m TEMPORARY GRAVEL CONSTR ° �9 \ �b'd \ \ ( ) \ O \ \ I \ DB 23180 PG 984 o a o \ \ \ \ \ e \\ 27 � / PROTECTIO CLDS 30.15 \ � \ \ Y \ ECKLENBbR.L Y ENTRANCE/EXIT \ \ b\ \ \ \ \ \ \ PID#163-08\ \ \ F \ \ \ \ \ \ 4751 EMORY LN. 3C-010 \ \ 1SBD \ / C] \ \ \ \ \ \ \\ \ DB 31390 PG 499 \ \\ TREE PROTECTION \ \ \ \ \ \ \\ \ \ \ \ \ \ TEMPORARY ROCK CHECK DA Q INLET PROTECTION \ \ \ P / z \ \ \ \ \ \�\� �\ � CLDS 30.10 (TYP.) � \ � \ \LE I \ \\ \ \ \ m f Nc \\ WAY \ \ O \\ PID N 083-09 4743 EMORY LN. DB 62D2 PG 915 \ / \ BST \ oIn y O N O � N W LLJ W Ca U U) CD a. e Q U � P7 P7 O C) [] [] N m J Q 0 V O O O~N Ow 41 � w PRELIHINARY PLANS 00 H07 UN FOR CONSTRUC\M w w 0 � � _ I I O DANIEL RYAN AND SPOUSE, R1YANOL LEGEND WHITBY POND HOMEOWNERS' CO I EROS I SIS ASSOCIATION. INC. PID#157-182-57 o / W I°i I BR Q I I — I I 4517 NIGHT HERON LN. I I I I a LIMITS OF DISTURBANCE DB 24262 PG 339 I I I l/ / 0 UAL MAITyii I FriPID#,-182-5s SEDIMENT FENCE (SILT FENCE) 4 ALUMI NIGHT45D6 265 PG 391LN. � I O C I / ✓ I— l I I n l 1 \ 1 / I a I l / UM FENCE \ � III ~ I I sr 1 \ �„ _ I I; / CHECK DAM II II II l F e l l 2 3� I I D / t�" YCA ORE I I i- �� q I II II / I = I I \ / / / / / I I I A II \% ° TEMPORARY GRAVEL CGLIaTR, I S (D \ 100 \ / D \� oo\ \ \ O / / I I I x �I ENTRANCE/EXIT III — \ I ISYCA O I I \ R II II I 6" I I II TREE PROTECTION \ � I \ \WALL \ \ / \ \ \6AG'NjdLIA / G L /I 6 RCH / I \ tx INLET PROTECTION \ \ \ \ I I FQo GATE __— 6" 9 / 6 © .I DB 30185 PG 516 0 \ / z o 0 /� \ \ \ CD I\ '� MAGNO MA 0 / 1 \ *� TORM DRgINAGE EASEMENT \ C\ \ PILLAR PI AR PILLAR, I ` 1 MAGNOLIA 6 C &` WALE` � — °�� �WALL��� � J MAGNOLIA 6 WALL � - w Lci \ / PILL PILLAR 6ILLAR P� R l I S 1 l MAGNOLIA / \\ 6g P PILL R pILLAR OSCgPEASE �F � Z \ / Q/Q i Q_ Q PIL �I \ \ SAS 9 PILLAR T I OE y CONC J 102� PIL G J m OEM OE OE OE — OE E OE 50 OD WgLL� PILLAR I 15' STORM ❑ Q ~ PILLAR � DRAINAGE � w Y _ \� / ! Il 0 OE P RARY INL T g� ���—Tl�AR E EASE NT y �/ J ' 1 \ ADA P D ADA P OE O�ONC Q PF�6TE�T10 \� —� Q J�— LLA PI�L & LA LLSCPIL A�q CC O Z N c) UT �— U „ �q T _(rI nC 30 1 r�—9�� _ _ 0 —�_ -�sPILLA y o S O — / / SYCAMORE YCAMORE / �J tea- — —6 —_/ \ CONC — \ "\O y " LLA ^� w U �o / � T —L— - E SYCAMORE O W/LT �— \ I� w Z c7 m cn SO — = 6" ELOD _ _ — ` a �� v� zou5 LLX T U T \ 102 —6„ E— \ C z Lq \ BST \ \ 15"RC 10 102 SYCAMORE U OELOD — 0� —� —oE — ` OE ,z a L) \ \ \ 4» STL \ S 105 / LOD a Ln O Q \ I spy LOD >�_ "� �� mites Road OG9 Public�R W) G 7 G G G G G \ G� BST G o G---- / G_ S4"RCP �— 7 �� zl`c>� z N Sharon Amity ( W _ -- G — ��— G � � � UT LOD 96 \ \ \ 12" WDI W \ W W T P ORY kA G -- G W G W W— _ o G (Gp coNc co T (CLDS 30.15 i — ---- = - - uI�j�w7W0 V N I �_ 0 —/ = r I e S G-�—w— / / _ \ _ G \ / BST/ / / IJSE BYPASS PUMPING I I fib` — — r SS SS SS SS SS SS SS SS SS SS SS SS SS/ SS IIIIRIN��I�\\/FF2T SS SS I S S CONSTRUCTION BST / W W W / (CLDS 30.22) 1 3A I mod„ DI ,i" ��IV� 03 oo \ SS _ L t W/LT \ � UT ° T UT qJ 00 O a0� LOD �N — - _ — _ _ — — — _ — _ _ — — BST SS �_ TEMPORARY INLET 99 w 11 — ss CQ \ CONC I 00 —coVC HA DR CONC �Q— 24 p{ �/ 60 N I �Q ` O LOD ---COD O p0° / �.. / I O� OO / " Lu wo S°? \ I I I / °� 1 A�¢ o� UT U BUT UT U� E �O- O� 20" M / N LL � \ \ \ Z eST00 / o I I 3 �o Ooo° a� UE / \ 4 � `A�'/CS� ` 1WLQI' 7�s IA'D �O� � �p n p 0 UE X � N \ HA LOT 8R4�3 O ° E UE ^ \ SQOCN. SOH RON AMIT� R 2 w U WATER OAK NCARTNERS, L STUC N / \ I I ` D�12435 G 1�8 0°#163-082-22 U CO WALL \ / o / 1 1 0 ° V CLF (� / 4909 WATER OAK R UE 'S I 1 O o° 0Y/V E DB 29726 P �.s' �` _ MATCHLINE EC08 o MATCHLINE ABOVE T o � � E ASEMEN � i � O SIDEW 1 O SS O \ � - c°Nc oo / m �L PLO 11 �J c� I \ 3n / \N I\ �\ SIGN LP \ /Lr O S /w� SS AD ` POST / n S / < C 3 Q 0 rs 11 0ST I N ° ' 3(1 ^ . 2S APARTMENT CONC S 1 o / � 1\ 2 Nc A PLAN ER n n \ 0 1 r 1`' / $ / -1 80 (g - \7,-° ® \ 00 (, PbRARY INLET `� 1 / WATER OAK NC PARTNERS, LLC �� G S tP S PID#163-082 22 r� WW E qS 1 OON 4909 WATER OAK RD. TV / CONIC VAUL III G G �S OTECTION�CLDS 30�) \ 0 ARY / DOG \ DB 29726 PG 50 MBER / (g 11 J� 1 C ' 0 $>RCP 0 PROT CTION QSTATION / Tlie PLANTER 2S APARTMENT V 11 S I O_ U5�'- 1 \ / SS a CD BS11� \I l l PA S -1 ° \ / �� 82 / �/ W Ca m w E ° O 11 O _8 A.,...... ^ 00 / I -�I g w d 1�--eS • w I w F / / / / AVERS 36" �J r ✓ \ I 0 g0 I / r / / \ PAVER / / I \ I I s W t C9 Q m _ G o cq co / BST C BST 9 ' _ _ �� / ' o O U Q = C? I I \ O a c� SMAPLE00� / ~ / PL ER� �E / 2 Posr % I m \ / Y\ \ / v� / PAVE S / \ / o LP c 24= WITHI SIGN / ° E PORARY INLET E op4E / / / 2 POST COL�ST / LP PN�6RS / r II cn / \ I TECTION (CLDS 0� 36I ERO ION CONTROL LEGEND U�—� PLANTER CD II / \ I I O (D JOHN R VELLIE STEPS O / f PID#1 7-183-10 r , _ UE © �� I I 4735 W R OAK RDf LOD W — — UE WiL / LP �( PAVE / CONIC d / c� N_ o I DB 30100 PG 170 LODLIMITS OF DISTURBANCE W / \ LANDSCAP o 1 I � G® 6jLIGHT Z SEDIMENT FENCE (SILT FENCE) _ f _ m x w 06 4" \ \I ® �� I TE ORAR INLET I r I Ok O BR FOR \�63 6� ) I I� - - - CHECK DAM a AL PR TECTIO (GSU3�0.15 / �-I PAVERS ' " DEC ° EMPORARY GRAVEL CONSTR. NTRANCE/EXIT W A W — — — — — — — 6 PLANTE-RS� / S \ U7 \ — _ ° BRA ORD \ / � ` I I O / -�1 �/ TREE PROTECTION w 0 / \ — P fag — — — —PE- —W7t — _ \ \ r I ;U > O OI i� BRADFOR / \ C) 18' /� �— — _ — ( \ I \ c�I I N ET PROTECTION o / / PAVERS / ° o RED / w I ONC BRADFORD / I - L � L !�I �/� / PEAR, / >- � � C � I PUE � \ CON \ \ �� � - PRE I M I ARY PLANS l\ ° PAVE \ II J � \ APPR / \ BST � \ � � D ❑ W I PLA / D0 0 0 0 0 w 1 PAVERS 00 M07 USE FOR C�O� SIrflu a W � o � L PLANTER', \ / w MATCHLINE EC3 W MATCHLINE EC2 BST \ I /O N� I a � �- \ � O \ SHED CONC — — _ / \ i EROSION CONTROL_ LEGEND C� I � I � E� � I � SWING � I / m SHED X� SHED 4, �cK l / SET LOB LOB LIMITS OF DISTURBANCE / SEDIMENT FENCE (SILT FENCE ) zi a' 'X _ --�--♦ CHECK D A M \ \ I I N U) \ I EMP RARY INLET I P ANTER o o I ROTE�TION (CLDS 35) �` / \ `� I ° g TEMPORARY GRAVEL CONSTR. ENTRANCE/EXIT 1 \ \ SS PLANTER I \ \ I ro / II m 1SBD PLANTER 720 TREE PROTECTION \ \ \ \ I DECK I x I �I J �� BRICK RWALL \ x LOD COC / \ A o � _ _ � Ix � INLET PROTECTION Z C) I LI DSAY ANN NAGELE AND HUSBAN z S PLANTER I o \ I - z o \ gS9 \ ANDREW ROBERT NAGELE I \ �- m - w L6 O \ 2 PID#157-183-11 - I \ \ / L/c~n z \1 I 627 N. SHARON AMITY RD. \ , m \ 12I' MAPLE / \ 0 O n I DB 29830 PG 243 �Q PLANTERLroma II \\ � m -C '�' ou° o I r it z ti �D I I 1 covc \ 24" APLE TEMw�R i�Y INLET O o z N 1 pU SHED CLOTHES I 20"°MAPL 61 U w cV u BST \ /C o I 8" C. MY E \ 0 I \ o(J LINE I 62 \ o PROTECTION o o AK / Q ) , 30" MAPLE 54"RCP (CLDS 30 O9) — 0. w ° K ii88^^ 00 I — Lu \ \ 54 RCP \ z_ z m } III \ \ \J" II CD �/� CONC \ �Q \ 12 TREE 18 MAPLE GC O O V/ �.l 65 "RCP TEMPORARY INLET 1-� w , 18" MAPLE ° I ,� iz w -1 Q -E E �_4"BCP E E €- E TEECTION IE Q, A E E/ a Lo(D_ �II I - - -- --- - - -- - - -- -(CLDS 30.0�---- ---- .a ------ 4'c�--- - - - zl`c>� z� \\\\ 18"0 _ - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - I cn ��� -E� Et— — — _ E - M AP� E I - -� - ®� - - - - - x \ / - ® E E I / _ 63 C w ° MAPLE ° L � 48" APLE 51 A - O }o 6' PRIVACY 24 I / ® / -3O OAK �- C ° / I TREElq_ / I I I A \ \ I I Q a o \ our i pU 18" PINE _ ANTEERR� j OX PILE ©I PATH e � OAK \ \\ / TEMPO RY INLET f _ O PART x GARAGE cn A \� o ROTE ON (CLDS 30.15) WATER OAK NC PARTNERS, LLC \ II 8" C. MYRTLE C/O CORTLAND PARTNERS LLC I \ 68 TEMF�ORAR INLET \ I I m I / 3 LE r CONC I / I I Z PID#163-082-22 \ 67 PRO ECTIO OLDS 0.1 I I �N" SHED I CONC I I J I O 4909 WATER OAK DB 29726 PG 50 �4" - L __CONCCA / h -� - _ - - - G� C N CONC CONC I I STEPS / I �— � c 4 STEPS S� / I► I LO LOD/ sv I / \ STEPS ( STEPS / I I I I CONC CONC x o / Imo_ I \ I \ n GAZEBO W 22 I, L I STEPS°N I I BST OAK // / I*1 / iSBD l O / RAYMOND FIELD & WIFE I A2SBD I \ // I I Cam/ \ I I PID#157BETTY D183 103 2SBD r� CARL E GODMAN, JR 0 m I I 4818 WALKER R. I MENDY L GODMAN — 1 0 5 A CONC I / DB 3690PG 9 9 I I PID 157-183-14 X IRON 4 # _ c0 F_ � I I I I LOUELLA ALLEN HEFNER DB088731LKER RD. PG 809 ❑ I T I v A2O2SBDoAK// p A PID#15RON AMIT I. I I m I W I I I / / I 635 N. SHARON AMITY RD. STEPS m / DB 3357 PG 442 I I F" I �II}f WI IAM AM RATI I n d C I LL J ES UB S HEATHER MARIE HAGEMAN I m Q IA PID#157-183-15 I BST T RARY IN T �a�s1 69 PG 2 6 I I' c E m-- I IRopd� I ► I z HVAC °N P�/// I II I o I P OTECTION (C 30.15 6� II _I I POST ©I I I o ! vI w I rm I I o S4" OAK CA I I I 9 I / I ` I I I CONC �, MATCHLINE EC8 o cu CIO m - o x X - // i / / I AGRO ®124' CLF4'CLF �OHN DAVID �LANTER EROSION CONTROL LEGEND — — — _ _ Z� ACCDA, III, h _ ND WIFE, EDITH H. ROWE w BROOKS s\ / k / LIMITS OF DISTURBANCE UD WIFE 611 hIDWATER 83-02 I WEND RANNON 00 00 \ DB 3756RPGA8280 48" K / - \ �25 �� / x - - T - - - - - -\ Q 4601 W}� E OAK RD / P TER SEDIMENT FENCE (SILT FENCE) � PAVER I - X DB 29144 P© 11 I _ X SPLIT\\ / CHECK DAM ATIO v \ I — X 4AWNFENCE-30 �O V o \ g g TEMPORARY GRAVEL CONSTR. APARTMENT \ \ I a' ,Nw PENCE / o O \ �0 ROCKS &Z GRAVEL ENTRANCE/EXIT \ I RA1L FENCE �i TREE PROTECTION a� a� PLANTER 12.. k 1SBD� / MAP ��� I n / �/ S PLANTER I \ ® PROTECTION ° DS 30.09) N c; INLET PROTECTION p / _ / / I D I / DECK / Qp \/ A , J\ 16 PAVER PATIO 18" L I Ld m w r / \ 3n QQ / MARY HELEN HACKNEY l- _I J o C O Lu / / PID 157-183-20 �- ` E CONC ERI 57-1183 121 ® 111 �Q� N d w # PID 1 / I I I �F� s Q z PLANTER / 1000 BRANTHAM CT. of 1001 BRANTHAM CT. w 29404 PG 763 �•��' �fr DB 29177 PG 494 \ P iSBD / II II 4 S018YLINDAHLN. © \ \ PID#157-183-29 (� SD PLANTER \ \ / ) 12" I DB 6940 PG 556 V1 CEDAR � P w OE PL�TVTE E— SD \ \ �\ / / / MAPLE AR sDE �� �- WIDE \n TEPS ® n I / 11 GARAGE r L 15" THE oU / -,,- I O -\ \ 24" MAPLE O�Q / / OQ�ONSTRU TRANCE \ I/ / I 6RE a e_'�/ k �PLANTER (CLDS 30.11A) \ \ V 19" CED ^�Q PR(Pv�E MOLD n °per 00 O 720 ° ° 00 OOvV 36" PLE \ \ / F ���—r \ AS I N O J O Q O S � O O • 9^0 / 4 ICIT O (1SJ FEN E ° Ham. - j uO O o�. MAPLE i O O O °� 4' CLF- PS / \� ooO o 0o O o moo o ° c — — — — \ TEMPORARY INLET Q I PLANTER ( ©® �� ° o0 0°�0 PROTECTION II D PLANTER TEMPORARY 0 °° o D - - - - - — — —�- — — — O I \ 0 \\ SILT FENCE ------_ ---- - -3 — — — — — — — I \ / -oh r^' _ ANTER C C - - - _ C-- - - - �1S - - PLANTER \ cJ _ / ANTER ° - - - - - - _ _ _ - - m WARREN M. SNOWD N AND\ OD C 10 P11VE- 4 CLF - WIFE SONYA WALLAC�PN ANDON / C I CONC - - PID#1y183-28 r \ SHED \ � D � 1024 LINDA LN. / / Y LOD LOD CONC PLANTED / DB�56\02 PG 704BRII II h•LI F1i�I W PLANTER TER \ 4 " M 12 TREE CAR 12" HOLLY / (D \ CONC CONCt — PORT � PORARY INLET J I�•I 1�1 P TECTION (CLDS 30.09) O �) X T RARY INLET � / o r TION CLDS 30.15 —J \ fil Z 19 A ( Zc ) � \O & LARRY WIFSTEWARIAJEN IIENKINS JAMES M. CLARK, JR. / ^� } \ PLANTER PID#157-183-19 AND WIFE, GAIL W. CLARK \ / Q \ (�/ 1008 BRANTHAM CT. \ / \ /I 48" AK PID 157-183-16 x �/ J / �/ \ PL TER / O� DB 3840 PG 314 S o S / \CO © Q O 48 OAK I 4718 WALKER RD. J / Fi�j x _:> DB 8487 PG 900 O \ \ /� I �C A / x I / ® CLAY DURKIN & WIFE � I O LINDA DURKIN / I / [..� O PLANTER PID#157-183-22 SHED \ 4' ICKET FENCE I \ 1009 BRANTHAM CT. 9 DB 21692 PC 90 STEPS m 1SBD ICI CONC - - _ _ PRE IMI ARY PLANS o ° ° — _ 00 M07 USE FOR CON MUM 0 W JOHN DAVID BROOKS KACEY NEIL SP S 1 "PINE 4523 WATER OAK RD. JOEL L. MA m AND FE WENDY BR-A4NNON BROOKS / \ AND WIFE, AMY B. SPE T MPORARY INLE { 1 DB 19046 PG 438 x I A L N w PID 1583-0\ \ �I \ PID/-131-02 0" S�WEEETGUM PROTE I PID#157-131-11 ATER OAK RD. / V� `47 A OAK RD. \ 38 PU�I�APLE QU �sgE SDE v 4511 ATER OAK RD. �ROPOSED 18' IWIDE 29144 PG 11 DB 4037 G 176 ° ou r DB 4099 PG 213 O SHE v P OD a" cE DE SD I 1 ALNUT CONSTRUCTIONENTR CLDS 0 UE R P ❑-, SIDE 12" \ E O O O 24" MAPLE vti 4 RUE ��pUTD00R OU SDE 15" ALN (100 V OQO O O U 2"iTovO� � \ 4„ AV" { � MAGNOLIA g, CEDAR FENCE „ ,nia l,J'8'HO 12°° WA QG ® ® ® 00 — 24" AGNO �A Ff�IQ$PT g' P IVACY OU '� LNU O ' LL OU 10"HOLLY � Q nn O O O O A?•. 3 "p 1 O OO�CB� ° O O[ 6 AS cS•, g 6"MA E E _ �� —CO \0"NOEL P 0 a O oO O o15"WALN ,T Y TR / XJ L • 6 TREE A — O f — _ NG ALL U j� o LL D CP 40 O OO OQ O �� rPaivervninF �E o ° ° a — \ �� � O � po Oo0 0 7 — \ --- �NSER_\----- 8 — ---- �— — 3' PICKET NCE SHED ----- — 6" THE e,� ° 3F) / O Lu / — — —�— — \ \ \ = 000 0 oo — — — — E / E E \ m ®� y� \ Q �O Q� P E IE PLANTE I S O o O O °p O \ L P9POS1=�18' WIDE 12" TREE 1 o WOOD \ / D Q ca W \ IECTI DES 30.11 A� \ \ w RAMP \ 042 41NE w i S �t oo-QO \ \\ Z / 41 I ; — I —o l / / o TEMPORARY INL _ �LLA ©PTEEAI;� / o \\\� W AG —1 \ PROTECTION (CLD ® i ;p i / J SALLY K. SHAW \ III \ / < IPLANTER / D \ © WALL I \ \�0 x K PID#157-183-29 I \ \ I TEMPORARY GARAG �C 1018 LINDA LN. Q CONC _ ER / \ PILL \ �_ ♦ ♦ DB 6940 PG 556 III \ I I Sit? FENCE Pia I \ �i 0 © T �0 RY INLET 1�1 I GATE I w � BRICK WALL ® \ \ \\ z a U I O \ O SLATE ATI O \ — w 1SBD PR TE N (CLDS 30,15� I 1 o \ 1SBD M C/ � Ld > _ 1 r LAMP 1 A BRICK PATIO PI STEPS / M \ ¢ Z Q 1 1 11 " ALEX M. MYRICK L / x I �S CONC SS O J J CONC O III 1 © & WIFE NARIAN LEXANDRA r / I \ X S G T SH TEMPO ET' =)Do -�2 zw I WAL ER C AVEZ U r— I POST 1 1 m� PI015 LINDA LN3 1 / J / '?� PROTEG�+O LDS / & WIFE MARIA CHAVEZ ) 1015 LINDA LN. � PID 157-131-10 � � � w N � I LAMP III p 7 DB 25824 PG 334 J POOL / w \ I U 00 In CONC O (\ 808 BRIDLEPATH LN. G� z cV p I SVC BST I o \ o �- DEC DB 20551 PG 238 I / \ a w � z om M m CONC J Z \ = 1 I zLLJ U"--ti LLx w r 1 l 2SBD PLANTER I \ CD — F- co c a PLANTER ® HVAC I \ �..+ z w J ° — D S I II ® O X \ COINC I a Lo (DCD ° 0 O I I / >� 2 I '\ GARAGE Z I� U z a � � �— r — � � � I cn ul co IP _ X _ \ _ �Q O I \ I ® © ® / 6' PRIVACY — — — — _ BRICK �111 I I I\ �\ ® ® \ I FENCE �Q I (D ® ® �I I O / PLANTER �� / O \ / / \ (D O I Z v r � CD WARREN M WALLACEN & WIFE I \ orlll I / SVC / / m / © I C { Q Z SONYA LLACE SNOWDON 1 / P�ANIER / \ 10245LINDA LN$ © ® p / (� O STEPS DB 15602 PG 704 T E P I / z - °I m { w / EROSION CONTROL LEGEND a /GREGORY T. WATSON ' Q p4 PLANTER 1 PI 57-131-09 U \\ / / 81 B IDLE TH PG 4L I °° °° LIMITS OF DISTURBANCE - w \III CD � n � I I PLANTER p \ I 1 SEDIMENT FENCE (SILT FENCE) o a I © / ® w / DECK CHECK DAM III cn J \ 1 �\ \ 1 ®® (D BRICK PORCH STEP O / I ) x / \ 01- L MP / Soo S TEMPORARY GRAVEL CONSTR. 00 00 \ 1SBD © ENTRANCE/EXIT ti II �n �-, MICHAEL E SAVAGE \ & WIFE CYNTHIA B SAVAGE �) TREE PROTECTION III C "\ PID#157-131-04 I w > c d MPO ARY INLET 1 1019 LINDA LN. 1 \ DB 13656 PG 970 \ ® Q ROTE�TION (CLDS 30.15)\ INLET PROTECTION II `� 1I x / o \ k � PILLAR PILLAR PILLAR 11 39 O I / ® I t� � � I w X I 1 x x— MATCHLINE EC1 CA T o SHED 'o A - — — —® EROSION CONTROL LEGEND I Zo T \ r ° w O ^� \ coNc V LIMITS OF DISTURBANCE ICI ,\ I \ © XI \ \ 0 SEDIMENT FENCE (SILT FENCE) I MADELINE GUADIANA AND SPOUSE, I EDWARD GUADIANA ®ii O x \ } PI 81101JUDITHI CT� ® \ I 5 O a \ CONC 1SBD 60" OAK DB 32660 PG 653 CHECK DAM I I 11 GLENN MOLNAR & �� �w�r�n TEMPORARY GRAVEL CONSTR. I I \ SPOUSE 157 13 MOLNAR — \ PID�/157-131-13 III � � 807 BRIDLEPATH LN. CONC \ 1SBD \ z ROPOE9D 18' JESSE GORE HELMS. JR. ENTRANCE/EXIT I I x� IDE C NSTRU TIO C �C & WIFE MOOSEHELMS I I DB 27371 PG 651 \ © o I \ \ I \ / CONC I 1SBD \ ® = ENTRAN ' `d N \ 809 JUDITH CT. �� TREE PROTECTION \ / /� / D ' LD 1 ) tO \ DB 2669 PG 602 I I © 1 \ I I ssL \ EIP/ I \� CO \ m coNc� \ I 3 \ INLET PROTECTION �, STEPS P o I ® co E �� o E } I SHED I I x ® \ co "ZI _S ° S18„ OAK \ 4' WW SPLITGDP 4 36"OAK 36" 0", 0 \ r — — — _ — — _ \ RgIL FEN CD \ \\ ��^-y{ \ I E G _ _ I > Lu TEMPORARY INL / \\ I 1a"AS ® Z III GQ 2 E/ �DAE-------�—_-- — �I II s w a Q / P RAP E Q GRAVEL Xc r _E_ a_ O PROTECTION (CL 0.151 \ PLANTER 1 30"RCP E O oo �� _ \ — — / — — Q 8 P PL g O O �\ W —Sbr-L m z o OoOoo r 24 E PRIVACY FENCE v Q I I PROPOS D 18' ` ° o / ✓ \ / x o w iii CONSTR ION NTRA CE (CLDS 1A � �\ E ry I r P A /36" MAPLE z m I U � J ° O(� \ 3 TEMPORARY T cr o l \ o 000 ° Q o00 0 °Q PROTECTIO (CL S 30. 9) I ® m I o 0 0 = o O O ° oQ O oo O O °Q - — / TEMP RARY I LE �\ I N BS / Z u L ¢ > J MAPLE ® ® PRO CTIO�I III �' I \ 1SBD I x I O O L)p/ \ MICHAEL SCOTT FARMER /� W Q O OO O° ogQ o — I \ ( D J I & WIFE MARGARET so P d L� 30. -c colvc a O O o ® A m MCALEER FARMER 26 orb Op O°QO ° O ° O O O 00 m l ( Lrn nrn o II / SVC 1 PID�j157-132-03 ( I I w 18"MAPLE° i / / o I J CONC o �I DB 7578815 1PG 801 I J �X I O p TEMPORARY s 1SBD CON 0 \ PLANTER ® �© ¢y �_ SILT FENS �� \� / < \ / \ ' / I \ \ u / 12""''fRE �—t�' -< I � GRAVEL OtL X{ / m / PLANTER/® / z / = I ` I I s / m O / 3 LLJ PO T m ELAINE POSTON I I© D f � I SVC I m I O W / BROOKS REVOCABLE I ® I II - f ® THOMAS RAY KEITH / TRUSPID 61579833 PIG 131-119 747 (D r p O— & WIFE MACIE E. KEITH / 816 JUDITH CT. ® \ / L O 4' CLF — — OE _ O — \ I_ ® � J / 4' CLF C� X x �E—� PLANTE / PID#157-131-14 SVC v v Q 1 x 813 BRIDLEPATH LN. \ SWING � � T ® DB 2739 PG 140 / x / / O V Q / 4' CLF �j \ / I SHED — �c J E BST r i- k SHED O \ O ~ c ul r l \ TEMP Y I�T � \ ? m 1SBD z� PRO I N C) \ \ W _ s wA DS 15) �o / CONF "'� / v / I � a 4' WW SPLIT 4'�� _ / A I \x LLJ � � D RAIL FENCE 5' PRIVACY FENCE � � EIP PLANTER a Xn / / / I I 2 JA o WILLIAMS LAND -< I I I "� r--F- / PID 157-1 -04 m O�v I I / / G DB 4352 WA ER4RD \ m / CYINTHI_ Y LEE II LO(DI III I \ I I ® I \ / 441001 WALKER RD. / / I wa ® �c �.. \ DB 5349 PG 667 © / 0 F+�I � � 'tr, � BST `�' X � DECK Poo PRELI�INARY PLANS III _ AG EIP _ I SHED / C / ) ® D ❑ 00 M07 USE F\ CONSMUMO W U c L� - W W 1 \ I I \� / �/ , \ I I /,II \ �I II �jl� I, I \ \ y I I I EROS I ON CONTROL_ LEGENIt Ir 81 � I o �\ I I —I I � j � \ / 'z I I o I KRISTI MOORE / / \\ / / \ / ( I PID#1 TER OAK CHARLOTTE MECKLENBURG I l\J 7 goo goo LIMITS OF DISTURB NCE BOAARDD OF -EDUCATION I \ I I I 4328 WATER OAK RD. I400 WATER OAK RD. SEDIMENT F (SILT F DB 26689 PG 912 w/ SED I EN FENCE FENCE I. l ( I D$ 27025 PG 514 I I I I I ��\ _ \ — I I \ _ I / CHECK DAM \ I I In �W/LT _ I \ ��IRI II Ioovc I �gTEMPORARY GRAVEL RA VEL , ONSTRo C MELANIE N D0 ®— Y3OBSON ENTRANCE/EXITPI --01 I30 4336 WA OAK RD. L WV S� DB 294G 498 W � \ 1I TREE PROTECTION LL -10 30` — © Q / I I INLET PROTECTION 0 J°ID�/15 E 3 - 0 2 R 4332 W -OAK RD I I \ w O / � — — — — — _ _ _ \ 1 8 0 6� \ { I ( I I DB 2 2 PG 885 I I Li o 0 Water Oak oad� �_ _ _ — _ 16 �Q LOD— _ _ r I I -� zgi � U w Ld / �� D _ � \ ��^ °� ao �BST (60' Publl� R/W� i I I \ �� �> TEMPORARY INL �RARY 0"RCP �T€eTK)Q1_ s \ I TEM INL T 1 o z �- BST ` '�� LOD LOD w o w ILO �� I PRO CTION I O J E w 1114, W�T (CLD 30.15) wnn J z N o LOD — 1 30 PO 0 e r U) w� c> o wV o I I TEMPORARY INLET 13 — 0� c�9 �0 NC m a z U" f / I J M I I PROTECTION (CLDS-30.15) � �� = � CD z� m / / \ Lq S5 —SS �S SS SS SS C.. SS SS SS SS SS SS � S SS $ SS LU '~ z o w / / M BST R A I U < Z a CD .5, Ln L / In n z I- u w/COD LOD— =1 6„ PVC 12 I BST / M II TEMPORARY IN J Q © OLOD r� M_� s PROTECTION (CLDS 30.15) 2 "RCP \ � I L � NDONE= LO I V � U, o _0 / _Q — M mz � I_W� ter ,- Pubica -EMPORARY"INLE - 9 17 =NCE L L�ROTECTION(CLS- 0�5) M ❑ 0 ss x m VV Ha � I JOSHUA S TONEY AND o 0 \ / WIFE HEATHER TONEY � El- � v � � z ` ® 6 \ DB2PID#157-131-21 I m p \ v2" \ 008JUDI 3477 PG T.644 \ O � \ I c \ l W C \ I \ V I 1 yl TEPS I K I I \ \ \ I I \ x7 1 r DECK GRAVEL I z \ I _ \ D ` Svc m \I \ I \J \I \ \ I D� \ \ \ 17so Q r\1O \ ° I I I z JACLYN B MF O FORTUNE AND BENJAMIN F FORTUNE III I I �— STEPS Imp \ f f PID#157-132-01 L� I ACHILD � II SVC ° 7 VA 801 JUDITH CT. I I CONr*tl DE�` � 0 5Q DB 29278 PG 272 WIOFENpBRA A. CHILI SSA / I I Y/ \ ���� \ I + \ z I I (& PiD�{157_t32_19 WLLAM C. C LE JR. I A \ \ O III SVC I D m W 4337 WATER OAK - BLWIFE KATHER1 COLEY \ 750 —� I I-P19#157-1 18 I \ 4333 WAT K RD. II I SHED m DB 31231 PG 7 _ SS[J ' KENT PHARR BURKE �I I DB 31252 P 236 \ \ APPROX I I / \ PID#15-132-15 1 I \ xl \ I I I 800 HAR ESS AVE. POST 0 \ — CONIC \ \ DB 7139 PG 206 ' \ 0 E — —_ - / - \ I I a' WW SPLI ICI CONC. I \ \ I \ PIT \ OE \ Cn —�— _� _ - RAIL FEN N RWALL \ \ AIL FEN \ Ci� OE O I I 1 O SICK RWALL x \\ X O GRAVEL \ 42" OAI II \ 1a of OE OE OE X - - \� OE l I II \ \ \ QED b X 0 -- EIP III M ` I o OE I \ MATCHLINE EC4 cr x I o EROSION CONTROL LEGEND I � / x I JONATHAN E SMITH AND 1 DOUGLAS�C DOZIER A—T— oo LIMITS OF DISTURBANCE R\ I I Hartnept Avenue -O n T POST oST POST oST POST POST POST Po�T S L ATE x l 10; \ o Y of I � � o I � EDNA HARTNESS PID#157-132-14 801 HARTNESS AVE. DB 1728 PG 76 \ I I \ 1 D ja 1 I Q0� / I OE O BST _ O 18"RCP I /oS I of I I to I� I I CONC.cl O �S / \ CONC. STEPS I I BST MATCHLINE ABOVE -BODE= I L— KENT PHARR BURKE PID #157-132-15 1SBD 800 HARTNESS AVE. DB 7139 PG 206 O J815 ALL ED / SEDIMENT FENCE (SILT FENCE) PID#157-132-13 PID#157-132-12 809 HARTNESS AVE. 815 HARTNESS AVE. I DB 27547 PG 550 DB 4485 PG 178 FTJ ®� CHECK DAM ®� I� o LAMP' TEMPORARY GRAVEL CONSTR. O — I / WILLIAM C TURNER ox PID #1 157-132-10 4310 WALKER RD. ENTRANCE/EXIT DB 29293 PG 94 / TREE PROTECTION m _ _ \ INLET PROTECTION \ CONCRETE I I \ I x OI GO IA` I / Ic I� \ l I GRAVEL I X I CONCRETE YGUY PORAR NL nm &e� ADA PAD / 00� J� cn PROTECTION (CLDS 30.15) TEMPORARY INLET / OPROTECTION (CLDS 30.15) TEMPORARY INLET H a r e S S Avenue \ 1 ,"RCP - PROTECTION (CLDS 30.15) (30' opublic R /W) /F oJ - 7bu O AD PAD L LD SOD OELO�- LOD LOD WPLT LOD LOD LOD I LOD 'C9D E ` — ��� I O \ W/L /I / ° OE of OE OE OE GUY I \ C)I 0 ® w 's I \ I O a \ — ox z T I I ® RWALL O J z CONIC/ \ I BST I ml 1 FT1n Q c I L 760 C r I \ I I I ` STEPPING STONES i / ALEX A. HAUGHTON, JR. I d & WIFE PO LLY K. HAUGHTON O / I PID 157-132-09 DECK / I I 810 HARTNESS AVE. � \ � DB 2041 PG 71 x CHRISTOPHER M MILLER AND I 1 \ WIFE ROBIN G MILLE / J \ 1SBD 1 PID#157-132-08 / �4320 WALKER RD. \, DB -22,118 PG 437 0 PRELNIHARY PLAHS CONIC I 00 M07 USE FOR coms7flu o tCD N II a w Q _ U 0 c p z N J O T 4 rT,I I CAROLYN A Nf� LSON\ \ \ \ I 5 aS 150 I \ 29 I ° I \ PIDil85-071 -1,2 \ \ \ \ \ \ \�/ 4834 GADD SON 1DR. I 1 4 O-ADDISON DR. \ BOBB�1 TH HAIRS HAIR AND, ��s \ I \ DB 27621 PG 645 1 \ \ 24"RCP \ BRIAN KEITH CAPRON AND I DB g88 111 \ I _ WIFE EDIT# J5-D71 HAIRS N \ \ \ — m FE LINDA CHAPMAN-CAPRON PID�{185- 1-12 PID�/185-071-10 \ \ \ \ I \ I \ 4900 ADDISO 99 \ \ 4918 ADDISON DR. I ` � \ DB 20018 PG�9 � � CONC. FF I \ DB 17282 PG 67 \ CONC. I \ CONC. \ 1 I \ \ I \ O JASON BROWN AND \\ �OOD TR JJJ \ \ I \ \ CONC. WIFE FRANCES BROWN I \ \ ,0 H ®,pyQOD I �� \ \ HARSH SINGHAL AND \WIFEI \ \ I \ \ \ \ \ \ N\ \ PD 85T071-131N \ PID4{1 DDISON D BRIAN KEITH D ) 4842 ADDISON DR. \ \ \ 4934 DDISON DR. � IFE LINDA CHAP \ / \ 6�S DB 20680 PG 563 P— ADD 071 \\ / g ,Q S I I � � I \ \ DB 17282 6 3 1kp \ eoa \ / CA / /\ \ \ \ I� \ \ \ \ \ DB 29239 PG 722 660.29 \ / gg\4 \ / �L REE 6 \ �n < GUY PROTECTION (CL MB S 3 l \ O 'IMF-�fyy \ i y OD LOD �D I < / W\CONC ALL BLOCK-, L� L 2" PL WM 2' PL in \ — T \ l _ �R W A oc� \ W l� —— O I n I \ CON L(v D 0 TAP) G3 CD o TEMPORA Y INLET z =' /A disoO Drive ('60' Public R/ ) / / uj Ld _ PROTEC ION •• g U, z \ \ NJ / esr / / \ (CLDS/30.15) / pq ¢ o � SS SS SS SS 6jo Ss BST SS SS \ SS� \ SS SS SS S SS SS SS SS SS SS BST ^ �, J \ \ \ \ \ o \ \ TEMPORARY INLE \ MPORA Y INLET S \ SS SS SS 1 SS SS co co m \ \ \ O \ \ PROTECTION (CLDS 30.15) \ PR TECTI N CLDS 30.15 \ C) �' 145 < to 0wN \ \ \ \ 18"RCP - IV \ \ O \ \ \ c<-1 \ 141 G� � i w 18"RCP pf a = a w w z ti w O S M M — _. o Q0 \ `� Ld O0 AA _ � ` M —� � �- � ,S � ��I � � z z � r~� d0� W Q0� 0� �0� M\ M M� z LLi o n 12" DI SS \ I Q0� \ \ I I THH a uj o a In —fin— —_ 1 In -{�_ 0 >�c1=1` J� 5 PRIVAC' FENCE \ \ `\ \ \ 6jo — in \ In r 0� I 1 _ \ i� \ LAMP _� \ 1 n \ z IGJ i z 4' WOOD FENCE \ \ _ _ \ \ 1 n S� S 6'MAPL \ \ Q1 �� OOP \ 4 P �I R P \ \ \ \ \\ \ \ \ 0 / WAGNOL� rn 10 TV r \8 t�TAPLE \ \ \ \ \ \ \ PLANTER 1 \ I I \ \ ✓ � \ �� / � ° � \\\ \\ \ � \ \ \ \ �� 15" OAK DIRT P18, \ I I I \ 660. 2 6 6 6 Ily/ \ T \ \ \\ 660.50 \��\ \ \ \ / 0�\ sS \ \ \ MO II \ 6 V � \ I I \ O66.14 _ 664.12 660.16 J „ O I a" I SET 9 I�� \ I I EILEEN P. CORLEY \ Q { ^ J 4833 ADDISON DR. EROSION CONTROL LEGEND �' \ RIPRAf\ \ \\\\s \ e \\ \O O PROCKATIO � �/ � ` :/ i PID�/163 oat-10 PP \ J \ \ \\ \\\\ BIRDHOUSE O ` \ \ 1 J DB 12708 PG 150 \ \ O \ \ STE S PLANTER\ II \ F�N�E ao ao LIMITS OF DISTURBANCE \ \ s \\\\ \ s� N I I \ SHED CNPN \N� \ 9 \\ IP \ \ `0 \�\ G STEPS � � ro " MAGN°�IAI I � \ \ SEDIMENT FENCE (SILT FENCE) \ \ \ \G � ,seD l � \ TENiF�ORT INLET , 11� I \ \ \ CHECK DAM \ 0 660.12 w ��\ \ \ \ � \ \ \LDS 3 1 col \ TEMPORARY GRAVEL CONSTR. \ \ \ \ \ \ \o ° 8 \ �oQ STEPS \ \ \Q \ \ \ 18 PIN ° ENTRANCE/EXIT \ < r? ,a PINE \ OAK o \\ \ \ 660.49 \\ �\\ \ D �\ \ \ SS M4. 6 PLANTE �/ 14 I I \ z TREE PROTECTION G CHRISTOPHER W. MARCIANI \ \ \ \ \\ PID#163-083-16 S o \ \ \ I 1 ° \ \ y \ & WIFE STEPHANIE MORSE MARCIANI I NLET PROTECTION s ^� \ 4865 STAFF CIRCLE \ / 143 �0 2 \ \ \ \ S L \11 \\\\ DB 23120 PG 180 \ n \ \ 8" PINE / j � / \ \OQ \ �\ 18" °AGNO IA � m nva STEPS - STEPS I I \ I I / I EROSION CONTROL LEGEND \ < / LIMITS OF DISTURBANCE \— PLANTER I I GEORGE F STRUSE I BRAD F BUSH ANb \ /� I I I \ I 1 CONC PID•185 071-14 I WIFE CAROLYN L BUSH SED I ENT FENCE (SILT FENCE) 4834 ADDISON DR. I PID•185 071-15 \ \ \ I I ROBERT CLAYTON LEWIS AND I \ DB 27621 PG 645 1 / I / WIFE MARY BANKS LEWIS \ 4826 ADDISON DR. I PID•185 071 17 ) IRVIN P MCMANUS AND DB 8961PG 321 EDWARD PACELLIAND 4810 ADDISON DR. WIFE DORIS P MCMANUS CHEC DAM EPID• 85Y 37 26XANDER \ \ \ I \ WIFE JILL PACELLI I DB 6907 PG 666 �— I 4800•ADDISON 1DR. 758 ADDISON DR. I I I / PID•185 071-16 I I DB 15972 PG 604 I \ DB 370 PG 410 / / 4818 ADDISON DR. I TEMP RARY GRAVEL CONSTR. I %'1 � 1 \ I I \ \ DB 28474 PG 866 � I � / I I \ \ 00 oGo� I � I ENTR NCE/EXIT / I TREE PROTECTION I I CONC. \ INL T PROTECTION \ \ o \ ° 5 PINE I _ �-, _ i \ ° < < \ I- -i w R ����� i N w Lj � F 18 PINELLJ _ \ 7`Lu / LOD wM RWALL — — x `i Q — 24" 0 U n I n \ Ifs \ wM MB In s n s�� s s I wM _ O LO0 \ L �90 L 0� n In - In rf1— In \LPL - =SOD 0 1-Ft— \_ — F M z QD � O LOD LOD L 10 - ❑ �G — — W Q / / 7- / — 13 138 / / / i W \ / Add d i s� r� —D r I ve < a TEMPORARY INT Q (60 Public R/W) - Z / n PROTECTIO-N-(SCSLDS 30.15 ( SS SS / i SS SS - _ SS ss \ j /� < U 5- >- / SS SS CSS SS / SS SS SS \ \ SS SS SS SS SS SS co \ O U O = O N \ 137 \ 15"RCP \ \ \ o 0 � O — — — — — — — — _ _ _\_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _>— — — — — 1-�"RCP= = = = = _ _ _ _ _ _ _ _ _ — — — — — — — - RCP r \— \ ^ � w o ===\=1 R P== _____---------- — ---- Q —� s Q0� Q01 M M ,' M M M M NC— �21 M 12„ p1 140 I\\ �I _ �'•,, \ 1 n IT n n ;® B� Wm In In TS In In In In �fl \ In 1� — /nn }IDD� 1� -`�� t� �� In wnn ll WM In uT in 1 lfl In In In 1 U In 1 In In In nl In In O� TEMPO Y I UT -�— UT UT 24 00� — --�o n � In ---a0 �n�� OQ� \ PROTECJfI N (C DS 0.1 ) CLDS 3�.1 ui Urn / a Oh •! 24" PI E ° � " \ I IP \ J 18 MAPLE �)TREE 4 P �I E \ I I — INE I CONC. \- \ \ / \ + / I �s PLANTER \ \ LAMP \ \ so I \ I I / / I PLAN y� R \ \ I AI`Pf LQX. LOCATION OF DRIVEWAY \ \ \ \ I AREA UNDER CONS-T-fON AT TIME OF SURVEY \ EILEEN P. CORLEY I / PORCH h� PID•163 SON I O O \ 4833 ADDISON DR. ���� � � \ I I / / - BRI I� \/ DB 12708 PG 150 o — POST / I 4' PIC O 1 I ( jI � STEPS � � KEJ � � UY \ STEPS �—ks ^'s STEPS LANTER a I a W r , ,seD \ 9ALL / � W MARK D HAZZARD AND I I 00 Y \ WIFE MERRITT HAZZARD I I O PID•163-081-09 HARRY P BOOTH AND PRELNIHARY PLAHS MEN -ALA 4821 ADDISON DR. WIFE JUDITH C BOOTH V ALLCLARA B BOOTH PID•163-081-07 4801 ADDISON DR. TONY MONROE STARNES AND \\� POLE O \ DB 19072 PG 190 I I 8111 ADDISON ODR. DB 10664 PG 867 n DB 3765 PG 710 WIFE THERRD 63 081GER STARNE D O MMO O U n 4757 ADDISON DR. DO uUo� �� �O� VOIIU���V��� O \ \ DB 27728 PG 408 U SHED 0 O �� \ \ \ w �1 N/ \\� \ DECK EROSION CONTROL_ LEGEND �� SS ' T PORGY I ET\ \ � l � PROTE TIO (CLDS 36r1-5) \\ / \/� \ \ \ \ / \ C/) Q \ I / , 695 \ \ \ \ \ �I \ FlImm WILLIAM R KAY AND LOD LIMITS OF DISTURBANCE 2 \ \ r WIFE JOANNA R KAY 2/ O PLANTER \ \ PID#163-081-01 PLANTER \ I a701 8537 N DRIVE SEDIMENT FENCE (SILT FENCE) DB 28537 PG 478 \ 12 \ �o \ \ / \ / X D C \ — \ CHECK DAM //112 \ O �O� \ 685 I \ C \ \ \ O 9, DO / o ° TEMPORARY GRAVEL CONSTR. / PORARY INLET ENTRANCE/EXIT OTECTION (CLUB 1SBD /,\ \ \ FRED W ALFORD JR AND C C1 \ \ \ \ \ �^ TREEPROTECTION WIFE SHIRLEY C ALFORD �� L / O \ / \/ \ PI 16 - 1-2 I \ / D# 3 08 D / I 1 4 STAFFORD � 3 \ \ \ \ \ \ 730 S 0 D r � \ / \ S \ \ \^ DB 4869 PG 530 r \ \ / LET PROTECTION / \\ \O n' \\ \ \ \ I �\ / / \ / �s✓ �O� Tom" APO ET / EI ) \ z rH WILLIAM F GEER AND / / w L6 \ \ SS \ \ \ \ WIFE PAMELA D GEER / / OQ 114 C) � � z \ 1SBD GM / e \ z PID 163-081-21 4' WW IT RAIL / \ \ \ 4716 STAFFORD CIRCLE / / / 5� ® 1 EE o 690 \ ` \ I DB 6904 PG 51 / / / / / ^� m � \ s /05 Uo� \�3. W _ (• M w U W LL 678zz \\ \\ �,�`SS OOj \ \ \ \I \ °' I \ // �� ��' / i / \- / / \ \ \ \ 0 - o � '� a 695 /LLJ o Q / / / / ^I Z W J >. u \ \ 2 \ ass\ \ \ \I �- / / / / // / \ \ zlLn `c>� z� \\\\ \ \ Q �'� \ \ \ \ — / / / / / \ �V� .�� \ TMPORARYL\T PRO CTION (CCD� J5 \ \ \ \ \ \ \ I \ \ ' / / / , 6 0 \e 119 c_ e ♦.4. 0 \,�\ S 6-9 STEPS \ ~ O \ _ \ M\ \ \ \ \ \ -TEM POF�A NL� O \S\ w 24" MA a \\\ O \ \CO 3n 3(1 RR T TIC' 3(0)-1 678.71 \ MCA SS \ �/ s� / / // \ \ COST / \ 30" MA \ \ \ \ S \ \ C��4„ PL TEMPORARY IN �� \ \ 25 \ PROTECTION �(�LDS 5 15 -- / \ CONC �\ l / \ WATER PIDK1NC 63-082T22RS, LLC )wp 4909 WATER OAK RD.S/ �\ \ \ DB 29726 PG 50 \\\ \\\ \ D 1 $ \ \ _ / / / \ i 0 X BST \� \\\\ 9� I$»RCP BST ��� l SS /�j \ /�/ \ \\ \\ \ \ 0" CEDAR I / / \ \\\ \ \ \ \ \ \\ 674.37 I \� \ \\\ \ \\\ \ \ \\ O to INICZ KING WM/„ / 10 MA OLFA� rN / \\ \ \\\ \ \ \ ( I PID#1 3-082-0 l 4723 ST FFORD IRCLE "MAPLE / \ \ 7 7 DB 5 03 PG 17 nva EROSION CONT LEGE 1SBD / / \ PETER M HUFF AND\ \ \ ` \ WIFPIDE 63FER A 1HUFF \ �\ \ \ \ r' I \ \ \ �T \ \ I '� / \ PID#163-081-17 A I��l 4756 STAFFORD CIRCLE ao LaoTE�1 OR RY INL 4824 STA ORD CI E / \ \ �P DB958�G 863 \ \ \ \ sr s L DB 12913 PG 776 1SBDM I TS OF D I�STURB i CEO I 12$ TIN (cLDs �.15)\ \ V A \ � �\ V \ \ \ \ \ \ \ \ E I \ S71C IMENT F CAE (SIL CE) \ \ \ \ \ I WA Q / \ \ —EK DAM \ MICHAEL WAYNE THOMAS STEPS I \ / PI 1 - 1-14 I � � D 63 08 S \ \ \ \ \ 4812 STAFFORD CIRCLE 4'C\ �P� / \ I \ EL IZABETEAN BAILEY W STE I, 1 S \ \ 1 DB 21884 PG 201 �F Q �� \ PAUL DANIEL WOODALL AND GM TEMPORARY GR VEL COIN TR / PID•163 081-18 ELIZABETH BALLENG_ ` �� \ STEPS WIFE MARY VIRGINIA WOODALL I 4748 STAFFORD CIRCLE & HUSBAND HA. D. BALLLNbtK \� Sw7 \ ,SBD y PID 163-0 -12 4764IDSTA STAFFORD CIRCLE \ I DB 29� PG 9 4833 TAFFORD CLE 8 SCOTT ROYLE AND \ ENTRANCE/EXIT I 4"PVC / \ a �� DB 9228 PG 346 \ �� \ — _ - TREE PROTECTI N DB 247,4 PG 9 S \ \ \ /\ I WIFE DAWN ROYLE / \ �/ / 4800 DSTAFFORD 1 CIRCLE I 1 SBD DB 20952 PG 246 STEPS \ \ \ \ \ \ \ \ Fp 1SBD / \ / _ - INLET PROTECT N I I \ — 1_ _ o w LANDS 9 I ' is / 1— —� u U F LIGHT l / \ / / / ✓ - a Lu EIP P 685 I _ _ s W \ > I f l STEP 690 �— f r L \ \ \ \ -CA�`P— \ s \ OO \ BST I \ \ \ \ \ \ \ 6�0 v \ LIGHT PE \ \ \ \ \ ` ' _ M P� C7 /\ \ \ I \ \6g5 , \�-- / w I�z—� — le \\ � ,\ �� � ��arc IZ W =W \ M — fiord C N J Q > 5 D hlic R SS w a L T 1 1 SS a d 685 � / / � � / � - \ \\ \ \ \ \ \ \ 0 C SS S \ 36" O129 A 0 �j / SS — 1 SS A \\\ S I �- / 124 — D \ \ \ rt� - MECKL� BURG COUNTY \ \\ \ \ \ I \ 6 f //� �% O —� E•j /\ PID 163-083-11 8p / — 4815 STAFFORD CIRCLE \ Q j E ORARY INLET \ 0 15�ASH o DB 30572 PG 962 \ \\ / / F� � \ \ \ EMPORAR�I - NL 00 °�� PRO ECTION (CLDS 30.15) 24 IO' A O PROTEC N (CL S 30.1 SS r �� _ _ _ _ 680\ -SH \\ / TEMPORARY \ �\ \ I \ \ "D / 7 �/ BST SS L 18" POP / 'PROTECTION 61 LO G SS �j �_ii i i_ % %_ -OP� 127 M \ LAMP G / \c / ��� / /� / I 0 / / o \J SS / /� �i a / t o" B I H r = — g � RIC own 125 � < S / �0 � � �cp oBI 12 BG ice% /�% ° I \\�✓ \ /� FOiI M� �O \ TE CHARY INLET / S / / /j / / S / \ �i2" POPLAR ti ✓ [�I O PROTECTI617- L S 30.1 MATCHLINE EC1 WATER OAK NC PARTNERS, LLC I / PID#163-082-22 PRELNIHARY PLAHS (49DB 29726 PG 50 D / ;Lg 30" M A D �:. �\ 48" APLEO \ — / oo M07 USE FOR CONS SUMO �W _ P 63-082-23 695 � \ \ � / \ \ � \ �- / �\ p \ SS \ \ \ \ \ \ \ \ 700 GRAVEL \ / CHARLOTTE M IC-TEM�E_ASSGCTATION \\ w 6aS SS \ \ \ \ \ \ y �� e �\ \ / I \ J I BST I I i sOCL N. sHgjRON�MI6TY�A �\ \ N. \\\ \ VIIIIIIIIIIIIIII 695 \ \\ \ 10" BIRCH \ _ / \ \ �\ / ` o �_ • \ 1a" P \ �_ ~ BAM<-OF WNNE-. tNS,TALL LIVE STAKES, TEMP-RARY MATTING & RIPARIAN SING FROM 8" M PL \ 8" MAP E ��t S\ 690 SS \��� �T �1A4t\99_0 TO-GIZLVERT tSTA. \+00). SEE SHEET D1 FORTAIL. �_ \ � -i GRACs —,� / / �d H \18"MADE \ SS -` \ 8 AS EXISTI \ 6gs 18'�VE 6' ZJ RIG 10' SEA\\ \\ _ / / \ \ u U uu S� uu GHT OF" -A-ND \ \\ / \ 51 -� uu \\ \ \\ \ \\ \ CH 8" PI 8° BIRD eL-i4RCH \ 8'�1otAPC� ° 8 SS SM G_ A�EEM O O 00 o oO \ \ EI \ \ \ D 10 — / K o 0 000 0 ° O 000 ODO (�00 6" BI \— \ \ / SDE 10" BIRCH �- O 00 0 0 ° OO o0 o Oo00 'S M� \ \ \ BIRCH \ ` - \ e L 1 1 0 n OOo n 0`J✓h - e e O 18" C AR�— / °O b o Ss e _ �, s— W, / ocp o �o oSB� 0 o O \ / O 10" BEECH _���j O O O 690 -\ / 6" ASH ° W v O O 0 O00 0 _ S 10" MAPLE\�"� \\ � � � p���"GUM \ \ / / Q 00 � SH �rn SIDE °og� 0 0000�� O°0 °0 0 0 \ \ / /^�� \ ° �S�F— \ \ SS / — 690 6—ASHY- / 4„ ASH SIDE SD o 0 00 00 ° 0 0 00 O o O \\ \\ \\ ° \ / �� \ — SDE — a' ASH ° .� \ 12"ASH 24 A 3p SIDE SIDE \ \ \ \ ` — „cam \ ° H\` \ \1o=—oAK —S SS SDE SDE rl � GU O o W \\ \\\\ \� H� \ SD rn rn ° 0" MAPLE �\ 2 0 Z \\ \ \ �\ — / aci z g" BIRCH N2 °E� �rn \ ,0° O �° Cti �� BEECH - / / / \ o°�.m°� m \ s \ 15 POPLAR ASH \ �� C \ / 1 "BEECH \ rn J \ \ \ \ \\ \\ \10" BIRCH 10" CEDAR n�. -� / °� 15\POPLAR \ sbJW — — — QF \ W � W \ 13�+ � 8" BIRCH _ \ / ��� N it z o I - BEECH 1 A5�/ �5' _� rn __ ASi AS CC O Z cV LS \\ O -�B t �- _ - -- -- \ \ \ 8„ CI La / \ 0 9 —�O ° SH— = 069 \ \ W 06 U 00 °' — \\\ \ / -gym 969 � \ W wow~ LLw \ / °-ASH �- \ Z O LL�O Lo a SS I x S69 a w Q a X 10' CLF - > � 2 ~ J R - /Ss y� 0 _ \ oG oo P / _ SS I I SS x I x 5„ PINE / \ O 7 �� pP SS SS 6g s8g \�\ l I 5" PINE / PLANTER / / USE BYPASS PUMPING SS — \ x DURING STREAM SS \ \ \\ \ I ✓ 2 D PSTERS / �- SS / I—S-ONSTRUCTION EXISTING 10' SEWER AND WATER LINE 6 CONC CLDS-0.22 RIGHT OF -vAy AGREEMENT G 1 \\ \ (REM VE) I BST / BST I / DB 2126 PG 81 AND 109 \ \ I 9�� C BST 09 / EROSION CONTROL_ LEGEND (8" PINE rOO A \ F 12" MAPLE Z O\ \ G E LIMITS OF DISTURBANCE ate. WATER OAK 63 PARTNERS. LLC O Lm goo -/ PIDg163-082-22� —� \ / / 4909 WATER OAK RD. U- P J� I a p \ 4" E I DB 29726 PG 50 \ I I / �a rc� / , p,pL SEDIMENT FENCE (SILT FENCE) Q CHECK DAM \O 12" MAPLE z \ NE 2S APARTMENT / / i` / / �� — TEMPORARY GRAVEL CONSTR. PINE \ � I m / (0 � ENTRANCE/EXIT — TREE PROTECTION INLET PROTECTION / \ \ FTI / BST / O 1 z - 0\ � / BST 25 WATER OAK INC-082T22RS, LLC I I I m CONC 4909 WATER OAK RD. BST �— DB 29726 PG 50 C \ BST 00 — I = nva CIO GOAL Q Q I \ � EROSION CONTROL LEGEND y M r C / ST / I \ L� z Loo Lo0 LIMITS OF DISTURBANCE p `�TEPS M —� DEC / PID#163-082-10 THRU 163-082-21 > STEPS / I LP / / I I I I EMORY LN. Q SEDIMENT FENCE (SILT FENCE) O7 / \ ntiG I ��' PB 7 PG 825 AND DB 21065 PG 568 6 o / I I _ CHECK DAM Q / I O Q 30 30 30 30 �Z 3 30 - �EMPORARY IILT J I QQ / TEMPORARY ( S 3 .1�) \ Qom— a / II I �I \ / J % °o°� o TEMPORARY GRAVEL CONSTR. —o \ ENTRANCE/EXIT — � � i � � � � � / � I I � 0 -I-J Q / i s� \ / I III TREE PROTECTION Jo t �,\ ® I J INLET PROTECTION _L - �� II /—\/ �- aw oQ mw LP /I I \ tr p y{ N w W L H = w o Q F- M \ / I TE P RA IINLET I I I Q / / P T C ON -moo � / J U �� `� / ( S .15) I I (��� a I I I I \ �' O 5\LIC \ I w LP y� W \ SHAMIEKA & HUSBAND MALIK DIXON 5 ` PID 157-195-16 Q Q J O � 70DB 29554IPG 5710E / / I 0 �I I I o o i \ I J w Q TEM RAR INLET \ 7,s_ ' o C 0 = o ~I PRO CTIO \ DEC / I I I O / I \ — — N u ¢ > QS K (CLD 30. \ o I II \ \ _� \ _ O o Q C CUUpRTRILES W MOROTON& 195 08/ / I kl r I I I J j / -r \ 710 P� d Q / pg i02r INTPGNfiL J \------tQ_ J / I� _ I I c� O II II I 0 — --I Q w \ 710 — — — S'RCP \ \ / / — I �H/ / % = / — — / Q[Ell� = - _ - O / EARS II I / S24 CD Q SST IGN _ - r- T LJ CATV -� W / L T — 1_ / f \ Fil FBI ~J FBI O — i a \ ( w 18"RCP � _ � / I I \ � ! / \ � � \ \ O � O NC TEMPORARY INLET BST / sly PROTECTION o \ A \\ Q I � o co- BST / I I \ WATER OAK NC PARTNERS, LLC esr 7 I �� I / / S �' QO Q01 C/0 C PRID#1A6 D 082 PARTNERS LLC \ P Walker Road / I \I o / 4909 WATER OAK RD. \ \ \ \ aI i v � o ICI I 69 0 / ITRED/ /DB 29726PG 50��j \J \OOED \ r\\\\I�OW WWW (60'_ Public—R�W) I C) 4 of S of/� o \ \ SS � SS °E�Rc G CONC O�c I mil\ GUYS IP �/ C WM -2'=ST�� \ \ OE�I P I �\ 2S APARTMENT \ EIP CONC R/WGONG o I o R/WPRELIMINARY PLANS m o RAYMOND FIELD & WIFE 3 PID#157-183-12/ I \ � Q /PILLAR �C3 _ BETTY D. FIELD 635 N. SHARON AMITY R / �q� \ CFILINE �'— O 00 M07 USE FOR coms7flu o W C PID�/157-183-13 I DB 3357 PG aa2 I \ � � S�PILL R MpT � O I 4818 WALKER RD. DB 3690P C/1 / I / KACEY NEIL SPEARS x / \ JOEL L. ADELMAN GRASS PLANT ° JOSEPH LINN JR. AND WIFE, AMY B. SPEARS �F- -77 / / X I / AND WIFE, STEPHANIE W. ADELMAN I ' 735 -� / 7 AND WIFE JOYCELYN LINN I \ PID#157-131-02 / / PID#157-131-11 PID#157-131-01 / 4527 WATER OAK RD. x 4511 WATER OAK RD. _� NANAKWASI OKRAH AND WIF 4523 WATER OAK RD. DB 14037 PG 176 _ x 735 DB 24099 PG 213 LAMONICA OKRAH L� DB 19046 PG 438 — i 3' WWF_ \ 45PID�/157-131-2 RD. O _ DB 29180 PG 887 / Gu \ �Vater \Oak — _a0 — -- — -- ----- ---- 1 R°�d \ \ o� o ---- --- — — — / �0 Public R/V� BST o Bsr TEMP "RY INLET 2 / ie� Oak Road — — _ BST II — \ \ - - — 15„RCP o / (60 P� r R /Wl BST o — _ / \ J I BST O E I_ _ / rO 11 W� Yow =5—�— _LLI OE/ �- I-� ST 6„ DI G CONC �0— •• Ind Z _ I BST z OE OE OE — S — — — L A q \ — — — -� _ CONc —_ - �— wccQ PIP OE OE �� — _ _O S �S m QE / _ _ SS O o OE OE OE _ OE OE / / — — CONC — SS —r�S SS— SS S it z v ti CC ozc� � ^� J WV sk�k� 6' PRIVACY FENCE— EIP OE Q QE QE OE Q Q CONC N O aO _ 0 (n�--- — E OE — — — wc>O�. _i S / / / L Q 00 ��zc� mm 730 III--- ON // CONC ° / \ E / �E, I Q� OE rn � z z m LL } Lq Q I + ' U ` / / / x x �30 / ,..+ w w OJ � 0 CD / ` J E \ / aLn c J I 1730 PLANTER G BRICK / / ° \ k- — LL \ R�A� AN TER / I PLANTE -� C) O \� SV BENJAMIN S. BAXTER & WIFE I = / LANTER \ X Ir I GILLIAN C. BAXTER I ` / STEPS O I o PID 157-134-77 z I \ ' �� POST ° / �- 333 940 QUEEN CHARLOTTE'S CT. II I STEPS DB 21257 PG 825 �( -r •� B \ � i U I / BRICK WOOD PATIO DECK \ 2SFD \ -�-- ----- _ — _ f __ CHAR TTE—MEC LK ENBURG I I I I O ) Z r �25 / 9� /\ O \ I BOA D OF EDUCATION ���°�} I I 1 I // / I \ �25 F, PI #157-134-34 I I I F 0 III GRAVEL ' �- ` 725 440 WATER OAK RD. O O BRICK � GOAL CONC 2SFD / U I D 7025 PG 514 TEMPORAR� INLET // ,,, II USE BYPASS PUMPING ALLISON C. ROSENSTOCK PLANTER / ^�T / PROTECTI0�1 �CL�S 15 J / / / _ # f�^1; !` ) x ° DURING STREAM I / PID 157-134-78 / EROSION CONTROL_ LEGEND I I a ( CONSTRUCTION ECK V 0 ► // 45D8 3764 PWATER �A292D ' ~ _� °I a"/ CLDS 30.22 I /\ ) I _ 3' , PLANTE, STEPS � J I I f I o CONTRACTOR TO MI ICKET FE goo goo LIMITS OF DISTURBANCE 1 DISTURBED AREyd'I_l/ — G I / I x 25 b4 J 723 DECK THOM ANN M EN SOMEM& WIFE 1 1� / 20.7 6 -� ^ I EWSO E SEDIMENT FENCE (SILT FENCE) I — 3 72®cgs 6 2 `` D FENCE PID#157-134-02 OAK O — — O\ // � \ � 4524 WATER OAK RD. / oa POST I ( I / - - - / / DB 4000 PG 167 1 —+--♦ CHECK DAM ' \ M //\ 1 .6 D„ 1 1\ / ✓ I \ \ 2SBD w zseD 0 q-�py0 � �� I O � I 5 I MICHAEL F. LANGEL & WIFE V l� TEMPORARY GRAVEL CONSTR. �.I I ANITA H. LANGEL III 3 PORT op I \ \ �^ 7 "OWARL€ 48" OAK / \ I / PID#157-134-01 (3) POE ENTRANCE/EXIT I W I 26. 5 J I 4526 WATER OAK RD. 1 \ O O TgI�Y'' R I 2 21.4 1 A'PLE O }, PRO`S CTI L ,8" � � \ � DB 461 8PG 89 \ z _ 1 , TREE PROTECTION I I — 1 � 31 Il�I 36" SY AM � INLET PROTECTION I I I \ I I ` I o _/�QD G PL \� O 1 \ / \ _ \ 10" BIR H 7 .66 �O \ 48 APL o M 4PLE \ \ I I O C� 1 E$IP \ „CEDAR n" CEDAR_ I \ \ \ CONC \ I I 7 0-1 I as 1 d I TrtH L nva GARAGE - ° ,Z ASH I I MICHAEL F. LANGEL & WIF 10 w I 1 KACEY NEIL SPEARS / THEOD RE C. GEORG & WIFE / ANITA H. LANGEL / I AND WIFE, AMY SPEARS ANNIE R. GEO GE EVIN JOSEPH ALTON & FE #157-1 1-02 PID�/157-134-01 I PID P9 315LIN[13 LN.S O� I AL SON B DALTON I 48" P L R I I 1 45 pg WATER 4618 POA$gRD. \ GRAVEL I II I I 4527 WATER LK RD. SI DB 22620 PG 168 / �0 I PID�/157 134-79 I 48" OPLAR1 ° �1 I DB 14037 PG 176 / 939 LI DA LN. I P12"rQAPLE I I DB 2306 PG 542 / I / BST �� / CONc ® I I� ��G OE- -- /J O �E / WM / M I 6; mm j�8" dYA LE\ I I I II / OE bE \ °d / G PORTABLEl f \ \ I o 0 I I \ CANOPY -� c9�C OE OE QE _ OE\ OE OE wM (JE T 46 I I I v _ ——_� �— --- w / III I J —covc - - - \ \ \ \S \ SS S SS SS —LC --- -0E / yy� 47 4 S -G �- - -SOD - - \ — OF:. — S — / / \ CONC BST > \ L `n d a �one „ - - - �— \ v _� — — — — — / / \ / (60'�j R BST\ _ _, ----- _-=�� Os� STEPS N —� / /I U b l I / l " -TE RARY INLET /- - -� W) / T CTION / / BST / / / / -j� - - - - - - Aa o l / \ — — / / ( LDS 30.15) �/ L I n a Lane / / / I / 45 - - - _ =s _ - w - " / w I° ( Bsr 44m2/(�o U b l I C/�I/� Lu D 1 1 „RC 4 I o W \ esr EllP co�i / / \� A .. o 0 0 O0� / / wt/ R T USE / 3 ^ covc / PA S UMPill EE o X / / 0) O D G N TI�IV�PL o / 4' PINE 1 21� r• r- I \ I I I IDS 30 22 6"XMIM�sr� / / IN/LANTER �/ / CD j ^ f o - Ll Ll I G r/� Z w w EROSION CONTROL LEGEND l ° I� ��/ I 1 / ° / / o�� o � ¢ � o LIMITS OF DISTURBANCE I I 1 r i a" MAGNOLIA / I x 7 � Q I / SEDIMENT FENCE (SILT FENCE) �I I� I STEPS OLAMP I 2s" MAGNO IA I 1 1 I ( 1 MAG OLIA b / 4 MA I \ \ I D \ l X MARL / / / / \ I I --�--♦ CHECK DAM I I / I I / cn 6„ C / PILE � / I / / mo z I I/ \ o I 11 1 I/ I I / I 24 H� / 0 4 P R / I CONC cn Q- I II I CONC I / o TEMPORARY GRAVEL CONSTR. I 1 AGNO� / � � I CONc / / ENTRANCE/EXIT I GATE— —I / \ / ° / / / / ( / / I w GIG TREE PROTECTION I ` / c /�NC� ry I CON c I1�1 BRICK / o I CK WALL 71 \ I I I I PLANTER C / / / / A m I / INLET PROTECTION PLANTER 42 i I \ I \ \ K KRISTIL. CLUTTS I I � \ \ \ Q \0 II I S%Fp / / / / / LATE PATIO / / RANAND DALLST. CLUTTS I / / / / I o \ \ p \ \ `PS\ I I S S�K / 1/ 4600 #WATER OAK RD. I BST / I PAUL E. DRYDEN &WIFE / / / / / / DB 30185 PG 516 / / I / ° I 11 KATHLEEN H. DRYDEN / / 1 OAK � / /® SLATE WALL J / PID#157-182-36 / 3 ( O 942 LINDA LN. I �J1 — I °DB 17936 PG 950 15 4'AK PANTER^1SBD JOHN DAVID BROOKS & WIFE / 2SBD I I jjv/ a I / / /° WENDY BRANNON BROOKS 5 PIDp157-183-01 p STEPS I r / / f STEPS GONC 1 �J 4601 WATER OAK RD. p I� I I l / I l I � / I I DB 29144 PG 114 �j � p R1 STEPS I I l l / / 04L CONC 111 w m ~ 'I BRONWYN I. FORD I / AND HUSBAND, JOHN T. FORD / ✓ ^\ / c/ = PI 34 LI-182-37 I / / / I / PLA TE% PRELIMINARY PLANS 1SBD 0 DB 16999 PGL321 SP/ I I1 I I / / / I RAIL F I I �, � o 00 M07 USE FOR C�ONSITRUma W � o 1SBD I / � l I I �W W m W 0 m GENERAL NOTES: 1. UNIFORMLY GRADE A SHALLOW NOTES: DEPRESSION APPROACHING THE INLET. 1. A STABILIZED ENTRANCE PAD OF #5 WASHED STONE AND RAILROAD BALLAST SHALL BE LOCATED WHERE STEEL POST 6 MAX. STEEL POST TRAFFIC WILL ENTER OR LEAVE THE CONSTRUCTION SITE ONTO A PUBLIC STREET. 2. DRIVE 5-FOOT STEEL POSTS 2 FEET INTO THE GROUND SURROUNDING THE 2. FILTER FABRIC OR COMPACTED CRUSHER RUN STONE SHALL BE USED AS A BASE FOR THE CONSTRUCTION ENTRANCE. INLET. SPACE POSTS EVENLY AROUND 4' MAX. 3. THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR FLOWING OF SEDIMENT z FILTER FABRIC THE PERIMETER OF THE INLET, A 19-GAUGE HARDWARE CLOTH ONTO PUBLIC STREETS OR EXISTING PAVEMENT. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH ADDITIONAL MAXIMUM OF 4 FEET APART. -------------- 77 ----- """""""""" " WOVEN FILTER FABRIC (a MESH OPENINGS) STONE AS CONDITIONS WARRANT AND REPAIR OR CLEANOUT OF ANY MEASURES USED TO TRAP SEDIMENT. o m F, a< FLOW ��e' 3. SURROUND THE POSTS WITH WIRE "'""""""""""""""""" 4. ANY SEDIMENT SPILLED, DROPPED, WASHED, OR TRACKED ONTO PUBLIC STREETS MUST BE REMOVED IMMEDIATELY. F 111 llil MESH HARDWARE CLOTH. SECURE ANY AGGREGATE TRACKED INTO THE ROADWAY MUST BE SWEPT BACK ONSITE ON A NIGHTLY BASIS. i1=w=1 =JIL THE WIRE MESH TO THE STEEL 1 = Illll�m=ll�iiiEil'- 5. WHEN APPROPRIATE, WHEELS MUST BE CLEANED TO REMOVE SEDIMENT PRIOR TO ENTERING A PUBLIC STREET. WHEN 1=III=III=III= =III=III=III=III-III-III=III=III=III=III=III=III=III=III=III II -III -III_ _ POSTS AT THE TOP, MIDDLE, AND 3' WASHING IS REQUIRED, IT SHALL BE DONE IN AN AREA STABILIZED WITH CRUSHED STONE WHICH DRAINS INTO AN o .I lil-Ill-IIl-111= N IIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIII �, _ITI=rI m= BOTTOM. PLACING A 2-FOOT FLAP NCDOT #5 OR #57 APPROVED SEDIMENT BASIN SEE STD. NO. 30.118. TI-III=III-III '11=III=III=III=III=III=III-III=III=III=III=III=III=III=III=1 =III=III-I OF THE WIRE MESH UNDER THE -"'-liI=III= =III=III-III=III=III-I" =III=III=III=III=III=III=III-III: -III-11' a' MIN. GRAVEL FOR ANCHORING IS WASHED STONE 2 6. CDOT MAY REQUIRE A STANDARD COMMERCIAL DRIVEWAY (STD. 1&24 & 1&25) TO -'-lil-li "'-III=III„III=I" RECOMMENDED. _ ACCESS THE CONSTRUCTION SITE IF THE DRIVEWAY IS ON A THOROUGHFARE. 4, PLACE CLEAN GRAVEL (NC DOT #5 ?7 Y 16" MIN. 100' MIN. GENERAL NOTES: OR #57 STONE) ON A 2:1 SLOPE WITH A HEIGHT OF 16 INCHES PUBLIC STREET 1. WOVEN FILTER FABRIC BE USED WHERE SILT FENCE IS TO REMAIN FOR A PERIOD OF MORE THAN 30 DAYS. AROUND THE WIRE, AND SMOOTH TO - AN EVEN GRADE. 2' EXISTING GROUND', III -I Z L=III=III= -III-III-II-TI-II-11=1T1=1TI=1TI=1T1=1TI=1TI=1TEm=' II=III - E, ITI-IT L=11L=11L=1iLITI-ITI-ITI-ITI-ITI=ITI-IIL=. IIL=11 L-ITI=i" - - III-III=11I=III-III=11I=11I=11'="'- 2. STEEL POSTS SHALL BE 5'-0" IN HEIGHT AND BE OF THE SELF -FASTENER ANGLE STEEL it =ITI=ITI=ITI=ITI=I'r I= SOIL STABILIZATION FABRIC TYPE. MAINTENANCE NOTES: 5. ONCE THE CONTRIBUTING DRAINAGE ITI=ITI=ITI-ITi=IOVF1= AREA HAS BEEN STABILIZED, REMOVE NCDOT #5 OR #57 L==III=ITI=ITI=ITI=- UNDER 5 WASHED STONE "� iirlll=- # 3. TURN SILT FENCE UP SLOPE AT ENDS. 1. FILTER BARRIERS SHALL BE INSPECTED BY THE FINANCIALLY RESPONSIBLE PARTY ACCUMULATED SEDIMENT, AND WASHED STONE OR HIS AGENT IMMEDIATELY AFTER EACH RAINFALL AND AT LEAST DAILY DURING ESTABLISH FINAL GRADING 4. ORANGE SAFETY FENCE IS REQUIRED AT BACK OF SILT FENCE WHEN GRADING IS PROLONGED RAINFALL. ANY REPAIRS NEEDED SHALL BE MADE IMMEDIATELY. ELEVATIONS. FILTERED 100' MIN. ADJACENT TO SWIM BUFFERS, STREAMS OR WETLANDS (REFER TO SWIM BUFFER WATER GUIDELINES). THE COLOR ORANGE IS RESERVED FOR VISUAL IDENTIFICATION OF 2. SHOULD THE FABRIC DECOMPOSE OR BECOME INEFFECTIVE PRIOR TO THE END 6. COMPACT THE AREA PROPERLY AND ENVIRONMENTALLY SENSITIVE AREAS. OF THE EXPECTED USABLE LIFE AND THE BARRIER STILL IS NECESSARY, THE FABRIC SHALL BE REPLACED PROMPTLY. STABILIZED IT WITH GROUNDCOVER. ° w 5. DRAINAGE AREA CAN NOT BE GREATER THAN 1/4 ACRE PER 100 FT OF FENCE. l 3. SEDIMENT DEPOSITS SHOULD BE REMOVED WHEN DEPOSITS REACH APPROX. 6. SLOPE LENGTHS CAN NOT EXCEED CRITERIA SHOWN IN TABLE 6.62A NORTH CAROLINA HALF THE HEIGHT OF THE BARRIER. ANY SEDIMENT DEPOSITS REMAINING IN _z EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL. PLACE AFTER THE SILT FENCE IS REMOVED SHALL BE DRESSED TO CONFORM TO HE U THE EXISTING GRADE, PREPARED AND SEEDED. o] -1 7. DO NOT INSTALL SEDIMENT FENCE ACROSS STREAMS, DITCHES, WATERWAYS OR OTHER m AREAS OF CONCENTRATED FLOW. is � NOT TO SCALE NOT TO SCALE NOT TO SCALE • CITY OF CHARLOTTE • CITY OF CHARLOTTE HARDWARE CLOTH AND GRAVEL • CITY OF CHARLOTTE �rn LAND DEVELOPMENT STANDARDS TEMPORARY SILT FENCE STD. NO. REV. LAND DEVELOPMENT STANDARDS STD. N0.�IEV LAND DEVELOPMENT STANDARDS STABILIZED CONSTRUCTION ENTRANCE STD. NO. REV. CHARLOTTE_ INCLUDES CHARLOTTE ETJ 30.0 6A 4 CILIRLOTTE,. INCLUDES CHARLOTTE ETJ INLET PROTECTION 30.09 (CHARLOTTE.. INCLUDES CHARLOTTE ETJ 30.1 1 A 12 0 0 FOR LATE WINTER AND SOIL AMENDMENTS: NOTES EARLY SPRING: FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 2,000 LB/ACRE GROUND AGRICULTURAL LIMESTONE AND 750 LB/ACRE 10-10-10 FERTILIZER 1. INLET MAINTENANCE SHALL BE DOCUMENTED IN PROJECT LOG BOOK. SEEDING MIXTURE: MULCH: 2. FILTER TYPES SHALL BE APPROVED BY THE CITY INSPECTOR PRIOR RYE (GRAIN) - 120 LB/ACRE APPLY 4,000 LB/ACRE STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR A MULCH NOTE: TO INSTALLATION. ANNUAL LESPEDEZA (KOBE) - 50 LB/ACRE ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING 3. FILTER BAGS MAY BE REMOVED WHEN SITE IS STABILIZED AT (OMIT ANNUAL LESPEDEZA WHEN DURATION OF TOOL CONTRACTOR SHALL FOLLOW CONSTRUCTION THE DIRECTION OF THE ENGINEER. TEMPORARY COVER IS NOT TO EXTEND MAINTENANCE: SEQUENCE AS NOTED ON CONTRACT DRAWING BEYOND JUNE) 4. FILTER BAGS SHALL BE REMOVED PRIOR TO STREET ACCEPTANCE. REFERTILIZE IF GROWTH IS NOT FULLY ADEQUATE. RESEED, FERTILIZE AND MULCH IMMEDIATELY FOLLOWING 5. FILTER BAGS SHALL BE CLEANED OR REPLACED ON A REGULAR SEEDING DATES: EROSION OR OTHER DAMAGE HOOD BASIS (NOT BE MORE THAN HALF FULL AT ANY TIME). JAN. 1 - MAY 1 LEVEL WITH TOP OF POLYETHYLENE MEMBRANE ON BANK OR AS 6. FILTER BAGS SHALL NOT BE ALLOWED IN EXISTING CITY OR NCDOT FOR SUMMER: SOIL AMENDMENTS: FACE 20 MIL THICK NECESSARY GRATE ROADS. FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 2,000 LB/ACRE GROUND AGRICULTURAL LIMESTONE SEEDING MIXTURE: AND 750 LB/ACRE 10-10-10 FERTILIZER 1 s o 1 46 GERMAN MILLET - 40 LB/ACRE MULCH: f 1 GRATE (A SMALL -STEMMED SUDANGRASS MAY BE APPLY 4,000 LB/ACRE STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR A MULCH - SUBSTITUTED AT A RATE OF 50 LB/ACRE) ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING EXPANSION 1" REBAR FOR BAG RESTRAINT REMOVAL FROM INLET TOOL SEEDING DATES: 1 MAY 1 - AUG. 15 MAINTENANCE: 1 CLASS 1 RIP RAP, NJ BARRIER D� REFERTILIZE IF GROWTH IS NOT FULLY ADEQUATE. RESEED, FERTILIZE AND MULCH IMMEDIATELY FOLLOWING OR OTHER APPROVED DEFLECTOR EROSION OR OTHER DAMAGE 3 MATERIAL FILTER BAG �a N of CIF USING RIP RAP �� SOIL AMENDMENTS: o OWNSTREAM, SLOPE NO DUMP LOOPS Fo R FALL: FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 2,000 LB/ACRE GROUND AGRICULTURAL LIMESTONE > n GREATER THAN 2:1) AND 1,000 LB/ACRE 10-10-10 FERTILIZER Z 4 SEEDING MIXTURE: TUR120 RYE (GRA N) LB/ACRE MULCH: D� APPLY 4,000 LB/ACRE STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR A MULCH 1� CATCH BASIN I SEEDING DATES: ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING AUG. 15 - DEC 30 TOOL 1'-0" D� MAINTENANCE: SANDBAGS, CLASS 1 RIP RAP OR GEOTEXTLE FABRIC OTHER NON -ERODIBLE MATERIAL 1� D OUTLET REPAIR AND REFERTILIZE DAMAGED AREAS IMMEDIATELY. TOPDRESS WITH 50 LB/ACRE OF NITROGEN IN 1� MARCH. IF IT IS NECESSARY TO EXTEND TEMPORARY COVER BEYOND JUNE 15, OVERSEED WITH 50 LB/ACRE KOBE LESPEDEZA IN LATE FEBRUARY OR EARLY MARCH. FOR ADDITIONAL INFORMATION, REFER TO NCDENR EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL (ESCPDM), SECTION 6.10. SECTION FOR PERMANENT SEEDING SPECIFICATIONS, INCLUDING SEED BED PREP, SEASONAL LIMITATIONS FOR SEEDING OPERATIONS, THE KINDS OF GRADES OF FERTILIZERS, THE KINDS OF SEED, AND THE RATES OF APPLICATION OF LIMESTONE, FERTILIZER, AND SEED, REFER TO NCDENR ESCPDM SECTION 6.11 AND NOT TO SCALE THE CHARLOTTE LANDSCAPE CONSTRUCTION STANDARDS SECTION 04200 SEEDING AND SODDING OF TURFGRASS. NOT TO SCALE • CITY OF CHARLOTTE CITY OF CHARLOTTE LAND DEVELOPMENT STANDARDS CATCH BASIN INLET PROTECTION LAND DEVELOPMENT STANDARDS TEMPORARY SEEDING S C H E D U E IMPERVIOUS DIKE STD. NO. REV. STD. N0. REV. CHARLOTTE., INCLUDES CHARLOTTE ETJ 30.15 CHARLOTTE.. INCLUDES CHARLOTTE ETJ 3 0. 1 7 9 0 f\I Cn LJ AonC LJncr ENE NOTES ON BYPASS PUMPING 1. EXCAVATION SHALL BE PERFORMED ONLY IN DRY AND/OR ISOLATED SECTIONS OF CHANNEL 2. IMPERVIOUS DIKES SHOULD BE USED TO ISOLATE WORK AREAS FROM STREAM FLOW. 3. THE CONTRACTOR SHALL NOT DISTRUB MORE AREA THAN CAN BE STABILIZED IN ONE WORKING DAY. A MAXIMUM OF 1000 FEET MAY BE DISTRUED AT ANY ONE TIME. 4• THE BYPASS PUMP SHOULD ADEQUATELY CONVEY MINIMUM 450 GALLONS / MINUTE 5. PERFORMANCE q=450 GPM ONLY dOSE 6. DIKE MUST BE CONSTRUCTED OF NON -ERODIBLE MATERIALS SUCH AS SANDBAGS SEE DETAIL THIS SHEET SEQUENCE OF CONSTRUCTION FOR TYPICAL BYPASS PUMPING INSTALL STILLING BASIN AND STABILIZED OUTFALL USING CLASS A RIP RAP AT THE DOWNSTREAM AND OF THE DESIGNATED PROJECT WORKING AREA. ` 2. THE CONTRACTOR WILL INSTALL THE PUMP AROUND PUMP AND THE TEMPORARY PIPING THAT WILL CONVEY THE BASE FLOW FROM UPSTREAM OF THE WORK AREA TO THE STABILIZED OUTFALL. c PROJECT TOP OF BANK 3. INSTALL UPSTREAM IMPERVIOUS DIKE AND BEGIN PUMPING OPERATIONS FOR STREAM DIVERSION. 4. INSTALL THE DOWNSTREAM IMPERVIOUS DIKE AND DWATERING PUMPING APPARATUS IF NEEDED TO DEWATER THE ENTRAPPED AREA. THE PUMP AND HOSE FOR THIS PURPOSE SHALL BE OF SUFFICIENT SIZE TO DEWATER THE WORK AREA. THIS WATER WILL ALSO BE PUMED TO AN OUTFALL STABILIZED WITH DEWATERING DEVICE CLASS A RIP RAP. 5. THE CONTRACTOR WILL PERFORM STREAM RESTORATION WORK IN ACCORDANCE WITH THE PLAN AND FOLLOWING THE GENERAL CONSTRUCTION SEQUENCE. 6. THE CONTRACTOR WILL EXCAVATE ANY ACCUMULATED SILT AND DWWATER BEFORE REMOVAL OF THE IMPERVIOUS DIKE. WHEN DEWATERING AREA, ALL DIRTY WATER MUST BE PUMPED THROUGH A SILT BAG. REMOVE IMPERVIOUS DIKES, PUMPS, AND TEMPORARY FLEXIBLE HOSE/PIPING STARTING WITH THE DOWNSTREAM DIKE FIRST. 7. ONCE THE WORKING AREA IS COMPLETED, REMOVE ALL RIP RAP AND IMPERVIOUS DIKES AND STABILIZE DISTURBED AREAS WTH SEED AND MULCH. WORK AREA 8. ALL WORK IN CHANNEL MUST BE COMPLETED BEFORE REMOVING IMPERVIOUS DIKE. NOTE: ANCHOR ALL PUMPS AND PIPES SECURELY • CITY OF CHARLOTTE _� LAND DEVELOPMENT STANDARDS ClltR TEe. INCLUDES CHARLOTTE ETJ BYPASS PUMPING NOT TO SCALE PRELIMINARY PLANS DO M07 USE FOR CONSMNJMO W O • o zCD a .. U7 U) > � cn z y CSC �m �w ozN c) S.I UWCV 6 000 z N O i2 Cn LL I U O r n ^y cr LW z mr�i 'cn LJ L LLI r-w I� LL X z z H } GC co CD a 2!W J � U W O CD LSJOQ r- >Ln2 z I- U c z z 0 a. U cn W �1 5- oa w Q 0 Z is CID o Q CIA � CD 0 N CD w Aa o c) � w mLd Lu U U Q FLu U� _ F a. W w w U 0 0 0 C Aa oa I N O o d O � a a c:: d O� TI1 �W Ew-IAw W O O O 0 � w GENERAL NOTES: 1. RIPRAP SIZE TO BE DESIGNED BY ENGINEER. 2. CHECK DAMS MAY BE USED IN SLOPING DITCHES OR CHANNELS TO SLOW VELOCITY OR TO CREATE SEDIMENT TRAPS. 3. ENSURE THAT MAXIMUM SPACING BETWEEN DAMS PLACES THE TOE OF THE UPSTREAM DAM AT THE SAME ELEVATION AS THE DOWNSTREAM DAM (SEE DIAGRAM BELOW). CLASS B RIP III_III_111= - A MAXIMUM SPACING B =III=III_III_III= -III=III=III=III_111=III=IILII_111=III=III_ III=III=III-III- A AND B ARE AT EQUAL ELEVATIONS Il —111= 111=\II=111= PLAN 1'- 6" MIN. 4' TO 6' f l CROSS SECTION —FILTER CLOTH ONE AAX NTER n IMPER`iini is nivr DEWATERING NOTE: ANCHOR ALL r-IJMF-�) AINIJ PIPES SECURELY IMPERVIOUS DIKE SUCTION TO DEWATERING DEVICE NOT TO SCALE • CITY OF CHARLOTTE 0 CITY OF �CY�% LAND DEVELOPMENT STANDARDS OTTE ob LAND DEVELOPMENT STANDARDS TEMPORARY ROCK CHECK DAM STD. NO. REV, CHARLOTTE.. INCLUDES CHARLOTTE ETJ 30.1OA 15 CHARLOTTE_ INCLUDES CHARLOTTE ETJ 0 v m z oU) DHomcn H-�v m0T--1� HZ-1 D J-1, co =mzDm LU Q 2W;00 z�oN�1 Stream Bank H ��L'o J C:2MZ =OHQ > > Special Stilling Basin z �°C H Cn0 0 0 wp z a) — Existing Terrain / r• o \ ,10 zy?,�+''K,T#r''st �p cs F„� Br-Wj��rrnis,^r t�k aTa,l; m �{axP"r���,a .,�,�kaz*I-'j`i"fi - " Ui H ~ co H m _ v r cn 15.0' to 20.0' Q cs I in D i z o N z Z Do j � 8" of Sediment Control Stone a N � = J Filter Fabric x N go z D 0 H C� JLLI Z 7o w i/i Note: Provide Stabilized Outlet to Streambank Not To Scale SHEET 1 OF 1 SHEET 1 OF 1 1630.06 1630.06 OF BANK MPERVIOUS DIKE SEAL AROUND PIPE ANCHOR PIPE SECURELY NOT TO SCALE SUSPENDED BYPASS PIPE 30.2213115 PRELIMINARY PLANS DO M07 USE FOR CONSMNJMO W O O � z OCD o0 U7 H � cn z Ci 4 ~ J CC Do U) W OfzN S.I .6 66 00 z N O u W LLI U O ri..j rn L� W z C+7 r�i 'cn WouS~ LLw r- li X i..l GC 0z� C''7 SkJ O a Z W Lq J � � U W O O LSJOQ ti E Lfl 2 Z I-- U a: z -�2 z C a W 5- oa w E� d Q 0 z CID o v �I � 0 0 N CD W Q LLJ m W LLJ cc Q LLJ _ x F a w 0 0 C 5- Aa 5- oa I N m o d C fl a 01 r� a �W Ew-IAw O ��w � W W �W W GROUND STABILIZATION AND MATERIALS HANDLING PRACTICES FOR COMPLIANCE WITH THE NCGO1 CONSTRUCTION GENERAL PERMIT Implementing the details and specifications on this plan sheet will result in the construction activity being considered compliant with the Ground Stabilization and Materials Handling sections of the NCGO1 Construction General Permit (Sections E and F, respectively). The permittee shall comply with the Erosion and Sediment Control plan approved by the delegated authority having jurisdiction. All details and specifications shown on this sheet may not apply depending on site conditions and the delegated authority having jurisdiction. SECTION E: GROUND STABILIZATION Required Ground Stabilization Timeframes Stabilize within this Site Area Description many calendar Timeframe variations days after ceasing land disturbance (a) Perimeter dikes, swales, ditches, and 7 None perimeter slopes (b) High Quality Water 7 None (HQW) Zones (c) Slopes steeper than If slopes are 10' or less in length and are 3:1 7 not steeper than 2:1, 14 days are allowed -7 days for slopes greater than 50' in length and with slopes steeper than 4:1 -7 days for perimeter dikes, swales, (d) Slopes 3:1 to 4:1 14 ditches, perimeter slopes and HQW Zones -10 days for Falls Lake Watershed -7 days for perimeter dikes, swales, (e) Areas with slopes ditches, perimeter slopes and HQW Zones flatter than 4:1 14 -10 days for Falls Lake Watershed unless there is zero slope Note: After the permanent cessation of construction activities, any areas with temporary ground stabilization shall be converted to permanent ground stabilization as soon as practicable but in no case longer than 90 calendar days after the last land disturbing activity. Temporary ground stabilization shall be maintained in a manner to render the surface stable against accelerated erosion until permanent ground stabilization is achieved. GROUND STABILIZATION SPECIFICATION Stabilize the ground sufficiently so that rain will not dislodge the soil. Use one of the techniques in the table below: Temporary Stabilization Permanent Stabilization • Temporary grass seed covered with straw or * Permanent grass seed covered with straw or other mulches and tackifiers other mulches and tackifiers • Hydroseeding * Geotextile fabrics such as permanent soil • Rolled erosion control products with or reinforcement matting without temporary grass seed * Hydroseeding • Appropriately applied straw or other mulch * Shrubs or other permanent plantings covered • Plastic sheeting with mulch • Uniform and evenly distributed ground cover sufficient to restrain erosion * Structural methods such as concrete, asphalt or retaining walls • Rolled erosion control products with grass seed POLYACRYLAMIDES (PAMS) AND FLOCCULANTS 1. Select flocculants that are appropriate for the soils being exposed during construction, selecting from the NC DWR List of Approved PAMS/Flocculants. 2. Apply flocculants at or before the inlets to Erosion and Sediment Control Measures. 3. Apply flocculants at the concentrations specified in the NC DWR List of Approved PAMS/Flocculants and in accordance with the manufacturer's instructions. 4. Provide ponding area for containment of treated Stormwater before discharging offsite. 5. Store flocculants in leak -proof containers that are kept under storm -resistant cover or surrounded by secondary containment structures. EQUIPMENT AND VEHICLE MAINTENANCE 1. Maintain vehicles and equipment to prevent discharge of fluids. 2. Provide drip pans under any stored equipment. 3. Identify leaks and repair as soon as feasible, or remove leaking equipment from the project. 4. Collect all spent fluids, store in separate containers and properly dispose as hazardous waste (recycle when possible). 5. Remove leaking vehicles and construction equipment from service until the problem has been corrected. 6. Bring used fuels, lubricants, coolants, hydraulic fluids and other petroleum products to a recycling or disposal center that handles these materials. LITTER, BUILDING MATERIAL AND LAND CLEARING WASTE 1. Never bury or burn waste. Place litter and debris in approved waste containers. 2. Provide a sufficient number and size of waste containers (e.g dumpster, trash receptacle) on site to contain construction and domestic wastes. 3. Locate waste containers at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 4. Locate waste containers on areas that do not receive substantial amounts of runoff from upland areas and does not drain directly to a storm drain, stream or wetland. 5. Cover waste containers at the end of each workday and before storm events or provide secondary containment. Repair or replace damaged waste containers. 6. Anchor all lightweight items in waste containers during times of high winds. 7. Empty waste containers as needed to prevent overflow. Clean up immediately if containers overflow. 8. Dispose waste off -site at an approved disposal facility. 9. On business days, clean up and dispose of waste in designated waste containers. PAINT AND OTHER LIQUID WASTE 1. Do not dump paint and other liquid waste into storm drains, streams or wetlands. 2. Locate paint washouts at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 3. Contain liquid wastes in a controlled area. 4. Containment must be labeled, sized and placed appropriately for the needs of site. 5. Prevent the discharge of soaps, solvents, detergents and other liquid wastes from construction sites. PORTABLE TOILETS 1. Install portable toilets on level ground, at least 50 feet away from storm drains, streams or wetlands unless there is no alternative reasonably available. If 50 foot offset is not attainable, provide relocation of portable toilet behind silt fence or place on a gravel pad and surround with sand bags. 2. Provide staking or anchoring of portable toilets during periods of high winds or in high foot traffic areas. 3. Monitor portable toilets for leaking and properly dispose of any leaked material. Utilize a licensed sanitary waste hauler to remove leaking portable toilets and replace with properly operating unit. EARTHEN STOCKPILE MANAGEMENT 1. Show stockpile locations on plans. Locate earthen -material stockpile areas at least 50 feet away from storm drain inlets, sediment basins, perimeter sediment controls and surface waters unless it can be shown no other alternatives are reasonably available. 2. Protect stockpile with silt fence installed along toe of slope with a minimum offset of five feet from the toe of stockpile. 3. Provide stable stone access point when feasible. 4. Stabilize stockpile within the tmeframes provided on this sheet and in accordance with the approved plan and any additional requirements. Soil stabilization is defined as vegetative, physical or chemical coverage techniques that will restrain accelerated erosion on disturbed soils for temporary or permanent control needs. NORTH CAROLINA �41V.6. Environmental Quality CLEANLY MANU USNAM ppr NOTW We= GOIX", NON ONSITE CONCRETE WASHOUT STRUCTURE WITH LINER � ,a�i.� L v%& UMTM LETEImm N rmu & THE COCAIN VAURR 271lC71I'>ES SMALL K waff m WM THE LTA AM M SCOICIM VASNW T S"Wen NE NEENS To s M Cr M YTARLSTYPJ IAL UMTM LE1OiMOi 1 M CLEANLY MAN= 3334A >E FIELD NOTO6 RVICE (19'7f24' NON ASIaR STRU 'R/IEt NIMLL X NO MM WM TM Li AM M =a NfACItS 7= O* TIE STRUCT RB CAPACITY To PWVOE ANXISTE NOL1W CAPACITY VITM A MOONM EUK u son W Awn ABOVE GRADE WASHOUT STGHM NOTZ♦!G ILVM STRUCTURE CONCRETE WASHOUTS 1. Do not discharge concrete or cement slurry from the site. 2. Dispose of, or recycle settled, hardened concrete residue in accordance with local and state solid waste regulations and at an approved facility. 3. Manage washout from mortar mixers in accordance with the above item and in addition place the mixer and associated materials on impervious barrier and within lot perimeter silt fence. 4. Install temporary concrete washouts per local requirements, where applicable. If an alternate method or product is to be used, contact your approval authority for review and approval. If local standard details are not available, use one of the two types of temporary concrete washouts provided on this detail. 5. Do not use concrete washouts for dewatering or storing defective curb or sidewalk sections. Stormwater accumulated within the washout may not be pumped into or discharged to the storm drain system or receiving surface waters. Liquid waste must be pumped out and removed from project. 6. Locate washouts at least 50 feet from storm drain inlets and surface waters unless it can be shown that no other alternatives are reasonably available. At a minimum, install protection of storm drain inlet(s) closest to the washout which could receive spills or overflow. 7. Locate washouts in an easily accessible area, on level ground and install a stone entrance pad in front of the washout. Additional controls may be required by the approving authority. 8. Install at least one sign directing concrete trucks to the washout within the project limits. Post signage on the washout itself to identify this location. 9. Remove leavings from the washout when at approximately 75% capacity to limit overflow events. Replace the tarp, sand bags or other temporary structural components when no longer functional. When utilizing alternative or proprietary products, follow manufacturer's instructions. 10. At the completion of the concrete work, remove remaining leavings and dispose of in an approved disposal facility. Fill pit, if applicable, and stabilize any disturbance caused by removal of washout. HERBICIDES, PESTICIDES AND RODENTICIDES 1. Store and apply herbicides, pesticides and rodenticides in accordance with label restrictions. 2. Store herbicides, pesticides and rodenticides in their original containers with the label, which lists directions for use, ingredients and first aid steps in case of accidental poisoning. 3. Do not store herbicides, pesticides and rodenticides in areas where flooding is possible or where they may spill or leak into wells, stormwater drains, ground water or surface water. If a spill occurs, clean area immediately. 4. Do not stockpile these materials onsite. HAZARDOUS AND TOXIC WASTE 1. Create designated hazardous waste collection areas on -site. 2. Place hazardous waste containers under cover or in secondary containment. 3. Do not store hazardous chemicals, drums or bagged materials directly on the ground. NCGO I GROUND STABILIZATION AND MATERIALS HANDLING EFFECTIVE: 04/01/19 W O O E zCD a �� > cn z Lrmm ~ J Y CSC m Cf)W ozN c) UWCV "1 z O �N O Cn W U O ^SDI' ICI Vj �y cr LW Z C+7 q Lt WOW ti r_� li X J GC ^ � CO Sk O L a 2!W J U W O = CD�noQti Z Il- U 6L: z -�2 z a a w w 0 z too o - CD a CD w - o c) m w Q LLJ _F a w 00 N z o U w d = w O a 01 N � V Q �a x � w N � w w � o �' w w ._. ITIff SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION A: SELF -INSPECTION Self -inspections are required during normal business hours in accordance with the table below. When adverse weather or site conditions would cause the safety of the inspection personnel to be in jeopardy, the inspection may be delayed until the next business day on which it is safe to perform the inspection. In addition, when a storm event of equal to or greater than 1.0 inch occurs outside of normal business hours, the self -inspection shall be performed upon the commencement of the next business day. Any time when inspections were delayed shall be noted in the Inspection Record. Frequency Inspect (during normal Inspection records must include: business hours) (1) Rain gauge Daily Daily rainfall amounts. maintained in If no daily rain gauge observations are made during weekend or good working; holiday periods, and no individual -day rainfall information is order available, record the cumulative rain measurement for those un- attended days (anc this will determine if a site inspection is needed). Days on which no rainfall occurred shall be recorded as "zero." The permittee may use another rain -monitoring device approved by the Division. (2) E&SC At least once per 1. Identification of the measures inspected, Measures 7 calendar days 2. Date and time of the inspection, and within 24 3. Name of the person performing the inspection, hours of a rain 4. Indication of whether the measures were operating event > 1.0 inch in properly, 24 hours 5. Description of maintenance needs for the measure, 6. Description, evidence, and date of corrective actions taken. (3) Stormwater At least once per 1. Identification of the discharge outfalls inspected, discharge 7 calendar days 2. Date and time of the inspection, outfalls (SDCs) and within 24 3. Name of the person performing the inspection, hours of a rain 4. Evidence of indicators of stormwater pollution such as oil event > 1.0 inch in sheen, floating or suspended solids or discoloration, 24 hours 5. Indication of visible sediment leaving the site, 6. Description, evidence, and date of corrective actions taken. (4) Perimeter of At least once per If visible sedimentation is found outside site limits, then a record site 7 calendar days of the following shall be made: and within 24 1. Actions taken to clean up or stabilize the sediment that has left hours of a rain the site limits, event > 1.0 inch in 2. Description, evidence, and date of corrective actions taken, and 24 hours 3. An explanation as to the actions taken to control future releases. (5) Streams or At least once per If the stream or wetland has increased visible sedimentation or a wetlands onsite 7 calendar days stream has visible increased turbidity from the construction or offsite and within 24 activity, then a record of the following shall be made: (where hours of a rain 1. Description, evidence and date of corrective actions taken, and accessible) event > 1.0 inch in 2. Records of the required reports to the appropriate Division 24 hours Regional Office per Part III, Section C, Item (2)(a) of this permit. (6) Ground After each phase 1. The phase of grading (installation of perimeter E&SC stabilization of grading measures, clearing and grubbing, installation of storm measures drainage facilities, completion of all land -disturbing activity, construction or redevelopment, permanent ground cover). 2. Documentation that the required ground stabilization measures have been provided within the required timeframe or an assurance that they will be provided as soon as possible. NOTE: The rain inspection resets the required 7 calendar day inspection requirement. PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION B: RECORDKEEPING 1. E&SC Plan Documentation The approved E&SC plan as well as any approved deviation shall be kept on the site. The approved E&SC plan must be kept up-to-date throughout the coverage under this permit. The following items pertaining to the E&SC plan shall be kept on site and available for inspection at all times during normal business hours. Item to Document Documentation Requirements (a) Each E&SC measure has been installed Initial and date each E&SC measure on a copy and does not significantly deviate from the of the approved E&SC plan or complete, date locations, dimensions and relative elevztions and sign an inspection report that lists each shown on the approved E&SC plan. E&SC measure shown on the approved E&SC plan. This documentation is required upon the initial installation of the E&SC measures or if the E&SC measures are modified after initial installation. (b) A phase of grading has been completed. Initial and date a copy of the approved E&SC plan or complete, date and sign an inspection report to indicate completion of the construction phase. (c) Ground cover is located and installed Initial and date a copy of the approved E&SC in accordance with the approved E&SC plan or complete, date and sign an inspection plan. report to indicate compliance with approved ground cover specifications. (d) The maintenance and repair Complete, date and sign an inspection report. requirements for all E&SC measures have been performed. (e) Corrective actions have been taken Initial and date a copy of the approved E&SC to E&SC measures. plan or complete, date and sign an inspection report to indicate the completion of the corrective action. 2. Additional Documentation to be Kept on Site In addition to the E&SC plan documents above, the following items shall be kept on the site and available for inspectors at all times during normal business hours, unless the Division provides a site -specific exemption based on unique site conditions that make this requirement not practical: (a) This General Permit as well as the Certificate of Coverage, after it is received. (b) Records of inspections made during the previous twelve months. The permittee shall record the required observations on the Inspection Record Form provided by the Division or a similar inspection form that includes all the required elements. Use of electronically -available records in lieu of the required paper copies will be allowed if shown to provide equal access and utility as the hard -copy records. 3. Documentation to be Retained for Three Years All data used to complete the e-NOI and all inspection records shall be maintained for a period of three years after project completion and made available upon request. [40 CFR 122.41] PART II, SECTION G, ITEM (4) DRAW DOWN OF SEDIMENT BASINS FOR MAINTENANCE OR CLOSE OUT Sediment basins and traps that receive runoff from drainage areas of one acre or more shall use outlet structures that withdraw water from the surface when these devices need to be drawn down for maintenance or close out unless this is infeasible. The circumstances in which it is not feasible to withdraw water from the surface shall be rare (for example, times with extended cold weather). Non -surface withdrawals from sediment basins shall be allowed only when all of the following criteria have been met: (a) The E&SC plan authority has been provided with documentation of the non -surface withdrawal and the specific time periods or conditions in which it will occur. The non -surface withdrawal shall not commence until the E&SC plan authority has approved these items, (b) The non -surface withdrawal has been reported as an anticipated bypass in accordance with Part III, Section C, Item (2)(c) and (d) of this permit, (c) Dewatering discharges are treated with controls to minimize discharges of pollutants from stormwater that is removed from the sediment basin. Examples of appropriate controls include properly sited, designed and maintained dewatering tanks, weir tanks, and filtration systems, (d) Vegetated, upland areas of the sites or a properly designed stone pad is used to the extent feasible at the outlet of the dewatering treatment devices described in Item (c) above, (e) Velocity dissipation devices such as check dams, sediment traps, and riprap are provided at the discharge points of all dewatering devices, and (f) Sediment removed from the dewatering treatment devices described in Item (c) above is disposed of in a manner that does not cause deposition of sediment into waters of the United States. PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION C: REPORTING 1. Occurrences that Must be Reported Permittees shall report the following occurrences: (a) Visible sediment deposition in a stream or wetland. (b) Oil spills if: • They are 25 gallons or more, • They are less than 25 gallons but cannot be cleaned up within 24 hours, • They cause sheen on surface waters (regardless of volume), or • They are within 100 feet of surface waters (regardless of volume). (c) Releases of hazardous substances in excess of reportable quantities under Section 311 of the Clean Water Act (Ref: 40 CFR 110.3 and 40 CFR 117.3) or Section 102 of CERCLA (Ref: 40 CFR 302.4) or G.S. 143-215.85. (d) Anticipated bypasses and unanticipated bypasses. (e) Noncompliance with the conditions of this permit that may endanger health or the environment. 2. Reporting Timeframes and Other Requirements After a permittee becomes aware of an occurrence that must be reported, he shall contact the appropriate Division regional office within the timeframes and in accordance with the other requirements listed below. Occurrences outside normal business hours may also be reported to the Department's Environmental Emergency Center personnel at (800) 858-0368. Occurrence Reporting Timeframes (After Discovery) and Other Requirements (a) Visible sediment a Within 24 hours, an oral or electronic notification. deposition in a + Within 7 calendardarys, a report that contains a description of the stream or wetland sediment and actions taken to address the cause of the deposition. Division staff may waive the requirement for a written report on a case -by -case basis. • If the stream is named on the NC 303(d) list as impaired for sediment - related causes, the permittee may be required to perform additional monitoring, inspections or apply more stringent practices if staff determine that additional requirements are needed to assure compliance with the federal or state impaired -waters conditions. (b) Oil spills and • Within 24 hours, an oral or electronic notification. The notification release of shall include information about the date, time, nature, volume and hazardous location of the spill cr release. substances per Item 1(b)-(c) above • A report at least fen days before the dare of the bypass, if possible. (c) Anticipated bypasses [40 CFR The report shall include an evaluation of the anticipated quality and 122.41(m)(3)] effect of the bypass. (d) Unanticipated . Within 24 hours, an oral or electronic notification. bypasses [40 CFR • Within 7 calendar days, a report that includes an evaluation of the 122.41(m)(3)] quality and effect of the bypass. (e) Noncompliance • Within 24 hours, an oral or electronic notification. with the conditions . Within 7 calendar days, a report that contains a description of the of this permit that noncompliance, and its causes; the period of noncompliance, may endanger including exact dates and times, and if the noncompliance has not health or the been corrected, the anticipated time noncompliance is expected to environment[40 continue; and steps taken or planned to reduce, eliminate, and CFR 122.41(1)(7)] prevent reoccurrence of the noncompliance. [40 CFR 122.41(I)(6). • Division staff may waive the requirement for a written report on a case -by -case basis. NCGO I SELF -INSPECTION, RECORDKEEPING AND REPORTING NORTH CAROLINAEnvironmental Quality EFFECTIVE: 04/01/19 W O O E zCD a g)� > cn Z CSC �m W ozN 3 S•� U W N -6o0 Z N O i2 Cn W U O r Vj Cr LWOW Z C+7 r�i 'cn W ~ LL w � li X GC ...I a O Lq a Z W J U W O O >Ln_ Z Il- U z a z 0 a x v w m w 0 z CCc o - � CD N a OLd 3 w LLJ Q LLJ _ F a o 0 C I N m o U d O a 01 U O �� oa �a x � w M � w w � o EROSION AND SEDIMENTATION CONTROL NOTES SOILS VEGETATIVE PLAN 1. ALL PRACTICES SHALL BE IN ACCORDANCE WITH THE GUIDELINES, THE SOILS IN THE PROJECT AREA ARE PREDOMINANTLY CECIL URBAN LOAM SEEDING MIXTURE: STANDARDS AND PRACTICES OF THE STATE OF NORTH CAROLINA AS (CuD AND CuB) AND HELENA SANDY LOAM (HeB). BLEND OR 50Y KY-31 TALL FESCUE AND 50% MIXTURE OF TWO OR SET FORTH IN THE ''EROSION AND SEDIMENT CONTROL PLANNING AND MORE TURF -TYPE FESCUES AT A RATE OF 200-250 PER ACRE DESIGN MANUAL.'' SLOPES IN THE PROJECT AREA ARE GENERALLY TWO TO FIVE PERCENT. THE OR 2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROPER PREDOMINENT SOIL TYPE CONSISTS OF 50 TO 70 PERCENT UNDISTURBED SOIL INSTALLATION, MAINTENANCE AND REMOVAL OF ALL EROSION AND 15 TO 35 PERCENT URBAN LAND WHERE THE NATURAL SOIL HAD BEEN BLEND OF THREE OR MORE TURF -TYPE TALL FESCUES AT A RATE CONTROL MEASURES AS DESIGNATED ON THESE PLANS. ALTERED DUE TO GRADING AND DEVELOPMENT. UNDISTURBED CECIL SOILS OF 200-250 LB. PER ACRE. ARE WELL -DRAINED WITH MODERATE PERMEABILITY AND MEDIUM RUNOFF 3. THE EROSION CONTROL PLANS DEPICT EROSION CONTROL MEASURES CHARACTERISTICS. THE WATER TABLE IS TYPICALLY BELOW 6 FEET. SEEDING DATES: FOR THE ENTIRE PROJECT. THESE DEVICES SHALL BE PLACED IN GROUND WATER IS NOT ANTICIPATED TO POSE A SIGNIFICANT PROBLEM. FALL: AUG. 25 - SEPT. 15 (BEST); AUG. 30 - OCT. 25 (POSSIBLE) ACCORDANCE WITH THE CONSTRUCTION SCHEDULE OUTLINED HEREIN WINTER: FEB. 1 - MAR. 31 (POSSIBLE) AS ACTUAL CONSTRUCTION WITHIN THE WORK AREA PROGRESSES. EROSION AND SEDIMENTATION CONTROL DEVICES REFER TO TRAFFIC CONTROL PLANS FOR DETAILED SEQUENCE OF FOR QUALITY TURF, AVOID SPRING SEEDING. WHERE GRADING IS CONSTRUCTION. THE LAND DISTURBING ACTIVITIES FOR THE CONSTRUCTION OF THIS COMPLETED DURING LATE WINTER OR SPRING, AN ALTERNATIVE TO PROJECT ARE TO TAKE PLACE IN ONE PHASE. CURB AND GUTTER SEED 30 LB. PER ACRE KOBE LESPEDEZA, KEEP MOWED, PREPARE 4. THE EROSION CONTROL MEASURES SPECIFIED ON THESE PLANS ARE AND SIDEWALK CONSTRUCTION WILL TAKE PLACE ON BOTH SIDES SEEDBED AND SEED PERMANENT MIXTURE BETWEEN AUG. 25 AND INTENDED TO REPRESENT THE MINIMUM REQUIREMENTS FOR THIS OF THE EXISTING ROADWAY. DENUDED AREAS WILL AVERAGE TEN TO SEPT. 15. PROJECT. ADDITIONAL TEMPORARY MEASURES AND/OR ADJUSTMENT FIFTY FEET IN WIDTH. OF THOSE SHOWN MAY BE REQUIRED AS FIELD CONDITIONS DICTATE. THESE MAY INCLUDE, BUT NOT BE LIMITED TO: DIVERSIONS, SOIL AMENDMENTS: TEMPORARY PIPING, ADDITIONAL SEDIMENT FENCE AND OR FILL SLOPES WILL VARY BETWEEN 2:1 AND 4:1 AND RANGE BETWEEN 0.5 APPLY LIME AND FERTILIZER ACCORDING TO SOIL TESTS OR APPLY INCIDENTAL STONE. TO 5.0 FEET IN HEIGHT. 4,000 LB. PER ACRE GROUND AGRICULTURAL LIMESTONE AND 1,000 LB. PER ACRE 10 - 10 - 10 FERTILIZER. 5. THE CONTRACTOR IS ADVISED TO EXERCISE DUE DILIGENCE AND CARE EROSION CONTROL MEASURES FOR THIS PROJECT ARE MODERATE, CONSISTING MULCH: IN THE PLACEMENT OF EROSION CONTROL MEASURES ADJACENT TO GENERALLY OF SILT FENCE TO BE LOCATED ALONG THE TOE OF FILL APPLY 4,000 LB. PER ACRE GRAIN STRAW OR EQUIVALENT COVER OF AND/OR AFFECTING PRIVATE PROPERTY. MEASURES SHALL BE PLACED SLOPES. TO PERMIT DRIVEWAY ACCESS AND TO PROVIDE PEDESTRIAN SAFETY ANOTHER SUITABLE MULCH. ANCHOR STRAW BY TACKING WITH AT ALL TIMES. ASPHALT, ROVING OR NETTING, OR BY CRIMPING WITH A MULCH THE SPECIFIC MEASURES USED IN THIS PROJECT ARE DENOTED ON THE ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN 6. DURING CONSTRUCTION, THE CONTRACTOR SHALL MAKE EVERY PLANS AND BRIEFLY SUMMARIZED AS FOLLOWS: BE USED AS A MULCH ANCHORING TOOL. EFFORT TO DIRECT AND/OR DIVERT POTENTIAL SEDIMENT -LADEN RUNOFF TO EROSION CONTROL DEVICES IN PLACE AS LAND 1. TEMPORARY SILT FENCE - PRACTICE 6.62 FROM THE NCDEHNR MANUAL MAINTENANCE DISTURBING ACTIVITY PROCEEDS. SEDIMENT CONTROL OR SILT FENCE, SHALL BE PLACED ALONG THE FERTILIZE ACCORDING TO SOIL TESTS OR APPLY 40 LB. PER ACRE TOE OF FILL SLOPES, DOWN GRADIENT OF UTILITY OR NITROGEN IN JANUARY OR FEBRUARY, 40 LB. IN SEPTEMBER AND 40 7. EROSION CONTROL MEASURES SHALL BE INSPECTED WEEKLY AND STORM DRAINAGE EXCAVATIONS, AND IN SPECIFIC LOCATIONS AS LB. IN NOVEMBER, FROM A 12-4-8, 16-4-8 OR SIMILAR TURF FERTILIZER. AFTER RAINFALL EVENTS. SEDIMENT SHALL BE PERIODICALLY INDICATED ON PLANS. THE SILT FENCE WILL HELP TO KEEP SEDIMENT AVOID FERTILIZER APPLICATIONS DURING WARM WEATHER AS THIS REMOVED AND PROPERLY DISPOSED OF AS REQUIRED. DEVICES SHALL FROM GRADED SLOPES CONTAINED WITHIN THE PROJECT AREA. INCREASES STAND LOSSES TO DISEASE. RESEED, FERTILIZE AND BE MAINTAINED AND/OR REPLACED AS NECESSARY TO ENSURE THAT PLACEMENT OF SILT FENCE IS RESTRICTED TO SHEET FLOW MULCH DAMAGED AREAS IMMEDIATELY. MOW TO A HEIGHT OF 2.5 - THEY PERFORM AS INTENDED. FROM DRAINAGE AREAS NOT EXCEEDING 114 ACRE PER 100 3.5 INCHES AS NEEDED. FEET OF FENCE. 8. EROSION CONTROL PLAN SHEETS ARE INTENDED FOR THE CONSTRUCTION SEQUENCE IMPLEMENTATION OF EROSION CONTROL MEASURES ONLY. REFER TO 2. CATCH BASIN INLET PROTECTION - STANDARD 30.15 FROM THE ROADWAY PLANS FOR ACTUAL DETAILS OF ROADWAY CONSTRUCTION. CHARLOTTE MECKLENBURG LAND DEVELOPMENT STANDARDS MANUAL. 1. OBTAIN PLAN APPROVAL AND ALL OTHER APPLICABLE PERMITS AS THIS TYPE OF INLET PROTECTION WILL BE UTILIZED TO PREVENT THE REQUIRED. 9. PREFRABRICATED SILT FENCE IS NOT ACCEPTABLE ON THIS PROJECT. INGRESS OF SEDIMENT INTO THE EXISTING STORM SEWER SYSTEM. THIS STEEL POSTS SHOULD BE USED INSTEAD OF WOODEN POSTS, BURIED MEASURE WILL BE APPLIED FOR STRUCTURES AS SHOWN ON THE EROSION OR DRIVEN TO A DEPTH OF TWO FEET IN THE GROUND. CONTROL PLANS AND SHALL BE INSTALLED PRIOR TO WHEN LAND 2. HOLD PRECONSTRUCTION CONFERENCE AS DIRECTED PRIOR TO DISTURBANCE BEGINS. BEGINNING CONSTRUCTION. PROJECT DESCRIPTION 3. LAND DISTURBING ACTIVITIES CONSIST OF CONSTRUCTION OF CURB AND GUTTER, SIDEWALK AND PAVEMENT. FINAL WORK WILL THIS PROJECT, LOCATED IN CHARLOTTE, NORTH CAROLINA, CONSISTS OF CONSIST OF PLACEMENT OF FINAL PAVEMENT LIFT, CONCRETE GRADING, DRAINAGE PIPES AND STRUCTURES, PAVING, CONCRETE WORK, CHANNEL MEDIANS, ETC. IMPROVEMENTS AND UTILITY RELOCATIONS ON WATER OAK RD AND ADJACENT ROADS, LOCATED WITHIN CATAWBA RIVER BASIN. THE EROSION CONTROL MEASURES TO BE IMPLEMENTED ARE AS FOLLOWS: 1. PRIOR TO INSTALLING EROSION CONTROL MEASURES, NCDEQ MUST BE NOTIFIED. PLACE SEDIMENT CONTROL FENCE ALONG THE PROPOSED LAND DISTURBING ACTIVITIES RELATED TO THIS PROJECT INCLUDE PIPE TOE OF FILL AT THE LOCATIONS INDICATED ON PLANS. AND STRUCUTRE INSTALLATION AS WELL AS GRADING AROUND CULVERTS THE TOTAL LENGTH OF THIS PROJECT IS 0.96 MILES. APPROXIMATELY 3.6 2. SEED ALL DENUDED AREAS IN ACCORDANCE WITH THE SEEDING SCHEDULE. ACRES WILL BE DISTURBED DURING CONSTRUCTION AND WILL NEED TO BE TEMPORARY GROUNDCOVER MUST BE PLACED ON EXPOSED SLOPES WITHIN RESEEDED. 7 WORKING DAYS FOLLOWING COMPLETION OF ANY PHASE OF GRADING: PERMANENT GROUNDCOVER MUST BE PLACED ON ALL DISTURBED AREAS WITHIN 10 WORKING DAYS FOLLOWING COMPLETION OF CONSTRUCTION SITE DESCRIPTION OR DEVELOPMENT. 3. PRIOR TO REMOVING EROSION CONTROL MEASURES, NCDEQ MUST BENOTIFIED. THE SITE HAS ROLLING TOPOGRAPHY WITH GROUND SLOPES RANGING FROM REMOVE TEMPORARY EROSION CONTROL DEVICES AFTER TWO TO TEN PERCENT. THE PROPOSED IMPROVEMENTS GENERALLY FOLLOW THE PROJECT HAS BEEN PERMANENTLY STABILIZED. THE EXISTING ROADWAY ALIGNMENT BUT SOME PIPES AND STRUCTURES ARE ARE BETWEEN EXISTING ROADS ON FUTURE EASTMENT. LONGTUDINAL GRADES RANGE FROM 0.4 TO 3.0 PERCENT. INSPECT EROSION CONTROL DEVICES WEEKLY AND FOLLOWING RAINFALL EVENTS. REMOVE SILT AND SEDIMENT PERIODICALLY AS REQUIRED TO KEEP DRAINAGE OF THE ROADWAY IS ACCOMPLISHED BY STORM SEWER DEVICES FUNCTIONING AS INTENDED. SYSTEMS WITH SEVERAL PRINCIPAL OUTFALL OR DISCHARGE POINTS INTO A TRIBUTARY TO MCMULLEN CREEK. UPON STABILIZATION, REMOVE ALL TEMPORARY MEASURES AND PERMANENTLY SEED AS REQUIRED. ADJACENT PROPERTY THE ADJACENT LAND USE ALONG THE PROJECT CONSISTS OF MOSTLY RESIDENTIAL PROPERTIES EXCEPT FOR A MASONIC LODGE ON N SHARON AMITY ROAD IN ADDITION TO A SCHOOL ALONG N SHARON AMITY ROAD. THE EROSION CONTROL PLAN IS SUBJECT TO CHANGE BASED ON SEDIMENT AND EROSION CONTROL MEASURES NECESSARY TO ENSURE SEDIMENT DOES NOT LEAVE THE DISTURBED AREA. ANY SEDIMENT OFF -SITE NEEDS TO BE REMOVED AND THE AREA CLEANED WHEN CONSTRUCTION IS COMPLETE TO MINIMIZE STORM WATER IMPACTS. MAINTENANCE PLAN 1. CHECK ALL EROSION CONTROL MEASURES WEEKLY AND AFTER EACH RAINFALL. 2. REMOVE SEDIMENT FROM BEHIND SEDIMENT FENCE WHEN THE ACCUMULATED MATERIAL IS 0.50 FEET DEEP. RESET AND/OR REPLACE FENCE AS REQUIRED THROUGHOUT CONSTRUCTION. ALSO, REMOVE SEDIMENT FROM OR REPLACE SEDIMENT BAGS AT CATCH BASIN INLET PROTECTION WHEN BAGS ARE HALF FULL. 3. SEED NEWLY GRADED AREAS AS EARLY AS POSSIBLE, RESEED, AS NECESSARY, ANY REMAINING OR NEWLY DISTURBED AREAS AS WORK PROGRESSES THROUGHOUT THE ENTIRE CONSTRUCTION PERIOD. EROSION CONTROL LEGEND REFER TO EROSION CONTROL DETAILS, SEE SHEET NO.EC-2 TEMPORARY SILT FENCE RUN-OFF FLOW ARROW PROPOSED PIPE _ EXISTING PIPE ROCK INLET SEDIMENT TRAP TYPE 'C' CHECK DAM SUMMARY OF EROSION CONTROL DEVICES ITEM QUANTITY TEMPORARY SILT FENCE 1417 LF ROCK INLET SEDIMENT TRAP TYPE 'C' 106 EA CHECK DAM 2 EA CLASS '1' RIPRAP 171 TN PLACE EXCAVATED MATERIAL UP GRADIENT OF TRENCH BASED ON FIELD CONDITIONS. BYPASS PUMPING SHALL BE INSTALLED FOR CONSTRUCTION TO BE DONE IN THE STREAMS. WORK IN STREAMS SHOULD BE CONSTRUCTED IN THE DRY. W O o E zCD a .. �„ � cn z Lroma~ J = CC �m Cf) W ozN c) S U W N O 00 z N wLL1U0 Vj W W W ti LL w z � li Xz� } GC � a Z W OLq a W O O � Ln J It z F- U z z 0 a. w w 0 z tog a 9 c, - � CD N a CD3 w Ld m Lu Q w x a w o 0 C5 I N O � C� Q i ::i C a � V Q w w w � o ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■ 1■■■■■■■L��.`■I I■■1 ■■►� \■■ .`■■I I■ .'\■I I■ �■■rl ■■■■■■�■■■■■■■■■■■■■ ■■■■■■■■■■■ 10000000 I■■bMI 1■■1 ■E AL'■■ VIM 10 1.\■1 10 1■■■1 ■■■■■Ld 10000000000000 ■■■■■■■■rM■ 1■■rM%■■ 100001 ■I ML \■ jk% in 1\\1 10 ■mmil ■■■■■■■ I■■■■■■■■■■■■■ ■■■■■■■■r■■ 1■■r■i■■L l■■171 I■■1 ■, A■■,1■ mok In l■►IN 1■_■_■1 ■■■■■■■ l■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■\.�iA�■■■■■■■■■■■■■■■■■■■■■■■■■■■'1'1JJ�CCCGiiii�i�JL,■■■■liLi�■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■rAr<Sri■��■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■�/'�■i�11 Fail■rl��■'�■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ECG■■■■■■ ■■\r�i■�GGCCL"1"1I■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■fir■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■\�■■■\■■■■■■■■■■■■■■■■■■Cif■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■\�■r■■■■■■■■■■■■■■■■Cif■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■\.Z'1'\■■■■■ACC=il■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■v■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■Ci='1'S'1J�GCCGi-.iiiir■■■ ■■■■■■■■■■■■■■■■■■■■■�\II■I■■I■■�\ICI,1��\Ii■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■ 1■■■■■■■Lidm.`■1 I■■1 ■■►1 \■■ .`■■I In .7■1 IN I■■rl ■■■■■■r l■■■■■■■■■■■■■ ■■■■■■■■■■■ 10000000 I■■bMI 1■■1 ■E I1'■■ VIM 10 1.\■1 10 1■■■1 ■■■■■Ld 10000000000000 ■■■■■■■■rM■ 1■■rM%■■ 100001 I■■I ■I ML \■ j\\I 1■ 1\\1 10 ■mmil ■■■■■■■ I■■■■■■■■■■■■■ ■■■■■■■■r■■ 1■_■r■i■■� ■■171 I■■1 ■� ■■,1■ mok IN l■►IN 1■_■_■1 ■■■■■■■ ■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■I'll■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■Girl/i�\■■■■■■■■■■■■■■■Ali■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■ass»■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■Ira■■■■■■■■■■■■■■■■■■■■�ir■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■iii3iJCC'LSE■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■f�1��Ca/ICE■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■err■■■■■■■■ ■■■■■■■■■,!!JCL'L!■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■S■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■err■r■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ l��J■JeeL■!t'===»>GCCCiiii�G�OGGi-iiiiiii���CCii■■r■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■�eelaee��a��.leeeee�*����eeeee������eeeeee�����eee ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ W WATER OAK ROAD cb E� N 0 O ACC-1 ACC- 2 PROP. CLDS 10.40A 2 20' R WITH 6' X 2' zCD DETACHABLE WARNING 1 'S% zo � cn z 0 NOTES. m 15' 5' 1.5 /0 \ 5 LANDING R.G. - ROAD GRADE. SLOPES SHALL NOT EXCEED ROAD GRADE OR 2% z 0 r C WHICHEVER IS GREATER.ROAD GRADE IS MEASURED AT GUTTER PAN. y = a w CN 4.00/ 2. DIMENSIONS ARE APPROXIMATE. CONSTRUCT PER RAMP SLOPE REQUIREMENTS. _ -j zz � o 9.6 0/ ° ° . 2 Q/ 0 J. RAMP 75/. DESIGN (8.3% MAX) a ILU w z m m ° 00 `�F 0 �J 4. FLARE - /O (WHERE APPLICABLE) z z ti L } 1. 5 % ° ° 0 ' 1 % ° /a 0 5 5. THE RUNNING SLOPE FOR THE CURB RAMP /S NOT LIMITED TO 8337 MAX/MUM p� z Ili o Lq w °° °O ° % IF THE CONSTRUCTED LENGTH EXCEEDS 15 FEET IN LENGTH.ALL PANELS MUST L0 CD Q r J 1. 5% 0• % o° o EQUAL THE SAME PERCENT. z ti L) a z % / 5 6. SIDEWALK CROSS SLOPE SHOULD BE 2/. MAX. /�1 6A.USE TRADITIONAL PANEL(S)TO TIE TO EXSITING SIDEWALK PANELS. TRANSITION Z 5, PANELS WILL BE 2/. CROSS SLOPE ON ONE SIDE AND MATCH EXISTING ON THE 1.5 /Q PROP. NCDOT TYPE 2 RAMP OPPOSITE SIDE. Q WITH 7 X 2 7. SEE DETAIL BELOW 0.1 % o 1.5 /0 5 DETACHABLE WARNING A FLOWLINE DEPTH ° � AT RAMP LOCATION EDGE OF Z 1 PAVEMENT ELEVATION 0PAMP 8._ P TO 7.5X UP TO 5% MAX. a' MAX)} 8.3JX MAX) W o I Q 1.5 0 ° DA P. MATCH 2'-6" RAMP SLOPE CURB AND GUTTER ° ♦ 2'-6" CURB AND GUTTER RAMP DETAIL r ^ MAXIMUM SLOPES FOR CURB AND o `J , GUTTER DEPRESSION AT RAMPS y m ^ 8. IF LANDING RAMP.OR FLARE SLOPES EXCEED MAX SLOPES (UNLESS OTHERWISE W NOTED) CONTACT ENGINEER. O Q o C z ACC 1 & 2 NOTES. I. LANDING - R.G. ROAD GRADE. SLOPES SHALL NOT EXCEED ROAD GRADE OR 2/. WHICHEVER IS GREATER.ROAD GRADE IS MEASURED AT GUTTER PAN. 2. DIMENSIONS ARE APPROXIMATE. CONSTRUCT PER RAMP SLOPE REQUIREMENTS. 3. RAMP - 7.5/. DESIGN (8.37 MAX) 4. FLARE - /0% (WHERE APPLICABLE) 5. THE RUNNING SLOPE FOR THE CURB RAMP IS NOT LIMITED TO 8.337 MAXIMUM IF THE CONSTRUCTED LENGTH EXCEEDS /5 FEET IN LENGTH.ALL PANELS MUST EQUAL THE SAME PERCENT. 6. SIDEWALK CROSS SLOPE SHOULD BE 27 MAX. ° 6AUSE TRADITIONAL PANELIS)TO TIE TO EXSITING SIDEWALK PANELS. TRANSITION PANELS WILL BE 27 CROSS SLOPE ON ONE SIDE AND MATCH EXISTING ON THE xOPPOSITE SIDE.7. SEE DETAIL BELOWo " FLOWLINE DEPTH o a N AT RAMP LOCATION a 5 N EDGE OF o W W O� PAVAmm- &33X m 28.2 W W ELE¢ W UP,O 7.5X PT &d3X 0 W 3 Z 0 N TYP, MATCH 2'-6" N d RAMP SLOPE CURB AND GUTTER \ a N 2'-6" CURB AND GUTTER RAMP DETAIL B o MAXIMUM SLOPES FOR CURB AND a GUTTER DEPRESSION AT RAMPS 5- oo ti 0 N OZ 0 Q 8. IF LANDING RAMP.OR FLARE SLOPES EXCEED MAX SLOPES (UNLESS OTHERWISE 7,> a R Q a o NOTED)CONTACT ENGINEER. W 0. 2.4% 0. 5' , 5� Q 51 3.6 0 �° 2.0% o 2.0% -w-, ° U 2.0% .0% 8.0/o 6, 2 o � O 2.7 /o O 0.5% 4 s_ 7. 000000 °° 00 ° ° O°° 0 ° ° 4�0)�44v °°° O °30' R w� loo �/ PROP. NCDOT TYPE 3 RAMP A.., y ACC- 3 6.1 % WITH 8' X 2' O DETACHABLE WARNING ACC 3 wa W NOTES: I. LANDING - R.G.- ROAD GRADE. SLOPES SHALL NOT EXCEED ROAD GRADE OR 2/. WHICHEVER IS GREATER.ROAD GRADE IS MEASURED AT GUTTER PAN. O 2. DIMENSIONS ARE APPROXIMATE. CONSTRUCT PER RAMP SLOPE REOUIREMENTS. J. RAMP - 7S DESIGN (8.37 MAX) F 4. FLARE - /07 (WHERE APPLICABLE) 5. THE RUNNING SLOPE FOR THE CURB RAMP IS NOT LIMITED TO 8.33% MAXIMUM IF THE CONSTRUCTED LENGTH EXCEEDS 15 FEET IN LENGTH.ALL PANELS MUST EQUAL THE SAME PERCENT. 6. SIDEWALK CROSS SLOPE SHOULD BE 2/. MAX. 01) 6A. USE TRADITIONAL PANEL(S) TO TIE TO EXSITING SIDEWALK PANELS. TRANSITION Q PANELS WILL BE 2/. CROSS SLOPE ON ONE SIDE AND MATCH EXISTING ON THE OPPOSITE SIDE. 7. SEE DETAIL BELOW J" FLOWLINE DEPTH AT RAMP LOCATION EDGE OF o PAVEMENT 5.1 % 14.7' E:T") N O Z F- a .. c Lo UJ Z -i -i 3 CMG - UP i0 7.5% UP5% MAX.UMM3 8.33% MAX)� w .J 8.33X MAX) C� z U f� a it p 00 z N CD`m -6 1 -� a O w U 0 may TYP, MATCH 2'' co RAMP SLOPE CURB AND GUTTER wpuZ..i ti LL m 2'-6" CURB AND GUTTER RAMP DETAIL �+ - MAXIMUM SLOPES FOR CURB AND QI Z z 0 L } zw� �� GUTTER DEPRESSION AT RAMPS --E� > o = o J 0% z1�Ua z� 8. IF LANDING RAMP,OR FLARE SLOPES EXCEED MAX SLOPES (UNLESS OTHERWISE 1.8' NOTED) CONTACT ENGINEER. v 8.0% 5' . % z 0 � 2.0 /0 8' a 23' R 15.3' w °° 0000 ° ° ° 5.1% ACC- 4 0.4% 2.0% PROP. NCDOT TYPE 2 Q RAMP WITH 7'X2' DETACHABLE WARNING z N. SHARON AMITY ROAD ACC 4 NOTES: I. LANDING R.G.- ROAD GRADE. SLOPES SHALL NOT EXCEED ROAD GRADE OR 2/. WHICHEVER IS GREATER.ROAD GRADE IS MEASURED AT GUTTER PAN. 2. DIMENSIONS ARE APPROXIMATE. CONSTRUCT PER RAMP SLOPE REQUIREMENTS. 3. RAMP - 7.5/. DESIGN (837 MAX) 4. FLARE - /0% (WHERE APPLICABLE) 5. THE RUNNING SLOPE FOR THE CURB RAMP IS NOT LIMITED TO 8.337 MAXIMUM IF THE CONSTRUCTED LENGTH EXCEEDS /5 FEET IN LENGTH.ALL PANELS MUST EQUAL THE SAME PERCENT. 6. SIDEWALK CROSS SLOPE SHOULD BE 27 MAX. 6AUSE TRADITIONAL PANEL(S)TO TIE TO EXSITING SIDEWALK PANELS. TRANSITION PANELS WILL BE 27 CROSS SLOPE ON ONE SIDE AND MATCH EXISTING ON THE Cb� OPPOSITE SIDE. Q 7. SEE DETAIL BELOW �P a x " FLOWLINE DEPTH a N AT RAMP LOCATION a 5 N o EDAkw- &33X C W Ca W PAVo Q ELE¢ � W UP 70 7.5X P T&33X 0. o W 3 Z r� 1'_g TYP, MATCH 2'-6" C C RAMP SLOPE CURB AND GUTTER C N W 2'-6" CURB AND GUTTER RAMP DETAIL o MAXIMUM SLOPES FOR CURB AND Ov a GUTTER DEPRESSION AT RAMPS \ A / � 5 ` ti o P7 0. Y CV 0 8. IF LANDING RAMP,OR FLARE SLOPES EXCEED MAX SLOPES (UNLESS OTHERWISE a R Q a o NOTED)CONTACT ENGINEER. , 2. I% 7 W 0. a` 1.2% 5 P w S 5 10 3 /o O O \ . 05 /o W lopol 050 6 3.2% 1.5% 12.0% V �w 0 0 0 0 0 0 0 0 0 27' R O ° 0 PROP. NCDOT TYPE 2 i '6 �0 RAMP WITH 7' X 2' DETACHABLE WARNING ACC 5 Q W NOTES: I. LANDING - R.G.- ROAD GRADE. SLOPES SHALL NOT EXCEED ROAD GRADE OR 2/. WHICHEVER IS GREATER.ROAD GRADE IS MEASURED AT GUTTER PAN. �� O 2. DIMENSIONS ARE APPROXIMATE. CONSTRUCT PER RAMP SLOPE REOUIREMENTS. O�' V • J. RAMP - 75% DESIGN (8.37 MAX) 4. FLARE - /07 (WHERE APPLICABLE) 5. THE RUNNING SLOPE FOR THE CURB RAMP IS NOT LIMITED TO 8.33% MAXIMUM IF THE CONSTRUCTED LENGTH EXCEEDS 15 FEET IN LENGTH.ALL PANELS MUST EQUAL THE SAME PERCENT. 6. SIDEWALK CROSS SLOPE SHOULD BE 2/. MAX. 6A. USE TRADITIONAL PANEL(S) TO TIE TO EXSITING SIDEWALK PANELS. TRANSITION PANELS WILL BE 2/. CROSS SLOPE ON ONE SIDE AND MATCH EXISTING ON THE 43' OPPOSITE SIDE. 7. SEE DETAIL BELOW J" FLOWLINE DEPTH AT RAMP LOCATION CD 0.4°/C3 CD EDGE OF Q z � � PAVEMENT •• UJ Z E:T") N o J - U( i0 7.5X RAMP UP5% VAX. 6.9 /•� � m - 8.3SX MAN 9 U1 w ~ 8.3JX N4J() it �o00 CN Q Z CV O `m 1-9 1 .0°/ y UWCV TYP, MATCH 2'-6- RAMP SLOPE CURB AND GUTTER 5 1 G 5' w wco w J a � w U co c 2'-6' CURB AND GUTTER RAMP DETAIL 4 � - � co m MAXIMUM SLOPES FOR CURB AND 5 QI z z ~ ~ " m 0 Lq GUTTER DEPRESSION AT RAMPS J wo_jo 3.0/0 1.4% ztiULz Q' 8. IF LANDING RAMP,OR FLARE SLOPES EXCEED MAX SLOPES (UNLESS OTHERWISE PROPOSED 1.5% O NOTED) CONTACT ENGINEER. 1 .5 /O O MANHOLE 1.5% F p � 5.4 7.0111.00 0 ` z o ° ° ° ° ° ° °p °° o°° o°o °°o s w Q 27' R 0.3% Q PROP. NCDOT TYPE 3 RAMP WITH 8' X 2' ACC- 6 w Q DETACHABLE WARNING N1140 o z ACC 6 -------------------------------------------------------------------------------------------------------- ----------------- Q, PROJECT REFERENCE NO. SHEET NO. O W+ �MON-WALK SUMAM SIDEWALK AREA BACK OF CURB UP TO 1.5% TOP OF CONCRETE CURB (BEYOND) (2.0% MAX) RAMP SLOPE UP TO DETECTABLE WARNING SW TRANSITION 7.57(8.33% MAX) 1/2" EXPANSION JOINT SEE DETAIL 10.35E PANEL -SEE SIDEWALK NOTE 5 2 MIN. 6•x IP DDNCR87II cDxe TRANSITION W W W W W W NON -WALK SURFACE PAY LIMITS FOR 1 CURB RAMP PANEL - SEE 6'" SURFACE SEE STANDARD 84x65 NOTE 5 DETECTABLE WARNING o M `+ LANDING WIDTH �' / I M a SLOPE A VARIES A o00o 4,. o RAMP � rRHx � i /� o00o UP TO 7.5x MATCH 2" TO 5.0 6" ��� a y N LDD (8.33X MAX} SIDEWALK WIDTH IF THERE IS AN W WW OI 8.33% (12:7)MAX RAMP SLOPE o 000o SEE 2'-6" CURB DETECTABLE WARNING INTERSECTINGwm D000 ` ����� TOE OF RAMP AND GUTTER 2' MIN. WIDTH IN RAMP, A TURNING O CROSS SLOPE. Z00% ¢ �. � Q W o R6�' W W RADIUS W W DETAIL BELOW DIRECTION OF SPACE/LANDING IS O CURB RAMPS REQUIRE A (4-0) MINIMUM LANDING r� U; y PEDESTRIAN TRAVEL REQUIRED WITH TYPE Z SAf°I WITH A MAXIMUM CROSS SLOPE AND LONGITUDINAL SLOPE 3° W W VARIES W w : a• CURB AND currER v a W W W W W CONCRETE SECTION A -A 1.5% (2% MAX.) SLOPE DRAINECU S PERFORM TUR1117XG MANEUVERS. W W W W CROSS SLOPE AND o W W W .Y SIDEWALK (OR RUNNING SLOPE a W TURNING SPACE IF N INTERSECTING RAMP)" FLOWLINE DEPTH N AT RAMP LOCATION PLAN TYp. 3-4X t 5E Sw Ta ITO PANE. RAMP RUNNING EDGE OF (UP TO 5X MAX.) (2% MAX) 1.5% (2% � 6CONCRETE CURB " v 5 PAVEMENT a 5- ti SLOPE UP TO 7.5% 1 /2" EXPANSION JOINT (TYP,) ELEVATION N a % (8.33% MAX) 00 (INCLUDES 1'-9" 1 W DETECTABLE* W CROSS -SLOPE W W j� NON -WALK SURFACE SIDEWALK AREA _ ^ O 0 SIDEWALK WIDTH SIDEWALK WIDTH if, W 0. W * " WARNING)* * 1.5% (2.Od% MAX * * * * * * 2'-6" s'MIN S'MIN o a * * * . W W CURB AND GUTTER li RAW\LANDING WIDTH a` SIDEWALK AREA TOE OF RAMP 2'-6" CURB AND GUTTER DETAIL �\ W W TO DDDD DDD DDDDDDDDDDDDDDDD MAXIMUM SLOPES FOR CURB AND GUTTER DEPRESSION AT DIRECTIONAL RAMPS O / \ O e-:TrCONCRETE CURB DDDDD DDD DDDDDDDDODDODDODD y. DDDDD DD DDDDDDDDDDDDDDDDDD e m DDDDDDDDD DDDDDDDDDDDDDDDDDD �\ O� I \ W.y WWWAcB . 2 TO 5 NOTES: * W W 1. USE THIS DETAIL ONLY UNDER THE FOLLOWING CIRCUMSTANCES: SIDEWALK \ WIDTH W W W W �`I • 5-FOOT SIDEWALKS WITH CURB RADII OF 35 FEET OR LESS � �'� O \ \ s•RON W 6-FOOT SIDEWALKS WITH CURB RADII OF 30 FEET OR LESS DEPRESSED i' 3 CURB HEIGHT `\\ W W 8-FOOT SIDEWALKS WITH CURB RADII OF 25 FEET OR LESS CONCRETE CURB < \> WwW SE,� VARIES D" TO 6' A`$ W.W.W oo s�•CURB s GUTTER SIDEWALK TRANSITION 2. DIRECTIONAL RAMPS WITH RETURNED CURBS AS SHOWN MAY BE USED WHEN A PLANTING 2-6" culls & GUTTER 1' f� SEE NOTE 2 PANEL - SEE NOTE 5 STRIP (NON -WALK SURFACE) IS PROVIDED. DO NOT USE THIS DETAIL IF THERE IS HARDSCAPE WW O (WALKABLE SURFACE) INSTEAD OF A PLANTING STRIP. IF A WALKABLE SURFACE IS ADJACENT e a e e \ TO RAMP CONSTRUCT CONCRETE FLARES WITH SLOPES UP TO 10% MAX, INSTEAD OF DETECTABLE WARNIN(: CONSTRUCTION JOINT (TYP.) RETURNED CURBS. ��tiHceio�ry,, W SURFACE SEE STANDARD 848.05 1�1I 3. ALL CONCRETE SHALL BE AT LEAST 3600 PSI.�f pESS ° lJ L 4. ENSURE FLUSH CONDITIONS AT RAMP TO GUTTER TRANSITION. 6, CONCREZE C ` s 1 5. SIDEWALK TRANSITION PANEL: PREFERRED DESIGN IS 1.5% 2.0% MAX IN ALL DIRECTIONS IN FRONT DEPRESSED ti, .�04296M PERSPECTIVE OF GRADE BREAK & DRAIN TO FLOW LINE. RUNNING SLOPE OF THIS AREA MUST NOT EXCEED 2%. CONCRETE CURB FLUSH DETECTABLE WARNING .,,%\t�CINENH,'� CROSS -SLOPE MAY MATCH STREET GRADE AT BACK OF CURB WHEN STREET GRADE >2%. TRANSITION WITH ROAD SURFACE SURFACE (SEE RSD 848.05) TY P F- 3 �j- (} I ` � w THIS DETAIL IS NOT FOR USE IN ETJ, OR ON NCDOT- MAINTAINED STREETS. TO 1.5% 2.0% MAXCROSS-SLOPE AT TOE OF RAMP. NOT TO SCALE MI 4' 0 MIN LANDING DOGOMRNT NOT WRFSERRD PINE BEHIND BACK OF CURB UNLESS LLLR101IRTURER COMPLETED • CITY OF CHARLOTTE CONTRACT STANDARDS DIRECTIONAL E C T O A L CURB RAMP AND DEVELOPMENT UNIT Office 919-707-6950 FAX 919-250-4119 LAND DEVELOPMENT STANDARDS sTD. No. REV. CURB RAMPS �- C) CHARLMTE WITH SMALL/MEDIUM CURB RADII 10.40A 17 a TYPE 2A Parallel Ramps `way rORIGINAL BY:J,S- HOWERTON DATE: 7/7/11 ^ REFER TO ROADWAY STANDARD DRAWING NUMBER 848.05 SHEET 3 OF 3 FOR ALL RAMP NOTES IED BY: DATE: �L.{ ED BY: DATE: «. SPEC. cn W L-�r LEGEND New Property Line .................................. RQW� ARQW Existing Property Line ................................... Maintained as R/W Line ................................ R,'W Existing Structures ......................................... Railroad Tracks ---------------------------------------------- Proposed Edge of Pavement .......................... Fence................................................................ X X X Slope Stake Line ............................................. D C C Temporary Construction Easement ............. e e e Sidewalk/Utility Easement ..................... SUE SUE SUE Storm Drainage Easement ............................ SDE SUE SUE Existing Gas Line ........................................... G G G Existing Water Line ....................................... W W W Existing Sanitary Sewer ................................ SS Ss SS Existing Underground Telecommunications DT DT Dr Existing Underground Electric ..................... UE UE UE Existing Storm Drainage Proposed Storm Drainage ftdw� Existing Tree ° Existing Water Meter............................................................................. WM ❑ ProposedWater Meter........................................................................... ■ WV Existing Water Valve............................................................................. I>< ProposedWater Valve........................................................................... H GV ExistingGas Valve................................................................................. I>< Existing Sanitary Sewer Manhole.........................................................0 Proposed Sanitary Sewer Manhole.......................................................� Existing Storm Drain Manhole Proposed Storm Drain Manhole...........................................................• Existing Telephone Manhole T Proposed Telephone Manhole...............................................................0 Existing Electric Manhole E Proposed Electric Manhole................................................................... 0 ExistingCatch Basin.............................................................................. ProposedCatch Basin............................................................................ ExistingLight Pole................................................................................. ProposedLight Pole................................................................................ ExistingUtility Pole................................................................................ .a GuyWire............................................................................................ Proposed Utility Pole.............................................................................. AV IronPin.................................................................................................... 0 ExistingFire Hydrant............................................................................ . 6- Proposed Fire Hydrant.......................................................................... ExistingDrop Inlet..................................................................................0 ProposedDrop Inlet................................................................................ AccessibleRamp...................................................................................(W CDR Tree Protection............................................................................. ProposedGuardrail................................................................... SiltFence..................................................................................... Proposed Curb & Gutter, Conc. Drive, Sidewalk ................... Proposed Asphalt Pavement........................................................ - Proposed Rip Rap Ditch.............................................................. ProposedGravel .................................................................... 7 Proposed Pavement Removal ...................................................... Proposed Sidewalk Bridging Tree Roots .................................. Proposed Sanitary Sewer ................................. -00 Proposed Water Line ....................................... INDEX OF SHEETS SHEET U1 COVER SHEET SHEET U2 THRU U5 UTILITY PLAN/PROFILE SHEETS SHEET U6 THRU U7 DETAIL SHEETS CHARLOTTE W)TER WATER OAK STORM DRA:NAkf__3`rE :MPROVEMENT PROJECT WATER SAN:TARY SEWER' RELOCAT:ONS PROPOSED 811 DI SANITARY SEWER MAIN PROPOSED 24" DI WATER MAIN PROPOSED 12" DI WATER MAIN �5 ` I PROPOSED 611 DI WATER MAIN li I I PROPOSED 6" DI WATER MAIN VICINITY MAP NTS ENGINEERING License No. C-2639 10815 Sikes Place, Suite 210 Charlotte, NC 28277 APPLICATION FOR PERMIT FOR WATER MAIN EXTENSION PROJECT NAME: WATER OAK STORM DRAINAGE IMPROVEMENT PROJECT CLTWater PROJECT NO.: PROJECT DESCRIPTION: PROPOSED 1,308 L.F. OF 6" WATER MAIN WITH IT'S ASSOCIATED FITTINGS ALONG STAFFORD CIRCLE & EMORY LANE IN THE CITY OF CHARLOTTE PROPOSED 18 L.F. OF 12" WATER MAIN WITH IT'S ASSOCIATED FITTINGS ALONG ADDISON DRIVE IN THE CITY OF CHARLOTTE PROPOSED 160 L.F. OF 24" WATER MAIN WITH IT'S ASSOCIATED FITTINGS ALONG SHARON AMITY ROAD IN THE CITY OF CHARLOTTE DESIGNED BY: FIRM: HINDE ENGINEERING, INC. ENGINEER: CLINT L. STEVENS, PE ADDRESS: 10815 SIKES PLACE, SUITE 210 CHARLOTTE, N. C. 28277 PHONE: (704) 814-4407 THIS APPLICATION IS MADE UNDER AND IN FULL ACCORD WITH THE PROVISIONS OF CHAPTER 130A-317 OF THE NORTH CAROLINA GENERAL STATUTES, AND SUCH OTHER STATUTES AS RELATED TO PUBLIC WATER SYSTEMS. CLTWater HAS BEEN GRANTED AUTHORITY TO ISSUE PERMITS FOR EXTENSION OF WATER MAINS PURSUANT TO 15A NCAC 18C.1801. THE APPLICANT AGREES THAT NO SIGNIFICANT CHANGE OR DEVIATION FROM THE PLANS AND SPECIFICATIONS APPROVED BY CLTWater WILL BE MADE WITHOUT THE WRITTEN CONSENT AND APPROVAL OF CLTWater OR ITS AUTHORIZED REPRESENTATIVE. A PROFESSIONAL ENGINEER LICENSED TO PRACTICE IN THE STATE OF NORTH CAROLINA SHALL SUBMIT A STATEMENT REFLECTING THAT ADEQUATE OBSERVATIONS DURING AND UPON COMPLETION OF CONSTRUCTION INDICATES THAT CONSTRUCTION WAS COMPLETED IN ACCORDANCE WITH APPROVED PLANS AND SPECIFICATIONS. PERMIT NO. APPROVED: DATE JOSEPH C WILSON, PE, CHIEF ENGINEER CHARLOTTE WATER 5100 BROOKSHIRE BLVD. CHARLOTTE, NORTH CAROLINA 28216 PROPOSED 8" DI SANITARY SEWER MAIN DESIGN COMPANY: PLANS PREPARED BY: HINDE ENGINEERING, INC. ADDRESS: 10815 SIKES PL, SUITE 210, CHARLOTTE, NC 28277 PHONE: (704) 814-4407 DATE DESIGN COMPLETED: 9/22/20 SURVEY COMPANY: SURVEYED BY: ADDRESS: PHONE: DATE SURVEY COMPLETED: flF-\/�-I nDF-Q• — ADDRESS: - PHONE: - CONTRACTOR: NI(-F)rn Tn rl. 11V ) F L L I VI\. — INSIDE CHARLOTTE: (,/) YES ( ) NO: TORO NO- - APPLICATION FOR NON -DISCHARGE PERMIT GRAVITY SEWER MAIN EXTENSION CHARLOTTE WATER PROJECT NAME PROPOSED 8" SANITARY SEWER RELOCATION TO SERVE CREEK BASIN McMullen Creek WATER OAK STORM DRAINAGE IMPROVEMENT PROJECT CLTWater PROJECT NO.: PROJECTTYPE: ❑NEW CONSTRUCTION ORELOCATION ❑MODIFICATION OF PERMIT NO. OTHER VOLUME OF WASTEWATER GENERATED BY THIS PROJECT: N/A GALLONS PER DAY BASED ON 190 GAL/DAY/SINGLE FAMILY HOUSEHOLD X N/A HOUSEHOLDS OR 135 GAL/DAY/MULTI-FAMILY UNIT X N/A UNITS OR IS BASED ON WASTEWATER TREATMENT PLANT RECEIVING WASTEWATER: ❑X McALPINE CR. (NCO024970) ❑ IRWIN CR. (NCO024945) ❑ McDOWELL CR. (NC0036277) ❑ SUGAR CR. (NCO024937) ❑ MALLARD CR. (NCO030210) NATURE OF WASTEWATER 100 % DOMESTIC % INDUSTRIAL %COMMERCIAL %OTHER ORIGIN OF WASTEWATER ® SUBDIVISION ❑ COMMERCIAL ❑X SCHOOL ❑ INDUSTRIAL ® APARTMENTS/CONDO'S ❑ OTHER LIST ANY PARAMETER AND ITS CONCENTRATION THAT WILL BE GREATER THAN NORMAL DOMESTIC LEVELS: NONE IF WASTEWATER IS NON -DOMESTIC, DESCRIBE LEVEL OF PRETREATMENT: N/A IF A PRETREATMENT PERMIT IS REQUIRED, HAS ONE BEEN ISSUED? ❑YES ❑ NO HAS ENGINEER DETERMINED THAT DOWNSTREAM SEWERS ARE CAPABLE TO HANDLE THIS FLOW? ❑X YES ❑ NO PERMIT NO. FOR SEWERS IMMEDIATELY DOWNSTREAM PIPE DIAMETER OF SEWERS IMMEDIATELY DOWNSTREAM 8-INCH HAS ENGINEER DETERMINED THAT NC DEM AND CLTWater MINIMUM DESIGN STANDARDS ARE MET BY THIS PROJECT? ❑X YES ❑ NO COMPLETE NAME AND ADDRESS OF ENGINEERING DESIGN FIRM: HINDE ENGINEERING, INC. 1081S SIKES PLACE, SUITE 210 CHARLOTTE, NORTH CAROLINA 28277 TELEPHONE 704 814 4407 PROFESSIONAL ENGINEER'S CERTIFICATION: I, CLINT L. STEVENS, PE ATTEST THAT THIS APPLICATION FOR 8" SAN. SEWER RELOCATION TO SERVE WATER OAK STORM DRAINAGE IMPROVEMENT PROJ. HAS BEEN REVIEWED BY ME AND IS ACCURATE AND COMPLETE TO THE BEST OF MY KNOWLEDGE. I FURTHER ATTEST THAT TO THE BEST OF MY KNOWLEDGE THE PROPOSED DESIGN HAS BEEN PREPARED IN ACCORDANCE WITH THE APPLICABLE REGULATIONS. ALTHOUGH CERTAIN PORTIONS OF THIS SUBMITTAL PACKAGE MAY HAVE BEEN DEVELOPED BY OTHER PROFESSIONALS, INCLUSION OF THESE MATERIALS UNDER MY SIGNATURE AND SEAL SIGNIFIES THAT I HAVE REVIEWED THIS MATERIAL AND HAVE JUDGED IT TO BE CONSISTENT WITH THE PROPOSED DESIGN. NORTH CAROLINA PROFESSIONAL ENGINEER'S SEAL, SIGNATURE, AND DATE: ,,,,l„j"�� CA '0�oFEssRo+9< • Q� SEAL • 040370 �. '�''�'T• L . S1��,•�� CLTWater PERMIT NO. ISSUED PLANT FLOW ALLOCATION RECORDED BY: PERMIT APPROVED BY: JOSEPH C WILSON, P.E., CHIEF ENGINEER SENSITIVE MATERIALS DO NOT DUPLICATE CONSTRUCTION SHALL BE IN ACCORDANCE WITH CHARLOTTE WATER STANDARD SPECIFICATIONS. GENERAL NOTES: 1. CONSTRUCTION AND MATERIALS SHALL BE IN ACCORDANCE WITH CHARLOTTE WATER (CLTWater) STANDARDS AND SPECIFICATIONS. 2. ALL CONTRACTORS WORKING ON CLTWater PROJECTS ARE REQUIRED TO OWN A COPY OF THE DESIGN MANUAL AND SHALL KEEP A COPY ON THE JOB SITE AT ALL TIMES. 3. CONTRACTOR IS FULLY RESPONSIBLE FOR CONTACTING ALL APPROPRIATE PARTIES AND ASSURING THAT UTILITIES ARE LOCATED PRIOR TO THE COMMENCEMENT OF CONSTRUCTION. CALL NC 811 (PREVIOUSLY NC ONE CALL) AT 811 OR 1-800-632-4949 FOR UTILITY LOCATING SERVICES 48 HOURS PRIOR TO COMMENCEMENT OF ANY WORK. CONTRACTOR SHALL VERIFY LOCATION AND DEPTH OF ALL EXISTING UTILITIES PRIOR TO CONSTRUCTION. 4. IF THE PROPOSED WATER AND/OR SANITARY SEWER MAIN IS INSTALLED WITHIN 12" IN ANY DIRECTION (VERTICALLY OR HORIZONTALLY) FROM GAS MAINS, THE CONTRACTOR SHALL CALL PIEDMONT NATURAL GAS COMPANY AT 704-525-5585 AND INFORM THEM. 5. DUCTILE IRON PIPE (RED BRASS FOR 2-INCH WATER PIPE) REQUIRED FOR WATER & SANITARY SEWER LINE IF THE FOLLOWING CLEARANCES ARE NOT MET: -18" VERTICAL FOR WATER LINES INSTALLED ABOVE SEWER LINES, DIP BOTH PIPES. -WATER LINE CROSSING UNDER SEWER LINE (FOR ANY CLEARANCE), DIP BOTH PIPES. -10' HORIZONTAL SEPARATION FOR WATER LINE PARALLEL TO SEWER LINE (OR 18" VERTICAL SEPARATION IN SEPARATE DITCHES, DIP BOTH PIPES. -FOR WATER LINES 12" CLEARANCE WITH STORM DRAINS, GAS MAINS, TELEPHONE DUCT BANKS AND UNDERGROUND CABLES. DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED APPROVALS (SEALS) �.•��H CARO�'�,,. •oFEsSio•41/ �. ��<• .Q� SEAL 040370 Obi• #is Bill," N.C.R.L.S. (AS BUILT) N.C.P.E. SUMMARY OF SEWER MAINS SUMMARY OF WATER MAINS SIZE LENGTH SIZE LENGTH 8" 521 LF 6" 1,308 LF 12" 18 LF 24" 160 LF TOTAL NO. OF MANHOLES: 6 TOTAL NO, OF FIRE HYDRANTS: N/A TOTAL NO. LOTS SERVED: N/A PROJECT NAME: WATER OAK STORM DRAIN IMPROVEMENT JOB NO: (S) (W) DATE OF ACTIVATION: DATE AS BUILT: BY: SENSITIVE MATERIALSJHINDE �� v' �� / yy I / � 20 10 30 40 L DO NOT DUPLICATE ' / o / / y SCALE: 1"=20' l ENGINEERING \ \ 01 S\ <//�j// / / �Sg I {a ���o ' j / \ 1 � N PID°63-082-09 4723 STAFFORD CIRCLE yy�r / / I / DB 5803 PG 6I7 OWING 2 WATO AWAF / / / / / I / / / / I License No. C-2639 Im 10815 Sikes Place, Suite 210 Charlotte, NC 28277 \ _ \ \ �� i—odkv^\ TO Be ASWOON'EO PROPOSED 11.Zr NJ �S �r�C�SS�uR�,� � DOCUMENT NOT CONSIDERED FINAL 11 I � \/V\ \ I \ �N 11 oj " �90�05�0 �i.��/ � � �l► ����Fl���� ����� I / I \ / � ' � � / / /I UNLESS ALL SIGNATURES COMPLETED \ JOINT W41 PIIPE9 PC 3SO 6 STA co \ 7 WM d� 9 /� oN / " \ 10 \ \ / 1 1 \ DISCONNECT & LUG 8 G G G �d b�l U 3d � (ROTATE AS IVECESSMY) � ( \ \ \ I \ \ I )a7��NV~I�'�IF �J I WM =�—Z� bZ° 1 �� lb° 89;� 1Np 6Z89 JNN/ 3N �/VO �l plp'68 s � \`y�M�S gc/ s/ \ �� / ` \ Ql �� 8 \ gl 6 �a-68p \ bl N/ l 9 byy ..O[ \ \ I_ EX 8" PV m _ 0 QTE-6pl /� — — — I - 81°82 I 1 0 / III I c� 3 ��Q I \ o \ �� W TER K NC PA NFtS, LLC PI,#163�¢82-22 4909 WATER OAK D. DB 2$726 PG 5 \ \ _�/� p �n z ��bO�G �/�p�� \NG�SS Obi / �� _ — — — V „ _ \ W NWS ✓M SS d — — V� / I I II I I \ \ \ \ CL wa ter SG�G V a \ S / Jos S 2� „81 - _ — — — 8 _ — ® 'J SS _—_-- — — S SS _ — — — — — — — — > OS \\ \ — — — 159� Nlb1� 6S°9�9- JNl ASS \\ Sll 69°6UJ Nl c I I \ I A SSt�Np/�1S0/ �9 9 � 1D_680 g8\ / \ SJy 1 �V'63 .17' \ o / C i9 67 .04 \ Q9 �_ _ — - _ �/ �, �— �j j \WT� W MS \\ -0/ \ N�SS \ yo J-NI \\ o U E SS J 1 \ 8 6 I � /SS a SS/ \\ s SN + .� a'e,\ On \ •. � �d c •.c °p \ v O — — � �La cn / � W � �_ — _ I \ \ O > G i bl SS Cy •. .: J \ \\/M�1�� � 0_8� . \ \ / Np p 8=G l \\\\ os X �\ \ / GI�ISN ��� \\ \\ \ gll bZ ��� GNp b`V -3,0 G O -� SS / xwO �- O 9 \ \ \ -3110 01, CAR1-14 \ n Z`669` °vwo� � W1 \\\ ��y ^ 8 9 S Z�19;U ` \ \ � '.QUO ��•• SEAL < •• RELOCATE EXISTING /�n\ /�' /�O \ ArCONNE4 T EXISTING STIN W47rR M \ i1�4TF R MEW a — " � � �. PROPOSED 46 IF S COR �� /� \\ Z l89 _ M \\\\ \ °� � S S \ = 0 4 0 3 7 0 �•. : FROPOSEO 12 \ b� 989- \ P OPOSEO 4 ++��``3 4//�� Copp�R _ i1�IN �R �'O IBC \ Ile \ \ \ \ �� / — — WATER TUMf6v TWE K 9 " " � \\ \ d � O ; ���•.FNG I NE��• ��` .,�ti .. ... • ��� . /+ /+ /�/y/��� 16 .8 71� �7�7 / \ .6 8 - �N sPROPOSED WALL PROPOSED � AKIN S SS a / ,n, \ " / �'Y� P o 514 f!� / PROPOSED V,07CO�RPOm1 n d� � " _ PROPOSED 3 4 X6 TAPPING SAOOLE \ � T��IAV � N \\ 514 CO RPORA11O�N' STOP � SHOP 1 \ zl \\ J�, D� i( \\ :� o � \\ s � �' � x� \ D .,, L . S� /j/111111, " PROPOSED 1 01 �R✓ d 0 SOU'O S� — o, / N � l S RECONNECT EX1 VNG WATER �IIM � 1 ds M M b o �1 �,�� PROPOSED 45 LF 514 " COPPER �— � \ EE \ 1 �/ RECONNECT EXI'S1'#0 WATER MEW I� � PROPOSED 49 L+ 5,1140 COPPER REMOVE APPROX. 18 LF Of � " \ J P i1rI� R ��� � 1C " " PROPOSED 4 * 6~ r�I N � A84INNOONEO 1 WATER Pile PROPOSED 118 LF 12" 01 �RESTIRA A00 PROPOSED 5l4 X6 UPPING S�40OLE /� PROPOSED 3,/4 CO�RPORAW N' STOP / 11 ,/ " I PROPOSED 1�/4 CO�RPORAT ON STOP \ `��J 5 JOINT WATER RK PC ss' 0 � X : i STA + �— o W —W1— STA 0+00 c SE���r � � ii0�S1��►1�i 0� \ SSG � - �►E TO EXIST. 13 01 �r4T�R �r�+E PWOPOSEO 6w 01 RJ CATE VALW //i FH e & r�,r�E 80 O1�RECT RJR //' \ \ — � �� l p �%�� \ W� �lldo �"�pNd �'��H, - � / � 901 � ��el��od�/n�� PROPOSED 4 LF 3 4 COPPER — J rr4TE�R I \ �/� wy " R f�FVfV�4 I���V a�� ///�j b " " " PROPOSED 1 X1 X6 O RY � " %\ PROPOSED 12 Of R+✓ \\ %% \ /ma \ S000 SLaw OAS 1 �ld ������ I� /-`/1 � PROPOSED 3 4" CO�O�110�' S'1OP / WILLIAM F GEER AND / WIFE PAMELA D GEER ��// � �� � 4716ID#163-08I CIRCLE1 DB 6904 PG 51 --PROPOSED 12 — _ P" UNE SHOP \ \ l l l ROT AS IMECESSOY i \ \ \ \ %/ WILLIAM R KAY AND WIFE JOANNA R KAY PID#163-081-01 FRED W ALFORD JR AND WIFE SHIRLEY C ALFORD PID#163-081-20 4701 ADDISON DRIVE DB 28537 PG 478 4730 STAFFORD CIRCLE DB 4869 PG 530 CHARLOTTE CHARLOTTE WATER W6TER CHARLOTTE, NORTH CAROLINA �w3 Job No. File No. WATER & SA NI T4 R Y SEWER RELOCA TIONS Scales PLAN 1 = 20 FOR PROFILE Hor. 1" = 20' Vert. 1„ = 4' WATER OAK STORM DRAINAGE IMPROVEMENT PROJECT As Built Date CLS JN A CLS 9/22/20 Sheet U 2 Of U 7 No. Date By Revision Surveyed By Designed By Drawn By Project-Engr Approved By Date A CITY OF CHARLOTTE DEPARTMENT SENSITIVE MATERIALS J o 680 ------------_---_----_—_—_ / / / 0 20 40 / _ DO NOT DUPLICATE 1a�� _ ���5 / / / 10 30 _ _ — — _ —�Pa.� — — — 680 — — — / _ / 6a �5/ SCALE: 1"-20 — — — -- — / — w DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED / / 8 3,p RT7� pB q 82 TF ,,, ��FRS� 26 ?� � / / � AkA / � � / / / �C�• FESSLo ,!2� ; \ SEAL V o QL �QT,� a312i11 e / �o�� 040370 _ ':���•.FjyGINE�.• ►� �\ v�—\ a �N r1 3 a �� TO Of ASAN'OO \ nNl / I �N M� �0► 1031 N � 675 • 1. S� • oz•ct9 �i ,• � I Z51 \'\ �Nd�oN�SN' i�A PIPE, PC — co 11 o \ 0 -0O Uj do 8 Z L,�„� SS °Q� a —_ Cb \ / � a3l�lrl9 183i1N1 W �: SS — SS _\ c� ' ° 099 /\ b HS q7Z o� 089 �l 9 c� \'.W�°•°`�� \V, SS DIjad��ON�'� „bZ �2� �_ H� — — —T _ — \ 0I\8A SS nd .01 (NN/ S �� T \SS/ q n 699-ANI 3S NO SaIC ,L6° \ L 99I89n NI M N N\ B�INO SS SS 1sa . . ti q _\ p� \2\L��: O\ � S \ HWSS X3l SS �� / w Q SS �ZS / S SS SS SS OAd,,8 SS �� SS —�sg S S = / •gyp• .'. °•'-�' �d ^� (M/ �j 3ijqn(d o/,g) — N Lu •' -` o � �. �'� _ e • .i— w +00- — — —VIM — 7+00 = � III � � � � _ WM ZJ+'� / _� — _ 989 \ _ /C4 6U G W S89 -- \ — I N = 5 _ \ \ P ROPOS� 4 LF 514 \ \ WATER TU&NA \ COPPER ' Y..�� I _/ _ /l �r _ _ �- �� \ \ —069 \ 069 \ \ \ PIlMSED 514*X6N rAPPI -V SA 0 KF �3� / �- � �- 44 RaVVIITE I=t CIA M R _ mmosroal's so V V WA( STOP \ ° 069 VY/T jai' I��V WATER N P"POSE0 10 L Jf � cmffR - /�/�� %��% /� WATER �R OOATE 0 WATER M � o�°iOsW4 TURD. Tr K ��5� 3��I6 �A�O SOO� — — WATER �&A(Gt TYPE K — P sED 5/4N�6N rAPPING SAO" PRMSEO 5/400 STOP Iai� OmJLr5 00 CWPER / os PVPV / /4V /# STOP ENCE l�aj a0bdo1alo &1-1203 81S69 �31S3M I1#d38 %3 PROPOSEO 5/6N)F6N TAPPING � P SV� N 4V FV iNVP \\ o LOCATION NOT WRIREO OY SURVEY. COAMUCTOR SMALL RELV VERIFY LOC4170A OF � —1 AO HINDESERME I II \`'2O PRIOR TO RELOOAU'NO WATER METER.) oT rrr— — TIYrm m 05 ENGINEERING License No. C-2639 10815 Sikes Place, Suite 210 Charlotte, NC 28277 CHARLOTTE CHARLOTTE WATER W6TER CHARLOTTE, NORTH CAROLINA �w3 WATER & S4 N/ T4 R Y SEWER Job No. File No. RELOCA TIONS Scales PLAN 1 = 20 FOR PROFILE Hor. 1" = 20' Vert. 1„ = 4' WATER OAK STORM DRAINAGE IMPROVEMENT PROJECT As Built Date CLS JN A CLS 9/22/20 Sheet U 3 Of U 7 No. Date By Revision Surveyed By Designed By Drawn By Project—Engr Approved By Date A CITY OF CHARLOTTE DEPARTMENT SENSITIVE MATERIALS \A DO NOT DUPLICATE 8E01N W C %ONSTRUCWN PROPOSED 60 Off' Ri SOLID SLED STA + �� �� \ ss PROPOSED ZZY Of NJ BEND (ROTATE AS NEOOSMY) \\ \ 0 aad\ sago 2�31 �' "\ �I\S SIN o • f10J �► n (ROI,4TEI` OW NECESSARY) 1�Z3034OV'd3J �� s F ROMM 113 LF 6" Of Ma MONEO 0�'0l, PC MS PIPS, NOIlISNVbl 4OW PA 1V 0 Ol 13H 8Jf1O 43A33A3 1SIX3 S- '0Z v4d3a • . ;• SI (ROTATE AS NL`OL` UU RY,) _ 6-7 Wz • •. ` REL/�/�� IE y+�M/� b0 OS SO40 ..a o FRMaIPAIT TURK � K 0N00 � I � =AN1 PROPOSM 3/4 "26" ZAPPING SO" _ _ , 9 = • � � PROPOSED 514 OONORAMN STOP (3 \ ABANDON EXM10HSv 3a0wVo Ls2" WATER AWN (D 2° 9 PROPOSED 221 LF 6" 01 8E 699 Lb'699 PIS. PC,3�#0 — _ _ 9 O �69'999 �3 09 / ° , �w .o „ b8°899= 3S X SSMH \ Sb3H10 J 8 NOIlOIQ= b� ljd3a ,ZO°699A a3AY�v tuL]Q 1 MO 6Z°SL9=3 G LID=675.20' \ (3AOW3b) 90 X3 NW INV=668°55' Sd 8 NOIlOfl�J1SN� 0TI f�� N �j % 0 \ SE INV=668°21' ttx �1 O 6 \ SS a3Aow 0 S]4Od 0N1 �!'� \� Ix3 \ \ 0 7a� 5S / S SS g° p\ 00 �\� �V yZ a Ss �J �� /o�o� sago / SS J � A\ N01 NVbl 8bflo + Z ••`°•- \ o•, �I�4 �I�I��V PROPOSED 6'" UNE STOP\ \\ / \ °�"� \ \\ � \\ \ / \ �J, �s.�- �, I � � � I � [Ij 0 20 40 - \ G I EX S MH IHINDE N D=6 2.62' I 10 30 L MOW APP ROX, 67 i PIPE � P90POSM 12 LF 8 V-662�0' �� I I � INBINNW NEE 6" WATER PIPE \.- STA g472 Z\ �3NNVHO 03SOdCONIKA0� j � �v \ � \ \ �'L°'L S INV=662°82' \ \ II \ \ \ SCALE: 1 "=20' S / °� \\ \\ \ \ \ SE INV=662.19 ���III \ 1� ENGINEERING \� S1 SHIN 012 \ \\ \ \ \ \ \ License No. C-2639 �/� PROPOSED 4 01A MANHOLE jf2 \ \ \ \ � � \ \ � \ \\ \ � \ � 10815 Sikes Place, Suite 210 Charlotte, NC 28277 (ROTATE ,QTATE A AMVO Y) M J tN f00 OA8N3,NO3 SOS ,\ \ \ \ \ �9 � Q \ \ \ f \ -St-SHIN 2+19 � �� \ �S 9tis FFo \ \ 6's � DOCUMENT NOT CONSIDERED FINAL PROPOSED �NLE UNLESS ALL SIGNATURES COMPLETED IQ MOVE & 8ERA0 ION00 ^/ 9 ?1'S0�O N �[7 \ SS SF2i�� �b 2i311n an )\3�IVA PROPOSED 40 Lf 14 \ / T 3A 3dVA2JVH0 b6b � TM � /l���j� S„ 6Z 80—c91ii01 ,c 94 L 30F14d3? SI����M Xy4`1�a7� PIPE w \ \ \ST SN3H S J 3,avaB \ \ :QUO Cti9•. 0.2S'0" NICK (8Y OPEN OLI�,� \\ \\ \ \ b6°699 SEAL � •_ y +� Ill V21 Cls REMOVE APPROX. 4 LF 0f l,/ � 6� \ SS \ \ � � _ 040370 INBINNOONO 8" S�R�7r ° o \ \�G6 b99•'.� `Q ;: • ,, : S?J3 J 8 F F �, a ; <i '•NGINE.•• �% N ° \ \ o12�8V3 4lix U030 \ '. T••• •` SV0 3 OCR ��� � � 8 O \ 3NId „a� ° \\\ \ \ \ `r � \ dJ.l lOQON N 03J.3�i � 1D- Of SCR PIPE PC SSOi \ SS � G W 1 = � �' 3NId , � \br699 \ \ J.S 91�A0 ,S LX,BIX;QI (NI \ S d y \ \ a3/.3X1)dva I? 1 ssb'40 S 11 FILL APPRO F, 5 Lr OF HSv . z o ��S � � � AV � \ �3 3H X bl 33V4d a� Sd3a „Zb X3 ONd :d 0 000ro 8 999=AN1 3S Hsv „bz 93 I2� 2� da3o „ 9 \ 99=� o S 0 �OW331HV IdB 30Va0 sus S g9`999 0 \ 3 3A0 X l) +Vo z ASS Hoa�a �G' \ SSA \ \ \ \ 3,ia�.w O �D / / / dyA3r,zl \ `b9NI\ sS\ \ \ \ \ _ HSV „0[ �C>S S '0 1z C7� �2'% / / / — 59G9 \ ° \ / — b �0 �S _ 2�i /0 / / / i \ V��, SSA s;o d Zb ON / / / -3 \ \ \ \ / c7 °Z� I gda30 ..ZbF \ \ \ \ \/ \ \ \ Sao (3 W d Zb -S1- SHIN O+W I ISN ,la�.w 'o „zL • • '° 3 SS -51= SHIN 1 #S1 O 3 c� \ - ,6105 F RO�VSEO OM WNNOLE 1 , S1 N 02 S \\ \ EX SSMH \ / wVo s z PROPOSED 4 11A 159 4F 8 ,11°010 X3 \ \\\ \ \ / L� 672.08' ° 1 V d Il(1 / PROPOSED S/M� 01 SEM PIP PC �3�#0 —� 89'899 NW IN'V 6L1..65' s S°L9 _ f�Jl 3S d` � /�� „oH „a AOt�l]a\a SS SE INV=661.48' \ \ S68Z L9= MN SrA 1 +0 III �> 9O . PROPOSED 6 1 �RJ CA4TE VALVE 0 VALVE 802 DIRECT SO�RR` III � � \ 66\ � \ °F \ \ SS -�W1= SHIN 10�9� I MH d �80�OS 11.2X 01 �RJ SENO ROTATE AS N80ESSIURN' LID=67� 88' NW INV - 665.78' r ALL �'SNO I� I V 8N��/ ,>� MANHOLE NE INV=665° 8' VnoNo Sw a /STA + SE INV=6 � ° \\ FF�\\ \� \ \ \ / T 69 \ SS F // N \ ✓ s ��Ci \ va „ a PROPOSED 4 LF 6 01 RJ WATER PIPEt PC JW � \ 8 zT��r\\ � SS \ (D � \ LZ �S°899=AN1 3 // PROPOSED 6 yyM y�RJ GAI rVALVE & VALVE 80X (DIRECT OURR,� II � � -099'1919 31Vb5 d1 D�RO�°OSL`L1 6"IF6"IFS" TrA k �..�(3AOW* 90 X3 OS l III \\ \ \\ _ I STIR 11 79 I / \ S �_P�Rmro I � Z69 Od Z�SO� 84 p — \ c \ 4F L>1 8J 8L`NO ROTATE AS NECESSARY I � \ NY1 I _ 3,oals abo33Vls ��8b • W f SHIN 1 1 +86 / Z l �80 �91 01d \ b NV, \ \ d \ \ N ,ZZ l Z 9 RLL APPROX. 100 S AlNf100 0df18N3,�03W / \ \ \ �� --d la „ :dOl Or IN81NH0WE0 6" S EX ��RO�OSL`0 �Ir 01 �RJ 8LN'0 �RO�IN E AS NECESSARY) � 9 l d il`IN 1L �1�L` N WL I 6 7 \ —W2— STI N 11 #9 / 2131VM 3110l21 21 0 SE 64,57' \ III I / \ > QQ \ \ \ 11 1S37 V=664,19' aNO W L CONS RUCT V� II II \ / O / P � \ \ \\ \\ \ ° PROPOSED I �/� . . 00 0 a�0 \ \ TAE TO EZ15�. 6 PAIER LANE / ° �\ \ \ SS IFV�IN� AS N�O�SSIUR� � NOIlIS �� � N 0�9 / y \ ( ) _ — (ROTATE AS NEOESSIU Y) d o S � � VO o w 3 �) \ PROPOSED 6 01 �R✓ S&10 .� � �� �� � P \\\�� \ \ � C. : : : : \ 34 OC 3A W3J 6 ,00'6 L9= NIVJO PROPOSED 6" 0M RBI GATE VALVE & VALVE OO Ci IN O EXIST. �RELOC41r E2 'NO PATO MEW � ( � / �� o s PROPOSM 6 26 26 Of 8j TEE \\ — - FROPOS80 9 S LF 4" OOPS R 9Af, S �' e �•� Q F A�o PROPOSED 6 01 9✓ GATE VALVE & VALVE 80 PROPOSED ALL SL001C1N0 � \ PROPOSED 3,/ 26 IN��1N0 S�NOOLE N . 9G ,� o \\ \ \\ \ \ \ �\ .. !,� F\ i 4 . i \ a O \ \ \ \ \ (�+���� 8���� ��O�Os�O �r� OO�R�O��N 5�0� Os�O s L�'N� S�0� =51= SHIN 684 �'� �O �� . 6" �IN1��R N� P SL`0 4 mm 1 684 0�. 6 SOLI iW a EXIST. GRADE @ � �1AW�r ,l6� �4 � =S1 SHIN 1 +S1 PROP. WATER L l E L`215. 1 =663.2 CV SKO 4 011N M4N0LE (R0rA INS N'ras m 0Y) -W2- S11A j+tj EXIST. 1AW Uf=665.24 1�VV �'�'=6 1� 1= SHIN 2+1 680 A + ��RO. 1AW oLr�=s 1,� s 0 ,� MANHOLE 680 ENO OOMMU N -St- SHIN 0# 12 Iq INLL = �E PROP. 6 IN R UN SL`O 4 011N HOLE 2 = 1* _ . Imarma VA wil cc rff Wrlo Pam. . 1AW I'N=683. 1 UISTGas SERV/ (A E UNE �r) . 1AW =8655 676 Q EXIST.. 2" STEEI PROP. INNS 0 .S1 PROP. 71X3' PCDC • INV 6 676 � GAS MAIM (APPROX.) EXIST. GR DE C� PROP. (APPROX.) 7IX51 PCBC PROP. SEWER LINE (APPROX.) 672 mn E WA » Of R L NE \ 1 = _ PROPr7. 13" RCP (APPROX.) EX . 2" WATER MAIN — — — — . — — — 672 M _--- _ � (AP X.) _ — — — — EXIST. 42 fS. 42" RCP (TO BE REMOVED)) F — J — -1 UST 8»Pic D 8E REMOVED) (APPROX.) SAM. MWER ME APPROX. 668 -� --- 668 PROP. PROP. GRADE WATER 0 LINE — S A 1 +08 �Ri CA� EMT 42" RCP (To BE REMOVED) am (TO 42" RcP REM ��R0�0 « 8 SL`O 6 01 Par . B" PVC (APPROX.) W) (APPROX.) L — J (A X) (O�►�R 4W VALVE �� SLr�R�,� 0" IN.SSEr►8 V 66 4 66 4 C TE AS 0+00 105 LF 0" 01 J01A ff WA TER — W2 1 +00 � E 0+00 EO 12 LF 01 Pipe, PC ASO 00.60X PROPOSED 39 LF 8" SEM PlAft PO i0 P SCR _S 1 _ 1 +00 �vfqf__A OSEO 68 U1 8" 01-1 PO MO qowx ��ROPO O 40 LF 14 aSTEa P/A No. I Date I By CHARLOTTE CHARLOTTE WATER W6TER CHARLOTTE, NORTH CAROLINA Job No. File No. WATER & S4 NI TA R Y SEWER Scales REL®CA TIONS PLAN 1 = 20 FOR PROFILE Hor. 1" = 20' 2+00 Vert. 1" = 4' WA TER ®AK STORM DRAINAGE IMPROVEMENT PROJECT As Built Date Sheet Of CLS JN A CLS 9/22/20 U 4 U 7 Revision Surveyed By Designed By Drawn By Project-Engr Approved By Date A CITY OF CHARLOTTE DEPARTMENT y o �I (�— q<< PROPOSED 4 0A FROPOSI � ®°III yy I I y O/SEWER F R 0 A�PROX. 79 Lf Of CnrO,r� y I I II 1 � ( rOSr 2IRLL APPROX. 46 Lr Of PROPOSED LVA A A&WOONEO 24 00 W4Ir8 PPE (REMOVE 'I =�r ov s� o�D +ry/�fix I PROPOSED � II ^ y RW 8/��� 4/� �4/�A{/� I SN D R a Sim P/prj y \ y ALL y - TIE TO EXIST. 24 LINE (ODy C DS ` ( ►0VE & m (COMMACTO To W8IFY MATE9ML & 8EU 0IMI I ry ' (MATCH SST. SLOPE � OO�r�+�OT oSr�rO �'�O�SSr4IRY ►�ros,� � ._�. _ _ /� /�� MAGNOLIA 1 ` WAL\ _-- OLL - PILLAR WALL 8~V4\ I l 6„ (} 6 - - - I MAGNO / PILL PILLAR ' 6ILLA© gP R *maw CWP %�0 O ST OE _ OEM OE �- OE _OE ' - E OE �rP y V S - coN E LACE 237 yF OF O ADA OE - B�T�ER-a ADAPD UT LDS1 .7 ;- s(0 SO ——yy�y�yy y�F�_y/ 1 y -T y y y UT �JT I UT y BST 1 G,S L Gy G G G G Sharon Amity Road 8 Public R W) � W W -00 1�2�DI — _ — NEXT 12" WATER VALVE o f F€D��1T R- \ APPROX. 450 LF O `s, D 3' -- - y / TO IPCE 85 REPLACE 40 LF/ E EV.. _ , NEXT SEWER MANHOLE APPROX. 20 LF y BST/ y OF UTTE CURB GUTTEFj7 SS SS SS SS SS SS SS 8° TCP SS SS y SS //SS & �R LS SSy DS 10 7 / W W /w 00 y -NEXT 24" WATER VALVE- - y y W�L r y y APPROX. 2, 200 LF UT T y U T tj U C CONC � 1 • ` C6 PROPOSED 2,0" LIME STOP / -- �—T oy _ _ — — - J �y « — P�ROPOSO WAU BLOCKING - Rj F yF (�ROWE AS �COEss�R�,� �B � // X INE N 8 ASH E O • Q� ��< - I I I I c :+ STA1 R SEAL - / ) OVENfENTS 1125- '01 NJ . 040370 _ / / I / / " y 306 y (ROUTE AS �NGI14e' �G,`I 1 / 1 I D8' 12435 C J I I �JHINDE Oil ENGINEERING License No. C-2639 10815 Sikes Place, Suite 210 Charlotte, NC 28277 704 11' ••i •.1 BIT P. 686"80 !, ,IAW 0WSOMM6"601 Lim LINE 0 20 40 10 30 SCALE: 1 "=20' CA PR SIN (BY OTHERS) 12" r. 4" 8E AI EMT ME. CAW (APPROX) PROP. WINGI WALL - S2 - EX^ST. GRADE 0 PROP. SEWER LIWE PROPOSEO 4' 00A IAW 111(_ma6i PROP" 1AW 00T=687.27 EXIST. 8" To SAN. WWR LINE E078V��8*/01 PIPE] JJV 00. 0+00 1 +00 �y (ROTAIr AS NECESU RY) BST v SS u.. CP - �� y � co r� 1 _'. / G� -' ---- \99 _\� v\ _ / tp SS J 6 � P- - - - y a 15 " R-�- • "d, a� . w INV 686.�' = y — 24" DI w Mly ss +IIV= 87 55' SS zoo 5 1INV=686,66- -= 2 NE INVo67.25' _�, _ \ 9 8i - _ - _ y5-R LAC �W RETAIN , y- W C� Cp Pr moo= v� ONC SI[ SSv=��� // Q (R 0IEIOW g4� Xy C B 4p O +4c 4y c�VROPOsO 66 Lf 8N SR PIPj PC JV V�tP CL6 O�F(� ME & fMA4E U \ \� \� y OVVEER (MATC8 UIST. SLOPE & 1LEV.) : \ y y y CON r y�WATER I O R: C I�OTTE WATER (ROTATE AS NECESS1� Y) ITNERS, L UE4 NDSCAPLt D P �[LH. y y z-zz y--- TOP: 2 Q 4909 WATER OAK RD y y UE� I E E .: 697�59 DB 29726 P /` Q y CONN_ i 1U E �I m o �T �-J I y ONC c (ROTATE AS Afrassay) �1 n F �L yAP�OX C � , PROPOSED 8" 01 TO TCP MAW=0A' i:OUPUtV WIL 0 �+ST OT�O�r kwo O&4TA TO MATEML TO lr..fflwMPlfd A. /%N.r.rfA%1r - 1EOES14 Y R MWS) I 1 I �r ►�+� r � ss � UNE (ROTATE As nEcEss011) PROP. GRADE 0 PROP. M4 TER LINE 0+00 TELL: (APPROX.) A AS 8" 01 SEWER & REPLACE) 1 +00 EXIST. GRADE @ PROP. WATER LINE i EXIST. C AAE (APPROM) PROPOSED WA4 aLO1 EXIST. 24" WATER LINE (APPROX) IM Lf 24" W4TO 7 MAI 2+00 704 700 692 CHARLOTTE CHARLOTTE WATER W6TER CHARLOTTE, NORTH CAROLINA Job No. File No. WATER & SANITARY SEWER Scales RELOCA %IONS PLAN 1 = 20 FOR PROFILE Hor. 1" = 20' Vert. 1„ = 4' WA TER OAK STORM DRAINAGE IMPROVEMENT PROJECT As Built Date CLS JN A CLS 9/22/20 f I l SheeI It O No. Date By Revision Surveyed By Designed By Drawn By Project-Engr Approved By Date u v A CITY OF CHARLOTTE DEPARTMENT 19 3/4" B+1 A 14 5/8" t Y5/8" RADIUS B A _? MANUFACTURERS: NOTES: a ' Wm SOUTHERN METER C.H. 518" x 3f4"METER 80X BODY A, METER BOX SHALL ACCOMMODATE COMPANION PLASTIC 4 0 ' BROOKS #36MB METER BOX BODY METER BOX LID - SEE STANDARD DETAIL. OLDCASTLE #MB36 METER BODY B. MINOR DIMENSION VARIATIONS ARE PERMITTED, BASED ON to a BES #C09W METER BOX BODY MANUFACTURER'S PRODUCT LINES PROVIDED THE CMUD 0 a `m e CHRISTY B9 METER BOX BODY STANDARD PLASTIC LID FITS PROPERLY. Z '> C. CONCRETE SHALL BE MINIMUM V c=3000 PSI COMPRESSIVE 1 3/8" RADIUS D. STRENGTH. DESIGN SHALL CONFORM TO ASTM C858-SPECIFICATIONS FOR " UNDERGROUND PRECAST CONCRETE UTILITY W STRUCTURE'. U E. STEEL REINFORCING DESIGN SHALL CONFORM TO ASTM C 857. F. WELDED WIRE FABRIC SHALL CONFORM TO ASTM A 185 AND A 82. O W m (/) 707/8, WW ,y10 LU \ice\ AS i\i\ W Q 1 314" L V W F 3 3/8" RADIUS Of Z 2 \y\ OUO PLASTIC LID U) (=j PIPE HOLE OPENING Z_ (_ 141/4" (1 EACH END) TYPICAL W 7 7/8" /�74ss a can ggla a 1 3/4" 'O LL 12" m 12" � 7 AN 1(d ZIn J L12" 1 OW ° w SIT J 0 F F 17 1 /4— 7/8" 3" zo 0 7 z 191.LL 101/2" \ 7� x y 12 1/4„ / \ 13112" 43. SECTION VIEW A -A SECTION VIEW B-B BODY k WEIGHT - 70 LB. ( MIN.) - 85 LB ( MAX.) •I NO. DESCRIPTION' 1 WATER MAIN i STREET RAW BUILD IN GFRONTAGE 2 DOUBLE STRAP SERVICE SADDLE- OC(TAPER) THREAD OUTLET SIDEWALK U X. ,2 3 BALL CORPORATION STOP- CC (TAPER) THREADz CTS m BACK OF SIDEWALK COMPRESSION 01 CURB 4 TYPE K COPPER TUBING OR SORT) HOPE(POLY)TUBING Z d Y IT 1'(TYP) Y Y WITH INSERT STIFFENERS 5 5/8•z34" ANGLE BALL VALVE WITH LOCK WINGS-CTS COMPRESSION.YOKE STAR NUT SIDEWALK X 8 SAS' DUCTILE IRON YOKE BAR 9 (1 FT. TYP.1 7 5A8'METER ASSEMBLY CMUD) WITH AMR TRANSMITTER 38' MIN. B 51B•z3/a'BRA533(YYq(E STAR NUTx CTS COMPRESSION CONNECTOR 4 a 9 CONCRETE METER BOX SEE STD, DETAILS RBBGUTTER 10 HOPE METER BOX LID WITHAM3 TRANSMITTER BRACKET"PAVEMENT•' 11 A COPPER (THNNTHN-WITHSLUE ACERMETE IN - INSULATION -TERMINATE IN METER BOX WITH 2d• EXCESS ULATION -TERMINATE BOX W WIRE (COLED) r Z 12SOLIDSTANDARDCONCRETEBRICKS-DIAGONALATCORNERS. Q 1" OR 3/4" SERVICE CONNECTION METER BOX IN SIDEWALK 4EACH (SHORT SIDE - IN PAVEMENT) (REQUIRES PRIOR CMU APPROVAL) U U En z LU Z OOU 0W �U 9P 10 12 10 10 I 1 W Q� II II , .... II I . 14_ _ _______________ __rl J,______ ______ I " ,' SIDEWALK J,______________-- ' SIDEW;..ALK `I Cl) CURB& GUTTER Ir 8'MIM 7 7 S'MAX I B -MN. I I 1 I I I I I B IT i 5 I I I 12 I I I TMI . I I 12 LU 4 a a W� rc W� a METER DETAIL METER DETAIL METER BOX IN SIDEWALK DETAIL of z (SIDE) (END) (REQUIRES PRIOR CMU APPROVAL) J Q (BOX SHALL BE SUPPORTED BY CONCRETE Q N SIDEWALK - AS SHOWN) 2 Q NOTE: A MIN. DISTANCE CENTER TO CENTER ON SERVICES OR TO BELLS C. SHOWN AS 3/4" SERVICE USE,"COMPONENTS FOR 1" E. WHEN METER BOX MUST BE PLACED IN CONCRETE IT SHALL BE k O OR SPIGOTS SHALL BE 3'-0' A3 MEASURED ALONG THE MAIN. DOMESTIC SERVICE. COMPLETELY IN AND CENTERED IN CONCRETE PANEL PER I B. CENTER ANGLE BALL VALVE - 90° CONNECTOR 5 - B IN D. TRACER WIRE IS NOT REQUIRED WITH ALL COPPER TUBING COOT / NCDOT REQUIREMENTS. (0 Q) i METER BOX. SERVICE. F. CMUD MAINTENANCE ENDS WITH 90° CONNECTOR ©. D U.S. FOUNDRY& MFG. CORP. EAST JORDAN IRON WORKS a g (4)-01-ANCHOR (4) - 0 VANCHOR Uj HOLES ONA V °z m 5t\ Ni HOLES ON A 6gt.1 '�GbR, 032314"B.C.D. 0 31" B.C.D. yQ . �^I'byy O a LL e ® \ Z " 3' �S> 2 O Y N _ s Z VT p1 n y MACHINED SURFACE Z W LU 20 a SMACHINED URFACE iin" 4° O LL Q J W LU fl 1/2" d J ~ Oz U ® ___ 1 518' n a w W OA7f cusyy, O Q U L~L.I Z I` LUaL 277116' 27 112" FRAME Zfi 1/4" - 11/2" LU Z 261/4' � FRAME � N 7/8" 7 in' C 518" 7 112" m J 1!2"LU I� 28 3/6" 24" 5/8 28 3/16" _I W O- J w LLuu w 3 G to a 3V' 36' 0 ] Z O FRAME SECTION a q WEIGHT - 170 LB. MIN., 0% MINUS TOLERANCE WEIGHT - 173 LB. MIN., 0% MINUS TOLERANCE t=, NOTES: - LOAD RATING HEAVY DUTY USE WITH TYPE 1 2 OR 3 COVER k o MATERIAL - ASTM A48 - CLASS 35 GRAY IRON FRAME SHALL CONFORM TO DIMENSION AND WEIGHT REQUIREMENTS. COATING - UNDIPPED FRAME SHALL NOT BE OUT OF ROUND. D CLTWater STANDARD DETAILS NO. DESCRIPTION 8 4 2 2 _ 1 WATER MAIN 2 DOUBLE STRAP SERVICESADDLE - CC(rAPER) THREAD OUTLET 3 BALLCORPORATION STOP -CC (TAPER)THREAOx US J Q y i o a Y COMPRESSION F c F1 4 TYPEKCOPPER TUBING OR SDR9 HDPE (POLY) TUBING Z " b �yII }Ir WITH INSERTSTIFFENERS S 5 BALL VALVE WITH LOCK WINGS-Ci3 COMP ESSION-ANGLE COMPRESSION xYOKE STAR NUT jJ� 9 8 W8'DUCTILE IRON YOKE BAR 7 WWMETERASSEMBLY(BYCMUD)WFHAMRTRANSMITTER B 5/8 . WC BRASS W YOKE STAR NUT. US DOMPRESSION CONNECTOR " 8 CONCRETE METER BOX -SEE STD. DETAILS 1" OR 3/4" SERVICE CONNECTION 10HDPEMETERBOXLIDWITHAMRTRANSMITTERBRACKETS (LONG SIDE - PLAN VIEW) 11 AWG NI2 GAUGE COPPER TRACERWIRE(THWN)-WITH BLUE INSULATION -TERMINATE IN METER BOX WITH 2A^ EXCESS LaL,I WIRE (COILED) F STREET RIW STREET RM/ 12 SOLID STANDARD CONCRETE BRICKS- DIAGONAL AT CORNERS - Q O 4 EACH. 3 �_ UU 5' (NP) BACK TO BACK CURB BACK TO BACK CURB 11ILL 1 (TYP) 10 G� W Z O O 0 —_ 3 W 4 W — a Q V) 2 " 1" OR 3/4" SERVICE CONNECTION Cl) (LONG SIDE - PROFILE VIEW) DETAIL AT MAIN (LONG SIDE) STREET RNV 11 STREET RAW BACK OF CURB rI I~ 'D J Y a 'L J1 3 TYP. 2 TYP. 8 W F Mlx. IN �J Z ] Z ROAD WITH SIDE DITCH 1" OR 3/4" SERVICE CONNECTION DETAIL AT MAIN rc (SHORT SIDE) (SHORT SIDE) U NOTE: A. MIN. DISTANCE CENTER TO CENTER ON SERVICES OR TO BELLS C. SHOWN AS WN' SERVICE USE 1" COMPONENTS FOR 1" E. WHEN METER BOX MUST BE PLACED IN CONCRETE IT SHALL BE OR SPIGOTS SHALL BE T-0" AS MEASURED ALONG THE MAIN. DOMESTIC WATER SERVICE. COMPLETELY IN, AND CENTERED IN CONCRETE PANEL, PER • I B. CENTER ANGLE BALL VALVE - 90° CONNECTOR (Q5 - Q8 ) IN D. TRACER WIRE IS NOT REQUIRED WITH ALL COPPER TUBING CDOT / NCDOT REQUIREMENTS. i METER BOX. SERVICE. F. CMUD MAINTENANCE ENDS WITH 90` CONNECTOR ©. D U.S. FOUNDRY & MFG. CORP. EAST JORDAN IRON WORKS $ a y.$-R (4)-01"ANCHOR i5i1 N/ 3 HOLES ON A LU (4) - 0 1 "ANCHOR q£ 9SVTO Q HOLES ON A i i c7 3 4q1. oky, 0 32 3/4" B.C.D. U)K 0 33 314" B.C.D. 0 'a g O O Z / 8> Y o z N 0 Z 0 Z W W u 20 $ LL J UJW MACHINED ® SURFACE MACHINED SURFACE O O Q U = 0_ U 1 5/8 aA7e 1 1I2" 1 1I2" EAST JDROANNR�ON WORKS 2W Z C LU WN aW U Z FRAME 27 7116" 26 1/4" FRAME 27 1/4" 04 24 � 1 " � 26 1/4" 1 1/2" ie 5/8" 1 1/2" 4„ m m N H P3 I_ 27" 4„ 24" 1/2" 27 15/16" V W f J F C w D 36" 36" k o ] ` B W WEIGHT - 155 LB. MIN., 0% MINUS TOLERANCE WEIGHT - 135 LB. MIN., 0% MINUS TOLERANCE NOTES: LOAD RATING -HEAW DUTY USE WITH TYPE 1, 2, OR 3 COVER k � 19 MATERIAL - ASTM A48- CLASS 35 GRAY IRON FRAME SHALL CONFORM TO DIMENSION AND WEIGHT REQUIREMENTS. a COATING - UNDIPPED FRAME SHALL NOT BE OUT OF ROUND. u 3/4 - INCH SERVICE LID 1 - INCH SERVICE LID LU a 15.125" o—WATER=o�o�o 02p�p�p�o�o�o�p�p�o�p T-L7-L 26.875 N 0� Z qd 3 a m> D�O�O�O�D�0000000�D�0�0�0� O�O�O�O�O�WATER�0�0�0�0_0 /Y O �o�0 -u— ouu):: �p�o�o�o�o�o�o�o 0�0000o�0�0a0o0o0�0�000�0�0 _ 0�0�0�L LU LULuo�p�p�p���p�p���p� Y 0=U�J�0�U-0-0—U-0 000p00000p000Iop p pop000pop000po WW oo = — Io�o�o�o� 0 p�Jo popopopopop000p oJ°o°o°J°o°o°o°o°o 525" 0 �� 0�0�0�0�0�0_0_0-0—D-0-0 J== o�o°J°J°J°J°J°J°J°J IJ :3 LU LU �W Ja 0000000 O�O�ODO�J 0_U0 o0�0�0��0J00 _ a 0_0_0_3_L3W J0 oO000000o oO000 O000000Q00000�? 15.375" M , .575"� d'r F 0 Z 1.75" W f--- � __ LU U W 1/2" x 6' REBAR(2) 40" 1/2'x 12"REBAR(2) ITRON60W MOUNT .40" Q Z 0 "DIA. 7!8" DIA. PICK HOLE I ITRON 40W MOUNT LL PICK HOLE I YW wF w O W �F ITRON 4. 0] pJp(( Q Q Z Q 0) ITRON BOW MOUNT 36C - RSGSM - LID MOUNT # DFW 65C - RSGSM = U - LID HT- INCLUDING REBARS - 6,511 LBS. WEIGHT -INCLUDING REBARS-23.50 LBS.• MATERIAL - HIGH DENSITY POLYETHYLENE(HDPE)- RECYCLED LW GREY • COLOR 5 •I -CHARLOTTE • LOAD RATING - HEAVY DUTY • MANUFACTURER- DFW PLASTICS INC. OR APPROVED EQUAL U U.S. FOUNDRY& MFG. CORP. EAST JORDAN IRON WORKS s W z bb G K L EN V ARULL TEXT µE BERG T Jp6DAN 1 RON M Q 3/4' LETTERS tA" 'eke U (RECESSED FLUSH) weer-KLENB/[���- 1' LETTERS D) -'Ri o ° m o a i t¢' of LA/ 5/8" ARIAL STYLE TEXT — (RECESSED FLUSH) 0 .it, /' _- �'`\ Gj. Z " P ;. (2) NON PENETRATING O r/ WARNING-_ GP I DO NOTE R m (2)-LIFTING BARS -------J PICK HOLES 11/2•/ SANITARY \� 2 ( SEWER 1 v, Pic BAPRs ® Y U 1 1/2" �O v 1 1/2' Z ? FLUSH) yeti ZU �O s P AN/TARY sE'K'c (2)-NON PENETRATING RECESSED 0 DO N .0 PICK HOLES M11ARp I N ayA 1 1/8, BOSS bir Y W 11J] Q 26" 6 1 /4" 15M 6' r 1 1/2" 026. 13116' 1 1/2" J L � z Z 31/4" o o T w MILLI0 1 15/16" 5 3/16'� I JI 3 13/16' II� 1 5/8. 3 1/8" 1/2" �J Pi 22 13116" 2 :!5 F O 15116" 1 �8• � I 6. W LU }aLU > ~U? 1/2" Z In SIB" TYPE 304 1n• S. 3. ROD 5/8"TYPE 304 MACHINED S. S. ROD J N 0 MACHINED SURFACE Ensr JcaonN IRON wowcv USF NR SURFACE K 1040A DATE 5/8" 3/4" 1 1 /4" CLASS 35 z t!4^ 7116" Ir :�4 1 31B• i 1. O m w y W W F f m Y o #J < S PICK HOLE DETAIL PICK HOLE DETAIL < W WEIGHT -150 LB. MIN., 0% MINUS TOLERANCE WEIGHT - 145 LB. MIN., 0% MINUS TOLERANCE NOTES: LOAD RATING - HEAVY DUTY USE WITH TYPE A, B, OR C FRAME I MATERIAL - ASTM A48 - CLASS 35 GRAY IRON COVER SHALL CONFORM TO DIMENSION AND WEIGHT REQUIREMENTS. COATING - UNDIPPED COVER SHALL NOT BE OUT OF ROUND. 0 U.S. FOUNDRY& MFG. CORP. EAST JORDAN IRON WORKS a 8 V.S.n W Q i o m ` j50 N73o bi` (4)-01"ANCHOR N 1 JOR"nx I"oN Ko6o-e y e s a x q!" HOLES ON A 0 _ 031"B.C.D. Z .� / O N o Z U o C.$ Z W N y W W v ODD LU ILL W aE MACHINED O ® SURFACE OU JI Q = W MACHINED FRAME SURFACE 1 1/2" YAOE IN USA W Z F F 2- W W 1 1/2" U 0 J 1 1/2" 0L LU U F MACHINED Z CJ) SURFACE N = 36" 26 114" 34 26 1/4"� 1 112" Z 19 24" + m 1 4 L Uj W Q o 5/8' 4" ' W I- D 1 112" 24" w J 5 26 1/4" L1_26 1/4"� Oj Q z SURFACE 27 114" K r N WEIGHT - 150 LB. MIN., 0% MINUS TOLERANCE WEIGHT- 121 LB. MIN., 0% MINUS TOLERANCE NOTES: LOAD RATING HEAVY DUTY USE WITH TYPE 1, 2, OR 3 COVER MATERIAL - ASTM A48 - CLASS 35 GRAY IRON FRAME SHALL CONFORM TO DIMENSION AND WEIGHT REQUIREMENTS. tj COATING - UNDIPPED FRAME SHALL NOT BE OUT OF ROUND. SENSITIVE MATERIALS DO NOT DUPLICATE DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED METER BOX BOX W a d 23.32' i h B U� 00 (n Z / l LID LU 15.31" U 17.83• REBARS W A A PLASTIC LID J (A r W Q G mm O.oB" Q Q — — � C)N 3 m LU B 0.69" DIA. PICK HOLE � W PLAN VIEW BODY W O 8.88" R = 0.26' U 15.44" 10.19" o.e1^ 0"0.61' 1.. � Z 0.88" QJ — 88• Dal^ D_ 2.81" RRON 40W MOUNT 375' C0 13.61' 0.25• 8.58' 1/2'x 6"REBAR(2) Ix 1.24" R =1.50" 12.00' O 10' 1.56' 10° 1.38" y 4.0 D" = y F-� 19.38' 1.00. 13.88' ITRON BOW MOUNT # J SECTION A -A SECTION C-C SECTION B - B BOTTOM VIEW IRA- Q 3 RIB DETAIL Q Y H N NOTES: _ A. MATERIAL SHALL BE HIGH DENSITY POLYETHYLENE. O B. LOAD RATING = HS20. C. COLOR SHALL BE CHARLOTTE GRAY. D. SUPPLIER/ MANUFACTURER: SOUTHEASTERN DISTRIBUTORS METER BOX BODY WEIGHT = 13.50 LBS. LID WEIGHT- INCLUDING REBARS -5.30 LBS. �fLV�I MODEL ME 16 - HD. V U.S. FOUNDRY& MFG. CORP. 1 • ARULL TEXT 314" LETTERS EAST JORDAN IRON WORKS (RECESSED FLUSH) µ 1 R jO"o QU a µDC KLENe 5/B'ARIAL STYLE TEXT (2) NON PENETRATING tyx IP U LOCKPICK SK0 RGG' HOLES GKLENg/� 1' LETTERS W -"V (RECESSED FLUSH) O: £j S�ASSEMBLY Yr DETAIL PICKBARSGT/� 1 SIB" _ r D DON RNENTER 1 CAM LOCK SANITARY . , 1/2' SEE ASSEMBLY SEWER 1 N Y � T7�I ® F—TI JI (2)-NON PENETRATING DETAIL U U 1 112" PICK HOLES BOLT HEX 518'-1IA' Y 3/4" LETTERS ( RECESSED FLUSH TYPE 304 S.S. ) /. ' .--2 C7 Q USF CAMLOCK 5/9'ALL HEX HEAD BOLT sq �p , 1 WASHER P n WASHER TYPE E 304 OD 4' � 1/18'x5I8'x11PY' TYPE 3043.3. � �' Z U Z ~ (2) -LIFTING BARS N/ VI t ALL GRADE S.S. 7A RY B'VI- 304 RUBBER 1'G •( NO W W D_aY IN = � DO 1 118" BOSS MADE 1 N MBA Z O U Oar Q U 23I8" 26" - LOCKLUG 0 28" 13/16" 1 1n" U Q W W W OJ U JO 22' 7/4" 8 15/18 3 1/ 0 0 2113" NUT EEXS.B1NI_ TYPE304 NUT HIX SJS. TYPE 304 S.S. Q_ F ZB 2 2 > 3 il8" 0 22 13116" ,/a" O w 0 Z 11n" 115I1 B' �53/16' 3118' 21V 025" NGASKET NE 3131,8� O.D. OF GKT GROOVE a W F _ _ 15l1� 0, 1/19, , 3/8' . X 518-TYPE S. S. ROD 9118 N W 31ETAIL GROOVEROOVE USF NL MACHINED .1800 1l'2' 5AB'NPE 304 EAsr.lolmAN lRaN wolxKs .2400' S. S. ROD SURFACE O• DATE 1 1/4' MACHINED SURFACE 1040AGS 0 m N J 3l4' 3116" 071W CAM LOCK CLASS 35 —F 2 1/4• Ir7/18' (J® , 3I8• JJ--LL__LL am.iaa"xse LU N WF f w OD w HOLE 0022' iJ 2 fiv AL3116"DOVETAILT �240" 5JIS• OJ ] GROOVE .180' Ix Q N PICK HOLE DETAIL WEIGHT - 150 LB. MIN., 0% MINUS TOLERANCE PICK HOLE DETAIL WEIGHT - 145 LB. MIN., 0% MINUS TOLERANCE = D NOTES: LOAD RATING -HEAVY DUTY USE WITH TYPE A, B, OR C FRAME k o MATERIAL - ASTM A48 - CLASS 35 GRAY IRON COVER SHALL CONFORM TO DIMENSION AND WEIGHT REQUIREMENTS. 0�I COATING - UNDIPPED COVER SHALL NOT BE OUT OF ROUND. O 111111III►I4 �O�O ESSRO</2-9 V \ i SEAL 040370 Co �/U1Slist, `�� JHIND ENGINEERING License No. C-2639 10815 Sikes Place, Suite 210 Charlotte, NC 28277 A CITY OF CHARLOTTE DEPARTMENT EXIST. ASPHALT, CONCRETE, OR CABC BASE. ,_-._= I I I- I -,_-1I COMPACTED EARTH ELEVATION SECTION NOTES: 1. ALL CONCRETE AND ASPHALT PAVEMENT, INCLUDING DRIVEWAYS, TO BE CUT WITH A SAW 2. WHERE CONCRETE PAVEMENT IS OVERLAID WITH ASPHALT H- BINDER MAY BE SUBSTITUTED FOR CONCRETE, AS A BASE MATERIAL, WITH THE APPROVAL OF THE CONTROLLING AGENCY. 3. ALL PAVEMENT REPAIRS ARE SUBJECT TO APPROVAL BY CITY OF CHARLOTTE DOT OR N.C. DOT AS APPLICABLE. 4. 12-INCH MIN. MINIMUM CUT OUTSIDE TRENCH IS ALSO REQUIRED FOR SLOPED TRENCH WALLS. 5. SHORING REQUIRED IN ACCORDANCE WITH OSHA STANDARDS PART 1926, SUBPART P. 6. SEE DETAILED SPECIFICATIONS FOR TRENCH WIDTH. R EXIST. OR FINISHED GRADE ' -III-III-III-III-III-I I I 11-III-III-III-III, IN. COVER -III-III-III A, 7 -I MINIMUM 9 \\-22-1/2' BEND (PVC, DIP OR CISP.) -COMPRESSION JOINT SEALER SEWER TAP SADDLE EPDXY SEALANT AS RECOMMENDED BY TAP SADDLE MANUFACTURER VARIES WTH SLOPE - VITRIFIED CLAY, PVC OR DUCTILE IRON PIPE. NOTES: 7. THE OPENING IN PIPE SHALL BE CUT WITH A TAP MACHINE ONLY 2. THE TAP SHALL BE MADE IN THE UPPER HALF OF THE PIPE AT 45' FROM THE HORIZONTAL. 3. MAXIMUM SIZE TAP SHALL BE FOUR INCHES. 4. TEE & BEND TO BE FULLY ENCASED WITH #67 CRUSHED STONE. 5. SDR 35 PVC LATERAL PIPE REOUIRE TYPE It/ GRANULAR BEDDING 6. MIN CLEAR TO PIPE JOINT ON MAIN SHALL BE "_0" 7 THE LATERAL MUST BE INSTALLED PERPENDICULAR 70 HTE MAIN S. IF THE LATERAL HAS LESS THAN 3' OF COVER, THE LATERAL MUST BE D.I.P. CHARLOTTE-MECKLENBURG UTILITY DEPARTMENT ENGINEERING DIVISION CHARLOTTE, NORTH CAROLINA . N PSTANDARD DETAIL S"„'INTS NSEWER PROFILE 4" LATERAL (TAP) A. BUM Dm< v,eel or MSW .e,ea B I-Engr App,<we B NOTES: i. ALL MASONRY MORTAR SHALL BE POR7LAND CEMENT JOWFDIP(MIN.) OR D.I.P7:3MIX. UNDISTURBED GROUND 2. CARE MUST BE TAKEN TO FORM A SMOOTH FINISHED TROUGH FROM ENTRANCE PIPES TO EXIT PIPE, AND 4"MIN IN CURVED MANHOLES THE TROUGH MUST BE A SMOOTH CIRCULAR ARCTANGENT TO THE INSIDE WALLS OF THE PIPES AT THEIR ENDS3.PROTECTIVE )To WALL FOR OUTSIDE DROP SHALL BE A MINIMUMOF 4" MASONRY.5"4. THE SLOPE OF THE OUTSIDE DROP TROUGH SHALL BE i/4"PER FO07.5. ALL PIPE OPENINGS 70 BE NO GREATER THAN 3" LARGER THAN O.O. OF PIPE AND ADDITIONALLY REINFORCED WITH A MINIMUM OF 0.20 SO. IN. OF oSTEEL AT 90 DEGREES PIPE 70 BE CENTERED IN STRAIGHT WALL OPENINGS ADDITIONAL REINFORCING NOT REQUIRED BE LOCATED OVER IMDEST FOR CORED OPENINGS. SHELF. -- E_ 6. RAMSET MASONRY TIES EVERY 12 INCHES. - a§' 7 DROP STRUCTURE MAYBE FORMED AND POURED OF `s 3600 PSI CONCRETE IN LIEU OF MASONRY. & FOOTING FOR DROP MAY BE POURED AS PART OF Z m THE MANHOLE BASE SLAB OR FIELD POURED AND VARIES TIED TO MANHOLE BASE WITH THREE EQUALLY SPACED _ _ y6 REBARS DOWELED INTO MANHOLE BASE 2" FROM N TOP OF SLAB. GROUT INTO 8" DEEP HOLES WITH EXPANSION GROUT a9. OUTSIDE DROP SHALL NOT ENTER MANHOLE IN CONE a" m - SECTION. 10. MATCH DROP INFLUENT CROWN TO CROWN WITH A A EFFLUENT PIPE. _. 11. DROP MAY BE PVC, D.I.P. OR VCR 3-,q16 REBARS -" � POUR T X 3' CONCRETE FOOTING 6 INCHES THICK 70 SUPPORT DROP STRUCTURE. . STONE OF REQUIRED) SECTION A -A :HARLOTTE-MECKLENBURG UTILITY DEPARTMENT ENGINEERING DIVISION 11 CHARLOTTE, NORTH CAROLINA ' E«I«TIN STANDARD DETAIL Nrs SEWER OUTSIDE DROP E.P N.C. D.O.T. ROAD RADIUS 1" OVERLAY OF-2 POINT \\ `CL OF \\ WATER MAIN N.C.D.O.T. RADIUS ROAD POINT E. P. E.P. P1 AAl 1/1FA/ NOTES: 1. ALL SHORING WILL BE ACCORDING TO OSHA TRENCHING STANDARDS PART 1926 SUBPART P. 2, PAVEMENT OVERLAY IS IN ADDITION TO PAVEMENT REPAIR PER STANDARD DETAIL 9. 3, FEATHER OVERLAY SMOOTHLY INTO EXISTING PAVEMENT. 4, THIS DETAIL APPLIES TO N.C. DEPARTMENT OF TRANSPORTATION ROADS ONLY, UNLESS OTHEWISE DIRECTED BY THE ENGINEER. CLTWater STANDARD DETAILS E.P N.C. D.O.T. ROAD 1" OVERLAY OF 1-2 RADIUS POINT BORE �fE OF WATER MAIN N.C.D.O.T. RADIUS ROAD POINT E. P. E.P. P1 AAl 1/1FW R EXIST. OR FINISHED GRADE I -III-III-III-III-III I I I 1 I -III -III -III -III, lk COVER -III-III-III AT -I MINIMUM % 22-112' BEND (PVC, DIP OR CISP.) VARIES N4 TH SLOPE VITRIFIED CLAY, PVC OR DUCTILE IRON PIPE. i NOTES: 1. CLAY TEES REQUIRE COMPRESSION GASKET TO PROVIDE SEAL FOR PLAIN END OF 22-1/2` BEND 2, IF THE LATERAL HAS LESS THAN 3' OF COVER, THE LATERAL MUST BE D.I.P. J. TEE AND BEND TO BE FULLY ENCASED IN #67 CRUSHED STONE. 4. SDR 35 PVC PIPING REQUIRES TYPE III GRANULAR BEDDING. 5. MIN. DISTANCE BETWEEN TEES SHALL BE 7' CENTER TO CENTER 6. THE LATERAL MUST BE INSTALLED PERPENDICULAR 70 THE MAIN, CHARLOTTE -MECKLENBURG UTILITY DEPARTMENT ENGINEERING DIVISION CHARLOTTE, NORTH CAROLINA Ne. N STANDARD DETAIL "'NTS NT NTS 'SEWER PROFILE 4" LATERAL (TEE) sneer or MSW - ,eyes B I-Engr App,<.ee B L NOTES L CARE MUST BE TAKEN TO FORM A SMOOTH FINISHED TROUGH FROM ENTRANCE PIPES TO EXIT PIPE, AND IN CURVED MANHOLES THE TROUGH MUST BE A SMOOTH CIRCULAR ARC TANGENT 70 THE INSIDE WALLS OF THE PIPES A THEIR ENDS. 2. THE SLOPE OF THE OUTSIDE DROP TROUGH SHALL BE 114" PER FOOT. J. ALL PIPE OPENINGS TO BE NO GREATER THAN 3" LARGER THAN O.D. OF PIPE AND ADDITIONALLY REINFORCED WITH A MINIMUM OF 0.20 SO. IN. OF STEEL AT 90 DEGREES, PIPE 70 BE CENTERED IN OPENINGS. ADDITIONAL REINFORCING NOT REQUIRED FOR CORED OPENINGS 4. OUTSIDE DROP SHALL NOT ENTER MANHOLE IN CONE SECTION. 5, MATCH DROP INFLUENT CROWN TO CROWN WITH EFFLUENT PIPE. S STEEL STRAP DROPS 4' MAX. IE (IF REQUIRED) TOP SEC. VALVE BOX WITH CONCRETE PAD MECHANICAL PLUG OR SLIP COUPLING JOINT PLUG WTH BLOCKING 2" BLOW -OFF \\ CONCR90' ELBOW . •. ` ETE ELEVATION VIEW 14" MIN. UNDISTURBED =1 EARTH III' I=1 I=11I=11I=11 s' MIN. rD' B. v � SLIP JOINT PLUG WITH BLOCKING OR M.J. PLUG WITH 2" 8.0, 3" WIDE u i" THICK THRUST RING 70 BE FACTORY WELDED =_III=III=11 70 PIPE AT CENTER Of JOINT III: =1 UN0157URBE0 1' MIN. III' EARTH 1 M11 1 4" I'I I' NOTE: 4- VERT. STEEL 4- 9" g'10 BARS, 4'-4" LONG, 8 REO'0 5 1 22" 4" HORIZ STEEL 6" J O C 5 1/2" , ¢ q'10 BARS 9'-4" GONG, 8 REO'D #10 BARS 3'-II" LONG. 8 REO'D -_ 5 r/2" 51 2" -DIACONAL STEEL A- #10 BARS, 4'-0- LONG, 4 REO'D 4r" q•, HORIZONTAL CHARLOTTE -MECKLENBURG UTILITY DEPARTMENT ENGINEERING DIVISION CHARLOTTE, NORTH CAROLINA NeSTANDARD DETAIL N.T .TN S WATER PROF. BLOCKING FOR BU,II Olt, 16 " 20 " 24 " PIPES J.F.B. ° DPI< eY a.,<,<a BY D«ly"<e ay D.P.M E, - .ee aY DOI< -III-III-III-III-III-1 11=1 I -I 11-III-III-III-III EXIST. OR FINISHED GRADE Mil -1 I I III -1 I I -III -III -III -III -III -I 11 I -III -III -I I -III -III -III -I 1- III=6=111=111=III-11 I-11100 11-I I-111 111=III=III=1 I-III=11 1=III=III=III=III=III Wim, 11-111-111-III-III-11 E-E III-1 III=1111-1111-111=111-111-III 111-111=III=1=1=I=1 o-111=III=III=III=III=III- 111=F, =111=111=11 =111=1 11=1 I 1=111=111 =III=III=III-1 -1 I I -,II- ? I I-111-III-111=1TI="'- SEEP W H INSIDE DROP SEE DETAIL 71 0�5p OR OAP N CORE HOLE AND INSTALL FLEXIBLE BOOT CONNECTOR 0 45' OR 22-1/2' BEND iOUTSIDE OF M.H. W m STONE BEDDING (IF REQUIRED) CHARLOTTE -MECKLENBURG UTILITY DEPARTMENT ENGINEERING DIVISION CHARLOTTE, NORTH CAROLINA . NPSTANDARD DETAIL B�1Q NTS SEWER NTS PROFILE LATERAL INSTALLATION AT MANHOLE At, BUIII Om< v,eel oI MSW 3 .eyes B 1-Engr M M 0 i-i/8 0 i 1_1/4„ 0 0 0 A 0 A 10-3/4" 12" COPOLYMER POLYPROPYLENE PLASTIC 1/2- GRADE 60 STEEL REINFORCEMENT - NO TE. HIS STEP TO BE DRIVEN INTO TAPERED HOLES IN PRECAST MANHOLE SECTIONS DO NOT USE AS A GROUTED -IN STEP. 5-3/4" SECTION A -A 1000 LB PULL OUT TEST REPORT REQUIRED ON EACH STEP. CHARLOTTE -MECKLENBURG UTILITY DEPARTMENT ENGINEERING DIVISION CHARLOTTE, NORTH CAROLINA STANDARD DETAIL TIN N SEWER PROFILEPLM PLASTIC STEP CORED HOLE DRIVEN IN PLACE Msw 1eI Dme eY Re,,.<" s,.,eWa ey Deely<m ey D.e.M aY Ka-E"Rn p e.ea eY Dme - - DONOTUSEANCHORRINGONwC, RC DIP-ACRIPE. CONCRETE TNRUBTBLOCK ( IF REQUIRED) THANSITION UPUNG CI I,-. G`u "M 7UPLINU 5'MIN. UNDISMiBED EMIR .._.._......_...._.. ._ __.._... 'ISENGS ImT ' CENTERED UNDER STORA DRNN PIPE. REQUIRED PROFILE VIEW NTS V mm DRNN ISTING PIPE MI _ L I IA-- T CONCRETE THRUGTBLOCK R0O BENDTO THRUST BLOCK PLAN VIEW _ NTS `STIRRUPS I TYPICAL 1 / SPACINCL B"MIN., 12"MAX 1917M'f {RI STORM DRNN �(A�y{(y�A{'1 ]{+ +�--- A A BEARING AREAS THRUST BLOCK DETAIL NTS BC BAR ITp 18' - - S" T COVER 9"COVER SECTION A -A CONCRETETHRUSTBLOCK WITHANCHORRING NEW D.I. PIPE, MIN. 10 LENGTH GRAN HCENTIPIPE.ED IN� ST NCIT 1. xGS SHAD BE RE- 0 USING MEGALUGS, PIPSTNMUESS E ASAPPSTROVED BY ENCYE RUM NEER RESTIUINEG JOIN 2. BY ACIIMLSCIL RESULTANT THRUST BASED ON 200 PSI TEST AT FIRINGS AT 200 PSI WATER PRESSURE. PRESSURE. SEE GHART BELOW TOTAL POUNDS. M•BEND -0 E� 14812 2W15 SOILVALUESFORTNEDEPTHSOF4FEETAAELISTEDONLYAS LTYPEAPB TO LOVER FUTURE CWTNf£31N P�IPIE EPRI.SOILBEARNG� DAD @Wg.rtl 0 •NORESPONSIBILITYGNBEPSSIIMED Im. FORIHEACCURAOYOFTHEDATAIN NOM. PIPE DIAMETER 4INCH SINCK 1UINCH 12INCH THEFOLLOWINGOFTENL AGUIDS.THEENGINEERSHOULDSELECTTHESEBEATUNGVALUESFOREACHS DEPTH FACTdt39H0ULD BEARRUED CMAQIIES, ETC. SOIL MUCK IAY SANDYSILT 1 THIS TABLEDUETCTHEWIDEV XDONH IfIaO CAPABILITIES FOR EaC SAND SAND D_ HARD CLAY 4A SOILTYPE.G 6,000 9.000 I IIII By CITY OF CHARLOTTE STANDARD CAST IRON FRAME AND COVER. FINISHED GRADE eg MUSE BRICK OR CONE GRADE RINGS FOR ADJUSTMENT OF N 24. FLUSH MANHOLES 7" JJOINT W `51EP5 (ON STRAIGHTWALL) h 5" STRAIGHT WALL OF M.H. TO BE LOCATED OVER INFLUENT PIPE (4'0 M.H.) g 4'-0" OR 5"-0- I� `m FLEXIBLE COUPLING CAST IN BASE OR INSTALLED IN CORED HOLE W17H STAINLESS STEEL COMPRESSION DEVICE. FOR B" ANO 10" PIPE, INVERTS ARE TO BE 3/4" PIPE 00 AT TROUGH, FOR 12" AND LARGER PIPE, PROVIDE FULL INVERT AS SHOWN THE SHELF SHALL SLOPE 2" FROM THE MANHOLE WALL TO THE TROUGH BDM alrex B<,.meBr Dwwe Br ,..., Br P,m.aErer App�„a Br 29 _ CITY OF CHAR L 077E STANDARD CAST IRON FRAME AND COVER (BOLT DORM -WATER TIGHT)? ry 7" MIN. 7' 1I111 i6�0. C. HEIGHT OF RISER AND CONE SECTION VARIES 4' NOTES: L MANHOLE TO CONFORM WITH ASTM C478 EXCEPT AS MODIFIED BELOW. 2. MANHOLE BASE TO BE REINFORCED WITH A MINIMUM AREA OF U20 SO IN. PER LINEAL FOOT EACH WAY WALL REINFORCING TO BE MINIMUM OF 0.12 SO. IN. PER LINEAL FOOT. EITHER TONGUE OR GROOVE SHALL HAVE REINFORCING EQUAL IN AREA TO MINIMUM OF WALL SECTION 3, ALL JOINTS SHALL CONFRRM WITH ASTM C443. 4, STEPS TO BE PLASTIC PER CITY STANDARDS. 5. ALL PIPE OPENINGS TO BE NO GREATER THAN 3" LARGER THAN OUTSIDE DIAMETER OF PIPE AND ADDITIONALLY REINFORCED WITH A MINIMUM OF 0,20 SO. IN, OF STEEL AT 90 DEGREES,(ADDI TOINAL REINFORCING NOT REQUIRED FOR CORED OPENINGS) 6. ALL SURFACES SHALL BE SMOOTH EVEN TEXTURED WITH A MINIMUM OF HONEYCOMB, FINS AND OTHER IMPERFECTIONS 7 PENETRATING LIFTING HOLES SHALL BE PLUGGED WITH EXPANSION GROUT. e. INVERTS MAY BE 3600 PSI READY MIX CONCRETE IN LIEU OF BRICK PRECAST INVERTS ARE ACCEPTABLE. 9. STEPS IN 5' DIAMETER MANHOLES TO BE OVER WIDEST SHELF. 70, 4'0 CONE SECTONS MAYBE USED WITH 5'0 MANHOLES WITH A 5'-4" TRANSITION SECTION PLACED DIRECTLY BENEATH THE 4''0 CONE. 11. ALL MANHOLE SECTIONS SHALL BE DESIGNED FOR H-20 LOADING. 12. MINIMUM HEIGHT FOR CONCENTRIC CONES ON MANHOLES WITH BOLT DOWN F&C IS 32 \\\\II III/1j IIA �010 ESS1/O< SEAL 040370 %,: 1'/1111111\\\\ SENSITIVE MATERIALS DO NOT DUPLICATE DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED JHINDE ENGINEERING License No. C-2639 10815 Sikes Place, Suite 210 Charlotte, NC 28277 A CITY OF CHARLOTTE DEPARTMENT