HomeMy WebLinkAbout20160742 Ver 3_USACE Permit_20201030DEPARTMENT OF THE ARMY
WILMINGTON DISTRICT, CORPS OF ENGINEERS
151 PATTON AVENUE
ROOM 208
ASHEVILLE, NORTH CAROLINA 28801-5006
October 29, 2020
Regulatory Division
Action ID No.: SAW-2015-02543
Mr. Jonathan Wise
Duke Energy Incorporated
400 South Tryon Street
Mail Code ST28U
Charlotte, North Carolina 28285-1900
Dear Mr. Wise:
On April 25, 2017, the Department of the Army issued a permit to Duke Energy for
the Cedar Cliff Auxiliary Spillway Upgrades Project in Tuckasegee, Jackson County,
North Carolina. The Corps issued a modification to this permit on June 21, 2019. A
written request for a second permit modification was received on August 5, 2020. This
request involves authorization for additional impacts associated with further
improvements to the Cedar Cliff public access area.
The permit is modified to include the impacts for a temporary rip rap apron and
excavation of accumulated lake sediment, as shown on the enclosed plans. These
impacts consist of 0.14 acres of temporary impacts to open waters and 0.007 acres of
permanent impacts to open waters. The total authorized open water impacts for this
action are now 52.42 acres of temporary open water impacts and 10.567 acres of
permanent open water impacts.
The permit is hereby modified to include the work as noted above. All conditions of
the original permit remain applicable and the expiration date is unchanged.
FOR THE COMMANDER
Digitally signed by
JO N ES.M ICHAE L.SCOTT.1258314
073
Date: 2020.10.29 15:55:21-04'00'
M. Scott Jones, PWS
Chief
Asheville/Charlotte Regulatory Field Offices
Enclosures
-2-
cc (with enclosures):
NOAA/National Ocean Service
1315 East -west Hwy., Rm 7316
Silver Spring, Maryland 20910-3282
Mr. Bryan Thompkins
U.S. Fish and Wildlife Service
160 Zillicoa Street
Asheville, North Carolina 28801
National Marine Fisheries Service
Habitat Conservation Division
101 Pivers Island Road
Beaufort, North Carolina 28516
Mr. Todd Bowers
Wetlands Protection Section — Region IV
Water Management Division
U.S. Environmental Protection Agency
61 Forsyth Street, SW
Atlanta, Georgia 30303
N.C. Department of Environmental Quality
Division of Coastal Management
400 Commerce Avenue
Morehead City, North Carolina 28557
National Marine Fisheries Service
Habitat Conservation Service
331 Fort Johnson Road
Charleston, South Carolina 29412-9110
Mr. Eric Mularski
HDR
440 S. Church Street
Charlotte, North Carolina 28202
cc (with enclosures) (via email):
NC DEQ - Division of Water Resources
NC WRC
2 3 4 5OD
ef
6 7 8
ef OD
ef
ef
ef
/ ♦� / / / // / / // / / / / / /, , � __ -- _ _ice,' / / i'i' ''_----' -'___--
CEDAR CLIFF RESERVOIR
DRAWDOWN EL 2300.00
fe
\ I I / / / / / / / // / / ! / .• , // /ter // ��/ , /� , , //, // , , , , // // / / , �/ ! / / �� ���/ �' ��— / �/ �
l I I / / / , / / / �/ l ,'/ /, , / �v♦ �� // , /, , //, , , / / / / , / / / ///// , / /� , / / , /
0105-007,
COMPOST SOCK TYP)
ef
fee
IV fe
ef
ef
ef(Nv/o-'PROPERTY LINE (TYP)' �' / /'� / j
. . / / / / / , / /, /, / �\ \ \
/ rL CEDAR CLIFF RESERVOIR , \
r / ' / - / ' fee/ FULL POND EL 2330.00 \
,�/
CS
ef
ef
�' ' _�' ,' / / ' /,/'' / I ' i• —B
/i / / FERC LICENSE r h�__�,' ,' •�► / / 1, /
/ PROJECT BOUNDARY r /� / , l / ry / //
1
z/ CONSTRUCTION ACCESS ROAD
ell
/ I O
/
/ o
CCL-0103-012
I 1 I I I I N
I 1 1 1 I I
1 1 I 1 I I
1 I 1 1 I 1
1 1 1 I 1
1 1 1 1 I I
11 TURBIDITY CURTAIN (TYPE 2)AN
1 11 1 I 1
1 \ 1 I 1
U 1 \ 1 I I
1 1 I I
\ - T
% 1---
REV. 3
GENERAL
NOTES:
1. FOR
ADDITIONAL GENERAL NOTES SEE
CCL-0100-004.
FOR
DRAWING INDEX SEE CCL-0100-001.
FOR
ABBREVIATIONS SEE CCL-0100-002.
FOR
LEGEND AND SYMBOLS SEE
CCL-0100-003.
2. SEE
CCL-0104-020 AND CCL-0104-021
FOR
GRADING PLAN, DRAINAGE PLAN,
AND
BOAT LAUNCH AREA CONSTRUCTION
SEQUENCE.
3. TEMPORARY IMPACTS BELOW ELEVATION
2330.0 = 1.5 ACRES.
KEYNOTES:
\
\
\\
O
AFTER DITCH CONSTRUCTION IS COMPLETE,
REMOVE ALL TEMPORARY MEASURES AND
�I
%+ ��
RESTORE DITCH TO EXISTING CONDITIONS
ok�
0
ABOVE FULL POND ELEVATION 2330.
CONTRACTOR TO MAINTAIN AND REPAIR
EXISTING AGGREGATE COARSE. SEE DETAIL
6/CCL-0105-011.
EXTEND RIPRAP APRON TO CONNECT TO
RIPRAP LINED DITCH.
\6k46 -2
o
`.
\ \
O
RIP RAP CHECK DAMS MAY BE LEFT IN
PLACE THE PROJECT.
N -�t�
t�`
AT END OF
55
INSTALL COMPOST SOCKS ALONG LEVEL
CONTOUR BELOW WORK AREAS WHERE
\ \
\ -4
\\
ADDITIONAL GRADING AND EXCAVATION OF
1 \
ACCUMULATED SEDIMENT IS REQUIRED.
'•�\\
\ ` ` \\
�' \\
/\
FIELD ADJUST LOCATION AS NEEDED.
\ � \ \ \
CONCRETE CS
I111 'TROUT BUFFER- BOAT RAMP
—C r
\ \ \ \ \
\ \
\
\1\ I I I O \\ \ \ \
FLOATING \ Op N i \\ �I i \ Off\` \\ \ \
/�
/ / BOAT DOCK `, 2 . `. 5 \ I \ \ \ \
E' \ 1 I CID ef
CP
J I 2 I
,' /"/'//'' \ 1 / /• / % / ' /' / // /. , , 1 II 1 1 1 \ (\ / `' 1 232 I X'
ROCK CHECK DAM ` \
/ / // /, , J /, / %• / 1 I / / / , • l , I 1 1 \ I I 01 05-007 O 1
/ /
fe
`: "> � \ Jllb /' � lJ ---• \, "1' 1 I I I I — ----_� \ \ .'_\
X I I _ 1
\ \ �� / MINIMUM TRANSMISSION LINE I n \ \
I \_ / 04 SAG WITHIN THE LOD SHALL II I CA
//,/__, / /) • / / • / , / / / , I / n.. \ >_.,.... 1 -/ -/ DITCH 6 CL BE ELEVATION. 2370.00
/ /, 0105-012
,,l 7/ r —� 1,/ 1 1 r l l / l l I I ,r 1 \ CO
// / I• I \ I / I I l I I I \ I \ `L'..��.'j%t".:•.' \ \ I,1 , k. \ i` 11 1 �/ ��--` _ \ \ \
fee, SLIT FENCE ROCK OUTLET (TYP)
0105�005
/)11
RIPRAP APRON r 5 I I \ O
/ ,, r//// I• / i / / / i ' 1 1 1 \ / i \ ,o \ ' i A 2 1 3 I O i II 1 ,u\ \`---11 CAUTION; OVERHEAD
AT PIPE OUTFACE 0105-008
: O 1 ` \ POWER LINE ---__
HEADWALL 1 C SLIT FENCE (TYP) 0105fe 005
"jb _ 3 30
MANHOLE 2C 1
/ / �/ ,/ !/ / / 1 WOOD DOCK '';- // / / 36" WHITEOAK ` \ �• `\ ,' ,' __ --_ `\
CAUTION: OVERHEAD k`. / / ' 2335 TRANSITION FROM
TO BE REMOVED j: �a ---- TO 2:1 SLOPE \
POWER LINE 1 � a� � „ '° rv` ,�\ \ 1 � ` LIMITS OF DISTURBANCE
1 1 WHITEOAK _ >ov
PARKING LOT 1 `` /' �- �— ` \ \ \_ /•' __---_ `\ �\ `\
/ // j• it/ / ,' / / ,' / / / \ ` OO + \ +
/ / 1 / \ O� ` // \
+ + + + + + + +tea +\ + + +
+ + + + + + + [\, — �� ` -_-'''
-_/ / , \ / J O i'/' / / + + + + + N `\ \ - - - -- - -- -
, + __-- --- 5 _ -------- L SHOOK COVE ROAD'` �\ `
\\ .-/O,/ ,/ ,' , AGGREGATE BASE` --- '•♦ \.
LOD 0105-011 - — TROUT BUFFER
1 ,/RpNO DROP INLET 3C 2350 ► -___-- J _ -.fie. - - �\............ Tom' _ -- --__
T P -\r' ��� ` -/ /''/ - COS 0+00 1 \ _ - TITLE
30 0 30
SCALE: FEET
I EM ORARY GRAVE ------
CONSTRUCTION OO_ ENTRANCE 0105-005�'' 2 _ _ _ __ ___ -- -�-----�--- AUXILIARY SPILLWAY
/DROP INLET PROTECTION-0105-014 `-- -----_ CEDAR CLIFF ACCESS AREA
���. 11 ,/�..�:-•--•�� -•--•- •�- �.,_r.:�' `,-' \ __ INSTALL PUMP -AROUND, MEASURES 5 EXISTING CULVERT _----
-
F__FOR DITCH CONSTRUCTION - ,� - __, :___ - - -- — -- -=-- _ - _—_-____ _ ___.- EROSION AND SEDIMENT CONTROL PLAN
0105-008 ' 2370� �� _ r ` _
PLAN--_ —_'`-- -- ---- ---__—_—!—_--_---
COORDINATE WITH OWNER BEFORE REMOVING TREES_ ' i ---- -- _ L - �`___ ---- '--_ - _
ONLY CLEAR TREES NECESSARY TO INSTALL PUMP / - /',' ; ! /---- - -- _ SCALE: 1"=30' _ ------ _-- - -- FOR
/�♦, ;• \�:,_�„ \ ��- ,' / /AROUND MEASURES _------- -- -- CEDAR CLIFF IDF & SPILLWAY UPGRADE
--
HDR Engineering, Inc. of the Carolinas License Number: F-0116
440 S Church Street, Suite 1000 Charlotte, NC 28202-2075
ISSUED FOR
REV2 NCDEQ
`,,.���;''"CARo�''%,,,
''ems%' .'�
PERMITTING FOR
- SEAL
INCREASED
37911 -
F�C5&,V�o
LIMITS OF•"•�IN�-
:
DISTURBANCE-,,,,,,,,,0
PE SEAL
3 06/05/2020 LOD, RAMP, DITCH, TURN AROUND GRADING & E&SC MEASURES UPDATE
2 05/19/2020 ADDED TRANSMISSION SAG NOTE.
1 11/05/2019 ADDED KEYNOTE 4.
0 10/16/2019 ISSUED FOR CONSTRUCTION.
NO.1 DATE I REVISION
INCHES 1 2 3 TENTHS 10 20 30 1 5 1 1
DUKEDWG
ENER('034' YO
SCALE: AS NOTED
DES: MGL
TYPE: DGN
DFTR: JTTD
JOB 10060948
CHKD: RMB
DATEN010/ 6/2019
FILENAME: CCL-0103-012.DGN
APPD: MGL
JTTD
MGL
RMB
MGL
JTTD
MGL
RMB
MGL
DWG SIZE
DRAWING NO.
REVISION
PTD
MGL
RMB
MGL
ANSI D 22.0"x34.0"
CCL-0103-012
3
JTTD
MGL
—
—
DFTR
DES
CHKD
APPD
9 10
C—
�u
M
W
F—
2 REV.
3 4 5 6 7 8 CCL-0104-021 1
\ \`. , \ / / ✓ / / r // / / /' /'/' /' _-- \ \ \ \ \ \ \ GENERAL NOTES:
1. FOR GENERAL NOTES SEE CCL-0100-004.
1 / ' , r I .' / / .' / r ' / ,/ Jr r, � / , • • , / / r / / / / /, / / ,- ,, �- _- ,- �-' ,- ;-',- ' �' __/ .--- -_-_ --' ` ` \ \ \ \ 1 I FOR DRAWING INDEX SEE CCL-0100-001.
`, ` \ I I � ' / / / / /' / /',' �� � ' /' � •' "r / ' ;' � ' / , ' / ,',', / / / / / , / , / / , . ,,'/ , / ,-,��' -'_ ,-',-,,- ,' ,_- \ \ \ \ \ \ 1 I FOR ABBREVIATIONS SEE CCL-0100-002.
` \ ` ) I ` / ' / / / / / / ♦• /' // .�' l /� /r / / , ' ,' / / ,/// r�r �/ �, / , / / \ \ \ \ , I FOR LEGEND AND SYMBOLS SEE
\ \ \ \ CCL-0100-003.
_ 2. SEE CCL-0104-020 FOR GRADING
, \ \ \ \ \
/ /, //,'/ < r' /, / / , / , , / / r r / / / / ' / /// /, / , , / / , . >� \ \ \ `\ \ \ \ 1 SEQUENCE.
3. PERMANENT IMPACTS BELOW ELEVATION
2330.0 = 0.70 ACRES.
CEDAR CLIFF RESERVOIR \ \
/ / / / / / , r / 0�/ / /, / '/ / / / /. / % _-/ � / / , / ' / / , , / / • ', , 'r' • /,/� / � , • , ' •�- - �- \
rlrr / / / p / , / / /,, / J' ;� ' _ ' '' /'.' '/' /' /' / / /'/' / ,'/' �/ :'. r. / .' ! i / ! ' / ,i.' /' _ \ \ • DRAWDOWN EL 2300.00Aj
I 1 \ \\
—A / / �// / ///-/ // / , , "PROPERTY LINE TYP.)
1 \ KEYNOTES:
TERMINATE PERMANENT \ \
,' ,',' CEDAR CLIFF RESERVOIR _------------------
OTHERS \ \ \\ \ `\ \ \\ 1 FLOATING DOCK TO BE REMOVED BY
/, , / / ; ,/ /\ \ DITCH AT ELEVATION \ \ \ PRIOR TO CONSTRUCTION.
-`-___ I \ \
FULL POND EL 2330.00 \ \ \ \
! CONTRACTOR SHALL MAINTAIN
/ / AGGREGATE BASE ON PARKING LOT IN
FERC LICENSE//// / ^_,/ , , , /, / / / O , / // \\ \\ \ \\ \ `\\ \ \\ lO \\ \\\ \\ \\ GOOD CONDITION.
�J,/ ,' // /,r / `\ �/ /J , / PROJECT BOUNDARY, I ,' ,' .' ,/; / / / (l� /; / // - _ - \\� \ `\ \ \ `I \\ \\ \ -7 \ d'o
,, , ,1 / , ,, / , I , I I_; , , , / , , , _ \ \ \ k46 O3 RIPRAP REVETMENT SHORELINE
STABILIZATION. SEE DETAIL
\ 2/CCL-0105-012.
/ / r r / / I /• / / / I I \ \ / \ \ \ \ \ 3� \
DEMOLISH AND REMOVE WOOD DOCK.
\ '♦ \ \ \
Excavation Area = .63
CONCRETE BOAT RAMP SHALL REMAIN
IN PLACE.
41
1
L
1 II/ /
�� _I
l l / '/ l Jl i i i 1''/' l' �'/• ir'' '''r '/'/ y '/ l / ! l l t l I ' / _'' ' ' ! I 1 ` II FILL CHANNEL AND
GRADE AREA FOR POSITIVE
TOWARDS 2322.0 CONTOUR
/ / r. �� ,/�, �/ / %• �, , ;' ,-' rr ,' // !' , III I\ I , 5 CONCRETE
BOAT RAMP
13
71
/ /I r//, '// /,r / / r / / _/ / / J I I , 1 \ \ \ :::: - `� °..: _ I I III �✓/ \ lJ�- _ ` 1 1 I I I 1 / ____ `- - \ \
//I �/ _) / ^ ///r /! / / / r // ' 1 1� � I I :-. \ :.:::>.:- \ - 1 \ \\ I I 1, I I I \\ _ ___ -✓ \ \ \` `
11
_J
DITCH 6
_;.. \ RIPRAP LINED 0105-012
1 FLOATING BOAT DOCK \ .'..: I ��
1 - T /j - 306 squarelept (0.007
/ � ! �/ I 1 I acres) of temporary fill
O2 PARKING LOT
WOOD DOCK
, 0 , \ l \
// /,/ ,• , / / , // r , / // , , , ' •\ ';:�.";.:- / , NCDOT STANDARD TYPE GUARD RAIL 1 \ , ,
2335 \ _
36" WHITEOAK -__
TOP OF ROCK VANE = 2332.0 1' WHITEOAK _
—2345
_ \ L_ \ �\ 1 41 + + + \+ + + +t� +
ROCK VANE / \` /j// + + + + + �• + + \+ + + + \� + +
// I / /// / / / / / , � \ �/V Apr\ •y rr' C1 + + + + + + + +
• - / / / / / / l - / . /�/ / + + + � + + + + + + +n � 1 1�. �—+ � � `"\ \ \ \ _ - - - r ter_ - _ ` � \
(` O ter/ + + + + \+ + - / t +--+--f_+ +_±- --- \ \ - --
+
SHOOK COVE ROAD ' / _ _=�-----------_-----------_- •♦ \\ \\
r � � \\ /' 1 \ ^-__--- mil•' \ ,�r� , ,------------ -- �-___ __ __- _ __- - - __ -__ �'---�----� I, '+ \- \
EXISTING CULVERT-------- �_______ __ -- - _— =t ---_ - ___'-__ �\ ) '♦
------------------------
-370
2370�===, -- -- — =��--_,___--_------- ---- `\ `\ '� SCALE: FEET
// - - - - -- - ----TITLE
AUXILIARY SPILLWAY
CEDAR CLIFF ACCESS AREA
-------------- - ------ \_r--- ,--\ -' GRADING PLAN
—F PHASE 2
PLAN
SCALE: 1 "=30' FORCE DAR CLIFF I D F & SPILLWAY UPGRADE
``11111111111„/,,,
CARO
SEAL
qe.........��,,,,,,
L G.
HDR Engineering, Inc. of the Carolinas License Number: F-0116 "'''11111111►0
440 S Church Street, Suite 1000 Charlotte, NC 28202-2075 PE SEAL
INCHES 1 2 3 TENTHS 10 20 30 4 5 6
SCALE: AS NOTED DES: MGL
DUKEDWG TYPE: DGN DFTR: JTTD
Y0 DATEN010/106/209CHKD: RMBENEM%ft7
FILENAME: CCL-0104-021.DGN APPD: MGL
DWG SIZE DRAWING NO. REVISION
1 06/05/2020 UPDATE RAMP, DITCH, TURN AROUND GRADING, & EXISTING CONTOURS. JTTD MGL RMB MGL
0 10/16/2019 ISSUED FOR CONSTRUCTION. JTTD MGL — — ANSI D 22.0"x34.0" `+ CCL-0104-021 1
NO. DATE REVISION DFTR DES CHKD APPD
7 8 9 10
m
-F
2
NOTES:
1. CLASS OR MEDIAN SIZE OF RIPRAP AND LENGTH,
WIDTH AND DEPTH OF APRON TO BE SHOWN ON
PLANS.
2. RIPRAP SHOULD EXTEND UP BOTH SIDES OF THE
APRON AND AROUND THE END OF THE PIPE OR
CULVERT AT THE DISCHARGE OUTLET AT A MAXIMUM
SLOPE OF :1 AND A HEIGHT NOT LESS THAN TWO
THIRDS THE PIPE DIAMETER OR CULVERT HEIGHT.
3. THERE SHALL BE NO OVERFLOW FROM THE END OF
THE APRON TO THE SURFACE OF THE RECEIVING
CHANNEL. THE AREA TO BE PAVED OR RIPRAPPED
SHALL BE UNDERCUT SO THAT THE INVERT OF THE
APRON SHALL BE AT THE SAME GRADE (FLUSH) WITH
THE SURFACE OF THE RECEIVING CHANNEL. THE
APRON SHALL HAVE A CUTOFF OR TOE WALL AT THE
DOWNSTREAM END.
4. THE WIDTH OF THE END OF THE APRON SHALL BE
EQUAL TO THE BOTTOM WIDTH OF THE RECEIVING
CHANNEL. MAXIMUM TAPER TO RECEIVING CHANNEL
5. ALL SUBGRADE FILL FOR STRUCTURE TO BE
COMPACTED TO 95% OF THE STANDARD PROCTOR
MAXIMUM DRY DENSITY OR TO THE DENSITY OF THE
SURROUNDING UNDISTURBED MATERIAL.
6. THE PLACING OF FILL, EITHER LOOSE OR COMPACTED,
IN THE RECEIVING CHANNEL SHALL NOT BE ALLOWED.
7. NO BENDS OR CURVES IN THE HORIZONTAL
ALIGNMENT OF THE APRON UNLESS OTHERWISE
SHOWN.
8. TYPE 1 GEOTEXTILE FILTER FABRIC SHALL BE
INSTALLED ON COMPACTED SUBGRADE PRIOR TO
PLACEMENT OF RIPRAP.
9. ANY DISTURBED AREA FROM END OF APRON TO
RECEIVING CHANNEL MUST BE STABILIZED.
3
_z
J A-
0
a
W2
END OF FLARES
SECTION
re
W1
END OF APRON
PLAN
1' MIN
FILTER FABRIC LAP (IF NEEDED)
ELEVATION
NATURAL GRADE
RIPRAP
IIII IIII =
9 2 2 IIII= IIII=_
II
H =111111 1 1 111IM-
II=
1111==111 II = T (THICKNESS)
IIalll= � =IIII.
LAYER OF TYPE 1 T = 1.5 X DMAX
NOTE: GEOTEXTILE FILTER FABRIC
MINIMUM H=2/3
PIPE DIAMETER SECTION B
NOTE:
USE USDA NOMOGRAPH FROM NC SEDIMENT AND EROSION CONTROL MANUAL.
OUTLET
Lo
(FT)
W1
(FT)
W2
(FT)
*T
(IN)
H
(IN)
D50 RIPRAP
SIZE (IN)
HW Al
10.0
1 1 .5
4.5
13.5
12
6
HW 131
16.0
19.0
6.0
13.5
16
6
HW C 1
16.0
19.0
6.0
13.5
16
6
OUTLET D 1
10.0
11.25
3.25
24.0
12
6
*D50 (SEE FIG 8.06 A&B "NC SEDIMENT AND EROSION CONTROL MANUAL"
DMAX = 1.5 * D50
T = 1.5 * DMAX
T(MIN) = 10"
RIPRAP APRON AT PIPE OUTFALL DETAIL �
SCALE: NOT TO SCALE 0103-022
0103-027
SILT FENCE AS NEEDED
FILTER MEDIA (SEE NOTE 2)
PUMP
FLOW
VEGETATIVE BUFFER
NOTES:
1. PRIOR TO INSTALLATION, MANUFACTURER SPECIFICATIONS OF FILTER
MEDIA SHALL BE PROVIDED TO THE EROSION CONTROL INSPECTOR
FOR APPROVAL AND USE. DISCHARGE FROM FILTER MEDIA SHALL MEET
OR EXCEED THE PROVISIONS OF THE CLEAN WATER ACT.
2. ENSURE THAT PUMP PRESSURE DOES NOT EXCEED FILTER MEDIA
PRESSURE RATING.
3. FILTER MEDIA MAY BE, BUT NOT LIMITED TO, SAND MEDIA FILTRATION
DEVICES, RATED FILTER FABRIC BAGS OR POLYMER BASED
DEWATERING PRACTICES.
4. PUMP STRAINER SHALL NOT BE IN CONTACT WITH BOTTOM OF POND.
EROSION CONTROL DEWATERING DETAIL 3
SCALE: NOT TO SCALE 0105-001
WATER LEVEL
LOW POINT
HDR Engineering, Inc. of the Carolinas License Number: F-0116
440 S Church Street, Suite 1000 Charlotte, NC 28202-2075
INCHES 1 2 3 TENTHS 10 20 30 4
5
TEMPORARY
FLEXIBLE HOSE
FILTER FABRIC TYPE 2
SEDIMENT BAG TOP OF BANK
(TIE TO TEMPORARY
(SEE NOTE 2) CTA 011 17Cf1 nI ITI CT\
7
SEDIMENT REMOVAL DEVICE
APPROXIMATE
BASE FI nw
WATER
TOP OF BANK
Tr\AM/lMAM\/
OSE
\IT BAG
TEMPORARY STABILIZED OUTLET SECTION
s
FLOW �.
IMPERVIOUS DIKE
(SEE r.inT� sz�
O
APPROXIMATE BASE
FLOW WATER LEVEL
(6") BASE FLOW + 1'
(2' MIN)
SANDBAG/STONE
_ (CLASS A) (SEE NOTE 8)
F WORKING AREA
1-1-1-1-1 I I- -1 i'
�11= IMPERVIOUS MEMBRANE
=IIII I TYPE 2
IMPERVIOUS DIKE DETAIL
NOTES:
1. SEDIMENT FILTER BAG FABRIC SHALL BE GEOTEXTILE MANUFACTURED FROM WOVEN
POLYPROPYLENE OR POLYMER MATERIAL. SEDIMENT FILTER BAG FABRIC MAY BE MADE
FROM RECYCLED POLYMER MATERIALS. POLYMER MATERIALS SHALL NOT CONTAIN
BIODEGRADABLE FILLER MATERIALS AND SHALL CONFORM TO THE REQUIREMENTS IN
ASTM DESIGNATION: E 204
2. THE SEDIMENT FILTER BAG SHALL BE 10'X12'X1.5' (MIN) AND SHALL BE COMPLETE WITH LIFTING LOOPS
AND DUMP STRAPS ATTACHED AT THE BOTTOM TO FACILITATE EMPTYING OF THE SEDIMENT FILTER BAG.
3. LIFTING STRAPS SHOULD BE PLACED UNDER THE DEWATERING SEDIMENT FILTER BAG TO FACILITATE
REMOVAL AFTER USE.
4. PLACE THE DEWATERING SEDIMENT FILTER BAG ON A LEVEL STABILIZED AREA OVER DENSE
VEGETATION/STRAW, OR GRAVEL (IF INCREASED DRAINAGE SURFACE AREA IS NEEDED).
5. INSERT DISCHARGE HOSE FROM PUMP INTO THE DEWATERING SEDIMENT FILTER BAG A MINIMUM OF 6
INCHES AND TIGHTLY SECURE WITH ATTACHED STRAP TO PREVENT WATER FROM FLOWING OUT OF THE
UNIT WITHOUT BEING FILTERED.
6. REPLACE THE UNIT WHEN 1 /2 FULL OF SEDIMENT OR WHEN SEDIMENT HAS REDUCED THE FLOW RATE
OF THE PUMP DISCHARGE TO AN IMPRACTICAL RATE.
7. REMOVE THE UNIT AND SEDIMENT FROM ENVIRONMENTALLY SENSITIVE AREA AND WATERWAYS. AT THE
APPROVED DISPOSAL SITE, OPEN OR SLIT THE UNIT, REMOVE SEDIMENT AND GRADE SMOOTHLY INTO
EXISTING TOPOGRAPHY. DISPOSE OF THE DEWATERING SEDIMENT FILTER BAG, AT AN APPROPRIATE
RECYCLING OR SOLID WASTE FACILITY.
8. INSTALL ROCK BERM AROUND FILTER BAG.
DEWATERING SEDIMENT FILTER BAG DETAIL �1
SCALE: NOT TO SCALE 0105-001
SILT FENCE
SEE DETAIL
2\CCL-0105-005
-1 I I-1' � -' I_I- .
I. �
10 (TYP) III SOIL/SEDIMENT -'Il=
3 -III-'' STOCKPILE AREA = -'ll- 3
1 =1 I I-' 11 1
-1IIIIIIF Q IIIIII-
ORIGINAL GROUND SURFACE
NOTES:
1. SILT FENCE TO EXTEND AROUND ENTIRE PERIMETER OF STOCKPILE, OR IF
STOCKPILE AREA IS LOCATED ON/NEAR A SLOPE, THE SILT FENCE IS TO EXTEND
ALONG CONTOURS OF THE DOWN -GRADIENT AREA.
2. IF STOCKPILE IS TO REMAIN FOR MORE THAN 14 DAYS, TEMPORARY STABILIZATION
MEASURES MUST BE IMPLEMENTED.
3. SILT FENCE SHALL BE MAINTAINED UNTIL STOCKPILE AREA HAS EITHER BEEN
REMOVED OR PERMANENTLY STABILIZED.
4. THE KEY TO FUNCTIONAL TEMPORARY STOCKPILE AREAS IS WEEKLY INSPECTIONS,
ROUTINE MAINTENANCE, AND REGULAR SEDIMENT REMOVAL.
5. TEMPORARY STOCKPILE TO HAVE A MAXIMUM HEIGHT OF 15'
TEMPORARY STOCKPILE E&SC DETAIL 4
SCALE: NOT TO SCALE 0105-001
Ess Rod"�
- SEAL
• t9t 7911
Js
%Z ° : w
x/ •...........
PE SEAL
5 6
1 I
1 06/05/20201 UPDATED DETAIL 1.
0 10/16/20191 ISSUED FOR CONSTRUCTION.
NO. DATE REVISION
1
TEMPORAR
FLEXIBLE
HOSE
DEWATERING PUMP
Y
CCL-0105-008 IREV. 1
GENERAL NOTES:
1. FOR GENERAL NOTES SEE CCL-0100-004.
FOR DRAWING INDEX SEE CCL-0100-001.
FOR ABBREVIATIONS SEE CCL-0100-002.
FOR LEGEND AND SYMBOLS SEE
CCL-0100-003.
CLEAN WATER
PUMP -AROUND PUMP
TEMPORARY FLEXIBLE HOSE
EXISTING CHANNEL
IMPERVIOUS DIKE
(SEE DETAIL, THIS
DRAWING)
SEDIMENT REMOVAL DEVICE 6 TEMPORARY STABILIZED OUTLET
SEE DETAIL 2 ON THIS DRAWING SEE DETAIL 2 ON THIS DRAWING
PLAN VIEW
NOTES:
1. ALL CHANNEL WORK INVOLVING EXCAVATION SHALL BE PERFORMED IN DRY
CONDITIONS OR IN CHANNEL SECTIONS ISOLATED BY IMPERVIOUS DIKES AND
KEPT DE -WATERED.
2. THE CONTRACTOR SHALL NOT DISTURB MORE AREA THAN CAN BE STABILIZED
THE SAME WORKING DAY.
3. PUMP -AROUND PUMP AND HOSE SHALL ADEQUATELY CONVEY BASEFLOW
(CONTRACTOR TO VERIFY). DE -WATERING PUMP SHALL ADEQUATELY DE -WATER
THE WORKING AREA AT THE DOWNSTREAM IMPERVIOUS DIKE.
4. GRAVITY -BASED GEOTEXTILE BAG FILTERS SHALL BE USED TO COLLECT SILT AND
SEDIMENT FROM WORK AREA DE -WATERING. THE DESIGNER MAY SPECIFY A
SEDIMENT BASIN OR OTHER SEDIMENT CONTROL MEASURE IN LIEU OF A
SEDIMENT BAG IF SITE CONDITIONS ARE FAVORABLE (I.E. - TREES WILL NOT BE
IMPACTED FOR BASIN EXCAVATION, ETC.).
5. EFFLUENT FROM CLEAN WATER PUMP AROUND MAY BE DISCHARGED DIRECTLY
INTO STABILIZED OUTLET (NO SEDIMENT REMOVAL DEVICE REQUIRED).
6. A STABILIZED OUTLET SHALL BE USED TO CONTROL THE EFFLUENT FROM ALL
PUMPING OPERATIONS. THE DESIGNER SHALL SPECIFY ALL MATERIALS AND
DIMENSIONS ASSOCIATED WITH STABILIZED OUTLETS.
7. FILTER FABRIC AS SPECIFIED BY THE DESIGNER SHALL BE USED UNDERNEATH
ALL STONE/RIP RAP PLACED FOR SEDIMENT BAGS, STABILIZED OUTLETS, SPLASH
PADS.
8. IMPERVIOUS DIKES SHALL BE CONSTRUCTED TO ISOLATE THE IN -STREAM
WORKING AREA. AN IMPERVIOUS FABRIC MEMBRANE AND SAND BAGS OR STONE,
AS SPECIFIED BY THE DESIGNER, SHALL BE USED TO CREATE THE DIKES. ADD
BENTONITE AS NEEDED TO REDUCE FLOW THROUGH AND AROUND IMPERVIOUS
DIKE.
9. INSTALL FLOAT SYSTEM WITH AUTOMATIC PUMP START.
10. PROVIDE 24 HR MONITORING DURING PUMP AROUND OPERATION.
11. THE WORK SEQUENCE IN PUMP -AROUND OPERATIONS PROCEEDS TYPICALLY AS
FOLLOWS:
A. INSTALL SEDIMENT REMOVAL DEVICE AND TEMPORARY STABILIZED OUTLETS
AT THE DOWNSTREAM END OF WORKING AREA.
B. INSTALL PUMP -AROUND PUMP AND FLEXIBLE HOSE.
C. INSTALL UPSTREAM IMPERVIOUS DIKE AND BEGIN PUMPING (CLEAN WATER)
DOWNSTREAM TO STABILIZED OUTLET.
D. INSTALL DOWNSTREAM IMPERVIOUS DIKE AND DE -WATERING PUMP.
E. PERFORM CHANNEL WORK IN ACCORDANCE WITH THE PLANS IN THE
WORKING AREA.
F. DE -WATER THE WORKING AREA (AS NEEDED) INTO THE SEDIMENT REMOVAL
DEVICE AND TEMPORARY STABILIZED OUTLET.
G. UPON COMPLETION OF WORK, REMOVE ANY SEDIMENT ACCUMULATION
BEHIND IMPERVIOUS DIKES.
H. REMOVE DOWNSTREAM AND THEN UPSTREAM DIKES AND ALL PUMPS AND
HOSE.
I. SEED AND MULCH ALL DISTURBED AREAS PER THE PLANTING PLAN.
J. REMOVE ALL PUMP AROUND MEASURES AND RESTORE AREA TO EXISTING
CONDITIONS OR PER PLAN DESIGN IF APPLICABLE.
PUMP -AROUND DETAIL
SCALE: NOT TO SCALE 0103-012
TITLE
AUXILIARY SPILLWAY
EROSION AND SEDIMENT CONTROL
DETAILS
FOR
CEDAR CLIFF IDF & SPILLWAY UPGRADE
DUKE
SCALE: AS NOTED DES: MGL
DWG TYPE: DGN DFTR: JTTD
JOB
ENEN%.7YO NO:10060948
CHKD: RMB
FILENAME: CCL-0105-008.DGN APPD: MGL
DWG SIZE DRAWING NO. REVISION
JTTD MGL RMB MGL
JTTD MGL - - ANSI D CCL-O 105-008 1
DFTR DES CHKD APPD 22.0"x34.0"
8 9 10
1 1 1
CLEAN WATER
PUMP -AROUND PUMP
TEMPORARY FLEXIBLE HOSE
EXISTING CHANNEL
IMPERVIOUS DIKE
(SEE DETAIL, THIS
DRAWING)
SEDIMENT REMOVAL DEVICE 6 TEMPORARY STABILIZED OUTLET
SEE DETAIL 2 ON THIS DRAWING SEE DETAIL 2 ON THIS DRAWING
PLAN VIEW
NOTES:
1. ALL CHANNEL WORK INVOLVING EXCAVATION SHALL BE PERFORMED IN DRY
CONDITIONS OR IN CHANNEL SECTIONS ISOLATED BY IMPERVIOUS DIKES AND
KEPT DE -WATERED.
2. THE CONTRACTOR SHALL NOT DISTURB MORE AREA THAN CAN BE STABILIZED
THE SAME WORKING DAY.
3. PUMP -AROUND PUMP AND HOSE SHALL ADEQUATELY CONVEY BASEFLOW
(CONTRACTOR TO VERIFY). DE -WATERING PUMP SHALL ADEQUATELY DE -WATER
THE WORKING AREA AT THE DOWNSTREAM IMPERVIOUS DIKE.
4. GRAVITY -BASED GEOTEXTILE BAG FILTERS SHALL BE USED TO COLLECT SILT AND
SEDIMENT FROM WORK AREA DE -WATERING. THE DESIGNER MAY SPECIFY A
SEDIMENT BASIN OR OTHER SEDIMENT CONTROL MEASURE IN LIEU OF A
SEDIMENT BAG IF SITE CONDITIONS ARE FAVORABLE (I.E. - TREES WILL NOT BE
IMPACTED FOR BASIN EXCAVATION, ETC.).
5. EFFLUENT FROM CLEAN WATER PUMP AROUND MAY BE DISCHARGED DIRECTLY
INTO STABILIZED OUTLET (NO SEDIMENT REMOVAL DEVICE REQUIRED).
6. A STABILIZED OUTLET SHALL BE USED TO CONTROL THE EFFLUENT FROM ALL
PUMPING OPERATIONS. THE DESIGNER SHALL SPECIFY ALL MATERIALS AND
DIMENSIONS ASSOCIATED WITH STABILIZED OUTLETS.
7. FILTER FABRIC AS SPECIFIED BY THE DESIGNER SHALL BE USED UNDERNEATH
ALL STONE/RIP RAP PLACED FOR SEDIMENT BAGS, STABILIZED OUTLETS, SPLASH
PADS.
8. IMPERVIOUS DIKES SHALL BE CONSTRUCTED TO ISOLATE THE IN -STREAM
WORKING AREA. AN IMPERVIOUS FABRIC MEMBRANE AND SAND BAGS OR STONE,
AS SPECIFIED BY THE DESIGNER, SHALL BE USED TO CREATE THE DIKES. ADD
BENTONITE AS NEEDED TO REDUCE FLOW THROUGH AND AROUND IMPERVIOUS
DIKE.
9. INSTALL FLOAT SYSTEM WITH AUTOMATIC PUMP START.
10. PROVIDE 24 HR MONITORING DURING PUMP AROUND OPERATION.
11. THE WORK SEQUENCE IN PUMP -AROUND OPERATIONS PROCEEDS TYPICALLY AS
FOLLOWS:
A. INSTALL SEDIMENT REMOVAL DEVICE AND TEMPORARY STABILIZED OUTLETS
AT THE DOWNSTREAM END OF WORKING AREA.
B. INSTALL PUMP -AROUND PUMP AND FLEXIBLE HOSE.
C. INSTALL UPSTREAM IMPERVIOUS DIKE AND BEGIN PUMPING (CLEAN WATER)
DOWNSTREAM TO STABILIZED OUTLET.
D. INSTALL DOWNSTREAM IMPERVIOUS DIKE AND DE -WATERING PUMP.
E. PERFORM CHANNEL WORK IN ACCORDANCE WITH THE PLANS IN THE
WORKING AREA.
F. DE -WATER THE WORKING AREA (AS NEEDED) INTO THE SEDIMENT REMOVAL
DEVICE AND TEMPORARY STABILIZED OUTLET.
G. UPON COMPLETION OF WORK, REMOVE ANY SEDIMENT ACCUMULATION
BEHIND IMPERVIOUS DIKES.
H. REMOVE DOWNSTREAM AND THEN UPSTREAM DIKES AND ALL PUMPS AND
HOSE.
I. SEED AND MULCH ALL DISTURBED AREAS PER THE PLANTING PLAN.
J. REMOVE ALL PUMP AROUND MEASURES AND RESTORE AREA TO EXISTING
CONDITIONS OR PER PLAN DESIGN IF APPLICABLE.
PUMP -AROUND DETAIL
SCALE: NOT TO SCALE 0103-012
TITLE
AUXILIARY SPILLWAY
EROSION AND SEDIMENT CONTROL
DETAILS
FOR
CEDAR CLIFF IDF & SPILLWAY UPGRADE
DUKE
SCALE: AS NOTED DES: MGL
DWG TYPE: DGN DFTR: JTTD
JOB
ENEN%.7YO NO:10060948
CHKD: RMB
FILENAME: CCL-0105-008.DGN APPD: MGL
DWG SIZE DRAWING NO. REVISION
JTTD MGL RMB MGL
JTTD MGL - - ANSI D CCL-O 105-008 1
DFTR DES CHKD APPD 22.0"x34.0"
8 9 10
1 1 1