Loading...
HomeMy WebLinkAbout20201494 Ver 1_Shoreline Stabilization_20201125Submission Form Pre -Filing Meeting Information Before submitting this form please ensure you have submitted the Pre -Filing Meeting Request Form as we will not be able to accept your application without this important first step. The Pre -Filing Meeting Request Form is used in accordance with 40 C.F.R. Section 121.4(a) "At least 30 days prior to submitting a certification request, the project proponent shall request a pre -filing meeting with the certifying agency" and in accordance with 40 C.F.R. Section 121.5(b)(7), and (c)(5) all certification requests shall include documentation that a pre -filing meeting request was submitted to the certifying authority at least 30 days prior to submitting the certification request. Click here to read more information on when this form is needed prior to application submission or here to viewthe form. Attach documentation of Pre -Filing Meeting Request here: Irlando DWR Pre -Filing Meeting Request 51.44KB Form.pdf Pre -fling Meeting or Request Date 10/19/2020 ID# 20201494 Version 1 I. Applicant Information [15A NCAC 02H .0502(a)] Please note: fields marked with a red asterisk below are required. You will not be able to submit the form until all mandatory questions are answered. Primary Contact Email * Owner Information: Name: * Email:* Phone Number:* Mailing Address:* donna.laneasterdocks@gmail.com Rease provide an er ail address for payment and requests for more infornation here. Andres Irlando airlando@yahoo. com (213)505-7810 (xxx)xxx-xxxx Street Address 1646 Friar Tuck Road Northeast Address Line 2 City Atlanta Rbstal / Zip Code 30309-2612 State / Frovince / Region GA Country Us Is there an agent working on the F Yes project?* r No Agent/Consultant Information Name: * Donna P. Hrko Company Affiliation:* Lancaster Custom Dock and Lift Systems, Inc. Email:* donna. lancasterdocks@gmaiL corn Phone Number:* (304)629-6096 (XXX)XXX-XXXX Address:* Street Address 1156 Perth Road Address Line 2 City State / Province / Region Troutman NC Fbstal / Zip Code Country 28166-8640 US Asigned and dated copy of the Agent Authorization letter:* Irlando Signed Agent Authorization Form.pdf 147.87KB Link to: Sample Agent Authorization Form Project Information [15A NCAC 02H .0502(a) & (b)] Project Name:* Irlando Dock Dredge If your project has a formal name please use this. If your project does not hake a formal name, please identify your project by the owner name and proposed activity (Jones Property Access Road, Smith Guest House, etc.) List in parentheses any other names that have been used to identify the project in the past. 1. Provide a vicinity map (i.e. street map) clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads.* r Upload File r Lookup address Property Address Lookup:* Street Address 108 Teakwood Lane Address Line 2 city Mooresville Fbstal / Zip Code 28117-7565 Latitude:* 35.520518 State / Province / Region NC Country US Longitude:*-80.894307 2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing, structures (buildings, retaining walls, docks, impervious surfaces, etc.), rip rap, excavation or dredging below Full Pond/ Normal Water Level elevations, and construction access corridors. You may use the diagram under section 12.normal pool lake level/normal water level* Irlando Dredge Application Packet.pdf 6.59MB Please use the diagram at the link below: https://edocs.deq.nc.gov/WaterResources/0/edoc/616616/Shoreline%20Layout.docx 3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of some sort- a yard stick, shovel handle, etc.)* Irlando Shoreline Photos.pdf 532.98KB 4. Location of the property (where work is to be conducted) Nearest Town:* Mooresville County:* Iredell Lake/ river/ ocean adjacent to Norman property: Subdivisions name or site address:* Sailors Lair Lot #12 Include phasellot number Directions to site:* From I-77 NB, Exit 31, Left onto Langtree Road, Take 2nd right in traffic circle and proceed straight on Langtree Road, Right onto Schooner Rd, Right onto Teakwood Lane. Property is on the left immediately adjacent to Sailors Bay Court (on right side of property looking toward the lake). Rease include road nacres and numbers, landmarks etc. 5. Describe the existing land use or condition of the site at the time of this application:* Residential Residential, undeveloped, etc. 6. Pro pertySize .690 Acres 7. Describe proposed work (include discussion as to how hardening of shoreline has been avoided, or why it is necessary): Remove existing dock. Dredge area for boating access. Construct a new fixed pier and covered dock. NOTE: Shoreline refresh was erroneously included in the prefiling meeting project scope and title however this work will not be performed under this contract. Shoreline stabilization approval is NOT being sought at this time. 8. How will the work be done? * I7 From Land V From Water 9. Total amount of disturbance below the normal pool lake level/ normal water level:* (including all clearing, back fill, excavation, rip rap, retaining walls, etc.) 1,680 sf square feet 10. Total amount of disturbance above the normal pool lake level/ normal water level and 50 feet land -ward:* (including all clearing, back fill, excavation, rip rap, retaining walls, etc.) 500 sf square feet 11. Please describe the vegetation above the normal pool lake level/ normal water level and 50 feet landward to be impacted:* (number of trees, for instance) None Sketch: Application Fee: Once the application has been accepted. You will need to send a corresponding fee in with the appropriate DWR#. The application fee is as follows (pursuant to G.S. 143-215.3D): 0 $240.00 for impacts to lake (below normal water level) of less than 1 acre 0 $570.00 for impacts to lake (below normal water level) of greater or equal to 1 acre By digitally signing below, I certify that: o I, the project proponent, hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief o I, the project proponent, hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. o I agree that submission of this Shoreline Stabilization online form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); o I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); 0 1 understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND o I intend to electronically sign and submit the Shoreline Stabilization online form. Full Name:* DonnaP. Hrko Signature:}7 Initial Review Is this accepted into the review process?* Project Number:* 20201494 Select Reviewer:* Select Reviewing Office Has payment been received?* What amount is owed?* rYes allo Version:* 1 Alan Johnsomeads\adjohnsonl Mooresville Regional Office - (704) 663-1699 r No Payment Needed r Fee Received r Need Fee - send electronic notification r $240.00 f $570.00 AGENT AUTHORIZATION FORM PROPERTY LEGAL DESCRIPTION: LOT NO: 12 PLAN NO: STREET ADDRESS: 108 Teakwood Lane Mooresville, NC 28117 Please print: Owner: Andres Irlando Property Owner: PARCEL ID: 4634693777 The undersigned, registered property owners of the above noted property, do herebyauthorize Donna P. Hrko of Lancaster Custom Dock and Lift Systems, Inc. (Contractor/Agent) (Name of consulting firm) to act on my behalf and take all actions necessary for the processing, issuance and acceptance of this permit or certification and any and all standard and special conditions attached. Property Owners Address (if different than property above): 1646 Friar Tuck Road NE Atlanta, GA 30309 Telephone: (213)505-7810 We hereby certify the above information submitted in this application is true and accurate tothe best of our knowledge. A/� Authorized Sign ture 11-6-2020 Authorized Signature Date Date CATAWBA RIPARIAN BUFFER NOTIFICATION FORM Project Name/address: IV, Owner: / - ky i ci +re 5 i r Print Contractor/agent: — Print ty: ire Z8117 The approval is for the purpose and design described in your application. Impacts not indicated in the application is a violation of the Buffer Rule. Site specific work should be provided in the application. [15A NCAC 02H .0506 and 15A NCAC 02B .0243(8)] Trees are not allowed to be removed from Zone 1 of the Buffer (within 30 ft of the full pond elevation), unless approved. Exception, those trees that are severely undermined along the immediate shoreline can be removed. Minimal shaping and sloping along the immediate shoreline is allowed. [15A NCAC 02B .0243(6)] Benching, grading in the buffer is not allowed. Excessive disturbance of ground cover. 115A NCAC 02B .0243 (6)] Beaches, impervious patios, impervious walkways, etc. are not allowed in the buffer unless specifically approved by the Division. There are limitation on size for decks. [15A NCAC 028 .0243(4) and (6)] Work to be conducted from land must indicate an access and indicate any trees that are to be removed. The work corridor should be described. The approved access corridor shall be restored. Staging, spoil, construction material must be outside the buffer. [15A NCAC 02H .0502 and 15A NCAC 02B .0243 (4), (6), (8)] 5tormwater cannot be piped or channeled for direct discharge to the lake. All constructed stormwater discharges must be at the natural elevation and discharged prior to entering the buffer directed as diffuse or sheet flow at non -erosive velocities to the lake. 115A NCAC 02B .0243(5), (6)] Acknowledgement of Notification I, Andy-C S .1 r L Q n d n , hereby state that I have been informed of the Catawba Riparian Buffer Rule. Any work conducted in the buffer, not specifically stated in the application and approved by the Division of Water Resources (DWR), is a violation and subject to enforcement. Due diligence will be taken such that the construction will be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plan(s) and specification(s), and other supporting materials. Signature (owner): Date: �w State of North Carolina Department of Environment and Natural Resources Division of Water Resources Water Resources 15A NCAC 02H .0500 — Water Quality Certification, Shoreline Stabiiization ENVIRONMENTAL QUALITY FORM: SSGP 02-2017 Please approximately sketch the following information on this plan and provide dimensions far each item: a. All proposed vegetation clearing b. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation c. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation d. Location of any proposed structures such as buildings, retaining walls, docks, etc. e. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation Full Pond/ Normal Water Shoreline Plan View FORM: SSGP 02-2017 La ke (At Full Pond/ Normal Water 10 Lake Iu cuu Pond/N—.1 wager L-1q Existing Dock /3a ha7 It rrrrr..wr...� rr�r r�i r�'rr rrrffr ��+r �iwwSiw��� iw� E AMP E Plan View Ale- wz,,k Op to �011 Page 1 of 3 Duke Energy Lake Services Guidance for Completing an Excavation Permit Application Notre: If you are proposing excavation in association with the permitting of a new or expanded facility under the Marina or Conveyance Programs, you do not need to complete this application. Instead, you should incorporate the excavation request into the permit application for the marina/conveyance using the appropriate application. Step 1: Contact Duke Energy Lake Services Complete "Part r' of the application and develop a drawing of the proposed excavation area. Contact Duke Energy Lake Services to schedule a site visit. Lake Services will conduct a site visit to determine if Duke Energy will accept an excavation permit application for the proposed work. If the Lake Services representative determines the application process may proceed, he/she will initial Part I of the application. Step 2: Draft Application Development Complete Parts II-III.A-G and Part V of the Excavation Permit Application. Step 3: Agency Consultation Send the draft application developed during Step 2 to the agencies for review and comment on the proposed activity. Refer to the Agency / Organization List available from Duke Energy to determine which federal, state, regional, and local agencies and organizations require consultation or review. Note: Dube Energy reserves the right to require consultation with additional organizations beyond those included in the Agency / Organization List. Each agency / organization must be provided at least 30 days prior notification. Evidence must be provided (e.g., response letter or Certified Mail receipt) in the complete application to show each agency / organization was given the opportunity to review the proposal. Consultation letters must be dated within the two years preceding Duke Energy's receipt of the application. All permits must be valid at time of application and have a term longer than the projected schedule for completing the permitted project. What to EAMt During Agency Review and Comment: • You will typically receive a letter from each agency / organization either documenting its concurrence with your proposal, requiring additional information, recommending modifications, or offering no continent. You must address each agency's / organization's comments with a follow-up letter and in your final application as described in part W. • If you do not receive any documentation from an agency / organization within 30 days of its receipt of your proposal, you must provide the agency / organization with a follow-up letter requesting comment on your proposal within 15 days from the date of the follow-up letter. If you still do not receive any response as a result of the second letter, type "NO RESPONSE" Duke Energy Page I of 13 rev 10/12019 Excavation Program at the top of the follow-up letter and include it in the application along with proof of the agency's / organization's receipt of the letter (e.g., Certified Mail receipt). You may proceed with the application process recognizing, however, that if its comments come later in the application process, you will be required to address them. From the United States Army Corps of Engineers (Corps): (* * Note — The Corps may have additional forms to submit for your proposal and an additional fee.) If the excavation can be done under the requirements of the General Permit (GP) or a Nationwide Permit (NWP), you will typically receive a copy of the Corps' tear sheet documenting authorization and providing any additional instructions. If the excavation isn't covered under the GP or a NWP, you'll be required to obtain an individual 404 Dredge and Fill permit from the Corps. You must receive written documentation from the Corps that your application either (1) meets the requirements of the GP or a NWP or (2) the proper 404 Dredge and Fill permit has been received before Duke Energy can process your application. From the North Carolina Department of Environmental Quality (NCDEQ), Division of Water Resources: (Note NCDEQ may have additional forms to submit for your proposal and an additional fee.) If the proposal meets the requirements of the Clean Water Act Sect. 401 Water Quality Certification, you will typically receive a letter from the NCDEQ Division of Water Resources documenting Sect. 401 Certification and providing any additional instructions. You may also receive a letter requiring additional information or recommending modifications. You must receive written documentation from NCDEQ noting any required Sect. 401 Certification has been received before Duke Energy can process your application. • From the North Carolina Wildlife Resources Commission (NCWRC): If you do not receive any documentation from the NCWRC within 30 days of their receipt of your application, you may proceed with the application process without submitting a follow-up request, recognizing however if comments come in later in the application process, you will be required to address them. From the South Carolina Department of Health and Environmental Control (SCDHEC): (Note — SCDHEC may have additional forms to submit for your proposal and an additional fee) The SCDHEC conducts a joint application process with the USACOE in S.C. If the proposal meets any applicable requirements of the Clean Water Act Sect. 401 Water Quality Certification, you will typically receive a letter from SCDHEC documenting Sect. 401 Certification and providing any additional instructions. You may also receive a letter from USACOE requiring additional information for the agencies participating in the joint application process. You must receive written documentation from SCDHEC noting Sect. 401 Certification has been received if required before Duke Energy can process your application. • From the South Carolina Institute of Archaeology and Anthropology (SCIAA): The applicant must wait 30 days after receiving the signed postal returned receipt. If a response from SCIAA has not been received by this time you may proceed with the application process without submitting a follow-up request, recognizing however if comments come in later in the application review process, you will also be required to address them. Duke Energy Page 2 of 13 rev 10/1/2019 Excavation Program Step 4: Final Application & Submittal to Duke Energy Following the consultation process, finalize the application. The final application submitted to Duke Energy should incorporate all comments and recommendations provided by agencies and organizations during the agency consultation process as well as copies of all permits received In addition to the fmal application include the following: • One check payable to Duke Energy for the application fee and security deposit • If applicable, a separate check payable to the appropriate Habitat Enhancement Program fund • Signed Excavation Program Applicant's Agreement Note: Co -applicants must also submit the application fees and applicable HEP fees with the application. Duke Energy Page 3 of 13 rev 10nY2019 Excavation Program Duke EneM Excavation Permit Application Form FOR DUKE ENERGY USE ONLY Duke File No. Application Fee $ Security Deposit $ Check 4 Date Recv'd Initials Date of Duke Energy Lake Services, applicant and/or contractor on -site inspections Date l0 car Z42itialsC.1.{ Date Final Protection/Avoidance Area Markings Field - Verified Initials Approved to Start Work By * : (Prim) Date Completion Required Date of Any Approved Extension Date Passed Closeout Inspection* Initials (.Senn) Initials Date Any Stop Work Orders or SMG Violations*? (check one) ❑Yes ❑No (if Yes. explain in PART V ) Date Deposit Refunded Initials Date Permit Database Updated Initials * Forward copy of approved application (all pages, plus any attachments that puke Energy changed) back to applicant with Approval Letter and highlight any changes. File copies of Approval and Close-out Checklists and any Stop Woric Orders with application. Part 1. Applicant Information (Please Print) Name n5 ly-lando _I Telephone Zt 3 - 505 - 7810 Email address: 1 r 1 [ Irj Ci Q t `� `f Q + J QQ , r cm L e Address Madin Address,(ifdifferent _reo wood Ln _ I ( Lo t- � ar iu� 96 _ NP M oore6vj I i e. NE ZS 117 o 0 Contractor Company Contractor Contact Person Contractor Email Address: LAKE LOT INFORMATION FiN pp Lake�bsrlY '1County Ire—dell.City r i� State Tax Map No. 3777 Subdivision Sal lor5 Loll r Lot / Section No. 12, Lot Size ZAcres Duke Energy Page 4 of 13 rev 10/l/2019 Excavation Program Duke Enemy Excavation Permit Application Form Are there any Co -Applicants*? (check one) ❑Yes QNo (If Yes, include names, street addresses or lot numbers, pier numbers, phone numbers, and email addresses in Part V — Additional information) * Co -Applicants exist when the proposed work is being done under a single application, will be performed by a single contractor as one continuous project, and is done to benefit multiple owners / lease holders of Project -front properties within a single development. There can be no more than 4 co -applicants in addition to the lead applicant on any application. Do not continue the application until an on -site inspection has been conducted between a Duke Energy Lake Representative and the applicant and/or the excavation contractor. NOTE: Initialling this portion of the application by a Lake Representative in no way constitutes approval or eminent approval of the excavation or any other lake use permitting activity. Date of on -site inspection to 7-0 Z ' Initials (Duke Energy) 4W - (applicant/contractor) C)e Duke Energy Page S of 13 rev 10l1C2019 Excavation Program D_uke_Eneray_ Excavation Permit Aunlication Form Part IL Description of Project A. Basic Information 1. Type of excavation: (check one) Plfgew excavation ❑ Maintenance excavation 2. Purpose of excavation: (check one) Ptoat Access Channel ❑ Water Intake Channel ❑ Wastewater Discharge Channel ❑ Other (spec): 3. Lake user category: (check one) OPrivate ❑Residential Marina [Commercial Marina ❑Public ❑Other (specify): 4. Max. Excavation Area Dimensions (ft): Length -V4* Width Depth L6 (Note: include additional area dimensions if necessary so response to #5 below equals max. area dimensions in 44) 5. VoIume of Excavated Material (TOTAL for the project): 07- `C,ubiic�yards 6. Type of material removed (applicant determines hyfeld sample ifpractical): Gann f 7. Excavation Site area: . L138 Acre (s) Disposal Site area: • 1038 Acre(s) 8. Total Disturbed Area (including equipment staging area): • 6 Z�2 Acre (s) 9. Does theproject meet the requirements of the applicable General Permit? (check one) Ues Vo 10. Do you claim title to the disposal area? (check one) ❑Yes ZNo 11. Do you claim title to the equipment staging area? (check one) 04'Yes �o 12. Are there any water-treatme facilities within 50 feet of the proposed excavation area? (check one) Yes Jo (If Yes, specify): 13. How will the excavated material be entrapped and the erosion controlled? (e.g. see attached Verosian control plan and disposal area design): —b*"ed�9e- W ►+v% lorn regc h P�CC x.V Or i'Q Mccke.+rigl in hopper- bcLr- es. Aout away e `n off lmd onty duM -h-LV- 'b Quad:=por4-ed +odi5po5a1Sl . Duke Energy Page 6 of 13 rev 10/112019 Excavation Program Duke EnerLyy Excavation Permit Application Form 14. Type(s) of excavation equipment to be used: LC r, �eaclh 5-xCa:ga+ y., 6j 10r+ React \ E-xcava+ow bame-S, dl�rnptr s 15. Will waters or wetlands he crossed in transporting equipment to or from the site? (check one) Yes ❑No (1 yes, explain) inc, equipmen+ i S hYiytS�pr vi a lraOw L �n Ja1cusf e-4- eus{�m oc.Vi 5 in D 514-e on L,C>LV,e Morm.ah , 16. Will return water re-enter the reservoir? (Check one) ❑Yes (If Yes, specify point(s) of re-entry and show on Excavation Area Drawing) P locthn P lanf w i h area �Pm-,- ❑No )OII/A 17. Is there an existing facility (e.g. pier) that access is being aintained to by colducting the 1 excavation? ❑Yes JONO a ''nQ dlaG��?�rej-rlaveC� y're�7/ctCea (If Yes, provide the exi i ermit nu be .�If No, inc d''ejja--s--c11a__led rawing of the proposed facility). Permit # G ee Ti `Oj EnQ r]eCfJ # 18. Total planned duration of the work (Include first equipment mobilization, excavation through final mitigation meas r s complete): START / FINISH (Month) (Year) (Month) (Year) Duke Energy Page 7 of 13 rev 1 a/ 1 no 19 Excavation Program Duke Energy Excavation Permit Application Form Part H. (Continued) B. Protection / Avoidance Area Description Complete the following table including all land areas within and immediately adjoining the disturbed area: Protection/Avoidance Areas Approx Identification Method * Avoid (A) or Mitigate (M) Acre Field ID Work Area Dw . ID (check all that apply) a. Marshland, swamp, ponds, beneficial /� aquatic vegetation or other potential wetlands circle allthat a ! `/ b. Buffer Zones (specify width & source of requirement) Dr W�11 �QZGD �Ied From YID piQi1} W51 w�ttl Ioe loadeda r.LclurxP owl I P�Q tcLLSWtE c. Environmental Areas as identified by Duke Energy d. Natural Areas as identified by Duke Energy e. Historic properties (specify) f. Rare or threatened species (spec) v A Duke Energy Page 8 of 13 Teti10.1 101y Excavation Program Duke Energy Excavation Permit Application Form Protection/Avoidanee Areas (check all that apply) Approx Identification Method Avoid (A) or Mitigate (M) Acre Field ID Work Area Dw,g. ID iz. Buried gas, water, sewer, communications or electric lines circle � yJ/A h. Impact Minimization Zones as identified by Duke EnergyV r i. Other areas requiring specific avoidance, protection or mitigation (spec) A f/A * For "Field ID" column, specify entity or person that performed the identification and how it was physically marked (e.g. Duke Energy (John Doe)/Pink and purple -dotted tape, Corps of Eng. (John Smith)/ yellow flagging). For "Work Area Dwg ID" column, show the symbol that is used on the drawings to identify the protection/avoidance area. ** List and attach mitigation plans Duke Energy Page 9 of 13 rev 10nn019 Excavation Program Duke Enerev Excavation Permit Application Form C. Applicant's Signatures Comments: Applicant Name (print) ft j Applicant Signature* Date i y r (o-2o2o Co -Applicant Name (print) Co -Applicant Signature* Date Co -Applicant Name (print) Co -Applicant Signature* Date Co -Applicant Name (print) Co -Applicant Signature* Date Co -Applicant Name (print) Co -Applicant Signature* Date *Per my signature, the information provided in this application is correct to the best of my knowledge. Duke Energy Page 10 of 13 rev 10/1/2019 Excavation Program Duke Enerev Excavation Permit Application Form Part III. Additional Information Deed and Survey Plat: A copy of the deed and registered survey plat or other instrument under which each applicant and co -applicant claims title to the affected property (the shoreline adjoining the excavation area, equipment staging area, area crossed by any spoil and return water lines, and the disposal area). If the applicant(s) is(are) not the owner(s) of said property, then forward a copy of the deed and registered survey plat or other instrument under which the owner(s) claim title plus written authorization from the owner(s) to carry out the project on their land. 131"l Excavation Area Drawing: An accurate drawing of the area to be excavated. The drawing must show at a minimum, a North arrow; the boundaries and acreage of the proposed excavation area and equipment staging areas; lake, county, city, cove, tributary, road and subdivision names and lot numbers (as applicable); property comers for project front lots; the full pond elevation contour and lines dividing the cove width into equal thirds (as applicable); approximate volume in cubic yards of the material to be excavated; point(s) of return water re-entry; the boundaries of any adjoining areas that are to be specifically avoided or protected during the work and the location (address) of the disposal area for the excavated material. [NOTE: A copy of this drawing must also be provided to the excavation contractor to ensure restricted areas are not impacted.] Disposal Area Drawing: An accurate drawing, of the proposed design for the disposal area. The drawing must show at a minimum, a North arrow; the boundaries and acreage of the proposed disposal area; lake, county, city, cove, tributary, road and subdivision names and lot numbers (as applicable); the full pond elevation contour (unless disposal is well away from the lake); the boundaries of any adjoining areas that are to be specifically avoided or protected during the work; the location (address) of the excavation area from which the material came and a statement of the disposal area's capacity with all dimensions labeled that were used in the volume calculation. [NOTE: A copy of this drawing must also be provided to the excavation contractor to ensure restricted areas are not impacted.] Also note for projects larger than one (1) acre in North Carolina, including excavated, equipment staging, and disposal areas, you must submit an erosion control plan. For projects larger than two (2) acres in South Carolina, including excavated, equipment staging and disposal areas, you must submit an erosion control plan. For projects < two (2) acres in South Carolina, you must submit a completed standard reportingform orm for construction sites disturbing two (2) acres or less to the South Carolina Dept. of Health and Environmental Control (SCDHEC) - Stormwater Management Vicinity Map and Driving Directions: A vicinity map and directions by road showing directions to both the excavation area and disposal area. Include the latitude and longitude of both the excavation area and the disposal area. Part IV. Agency Reviews and Approvals Begin this section with a summary table of all agencies consulted and applicant response to agency comments as shown in the example table below. Agencies should be listed in the order Duke Energy Page 11 of 13 rev 1041/2019 Excavation Program Duke Enerey Excavation Permit Application Form shown in the Agency/Organization List. Consultation letters must be dated within the two years preceding Duke Energy's receipt of the application. Table IV-1. Sample Agency Comment and Response Table Agency Comment Applicant Response Agency 1 The activi is a roved as proposed. NA y2 Agenc The on -site well provides drinking water to the Contacted Mr. Smith on 1/1/20xx. No public. Please contact Mr. Smith to discuss the further action needed. proposed changes and potential issues associated with youpipposal. You must contact us immediately if Applicant will contact Agency 2 if endangered species are located during the endangered species are located during course of construction. construction Azencv 3 Requested agency comments on 1/l/20xx and NA again on 2/1/20xx. No response as of 2/I 6/20xx. Agency 4 Section 401 Water Quality Certification Applicant will comply with the conditions of the 401 Water Quality Certification Following the table of agency comments and applicant responses, include a table of permits and certifications issued by the reviewing agencies. As with the table of agency comments and applicant responses, agencies should be listed in the same order as they are listed in the Agency/Organization List. Table IV-2. Sample Agency Permits and Certifications Table Agency Permit/Certification Name Date of Date of Issuance Expiration Agency 1 Surface Water Withdrawal Permit Agency 2 Section 401 Water Quality Certification Following the two summary tables, include a copy of all correspondence to and from any local, regional, state and federal agencies or other organizations with which you are required to consult, including any required permits (e.g., Section 401 water duality certifications, Section 404 dredge/fill permits, building permits, etc.) or other approvals or comments which have been obtained from these organizations regarding this activity. Include a copy of any local, regional, state or federal regulations or guidelines that will be followed. All permitting issues must be resolved and clearly documented. Correspondence should be organized in the order the agencies are listed on the Agency/Organization list with the applicant's request for comments followed by additional correspondence in chronological order. All permits must be valid at time of Duke Energy Page 12 of 13 rev 10/1/2019 Excavation Program Duke Enersv Excavation Permit Application Form application and have a term longer than the projected schedule for completing the permitted project. Part V. Additional Information Provide relevant additional information. Reference previous parts as applicable. Include the FERC-required Environmental Assessment if you were directed to do so during the initial site visit. if there are co -applicants, this is where their information would be provided (see Part I). Duke Energy Page 13 of 13 rev 1011/201 Excavation Program Type: CONSOLIDATED REAL PROPERTY Recorded: 8/7/2020 12:43:58 PM Fee Amt: $2,616.00 Page 1 of 4 Revenue Tax: $2,590.00 Iredell County, NC Ronald N. Wyatt Register of Deeds B K 2722 PG 1532 - 1535 NORTH CAROLINA GENERAL WARRANTY DEED Excise Tax: $ 2,590.00 Parcel Identifier No. 463469377 Verified by County on the day of , 20 By: Mail/Box to: GRANTEE This instrument was prepared by: KIMBERLY E. FOX PLLC 21031 Catawba Ave. Ste 104, Cometius, NC 28031 Brief description for the Index: LOT 12 SAILORS LAIR, THIS DEED made this _r,t'd-a-y of August , 2020 , by and between GRANTOR CECIL N. SMITH III and spouse, ANNE M. SMITH Co GRANTEE ANDRES FEDERICO IRLANDO and spouse, OLIVIA IRLANDO 1646 FRIAR TUCK RD NE ATLANTA, GA 30309 Enter in appropriate block for each Grantor and Grantee: name, mailing address, and, if appropriate, character of entity, e.g. corporation or partnership. The designation Grantor and Grantee as used herein shall include said parties, their heirs, successors, and assigns, and shall include singular, plural, masculine, feminine or neuter as required by context. WITNESSETH, that the Grantor, for a valuable consideration paid by the Grantee, the receipt of which is hereby acknowledged, has and by these presents does grant, bargain, sell and convey unto the Grantee in fee simple, all that certain lot, parcel of land or condominium unit situated in the City of MOORESVILLE Township, IREDELL County, North Carolina and more particularly described as follows: SEE ATTACHED EXHIBIT "A" The property hereinabove described was acquired by Grantor by instrument recorded in Book 2386 page 787 All or a portion of the property herein conveyed X includes or _ does not include the primary residence of a Grantor. A map showing the above described property is recorded in Plat Book 14 Page 1 of 2 NC Bar Association Form No. 3 C9 1976, Revised @ 1977, 2002, 2013 Printed by Agreement with the NC Bar Association — 1981 page 90 This standard form has been approved by: North Carolina Bar Association — NC Bar Form No. 3 Page Count q ROTC NS PQ St TO HAVE AND TO HOLD the aforesaid lot or parcel of land and all privileges and appurtenances thereto belonging to the Grantee in fee simple. And the Grantor covenants with the Grantee, that Grantor is seized of the premises in fee simple, has the right to convey the same in fee simple, that title is marketable and free and clear of all encumbrances, and that Grantor will warrant and defend the title against the IawfuI claims of all persons whomsoever, other than the following exceptions: Easements, Restriction and Rights of way ofmcord and the lien of ad valorem taxes which the Grantee hereby assumes and agrees to pay. IN WITNESS WHEREOF, the Grantor has duly executed the foregoing as of the day and year first above written. r (SEAL) (Entity Name) Prin ype N me: CECIL N. SMITH M By: �- ^'k�" � SEAL PrintiType Name & Title: Prin yp Name: ANNE M. SMITH By: PrintiType Name & Title: By: PrintiType Name & Title: (SEAL) Print/Type Name: SEAL Print/Type Name: State of North Carolina - County or City of IREDELL XI, the unders' ed Notary Public of the County or City of IREDELL and State aforesaid, certify that CE N. SNUTH n d s ouse ANNE M. SMITH personally appeared before me this day and ackno edged th ue execution of the foregoing instrument for the purposes therein expressed. Witness my hand and Notarial stamp or seal this th ay of Aup�Bt , 20 20 . My/CossiN res: Notary Public (Af) Notary's Printed or Typed Name tate of - County or City of I, the unders' ed Notary Public of the County or City of and State aforesaid, certify that personally came before me this day and acknowledged that _he is the of , a North Carolina or corpora 'on/li d liability company/general partnership/limited partnership (strike through the inapplicable), and that by authority duly give an the act of such entity, _he signed the foregoing instrument in its name on its behalf as its act and deed. Witness my hand an otarial stamp or seal, this day of , 20—• My C ssion ires: Notary Public (A Seal) Notary's Printed or Typed Name to of - County or City of 1, the un igned Notary Public of the County or City of and State aforesaid, certify that Witness d and Notarial stamp or seal, this day of , 20 M onunission E ires: Notary Public ffix Seal) Notary's Printed or Typed Name NC Bar Association Form No. 3 C 1976, Revised © 111/2010 Printed by Agreement with the NC Bar Association NOTARY ACKNOWLEDGEMENT FOR NORTH CAROLINA GENERAL WARRANTY DEED FROM CECIL N. SMITH III and ANNE M. SMITH (GRANTOR) to ANDRES FEDERICO IRLANDO and OLIVIA IRLANDO (GRANTEE) STATE OF N C/ COUNTY OF MQCkty�V C I, certify that the following person appeared before me this day, acknowledging to me that he or she voluntarily signed the foregoing document for the purpose stated therein and in the capacity indicated. CECIL N. SMITH III and ANNE M. SMITH (Name of Principal(s) (person(s) appe ' bore you) Witness my hand and official sea , thise'A day of Notary Public J Type or Print Name: 7 My Commission Expires: 3 uv�'z 2S ljti'� KIMBERLY E. FOX NOTARY PUBLIC Mecklenburg County, NO hly commission Expires June 25, 2023 (Notary Seal) EXHIBIT A ALL THAT CERTAIN LOT OR PARCEL OF LAND SITUATED IN IREDELL COUNTY, NORTH CAROL.INA AND MORE PARTICULARLY DESCRIBED AS FOLLOWS: TRACT ONE: BEING ALL OF LOT 12 OF THE SAILORS LAIR SUBDIVISION, AS SAME AS SHOWN ON A MAP OR PLAT THEREOF WHICH IS RECORDED 1N THE IREDELL COUNTY PUBLIC REGISTRY 1N BOOK 14, PAGE 90. TRACT TWO: THAT CERTAIN TRACT OF LAND CONTAINING 0.0260 ACRE BOUND ON THE EAST BY OTHER LANDS OF GRANTOR IN DEED BOOK 1545 PAGES 182 AND ON THE WEST BY DUKE POWER'S COWANS FORD HYDROELECTRIC PROJECT (LAKE NORMAN), AS SHOWN ON PLAT OF SURVEY ATTACHED TO DEED RECORDED IN BOOK 823, PAGE 029, IREDELL COUNTY REGISTRY, TRACT THREE: THAT CERTAIN TRACT OF LAIC❑ CONTAINING 0.0040 ACRE BOUND ON THE SOUTHEAST LANDS OF GRANTOR IN DEED BOOK 1545, PAGE 182 AND ON THE NORTHWEST BY DUKE POWER'S COWANS FORD HYDROELECTRIC PROJECT (LAKE NORMAN), AS SHOWN ON PLAT OF SURVEY ATTACHED TO DEED RECORDED IN BOOK 823, PAGE 29, IREDELL COUNTY REGISTRY. BEING THE SAME PREMISES CONVEYED BY DEED RECORDED IN IREDELL COUNTY IN BOOK 2386, PAGE 787. PIN: 4634693777.000 NOTES • PROPERTY wAy of susiv;F TD RECORDED oR INSIECORDED RIGHTS OF WAYS OR EASDA NTS NOT OBSFRIQD • OWNER TO VWFY All. SETBACKS AND ZONING RAULATIONS PRIOR TO ANY PLANNING OR CONSTRUCTION. • CIMDESONR OF ALL IMPRVANIENTS SHOWN ON THIS PLAT SHOULD NOT BE SCALED OR RLTIEO UPON FOR nFSGN OR CONSIRLIORON WRHOUT A MELD VE iIFMF10N OF AU DNENSION9. • DKGRAL COPIES OF THIS ALE ARE FOR REFEAD40E ONLY AND ANY NOT BE USED FOR DESIGN WORK • NO PORRON OF THE RO ODITUL STRUCTURE 19 LOCATED IN THE 100 YEAR FLOOD PLAI1. • A PORTION OF YEAS PROPFRT' 9 LCOATM R A 100 YEAR Flom PLAIN, Courm Rearing Distance L1 N 2T01 01 E 25.94 N 34'05 05 E 1 . L3 N 3751 31 W 10.32 L N 7U 12 20 E 22.79 L5 N 3542 28 E B 88 L8 N 473156 E 32. 2 L7 N 14 39 15 E 4.59 S 2732 00 E 7.12 10 PB 14-90 \ \ OF 10000OYEAR F1A UNE P8 14-90 � REHAB TRACT 2 0.690 AC I)B 2362-2407 TOTAL S� t a4 FENCE I t F WµL! R I _ 4 OB 23eY10 -27 TRACT 3 !- '- `A i4 aEaw DOCK 1 \ 1 APPROXHATE 780' CONTWR GNE PHYSICAL SURVEY FOR 40 a 40 90 120 ANDRES & OLrv" CR"EEC SCALE - FEET IRLANDO 108 TE/KNDOO LANE - MOORMWILLE, ND LOT #12. SAILORS ENR • 7 ACOMOINL PARCELS DAVIDSON 7OWaW. REDELk DDUNY, MC i DEDMON SURVEYS OCHUCK POOVEY, PLS 03762 FIB 14-90 ' 37a4 NC HIGHWAY fi NORTH 1 P.O. BOX 494 - DENVER, NC 28037 iASPYALT DRNRYrAY PHONE: 704/48314909 AWL IN DRPAWAY FAX:7041483/2170 r-__ _---__-_ --- I YWYW.DEDMONsURVEYi 01'S533 E. NAEL IN DWIVEWAr j 14!! tlllr� :r Sm _ \ f� .l ^'QJL 1 �Ap'sy4 Yq \\� 0a 4, \ � 'iMiiin", \ L ROBERT J. DEDMON, COMFY THAT THIS PLAT WAS DRAWN FROM AN AC7114 SURVEY LODE UNVER MY SWERMION (139 s3ee. Pa 737XM 14. PC 90): l* THAT THE RATIO OF PRECISION AS CALCUTATED WELL ., \. V' \ EXCEEDS 1n D.000% TENT THIS PUT WAS PREPARED _U •.• qA IN ACODRCANCE WnM OS 47-30 AS AYENOEO. WITNESS MY ODOINAL SIGNATURE, JULY TO, 7020. 277.7V Z- (�coEern ,1r. AC.d' 3899 30 .3B TOTAL '\ F-FE55ION& LAP40 SUMEYOR LCOME N0. OUTDOOR SHOWER \ SURV. FN: MP DRAWN: RD JOB% WSL12 ti VICINITY NAP SITE P814-90 ¢4 04 RERAR PLAT BOON ih90 eYM U,31A Z L15M /9af I ON iNMYNO I o .ntln 'ON 35NCM SWYM W1 Ia6 Md 6662 — ?-& 2Y 47c9 'OZOZ '3a 'OZ Alar ruvmvs MA9553 ao An NWN '03a0w W M-Lt SO RM 37NMOaooN NI C3fWg3ad Sm IrW 6INL lYNL :.000'01'L SOMX3 a34Y1n3TY.1 SW NOIS103ad .AO OILW 3NL U4AL (ae as •I 9d)(tot Od •09CZ 90) NOISY5lsfdnS AN IV 30YI'I A3NIn5 lYNI.7.' NY MU ILMWQ W SYL4 LYId 9INL i*U AdYA0 '_ 30 T id3BOa Y � , OLt[/£gilOOL:)(/j* ga61,/EgIFj"L:3N0Hd HOW )N'H3AN3(1.064 XOg 'O'd H1bON 9LIAVMHDIH 3N *OLE 669E# Md 'NOW030IN39OW zgLf4 Sld 'A3A00d )p:)no SARAI MS NOMMU At - .L 3"Mm ON '1U9100 TGMM '.nHSWOd. NMWp smmd TYNOMN Z • ar" Samlrs 'a if 1O3 ON '3TN1S'At" - 3NY1 OOOMWA 961 0GNV al VIAi'10 V SUxaxV Hod AHAMS WDISA.Hd of-tl mom LY1d � ava3a r/ o6+L 9d N13Mdfi5 aoaatnp '� -WIDI Bf'90f - 4 Tw ` \ to 10 r A - ---- ---- - ' AYNMHCI NI -MI 3 i£ SSt4 5 --- �--- - AYM3Nd0 NI 1IY11 - AYMLJaa J_W,dY 1 1 06-bL 9d \ � O MM - ZVOS DWdYUV 021 09 0i 0 0i Pa A QUW a.,r aq 4 a -" J-tI ----ibirld X, ! a b� P7aAQCCQJ -aq a� Piro L 3Nf1 NInOLNDO ,oBL 31MMjfpiddY M LOYZ-Z9CZ Be }I� 37N3i "W V g r IILI + IH101 cntz-z=Bc We3a , >N o69•0 3Nn 000-U evil 00L d0 o6-b4 ed Nolvaol 3amwm " _ LL o6-bl ed _ 04 Z L'L 3 4p ZCZZ 5 L9'Zf 3 89 LFZ* N 91 98'9 3 9Z Z*.gC N 91 8L'ZL 3 pL Z L-04 N �l ZC-OL M lC lS C N 69'SL 3 90.90- f N Zl 1'6"5Z 3 lO loll N Ll aauoaaLp 6ulroug 9uno7 'Wad o001i um 001 Y NI alMV) & ALiddONd S. Jo Nwaod Y . 'NNW OOP•! W3k OOL 3NL N a3L1Um 9 3aNLYRO TNN[3atM 3M d0 NOUMOd ON . 71du NOMM Wad am 38 IN AM Ow Jlw 3YnVL-M V(W 3W PW SNa i0 0" ' NW . 'SNOaNf3R0 T% 30 NMVDLMW TUTA Y JMK M NBILMUSN00 1I0 NOIS30 URA NOT a3raw 00 a3lYW 30 ION aTa6 lYld SNa NO NMDaS Slh31Si1101" TW AO ANMSOORIO . 'NOaa11y1SNW NO 'JNINNYSd ANY OL H34W 9NOOYM03M OMNOZ aw OLNUM TW AAG& OL N9NW . SU131+OSY3 90 SM to SWOIa G30tlO33WM NO 93aWOOM M JZ3Bn5 30 Am AXIdOad . :s3LON 108 `T'ecAwood Ln. �*rebv r ! le. !.r lJ ( C.. Li Up E- Y GZ r i �s /Q deep w �h required slopcs . 1 V� j D& Pry i ql�ljl I I ' � f w 6 _ r ' JL 4 t Goole -ea h �p DUKE ENERGY DIRECTIONS BY ROAD FORM Lake Use Permit Applicants and Contractors: Ease of locating the proposed project site canhaveabig impact on permitting processing time. Please complete this form and return it along with your completed application to: 1618J_3210121:t�'f•1 CIO LAKE SERVICES — EC 12 Q 526 SOUTH CHURCH STREET CHARLOTTE, NC 28202 Applicant's Name: Andres lrlando Street Address (at lake): 108 Teakwood Lane Lake Name: Norman Subdivision Name: Sailors Lair Property Section: Lot #: 12 City: Mooresville County: Iredell State: NC I Zip: 28117 Telephone: 213-505-7810 Directions (from major road or highway): From I-77 NB Exit 31, Left onto Langtree Road, Take 2nd Right in round about and proceed straight on Langtree Road, Right onto Schooner Road, Right onto Teakwood Lane, Property is on the left immediately adjacent to Sailors Bay Ct (on the right side of property looking toward the lake). Descriptive Structure(s) on Property (i.e. brick garage, white fence, mobile home, etc.) *Note: Please use the back of this form if desired to draw us a map to the site. Google Earth «2020 Googie iTouchMap.com Home a Find Latitude and Longitude tMaps CRM Address or Place GO 108 Teakwood Lane Mooresville, NC 28117 Ads by Google Stop seeing this ad Why this ad? . 35.520650,-80.894316 Drag Me! • ♦ Deg ♦ DMS Decimal Degrees Latitude: 35.520650 Decimal Degrees Longitude:-80.894316 Clear Show Poinf Tahle 31 21 I Help LUA — + DUKE ENERGY DIRECTIONS BY ROAD FORM LANCASTER CUSTOM DOCKS DISPOSAL SITE Lake Use Permit Applicants and Contractors: Ease of locating the proposed project site can have a big impact on permitting processing time. Please complete this form and return it along with your completed application to: DUKE ENERGY C/O LAKE SERVICES — EC 12 Q 526 SOUTH CHURCH STREET CHARLOTTE, NC 28202 Applicant's Name: Lancaster Custom Dock Disposal Site Street Address (at lake): 1162 River Highway Mooresville, NC 28117 Lake Name: Norman Subdivision Name: Big Daddy's of Lake Norman Property Section: Lot 4: City: Mooresville County: Iredell State: NC Zip: 28117 Telephone: 704-3 61-4908 Directions (from major road or highway): From I-77 NB, Exit 36, Left onto NC- 150 WB, Disposal Area is on the right behind Big Daddy's Restaurant Complex. Descriptive Structure(s) on Property (i.e. brick garage, white fence, mobile home, etc.) *Note: Please use the back of this form if desired to draw us a map to the site. C oo(Slc earth 17 !�ff � �■ h ID#* 20201494 Version* 1 Regional Office * Mooresville Regional Office - (704) 663-1699 Reviewer List* Alan Johnson Pre -Filing Meeting Request submitted 10/19/2020 Contact Name* Donna P. Hrko Contact Email Address* donna. lancasterdocks@gmail.com Project Name* Irlando Dock/Dredge/Shoreline Refresh Project Owner* Andres Irlando Project County* Iredell Owner Address: Street Address 108 Teakwood Lane Address Line 2 aty State / Province / Pegion Mooresville NC Postal / Zip axle Country 28117 United States Is this a transportation project?* r Yes (' No Type(s) of approval sought from the DWR: F 401 Water Quality Certification - F 401 Water Quality Certification - Regular Express F- Individual Permit F- Modification W Shoreline Stabilization Does this project have an existing project ID#?* C Yes (-- No Do you know the name of the staff member you would like to request a meeting with? Please give a brief project description below.* Remove and replace e)asting dock. DREDGE for boating access. SHORELINE REFRESH. Please give a couple of dates you are available for a meeting. Please attach the documentation you would like to have the meeting about. pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. 1 understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. 1 also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature Submittal Date 10/19/2020