Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
20201533 Ver 1_401 Application_20201120
DWR mrlslon of Water Resources Pre -Construction Notification (PCN) Form September 1, 2020 Ver 3.2 Initial Review Has this project met the requirements for acceptance in to the review process?* r Yes r No Is this project a public transportation project?* C Yes r No Change only if needed. BIMS # Assigned * Version#* 20201533 1 Is a payment required for this project?* r No payment required What amout is owed?* r Fee received IT $240.00 r Fee needed - send electronic notification r $570.00 Reviewing Office * Select Project Reviewer* Mooresville Regional Office - (704) 663-1699 Alan Johnson:eads\adjohnson1 Information for Initial Review 1a. Name of project: PING Rocky River HDD 1a. Who is the Primary Contact?* Tom Morris 1b. Primary Contact Email:* tom.rriorris2@duke-energy.com Date Submitted 11/20/2020 Nearest Body of Water Rocky River Basin Yadkin-PeeDee Water Classification C Site Coordinates Latitude: 35.229777 A. Processing Information Longitude: -80.484217 County (or Counties) where the project is located: Cabarrus Stanly Is this a NCDMS Project r Yes r No Is this project a public transportation project?* r Yes r No 1a. Type(s) of approval sought from the Corps: * Section 404 Permit (wetlands, streams and waters, Clean Water Act) r Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) 1b. What type(s) of permit(s) do you wish to seek authorization? 1c. Primary Contact Phone:* (704)731-4245 U W Nationwide Permit (NWP) r Regional General Permit (RGP) r Standard (IP) 1c. Has the NWP or GP number been verified by the Corps? r Yes r No Nationwide Permit (NWP) Number: NWP Numbers (for multiple NWPS): 1d. Type(s) of approval sought from the DWR: W 401 Water Quality Certification - Regular r Non-404 Jurisdictional General Permit r Individual Permit 12 - Utility Lines le. Is this notification solely for the record because written approval is not required? For the record only for DWR401 Certification: For the record only for Corps Permit: r 401 Water Quality Certification - E)press r Riparian Buffer Authorization 1f. Is this an after -the -fact permit application?* r Yes r No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? r Yes r No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? r Yes r No Acceptance Letter Attachment 1h. Is the project located in any of NC's twenty coastal counties? r Yes r No 1j. Is the project located in a designated trout watershed? 4 Yes r No B. Applicant Information 1d. Who is applying for the permit? F Owner W Applicant (other than owner) le. Is there an Agent/Consultant for this project?* r Yes r No 2. Owner Information 2a. Name(s) on recorded deed: Piedmont Natural Gas 2b. Deed book and page no.: 2c. Responsible party: 2d.Address Street Address 4720 Piedmont Row Drive Address Lim 2 City Charlotte Rostal / Zip Code 2810 2e. Telephone Number: (704)731-4245 2g. Email Address:* tom.morris2@duke-energy.com State / Province / Region NC Country USA 2f. Fax Number: r Yes r No r Yes r No 3. Applicant Information (if different from owner) 3a. Name: Tom Morris 3b. Business Name: Piedmont Natural Gas 3c.Address Street Address 4720 Piedmont Row Drive Address Line 2 City Charlotte Postal / Zip Code 28210 3d. Telephone Number: (704)731-4245 3f. Email Address:* tom.morris2@duke-energy.com 4. Agent/Consultant (if applicable) 4a. Name: Jesse Brown 4b. Business Name: Burns & McDonnell 4c.Address Street Address 3650 Mansell Road Address Line 2 Suite 300 City Alpharetta Postal / Zip (ode 30022 4d. Telephone Number: (770)510-4526 4f. Email Address:* jabrown3@burnsmcd.com Agent Authorization Letter* AGENT_AUTHORIZATION_FORM_RockyRiver. pdf State / Province / lRLgion NC Country USA 3e. Fax Number: State / Province / legion GA Country USA 4e. Fax Number: 86.08KB C. Project Information and Prior Project History O 1. Project Information 1b. Subdivision name: (d appropriate) 1c. Nearest municipality/ town: Midland Project Identification 2a. Property Identification Number: 2b. Property size: 2c. Project Address Street Address Multiple, see attached parcel map Address Line 2 City State / Province / legion Postal / Zip OXIe Country 3. Surface Waters 3a. Name of the nearest body of water to proposed project:* Rocky River 3b. Water Resources Classification of nearest receiving water:* C 3c. What river basin(s) is your project located in?* Yadkin-PeeDee 3d. Please provide the 12-digit HUC in which the project is located. 030401050307 4. Project Description and History 4a. Describe the existing conditions on the site and the general land use in the vicinityof the project at the time of this application:* The proposed pipeline crosses the Rocky River via Horizontal Directional Drill (HOD) within the Muddy Creek -Rocky River watershed approximately 2 miles east of Midland, NC. The surrounding land use is agricultural field, rural residential, and undeveloped land. 4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past?* r Yes r No r Unknown 4d. Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR) DR_RockyRiver_Cultural_FigA2.pdf 1.81 MB 4e. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR) DR_RockyRiver_Fig3_20200717.pdf 1.18MB 4f. List the total estimated acreage of all existing wetlands on the property: 0.856 4g. List the total estimated linear feet of all existing streams on the property: 1,333 4h. Explain the purpose of the proposed project:* The purpose of the Piedmont Natural Gas (PNG) Rocky River HDD project is to install approximately 3,125 feet of 30-inch pipeline to replace a section of existing pipe beneath Rocky River due to integrity and corrosion concerns. 41. Describe the overall project in detail, including indirect impacts and the type of equipment to be used:* The proposed Project includes the replacement of approximately 3,125 linear feet of 30-inch pipe adjacent to an existing PNG right of way (ROW) (Attachment A: Figure A-3). Approximately 725 feet of pipeline would be constructed and installed via open -cut method from the existing ROW to the Horizontal Directional Drill (HDD) entry and exit points and approximately 2,400 feet of pipeline will be installed via HDD method beneath Rocky River. The new pipeline will be approximately 52 feet below ground where it crosses the Rocky River. The portions of pipeline that will be installed via the open -cut method are in an existing active agriculture field on the west side of the Rocky River and in an existing maintained ROW of the east side of the Rocky River. Additional Project components include an approximately 1,800-foot-long temporary pipestring laydown area, an approximately 16-acre temporary laydown area, and 4,875 feet of extant access roads. Gravel may be added to the existing access roads, however, no subsurface impacts are anticipated from use of the access roads or temporary laydown areas. Subsurface disturbance will be limited to the open cut sections, the HDD entry and exit points, and the two temporary retention ponds west of Rocky River. Tree clearing is proposed for a 20-foot-wide-permanant easement over the HDD installed portion of the pipeline, approximately 0.3 acres for the pipe -string laydown, and approximately 2 acres for the HDD drill pad and tie-in east of the Rocky River. Construction and operation of the Project will result in the permanent conversion of approximately 0.051-acres of PFO wetlands to PEM wetlands. There will be no net loss of wetlands as a result of the Project. There will be no impacts to streams as a result of the Project. PNG plans to begin construction in December 2020; and the anticipated in-service date is March 2021. 4j. Please upload project drawings for the proposed project. 1.7.1_0231792_20201012_IFB_HDD.pdf 50.21 MB 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the propertyor proposed impact areas?* r Yes r No C, Unknown Comments: Delineations were completed in April and June 2020 5b. If the Corps made a jurisdictional determination, what type of determination was made?* r Preliminary r Approved r Not Verified r Unknown r N/A Corps AID Number: 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Jesse Brown Agency/Consultant Company: Burns & McDonnell Other: Sd1. Jurisdictional determination upload RGL_08-02_App_A_Prelim _JD_Form _fillable_Rocky River_10152020.pdf 148.79KB Rocky River PJD Request 20201104_reduced.pdf 10.93MB 6. Future Project Plans 6a. Is this a phased project?* F Yes f• No Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? D. Proposed Impacts Inventory 1. Impacts Summary 1a. Where are the impacts associated with your project? (check all that apply): W Wetlands r Streams -tributaries r Open Waters r Pond Construction 2. Wetland Impacts F Buffers 2a. Site #* (') 2a1 Reason (?) 2b. Impact type * (?) 2c. Type of W.* 2d. W. name * 2e. Forested* 2f. Type of Impact Jurisdicition*(?)]2g. area* t tland PFO 2 Temporary Access T BottoYesmland Hardwood Forest WET Both 0.051 Wetland ]Road (acres) 2g. Total Temporary Wetland Impact 0.051 2g. Total Wetland Impact 0.051 2h. Comments: E. Impact Justification and Mitigation 1. Avoidance and Minimization 2g. Total Permanent Wetland Impact 0.000 la. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: All route alternatives are considered and designed to reduce environmental impacts and keep land disturbance to a minimum. Reducing impacts to wetlands and vaterbodies was considered during route analysis for the Rocky River Project. Alternate pipeline routes, temporary workspaces, and access roads would either conflict with epsting pipelines, landowner requests or cause increased environmental impacts. The direction and location of the proposed pipeline, direction and location of an epsting pipeline, and and temporary workspaces required for an HDD drill pad location within Project area does not enable a route for complete avoidance of forest wetland. However, temporary conversion impacts have been limited to 0.05 acres There are no other viable alternatives to the Proposed Project area that would completely avoid impacts to wetlands. The Project has been reduced in size to the extent possible so the purpose of the Project can be practically accomplished while minimizing land disturbance, preserving natural resources, and protecting water quality to the extent possible. For the Rocky River and another unnamed intermittent stream crossing, the pipeline will be installed using HDD, which means the permanent pipeline easement will not require earth work. Tree clearing will be required as part of PNG's Integrity Management Plan. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: For the Rocky River and additional intermittent stream crossing, the pipeline will be installed using HDD, which means the permanent pipeline easement will not require earth work. Tree clearing will be required as part of PNG's Integrity Management Plan. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? F Yes f• No 2b. If this project DOES NOT require Compensatory Mitigation, explain why: Impacts to the wetland within the Project will be temporary and there will be no permanent conversion or loss of wetlands. F. Stormwater Management and Diffuse Flow Plan (required by DWR) 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? r Yes r No V u U If no, explain why: The project is located in the Yadkin-PeeDee River Basin, which is not subject to protected riparian buffer rules 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?* r Yes r No 2b. Does this project meet the requirements for low density projects as defined in 15A NCAC 02H .1003(2)? r Yes r No Comments: G. Supplementary Information 1. Environmental Documentation 1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?* r Yes r No 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)? * r Yes r No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project result in additional development, which could impact nearby downstream water quality?* r Yes r No 3b. If you answered "no," provide a short narrative description. Because this is a pipeline project intended to replace existing compromised infrastructure in a specific location, it is not intended to support future development. No impacts from additional development associated with this project is expected. 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project?* r Yes r Nor WA 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat?* r Yes r No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts?* r Yes r No 5c. If yes, indicate the USFWS Field Office you have contacted. Asheville 5d. Is another Federal agency involved?* r Yes r No 5e. Is this a DOT project located within Division's 1-8? r Yes r No 5f. Will you cut any trees in order to conduct the work in waters of the U.S.? r Yes r No 5g. Does this project involve bridge maintenance or removal? r Yes r No 5h. Does this project involve the construction/installation of a wind turbine(s)?* r Yes r No r Unknown 5i. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.? r Yes r No 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? An Information, Planning, and Consultation (IPaC) report was obtained for the project. Additionally, a project coordination letter was sent to USFWS on August 17, 2020. USFWS response requested for for species specific survey of Helianthus schweinitai. Survey was conducted Sepetember 23, 2020 and results submitted to USFWS on October 14, 2020. Concurrence received on October 30, 2020. Consultation Documentation Upload 20200821PING_RockyRiverHDD_USFWSConcurrenceRequestDraft_Reduced.pdf 11.64MB 20-475 Rocky River HDD Project; Cabarrus and Stanly Co (KQ-BH).pdf 430.46KB H.schweinitai draft tech memo_20201002_reduced.pdf 5.76MB 20-475 Rocky River HDD Project; Cabarrus and Stanly Co (Survey Results) (BH edits).pdf 414.63KB 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* r Yes r No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?* NOAA EFH Interactive Mapper 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status?* r Yes r No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources?* Burns & McDonnell performed a records review at SHPO and sent a Section 106 coordination to SHPO on October 5, 2020. A response stating no historic resources would be affected by the Project. Therefore, SHPO has no further comment on the project as proposed. 7c. Historic or Prehistoric Information Upload Rocky River SHPO consultation_10052020.pdf ER-20-2173_SHPO Concurrence.pdf 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain?* r Yes r No 8b. If yes, explain how project meets FEMA requirements: No permanent fills or structures within a floodplain 8c. What source(s) did you use to make the floodplain determination?* FEMA GIS data and website Miscellaneous Comments Attached are: 1. Limits of Disturbance 2. Wetland Delineation Figures 3. DWR pre -filing meeting request Miscellaneous attachments not previously requested. 5.02MB 153.21 KB U Rocky River LOD.kmz 115.65KB Rocky River WDR Figures_AppendixA.pdf 12.33MB DWR Pre -Filing Meeting Request Form.pdf 52.14KB Signature U * EJ By checking the box and signing below, I certify that: • I have given true, accurate, and complete information on this form; • I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND • I intend to electronically sign and submit the PCN form. Full Name: Jesse A Brown Signature 6�Kff_111 /6 Date 11/20/2020 SAMPLE AGENT AUTHORIZATION FORM PROPERTY LEGAL DESCRIPTION: Rocky River HDD Project LOT NO. PLAN NO. PARCEL ID: STREET ADDRESS: Multiple parcels near Garmon Mill Rd and Pine Bluff Rd. Cabarrus and Stanly Counties Please print: Property Owner: Piedmont Natural Gas (holder of easement) Property Owner: Tom Morris (Project Manager at Piedmont Natural Gas) The undersigned, registered property owners of the above noted property, do hereby authorize Jesse A. Brown (Contractor / Agent) of Burns & McDonnell (Name of consulting firm) to act on my behalf and take all actions necessary for the processing, issuance and acceptance of this permit or certification and any and all standard and special conditions attached. Property Owner's Address (if different than property above): P.O. Box 33068, Charlotte, NC 28233 Telephone: 704-731-4245 We hereby certify the above information submitted in this application is true and accurate to the best of our knowledge. Tom Morris Digitallysigned byTom i Morris, PE P E Date: 2020.1 1.03 _ 14:43:50-05'00' Authorized Signature Authorized Signature Date: Date: 11 /03/2020 0 N 0 N N N L .0 m O Y d ift �, \ l5 1 �Mi d`I a n d 5 ` na - , r _ Ills 0" � 3 �� _ fsq�,'• °�' \`` � �� � J /� Wig' e /,/ i113 1 00.3 r ,�1 �c �i •�' I �~ d I •Ny � l _ % � � 1 n \ a V., o Potential Effects Q Quadrangle Boundary NORTH Figure A-2 **BURNS Proposed Project Area 2,000 1,000 0 2,000 `WDONNELL" Rocky River HDD Cabarrus & Stanly Co., NC Scale in Feet Source: Esri, and Burns & McDonnell Consultants, Inc. Issued: 9/25/2020 Path: Z:\Clients\TND\DukeEnrgyCar\123240 RockyRiverHDD\Studies\Geospatial\DataFiles\ArcDocs\ENS DesktopReview\DR Rocky River_Fig3.mxd kdboatright 7/17/2020 Service Laver Credits: Source: Esri. Maxar. GeoEve. Earthstar Geoaraohics. CNES/Airbus IDS. USDA. USGS. AeroGRID. IGN. and the GIS User Communitv Map Unit Symbol & Name GoF - Goldston very channery silt loam, 15 to 45 % slopes MsA- Misenheimer channery silt loam, 0 to 4 % slopes BaB - Badin channery silt loam, 2 to 8 % slopes KkB - Kirksey silt loam, 0 to 6 % slopes OaA- Oakboro silt loam, 0 to 2 % slopes, frequently flooded* BaD - Badin channery silt loam, 8 to 15 % slopes KkB - Kirksey silt loam, 1 to 6 % slopes TbB - Tarrus channery silt loam, 2 to 8 % slopes ChA - Chewacla sandy loam, 0 to 2 % slopes, frequently flooded* LdB2 - Lloyd clay loam, 2 to 8 % slopes, moderately eroded TcB2 - Tarrus channery silty clay loam, 2 to 8 % slopes, moderately eroded GoC - Goldston very channery silt loam, 4 to 15 % slopes MhB - Misenheimer channery silt loam, 0 to 4 % slopes W - Water Asterisk (*) indicates hydric soil. r,p _ MhB j AL �.�. -. t� 1.1 nT l v T ��i �'' • • _ - J-46 Q Survey Area _ ;County Boundary NORTH Figure 3 BURNS Soils Map �r Access Road (AR) 800 400 0 800 �MMONNELL" Rocky River HDD Q SSURGO Soils Map Unit Cabarrus & Stanly Co., NC Scale in Feet Source: Esri, USGS-SSURGO Soils Database, and Burns & McDonnell Engineering Company, Inc. Issued: 7/17/2020 Path: Z:\Clients\TND\DukeEnrgyCar\123240_RockyRiverHDD\Studies\Geospatial\DataFiles\ArcDocs\ENS_DesktopReview\DR_RockyRiver_Fig1.mxd kdboatright 7/17/2020 .I r I • S •- ., x i iJ � ,� 4`ti � �� rl • 1 - ='� - z. i� � .. _ �' +'ter_ , C.-` :� i � i ,, � i .f•. •i, :. C4, Lirru Will I cio • J7 `3-hrir.H�n�3 •,� Y. .. jj Survey Area County Boundary NORTH Figure 1 Access Road (AR) BURNS Topographic Map -BURNS Tr 3,300 1,650 0 31300 Rocky River HDD Cabarrus & Stanly Co., NC Scale in Feet Source: Esri, and Burns & McDonnell Consultants, Inc. Issued: 7/17/2020 r _..' AR-3 Path: Z:\Clients\TND\DukeEnrgyCar\123240 RockyRiverHDD\Studies\Geospatial\DataFiles\ArcDocs\ENS DesktopReview\DR Rocky River_Fig3.mxd kdboatright 7/17/2020 Service Laver Credits: Source: Esri. Maxar. GeoEve. Earthstar Geoaraohics. CNES/Airbus IDS. USDA. USGS. AeroGRID. IGN. and the GIS User Communitv Map Unit Symbol & Name GoF - Goldston very channery silt loam, 15 to 45 % slopes MsA- Misenheimer channery silt loam, 0 to 4 % slopes BaB - Badin channery silt loam, 2 to 8 % slopes KkB - Kirksey silt loam, 0 to 6 % slopes OaA- Oakboro silt loam, 0 to 2 % slopes, frequently flooded* BaD - Badin channery silt loam, 8 to 15 % slopes KkB - Kirksey silt loam, 1 to 6 % slopes TbB - Tarrus channery silt loam, 2 to 8 % slopes ChA - Chewacla sandy loam, 0 to 2 % slopes, frequently flooded* LdB2 - Lloyd clay loam, 2 to 8 % slopes, moderately eroded TcB2 - Tarrus channery silty clay loam, 2 to 8 % slopes, moderately eroded GoC - Goldston very channery silt loam, 4 to 15 % slopes MhB - Misenheimer channery silt loam, 0 to 4 % slopes W - Water Asterisk (*) indicates hydric soil. Q Survey Area L___j County Boundary NORTH Figure 3 BURNS Soils Map T� Access Road (AR) �MSDONNELL" Rock River HDD SSURGO Soils Ma Unit 800 400 0 800 y p Cabarrus & Stanly Co., NC Scale in Feet Source: Esri, USGS-SSURGO Soils Database, and Burns & McDonnell Consultants, Inc. Issued: 7/17/2020 Path: Z:\Clients\TND\DukeEnrgyCar\123240 RockyRiverHDD\Studies\Geospatial\DataFiles\ArcDocs\ENS DesktopReview\DR Rocky River_Fig3_MLV.mxd kdboatright 7/17/2020 Service Laver Credits: Source: Esri. Maxar. GeoEve. Earthstar Geoaraohics. CNES/Airbus IDS. USDA. USGS. AeroGRID. IGN. and the GIS User Communitv Map Unit Symbol & Name EnB - Enon sandy loam, 2 to 8 percent slopes MeD - Mecklenburg loam, 8 to 15 percent slopes Cc132 - Cecil sandy clay loam, 2 to 8 percent slopes, moderately eroded EnD - Enon sandy loam, 8 to 15 percent slopes SfB - Sedgefield sandy loam, 2 to 8 percent slopes' ChA- Chewacla sandy loam, 0 to 2 percent slopes, frequently flooded' IdB - Iredell loam, 2 to 6 percent slopes* VaB - Vance sandy loam, 2 to 8 percent slopes CuB2 - Cullen clay loam, 2 to 8 percent slopes, moderately eroded MeB - Mecklenburg loam, 2 to 8 percent slopes W - Water Asterisk (*) indicates hydric soil. 1 • i •• A %X �, �+} watt y. _ 4� � e/;� �Vy'[.•.'� t i c� 7 Y yj i'hli r - y a *�1���.• F �• i 4 tM.07 lo :�� tt ] r� 414) ! 4., r i Y�7LyYiG�► S _ �.r lu i �. : };'1 Q Survey Area L___j County Boundary Q SSURGO Soils Map Unit Source: Esri, USGS-SSURGO Soils Database, ar NORTH Figure 3 BURNS Soils Map 400 200 0 400 `MSDONNELL" Rocky River HDD Cabarrus & Stanly Co., NC Scale in Feet onnell Consultants, Inc. Issued: 7/17/2020 Path: Z:\Clients\TND\Du kill - .'_ 23240 RockyRiverHDD\Studies\Geospatial\DataFiles\ArcDocs\ENS DesktopReview\DR Rocky River_Fig4.mxd kdboatright 7/8/2020 axar GeoE a Earthstar Geo ra hics CNES/Airbus DS USDA USGS AeroGRID IGN and the GIS User Communit } r, low We XLIM t�. qR-3 i " / � .� -. � fir'. �,.�4��` � •`� �' �, t a?�, � �� .fir, ► AR-2 Survey Area Wetland Stream (S) 0 Culvert PEM Perennial T� Access Road (AR) —"'—" Ephemeral • 0 01 <24 Figure 4 NORrH - Wetland Delineation Map BURNS Rocky River HDD 200 100 0 200 `M DONNELL" Cabarrus & Stanly Co., NC Page 1 of 8 Scale in Feet rce: Esri, FEMA, USFWS-National Wetland Inventory (NHD), and Burns Path: Z:\Clients\TND\Du 23240_RockyRiverHDD\Studies\Geospatial\DataFiles\ArcDocs\ENS_DesktopReview\DR_RockyRiver _Fig4.mxd kdboatright 7/8/2020 WE PEM AR-2 A4 Survey Area Wetland Stream (S) 01 0 Culvert � PEM Perennial 24 Figure 4 NORTH Wetland Delineation Map T� Access Road (AR) - PFO — — Intermittent AL* BURNS Rocky River HDD M_DONNELL" O Sample Plot (SP) —"'—" Ephemeral 200 100 0 200 Cabarrus & Stanly Co., NC Page 3 of 8 Scale in Feet rce: bsn, rblw,v, uarvva-I,4auonal vveaana Invencory u4nu), ana burns Path: Z:\Clients\TND\Du 123240 RockyRiverHDD\Studies\Geospatial\DataFiles\ArcDocs\ENS DesktopReview\DR Rocky River_Fig4.mxd kdboatright 7/8/2020 Jaxar GeoE a Earthstar Geo ra hics CNES/Airbus DS USDA USGS AeroGRID IGN and the GIS User Communit r Fill" Il% AR Survey Area Wetland Stream (S) PFO Ephemeral �2� Figure 4 0 Culvert NORTHITW Wetland Delineation Map T� Access Road (AR) Ly BURNS Rock River HDD M�DONNELL" 0 Sample Plot (SP) 200 100 0 200 Cabarrus & Stanly Co., NC Page 6 of 8 Scale in Feet rce: bsn, rbiw,v, uarvva-i,4auonai vveaana inventory pwnu/, ana burns NC-24/NC-27 i. CL � t�tain St � yy 1�Rain 5t � .!]h1C STaY! z � � a a� OJ2�� V�J TLRIV°k LM1 PLAN1-471ON p'� F1' sf D, 0,5r- .:k �a �� -Vieb'80k P: PINE BLUFF ROAD LINE 1 (SR 1100/1146) LINE 129 Ro€kY< River Naths_&A" ACWR RAILROAD -' x �d ROCKY RIVER p Um Ave a CfeLc A-4� CREERSLQE r• Hsi " Rd' APARTWINTS W - ti'bCfSA.R",mr, ' -f I dC�n PROPOSED 30" PIPELINE Tom"' PROJECT 0231792 RIVER ROAD (SR 1114) D r.ty o y'Ln n \J\ {S SITE LOCATION MAP - ROCKY RIVER, LINE 129 (3011) - 0231792 SCALE:1"=2,000' 0 2000 4000 1IN = 2000FT NOTES: 1) LAT/LONG TO BE VERIFIED BY AS BUILD SURVEY. 2) AS BUILD SURVEY LOCATION TIE IN POINT LATITUDE: TBD LONGITUDE: TBD DRAWING INDEX DRAWING NUMBER DRAWING TITLE REV. SHT. No. PNG-G-129-0001016 COVER PAGE D 1 OF 27 PNG-G-129-0001018 CIVIL GENERAL NOTES, LEGEND AND ABBREVIATIONS D 2 OF 27 PNG-G-129-0001019 BILL OF MATERIALS D 3 OF 27 PNG-C-129-0001010 ACCESS ROUTE PLAN D 4 OF 27 PNG-C-129-0001012 RETIREMENT PLAN C 5 OF 27 PNG-C-129-0001013 ALIGNMENT SHEET D 6 OF 27 PNG-C-129-0001014 ALIGNMENT SHEET D 7 OF 27 PNG-C-129-0001015 ALIGNMENT SHEET D 8 OF 27 PNG-C-129-0001016 CROSSING DRAWING D 9 OF 27 PNG-C-129-0001018 TIE-IN PLAN C 10 OF 27 PNG-M-129-0001019 LINE STOP DETAIL B 11 OF 27 PNG-C-129-0001021 SOIL BORING LOGS D 12 OF 27 PNG-C-129-0001022 SOIL BORING LOGS D 13 OF 27 PNG-C-129-0001023 ES&PC GENERAL NOTES B 14 OF 27 PNG-C-129-0001024 ES&PC PLAN B 15 OF 27 PNG-C-129-0001025 ES&PC PLAN B 16 OF 27 PNG-C-129-0001026 ES&PC PLAN B 17 OF 27 PNG-C-129-0001027 ES&PC DETAILS B 18 OF 27 PNG-C-129-0001028 ES&PC DETAILS B 19 OF 27 PNG-C-129-0001029 ES&PC DETAILS B 20 OF 27 PNG-C-129-0001030 ES&PC DETAILS B 21 OF 27 PNG-C-129-0001033 TEMPORARY GRADING PLAN B 22 OF 27 PNG-C-129-0001034 TEMPORARY GRADING PLAN B 23 OF 27 PNG-C-129-0001035 CONSTRUCTION DETAILS C 24 OF 27 BURNS & McDONNELL CONSULTANTS, INC. STATE LICENSE # C-1435 CLAUDE A McMULLAN IFC SUBMITTAL DATE NORTH CAROLINA SEAL 047852 PROFESSIONAL EN&ARCH STAMP PNG-C-129-0001036 CONSTRUCTION DETAILS C 25 OF 27 PNG-C-129-0001037 CONSTRUCTION DETAILS B 26 OF 27 PNG-C-129-0001038 CONSTRUCTION DETAILS B 27 OF 27 GENERALNOTES 1. INSTALLER SHALL FURNISH ALL MATERIALS NOT PROVIDED BY THE COMPANY (UNLESS OTHERWISE NOTED ON DRAWINGS OR SPECIFICATIONS) INCLUDING EQUIPMENT TRANSPORTATION, SERVICES AND PERFORM ALL NECESSARY WORK AS SHOWN ON THE DRAWINGS AND SPECIFIED HEREINAFTER. 2. IT SHALL BE THE RESPONSIBILITY OF THE INSTALLER TO VERIFY ALL DIMENSIONS GIVEN ON THE DRAWINGS. ANY ITEM IN QUESTION SHALL BE BROUGHT TO THE ATTENTION OF THE PROJECT MANAGER PRIOR TO PROCEEDING WITH THE WORK. 3. INSTALLER SHALL BE RESPONSIBLE FOR PROTECTION OF ALL SURROUNDING AREAS. 4. ALL BELOWGROUND WELDS SHALL BE COATED WITH HBE-95 PER PERTINENT PIEDMONT DESIGN AND CONSTRUCTION STANDARDS. 5. ALL ABOVEGROUND PIPING TO BE BLASTED TO CORRECT SOCIETY FOR PROTECTIVE COATINGS (SSPC) SURFACE PROFILE. PAINT SYSTEM TO BE UTILIZED SHALL BE PER PERTINENT PIEDMONT DESIGN AND CONSTRUCTION STANDARDS. 6. UPON BACKFILLING IN AREAS OF ROCK, BURIED PIPE SHALL HAVE 18" OF SAND PAD FILL PLACED AROUND THE PIPE'S CIRCUMFERENCE. 7. PRESSURE TESTING SHALL MEET THE REQUIREMENTS OF PNG'S PRESSURE TESTING STANDARD, PER PERTINENT PIEDMONT DESIGN AND CONSTRUCTION STANDARDS. 8. INSTALLER SHALL DEWATER ALL HYDROSTATICALLY TESTED PIPING, USING CLEANING PIGS AS REQUIRED, AND DRY TO A DEWPOINT OF -40 OF PER PERTINENT PIEDMONT DESIGN AND CONSTRUCTION STANDARDS. CONSTRUCTION NOTES 1. EXISTING OVERHEAD AND BELOWGROUND FACILITIES MAY BE IN THE WORK AREA VICINITY. INSTALLER IS RESPONSIBLE FOR HAVING SUCH FACILITIES LOCATED AND IS RESPONSIBLE FOR MAINTENANCE AND PRESERVATION OF THESE FACILITIES. 2. PER PERTINENT PIEDMONT DESIGN AND CONSTRUCTION STANDARDS, INSTALLER IS REQUIRED TO CALL 811 FOR UTILITY LOCATES A MINIMUM OF 72 HOURS PRIOR TO COMMENCEMENT OF WORK. NO EXTRA COMPENSATION WILL BE ALLOWED FOR DELAYS FROM ANY WORK PROVIDED BY OTHER UTILITIES. 3. IF EXISTING UTILITIES OF ANY TYPE ARE ENCOUNTERED IN THE FIELD AND DEEMED TO BE IN CONFLICT WITH INSTALLATION OF FACILITIES, INSTALLER SHALL NOTIFY THE PROJECT MANAGER IMMEDIATELY SO THE CONFLICT MAY BE RESOLVED. 4. WHEN EXISTING DRAINAGE FACILITIES ARE DISTURBED, INSTALLER SHALL PROVIDE AND MAINTAIN TEMPORARY OUTLETS AND CONNECTIONS FOR PRIVATE DRAINS OR SEWERS. RESTORATION OF THESE FACILITIES IS TO BE PERFORMED ONCE CONSTRUCTION IS COMPLETE AND ARE CONSIDERED INCIDENTAL COSTS OF THE PROJECT. 5. ALL DRAWING MEASUREMENTS ARE TO BE TAKEN FROM EXISTING GRADE. FINAL GRADE SHALL BE MATCHED TO SURROUNDING GRADE AS PER PERTINENT PIEDMONT DESIGN AND CONSTRUCTION STANDARDS. 6. INSTALLER IS TO REMAIN WITHIN CONSTRUCTION WORKING LIMITS. ACCESS TO AREAS OUTSIDE WORKING LIMITS MUST BE COORDINATED WITH THE OWNER OR PIEDMONT PROJECT MANAGER. 7. ALL EXCESS EXCAVATION, CONSTRUCTION DEMOLITION DEBRIS AND UNSUITABLE MATERIALS THAT DO NOT CONTAIN ASBESTOS SHALL BE REMOVED FROM THE SITE AND PROPERLY DISPOSED. 8. STANDARD SPECIFICATIONS REFERENCED ON THIS SHEET AND CONSTRUCTION PLANS ARE CONSIDERED AS PART OF THE CONTRACT DOCUMENTS. INCIDENTAL ITEMS OR ACCESSORIES NECESSARY TO COMPLETE THIS WORK MAY NOT BE SPECIFICALLY NOTED, BUT ARE CONSIDERED TO BE A PART OF THIS CONTRACT. 9. BEFORE ACCEPTANCE BY THE OWNER AND FINAL PAYMENT, ALL WORK SHALL BE INSPECTED AND APPROVED BY PIEDMONT OR COMPANY REPRESENTATIVE. FINAL PAYMENT SHALL BE MADE AFTER ALL OF THE INSTALLER'S WORK HAS BEEN ACCEPTED AND APPROVED AND IN ACCORDANCE WITH THE CONTRACT DOCUMENTS. 10. DURING CONSTRUCTION, ALL LOOSE MATERIAL THAT ARE DEPOSITED IN THE FLOW LINE OF GUTTERS, DRAINAGE STRUCTURES, DITCHES, ETC. SUCH THAT THE NATURAL FLOW LINE OF WATER IS OBSTRUCTED, SHALL BE REMOVED AT THE END OF EACH WORK DAY. 11. ALL FIELD TILE ENCOUNTERED DURING CONSTRUCTION SHALL BE EXTENDED TO OUTLET INTO AN EXISTING DRAINAGE WAY. A RECORD OF ALL FIELD TILE FOR ONSITE DRAIN PIPE ENCOUNTERED SHALL BE KEPT BY THE INSTALLER AND TURNED OVER TO THE PROJECT MANAGER UPON COMPLETION OF THE PROJECT. 12. INSTALLER IS REQUIRED TO MAINTAIN A SET OF ISSUED FOR CONSTRUCTION DRAWINGS AND ALL PERMITS AT THE JOB SITE. ANY MODIFICATIONS OR ALTERATIONS TO THE PLANS OR SPECIFICATIONS SHALL BE APPROVED BY THE PROJECT MANAGER. 13. INSTALLER IS SOLELY RESPONSIBLE FOR EXECUTION OF HIS/HER WORK IN ACCORDANCE WITH THE CONTRACT DOCUMENTS AND SPECIFICATIONS. INSTALLER IS RESPONSIBLE FOR THE CONSTRUCTION METHODS AND TECHNIQUES, SEQUENCES, TIME OF PERFORMANCE ALL SAFETY PRECAUTIONS. 14. MINIMUM DEPTH OF BURIAL SHALL BE PER PERTINENT PIEDMONT DESIGN AND CONSTRUCTION STANDARDS. 15. ALL PIPELINES BEING CROSSED ARE TO BE PROTECTED WITH A MINIMUM OF (3) 4 FEET X 18 FEET WOODEN MATS. 16. PER PERTINENT PIEDMONT DESIGN AND CONSTRUCTION STANDARDS, FOR OPEN DITCH EXCAVATION, A MINIMUM OF TWO FEET OF SEPARATION SHALL BE MAINTAINED BETWEEN ALL CROSSING STRUCTURES. SEPARATION BETWEEN CROSSING STRUCTURES AND PIPELINES THAT ARE INSTALLED VIA DIRECTIONAL DRILLING METHODS IS AT THE DISCRETION OF ENGINEERING. 17. DURING BACKFILLING, A SIX INCH CROWN SHALL BE PLACED ON ALL DISTURBED AREAS. COMPACTION REQUIREMENTS SHALL BE PER PERTINENT PIEDMONT DESIGN AND CONSTRUCTION STANDARDS. 18. BOLTS FOR FLANGES TO BE TORQUED PER PERTINENT PIEDMONT DESIGN AND CONSTRUCTION STANDARDS. CIVIL AND STRUCTURAL NOTES 1. ADDITIONAL EXCAVATIONS BELOW FOOTINGS MAY BE NECESSARY TO REACH UNDISTURBED SOIL. SHOULD THIS OCCUR, THE EXCAVATION SHALL BE BROUGHT TO THE BOTTOM OF THE FOOTING ELEVATION WITH COMPACTED SAND FILL MEETING THE REQUIREMENTS OF MODIFIED PROCTOR COMPACTION TEST (ASTM D1557) TO 95% IN SIX INCH LIFTS. 2. ALL EXPOSED CONCRETE EDGES SHALL HAVE A 1" X 1" 450 CHAMFER. 3. CONCRETE SHALL BE MIXED AND POURED PER PERTINENT PIEDMONT DESIGN AND CONSTRUCTION STANDARDS. TESTING SHALL CONFORM TO ACI 318. INSTALLER TO SUPPLY ALL CONCRETE AND TESTING. 4. ALL STRUCTURAL STEEL SHALL CONFORM TO ASTM A36 SPECIFICATION. STEEL REINFORCING BAR SHALL CONFORM TO ASTM A615 GRADE 60 AND WELDED WIRE FABRIC SHALL CONFORM TO ASTM A185. TIE WIRE SHALL CONFORM TO ASTM A82. 5. UNSUITABLE OR EXCESS EARTH SPOIL SHALL BE DISPOSED OF AT AN APPROVED WASTE LOCATION. SOIL BEING TRANSPORTED ONTO THE JOB SITE SHALL BE APPROVED BY EITHER THE PROJECT MANAGER OR CONSTRUCTION MANAGER. 6. REINFORCED FIBERGLASS PAD (RFP) OR SIMILAR COMPANY APPROVED PRODUCT MUST BE INSTALLED BETWEEN ALL PIPE AND FITTINGS THAT COME INTO CONTACT WITH CONCRETE. A LAYER OF NON ABRASIVE MATERIAL SUCH AS FRP SHALL BE INSTALLED BETWEEN ALL PIPE SUPPORTS AND PIPING. 7. ALL FIELD BENDING OF REBAR SHALL BE DONE COLD. SOIL EROSION AND SEDIMENT CONTROL NOTES 1. INSTALLER IS TO CONSTRUCT ALL SOIL EROSION AND SEDIMENT CONTROL MEASURES AT THE COMMENCEMENT OF THE PROJECT, PROVIDE MAINTENANCE AND ASSURE EFFECTIVENESS THROUGHOUT THE DURATION OF THE PROJECT. 2. CARE SHALL BE TAKEN TO MINIMIZE DOWNSTREAM SILTATION. RAW BANKS MAY BE SEEDED AND MULCHED TO PREVENT EROSION. 3. ALL SPOILS INCLUDING ORGANIC SOILS, VEGETATION AND DEBRIS SHALL BE REMOVED FROM THE SITE AND PROPERLY DISPOSED OF IN SUCH A MANNER AS TO NOT ERODE INTO ANY BODY OF WATER OR WETLAND. 4. SILT FENCING SHALL BE PLACED WHERE NECESSARY TO PREVENT SEDIMENT FROM LEAVING THE WORK AREA. 5. CATCH ALL INLET FILTERS ARE REQUIRED AT ALL SEWER INLETS, GRATES AND MANHOLES FOR SEDIMENT CONTROL. 6. WETLAND AREAS SHALL HAVE SILT FENCING AND ONE LAYER OF STRAW LOG INSTALLED NO CLOSER THAN 50 FEET FROM POINT OF WETLAND DELINEATION. 7. TOPSOIL STOCKPILES SHALL BE LOCATED TO AVOID EROSION OF SAID STOCKPILE ONTO OFFSITE AREAS. 8. ALL ENVIRONMENTAL MEASURES SHALL BE PER PERTINENT PIEDMONT DESIGN AND CONSTRUCTION STANDARDS. PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO ENSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 NO. DATE REVISION(S) DESCRIPTION A 05-22-2020 ISSUED FOR 30% REVIEW B 07-07-2020 ISSUED FOR 60% REVIEW C 08-28-2020 ISSUED FOR 90% REVIEW D 110-12-20201 ISSUED FOR BID BY CHK I APPD DESCRIPTION NPR KVG CAM AREA CODE 1841 NPR KVG CAM ACCOUNT NUMBER NPR KVG CAM PROJECT NUMBER 0231792 NPR KVG CAM DRAWING BY NPR STATION ID CHECKER INITIALS KVG APPROVALS DATE INITIALS NIA N/A REGIONAL ENGINEER DATE INITIALS MGR TECH NIA N/A REC & STD DATE INITIALS PRINCIPAL 05/22/2020 CAM ENGINEER ,fa*, DUKEr6111 Piedmont ENERGY Natural Gas COPYRIGHT 2018 LINE 129 SECTION 1 ROCKY RIVER HDD COVER PAGE CABARRUS COUNTY, NC INDIAN TRAIL RESOURCE CENTER, INDIAN TRAIL, NORTH CAROLINA & BURNS MEDONNELL CONSULTANTS, INC. SHEET(S) 1 OF 27 DWG SCALE NONE DWG DATE 05/15/2020 ISUPERSEDED DRAWING NUMBER REVISION PNG-G-129-0001016 D DISCIPLINE / RESOURCE CENTER / LINE NUMBER LEGEND: Ft PROPERTY LINE G EXISTING GAS LINE TEMPORARY SILT FENCE LIMITS OF DISTURBANCE TEMPORARY GRAVEL CONSTRUCTION ENTRANCE PROPOSED GRAVEL SURFACE COURSE F - - - WETLANDS/STREAMS �► CONTRACTOR HAUL ROUTE i PROPOSED 30" PIPELINE 8+00 PROPOSED PERMANENT EASEMENT PROPOSED TEMPORARY WORKSPACE I. I I PROPOSED ADDITIONAL TEMPORARY WORKSPACE SOIL BORING PROPOSED MATTING CULVERT ANODEFLEX 500 ANODEFLEX 1500 (2 STRINGS) ANODEFLEX CABLE ABBREVIATIONS: ASTM AMERICAN SOCIETY FOR TESTING AND MATERIALS BOC BACK OF CURB CB CATCH BASIN CBR CALIFORNIA BEARING RATIO C/L CENTERLINE COMB COMBINATION BEND (VERT. & HOR. DIRECTIONAL CHANGE) CONIC CONCRETE CI CURB INLET CMP CORRUGATED METAIL PIPE DB DEED BOOK DI DROP INLET DR DRIVE ELEC ELECTRICAL EOP EDGE OF PAVMENT EX EXISTING FT FEET FTG FITTING JAB JACK AND BORE GIS GEOGRAPHIC INFORMATION SYSTEM LL LAND LOT MAX MAXIMUM MIN MINIMUM MISC MISCELLANEOUS NTS NOT TO SCALE PG PAGE PVC POLYVINYL PLASTIC PIPE NCDEQ NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY NCDOT NORTH CAROLINA DEPARTMENT OF TRANSPORTATION N/F NOW OR FORMERLY NPDES NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM - NTS NOT TO SCALE OSHA OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION - PC POINT OF CURVATURE - P/L PROPERTY LINE - PT POINT OF TANGENCY o RCP REINFORCED CONCRETE PIPE - R/W RIGHT OF WAY SAG SAG (PIPE DIRECTION UP) SBL SIDE BEND LEFT L SBR SIDE BEND RIGHT = SSMH SANITARY SEWER MANHOLE STMH STORM MANHOLE BURNS & McDONNELL CONSULTANTS, INC. STATE LICENSE # C-1435 CLAUDE A McMULLAN IFC SUBMITTAL DATE NORTH CAROLINA n SEAL 047852 PROFESSIONAL EN&ARCH STAMP GENERAL NOTES: 1. THE EXISTING SITE UTILITIES AND FEATURES SHOWN ARE BASED ON A FIELD RUN TOPOGRAPHIC SURVEY PERFORMED BY SGC ENGINEERING, LLC IN MAY 2020. 2. ALL DIMENSIONS, ELEVATIONS, AND STATIONS ARE IN FEET, UNLESS INDICATED OTHERWISE. 3. CALLOUTS, COORDINATES, AND DIMENSIONS ARE POINTED TO OR MEASURED TO STRUCTURE CENTER, EDGE OF PAVEMENT, BACK OF CURB, OR OUTSIDE FACE OF FOUNDATION WALL, UNLESS INDICATED OTHERWISE. 4. ALL WORK SHALL BE SUBJECT TO INSPECTION BY AUTHORIZED PERSONNEL OF LOCAL AND GOVERNMENT REGULATORY AGENCIES AND THE CLIENT REPRESENTATIVE. 5. SEE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION (NCDOT) DESIGN STANDARDS FOR REFERENCES TO NCDOT STANDARD DRAWINGS. ALL SUBSEQUENT SPECIFICATIONS AND STANDARDS SHALL APPLY. 6. ALL WORK SHALL BE CONDUCTED IN ACCORDANCE WITH THE PLANS AND SPECIFICATIONS AND LOCAL AND GOVERNMENT CODES, ORDINANCES, AND REGULATIONS. IN CASE OF CONTRADICTION OR DISCREPANCY BETWEEN REQUIREMENTS, CONTRACTOR SHALL INCORPORATE WHICHEVER IS MOST STRINGENT. WHERE A QUESTION REMAINS ON WHICH REQUIREMENT IS MOST STRINGENT, CONTRACTOR SHALL SUBMIT ISSUE TO THE CLIENT REPRESENTATIVE IN WRITING. THE DECISION OF THE CLIENT REPRESENTATIVE SHALL BE CONSIDERED FINAL. 7. ALL WORK SHALL BE CONDUCTED IN A PROFESSIONAL WORKMANSHIP MANNER USING USING QUALITY MATERIALS. WORK SHALL CONFORM TO THESE DRAWINGS, UNLESS INDICATED OTHERWISE OR AS DIRECTED BY THE CLIENT REPRESENTATIVE. 8. CONTRACTOR SHALL CONFINE ALL WORK TO BE WITHIN THE PERMANENT AND TEMPORARY EASEMENTS. 9. ALL GRADING, PAVEMENT WORK, AND ANY OTHER MISCELLANEOUS WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE CURRENT NCDOT STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION AND SUPPLEMENTAL SPECIFICATIONS. 10. CONTRACTOR SHALL TAKE CARE TO MAINTAIN THE SITE AND ADJACENT AREAS IN AS CLEAN A CONDITION AS POSSIBLE. ANY DEBRIS, DIRT, MUD, ETC. SHALL BE CLEANED DAILY, OR AS THE CLIENT REPRESENTATIVE DIRECTS, FROM ANY ADJOINING STREETS OR PROPERTIES BY THE CONTRACTOR AS A PART OF THE PRIMARY CONSTRUCTION WORK. THIS SHALL BE AT NO ADDITIONAL COMPENSATION TO THE CONTRACTOR. 11. ALL WORK SHALL BE IN ACCORDANCE WITH PIEDMONT NATURAL GAS "DESIGN AND CONSTRUCTION MANUALS", LATEST EDITION. IN CASES OF CONTRADICTION, PIEDMONT NATURAL GAS STANDARDS SHALL GOVERN. CONSTRUCTION DRAWING NOTES: 1. CONTRACTOR SHALL MAINTAIN UPDATED CONSTRUCTION DRAWINGS AT ALL TIMES THROUGH THE DURATION OF THE PROJECT. CONSTRUCTION RECORD DRAWINGS SHALL BE SUBMITTED TO THE CLIENT REPRESENTATIVE. 2. DURING CONSTRUCTION OF THE PROJECT, CONTRACTOR SHALL BE RESPONSIBLE FOR KEEPING TRACK OF ANY CLIENT REPRESENTATIVE -APPROVED FIELD CONSTRUCTION REVISIONS TO THE DESIGN DEPICTED ON APPROVED CONSTRUCTION DRAWINGS. 3. ALL VARIATIONS IN PROJECT CONDITIONS, LOCATIONS, AND CONFIGURATIONS, AND ANY OTHER CHANGES OR DEVIATIONS FROM THE INFORMATION PRESENTED ON THE ORIGINAL, APPROVED CONSTRUCTION DRAWINGS SHALL BE NOTED. THIS INCLUDES BURIED OR CONCEALED CONSTRUCTION AND UTILITY FEATURES THAT WERE REVEALED DURING CONSTRUCTION. 4. THE CLIENT REPRESENTATIVE SHALL REVIEW COMPLETENESS, ACCURACY, AND FORMAT OF SUBMITTED CONSTRUCTION DRAWINGS. IF THE CONSTRUCTION DRAWINGS ARE CONSIDERED UNACCEPTABLE, THEY SHALL BE RETURNED TO THE CONTRACTOR FOR CORRECTION AND RESUBMISSION. THIS SHALL BE AT NO ADDITIONAL COMPENSATION TO THE CONTRACTOR. COORDINATION AND COMMUNICATION 1. CONTRACTOR SHALL APPOINT A PRIMARY CONSTRUCTION SUPERINTENDENT, SUBJECT TO THE APPROVAL OF THE CLIENT REPRESENTATIVE, WHO SHALL BE PRESENT ON THE CONSTRUCTION SITE AT ALL TIMES DURING WORKING HOURS AND ACCESSIBLE AT ALL TIMES WHILE WORK IS IN PROGRESS. THE PRIMARY CONSTRUCTION SUPERINTENDENT SHALL BE DESIGNATED THE RESPONSIBLE CONTRACTOR'S REPRESENTATIVE WHO SHALL BE AVAILABLE ON A 24-HOUR BASIS. WHEN THE CONTRACTOR'S PRIMARY CONSTRUCTION REPRESENTATIVE IS NOT AVAILABLE ON THE CONSTRUCTION SITE, AN ALTERNATE REPRESENTATIVE SHALL BE PROVIDED. CONTRACTOR SHALL PROVIDE NAMES AND CONTACT INFORMATION OF REPRESENTATIVES TO THE CLIENT REPRESENTATIVE PRIOR TO THE START OF CONSTRUCTION ACTIVITIES. 2. CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING CONSTANT COORDINATION BETWEEN ANY SUBCONTRACTORS AND THE CLIENT REPRESENTATIVE. ALL CONSTRUCTION ACTIVITIES PLANNED BY THE CONTRACTOR SHALL BE REVIEWED AND APPROVED BY THE CLIENT REPRESENTATIVE. 3. THE FOLLOWING CONTACT INFORMATION IS PROVIDED FOR CONTRACTOR'S USE IN CASE OF AN EMERGENCY: & EMERGENCY 911 b. OTHER CONTACTS AS DIRECTED AT PRE -CONSTRUCTION MEETING EXCAVATION AND TRENCHES 1. CONTRACTOR SHALL COMPLY WITH THE MOST CURRENT EDITION OF OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA) REGULATIONS AND THE STATE OF NORTH CAROLINA LAWS CONCERNING EXCAVATION. 2. CONTRACTOR SHALL BE RESPONSIBLE FOR ENSURING THAT ALL EXCAVATION, TRENCHING AND SHORING ARE PERFORMED IN A MANNER THAT COMPLIES WITH LOCAL REGULATIONS AND OSHA REGULATIONS FOR CONSTRUCTION. 3. OPEN TRENCHES AND EXCAVATIONS AT THE CONSTRUCTION SITE SHALL BE PROMINENTLY MARKED WITH ORANGE BARRICADES WITH FLASHING RED LIGHTS ACCEPTABLE TO THE CLIENT REPRESENTATIVE. 4. CONTRACTOR SHALL PROVIDE A MINIMUM NOTICE OF 48 HOURS TO THE CLIENT REPRESENTATIVE AND ASSOCIATED UTILITY COMPANIES AND AGENCIES BEFORE PROCEEDING WITH ANY EXCAVATION. 5. DEWATERING OF UTILITY TRENCHES AND OTHER EXCAVATIONS MAY BE REQUIRED. 6. OPEN ONLY THOSE TRENCHES FOR WHICH MATERIAL IS ON -HAND AND READY FOR PLACING THEREIN. AS SOON AS POSSIBLE AFTER THE MATERIAL HAS BEEN PLACED AND WORK APPROVED, BACKFILL AND COMPACT TRENCHES AS SPECIFIED. 7. NO SPECIAL PROVISIONS WILL BE MADE FOR ROCK EXCAVATION, ANY BOULDERS ENCOUNTERED SHALL BE REMOVED AND DISPOSED OF OFF SITE. 8. ALL TOPSOIL SHALL BE REMOVED FROM AREAS TO BE GRADED. ALL USEABLE TOPSOIL SHALL BE STOCKPILED DURING GRADING AND REAPPLIED IN 3" LAYERS TO ALL SLOPES IMMEDIATELY AFTER GRADING IS COMPLETE. OTHER SAFETY REQUIREMENTS 1, CONTRACTOR SHALL MAINTAIN SAFETY PRACTICES THAT CONFORM TO OSHA REGULATIONS. 2. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO OBTAIN AND PAY FOR ALL APPLICABLE PERMITS, FEES AND LICENSES FOR CONSTRUCTION AND EQUIPMENT. 3. THE CONTRACTOR SHALL PERFORM ON -SITE INSPECTIONS THROUGHOUT THE PROJECT AND REMEDY ANY SAFETY CONCERNS IMMEDIATELY. 4. THERE SHALL BE NO PERMANENT WASTE SITES ON SITE PROPERTY. ANY TEMPORARY WASTE AREA SHALL BE APPROVED BY THE CLIENT REPRESENTATIVE AND SHALL BE KEPT IN AN ORDERLY CONDITION. REMOVAL OF WASTE THAT IS NOT PROPERLY MAINTAINED IS SUBJECT TO THE DIRECTION OF THE CLIENT REPRESENTATIVE. 5. EROSION CONTROL DEVICES SHALL BE USED FOR THE ACCESS AND HAUL ROUTES, STAGING AREA, AND ANY MATERIAL STOCKPILES WHEN NECESSARY TO CONTROL EROSION AND STORM WATER RUNOFF. SEE DRAWINGS C-022-000124 - C-022-0001251 AND PNG-C-022-0001255 - PNG-C-022-0001256 FOR EROSION AND SEDIMENT CONTROL REQUIREMENTS. 6. STOCKPILED MATERIAL SHALL BE CONSTRAINED IN A MANNER TO PREVENT MOVEMENT RESULTING FROM WIND CONDITIONS. 7. CONTRACTOR SHALL MAKE NECESSARY PROVISIONS TO LIMIT DUST CAUSED BY CONSTRUCTION ACTIVITIES TO A LIMIT ACCEPTABLE TO PROJECT SITE OPERATIONS. THE CONTRACTOR SHALL CONTROL BLOWING DUST ON THE PROJECT SITE FROM ANY HAUL ROUTE OR WORK AREA REGARDLESS OF SOURCE. 8. WILDLIFE ATTRACTANTS, SUCH AS TRASH AND FOOD SCRAPS, FROM CONSTRUCTION PERSONNEL AND ACTIVITIES SHALL BE REMOVED FROM THE PROJECT LIMITS. 9. GASOLINE, DIESEL FUEL, OIL, AND HAZARDOUS WASTE RESULTING FROM CONTRACTOR'S OPERATIONS OR ACTIVITIES SHALL BE PROPERLY DISPOSED OF IN ACCORDANCE WITH THE SPECIFICATIONS AND LOCAL REGULATORY REQUIREMENTS AND PROPERLY REMOVED FROM THE PROJECT PROPERTY. IF HAZARDOUS MATERIALS ARE ENCOUNTERED OR UNCOVERED DURING CONSTRUCTION ACTIVITIES, THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE CLIENT REPRESENTATIVE. 10. FAILURE TO COMPLY WITH THE CLIENT REPRESENTATIVE SAFETY REQUIREMENTS SHALL RESULT IN THE SUSPENSION OF CONSTRUCTION ACTIVITIES UNTIL ALL SAFETY CONCERNS ARE ADDRESSED BY THE CONTRACTOR TO THE SATISFACTION OF THE CLIENT REPRESENTATIVE. 11. ANY WORKERS AND EQUIPMENT NOT IN COMPLIANCE WITH SAFETY PLAN SHALL IMMEDIATELY BE REMOVED FROM THE WORK AREA. 12. THE CONTRACTOR SHALL NOT BURN OR BURY DEBRIS WITHOUT PERMISSION FROM THE SITE INSPECTOR. SURVEY AND SUBSURFACE INVESTIGATION NOTES: 1. SURVEY CONTROL POINTS WILL BE PROVIDED PRIOR TO CONSTRUCTION. IF THE CONTRACTOR SHOULD NEED TO DISTURB THE CONTROL POINTS DURING CONSTRUCTION, REQUEST SHALL BE GIVEN TO THE SURVEYOR TO HAVE THE CONTROL POINTS RESET. 2. IF BENCHMARKS SHOWN ARE IN AREAS THAT REQUIRE DEMOLITION, OTHER BENCHMARKS SHALL BE ESTABLISHED BEFORE DEMOLITION AND CONSTRUCTION WORK BEGINS. CONTRACTOR SHALL GIVE REQUEST TO THE SURVEYOR. 3. HORIZONTAL CONTROL IS BASED ON NORTH CAROLINA STATE PLANE VERTICAL CONTROL IS BASED ON NAVD88. EXISTING CONDITIONS NOTES: 1. THE LOCATIONS OF STRUCTURES AND UNDERGROUND UTILITIES AS INDICATED HAVE BEEN OBTAINED FROM EXISTING RECORDS AND FIELD SURVEYS. UNDERGROUND STRUCTURES AND UTILITIES MAY BE PRESENT WHICH ARE NOT DOCUMENTED OR LOCATED. 2. THE CONTRACTOR SHALL FIELD -CHECK ALL EXISTING CONDITIONS AND BE THOROUGHLY FAMILIAR WITH THE SITE BEFORE ANY WORK COMMENCES. ANY DISCREPANCIES IN THE DRAWINGS SHALL BE IMMEDIATELY REPORTED TO THE CLIENT REPRESENTATIVE BEFORE ANY FURTHER WORK COMMENCES. 3. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO FIELD -VERIFY EXISTING STRUCTURES, UTILITIES, AND SURVEY INFORMATION, AND TO TAKE NECESSARY PRECAUTIONS DURING DEMOLITION AND CONSTRUCTION. CONTRACTOR SHALL VERIFY EXISTENCE AND MARK LOCATIONS OF ALL UTILITIES, INCLUDING SERVICE CONNECTIONS TO UNDERGROUND UTILITIES, PRIOR TO BEGINNING WORK. CONTRACTOR SHALL CONTACT THE CLIENT REPRESENTATIVE AND ALL ASSOCATED UTILITY COMPANIES AND AGENCIES TO IDENTIFY THE LOCATION OF UTILITIES. THERE IS NO GUARANTEE, EITHER EXPRESSED OR IMPLIED, THAT THE LOCATIONS, SIZE AND TYPE OF MATERIAL OF EXISTING UNDERGROUND UTILITIES INDICATED ARE REPRESENTATIVE OF THOSE TO BE ENCOUNTERED DURING CONSTRUCTION. 4. PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL NOTIFY THE CLIENT REPRESENTATIVE OF OPERATIONAL PLANS. IN THE EVENT AN UNEXPECTED UTILITY OR STRUCTURE INTERFERENCE OR CONFLICT IS ENCOUNTERED DURING CONSTRUCTION, THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE CLIENT REPRESENTATIVE. ANY UTILITY SERVICES OR STRUCTURES DISTURBED BY THE CONTRACTOR'S OPERATIONS SHALL BE RESTORED IMMEDIATELY AT CONTRACTOR'S EXPENSE TO THE SATISFACTION OF THE OWNER. 5. THE CONTRACTOR IS RESPONSIBLE FOR PROTECTING ITEMS NOT TO BE DAMAGED DURING DEMOLITION AND CONSTRUCTION. THE CONTRACTOR SHALL REPAIR OR REPLACE DAMAGED OR DISTURBED ITEMS TO THE SATISFACTION OF THE CLIENT REPRESENTATIVE. GENERAL GRADING NOTES 1, ALL GRADING, PAVEMENT WORK, AND ANY OTHER MISCELLANEOUS WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE CURRENT NC DOT STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION AND SUPPLEMENTAL SPECIFICATIONS. 2. THE GRAVEL SURFACE COURSE SHALL BE CONSTRUCTED IN ACCORDANCE WITH SECTION 520 OF THE NC DOT STANDARD SPECIFICATIONS. 3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR GRADING INCLUDING EXCAVATION, EMBANKMENT, AND BACKFILLING AS NECESSARY TO CONSTRUCT ALL AGGREGATE ACCESS ROADS, AS OUTLINED IN THESE TECHNICAL SPECIAL PROVISIONS AND AS DIRECTED BY THE CLIENT REPRESENTATIVE. 4. THE CONTRACTOR SHALL BE HELD RESPONSIBLE FOR ANY DAMAGE DONE TO STORM MANHOLES OR OTHER UTILITIES DURING GRADING. 5. DISTRIBUTE EXCESS SOIL ON SITE AT THE DIRECTION OF THE CLIENT REPRESENTATIVE. DO NOT ALTER DIRECTION OF SURFACE DRAINAGE PATTERNS. 6. THE TOLERANCE OF THIS WORK SHALL BE TO WITHIN TO 0.1 FT OF THE EXISTING GROUND SURFACE ELEVATIONS. 7. THE ACCESS ROAD SUBGRADE SHALL HAVE SUFFICIENT STABILITY TO ACCOMMODATE CONSTRUCTION TRAFFIC WITHOUT EXCESSIVE SUBRADE RUTTING OR SHOVING. AT THE TIME OF PLACEMENT OF THE PAVEMENT, THE IN SITU SUBGRADE SHALL HAVE A CALIFORNIA BEARING RATIO (CBR) OF AT LEAST 6 PERCENT IN THE TOP 12 INCHES OF SUBGRADE. THE CBR PERCENTAGE WILL BE ASCERTAINED BY THE CONTRACTOR. 8. IF SOFT SPOTS ARE IDENTIFIED IN THE SUBGRADE SOIL, THE SUBGRADE SHALL BE SCARIFIED AND PROOF -ROLLED TO THE DEPTHS REQUIRED BY THE OWNER'S CONSTRUCTION INSPECTOR TO COMPACT AREAS TO THE DENSITY REQUIREMENTS OF THIS DOCUMENT. IF THE SOFT AREAS CANNOT BE ADEQUATELY COMPACTED, THE SOFT SOIL SHALL BE REMOVED AND REPLACED PER THE DESIGN PLANS WITH SUITABLE SOIL MATERIAL AND COMPACTED TO THE DENSITY REQUIREMENTS IN ACCORDANCE WITH THIS DOCUMENT. 9. THE QUALITY OF THE SOIL TO BE USED AS FILL MATERIAL SHALL BE AS SPECIFIED IN THIS DOCUMENT. ALL BACKFILL SHALL BE SPREAD IN LOOSE LIFTS NOT EXCEEDING 8" INCHES IN THICKNESS WHEN SELF-PROPELLED EQUIPMENT IS USED AND NOT EXCEEDING 6" WHEN HAND GUIDED EQUIPMENT IS USED. ALL ROOTS, WOOD, AND VEGETATION SHALL BE REMOVED FROM THE LAYER OF FILL PRIOR TO COMPACTION. ALL FILL AND EXPOSED SOIL IN CUT AREAS SHALL BE COMPACTED AS SPECIFIED IN THIS DOCUMENT. SOIL COMPACTION TESTS WILL BE REQUESTED BY THE OWNER AT APPROPRIATE INTERVALS DURING GRADING OPERATIONS. 10. ALL HAUL -IN MATERIAL SHALL BE FREE OF ROCKS 3" IN DIAMETER AND LARGER. THE OWNER'S CONSTRUCTION INSPECTOR SHALL APPROVE ALL HAUL -IN MATERIAL TO ENSURE THE QUALITY AND THE ABSENCE OF ENVIRONMENTAL HAZARDS. 11. THE FILL AREA SHALL BE CONSTRUCTED TO THE LINES AND GRADES SHOWN ON THE DESIGN DRAWINGS WITH MATERIAL SPECIFIED IN THIS DOCUMENT. THE OWNER'S CONSTRUCTION INSPECTOR WILL PROVIDE ALL NECESSARY BENCHMARKS, SURVEY MONUMENTS, AND BASE LINES REQUIRED FOR THE WORK. THE CONTRACTOR SHALL LAY OUT ALL LINES AND GRADES FOR THE BACKFILL AREAS. ANY PROPOSED CHANGES TO THE SLOPES AND GRADES SHALL REQUIRE THE APPROVAL OF THE OWNER'S CONSTRUCTION INSPECTOR IN ADVANCE. THE CONTRACTOR SHALL BE REQUIRED TO REMOVE, AT HIS OWN EXPENSE, ANY COMPACTED MATERIAL PLACED OUTSIDE OF THE APPROVED LINES OR GRADES. 12. SPOIL MATERIAL SHALL BE TOPSOIL AND OTHER SOIL MATERIALS CONTAINING GREATER THAN 5 PERCENT ORGANIC MATERIAL, SOIL WHICH IS TOO WET, SOIL WHICH DOES NOT MEET THE PLASTICITY AND/OR GRADATION LIMITS FOR SELECT MATERIAL AS SPECIFIED IN THIS DOCUMENT, OR OTHER SOIL MATERIAL DESIGNATED BY THE OWNER'S CONSTRUCTION INSPECTOR TO BE UNSUITABLE FOR SELECT MATERIAL. 13. SELECT SOIL MATERIAL SHALL BE THAT MATERIAL CLASSIFIED AS SM, SP, SC, SW AND CL, OR SW AND SC IN ACCORDANCE WITH ASTM D2487, AND SHALL HAVE A MAXIMUM LIQUID LIMIT OF 30, A MAXIMUM PLASTICITY INDEX OF 8, AND A MAXIMUM OF 35 PERCENT PASSING THE #200 SIEVE. 14. THE TOP SURFACE OF EACH LIFT OF BACKFILL SHALL BE PROTECTED FROM PUMPING, PONDING, AND GULLYING. 15. COMPACTION TESTING WILL BE PROVIDED AT THE EXPENSE OF THE CONTRACTOR. COMPACTION REQUIREMENTS OF SOIL BACKFILL SHALL BE AS INDICATED IN THE FOLLOWING TABLE: LOCATION OF FILL MINIMUM REQUIRED COMPACTION LEVEL STANDARD PROCTOR A. GENERAL YARD AREA 98%(ASTM D698) B. UPPER 18 INCHES OF SOIL TO BE USED AS 98%(ASTM D698) ROAD SUBGRADE MATERIAL AND EXTENDING A MINIMUM OF 5 FEET BEYOND THE EDGE OF DEFINED ROADWAYS (IMMEDIATELY UNDER BASE MATERIAL) 15. CRUSHED STONE IN DRIVE AREAS SHALL BE COMPACTED WITH A STATIC STEEL DRUM ROLLER (APPROXIMATELY 8 TONS). IF A VIBRATORY COMPACTOR IS USED, NO MORE THAN FOUR (4) PASSES SHALL BE ALLOWED. 16. APPROVAL SHALL BE RECEIVED FROM THE CLIENT REPRESENTATIVE FOR EACH FILL TYPE TO BE USED PRIOR TO PROCEEDING WITH BACKFILL OPERATIONS WITH THE MATERIAL IN QUESTION. 17. BACKFILL TO BE IMPORTED SHALL BE TESTED IN ACCORDANCE WITH THIS DOCUMENT AND APPROVED BY THE PROJECT MANAGER PRIOR TO DELIVERY OF MATERIAL TO THE SITE. THE OWNER'S CONSTRUCTION INSPECTOR ACCEPTS NO LIABILITY FOR ANY OUT OF SPECIFICATION MATERIAL ACCEPTED AND STOCKPILED BY THE CONTRACTOR 18. INSPECTION AND TESTING OF MATERIAL SHALL BE PERFORMED AS REQUIRED BY THIS DOCUMENT AT THE EXPENSE OF THE CONTRACTOR. 19. TESTS AND ANALYSIS OF MATERIAL SHALL BE PERFORMED IN ACCORDANCE WITH THE APPLICABLE STANDARDS REFERENCED IN THIS DOCUMENT FOR THE SPECIFIC TEST. FIELD INSPECTION SHALL BE PERFORMED AS REQUIRED BY THIS DOCUMENT. 20. THE BACKFILL AND EXPOSED SOIL IN CUT AREAS SHALL BE COMPACTED AS SPECIFIED ON THIS DOCUMENT. FIELD DENSITY TESTS SHALL BE PERFORMED BY THE CONTRACTOR TO VERIFY COMPACTION REQUIREMENTS HAVE BEEN ACHIEVED. IN -PLACE FIELD DENSITY TESTING OF THE COMPACTED BACKFILL SHALL BE CONDUCTED ACCORDING TO THE PROCEDURES OF THE SAND CONE METHOD (ASTM 1556), NUCLEAR METHOD (ASTM D3017), OR ACCORDING TO THE PROVISIONS OF THIS DOCUMENT. TEST RESULTS REPORTED SHALL INCLUDE BOTH THE MOISTURE CONTENT AND DRY DENSITY, ALONG WITH OTHER PERTINENT DATA SUCH AS LOCATION, ELEVATION, PROCTOR CURVE USED FOR COMPARISON, ETC. THE TESTING FREQUENCY SHALL BE ONE TEST FOR EACH 5,000 SQUARE FEET OF LIFT AREA OR PORTION THEREOF FOR EACH LIFT. IN ISOLATED AREAS OF LESS THAN 5,000 SQUARE FEET, TEST AT LEAST EVERY THIRD LIFT. WHEN BACKFILL OPERATIONS ARE CONCENTRATED IN SMALL AREAS USING LIGHT MANUALLY -GUIDED EQUIPMENT AND RELATIVELY THIN LIFTS, THE FREQUENCY OF DENSITY TESTING MAY BE REVISED AS DIRECTED BY THE OWNER'S CONSTRUCTION INSPECTOR. TEST LOCATION SHALL BE THE WEAKEST APPEARING AREA OF THE TOP LIFT DETERMINED BY TRACKING ACTION OF THE EQUIPMENT. 21. SUITABILITY OF SOIL MATERIAL FOR USE AS BACKFILL SHALL BE DETERMINED FOR EACH FILL TYPE BY THE RESULTS OF THE FOLLOWING TESTS: A. LIQUID LIMIT IN ACCORDANCE WITH ASTM D4318. B. PARTICLE SIZE ANALYSIS IN ACCORDANCE WITH ASTM D422. C. MOISTURE -DENSITY RELATIONS (STANDARD PROCTOR) IN ACCORDANCE WITH ASTM D698. D. MOISTURE CONTENT IN ACCORDANCE WITH ASTM D2216. E. SAMPLING OF SOIL SHALL BE IN ACCORDANCE WITH ASTM D2216. F. SOIL SHALL BE CLASSIFIED IN ACCORDANCE WITH ASTM D2487. 22. FREQUENCY OF TESTS: TESTS OF MATERIALS TO BE USED IN THE OPERATIONS COVERED IN THIS DOCUMENT SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS GIVEN IN THIS DOCUMENT. FREQUENCIES OF IN -PLACE DENSITY TESTS SHALL BE AS STATED IN THIS DOCUMENT. 23. IF QUESTIONABLE COMPACTION RESULTS ARE OBTAINED, THE CLIENT REPRESENTATIVE MAY REQUIRE THE CONTRACTOR TO PERFORM PROCTOR CHECKS (ON DRY SIDE OF OPTIMUM) TO VERIFY THAT THE PROPER PROCTOR CURVE IS BEING REFERENCED. IF NOT, A NEW PROCTOR CURVE DETERMINED BY A FIVE -POINT TEST SHALL BE REQUIRED. IF THE COMPACTION REQUIREMENTS FOR A LIFT HAVE NOT BEEN ACHIEVED, THE LIFT SHALL BE REWORKED OR REPLACED AT THE CONTRACTOR'S EXPENSE. 24. TESTING OF IN -PLACE DENSITY AND MOISTURE CONTENT BY NUCLEAR METHODS IN ACCORDANCE WITH ASTM D2922 AND ASTM D3017, RESPECTIVELY, WILL BE ALLOWED PROVIDED: A. ACCEPTABLE CORRELATION WITH SAND CONE DENSITY AND LABORATORY DETERMINED MOISTURE CONTENT TEST RESULTS CAN BE OBTAINED ACCORDING TO THE GUIDELINES OF "CALIBRATION" SECTIONS OF ASTM D2922 AND ASTM D3017. B. THE INITIAL CORRELATION RESULTS ARE REVIEWED AND USE OF THE NUCLEAR DEVICE IS APPROVED BY THE OWNER'S CONSTRUCTION INSPECTOR. C. THE CONTRACTOR INSURES THAT THE REPRESENTATIVE FROM THE TESTING AGENCY OPERATING THE NUCLEAR DENSITY TESTING HAS THE NECESSARY STATE AND/OR FEDERAL LICENSES TO OPERATE THE DEVICE AND CARRY A NUCLEAR ENERGY SOURCE. EMBANKMENT FILL NOTES: 1. EMBANKMENT FILL SHALL CONSIT OF AN INORGANIC, NON -PLASTIC, GRANULAR SOIL CONTAINING LESS THAN 10% MATERIAL PASSING THE NO.200 MESH SIEVE WITH UNIFIED SOIL CLASSIFICATION OF SP, SP-SC, OR SP-SM. EMBANKMENT FILL SHALL BE PLACED IN LIFTS NOT EXCEEDING 8 INCHES WHEN USING A STATIC DRUM ROLLER WITH A MINIMUM OPERATING WEIGHT OF 5 TONS WITH A DRUM DIAMETER OF 3 TO 4 FEET. WHERE LIGHTWEIGHT VIBRATORY COMPACTION METHODS ARE UTIILIZED MAXIMUM LOOSE LIFT THICKNESS SHALL BE 6 INCHES. COMPACTION TO MEET A MAXIMUM DRY DENSITY OF 98% STANDARD PROCTOR DRY DENSITY. 2. ANY GRADING TO CORRECT SLOPES SHALL BE COMPACTED PER THIS DOCUMENT. GENERAL EXCAVATION REQUIRED FOR CONSTRUCTION 1, THIS ITEM SHALL CONSIST OF FURNISHING ALL LABOR, MATERIALS, MACHINERY, TOOLS, AND SUPERVISION FOR EXCAVATION AND GRADING REQUIRED TO PREPARE THE ROADWAY, AND GRADING REQUIRED TO COMPLETE THE FINAL GRADING OF AREAS ADJACENT TO THE ROADWAY AS SHOWN ON THE PLANS IN ACCORDANCE WITH THE PROVISIONS OF SECTION 225 OF THE NC DOT STANDARD SPECIFICATIONS INSOFAR AS THEY ARE NOT AMENDED BY THE PLANS AND THESE SPECIAL PROVISIONS, AND IN ACCORDANCE WITH THE FOLLOWING SPECIAL PROVISIONS. SUBGRADE COMPACTION VERIFICATION 1. THE CONTRACTOR SHALL EMPLOY AN INDEPENDENT CONSTRUCTION MATERIAL ENGINEERING TESTING FIRM TO MONITOR THE PROOFROLLING OF THE SITE AFTER THE STRIPPINGS HAVE BEEN REMOVED TO INSPECT AND TEST THE COMPACTED FILL AREAS IN THE ACCESS ROAD AREAS AS INDICATED ON THE BID DOCUMENTS AND/OR AS SPECIFIED BY THE OWNER'S DESIGNATED REPRESENTATIVE. COPIES OF THE TEST RESULTS SHALL BE FURNISHED TO THE OWNER'S DESIGNATED REPRESENTATIVE AND OTHERS AS INDICATED BY OWNER'S DESIGNATED REPRESENTATIVE. THE OWNER'S DESIGNATED REPRESENTATIVE MUST APPROVE THE INDEPENDENT CONSTRUCTION MATERIAL ENGINEERING TESTING FIRM. INCLUDED WITH THIS BID PROPOSAL, THE CONTRACTOR SHALL FURNISH THE NAME, ADDRESS AND A PHONE NUMBER OF THE INDEPENDENT CONSTRUCTION MATERIAL ENGINEERING TESTING FIRM FOR APPROVAL. PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO ENSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 NO. DATE REVISION(S) DESCRIPTION BY I CHK APPD I DESCRIPTION APPROVALS lJI'DUKE Piedmont ENERGY Natural Gas COPYRIGHT 2018 LINE 129 SECTION 1 ROCKY RIVER H D D CIVIL GENERAL NOTES, LEGEND AND ABBREVIATIONS CABARRUS COUNTY NC INDIAN TRAIL RESOURCE CENTER, INDIAN TRAIL, NORTH CAROLINA A 05-22-2020 ISSUED FOR 30% REVIEW NPR KVG CAM AREA CODE 1841 DATE NIA INITIALS N/A REGIONAL ENGINEER B 07-07-2020 ISSUED FOR 60% REVIEW NPR KVG CAM ACCOUNT NUMBER C 08-28-2020 p REVIEW ISSUED FOR 90% NPR KVG CAM PROJECT NUMBER 0231792 DATE NIA INITIALS N/A MGR TECH REC&STD D 10-12-2020 ISSUED FORBID NPR KVG CAM DRAWING BY NPR STATION ID DATE 05/22/2020 INITIALS CAM PRINCIPAL ENGINEER CHECKER INITIALS KVG REF. DWG(S) PNG-G-129-0001016 SHEET(S) 2 OF 27 DWG SCALE NONE DWG DATE 05/15/2020 SUPERSEDED DRAWING NUMBER REVISION PNG-G-129-0001018 D DISCIPLINE / RESOURCE CENTER / LINE NUMBER BURNS & McDONNELL CONSULTANTS, INC. STATE LICENSE # G1435 Piedmont r6111 NaturalGas I.R. Number 231792 Project Manager Tom Morris BOM rev # E BILL OF MATERIAL Job Name Line 129 Section 1 Rocky River HDD PM Area Code 1841 BOM rev date 10/5/2020 Revised: 6/27/2019 Resource Center Indian Trail Design Engineer Jeremy Grabowski Drawing # G-129-0001019 Station ID Engineering Co. Material Need Date 5/22/2020 Ship To Attention To BOM # Legacy Number Maximo Part # Data Sheet? Source System Qty Retired? Description Ordering Instructions Ordering Specifications Manuf Model Manuf Part # 1 16925 1552791 PNG 930 PIPE, 30" NPS X 0.500 W.T., DBL RANDOM LG, BEVELED ENDS, LONGITUDINAL SUBMERGED ARC WELDED, FBE, STL, API 5L PSL-2, GR X70, NO JOINTERS UNKNOWN, 1552791 2 16926 1552792 PNG 2297 PIPE, 30" NPS X 0.500 W.T., DBL RANDOM LG, BEVELED ENDS, LONGITUDINAL SUBMERGED ARC WELDED, FBE/PC, STL, API 5L PSL-2, GR X70, NO JOINTERS UNKNOWN, 1552792 3 16625 1552945 PNG 3 ELBOW,PIPE, 30" NPS X 0.5 W.T., BW, 45 DEG, 3D RADIUS, STL, MSS SP-75, GR Y70, FULLY SEGMENTABLE, PAINTED PREFERRED, BARE ACCEPTABLE., MACHINE BEVEL ENDS PER ASME B31.8 APPENDIX I, FIG 1-4 UNKNOWN, 1552945 4 17691 1563913 PNG 4 TEE, STOPPLE, 30" NPS, WELD X WELD X RF, STL, CLASS 600, STOPPLE KIT, SPLIT TEE, CLASS 600, 30"" LOR,10200 MWP @ 0.50 DESIGN FACTOR, ORDER COMPLETE WITH BACK UP STRIPS, AND THE APPROPRIATE SCARFED NIPPLE, PLUG AND BLIND FLANGE FIT WITH STUDS, NUTS ANDGASKET ** PRO -SERIES, ALL OF THE ABOVE PARTS MUST BEPACKAGED TOGETHER WHEN SHIPPING TDWILLIAMSON, PRO -SERIES 12334654 5 14151 1553338 PNG 8 FITTING, THREAD-O-RING, 2" X 30-6" NPS WE, STL, ASTM A333 GR. 6 ASME B31.8,, BARE, NIPPLE, ASTM A333. CAP, ASTM A105. PLUG, ASTM B-16 YELLOW BRASS. VITON 0-RING TDWILLIAMSON, TR-0000-0002-00 6 14542 1553543 PNG 2 CAP,PIPE, 30" NPS X 0.500 W.T., WELD, STL, MSS SP-75, GR Y70 UNKNOWN, 1553543 7 17388 1553031 PNG 4 ELBOW,PIPE, 30" NPS X 0.5 W.T., BW, 90 DEG, 3D RADIUS, STL, MSS SP-75, GR Y70, FULLY SEGMENTABLE, PAINTED PREFERRED, BARE ACCEPTABLE., MACHINE BEVEL ENDS PER ASME B31.8 APPENDIX I, FIG 1-4 UNKNOWN, 1553031 8 - - - NOT USED - - - 9 - - - NOT USED - - - 10 - - - NOT USED - - - 11 17122 1551369 PNG 4 FLANGE,PIPE, WN, RF, 30" NPS, CLASS 600, FORGED STL, ASTM A694, ASME B16.5, GR F70, MSS SP-44, 125-250 MICRO INCHES AARH UNKNOWN, 1551369 12 17276 1557091 PNG 4 GASKET,SPIRAL WOUND, 30" NPS, CLASS 600, 1/8" THK, 304 SS RIBBON WITH GRAPHITE FILLER, SS INNER RING, CS OUTER RING, ASME B16.20, TYPE E, TO SUIT MSS SP-44 FLANGE FLEXITALLICI, 1557091 13 17283 1553088 PNG 112 BOLT, STUD, 2" DIA, 15" LG, STL, ASTM A193 GR B7 UNKNOWN, 1553088 14 16613 1553451 PNG 224 NUT,HEX, 2" DIA, STL, ASTM A194 GR 2H UNKNOWN, 1553451 15 16927 1552793 PNG 80 PIPE, 30" NPS X 0.500 W.T., DBL RANDOM LG, BEVELED ENDS, LONGITUDINAL SUBMERGED ARC WELDED, BARE, STL, API 5L PSL-2, GR X70, NO JOINTERS UNKNOWN, 1552793 * CONTRACTOR TO TAPER BORE A 30" X-70 TRANSITION PIECE BEVELED TO A MINIMUM OF 0.438" W.T. TO MAINTAIN A DESIGN PRESSURE OF 1000 PSIG. SEE PNG-C-129-0001037 FOR TAPER BORE DETAIL. PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO ENSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 CLAUDE A. McMULLAN IFC SUBMITTAL DATE NORTH CAROLINA SEAL047852 NO. DATE A 05-22-2020 B 07-07-2020 C 08-28-2020 D 10-12-2020 PROFESSIONAL ENG/ARCH STAMP REVISION(S) DESCRIPTION ISSUED FOR 30% REVIEW ISSUED FOR 60% REVIEW ISSUED FOR 90% REVIEW ISSUED FOR BID BY CHK APPD DESCRIPTION APPROVALS NPR KVG CAM AREA CODE 1841 DATE NIA INITIALS N/A REGIONAL ENGINEER NPR KVG CAM ACCOUNT NUMBER NPR KVG CAM PROJECT NUMBER 0231792 DATE NIA INITIALS N/A MGR TECH REC & STD NPR KVG CAM DRAWING BY NPR STATION ID DATE 05/22/2020 INITIALS CAM PRINCIPAL ENGINEER CHECKER INITIALS KVG LINE 129 SECTION 1 ROCKY RIVER HDD 4 � N E r6lliPiedmont BILL OF MATERIALS Natural Gas CABARRUS COUNTY NC COPYRIGHT 2018 INDIAN TRAIL RESOURCE CENTER, INDIAN TRAIL, NORTH CAROLINA NOTES: 1. ANY CHANGES REQUIRED DUE TO FIELD CONDITIONS MUST BE APPROVED BY THE ENGINEERING DEPARTMENT. REF. DWG(S) PNG-C-129-0001013, PNG-G-129-0001016, PNG-C-129-0001037 SHEET(S) 3 OF 27 DWG SCALE NONE DWG DATE 05/15/2020 (SUPERSEDED DRAWING NUMBER REVISION PNG-G-129-0001019 D DISCIPLINE / RESOURCE CENTER / LINE NUMBER ACCESS AND STAGING _+oo'ilii ir�'I EXISTING 50' PNG PERMANENT EASEMENT R I I\ , , , 555463980400000 f�TEMPORARY MATTING (20' WIDTH) I'r`-yll�rl i 10+00 � I I I IIi ,� . ;� 1 /l, Irj t 15+00 20+00 a rr rr o 13C -----��—��--��. i I� li LPL/ ' �.'lllll�; \\#�"'! 6755548116400000 -- 16 HDD STRINGING --------------- AREA (2425 x 60) ADDITIONAL TEMPORARY ''; j '�''i , PROPOSED 30" PIPELINE WORKSPACE 55545180830000 � t- R. 91 � �- MACHINE CLEARING ONLY AREA I BURNS & McDONNELL CONSULTANTS, INC. 5 STATE LICENSE # C-1435 CLAUDE A McMULLAN IFC SUBMITTAL DATE NORTH CAROLINA n SEAL 047852 PROFESSIONAL ENG/ARCH STAMP N0 �p NP / c � SR 1114 - TIMBER MAT AIR BRIDGE OVER 8" PVC SEE DETAIL 3, PNG-129-0001027 L PROPOSED 60 PNG R PERMANENT EASEMENTAlma I.VIVIKHI.IVK IV BUILD UP RAILROAD PC`N I _,� -'� CROSSING FOR TRUCK TRAFFIC TIMBER MAT AIR BRIDGE OVER 12" (`RAD CGG f)GTAII '2 DKI _-17a_r)r)r11r177 DISTURBED AREA FOR ACCESS ROAD (WIDTH VARIES) DETAIL �1 PERMANENT ACCESS ROAD #1 (30' WIDTH) MAKE IMPROVEMENTS AS NECESSARY TIMBER MAT AIR BRIDGE OVER 12" CMP SEE DETAIL 3, PNG-129-0001027 b SEE PLAN VIEW - A BELOW MACHINE CLEARING ONLY AREA 1 I"I I%111 IV19 V"V I - 1 ILL 1V V It 1-1- FOUNDATION (ESPECIALLY IMPORTANT WHERE SOFT SOIL IS ANTICIPATED) IiO PLAN VIEW SCALE: AS NOTED BELOW 0 300 600 00119 1IN = 30OFT 0 TIMBER MAT AIR BRIDGE OVER 12"- RCP SEE DETAIL 3, PNG-129-0001027 I SEE PLAN VIEW - B BELOW +27 - -- ADDITIONAL TEMPORARY / WORKSPACES a �- TEMPORARY -� ACCESS ROAD #2 _ -- - (20' WIDTH) ADDITIONAL TEMPORARY TIMBER MAT AIR BRIDGE OVER 8" WORKSPACE re RCP SEE DETAIL 3, PNG-129-0001027 - / R 1174 EXPANDED TEMPORARY —ACCESS ROAD (SEE \, RAL NOTES 2) 1 / / CLEAR AND GRUB EXISTING VEGETATION ---------- -----� ---------------- R R pINEB�Ud EXP EMPORARY �.' E OND (SEE � C3f_� AL NOTES 2) / CL AID AND GRUB / E IST'ING VEGET TI N / R36 RI 1. ACCESS AND HAUL ROUTES FOR ALL CONTRACTOR PERSONNEL, VEHICLES, EQUIPMENT, AND DELIVERIES ARE ILLUSTRATED ON THIS DRAWING AND ARE SUBJECT TO THE APPROVAL OF THE CLIENT REPRESENTATIVE. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO COORDINATE OFF -SITE HAUL ROUTES WITH THE APPROPRIATE OWNER WHO HAS JURISDICTION OVER THE AFFECTED ROUTE. ACCESS ROUTES AND HAUL ROUTES ARE SUBJECT TO CHANGE AT THE DIRECTION OF THE CLIENT REPRESENTATIVE AND MAY CHANGE BASED ON OPERATIONAL REQUIREMENTS OF THE SITE. 2. CONTRACTOR SHALL COORDINATE ACTIVITIES AND MAINTAIN ALL ACCESS AND HAUL ROUTES IN A MANNER THAT ALLOWS UNOBSTRUCTED EMERGENCY ACCESS TO ALL PROJECT AREAS AND EXISTING ROADWAYS AT ALL TIMES WITHOUT DELAY TO EMERGENCY AND SECURITY VEHICLE RESPONSE TIME. 3. IF ANY EMERGENCY ROUTES REQUIRE CLOSURE DUE TO CONSTRUCTION ACTIVITIES, CONTRACTOR SHALL NOTIFY THE CLIENT REPRESENTATIVE, POLICE, LOCAL FIRE AUTHORITY, AND ALL OTHER EMERGENCY SERVICES OF THE CLOSURE. 4. CONTRACTOR SHALL MAINTAIN ACCESS AND HAUL ROUTES TO BE FREE FROM DEBRIS CAUSED FROM CONSTRUCTION ACTIVITIES ON A DAILY BASIS. 5. CONTRACTOR SHALL RESTRICT ALL OPERATIONS TO AREAS WITHIN THE CONSTRUCTION LIMITS UNLESS COORDINATED OTHERWISE WITH THE CLIENT REPRESENTATIVE. 6. CONTRACTOR SHALL PROVIDE TEMPORARY CONSTRUCTION FENCING AROUND THE ENTIRE SITE DURING CONSTRUCTION. 7. CONTRACTOR IS RESPONSIBLE FOR ESTABLISHING A STAGING AND STOCKPILE AREA FOR MATERIALS AND EQUIPMENT. LOCATION OF CONTRACTOR'S STAGING SHALL BE AS ILLUSTRATED ON THIS DRAWING, AND IS SUBJECT TO THE APPROVAL OF THE CLIENT REPRESENTATIVE. CONTRACTOR MAY SUBMIT ALTERNATIVES TO THE STAGING AREA LOCATIONS AS SHOWN. CONTRACTOR'S STAGING AREA IS SUBJECT TO CHANGE AT THE DIRECTION OF THE CLIENT REPRESENTATIVE AND MAY CHANGE BASED ON OPERATIONAL REQUIREMENTS OF THE PROJECT SITE. 8. WHEN NOT ENGAGED IN CONSTRUCTION ACTIVITIES, CONTRACTOR'S EQUIPMENT AND VEHICLES SHALL BE PARKED IN THE STAGING AREA. 9. ACCESS POINTS, HAUL ROUTES, STAGING AREA, AND ANY OTHER AREAS DISTURBED BY THE CONTRACTOR SHALL BE RESTORED TO THEIR ORIGINAL CONDITION OR BETTER TO THE SATISFACTION OF THE CLIENT REPRESENTATIVE. 10. CONTRACTOR SHALL IMPROVE THE EXISTING ACCESS ROAD AS REQUIRED AND AS DIRECTED BY AND APPROVED BY OWNER. GRAVEL ROAD SHALL BE 6" GRAVEL SURFACE COURSE OVER 12" COMPACTED SUBGRADE AND AT LEAST 12' IN WIDTH. 11. USE 6" COMPACTED ABC STONE AS SHOWN ON PLANS. STONE TYPICALLY INSTALLED ON SLOPES OF 20% OR MORE. 12. CONTRACTOR SHALL MONITOR TO SUPPLEMENT STONE OR BLADE TO MAINTAIN UNIFORM RIDING SURFACE. TRAFFIC CONTROL 1. PRIOR TO CONSTRUCTION, CONTRACTOR SHALL CORDON OFF THE CONSTRUCTION WORK AREA AND ASSOCIATED ROADWAYS BY USING BARRICADES APPROVED BY THE CLIENT REPRESENTATIVE. 2. ALL CONSTRUCTION EQUIPMENT AND VEHICLES SHALL BE MARKED WITH COMPANY DESIGNS, INSIGNIAS, OR OTHER MARKINGS, WHICH ARE CLEARLY VISIBLE. 3. CONSTRUCTION EQUIPMENT SHALL HAVE AUTOMATIC SIGNALING DEVICES TO SOUND AN ALARM WHEN MOVING IN REVERSE. 4. NO PEDESTRIAN TRAFFIC SHALL BE ALLOWED INSIDE THE CONSTRUCTION LIMITS. 5. ANY DAMAGE TO ROADS AND PAVEMENTS -TO -REMAIN DUE TO CONSTRUCTION EQUIPMENT OR TRAFFIC SHALL BE REPAIRED TO RESTORE THE ROADS AND PAVEMENTS TO THEIR ORIGINAL CONDITION TO THE SATISFACTION OF THE CLIENT REPRESENTATIVE. GENERAL NOTES: 1. CONTRACTOR SHALL IMPROVE THE EXISTING ACCESS ROAD AS REQUIRED AND AS DIRECTED BY AND APPROVED BY CLIENT REPRESENTATIVE. HAUL ROAD SHALL BE IN ACCORDANCE WITH DETAIL 1, THIS SHEET 2. INSTALL TEMPORARY CONSTRUCTION ENTRANCE, SEE DETAIL 1 ON SHEET PNG-C-129-0001027. TEMPORARY ACCESS ROAD ENTRANCES SHALL BE RESTORED TO EXISTING CONDITIONS UPON CONSTRUCTION COMPLETION. LIMITS OF DISTURBED AREA PIPELINE PROJECT: 21.26 AC SCALE: AS NOTED BELOW SCALE: AS NOTED BELOW NTS 0 20 40 0 20 40 POINT OF CONTACT (CONSTRUCTION): 00119 SHAUN HUNEYCUTT 704-438-0036 ACCESS ROAD DETAIL 11N = 20FT 11N = 20FT PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY REF. DWG(S) PNG-G-129-0001016 PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO ENSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 PLAN VIEW - A PLAN VIEW - B NO. DATE REVISION(S) DESCRIPTION BY I CHK APPD I DESCRIPTION APPROVALS V`ENEEr611i Piedmont ENERGY; Natural Gas COPYRIGHT 2018 LINE 129 SECTION 1 ROCKY RIVER HDD ACCESS ROUTE PLAN CABARRUS COUNTY NC , INDIAN TRAIL RESOURCE CENTER, INDIAN TRAIL, NORTH CAROLINA SHEET(S) 4 OF 27 DWG SCALE 1"=300' A 05-22-2020 ISSUED FOR 30% REVIEW NPR KVG MMT AREA CODE 1841 DATE NIA NITIALS N/A REGIONAL ENGINEER DWG DATE 04123/2020 SUPERSEDED B 07-07-2020 ISSUED FOR 60% REVIEW NPR KVG CAM ACCOUNT NUMBER C 08-28-2020 ISSUED FOR90% REVIEW NPR KVG CAM PROJECT NUMBER 0231792 DATE NIA INITIALS N/A MGR TECH REC&STD DRAWING NUMBER - - - PNG C 129 0001010 REVISION D D 10-12-2020 ISSUED FOR BID NPR KVG CAM DRAWING BY NPR STATION ID DATE 05/22/2020 INITIALS CAM PRINCIPAL ENGINEER CHECKER INITIALS I KVG DISCIPLINE / RESOURCE CENTER / LINE NUMBER X,It , .... ,.......... ......... / 1 K �\ \ � 1 �,...........�...... It It ............. \ \ 0 �:......�.. \ / / i l/ �� . .� ........ �.. \ \ 1 / / l l l �� / �/ i �� l I It ;:..........\....... ...............�...\. �� . ............ :::r:::7::: a. f.. j..l. ,:::r:::::.: �.� ::::� .. . .I....I.....I... �........... ............. 1......./....1.............. .......... /........_. _ .�...i ........... l ,.. .r....r.� j..— .... ..... /............ �.. _ .... .... .�: /.......,�........\ .. ................. .. I �.�: .......... . \ / / / / I Imo. / / 0 \SOO /. It I d EXITING 50' PNG PERMANENT EASEMENT EXISTING PIPE TO I BE GROUTED IN 1 \V PLACE (TYP) GROUTING LOCATION 1 75'x50' EXISTING LINE 129 MAINLINE VALVE 1 \\ \ IIII I I 11 i I / / Itlj l It III fill li P \\\\\� 1�1��IIa�1�INll t�Mt-%1 ITIN Ill 1 nn ATl nwl n tl 11 � 1►I I I ' ► t �` � ���\\ N\�\�s S�O.,,,� III � �\ \ � °' p `•�� �' I NOTES: 1. THE EXISTING SITE UTILITIES AND FEATURES SHOWN ARE BASED ON A FIELD RUN TOPOGRAPHIC SURVEY PERFORMED BY SGC ENGINEERING, LLC IN JUNE 2020. 2. SEE SHEET PNG-G-129-0001018 FOR CIVIL LEGEND, ABBREVIATIONS, AND GENERAL NOTES. 3. ALL DIMENSIONS SHOWN ARE IN FEET UNLESS NOTED OTHERWISE. LEGEND: DEMOLISH AND REMOVE ALL ABOVE GROUND APPURTENANCES AND BELOW GROUND PIPING WITHIN STATION FENCING. CONTRACTOR TO REMOVE ALL BELOW GRADE PIPING WITHIN THE DOT ROW, CUT, AND CAP. RETIRE 30" PIPELINE. PIPELINE TO BE GROUTED AND LEFT IN PLACE FROM GROUTING LOCATION 1 TO GROUTING LOCATION 2. 0 100 200 1IN = 10OFT CLASS /MACIP BURNS& McDONNELL CONSULTANTS, INC. PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY REF. DWG(S) PNG-C-129-0001010, PNG-G-129-0001016, STATE LICENSE # C-1435 PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO ENSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 PNG-C-129-0001018 CLAUDE A McMULLAN IFC SUBMITTAL DATE NORTH CAROLINA SEAL 047852 PROFESSIONAL ENG/ARCH STAMP NO. DATE REVISION(S) DESCRIPTION BY CHK APPD I DESCRIPTION APPROVALS _ ' DUKE Piedmont VENERGY,.. � d o Gas COPYRIGHT 2018 LINE 129 SECTION 1 ROCKY RIVER H D D RETIREMENT PLAN CABARRU S COUNTY N C INDIAN TRAIL RESOURCE CENTER, INDIAN TRAIL, NORTH CAROLINA A 07-07-2020 ISSUED FOR 60% REVIEW NPR KVG CAM AREA CODE 1841 DATE NIA INITIALS N/A REGIONAL ENGINEER B 08-28-2020 ISSUED FOR 90% REVIEW NPR KVG CAM ACCOUNT NUMBER C 10-12-2020 ISSUED FORBID NPR KVG CAM PROJECT NUMBER 0231792 DATE NIA INITIALS N/A MGR TECH REC &STD DRAWING BY NPR STATION ID DATE 05/22/2020 INITIALS CAM PRINCIPAL ENGINEER CHECKER INITIALS KVG SHEET(S) 5 OF 27 DWG SCALE V=100' DWG DATE 04/23/2020 SUPERSEDED DRAWING NUMBER REVISION PNG-C-129-0001012 C DISCIPLINE / RESOURCE CENTER / LINE NUMBER ` 1 MI :1: 1111 OWNER: . . • • • DEED BOOK/ 1 • I • ■ `50'PNG EASEMENT 1 • • 111 1 • 111 1 • • 111 1 • - • --�-= ow •• I :1: 1111 ............... I • ........... ' /.....�....•lisle I • • 11 11 11 11 11 • 11.......... . 11 ...................... �L L ... T' f� L .1T• •L L �L LLLL L .. •'•••••..�.•.•. ••'•'•••••••••••••.•.•.! •..•.•.•.•.•.•.•...........•..•.•.•.•.•.•.•...........•..•.•.•.•.•.•.•.•.....•.•.•..•.•.•.•.•.•.•.•.•.•.•.•.•.. .. • ...... .L .•.•.•.•.•...•.•.•.•.•.•.•......, .�.•.•.•.•••••.•.•.•-• •'•••••••••••.•.• �I.•.•••••••'•'•••••.••..•.•.•.•.•.•...............•.•.•.•.•.•.•....� •.:• .... •••. . .. •.•••••••••• ••.••.• •.••••.••• •.••.••.•••••••••••.••.••.••.••.••.•••.•••.•••.'••.••..••.. ••.•••••••••••••••••••••••.•• •.• •.• •••••••••••••••••••••••...•'•••' •••• ..••..••.•.•..•.•.•....•.•.. ..•• .•••'.••••.•••. •'•• •• •• •• •• ••.•••.•••.••••.•••... •. •. •. •. •. ••••••••••••.•.•.•.•.••• .••••••.....•••••••••• .•.•.•.•.• .•.•.•.•.•.••..••••..••••..•••••.••••.•••.•�.•'•••.• • • •••••••••.. .••.••.•...•......................• .••• .• .•• ......... .••• .••..• • • • .• • •••••.........•.••• ..•.•.•..•.•.•AREA •. ..••.• ..••••••...... •.....• ............ ... • • • • • ••••. •••••••• ....1 . • • ..•..•.••••'• ••••.. •... •• . .....•.•••...... ...•. .•.•• .•• .•• ....•••••••••• �• ••• .•.•........••••................ .......•• • I • 1 a a ---------------1_� Is --��--- _-�---_ --- EXIT POINT AT • • ---- --------------- ---- ■ I ■ --- ---------------- ----- _ 1 ,. PROPOSED TIE-IN LOCATION ■ --- I I • 1 1 1 1•• ---------------- ------------- - ------ ------------- - --------------- --------------- ------------- - ------------- - --------------- -------- ------------ - 1 1 1 1 1 1 1 1 1 I 1 1 1 1 ■ 1 1 1 1 � 1 1 MATERIAL • © O O • METHOD OPEN CUT 11 CLASS 1 • ■ ` • / ' ■ , , l ■ / 1 l , ■ 1 1 ■ • ■ • 1 • • ■ 1 ■ ■ • ■ • 1 ■ • ■ ■ , ■ • 1 ■ ■ ■ • ■ ■ l • ■ 1 ■ ■ • ■ 1 ■ ■ • ■ • ■ 1 ■ ■ • 1 • ■ 1 1 ■ • ■ • • 1 1 ■ ■ • 1 ■ • • ' • • ■ • • REVISION(S) DESCRIPTION DESCRIPTION CLAUDE A Md\AULLAN LINE 129 SECTION 1 ROCKY RIVER HDD ISSUED FOR 30% REVIEW REGIONAL IFC SUBMITTAL D1 ENGINEER s DWG DATE 05/15/2020 SUPERSEDED i 1 1 1 1ISSUED FOR61•• REVIEW ` 55545180830000 555463980400000 5554518083000 .. 48116400000 OWNER: ABSAROKA LLC Ln MITZI GREEN MALONE FAMILY LP CD ABSAROKA LLC CD cN clROCKY RIVER cN TIMOTHY J. MORRISON AND WIFE, CYNTHIA G. MORRISON • 1 A • ■ Boom• . 61 -• A • ..•.: .•:.•:.•......:.•.•.•.•.•.•.•.•.•.•.•.•.••....... p - •......... _. CLEARING LIMITS • .... ....30" PIPELINE ADDITIONAL TEMPORARY ••••••• A �: •�11111 :1: 1111 ........ ............ -••� o - • 1 T CURVE SEE PNG-C-129-0001016 P.C. EXIT CURVE ------------ ----- ----- FMITI MATERIAL • METHOD 1 CLASS 1 • ■ 1 , • • ■ 1 • 11111110 11 F.11 • 1• Im 11 ■ • 1 12 64 11 ■ I RA 64 12 1 NJ 11.111 • 11A 10 Lm� 0 turd ■ , , 10 l ■ / 1 l Q K.11TA 10 no7.11 ■ I to • 0 64 11111 M1• 1 wa I I ■ ' • 1 1 ■ ■ • ■ w • w 1 1 R 1 ■ 1 ■ Inkleyd 1 to] ■ 11.110 'M41601 • • 1 ETCi I iT5 I i ■ ■ ■ • ■ ■ 1 , ■ 1 ■ ■ 1011164 to] ■ ■ 10 Lei ■ 12 • F.11 9.11111 ■ • • REVISION(S) DESCRIPTION mmm DESCRIPTION • SECTION • SHEET(S) 7 OF 27 DWGSCALE H:1"=50',V:1"=30' IFIC SUBMITTAL DATE , 1REGIONAL 1 11 1 00 SUPERSEDED _ REVIEW60% ISSUED FOPROFESSIONAL _ _ ■ •• IENGIARCH I • 05/22/2020 1iT5 ENGINEER COPYRIGHT20181 • . CENTER, 1 1 TRAIL, NORTH 1 ■ • 1 1 RESOURCE 1 TRAIL ■ ___ • INITIALS DISCIPLINE / RESOURCE CENTER / LINE NUMBER w J LL 0 ry 530 520 510 500 u 490 R 480 N a O 470 N at O o = 460 440 J 430 > 420 410 400 390 380 GENERAL NOTES: PROPOSED PIPELINE SHALL BE CONSTRUCTED AND INSTALLED IN ACCORDANCE WITH PIEDMONT NATURAL GAS' DESIGN AND CONSTRUCTION MANUALS, LATEST EDITION. ALL EQUIPMENT MUST ACCESS THE SITE ALONG THE CONSTRUCTION RIGHT-OF-WAY OR FROM APPROVED ACCESS ROADS. CONTRACTOR SHALL SUBMIT ANY REQUESTS FOR DEVIATION FROM THIS DESIGN FOR REVIEW PRIOR TO CONSTRUCTION. CONTRACTOR SHALL DISPOSE OF EXCESS DRILLING FLUID AS DIRECTED BY THE COMPANY REPRESENTATIVE IN ACCORDANCE WITH PERMIT CONDITIONS, UNDER NO CIRCUMSTANCES SHALL DRILLING FLUID BE DISPOSED OF IN WATER BODIES OR WETLANDS. THE ENTRY AND EXIT POINTS SHALL BE CONTAINED AND COLLECTED TO THE EXTENT PRACTICAL AND DISPOSED OF AS DIRECTED BY THE COMPANY REPRESENTATIVE IN ACCORDANCE WITH PERMIT CONDITIONS. EXISTING UNDERGROUND UTILITIES SHOWN ARE APPROXIMATE AND ARE TO BE FIELD VERIFIED BY CONTRACTOR PRIOR TO CONSTRUCTION. CONTRACTOR SHALL VERIFY ALL COORDINATES AND DIMENSIONAL INFORMATION PRIOR TO CONSTRUCTION. BRING ANY DISCREPANCIES WITH LAYOUT TO ATTENTION OF COMPANY PRIOR TO STARTING CONSTRUCTION. CONTRACTOR IS RESPONSIBLE FOR KNOWING LOCATION OF ALL ENVIRONMENTALLY SENSITIVE AREA RESTRICTIONS PERTAINING TO THIS PROJECT. DRILL PATH NOTES: DRILL PATH STATIONING IS IN FEET BY HORIZONTAL MEASUREMENT AND IS REFERENCED TO CONTROL ESTABLISHED FOR THE DRILLED SEGMENT. DRILL PATH COORDINATES REFER TO THE CENTERLINE OF PILOT HOLE AS OPPOSED TO TOP OF INSTALLED PIPE. HORIZONTAL DIRECTIONAL DRILL PATH DEPICTS MINIMUM REQUIREMENTS ONLY. PILOT HOLE TOLERANCES: THE PILOT HOLE SHALL BE DRILLED TO THE TOLERANCES LISTED BELOW. HOWEVER IN ALL CASES, RIGHT-OF-WAY RESTRICTIONS AND CONCERN FOR ADJACENT FACILITIES SHALL TAKE PRECEDENCE OVER THESE TOLERANCES. 1. ENTRY POINT: NO MODIFICATIONS SHALL BE MADE WITHOUT APPROVAL FROM THE COMPANY ENGINEER. 2. ENTRY ANGLE: UP TO 1' INCREASE FROM THE DESIGNED ENTRY ANGLE; NO DECREASE IN ENTRY ANGLE WILL BE ALLOWED. y EXISTING 16" PNG / — — — PIPELINE (LINE 1) G EXISTING 30 PNG -- - 1 G—, PIPELINE (LINE 129) 555463980400000 G 1 _ ,- � \�� 50� STA 14+68 STREAM S _ OFFSET 135' LT PROPOSED 30" PIPELINE 1857 \ � � ADDITIONAL TEM-yr-A ........ ....... Jbi .:..........::::•... ... .. ..... ••••••••••••••••••• • • •' •••••••••..... ..'•'.'•'•'•••••••••• •••• •• HDD STRINGING • .. • • • • •j • • AREA 1 • 1 • •• • • • • • • • • • •/ /• •/ .......................... .......... .......................... .... HORIZONTAL LENGTH: 2390' TRUE DRILLED LENGTH: 2404' 20+00 PROPOSED 60' PNG PERMANENT EASEMENT B-2 STA 20+56 • 3. EXIT POINT: UP TO 5 FEET FORWARD OR BACK FROM THE EXIT POINT; UP TO 2 FEET RIGHT OR LEFT OF THE DESIGNED ALIGNMENT. 4. EXIT ANGLE: NO INCREASE IN EXIT ANGLE WILL BE ALLOWED; UP TO 1° DECREASE IN ENTRY ANGLE WILL BE ALLOWED. 5. ELEVATION: UP TO 10 FEET BELOW DESIGNED PROFILE. 6. ALIGNMENT: UP TO 5 FEET RIGHT OR LEFT OF THE DESIGNED ALIGNMENT. 7. CURVE RADIUS: NO LESS THAN 2,400 FEET BASED ON A 3 JOINT AVERAGE. PROTECTION OF EXISTING FACILITIES: CONTRACTOR SHALL UNDERTAKE THE FOLLOWING STEPS PRIOR TO COMMENCING DRILLING OPERATIONS: 1. CONTACT THE UTILITY LOCATION IDENTIFICATION SERVICE FOR THE CONSTRUCTION AREA. 2. POSITIVELY LOCATE AND STAKE ALL EXISTING UNDERGROUND FACILITIES. ANY FACILITIES LOCATED WITHIN 10 FEET OF THE DESIGNED PATH SHALL BE EXPOSED. 3. MODIFY DRILLING PRACTICES AND DOWNHOLE ASSEMBLIES AS NECESSARY TO PREVENT DAMAGE TO EXISTING FACILITIES. ACCESS ROAD 2 STA 24+02 STA 29+09 OFFSET: 42' LT OFFSET: 40' LT OFFSET. 64 LT PP 12 owl �. +00 _---=_�32+27 = ===G-- — — — cADDITIONALTEMF ----G---------_G\ (/� WORKSPACE 30+01 1 5's9o� 'PFO2 0000 STREAM S-05 - HDD ENTRY • - - ACWR RAILROAD ADDITIONAL TEMPORARY WORKSPACE 0 960' ' �. STREAM S-04 494 EXIT POINT AT STA 6+99 ELEV: 510' 60 B-1 (PNG-C-129-0001021) AREA TO BE GRADED 8,600 CY / / / 1 1 1 1 APPROX. ENTRY POINT AT 120 STA 30+89 ELEV:514' — B-4 (PNG-C-129-0001022) PROPOSED TIE-IN LOCATION / STA 30+60 ELEV: 509' / B-3 (PNG-C-129-0001021) REFUSAL 4AT. 18.1 FEET / \ — 10 RADIUS=3000' -20 REFUSAL AT 15.0 FEET 30 \ — — — — REFUSAL AT 7.5 FEET B-2 (PNG-C-129-0001021) PROPOSED TIE-IN LOCATION STA 7+63 ELEV: 504' 10 Pn 20 \ �p M 30 DESIGNED DRILLED PROFILE 30" NPS 0.500" W.T. API 5L X70 PSL2 STEEL LINE PIPE FUSION BONDED EPDXY WITH POWERCRETE 40 3 9��" REFUSAL AT 7.5 FEET P.C. ENTRY CURVE STA 28+47 ELEV: 464' 50 60 70 RADIUS=3000' N 40 50 bu P.T. / EXIT CURVE STA 16+11 374, ELEV: 414' P.C. / EXIT CURVE STA 19+25 ELEV: 398' 70 P.T. / ENTRY CURVE STA 22+24 ELEV: 398' — 301' 530 520 510 500 490 480 470 460 450 440 430 420 410 400 390 380 O RARY NOTE: IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO PROTECT ALL EXISTING UTILITIES AND OTHER STRUCTURES. CONTRACTOR SHALL BE RESPONSIBLE FOR LOSSES AND REPAIRS OCCASIONED BY DAMAGE TO FACILITIES RESULTING FROM DRILLING OPERATIONS. CONTRACTOR SHALL TAKE STEPS TO PROTECT EXISTING FACILITIES, INCLUDING, BUT NOT LIMITED TO, SETTING SURFACE CASING AS NECESSARY TO PREVENT SETTLEMENT AND DISPLACEMENT. NOTE: STRATIFICATION LINES AND SUBSURFACE MATERIAL DESCRIPTIONS SHOWN ON THIS DRAWING HAVE BE SIMPLIFIED FOR PRESENTATION PURPOSES. REFER TO THE PROJECT GEOTECHNICAL BORING LOGS AND REPORT FOR MORE DETAILED SUBSURFACE INFORMATION. NOTE: CONTRACTOR SHALL ACTIVELY MONITOR THE DRILLED ALIGNMENT FOR IMPACTS THAT COULD OCCUR AS A RESULT OF HDD OPERATIONS (I.E. SETTLEMENT, HEAVE, AND DRILLING FLUID FLOW). CONTRACTOR'S MONITORING PROCEDURES AND ASSOCIATED EMERGENCY RESPONSE PLANS SHALL BE APPROPRIATED TO ENSURE THAT PUBLIC SAFETY IS NOT COMPROMISED. LEGEND: ❑ CLAY ROCK * SOIL BORING LOGS SHOWN ON THE HDD PROFILE DRAWING REPRESENT APPROXIMATE SUBSURFACE STRATIFICATION. REFER TO PNG-C-129-0001021 AND PNG-C-129-0001022 FOR DETAILED BORING LOGS. z Q w J LL 0 0+00 5+00 10+00 15+00 20+00 25+00 30+00 32+27 MATERIAL CONST. METHOD 763' OPEN CUT 2297' 167' 0 OPEN CUT HDD CLASS /MAOP BURNS& McDONNELL CONSULTANTS, INC. STATE LICENSE#G1435 PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO ENSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 REF. DWG(S) PNG-C-129-0001010, PNG-G-129-0001016 CLAUDEAMcMULLAN IFCSUBMffTALDATE ' NORTH CAROLINA SEAL047852 PROFESSIONAL ENG/ARCHSTAMP NO. DATE REVISION(S) DESCRIPTION BY CHK APPD DESCRIPTION APPROVALS '�� DUKE Piedmont ENERGY Natural Gas COPYRIGHT 2018 LINE 129 SECTION 1 ROCKY RIVER HDD CROSSING DRAWING CABARRU S COUNTY NC INDIAN TRAIL RESOURCE CENTER, INDIAN TRAIL, NORTH CAROLINA SHEET(S) 9 OF 27 DWG SCALE H; 1"=150', V: 1"=20' A 05-22-2020 ISSUED FOR 30% REVIEW NPR KVG CAM AREA CODE 1841 DATE NIA INITIALS N/A REGIONAL ENGINEER DWG DATE 04/23/2020 SUPERSEDED B 07-07-2020 ISSUED FOR 60% REVIEW NPR KVG CAM ACCOUNT NUMBER C 08-28-2020 ISSUED FOR 90% REVIEW NPR KVG CAM PROJECT NUMBER 0231792 DATE NIA INITIALS N/A MGR TECH REC &STD DRAWING NUMBER PNG -C-129-0001016 REVISION D D 10-12-2020 ISSUED FORBID NPR KVG CAM DRAWING BY NPR STATION ID DATE 05/22/2020 INITIALS CAM PRINCIPAL ENGINEER CHECKER INITIALS KVG DISCIPLINE / RESOURCE CENTER / LINE NUMBER BURNS & McDONNELL CONSULTANTS, INC. STATE LICENSE # C-1435 CLAUDE A McMULLAN IFC SUBMITTAL DATE u NORTH CAROLINA n SEAL 047852 PROFESSIONAL ENG/ARCH STAMP EXISTING 30" PIPELINE CONTRACTOR TO VERIFY TIE-IN LOCATION 0 \I DETAIL NORTH TIE-IN AT EXISTING PIPING 0 2 4 00119 1 IN = 2FT PLAN EXISTING PIPING AT GRIMES BRIDGE ROAD 0 150 300 11N = 150FT STOPPLE FITTING, TYP SEE PNG- M-129-0001019 EXISTING PIPELINE TO BE RETIRED AND GROUTED STOPPLE FITTING, TYP SEE PNG- M-129-0001019 � EXISTING PIPELINE TO BE RETIRED AND GROUTED DETAIL SOUTH TIE-IN AT EXISTING PIPING 0 2 4 00119 11N = 2FT EXISTING 30" PIPELINE CONTRACTOR TO VERIFY TIE-IN LOCATION SEGMENTED ELBOW PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO ENSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 NO. DATE REVISION(S) DESCRIPTION A 07-07-2020 ISSUED FOR 60% REVIEW B 08-28-2020 ISSUED FOR 90% REVIEW C 10-12-2020 ISSUED FORBID BY CHK JAPPD DESCRIPTION APPROVALS NPR KVG CAM AREA CODE 1841 DATE NIA INITIALS N/A REGIONAL ENGINEER NPR KVG CAM ACCOUNT NUMBER NPR KVG CAM PROJECT NUMBER 0231792 DATE NIA INITIALS N/A MGR TECH REC & STD DRAWING BY NPR STATION ID DATE 05/22/2020 INITIALS CAM PRINCIPAL ENGINEER CHECKER INITIALS KVG LINE 129 SECTION 1 ROCKY RIVER HDD ,fa*, DUKE Piedmont TIE-IN PLAN ENERGY Natural Gas ABARR COUNTY, N C US COU C COPYRIGHT 2018 INDIAN TRAIL RESOURCE CENTER, INDIAN TRAIL, NORTH CAROLINA REF. DWG(S) PNG-G-129-0001016, PNG- M-129-0001019 SHEET(S) 10 OF 27 DWG SCALE AS NOTED DWG DATE 04/23/2020 SUPERSEDED DRAWING NUMBER REVISION PNG-C-129-0001018 C DISCIPLINE / RESOURCE CENTER / LINE NUMBER SEE NOTE 2 DnI I IAICIME: TnD CITTIAInC EXISTING PIPE TO BE —\ SEE NOTE 2 BURNS & McDONNELL CONSULTANTS, INC. STATE LICENSE # C-1435 CLAUDE A McMULLAN IFC SUBMITTAL DATE NORTH CAROLINA SEAL 047852 PROFESSIONAL ENG/ARCH STAMP SANDWICH VALVE (TYP.) L DETAIL SCALE: 1 /41,= 1'-01, TYPICAL LINE STOP AND BYPASS DETAIL 0 2 4 1 /4" =1'-01, SECTION =A SCALE: 1 /4" = 1'-0" T H D D W G 0 2 4 1 /4" =1'-01, EXISTING PIPE TO BE GROUTED IN PLACE (TYP.) A H W DWG I VALVE (TYP.) PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO INSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSER ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 NO. DATE REVISION(S) DESCRIPTION A 08-28-2020 ISSUED FOR 90% REVIEW B 10-12-2020 ISSUED FOR BID BY CHK APPD DESCRIPTION APPROVALS NPR KVG CAM AREA CODE 1841 DATE NIA INITALS N/A REGII®NAIL ENGIINEER NPR KVG CAM ACCOUNT NUMBER PROJECT NUMBER 0231792 DATE NIA INITALS N/A MGR TECH REC&STD DRAWING BY NPR STATION ID DATE 08/20/2020 INITALS CAM PRINCIPAL ENGINEER CHECKER INITIALS KVG LINE 129 SECTION 1 ROCKY RIVER HDD DUENERr6111Piedmont LINE STOP DETAIL Natural Gas CABARRUS COUNTY NC COPYRIGHT 2018 INDIAN TRAIL RESOURCE CENTER, INDIAN TRAIL, NORTH CAROLINA NOTES: 1. THIS LINE STOP DETAIL IS FOR REFERENCE ONLY. REFER TO VENDOR STOPPLE MANUAL FOR ADDITIONAL INSTRUCTIONS REGARDING THE LINE STOP PROCEDURE. 2. OFFSET DISTANCE TO BE SPECIFIED BY TD WILLIAMSON 3. ALL ABANDONED ENDS SHOULD BE PLATED AND MATERIALS SHALL BE SUPPLIED BY CONTRACTOR. 4. EXISTING PIPE IS TO GROUTED IN PLACE. SEE RETIREMENT PLAN ON PNG-C-129-0001012 FOR GROUTING LOCATIONS. REF. DWG(S) PNG-C-129-0001012 SHEET(S) 11 OF 27 DWG SCALE 1/4" = 1'-0" DWG DATE 08/19/2020 SUPERSEDED DRAWING NUMBER REVISIO PNG-M-129-0001019 B DISCIPLINE / RESOURCE CENTER / LINE NUMBER Iff 7606 Whitehall Executive 704-529-3200 'W'wffkTcCharlotte, NC Center 28273 Drive TEST BORING LOG 7606 Whitehall Executive Charlotte, NC 704-529-3200 Center 28273 Drive TEST BORING LOG' 7606 Whitehall Executive Charlotte, '' NC 704-529-3200 Center 28273 Drive TEST BORING LOG � 7606 Whitehall Executive M Ak Charlotte, NC 704-529-3200 Center 28273 Drive TEST BORING LOG Fax 704-529-3272 Fax 704-529-3272 Fax 704-529-3272 Fax 704-529-3272 CLIENT BURNS AND MCDONNELL BORING # B-1 CLIENT BURNS AND MCDONNELL BORING # B-1 CLIENT BURNS AND MCDONNELL BORING # B-2 CLIENT BURNS AND MCDONNELL BORING # B-2 199BAM2005 199BAM2005 199BAM2005 199BAM2005 PROJECT NAME ROCKY RIVER PNG JOB # PROJECT NAME ROCKY RIVER PNG JOB # PROJECT NAME ROCKY RIVER PNG JOB # PROJECT NAME ROCKY RIVER PNG JOB # BY JGS BY JIGS BY JGS BY JIGS PROJECT LOCATION ROCKY RIVER PNG DRAWN PROJECT LOCATION ROCKY RIVER PNG DRAWN PROJECT LOCATION ROCKY RIVER PNG DRAWN PROJECT LOCATION ROCKY RIVER PNG DRAWN JGS JGS JGS JGS MIDLAND, NORTH CAROLINA APPROVED BY MIDLAND, NORTH CAROLINA APPROVED BY MIDLAND, NORTH CAROLINA APPROVED BY MIDLAND, NORTH CAROLINA APPROVED BY TEST DATA TEST DATA TEST DATA TEST DATA DRILLING and SAMPLING INFORMATION DRILLING and SAMPLING INFORMATION DRILLING and SAMPLING INFORMATION DRILLING and SAMPLING INFORMATION Date Started 4/13/20 Hammer Wt. 140 lbs. Date Started 4/13/20 Hammer Wt. 140 lbs. Date Started 4/15/20 Hammer Wt. 140 lbs. Date Started 4/15/20 Hammer Wt. 140 lbs. Date Completed 4/14/20 Hammer Drop 30 in. Date Completed 4/14/20 Hammer Drop 30 in. Date Completed 4/16/20 Hammer Drop 30 in. Date Completed 4/16/20 Hammer Drop 30 in. Drill Foreman MWDRILLING Spoon Sampler OD 2.25 in. Drill Foreman MWDRILLING Spoon Sampler OD 2.25 in. Drill Foreman MWDRILLING Spoon Sampler OD 2.25 in. Drill Foreman MWDRILLING Spoon Sampler OD 2.25 in. Inspector ATC Rock Core Dia. 2 in. Boring Method HSA Shelby Tube OD NA in. Vl o L L d a7 Q m� >' U' C7 �- N a) a) O. O.> a°i U) Of @ 3 7 o c O o `� N N C a)o a- a a1 Z C _ y in D 7 C o C 4= fn C o> c._ c m N a d Ci E <7 o C m o U o y J �. E J :O J a E U w a °' E O °' c m a Y a° N Y a7 E Inspector ATC Rock Core Dia. 2 in. Boring Method HSA Shelby Tube OD NA in. U! L L O- N a @` C7 >' C� a1 Nm O. O.Q E E� m m co U) o f m m 3 > o c O O N N C oo a- 0 OZ C Y u, 0 0 U) y � 'O C m B C w rn G > �._ c w y N O. O. E 0 �J U o C m o UE ° N 5 zt J .J.. E J "� J a U w+ 0 E f? a, E O d c d a Y o a v � N E d Inspector ATC Rock Core Dia. 2 in. Borin Method HSA Shelby Tube OD NA in. 9 Y uJ ° OL L d a7 Q m� U >^ U N Nm O. O.> E Eck m as m co u> a @ 3 7 o O c o O o N !A C mo a a a1Z 'O _ cy o ins m L C m R C 4- fn C o°' c> c m N N d Ci E o 0 L) o C m c o U o .0. !o 0 2 J _ E J -O '� o � J a E U w m E �? o E O �, c m a Y o a N Y N E m � Inspector ATC Rock Core Dia. 2 in. Boring Method HSA Shelby Tube OD NA in. 9 Y N V 0 vL L OQ N a @L a U >' C� a1 Nm O. O.Q E E� m m m , m a m o 3' r j o C� c o O o N N C CD o a W Z 'O cy 0 m U) m 'O C m B c w V) C om O> c w M y O. O. E o CY U c m c o U ° .� 0 M _ J .J.. E J -� o � a E � U w+ m a. f? a) nE P d c d a Y o a of E m � SOIL CLASSIFICATION E .�- .L.. in o .L.• N o m N n cEn z° SOIL CLASSIFICATION E L %a m � o L a, n- d 8 o co N a E co o rn z SOIL CLASSIFICATION E 7 .L.. E2 0 in 0 .L.• N am o U o m N a E co o w z SOIL CLASSIFICATION E 3 L %a m in o L a, n� d o 0 co 01 a E co o rn z SURFACE ELEVATION approx. 505 (continued) SURFACE ELEVATION approx. 470 (continued) Very stiff to hard light brown sandy CLAY SPT 28 ROD = 71 % REC = 97% 40.5 g RC 2400 Firm to stiff light brown sandy CLAY SPT 7 40.7 12 RC 1 1 ° ROD = 86 /0 REC = 100% SPT X 49 SPT X 5 2 2 5 45.5 45 5 45.7 45 ROD = 97% REC = 100% 10 ROD = 45% REC = 100% 13 7.5 SPT 40 RC 7.5 SPT 10 RC 3 3 PARTIALLY WEATHERED ROCK PARTIALLY WEATHERED ROCK 9.0 10 SPT RC 60/1" 50.5 50 RC 22510 8.5 10 SPT RC RC 60/0" 50.7 50 RC 8010 Mapped as the Floyd Church Formation; gray, commonly pink -weathering, siltsone and argillite,; mainly in graded beds 20-60 cm thick. High angle (-45°) structures (residual bedding planes and sealed joints, with the planes at different strike than the bedding plane). Very fine grained. 4 Mapped as the Floyd Church Formation; gray, commonly pink -weathering, siltsone and argillite,; mainly in graded beds 20-60 cm thick. High angle (-45°) structures (residual bedding planes and sealed joints, with the planes at different strike than the bedding plane). Very fine grained. 4 5 6 ROD = 88% REC = 100% 11 ROD = 98% REC = 100% 14 RQD = 67% 0 15.5 15 RC 55.5 55 RC ROD = 67% REC = 93% 15.7 15--55.7 RC 55 RC 6 ° ROD = 54 /0 REC = 97% 12 7 ROD = 68% REC = 100% 15 ROD = 95% REC = 100% ROD = 86% REC = 100% 20.5 20--60.5 60 20.7 20 60.7 60 ROD = 63% REC = 100% ROD = 76% REC = 100% 13 ROD = 93% REC = 100% 8 ROD = 79% REC = 100% 16 RC RC RC 12160 25.5 25 65.5 65 25.7 25--65.7 65 ROD = 63% REC = 90% 7 ROD = 90% REC = 100% 14 ROD = 94% REC = 100% 9 ROD = 93% REC = 100% 17 RC RC 9560 RC RC 30.5 30 70.5 70 30.7 30 70.7 70 ROD = 63% REC = 75% ROD = 94% REC = 100% 15 ROD = 88% REC = 100% 10 ROD = 87% REC = 98% 18 RC RC RC 13710 35.5 35 75.5 75 35.7 35 75.7 75 ROD = 88% REC = 100% 8 BORING TERMINATED ROD = 93% REC = 100% 11 ROD = 100% REC = 100% 19 RC RC RC Sample Type Depth to Groundwater Boring Method Sample Type Depth to Groundwater Boring Method Sample Type Depth to Groundwater Boring Method Sample Type Depth to Groundwater Boring Method SS - Driven Split Spoon ok Noted on Drilling Tools NA ft. HSA - Hollow Stem Augers SS - Driven Split Spoon A Noted on Drilling Tools NA ft. HSA - Hollow Stem Augers SS -Driven Split Spoon a Noted on Drilling Tools NA ft. HSA - Hollow Stem Augers SS - Driven Split Spoon A Noted on Drilling Tools NA ft. HSA - Hollow Stem Augers ST - Pressed Shelby Tube f At Completion in augers) P C CA - Continuous Flight Auger At Completion (open RC -Rock Core CU - Cuttings $ After NA hours CT -Continuous Tube After NA hours n Cave Depth NA 9� hole) NA NA NA NA ft. ft. ft. ft. ft. CFA DC MD - Continuous Flight Augers - Driving Casing -Mud Drilling Page 1 of 2 ST - Pressed Shelby Tube At Completion in augers) � P C CA - Continuous Flight Auger At Completion (open RC -Rock Core CU - Cuttings 4 After NA hours CT -Continuous Tube i After NA hours A Cave Depth NA 9� hole) NA NA NA NA ft. ft. ft. ft. ft. CFA DC MD - Continuous Flight Augers - Driving Casing -Mud Drilling Page 2 of 2 ST -Pressed Shelby Tube f At Completion in augers) P C CA - Continuous Flight Auger At Completion (open RC -Rock Core CU - Cuttings $ After NA hours CT -Continuous Tube After NA hours -a Cave Depth NA 9 �_ hole) NA NA NA NA ft. ft. ft. ft. ft. CFA DC MD - Continuous Flight Augers - Driving Casing -Mud Drilling Page 1 of 3 ST -Pressed Shelby Tube At Completion in augers) � P C CA - Continuous Flight Auger At Completion (open RC -Rock Core CU - Cuttings After NA hours CT -Continuous Tube i After NA hours to Cave Depth NA 9� hole) NA NA NA NA ft. ft. ft. ft. ft. CFA DC MD - Continuous Flight Augers - Driving Casing -Mud Drilling Page 2 of 3 7606 Whitehall Executive Center Drive TEST BORING LOG Whitehall Executive Center Drive TEST BORING LOG � 7606 Whitehall Executive Center Drive TEST BORING LOG 7606 Whitehall Executive Center Drive TEST BORING LOG Iffi �� Charlotte, NC 28273 Charlotte, NC TC7606 28273 / Charlotte, NC 28273 / Charlotte, NC 28273 704-529 3200 -A 704-529-3200 ��� 704-529 3200 704-529-3200 Fax 704-529-3272 Fax 704-529-3272 Fax 704-529-3272 Fax 704-529-3272 CLIENT BURNS AND MCDONNELL BORING # B-2 CLIENT BURNS AND MCDONNELL BORING # B-3 CLIENT BURNS AND MCDONNELL BORING # B-3 CLIENT BURNS AND MCDONNELL BORING # B-3 199BAM2005 199BAM2005 199BAM2005 199BAM2005 PROJECT NAME ROCKY RIVER PNG JOB # PROJECT NAME ROCKY RIVER PNG JOB # PROJECT NAME ROCKY RIVER PNG JOB # PROJECT NAME ROCKY RIVER PNG JOB # BY JGS BY JGS BY JGS BY JGS PROJECT LOCATION ROCKY RIVER PNG DRAWN PROJECT LOCATION ROCKY RIVER PNG DRAWN PROJECT LOCATION ROCKY RIVER PNG DRAWN PROJECT LOCATION ROCKY RIVER PNG DRAWN JGS JGS JGS JGS MIDLAND, NORTH CAROLINA APPROVED BY MIDLAND, NORTH CAROLINA APPROVED BY MIDLAND, NORTH CAROLINA APPROVED BY MIDLAND, NORTH CAROLINA APPROVED BY TEST DATA TEST DATA TEST DATA TEST DATA DRILLING and SAMPLING INFORMATION DRILLING and SAMPLING INFORMATION DRILLING and SAMPLING INFORMATION DRILLING and SAMPLING INFORMATION Date Started 4/15/20 Hammer Wt. 140 lbs. Date Started 4/17/20 Hammer Wt. 140 lbs. Date Started 4/17/20 Hammer Wt. 140 lbs. Date Started 4/17/20 Hammer Wt. 140 lbs. Date Completed 4/16/20 Hammer Drop 30 in. Date Completed 4/18/20 Hammer Drop 30 in. Date Completed 4/18/20 Hammer Drop 30 in. Date Completed 4/18/20 Hammer Drop 30 in. Drill Foreman MWDRILLING Spoon Sampler OD 2.25 in. Drill Foreman MWDRILLING Spoon Sampler OD 2.25 in. Drill Foreman MWDRILLING Spoon Sampler OD 2.25 in. Drill Foreman MWDRILLING Spoon Sampler OD 2.25 in. Inspector ATC Rock Core Dia. 2 in. Boring Method HSA Shelby Tube OD NA in. L L Qnm m >^ UC7 N N j n no w vcoi� m 3 C O 6 c °o `� N N c m o a a a a1 Z C N in D = aDi C 4= fn c o c'm N 'W O_ O. E C aI a U m .0. y J �. E -O .= J a .� U N a °' E O aci a N y a° ° ,` a7 E Inspector ATC Rock Core Dia. 2 in. Boring Method HSA Shelby Tube OD NA in. ��- L L am a@ L >' C�(7 a� �dv > O. O.O E E� �� c o °o N N c m a o m a 3 0 C Z J C o y r i ° m C w rn c o; cw y .N d Cl O. E C m a U o .�+ N g° J E -� J a U w a : ° E O d d a Y a° ° f6 E Inspector ATC Rock Core Dia. 2 in. Borin Method HSA Shelb Tube OD NA in. 9 Y ° 2' L nc� Q m �^ UC7 N N m n O. > E Eck m m m co u>aO @ 3 9 j o c o 2 °o N !A c m o a a a a1 Z 'O - c n co o ins a a C 4- fn c o °' c'N N a) a O_ E o c7U C m c U m .O. o 0 J _ E J .O o J a .� V w m E �? °' E O �, m a y o a ° Y l0 E m Inspector ATC Rock Core Dia. 2 in. Boring Method HSA Shelby Tube OD NA in. 9 Y 3 L L am m m 'r C7U m N m O_ a E E� m an d cn toad c o m °o N N c �, a, 3 a a 3 v �`p Z j 'O o c" 0 a inr d u C w (n c d N Q O- E o aL) C a1 c U w 0 � _ J __ J :O o D J a V N m E E 2 io Y o a l0 E m � SOIL CLASSIFICATION E o o N a z° SOIL CLASSIFICATION 7 L a o L a1 n� o O. E z° SOIL CLASSIFICATION E .�-..L.. co o o in6 .L.. N a� a o DU N a E m d rnz SOIL CLASSIFICATION E 7 L m a m ino L y aca a o ocn 21 O. E an d mz (continued) SURFACE ELEVATION approx. 470 (continued) (continued) Firm to stiff hard light brown sandy CLAY SPT 9 40.5 12 RC 80.7 20 RC ° ROD = 86 /o REC = 100% 80.5 20 RC o ROD = 80 /0 REC = 97% ROD = 91 % REC = 1000 1 SPT 10 2 85.7 85 5 45.5 45 85.5 85 ROD = 99% REC = 100% 21 ROD = 74% REC = 100% 13 ROD = 70% REC = 100% 21 RC SPT 6 RC 8020 RC 3 SPT 6 4 90.7 90 10 50.5 50 90.5 90 ROD = 76% REC = 100% 22 ROD = 60% REC = 100% 14 BORING TERMINATED RC RC 95.7 95 RC 15.0 15 SPT 8 55.5 55 RC 5 PARTIALLY WEATHERED ROCK ROD = 90% REC = 100% 23 ROD = 28% REC = 100% 15 18.5 Ix Mapped as the Floyd Church Formation; gray, -L6_j SPT 60/117 " 100.7 100 commonly pink -weathering, siltsone and argillite,; mainly in graded beds 20-60 cm thick. High angle (-45°) structures (residual bedding planes and sealed joints, with the planes at different strike than 20 7 RC RC 60.5 60 RC 11010 BORING TERMINATED 8 ROD = 82% REC = 100% 16 the bedding plane). Very fine grained. ROD = 56% 25.5 25 65.5 65 9 ROD = 88% 17 REC = 98% RC RC 19160 REC = 100% ROD = 96% REC = 100% 30.5 30 70.5 70 ROD = 65% 10 ROD = 87% 18 RC RC REC = 97% REC = 100% 35.5 35 75.5 75 ROD = 87% 11 ROD = 83% 19 RC RC REC = 100% REC = 100% Sample Type Depth to Groundwater Boring Method Sample Type Depth to Groundwater Boring Method Sample Type Depth to Groundwater Boring Method Sample Type Depth to Groundwater Boring Method SS - Driven Split Spoon ok Noted on Drilling Tools NA ft. HSA - Hollow Stem Augers SS - Driven Split Spoon A Noted on Drilling Tools NA ft. HSA - Hollow Stem Augers SS - Driven Split Spoon ok Noted on Drilling Tools NA ft. HSA - Hollow Stem Augers SS - Driven Split Spoon A Noted on Drilling Tools NA ft. HSA - Hollow Stem Augers ST -Pressed Shelby Tube f At Completion in augers) P C CA - Continuous Flight Auger At Completion (open RC -Rock Core CU - Cuttings After NA hours CT -Continuous Tube After NA hours n Cave Depth NA 9 � hole) NA NA NA NA ft. ft. ft. ft. ft. CFA DC MD - Continuous Flight Augers - Driving Casing -Mud Drilling Page 3 of 3 ST - Pressed Shelby Tube At Completion in augers) � P C CA - Continuous Flight Auger At Completion (open RC -Rock Core CU - Cuttings 4 After NA hours CT -Continuous Tube i After NA hours 14 Cave Depth NA 9 � hole) NA NA NA NA ft. ft. ft. ft. ft. CFA DC MD - Continuous Flight Augers - Driving Casing -Mud Drilling Page 1 of 3 ST - Pressed Shelby Tube f At Completion in augers) P C CA - Continuous Flight Auger At Completion (open RC -Rock Core CU - Cuttings After NA hours CT -Continuous Tube After NA hours fg_ Cave Depth NA 9 � hole) NA NA NA NA ft. ft. ft. ft. ft. CFA DC MD - Continuous Flight Augers - Driving Casing -Mud Drilling Page 2 of 3 ST - Pressed Shelby Tube f At Completion in augers) P C CA - Continuous Flight Auger At Completion (open RC -Rock Core CU - Cuttings 4 After NA hours CT -Continuous Tube i After NA hours ja Cave Depth NA 9 � hole) NA NA NA NA ft. ft. ft. ft. ft. CFA DC MD - Continuous Flight Augers - Driving Casing -Mud Drilling Page 3 of 3 BURNS & McDONNELL CONSULTANTS, INC. STATE LICENSE # C-1435 CLAUDE A McMULLAN IFC SUBMITTAL DATE NORTH CAROLINA n SEAL 047852 PROFESSIONAL EN&ARCH STAMP PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO INSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSER ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 NO. DATE REVISION(S) DESCRIPTION A 05-22-2020 ISSUED FOR 30% REVIEW B 07-07-2020 ISSUED FOR 60% REVIEW C 08-28-2020 ISSUED FOR 90% REVIEW D 110-12-20201 ISSUED FOR BID BY CHK APPD DESCRIPTION APPROVALS NPR KVG CAM AREA CODE 1841 DATE NIA INITIALS N/A REGIONAL ENGINEER NPR KVG CAM ACCOUNT NUMBER NPR KVG CAM PROJECT NUMBER 0231792 DATE NIA INITIALS N/A MGR TECH REC & STD NPR KVG CAM DRAWING BY NPR STATION ID DATE 05/22/2020 INITIALS CAM PRINCIPAL ENGINEER CHECKER INITIALS KVG LINE 129 SECTION 1 ROCKY RIVER HDD lf'DUKE Piedmont SOIL BORING LOGS ENERGY Natural Gas ABARR COUNTY, N C US COU C COPYRIGHT 2018 INDIAN TRAIL RESOURCE CENTER, INDIAN TRAIL, NORTH CAROLINA REF. DWG(S) PNG-C-129-0001022, PNG-G-129-0001016 SHEET(S) 12 OF 27 1 DWG SCALE NONE DWG DATE 05/18/2020 ISUPERSEDED DRAWING NUMBER REVISION PNG-C-129-0001021 D DISCIPLINE / RESOURCE CENTER / LINE NUMBER 7606 Whitehall Executive Center Drive TEST BORING LOG A�TC Charlotte, NC 28273 704-529-3200 Fax 704-529-3272 CLIENT BURNS AND MCDONNELL BORING # B-4 PROJECT NAME ROCKY RIVER PNG JOB # 199BAM2005 PROJECT LOCATION ROCKY RIVER PNG DRAWN BY JIGS MIDLAND, NORTH CAROLINA APPROVED BY JGS r)P11 I IN(, a i SAPAPI IN(: IMPOP AATInKi TEST nATA Date Started 4/18/20 Hammer Wt. 140 lbs. Date Completed 4119/20 Hammer Drop 30 in. Drill Foreman MWDRILLING Spoon Sampler OD 2.25 in. Inspector ATC Rock Core Dia. 2 in. BoringMethod HSA Shelby Tube OD NA in. Y a ��,! a m@ m rn maw 2 2 z ° m in r o� M"n �+ a = o a 0 0 .�, o M J a j � a m a d o a N SOIL CLASSIFICATION E 7 L a rn o t a° o m n m o U) SURFACE ELEVATION approx. 522 Very stiff to hard light brown sandy CLAY 1 SPT 10 SPT 56 2 5 SPT 76 3 SPT X 52 4 10 SPT 60 5 15 18.1 RC Mapped as the Floyd Church Formation; gray, 6 commonly pink -weathering, siltsone and argillite,; mainly in graded beds 20-60 cm thick. High angle (-45°) structures (residual bedding planes and sealed joints, with the planes at different strike than 21.1 20 RC 7 the bedding plane). Very fine grained. RQD = 11 % REC = 53% 26.1 25 RQD = 8% 8 RC REC = 48% RQD = 48% REC = 100% 30 31.1 RC RQD = 58% 9 REC = 100% 36.1 35 RC RQD = 42% 10 REC = 67 0 39.1 7606 Whitehall Executive Center Drive TEST BORING LOG / Charlotte, NC 28273 704-529-3200 Fax 704-529-3272 CLIENT BURNS AND MCDONNELL PROJECT NAME ROCKY RIVER PNG PROJECT LOCATION ROCKY RIVER PNG MIDLAND, NORTH CAROLINA nP11 I Mr: -I SAMPI IN(: 1K1Pr)QMAT1()N BORING # 13-4 JOB # 199BAM2005 DRAWN BY JGS APPROVED BY JGS TEST nATA Date Started 4/18/20 Hammer Wt. 140 lbs. Date Completed 4/19/20 Hammer Drop 30 in. Drill Foreman MWDRILLING Spoon Sampler OD 2.25 in. Inspector ATC Rock Core Dia. 2 in. Boring Method HSA Shelby Tube OD NA in. 88 o a` E d E Ur` �°o CL O > c O C SOIL CLASSIFICATION 30 z J � a ° E Mt o. t am n E n ao E E, v- Qn E v rn Y E E (continued) m o o Cn rn z° U) mo o min in r a L) 2 j a a- � RQD = 53% REC = 56% 41.1 11 RC RC 20420 12 RQD = 93% REC = 100% 45 46.1 RC 12860 RQD = 86% 13 REC = 100% 50.3 50 BORING TERMINATED Sample Type Death to Groundwater Borino Method Sample Type Death to Groundwater SS - Driven Split Spoon A Noted on Drilling Tools NA ft. HSA - Hollow Stem Augers SS - Driven Split Spoon A Noted on Drilling Tools NA ft. ST -Pressed Shelby Tube * At Completion (in augers) NA ft. CFA - Continuous Flight Augers ST -Pressed Shelby Tube f At Completion (in augers) NA ft. CA - Continuous Flight Auger At Completion (open hole) NA ft. DC - Driving Casing CA - Continuous Flight Auger At Completion (open hole) NA ft. RC -Rock Core CU - Cuttings Y After NA hours NA ft. MD -Mud Drilling RC -Rock Core CU - Cuttings Y After NA hours NA ft. CT - Continuous Tube i After NA hours NA ft. Page 1 of 2 CT - Continuous Tube i After NA hours NA ft. U Cave Depth NA ft. ja Cave Depth NA ft. Boring Method HSA - Hollow Stem Augers CFA - Continuous Flight Augers DC - Driving Casing MD -Mud Drilling Page 2 of 2 BURNS & McDONNELL CONSULTANTS, INC. I PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY STATE LICENSE # C-1435 PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO INSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSER ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 CLAUDE A McMULLAN IFC SUBMrFFAL DATE NORTH CAROLINA SEAL047852 NO.1 DATE A 05-22-2020 B 07-07-2020 C 08-28-2020 D 10-12-2020 PROFESSIONAL ENG/ARCH STAMP REVISION(S) DESCRIPTION ISSUED FOR 30% REVIEW ISSUED FOR 60% REVIEW ISSUED FOR 90% REVIEW ISSUED FOR BID BY CHK I APPD DESCRIPTION APPROVALS NPR KVG CAM AREA CODE 1841 DATE NIA INITIALS N/A REGIONAL ENGINEER NPR KVG CAM ACCOUNT NUMBER NPR KVG CAM PROJECT NUMBER 0231792 DATE NIA INITIALS N/A MGR TECH REC & STD NPR KVG CAM DRAWING BY NPR STATION ID DATE 05/21/2020 INITIALS CAM PRINCIPAL ENGINEER CHECKER INITIALS KVG LINE 129 SECTION 1 ROCKY RIVER HDD ,1&DUKE Piedmont SOIL BORING LOGS V ENERGY r6lli Natural Gas ABARR COUNTY, N C US COU C COPYRIGHT 2018 INDIAN TRAIL RESOURCE CENTER, INDIAN TRAIL, NORTH CAROLINA REF. DWG(S) PNG-C-129-0001021, PNG-G-129-0001016 SHEET(S) 13 OF 27 1 DWG SCALE DWG DATE 05/18/2020 ISUPERSEDED DRAWING NUMBER NONE PNG-C-129-0001022 DISCIPLINE / RESOURCE CENTER / LINE NUMBER REVISION D GENERAL EROSION AND SEDIMENT CONTROL NOTES 1. THIS PROJECT IS LOCATED IN THE YADKIN PEE-DEE RIVER BASIN. RECEIVING WATERS: ROCKY RIVER CLASSIFICATION: C 2. CONSTRUCTION ACTIVITY POLLUTION PREVENTION IS REQUIRED FOR THIS PROJECT. PREVENTION OF POLLUTION RESULTING FROM CONSTRUCTION ACTIVITIES SHALL BE ACCOMPLISHED BY CONTROLLING SOIL EROSION, WATERWAY SEDIMENTATION, AND AIRBORNE DUST GENERATION. CONTRACTOR SHALL ENSURE THAT NO SEDIMENT RESULTING FROM CONSTRUCTION ACTIVITIES INFRINGES ONTO ADJACENT PROPERTIES. CONTRACTOR SHALL COORDINATE EROSION AND SEDIMENT CONTROL WITH OTHER CONSTRUCTION ENTITIES PERFORMING WORK ON ADJACENT PROPERTIES. 3. SOIL EROSION AND SEDIMENT CONTROLS ARE MEASURES USED TO REDUCE THE AMOUNT OF SOIL PARTICLES THAT ARE CARRIED OFF AN AREA AND DEPOSITED INTO A DRAINAGE COLLECTION SYSTEM OR INTO A BODY OF WATER. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ENSURING THAT EROSION AND SEDIMENTATION ARE CONTROLLED TO THE EXTENT PRACTICABLE. ALL APPLICABLE SOIL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE IMPLEMENTED AND MAINTAINED THROUGHOUT THE DURATION OF CONSTRUCTION ACTIVITIES. PRIOR TO INITIATING CONSTRUCTION IN AN AREA, ALL TEMPORARY EROSION AND SEDIMENT CONTROL PRACTICES SHALL BE IN PLACE. UPON PROJECT COMPLETION AND PERMANENT STABILIZATION, ALL TEMPORARY SOIL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE REMOVED. 4. TEMPORARY EROSION CONTROL SHALL BE THE CONTRACTOR'S RESPONSIBILITY, WHO SHALL UTILIZE APPROPRIATE BEST MANAGEMENT PRACTICES (BMPS). THOSE BMPS SHALL CONSIST OF SILT FENCE, WATTLES OR OTHER MEANS TO CONTROL EROSION AS NEEDED. 5. CONTRACTOR SHALL PLACE SILT FENCE PRIOR TO BEGINNING WORK. THE DEVICES SHALL BE PLACED DOWN -SLOPE OF DISTURBED AREAS WHERE SHEET EROSION WOULD OCCUR. SILT FENCE SHALL BE CLEANED AND REPAIRED WHEN SEDIMENT BUILDUP REACHES ONE-THIRD OF SILT FENCE HEIGHT. AFTER SIGNIFICANT RUNOFF EVENTS (1" OF RAINFALL OR MORE) AND ON A WEEKLY BASIS, THE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL STRUCTURES FOR SILT BUILD-UP THAT INTERFERES WITH THE PERFORMANCE OF THE EROSION CONTROL STRUCTURE AND REPAIR OR REPLACE THOSE STRUCTURES, AS NECESSARY. 6. ALL STORM DRAIN INLETS SHALL BE PROTECTED BY APPROPRIATE BMPS DURING CONSTRUCTION, UNTIL ALL SOURCES WITH POTENTIAL FOR DISCHARGE TO THE INLETS HAVE BEEN STABILIZED. 7. ALL EXISTING DRAIN INLETS SHALL HAVE INLET PROTECTION INSTALLED IN ACCORDANCE WITH NORTH CAROLINA MANUAL FOR EROSION CONTROL. EROSION PROTECTION MAY BE REMOVED WHEN VEGETATION IS ESTABLISHED. 8. IN ACCORDANCE WITH SECTION II.B.2 OF THE NPDES GENERAL PERMIT, ANY DISTURBED AREA LEFT EXPOSED SHALL BE STABILIZED WITH TEMPORARY SEEDING WITHIN 7 TO 14 DAYS IN ACCORDANCE WITH NORTH CAROLINA EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL SECTION 6.11. PERMANENT STABILIZATION SHALL BE ACHIEVED THROUGH PERMANENT SEEDING FOR ALL DISTURBED AREAS. SEE SEEDING SCHEDULE IN NORTH CAROLINA EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL SECTION 6.11. 9. AFTER FINAL SITE STABILIZATION HAS BEEN ACHIEVED AND APPROVED BY CONSTRUCTION SEQUENCE (SITE) (PHASE 1) 1. CONTACT THE DEMLR REGIONAL OFFICE AT LEAST 48 HOURS PRIOR TO COMMENCING THE LAND -DISTURBING ACTIVITY. 2. INSTALL CONSTRUCTION ENTRANCE(S) AS SHOWN ON PLAN SHEETS WHERE EQUIPMENT WILL ENTER AND LEAVE THE PROJECT SITE. 3. INSTALL EROSION CONTROL DEVICES. 4. STABILIZE DISTURBED AREAS WITH EROSION CONTROL DEVICES. UTILIZE TEMPORARY SEEDING AS NECESSARY. 5. CONTACT INSPECTOR FOR ONSITE INSPECTION OF INSTALLED EROSION CONTROL DEVICES. 6. MAINTAIN DEVICES AS NEEDED PER NCDEQ MAINTENANCE INSTRUCTIONS. 7. ALL BARE SOILS ARE TO BE STABILIZED UNDER CONDITIONS OUTLINED IN THE CURRENT NPDES PERMIT OR, IF IT IS IN A CRITICAL AREA, BY THE END OF THE DAY. 8. SELF -INSPECTIONS FOR EROSION AND SEDIMENTATION CONTROL MEASURES ARE TO BE PERFORMED AT LEAST ONCE EVERY SEVEN CALENDAR DAYS AND WITHIN 24 HOURS OF EVERY RAIN EVENT OF GREATER THAN 1 INCH. ANY NEEDED REPAIRS SHALL BE MADE IMMEDIATELY TO MAINTAIN MEASURES AS DESIGNED. ALL ESC MEASURES SHALL BE MAINTAINED AS SPECIFIED IN THE CONSTRUCTION DETAILS ON THIS PLAN. A RAIN GAUGE SHALL BE INSTALLED AT THE PROJECT SITE FOR MONITORING. (PHASE 2 & 3) 1. BEGIN ACCESS ROAD INSTALLATION ON THE SITE AND SITE EXPANSION. 2. MAINTAIN ALL EROSION CONTROL DEVICES PER NCDEQ MAINTENANCE INSTRUCTIONS. 3. STABILIZE SITE AS AREAS ARE BROUGHT UP TO FINISH GRADE WITH VEGETATION, GRAVEL, ETC. 4. ALL EROSION CONTROL DEVICES SHALL REMAIN IN PLACE AS SHOWN ON THE DRAWINGS UNTIL THE ENTIRE SITE IS PERMANENTLY STABILIZED AND APPROVED BY THE NCDEQ INSPECTOR. 5. GROUNDCOVER SHALL BE ESTABLISHED IN 90 CALENDAR DAYS. HOWEVER, NPDES GROUNDCOVER REQUIREMENTS TAKE PRECEDENCE. 6. WHEN CONSTRUCTION IS COMPLETE AND ALL AREAS ARE STABILIZED COMPLETELY, ARRANGE FOR FINAL INSPECTION WITH THE NCDEQ INSPECTOR. 7. WHEN THE PROJECT IS COMPLETE, THE PERMITTEE SHALL CONTACT DEMLR TO CLOSE OUT THE E&SC PLAN. AFTER DEMLR INFORMS THE PERMITTEE OF THE PROJECT CLOSE OUT, VIA INSPECTION REPORT, THE PERMITTEE SHALL VISIT DEQ.NC.GOV/NCG01 TO SUBMIT AN ELECTRONIC NOTICE OF TERMINATION (E-NOT). A $100 ANNUAL GENERAL PERMIT FEE WILL BE CHARGED UNTIL THE E-NOT HAS BEEN FILLED OUT. 8. IF SITE IS APPROVED, REMOVE EROSION CONTROL MEASURES AND STABILIZE RESULTING BARE AREAS IMMEDIATELY. NCDEQ, TEMPORARY EROSION AND SEDIMENTATION CONTROLS MUST BE SELF -INSPECTION REPORT FOR LAND DISTURBING ACTIVITY AS REQUIRED BY REMOVED. AREAS DISTURBED DURING REMOVAL OF THE CONTROLS MUST NCGS 113A54.1 (E) BE STABILIZED WITH PERMANENT SEEDING AS SOON AS POSSIBLE WITHIN 14 (EFFECTIVE OCTOBER 1, 2010; READOPTED EFFECTIVE APRIL 1, 2020) CALENDAR DAYS. 10. PER NPDES REQUIREMENTS, A RAIN GAUGE, SELF -INSPECTIONS RECORDS, PERMIT, CERTIFICATE OF COVERAGE, AND S&E PLAN ARE REQUIRED TO BE MAINTAINED ON SITE AND ACCESSIBLE DURING INSPECTION. IT IS RECOMMENDED THAT THESE ITEMS BE PLACED IN A PERMITS BOX AT THE BEGINNING OR ENTRANCE OF PROJECT. 11. THE CONTRACTOR SHALL CONDUCT SELF -INSPECTIONS OF THE EROSION AND SEDIMENTATION CONTROL MEASURES AND COMPLETE THE DUKE ENERGY PROVIDED SELF -INSPECTION FORM. TWELVE MONTHS OF COMPLETE INSPECTION FORMS SHALL BE KEPT ON -SITE AND AVAILABLE FOR INSPECTION AT ALL TIMES. IT IS RECOMMENDED A COPY BE KEPT IN A PERMITS BOX. BURNS & McDONNELL CONSULTANTS, INC. STATE LICENSE # G1435 CLAUDE A. McMULLAN IFC SUBMfTTAL DATE NORTH CAROLINA SEAL 047852 PROFESSIONAL ENG/ARCH STAMP 15A NCAC 04B .0131 SELF -INSPECTIONS ALL LAND -DISTURBING ACTIVITIES REQUIRED TO HAVE AN APPROVED EROSION AND SEDIMENTATION CONTROL PLAN UNDER G.S. 113A54.1(E) SHALL CONDUCT SELF -INSPECTIONS FOR INITIAL INSTALLATION OR MODIFICATION OF ANY EROSION AND SEDIMENTATION CONTROL DEVICES AND PRACTICES DESCRIBED IN AN APPROVED PLAN. IN ADDITION, WEEKLY AND RAIN -EVENT SELF -INSPECTIONS ARE REQUIRED BY FEDERAL REGULATIONS, THAT ARE IMPLEMENTED THROUGH THE NPDES CONSTRUCTION GENERAL PERMIT NO. NCG 010000. 1. FOR SELF -INSPECTIONS REQUIRED PURSUANT TO G.S. 113A-54.1(E), THE INSPECTION SHALL BE PERFORMED DURING OR AFTER EACH OF THE FOLLOWING PHASES OF THE PLAN; a. INITIAL INSTALLATION OF EROSION AND SEDIMENT CONTROL MEASURES; b. CLEARING AND GRUBBING OF EXISTING GROUND COVER; c. COMPLETION OF ANY GRADING THAT REQUIRES GROUND COVER; d. COMPLETION OF ALL LAND -DISTURBING ACTIVITY, CONSTRUCTION, OR DEVELOPMENT, INCLUDING PERMANENT GROUND COVER ESTABLISHMENT AND REMOVAL OF ALL TEMPORARY MEASURES; AND e. TRANSFER OF OWNERSHIP OR CONTROL OF THE TRACT OF LAND WHERE THE EROSION AND SEDIMENTATION CONTROL PLAN HAS BEEN APPROVED AND WORK HAS BEGUN. THE NEW OWNER OR PERSON IN CONTROL SHALL CONDUCT AND DOCUMENT INSPECTIONS UNTIL THE PROJECT IS PERMANENTLY STABILIZED AS SET FORTH IN SUB -ITEM (C) OF THIS ITEM. 2. DOCUMENTATION OF SELF -INSPECTIONS PERFORMED UNDER ITEM (1) OF THIS RULE SHALL INCLUDE: a. VISUAL VERIFICATION OF GROUND STABILIZATION AND OTHER EROSION CONTROL MEASURES AND PRACTICES AS CALLED FOR IN THE APPROVED PLAN; b. VERIFICATION BY MEASUREMENT OF SETTLING BASINS, TEMPORARY CONSTRUCTION ENTRANCES, ENERGY DISSIPATORS, AND TRAPS. c. THE NAME, ADDRESS, ORGANIZATION AFFILIATION, TELEPHONE NUMBER, AND SIGNATURE OF THE PERSON CONDUCTING THE INSPECTION AND THE DATE OF THE INSPECTION SHALL BE INCLUDED, WHETHER ON A COPY OF THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN OR AN INSPECTION REPORT. A TEMPLATE FOR AN EXAMPLE OF AN INSPECTION AND MONITORING REPORT IS PROVIDED ON THE DEMLR WEBSITE AT: HTTPS://DEQ.NC.GOV/ABOUT/DIVISIONS/ENERGY-MINERAL- LANDRESOURCES/EROSION-SEDIMENT-CONTROL/FORMS. ANY RELEVANT LICENSES AND CERTIFICATIONS MAY ALSO BE INCLUDED. ANY DOCUMENTATION OF INSPECTIONS THAT OCCUR ON A COPY OF THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN SHALL OCCUR ON A SINGLE COPY OF THE PLAN AND THAT PLAN SHALL BE MADE AVAILABLE ON THE SITE. d. A RECORD OF ANY SIGNIFICANT DEVIATION FROM ANY EROSION OR SEDIMENTATION CONTROL MEASURE FROM THAT ON THE APPROVED PLAN. FOR THE PURPOSE OF THIS RULE, A "SIGNIFICANT DEVIATION" MEANS AN OMISSION, ALTERNATION, OR RELOCATION OF AN EROSION OR SEDIMENTATION CONTROL MEASURE THAT PREVENTS IT FROM PERFORMING AS INTENDED. THE RECORD SHALL INCLUDE MEASURES REQUIRED TO CORRECT THE SIGNIFICANT DEVIATION, ALONG WITH DOCUMENTATION OF WHEN THOSE MEASURES WERE TAKEN. DEVIATIONS FROM THE APPROVED PLAN MAY ALSO BE RECOMMENDED TO ENHANCE THE INTENDED PERFORMANCE OF THE SEDIMENTATION AND EROSION CONTROL MEASURES. PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO INSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 NO. DATE IREVISION(S) DESCRIPTION A 08-28-20201 ISSUED FOR 90% REVIEW B 10-12-20201 ISSUED FOR BID BY CHK JAPPD DESCRIPTION NPR KVG CAM AREA CODE 1841 NPR KVG CAM ACCOUNT NUMBER PROJECT NUMBER 0231792 DRAWING BY NPR STATION ID CHECKER INITIALS KVG APPROVALS DATE INITIALS REGIONAL NIA N/A ENGINEER DATE INITIALS MGR TECH NIA N/A REC & STD DATE INITIALS PRINCIPAL 07/07/2020 CAM ENGINEER ef' DUKE Piedmont ENERGY, Natural Gas COPYRIGHT 2018 LINE 129 SECTION 1 ROCKY RIVER HDD EROSION CONTROL NOTES CABARRUS COUNTY, NC INDIAN TRAIL RESOURCE CENTER, INDIAN TRAIL, NORTH CAROLINA REF. DWG(S) SHEET(S) 14 OF 2 1 DWG SCALE AS NOTED DWG DATE 06/15/2020 SUPERSEDED DRAWING NUMBER REVISION P N G-C-129-0001023 B DISCIPLINE / RESOURCE CENTER / LINE NUMBER Ln i I i i i I pO�Q \ \ I 1 1 I I I I O I ( R 1 1 1 I , 1 1 I It to N / —G-----G G----_GD --- / I I I I \ 1 1 , J6 -- I G-----G-----G-----G G-----G-y - G� ---I I 1 1 1 c—---c— —G---- / I / G--- G--- G---- G-- G-- \--_ / / / / — , 7- 1--1 \ / , - O- --I �--c G-----G-�- �--•—==cam c O+OQ � , I , \ 1 I \ \ �-_ / / / /� I 1 I I \ \ \ \ �---- \ __ / �-- r--/ �� c r-c+- t-G-T---c-- \. --- �/ �/ 1\ 1\ 1 G_____c is y i�K c I I I \ 1 \ G I I I I 1 \ \ \ \ -- / � i iH�lhc�li��c irKN�� ,i�� i��y icy�� �icy iF�cK�—/ i�K��c�tK�ctiv iF\c//— ��r i�� iF� i��—=i��c i �' �— �f��� is i�x\�cl 11 Gam/ y� I 1 1 I �_ \ \ /` ♦ \ ------ \\ \\ \1 ------------ ,' , \ , / I 1 1 , \ \ \ \ I l / /--------------/ I I , I 1 /� // \ \ \ I C 1 1 jtc� O-------------- \ \`� \`� \` \`\ _ ^� It It `------------- \ --------------- 06 z'\\ 0'0 do \ \o // ---------- SFWB --- _ \ I 1 1 1 1 \ \ \ \ \ \ \ \ \ \ \ \ I OQ I I l I / l / / -- \ \ \ I Q ` x ------ \ \ \ \ I I \ \ \ \ 1 I I OO O c9 \' W�0 \ O � \ \ AR \ \ \ 1 1 1 i � O 1 / �N �OD I �XO \,� \\ \ ! ' N I O \ 1 \ 1 1% 1 \ Lf) O I \ \ \ / \ li) \ 1 c') 1 co \ O \ \ \ I \ \ \ \ I I 1 1 1 1 1 lf� I I ' 1 I / / ! I \\ ` \ \\ I 1 1 1 O 1 `\ \ `\ \ \\ `\ \\ I I I I I \\ \ 1 1 1 1 \ \\ \ �� ' \ I I I I I \� ��. `\ � I \ 1 \ \ \ \ •\ \ `\ `\\ � \\ I I I I\ \ ISi \ ' 11 � Ilk/ L0 04 O 1 1 OI \-� 0 �► \ 1 o I \ 1 +00 \ DRAINAGE ARE2c A - 2 DA = 2.79 ACRES `\ 7+p0 \ — / I I I it kill To i /' /' DRAINAGE AREA DA - 3.33 ACRES END HDD I I 1 \ \ — / /, /, /, /, / / — I I 1\ \ N—---------- 0 JA �i , I I I I I I I / / .\ O I I I 1 \----------------' CN 06' - \` 500-1 WCD1 11 i I I / I / \ \ \ / / / \I \\ \\ \\ 11 \ \ \ `\ LU OV, / ' \ \ I ' RPM ___----- ,/ I I C+ I , ' , ' \I / \ Q TOP ELEV: 503 TOP ELEV: 503 i � �`�, �`• �� `� ` / I I I PG BOTTOM ELEV: 500 i i a\\� \\` `��\ \\\ BOTTOM ELEV: 500 35' i �I i G CIO VOLUME: 8,664 CF I 13 \ \ VOLUME: 7,350 CF 1 r /IF- ------------------------------------ 55545180830000 NOTES: 1. CONTRACTOR SHALL INSTALL CONSTRUCTION EXIT AT ALL SITE ACCESS POINTS. 2. ALL TREES TO REMAIN SHALL BE PROTECTED WITH TREE PROTECTION FENCING. 3. ANY DISTURBED AREA LEFT IDLE FOR A PERIOD OF 14 DAYS OR LONGER SHALL BE STABILIZED WITH MULCHING AND TEMPORARY SEEDING WITH THE EXCEPTION OF AGRICULTURAL FIELDS WHICH ONLY NEED STABILIZATION TO THE EXTENT REQUIRED TO AVOID TOP SOIL WASHING AWAY. SEE DETAIL 1, SHEET C-129-0001028. 4. STABILIZE ALL DISTURBED AREAS OUTSIDE OF THE CULTIVATED FIELD WITH PERMANENT SEEDING IN ACCORDANCE WITH DETAIL 2, SHEET C-129-0001028. ALL OTHER DISTURBED AREAS SHALL BE RESTORED TO ORIGINAL CONDITIONS AS A CULTIVATED FIELD; PERMANENT SEEDING WILL NOT BE UTILIZED. ONCE RESTORATION TO A CULTIVATED FIELD IS COMMENCED, TEMPORARY SEDIMENT BASINS WILL BE REMOVED AND RETURNED TO EXISTING CONDITIONS. 0 5. REFER TO SITE PLAN PNG-C-129-0001010 FOR OVERALL LIMITS OF LO DISTURBANCE, HDD ENTRY AND EXIT WORKSPACE, AND TEMPORARY AND 0 PERMANENT ACCESS ROADS. W Z_ J U Q LEGEND: N --- LOD--- 8+00 �pp�P I L_ PR / l / / •,• _ // .•• :. I \ I l I /� \ \ / / —_ / \ \ •• Q 0 \ o \ SEE SHEET PNG-C-129-0001010 \ FOR CONTINUATION / 1 / ' LUU ILUJ ----- SFWB ` ---- ----------------- SFWB \ 1 \ LU�T�� / \ ���� ��� �T��� is BURNS & McDONNELL CONSULTANTS, INC. STATE LICENSE # C-1435 CLAUDE A McMULLAN IFC SUBMITTAL DATE NORTH CAROLINA SEAL 047852 PROFESSIONAL ENG/ARCH STAMP 9+00 PROPERTY LINE TEMPORARY SILT FENCE LIMITS OF DISTURBANCE PROPOSED 30" PIPELINE 1 C-129-0001027 N�� SILT FENCE WATTLE BREAK 5 C-129-0001027 SKIMMER SEDIMENT BASIN 1 & 2 WITH POROUS BAFFLES C-129-0001030 N�� TIMBER MAT AIR BRIDGE TEMPORARY DIVERSION WETLAND STREAM LIMITS OF DISTURBED AREA PIPELINE PROJECT: 23.88 AC POINT OF CONTACT (CONSTRUCTION): SHAU N H U N EYC UTT 704-438-0036 Iz'' 0 50 100 I IN = 50FT PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO ENSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 NO. DATE IREVISION(S) DESCRIPTION A 08-28-20201 ISSUED FOR 90% REVIEW B 10-12-20201 ISSUED FOR BID BY CHK JAPPD DESCRIPTION ABR JTG CAM AREA CODE 1841 NPR KVG CAM ACCOUNT NUMBER PROJECT NUMBER 0231792 DRAWING BY ABR STATION ID CHECKER INITIALS JTG APPROVALS DATE INITIALS N/A N/A REGIONAL ENGINEER , � DUKE DATE INITIALS N/A NIA MGR TECH ENERGY,: REC & STD DATE INITIALS PRINCIPAL 08/25/2020 CAM ENGINEER LINE 129 SECTION 1 ROCKY RIVER HDD r6��1 Piedmont ES&PC PLAN �1 Natural Gas CABARRUS COUNTY, NC COPYRIGHT 2018 INDIAN TRAIL RESOURCE CENTER, INDIAN TRAIL, NORTH CAROLINA REF. DWG(S) 3 C-129-0001027 N--� 3 C-129-0001029 SHEET(S) 15 OF 27 1 DWG SCALE 1" = 50' DWG DATE 08/28/2020 SUPERSEDED — DRAWING NUMBER REVISION P N G-C-129-0001024 B DISCIPLINE / RESOURCE CENTER / LINE NUMBER r it AORI 0� / / f GR SS) CO�A`\ \ `\\ I\\ \\\ \\ \\\ Q\ / \ `\ `\ \ OOOEO \ 00 \ G,k I r Tye G� 506 J \ I I SFWBid GAI If SFWB If Cri � O \ 1 \ / / i / / / I / 7i.� / / � Illpy ' If 6^ �� /// // 1 \ J s.�/ if 1 is \ \ \ I /�G, 1 IIlII //1 \ \ I I CO \ \ \ \ 1 1 / x_ 1 Ci // / / IIU11ll� I \ // l _ ' I \ \\ \ /� / / \ _ \ yilll 11111111 1 / \ �/ \ \\ 1 \ \ \ / CIS 1 I \ I I ��'/ O / \ //IIII /\ . �_- � // � \ 1 I w_ l 11/llll I \ 1 IIII IIII \ \ \ \ d' 1S \\ II/\ I yr, \ ` \ / \ 1 / ` \ \ \ \ / x I. Illl 1/l / IIII l �p l /-- \ \ \ \ \ \ \ I � \ I / / I 1 \ y IIlI/rIHII \ \ / 111 1 / \ \ \ Qc / / \\ \ 1 1 / / /mil \ \ - / \\ -� // i l l \ 468 Wa9�ED \\ \ \\ ` - c _ 1 b \ \\4RE\cAO I1 1 / C9 \ IIII llf/l I f� /1�/ 1\� �• _` � _ C�^�1-\'.xL\ ;�C^-�.�., ' �1S \\ `\ 11 1 1 \ / lllllllllll� If -cf l 1 / llll \ ks \ / \ 1 1 1 1 / \ \ \ \ \ \ \ \ \ \ � 1 � / I \ \ \ \ \ \ \ \ \ \\ ` \ \\ \ \ \ I \ \ 9-- \ \ \ \\ \ \ \ \ \ \ \ \ \ ` \ 1 I 1 IIII lllr 4 �� I \ \ \ \ \ \ \ \ \ I II 1 1 I Ilq IIII I I 1 1 I \ IIII IIII I 1 1 I I I 1 1' / \ \ / I I I 1 1 \ I 11 1 11111I �I \ I l I I I I I I 1 \ llIIII 111 / 1 � �� I 1 I IIII III! IIII `� i-- \ \ \ \ 1 1 ` w//m 1 11IIIIIUIIll ` ` ii' `\ `\ 1 \ IIII r� I I I 1 1 1 /l 111 \ \ \ \ \ \ \ \ \ 1 1 I I I \ \ 11 ll O �� Q0� --—QO�/---i-1-Q0�1 — —�—QO� —ra0� -- Q0� ----- j]-—QOT� � i30�`�� \—\a(`���— —a0�1� 1—��CO�—I—�—trta y�l�—�j0� — millllull I i / ri illul'u//.i�f y— Qp/i•----�a0 ---- —\ -- O O \ I \ \ 1 1 / I I I OO'' \ \ \ \ \ \ \ \ \ \ \ \ \ \ 1 1 1 1 1 I I 1 1 1 1 \ I I IIII 111 r l�lll/llll 11 i \ \ . ----- L0 + 1 \ 1 \\ `\ \ I I I \ I 1 1 \ \ / /-\ \ \ \ \ \ \ \ \ I \ 1 11 11 / I + I \ �i \ \ \ \ \ \ 1 1 I \ \ l 1 IIII rl IIII I + \ \ \ \ \ \ \ \ \ ` \ 1 1 1 1 1 I \ \ \ \ 1 CLEARING LIMIT `\ ` ` ` ` \ ` HDD 1 \ 1 1 I 1 1 ED ` \\ `\ 1 I I 1 I lI 11j1 1 I I 1 III IIII IIr \ _ LEARIN LIMIT \ N C G S \ / IIT,- _ C G S \ I / \ \ \ \ \ \ 1 ` I IIII IlllllllillA \ W I I \\ (\ II 1\ 11 1 1 1 \ \ \� \ _ \ \ \\ 11 1 11 1 1 I BQD \ `\ `\ I I I I 1 I 11 1 1 / 1 1 , \ II f IIII IIII <11 1 \ -- 1 1 \ \ 1 / \ \ \ \ ` \ \ O \ \ \ \ \ \ 1 I I 1 1 \ AREA \ \ \ \ / ll'1/1/�Ul / I —� \ . W Z \ I I \ \ \ 1 1 \ 1 1 \ \ \ ` \ \ \ \ O \ \ 1 I 1 \ 1 I I u...il 1 I 1 u II - \ \ Z I \ \ \ 1 1 1 1 \ ——I—\—\� — �19+00 1 — —l. �1— 1 I I I \ /I II .� — — — — — J 00 i \\ \ 13+00 \ 1 1 11 1 14+00 1 \ \\ 15+00 - - - \� - 16+00 � - o ' - 17+00 �1- I 1 1 1 18+00 �\\ \ \ 1 - - 20+00 -\ 1 1 I I - 21 +00 I I I 1/ \ 22+00 �Illll/ n \I o - 23+00 24+00 - - - - J \ 1 1 1 1 \ • \ \ �\ 1 III IIII V1 \ I \ \ \ \ 1 1 1 1 1 \ \ �\1 — — — — — — — — \ — c\I 1 1 II— �01 �LOD +1 L D—�,r LOD \\ \ \ pY I III �� �l(7 II _ N — — — — — — —\ `\ — _ 11 L0� J \ LSD —��\ \\� Od\—ILA—\r LOD \T— \\�— LOD\�� LOD �— -- LOD ---�— LOD t i LIDJ_ T 1�� I I 1 \� — ����— \\+ �1 / 1 iiill�l �/ 1 \� i'rl�Iii L-C;"��-- LOD — — — — .SOD — — LOD ; e H \\\ \ I I I + 11 ll � � WOODED ' \ I I I I I - --� \ //1 1 Il! I I I Ill/ / \ 1 1 I I I 1 I I I I I I I p-- \ \\ \\\\fi COIII II / I I \II III III �/ I / \ \ \ \ 1 I I I I I I _ -I� 1 I I \ I AREA // \ IIII 1 /I I �' Illlllpl / I N I/ll Ill' ll/ IIII Cp / \ � IN / \ \ \ \ \ I I IIIIIIIIIIII / I /' II Illl IIII Ill \ 11 II \ / 1 I iJ III Illll III I71/ I l Ill + I I I / I \ \ \ \ \ , / I 1 I 1 I I I I I I -- • \ \ \ 111 n\ III IIII , IIII II11Il I + l , �I� I I / / I it I II � I 1 / 1 1 \ 1 4 II IIII N/ I \ I I / III IIII I 1 / II IIII IIII III�11I I I 1 I I / / lllnul..,.�...'ll! MATCH LINE SEE SHEET PNG-C-129-0001026 -/G \/�SFWB G-G---/-G- G_ G\— 400000 I ! \ \ 1 \�1 1yl TitI I 1 �1 �UU — , \ \\\ \\\\ \\ I I \ � `\ \ \ \ \ \_--_� \ \ \ CLEARING LIMITS + - - - - 25 00 , - -� , = 26+00'- ` - 27+00 \� �1 \ \\ `\ `\ `\ \ \ i \s O O / \ / /,---------_ _ ` �\ \ \ \\ \\\\ \ \ ` \ 1 1 \ \� 29 00� �1� r, \ 130+00 / \ \ \ \\\ \� \` 6' CN _ _ O, \ \ \ \ \\ \ \ O \ \ LU0 it Z --- LOD --- r1 \ \ / \ \ \ \ \ \ \ _ / �g� ++�� L� L \L`� \� t-1 I1 D j \ Q L l / / J ` �" �/ // � / /--------'/'�-- ``` ` -� �� \ \ \\ '\ �\ \ \ �\�\ \ \ \ T \ \ \ � \/AREA — — �� ��_- _-_-_ -__ _\ \ \\ \\\ \ \ \ \ \ \\\` \� \\ \ \ \ \ \ \ \ II 1 \ ' BEGIN HDD Of //i (� /- �,__ HDD ,, \ \ \ \ \\\\\\ \ \ \ \\ \ \ \ \ \ \ \ \ oo \ \ / / / /'Q / 1000 ��+'_'_-QO1�--- / / / / EA I 1 \ \\ \ \ \ \ \ \ \ \ \ C9 \`\\`\ X \`\ \I cfl\ \` \\ �\ \Lozc \\\ \\ \\ \\ \ \ \ \ \ \ \ \ \ \ \ \ \ - ---------------------- \--�� ca — I X", 11- I 1 It 11111 I, / / / BURNS & McDONNELL CONSULTANTS, INC. STATE LICENSE # C-1435 CLAUDE A McMULLAN IFC SUBMITTAL DATE NORTH CAROLINA SEAL 047852 PROFESSIONAL ENG/ARCH STAMP KInTCc- 1. CONTRACTOR SHALL INSTALL CONSTRUCTION EXIT AT ALL SITE ACCESS POINTS. 2. ALL TREES TO REMAIN SHALL BE PROTECTED WITH TREE PROTECTION FENCING. 3. ANY DISTURBED AREA LEFT IDLE FOR A PERIOD OF 14 DAYS OR LONGER SHALL BE STABILIZED WITH MULCHING AND TEMPORARY SEEDING WITH THE EXCEPTION OF AGRICULTURAL FIELDS WHICH ONLY NEED STABILIZATION TO THE EXTENT REQUIRED TO AVOID TOP SOIL WASHING AWAY. SEE DETAIL 1, SHEET C-129-0001028. 4. STABILIZE ALL DISTURBED AREAS OUTSIDE OF THE CULTIVATED FIELD WITH PERMANENT SEEDING IN ACCORDANCE WITH DETAIL 2, SHEET C-129-0001028. ALL OTHER DISTURBED AREAS SHALL BE RESTORED TO ORIGINAL CONDITIONS AS A CULTIVATED FIELD; PERMANENT SEEDING WILL NOT BE UTILIZED. 5. REFER TO SITE PLAN PNG-C-129-0001010 FOR OVERALL LIMITS OF DISTURBANCE, HDD ENTRY AND EXIT WORKSPACE, AND TEMPORARY AND PERMANENT ACCESS ROADS. 6. CONTRACTOR MAY USE SHEET PILING IN LIEU OF A STABILIZED SLOPE. CONTRACTOR SHALL INCLUDE IN BASE BID AT NO ADDITIONAL COST. SHEET PILING SHALL BE DESIGNED BY A LICENSED PROFESSIONAL ENGINEER IN THE STATE OF NORTH CAROLINA. SHEET PILING PLAN SHALL BE SUBMITTED TO CLIENT REPRESENTATIVE FOR REVIEW. LEGEND: R PROPERTY LINE tl 1 TEMPORARY SILT FENCE C-129-0001027 — - - LOD- - — LIMITS OF DISTURBANCE PROPOSED 30" PIPELINE 8+00 9+00 SFWB SILT FENCE WATTLE BREAK 5 C-129-0001027 ROLLED EROSION CONTROL 1 PRODUCTS C-129-0001029 I II I I I STABILIZED SLOPE 2 (SEE NOTE 6) C-129-0001029 N�-� F_ -1 WETLAND L- J STREAM LIMITS OF DISTURBED AREA PIPELINE PROJECT: 23.88 AC POINT OF CONTACT (CONSTRUCTION): SHAU N H U N EYC UTT 704-438-0036 0 50 100 1IN = 50FT PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO ENSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 NO. DATE IREVISION(S) DESCRIPTION A 08-28-20201 ISSUED FOR 90% REVIEW B 10-12-20201 ISSUED FOR BID BY CHK JAPPD DESCRIPTION ABR JTG CAM AREA CODE 1841 NPR KVG CAM ACCOUNT NUMBER PROJECT NUMBER 0231792 DRAWING BY I ABR STATION ID CHECKER INITIALS JTG DATE INITIALS N/A N/A DATE INITIALS N/A N/A DATE INITIALS 08/25/2020 CAM APPROVALS REGIONAL ENGINEER DUKE MGR TECH ENERGY REC & STD PRINCIPAL ENGINEER LINE 129 SECTION 1 ROCKY RIVER HDD r6��1 Piedmont ES&PC PLAN �1 Natural Gas CABARRUS COUNTY, NC COPYRIGHT 2018 INDIAN TRAIL RESOURCE CENTER, INDIAN TRAIL, NORTH CAROLINA REF. DWG(S) SHEET(S) 16 OF 27 1 DWG SCALE 1" = 50' DWG DATE 08/28/2020 SUPERSEDED — DRAWING NUMBER REVISION P N G-C-129-0001025 B DISCIPLINE / RESOURCE CENTER / LINE NUMBER 0 I O N It I I 1 I I I I I I i I I I I I I I � I I I 06 JLO LU LO m---- -----I \ W c/) \\\ LU Z-- ----------II- J \ 1 I 0 , 1 1 I ( 1 1 1 1 1 1 1 I I I I 1 c9 10 o 0 I 0----- 0—yamQ0� \ ARP \Q0� \�\\0\� \\— — — — \I -----(10� QE/ — — — — — — — —I — — — — — — — — — — — — — — — — — — — — — — — — — � — — — — — — — --- — — — — — — — — — '— — •— ---- ----- SFWB /� ---T— ----- -- — --- ---- \ ---- --�-- --- — --LUL — `_- `" \` ----- \ ----- ` .NRAL � POR�nPL FIE�O 55545180830000 N 1 — I --I I C) I � 1 LU 1 I W w z NOTES: I � — — I J I .' 1. CONTRACTOR SHALL INSTALL CONSTRUCTION EXIT AT ALL SITE ACCESS < POINTS. 2. ALL TREES TO REMAIN SHALL BE PROTECTED WITH TREE PROTECTION FENCING. 3. ANY DISTURBED AREA LEFT IDLE FOR A PERIOD OF 14 DAYS OR LONGER SHALL BE STABILIZED WITH MULCHING AND TEMPORARY SEEDING WITH THE EXCEPTION OF AGRICULTURAL FIELDS WHICH ONLY NEED STABILIZATION TO THE EXTENT REQUIRED TO AVOID TOP SOIL WASHING 7 AWAY. SEE DETAIL 1, SHEET C-129-0001028. 1 1 I i i i 4. STABILIZE ALL DISTURBED AREAS OUTSIDE OF THE CULTIVATED FIELD WITH PERMANENT SEEDING IN ACCORDANCE WITH DETAIL 2, SHEET uJ C-129-0001028. ALL OTHER DISTURBED AREAS SHALL BE RESTORED TO '1 �I N \�\ `\\� `;' ', >0 ORIGINAL CONDITIONS AS A CULTIVATED FIELD; PERMANENT SEEDING \\ WILL NOT BE UTILIZED. ao — -- — — — — -- -- -- -- ----- ----- ----- -- - Q 11 \\\ \\\ \\\ \______.-52 5. REFER TO SITE PLAN PNG-C-129-0001010 FOR OVERALL LIMITS OF 1 I ' —+--+ ------ /� �/ --- `\\--i---� — — — — — — — — — — — — — — — — L — — / i LU DISTURBANCE, HDD ENTRY AND EXIT WORKSPACE, AND TEMPORARY AND SFWB , T----�— Z PERMANENT ACCESS ROADS. I IA /� — ---,LUU-- --LUU---� A\ A A A i --� — -- -- 0 H / 55545180830000 00 00 DUKE POWER ` — \\ \\ \\ \\ \ ----- EASEMENT °N` �\ \\ \\ \\ - --- ` TEMPORARY DIVERSION TO /' / I� GRAPEL RO D _ \\ BYPASS OFF -SITE FLOW °"�°" ,' ____ __ °" SEE SHEET PNG-C-129-0001010 OH -�� ,'°"� �o _ -`�s - - ••• —� •t�s' ; ` - TEMPORARY CULVERT FOR CONTINUATION •• — UNDER HAUL ROAD / - - I - ------ 1 �� SLOPE DRAIN ---------- 1\\\ • \ 20 `SLOPE DRAIN-.AG0C0 • __\ 1 _ - _ GR (0p15) -- DIVERSION SWALE ADDITIONAL HAUL ROAD FOR SOIL STOCKPILE -------------' \ \ I DIVERSION SWALE - 5Q- ______ ________________ \\ \ 11 I i 1 i \ � \�S ••• 1 - _- ,,, 2.60 ACRES \\ \\ a \� 11 1 li 1\ `\ ••� _ - ••• TOP ELEV: 517 BOTTOM ELEV: V 514 ----- ADDITIONAL LOD----------- __ STABILIZE SLOPES WITH ROLLED _ - VOLUME: 5,000 CF / EROSION CONTROL PRODUCTS (RECP) 1 \ \ J _ �----------- \�\ \\\\\� \ �` \`\ \\\ \\� TEMPORARY -------------- \ SEDIMENT BASIN --- ---- ---- ----- \ \ \ 0 - r -----____ - \�\ TEMPORARY CULVERT _ 0�--------- ---- UNDER HAUL ROAD MATCH LINE SEE SHEET PNG-C-12970001025 BURNS & McDONNELL CONSULTANTS, INC. STATE LICENSE # C-1435 CLAUDE A McMULLAN IFC SUBMITTAL DATE NORTH CAROLINA SEAL 047852 PROFESSIONAL ENG/ARCH STAMP LEGEND: 8+00 --- LOD--- 9+00 0 PROPERTY LINE 1 TEMPORARY SILT FENCE C-129-0001027 LIMITS OF DISTURBANCE �J PROPOSED 30" PIPELINE 5 SILT FENCE WATTLE BREAK C-129-0001027 N�� Ei) SKIMMER SEDIMENT BASIN WITH POROUS BAFFLES C-129-0001030 3 TEMPORARY DIVERSION C-129-0001029 4 TEMPORARY SLOPE DRAIN C-129-0001029 ROLLED EROSION CONTROL 1 PRODUCTS C-129-0001029 N�� LIMITS OF DISTURBED AREA PIPELINE PROJECT: 23.88 AC POINT OF CONTACT (CONSTRUCTION): SHAU N H U N EYC UTT 704-438-0036 0 50 100 1IN = 50FT PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO ENSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 NO. DATE IREVISION(S) DESCRIPTION A 08-28-20201 ISSUED FOR 90% REVIEW B 10-12-20201 ISSUED FOR BID BY CHK JAPPD DESCRIPTION ABR JTG CAM AREA CODE 1841 NPR KVG CAM ACCOUNT NUMBER PROJECT NUMBER 0231792 DRAWING BY ABR STATION ID CHECKER INITIALS JTG APPROVALS DATE INITIALS N/A N/A REGIONAL ENGINEER , � DUKE DATE INITIALS N/A N/A TECH ENERGY,: REC &STD EC DATE INITIALS PRINCIPAL 08/25/2020 CAM ENGINEER LINE 129 SECTION 1 ROCKY RIVER HDD r6��1 Piedmont ES&PC PLAN �1 Natural Gas CABARRUS COUNTY, NC COPYRIGHT 2018 INDIAN TRAIL RESOURCE CENTER, INDIAN TRAIL, NORTH CAROLINA REF. DWG(S) SHEET(S) 17 OF 27 1 DWG SCALE 1" = 50' DWG DATE 08/28/2020 SUPERSEDED — DRAWING NUMBER REVISION P N G-C-129-0001026 B DISCIPLINE / RESOURCE CENTER / LINE NUMBER v. INSTALLATION NOTES: -AGGREGATE SIZE: 2-3" DIAMETER WASHED STONE. -PAD THICKNESS: 6" MINIMUM. -PAD WIDTH: 24' MINIMUM. -PAD LENGTH: 100' MINIMUM. -PAD LOCATION: LOCATE CONSTRUCTION ENTRANCES AND EXITS TO LIMIT SEDIMENT FROM LEAVING THE SITE AND TO PROVIDE MAXIMUM UTILITY BY ALL CONSTRUCTION VEHICLES. AVOID STEEP GRADES AND ENTRANCES AT CURVES IN PUBLIC ROADS. o � o �O O �O FILTRATION GEOTEXTILE TO STABILIZE FOUNDATION (ESPECIALLY IMPORTANT WHERE SOFT SOIL IS ANTICIPATED) 2-3" DIAMETER WASHED STONE, 6" DEEP ISOMETRIC VIEW BURNS & McDONNELL CONSULTANTS, INC. STATE LICENSE # G1435 CLAUDE A MCMULLAN IFC SUBMITTAL DATE NORTH CAROLINA SEAL 047852 PROFESSIONAL ENGIARCH STAMP FRONT VIEW PERSPECTIVE VIEW DETAIL SCALE: NTS CONSTRUCTION ENTRANCE MAINTENANCE NOTES: -MONITOR DAILY TO SUPPLEMENT STONE TO ENSURE ENTRANCE FUNCTIONS PROPERLY. -CLEAN ANY MATERIAL TRACKED ONTO PUBLIC ROADWAY IMMEDIATELY. -SCHEDULE ROUTINE SWEEPING AT THE END OF EACH WORK DAY. -WASHING: IF CONDITIONS AT THE SITE ARE SUCH THAT MOST OF THE MUD AND SEDIMENT ARE NOT REMOVED BY VEHICLES TRAVELING OVER THE GRAVEL, THE TIRES SHOULD BE WASHED. WASHING SHOULD BE DONE ON AN AREA STABILIZED WITH CRUSHED STONE THAT DRAINS INTO A SEDIMENT TRAP OR OTHER SUITABLE DISPOSAL AREA. A WASH RACK MAY BE USED TO MAKE WASHING STONE MORE CONVENIENT AND EFFECTIVE. INSTALLATION NOTES: -USE MINIMUM 18 IN. NOMINAL DIAMETER EXCELSIOR WATTLE AND LENGTH OF 10 FT. -EXCAVATE A 2 TO 3 INCH TRENCH FOR WATTLE TO BE PLACED. -DO NOT PLACE WATTLES ON TOE OF SLOPE. -USE 2 FT. WOODEN STAKES WITH A 2 IN. BY 2 IN. NOMINAL CROSS SECTION. -INSTALL A MINIMUM OF 2 UPSLOPE STAKES AND 4 DOWNSLOPE STAKES AT AN ANGLE TO WEDGE WATTLE TO GROUND. -PROVIDE STAPLES MADE OF 0.125 IN. DIAMETER STEEL WIRE FORMED INTO A U SHAPE NOT LESS THAN 12" IN LENGTH. -INSTALL STAPLES APPROXIMATELY EVERY 1 LINEAR FOOT ON BOTH SIDES OF WATTLE AND AT EACH END TO SECURE IT TO THE SOIL. -FOR BREAKS ALONG LARGE SLOPES (HEIGHT OF 15' OR MORE MEASURED ALONG THE SLOPE), USE MAXIMUM SPACING OF 25 FT. SEE IPiSt i DETAIL 4 SCALE: NTS WATTLE BARRIER �it9;$,�:�'9 9 . TOP VIEW 24' MIN. PLASTIC CAP 6' MAX. WITH WIRE OVER POST INSTALLATION NOTES -USE FILTRATION GEOTEXTILE 4' MAX FOR TROUT WATERS A MINIMUM OF 36" IN WIDTH AND FASTEN ADEQUATELY TO THE POSTS AND WIRE AS DIRECTED. -USE WIRE A MINIMUM OF 32" IN WIDTH AND WITH A MINIMUM MIDDLE AND VERTICAL WIRES OF 6 LINE WIRES WITH 12" STAY SPACING. SHALL BE 121/2 GAUGE MIN. -PROVIDE 5'-0" STEEL POST OF THE SELF -FASTENER ANGLE STEEL TYPE. -FOR MECHANICAL SLICING METHOD INSTALLATION, GEOTEXTILE TOP AND BOTTOM STRAND SHALL BE A MAXIMUM OF 18" ABOVE GROUND SURFACE. SHALL BE 10 GAUGE MIN. 24" MAX. {18" MIN.) MAINTENANCE NOTES: —REMOVE AND DISPOSE OF SILT ACCUMULATIONS WHEN THE DEPTH REACHES ONE—HALF OF THE HEIGHT OF THE WATTLE. —REPLACE OR CLEAN THE WATTLE AS NEEDED TO ALLOW RUNOFF TO SLOWLY DEWATER THROUGH THE DEVICE BETWEEN RAIN EVENTS. —MONITOR THE WOODEN STAKES AND STAPLES TO ENSURE THAT THE WATTLE REMAINS SECURELY ANCHORED AFTER RAIN EVENTS. IgIG1A1GII IGIIIGIIAIAlI�l01FalFalh ... GEOTEXTILE. .......----.,—.,—.,.--..—I r•.--,•.--,—..------ ...—...r—•• MAINTENANCE NOTES: —REMOVE AND DISPOSE OF SILT ACCUMULATIONS WHEN THE '-- I DEPTH REACHES ONE—HALF OF THE HEIGHT OF THE WIRE GEOTEXTILE. —REMOVE AND REPLACE DETERIORATED OR CLOGGED FILTRATION GEOTEXTILE FILTR ISOMETRIC VIEW VIEW FROM SLOPE EXTENSION OF GEOTEXTILE AND WIRE INTO TRENCH DETAIL 2 SCALE: NTS REINFORCED TEMPORARY SILT FENCE INSTALLATION NOTES: -USE MINIMUM 12 IN. DIAMETER EXCELSIOR WATTLE AND LENGTH OF 10 FT. -EXCAVATE A 1 TO 2 INCH TRENCH FOR WATTLE TO BE PLACED. -DO NOT PLACE WATTLE ON TOE OF SLOPE. -OFFSET SLIGHTLY OFF TOE. -USE 2 FT. WOODEN STAKES WITH A 2 IN. BY 2 IN. NOMINAL CROSS SECTION. -INSTALL A MINIMUM OF 2 UPSLOPE STAKES AND 4 DOWNSLOPE STAKES AT AN ANGLE TO WEDGE WATTLE TO GROUND. -PROVIDE STAPLES MADE OF 0.125 IN. DIAMETER STEEL WIRE FORMED INTO A U SHAPE NOT LESS THAN 12" IN LENGTH. -INSTALL STAPLES APPROXIMATELY EVERY 1 LINEAR FOOT ON BOTH SIDES OF WATTLE AND AT EACH END TO SECURE IT TO THE SOIL. INSET A FILL SLOPE DETAIL 5 SCALE: NTS SILT FENCE WATTLE BREAK PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY 1"-2" TRENCH STAPLE SIDE VIEW CULVERT PIPE CULVERT PIPE PROFILE VIEW 1 SEE NOTE 9 PROFILE VIEW 2 SEE NOTE 4 - PROFILE VIEW 1 1. THIS TYPE OF BRIDGE IS GENERALLY USED ON NARROW CROSSINGS, LESS THAN 20 FEET WIDE WITH APPROPRIATE BANK CONFIGURATION OR AS BRIDGES ACROSS PIPES. MULTIPLE MATS MAY BE LAYERED FOR HEAVIER EQUIPMENT CROSSINGS. 2. BRIDGE IS ANCHORED AND/OR TIED OFF TO ANCHOR BLOCKS FOR STABILITY. BRIDGE SHOULD BE TEMPORARILY REMOVED IF HIGH WATER RENDERS IT UNSAFE TO USE. 3 MAINTENANCE NOTES: -REMOVE AND DISPOSE OF SILT ACCUMULATIONS WHEN THE DEPTH REACHES ONE-HALF OF THE HEIGHT OF THE WATTLE. 4 -REPLACE OR CLEAN THE WATTLE AS NEEDED TO ALLOW RUNOFF TO SLOWLY DEWATER THROUGH THE DEVICE BETWEEN RAIN EVENTS. -MONITOR THE WOODEN STAKES AND STAPLES TO ENSURE THAT THE WATTLE REMAINS SECURELY ANCHORED AFTER RAIN EVENTS. -MONITOR THE WATTLE/SILT FENCE OVERLAP TO 5 ENSURE THIS INTERFACE REMAINS SECURELY SEALED AFTER RAIN EVENTS. SILT FENCE POST SEE INSET A DOWNSLOPE STAKE IF REQUIRED, UTILIZE APPROACH FILLS OF CLEAN GRANULAR MATERIAL, SWAMP MATS, SKIDS OR OTHER SUITABLE MATERIALS TO AVOID CUTTING THE BANKS WHEREVER FEASIBLE. ENSURE ADEQUATE FREEBOARD. AS REQUIRED, ENSURE THAT FILL MATERIAL IF USED DOES NOT SPILL INTO WATERCOURSE INCLUDING REMOVAL OF DIRT FROM DECK DURING OPERATION. CONSTRUCT SEDIMENT BARRIERS ACROSS THE ENTIRE CONSTRUCTION R.O.W. TO PREVENT SILT LADEN WATER AND SPOIL FROM FLOWING BACK INTO WATERBODY. BARRIERS MAY BE TEMPORARILY REMOVED TO ALLOW CONSTRUCTION ACTIVITIES BUT MUST BE REPLACED BY THE END OF EACH WORK DAY. SILT FENCE, COIR WATTLES OR SANDBAGS MAY BE USED INTERCHANGEABLY. REMOVE BRIDGES AS SOON AS POSSIBLE AFTER PERMANENT SEEDING UNLESS OTHERWISE DIRECTED BY COMPANY REPRESENTATIVE. THE STRUCTURE IS TO BE REMOVED IF THERE IS MORE THAN ONE MONTH BETWEEN FINAL GRADING AND SEEDING, AND ALTERNATIVE ACCESS TO THE CONSTRUCTION R.O.W. IS AVAILABLE. 6. DISPOSE OF ANY ROCK AS DIRECTED BY COMPANY REPRESENTATIVE. 7. RESTORE AND STABILIZE BED AND BANKS TO APPROXIMATE PRE -CONSTRUCTION CONDITIONS. 8. TIMBER MATTING BOARDS SHALL BE PLACED IN TWO LAYERS, ONE AFTER ANOTHER ALONG THE ENTIRE LENGTH OF BRIDGE SUCH THAT THE TWO LAYERS ARE PERPENDICULAR TO EACH OTHER 9. GEOSYNTHETIC FABRIC SHALL BE PLACED BETWEEN THE TWO PERPENDICULAR LAYERS OF MATS AND WRAPPED UP THE SIDES OF THE TOP MAT. RUNNING BOARDS SHALL BE INSTALLED ALONG THE LENGTH OF BRIDGE TO PREVENT SEDIMENT LOSS OVER THE EDGES OF THE TOP MAT. DETAIL 3 SCALE: NTS TIMBER MAT AIR BRIDGE PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO ENSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 NO. DATE REVISION(S) DESCRIPTION BY CHK APPD I DESCRIPTION APPROVALS Piedmont p�� DUKEr6lj� V ENERGY Natural Gas COPYRIGHT 2018 LINE 129 SECTION 1 ROCKY RIVER H D D ES&PC DETAILS CABARRUS COUNTY NC INDIAN TRAIL RESOURCE CENTER, INDIAN TRAIL, NORTH CAROLINA A 08-28-2020 ISSUED FOR 90% REVIEW ABR JTG CAM AREA CODE 1841 DATE NIA NI N//ALS A REGIONAL ENGINEER B 10-12-2020 ISSUED FORBID NPR KVG CAM ACCOUNT NUMBER PROJECT NUMBER 0231792 DATE NIA INITIALS N/A MGR TECH REC&STD DRAWING BY ABR STATION ID DATE 08/25/2020 INITIALS CAM PRINCIPAL ENGINEER CHECKER INITIALS JTG REF. DWG(S) SHEET(S) 18 OF 27 DWG SCALE NONE DWG DATE 08/28/2020 SUPERSEDED DRAWING NUMBER REVISION P N G-C-129-0001027 B DISCIPLINE / RESOURCE CENTER / LINE NUMBER PERMANENT SEEDING SCHEDULE: BURNS & McDONNELL CONSULTANTS, INC. STATE LICENSE # G1435 CLAUDE A McMULLAN IFC SUBMITTAL DATE NORTH CAROLINA SEAL 047852 PROFESSIONAL ENGIARCH STAMP seeding mixture species Rate (lb/acre) Rye (grain) 120 Annual lespedeza (Kobe in Piedmont and Coastal Plain, Korean in Mountains) 50 Omit annual lespedeza when duration of temporary cover is not to extend beyond June. seeding dates Mountains —Above 2500 feet: Feb. 15 - May 15 Below 2500 feet: Feb. 1- May 1 Piedmont —Jan. 1 - May 1 Coastal Plain —Dec. 1 - Apr. 15 soil amendments Follow recommendations of soil tests or apply 2,000 lb/acre ground agricultural limestone and 750 lb/acre 10-10-10 fertilizer. mulch Apply 4,000 lb/acre straw. Anchor straw by tacking with asphalt, netting or a mulch anchoring tool. A disk with blades set nearly straight can be used as a mulch anchoring tool. maintenance Refertilize if growth is not fully adequate. Reseed, refertilize and mulch immediately following erosion or other damage. seeding mixture species German millet Rate (lb/acre) 40 In the Piedmont and Mountains, a small -stemmed Sudangrass may be I substituted at a rate of 50 lb/acre. seeding dates Mountains —May 15 - Aug. 15 Piedmont —May 1 - Aug. 15 Coastal Plain —Apr. 15 - Aug. 15 soil amendments Follow recommendations of soil tests or apply 2,000 lb/acre ground agricultural limestone and 750 lb/acre 10-10-10 fertilizer. mulch Apply 4,000 lb/acre straw. Anchor straw by tacking with asphalt, nettin , or a mulch anchoring tool. A disk with blades set nearly straight can be used as a mulch anchoring tool. maintenance Refertilize if growth is not fully adequate. Reseed, refertilize and mulch immediately following erosion or other damage. seeding mixture species Rye (grain) Rate (lb/acre) 120 seeding dates Mountains —Aug. 15 - Dec. 15 Coastal Plain and Piedmont —Aug. 15 - Dec. 30 soil amendments Follow soil tests or apply 2,000 lb/acre ground agricultural limestone and 1,000 lb/acre 10-10-10 fertilizer. mulch Apply 4,000 lb/acre straw. Anchor straw by tacking with asphalt, netting or a mulch anchoring tool. A disk with blades set nearly straight can be used as a mulch anchoring tool. maintenance Repair and refertilize damaged areas immediately. Topdress with 50 lb/acre of nitrogen in March. If it is necessary to extent temporary cover beyond June 15, overseed with 50 lb/acre Kobe (Piedmont and Coastal Plain) or Korean (Mountains) lespedeza in late February or early March. TEMPORARY SEEDING NOTES: 1. COMPLETE GRADING BEFORE PREPARING SEEDBEDS, AND INSTALL ALL NECESSARY EROSION CONTROL PRACTICES SUCH AS, DIKES, WATERWAYS, AND BASINS. MINIMIZE STEEP SLOPES BECAUSE THEY MAKE SEEDBED PREPARATION DIFFICULT AND INCREASE THE EROSION HAZARD. IF SOILS BECOME COMPACTED DURING GRADING, LOOSEN THEM TO A DEPTH OF 6-8 INCHES USING A RIPPER, HARROW, OR CHISEL PLOW. SEEDBED PREPARATION 2. GOOD SEEDBED PREPARATION IS ESSENTIAL TO SUCCESSFUL PLANT ESTABLISHMENT. A GOOD SEEDBED IS WELL -PULVERIZED, LOOSE, AND UNIFORM. WHERE HYDROSEEDING METHODS ARE USED, THE SURFACE MAY BE LEFT WITH A MORE IRREGULAR SURFACE OF LARGE CLODS AND STONES. 3. LIMING —APPLY LIME ACCORDING TO SOIL TEST RECOMMENDATIONS. IF THE PH (ACIDITY) OF THE SOIL IS NOT KNOWN, AN APPLICATION OF GROUND AGRICULTURAL LIMESTONE AT THE RATE OF 1 TO 1 1/2 TONS/ACRE ON COARSE -TEXTURED SOILS AND 2-3 TONS/ACRE ON FINE -TEXTURED SOILS IS USUALLY SUFFICIENT. APPLY LIMESTONE UNIFORMLY AND INCORPORATE INTO THE TOP 4-6 INCHES OF SOIL. SOILS WITH A PH OF 6 OR HIGHER NEED NOT BE LIMED. 4. FERTILIZER —BASE APPLICATION RATES ON SOIL TESTS. WHEN THESE ARE NOT POSSIBLE, APPLY A 10-10-10 GRADE FERTILIZER AT 700-1,000 LB/ACRE. BOTH FERTILIZER AND LIME SHOULD BE INCORPORATED INTO THE TOP 4-6 INCHES OF SOIL. IF A HYDRAULIC SEEDER IS USED, DO NOT MIX SEED AND FERTILIZER MORE THAN 30 MINUTES BEFORE APPLICATION. 5. SURFACE ROUGHENING —IF RECENT TILLAGE OPERATIONS HAVE RESULTED IN A LOOSE SURFACE, ADDITIONAL ROUGHENING MAY NOT BE REQUIRED, EXCEPT TO BREAK UP LARGE CLODS. IF RAINFALL CAUSES THE SURFACE TO BECOME SEALED OR CRUSTED, LOOSEN IT JUST PRIOR TO SEEDING BY DISKING, RAKING, HARROWING, OR OTHER SUITABLE METHODS. GROOVE OR FURROW SLOPES STEEPER THAN 3:1 ON THE CONTOUR BEFORE SEEDING (PRACTICE 6.03, SURFACE ROUGHENING). PLANT SELECTION 6. SELECT AN APPROPRIATE SPECIES OR SPECIES MIXTURE FROM TABLE 6.10A FOR SEEDING IN LATE WINTER AND EARLY SPRING, TABLE 6.10B FOR SUMMER, AND TABLE 6.10C FOR FALL. 7. IN THE MOUNTAINS, DECEMBER AND JANUARY SEEDINGS HAVE POOR CHANCES OF SUCCESS. WHEN IT IS NECESSARY TO PLANT AT THESE TIMES, USE RECOMMENDATIONS FOR FALL AND A SECURELY TACKED MULCH. SEEDING 8. EVENLY APPLY SEED USING A CYCLONE SEEDER (BROADCAST), DRILL, CULTIPACKER SEEDER, OR HYDROSEEDER. USE SEEDING RATES GIVEN IN TABLES 6.10A-6.10C. BROADCAST SEEDING AND HYDROSEEDING ARE APPROPRIATE FOR STEEP SLOPES WHERE EQUIPMENT CANNOT BE DRIVEN. HAND BROADCASTING IS NOT RECOMMENDED BECAUSE OF THE DIFFICULTY IN ACHIEVING A UNIFORM DISTRIBUTION. 9. SMALL GRAINS SHOULD BE PLANTED NO MORE THAN 1 INCH DEEP, AND GRASSES AND LEGUMES NO MORE THAN 1/2 INCH. BROADCAST SEED MUST BE COVERED BY RAKING OR CHAIN DRAGGING, AND THEN LIGHTLY FIRMED WITH A ROLLER OR CULTIPACKER. HYDROSEEDED MIXTURES SHOULD INCLUDE A WOOD FIBER (CELLULOSE) MULCH. MULCHING 10. THE USE OF AN APPROPRIATE MULCH WILL HELP ENSURE ESTABLISHMENT UNDER NORMAL CONDITIONS, AND IS ESSENTIAL TO SEEDING SUCCESS UNDER HARSH SITE CONDITIONS (PRACTICE 6.14, MULCHING). HARSH SITE CONDITIONS INCLUDE: • SEEDING IN FALL FOR WINTER COVER (WOOD FIBER MULCHES ARE NOT CONSIDERED ADEQUATE FOR THIS USE), • SLOPES STEEPER THAN 3:1, • EXCESSIVELY HOT OR DRY WEATHER, • ADVERSE SOILS (SHALLOW, ROCKY, OR HIGH IN CLAY OR SAND), AND • AREAS RECEIVING CONCENTRATED FLOW. 11. IF THE AREA TO BE MULCHED IS SUBJECT TO CONCENTRATED WATER FLOW, AS IN CHANNELS, ANCHOR MULCH WITH NETTING (PRACTICE 6.14, MULCHING). TEMPORARY SEEDING MAINTENANCE NOTES: 1. RESEED AND MULCH AREAS WHERE SEEDLING EMERGENCE IS POOR, OR WHERE EROSION OCCURS, AS SOON AS POSSIBLE. DO NOT MOW. PROTECT FROM TRAFFIC AS MUCH AS POSSIBLE. DETAIL SCALE: NTS TEMPORARY SEEDING THE KINDS OF SEED AND FERTILIZER, AND THE RATES OF APPLICATION OF SEED, FERTILIZER, AND LIMESTONE, SHALL BE AS STATED BELOW. DURING PERIODS OF OVERLAPPING DATES, THE KIND OF SEED TO BE USED SHALL BE DETERMINED. ALL RATES ARE IN POUNDS PER ACRE. MARCH 1 - AUGUST 31 504 TALL FESCUE 10# CENTIPEDE 25# BERMUDAGRASS (HULLED) 500# FERTILIZER 4000# LIMESTONE PERMANENT SEEDING NOTES: SEPTEMBER 1 - FEBRUARY 28 504 TALL FESCUE 10# CENTIPEDE 35# BERMUDAGRASS (UNHULLED) 500# FERTILIZER 4000# LIMESTONE SOIL PREPARATION 1. PROPER SOIL PREPARATION IS NECESSARY FOR SUCCESSFUL SEED GERMINATION AND ROOT ESTABLISHMENT. IT IS ALSO NECESSARY FOR ESTABLISHMENT OF ROOTED SPRIGS, SOD AND WOODY PLANTS. HEAVILY COMPACTED SOILS PREVENT AIR, NUTRIENTS AND MOISTURE FROM REACHING ROOTS THEREBY RETARDING OR PREVENTING PLANT GROWTH. THE SUCCESS OF SITE STABILIZATION AND REDUCTION OF FUTURE MAINTENANCE ARE DEPENDENT ON AN ADEQUATELY PREPARED SOIL BED. FOLLOWING ARE THE REQUIREMENTS FOR PREPARATION OF AREAS TO BE VEGETATED BY GRASSING, SPRIGGING, SODDING, AND/OR PLANTING OF WOODY PLANTS: GENERAL REQUIREMENTS: 2. PREPARATION FOR PRIMARY/PERMANENT STABILIZATION SHALL NOT BEGIN UNTIL ALL CONSTRUCTION AND UTILITY WORK WITHIN THE PREPARATION AREA IS COMPLETE. HOWEVER, IT MAY BE NECESSARY TO PREPARE FOR NURSE CROPS PRIOR TO COMPLETION OF CONSTRUCTION AND INSTALLATION OF UTILITIES. 3. A NORTH CAROLINA DEPARTMENT OF AGRICULTURE SOILS TEST (OR EQUAL) SHALL BE OBTAINED FOR ALL AREAS TO BE SEEDED, SPRIGGED, SODDED OR PLANTED. RECOMMENDED FERTILIZER AND PH ADJUSTING PRODUCTS SHALL BE INCORPORATED INTO THE PREPARED AREAS AND BACKFILL MATERIAL PER THE TEST. 4. ALL AREAS TO BE SEEDED OR PLANTED SHALL BE TILLED OR RIPPED TO A DEPTH SPECIFIED ON THE APPROVED PLANS, CONSTRUCTION SEQUENCE AND/OR CONSTRUCTION BID LIST. RIPPING CONSISTS OF CREATING FISSURES IN A CRISS-CROSS PATTERN OVER THE ENTIRE SURFACE AREA, UTILIZING AN IMPLEMENT THAT WILL NOT GLAZE THE SIDE WALLS OF THE FISSURES. SITE PREPARATION THAT DOES NOT COMPLY WITH THESE DOCUMENTS SHALL NOT BE ACCEPTABLE. THE DEPTH OF SOIL PREPARATION MAY BE ESTABLISHED AS A RANGE BASED ON THE APPROVAL OF THE REVIEWING STATE OR LOCAL AGENCY. ONCE TILLED OR RIPPED ACCORDING TO THE APPROVED PLAN, ALL AREAS ARE TO BE RETURNED TO THE APPROVED FINAL GRADE. PH MODIFIERS AND/OR OTHER SOIL AMENDMENTS SPECIFIED IN THE SOIL TESTS CAN BE ADDED DURING THE SOIL PREPARATION PROCEDURE OR AS DESCRIBED BELOW. 5. ALL STONES LARGER THAN THREE (3) INCHES ON ANY SIDE, STICKS, ROOTS, AND OTHER EXTRANEOUS MATERIALS THAT SURFACE DURING THE BED PREPARATION SHALL BE REMOVED. AREAS TO BE SEEDED: 6. TILL OR DISC THE PREPARED AREAS TO BE SEEDED TO A MINIMUM DEPTH OF FOUR (4) INCHES. REMOVE STONES LARGER THAN THREE (3) INCHES ON ANY SIDE, STICKS, ROOTS AND OTHER EXTRANEOUS MATERIALS THAT SURFACE. IF NOT INCORPORATED DURING THE SOIL PREPARATION PROCESS, ADD PH MODIFIER AND FERTILIZERS AT THE RATE SPECIFIED IN THE SOIL TEST REPORT. 7. RE -COMPACT THE AREA UTILIZING A CULTIPACKER ROLLER. THE FINISHED GRADE SHALL BE A SMOOTH EVEN SOIL SURFACE WITH A LOOSE, UNIFORMLY FINE TEXTURE. ALL RIDGES AND DEPRESSIONS SHALL BE REMOVED AND FILLED TO PROVIDE THE APPROVED SURFACE DRAINAGE. SEEDING OF GRADED AREAS IS TO BE DONE IMMEDIATELY AFTER FINISHED GRADES ARE OBTAINED AND SEEDBED PREPARATION IS COMPLETED. AREAS TO BE SPRIGGED, SODDED, AND/OR PLANTED: 8. AT THE TIME OF PLANTING TILL OR DISC THE PREPARED AREAS TO A DEPTH OF FOUR (4) TO SIX (6) INCHES BELOW THE APPROVED FNISHED GRADE. REMOVE ALL STONES LARGER THAN THREE (3) INCHES ON ANY SIDE, STICKS, ROOTS AND OTHER EXTRANEOUS MATERIALS THAT SURFACE. IF NOT INCORPORATED IN THE RIPPING PROCESS, ADD PH MODIFIER, FERTILIZER, AND OTHER RECOMMENDED SOIL AMENDMENTS. 9. RE -COMPACT THE AREA UTILIZING A CULTIPACKER ROLLER AND PREPARE FNAL GRADES AS DESCRIBED ABOVE. INSTALL SPRIGS, SOD AND PLANTS AS DIRECTED IMMEDIATELY AFTER FINE GRADING IS COMPLETE. MULCH, MAT AND/OR TACK AS SPECIFIED. DETAIL 2 SCALE: NTS PERMANENT SEEDING NATIVE GRASS SEEDING SHALL BE PERFORMED ON THE DISTURBED AREAS OF WETLANDS AND RIPARIAN AREAS, AND ADJACENT TO STREAM RELOCATION CONSTRUCTION WITHIN A 50 FOOT ZONE ON BOTH SIDES OF THE STREAM OR DEPRESSION, MEASURED FROM TOP OF STREAM BANK OR CENTER OF DEPRESSION. THE STREAM BANK OF THE STREAM RELOCATION SHALL BE SEEDED BY A METHOD THAT DOES NOT ALTER THE TYPICAL CROSS SECTION OF THE STREAM BANK. NATIVE GRASS SEEDING SHALL ALSO BE PERFORMED IN THE PERMANENT SOIL REINFORCEMENT MAT SECTION OF PREFORMED SCOUR HOLES, AND IN OTHER AREAS AS DIRECTED. THE KINDS OF SEED AND THE RATES OF APPLICATION SHALL BE AS STATED BELOW. DURING PERIODS OF OVERLAPPING DATES, THE KIND OF SEED TO BE USED SHALL BE DETERMINED. ALL RATES ARE IN POUNDS PER ACRE. MARCH 1 -AUGUST 31 18# CREEPING RED FESCUE 6# INDIANGRASS 8# LITTLE BLUESTEM 4# SWITCHGRASS 25# BROWNTOP MILLET 500# FERTILIZER 4000# LIMESTONE APPROVED CREEPING RED FESCUE CULTIVARS: ABERDEEN BOREAL EPIC CINDY LOU SEPTEMBER 1 - FEBRUARY 28 18# CREEPING RED FESCUE 6# INDIANGRASS 8# LITTLE BLUESTEM 4# SWITCHGRASS 35# RYE GRAIN 500# FERTILIZER 4000# LIMESTONE DETAIL 3 SCALE: NTS WETLAND & RIPARIAN SEEDING PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO ENSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 NO. DATE IREVISION(S) DESCRIPTION A 08-28-20201 ISSUED FOR 90% REVIEW B 10-12-20201 ISSUED FOR BID BY CHK JAPPD DESCRIPTION APPROVALS ABR JTG CAM AREA CODE 1841 DATE NIA INITIALS N/A REGIONAL ENGINEER NPR KVG CAM ACCOUNT NUMBER PROJECT NUMBER 0231792 DATE NIA INITIALS N/A MGR TECH REC & STD DRAWING BY ABR STATION ID I DATE 08/25/2020 INITIALS CAM PRINCIPAL ENGINEER CHECKER INITIALS JTG �(' DUKEr6111 Piedmont V ENERGY Natural Gas COPYRIGHT 2018 LINE 129 SECTION 1 ROCKY RIVER H DD ES&PC DETAILS CABARRUS COUNTY, NC INDIAN TRAIL RESOURCE CENTER, INDIAN TRAIL, NORTH CAROLINA REF. DWG(S) SHEET(S) 19 OF 27 1 DWG SCALE NONE DWG DATE 08/28/2020 SUPERSEDED DRAWING NUMBER REVISION P N G-C-129-0001028 B DISCIPLINE / RESOURCE CENTER / LINE NUMBER Slope surface shall be smooth before placement for proper soil contact. If there is a berm at the top of slope, anchor upslope of the berm. 0 ■ Stapling pattern as per manufacturers recommendations. Min. 2" overlap Do not stretch blankets/matting tight -allow the rolls to conform to any irregularities. For slopes less than 3H:1V, rolls may be placed in horizontal strips. �- Anchor in 6"x6" min. Trench and staple at 12" intervals. Min. 6" overlap. Staple overlaps max. 5" spacing. im Bring material down to a level area, turn the end under 4" and staple at 12" intervals. Lime, fertilize, and seed before installation. Planting of shrubs, trees, etc. should occur after installation. INSTALLATION NOTES: GRADE THE SURFACE OF INSTALLATION AREAS SO THAT THE GROUND IS SMOOTH AND LOOSE. WHEN SEEDING PRIOR TO INSTALLATION, FOLLOW THE STEPS FOR SEED BED PREPARATION, SOIL AMENDMENTS, AND SEEDING. ALL GULLIES, RILLS, AND ANY OTHER DISTURBED AREAS MUST BE FINE GRADED PRIOR TO INSTALLATION. SPREAD SEED BEFORE RECP INSTALLATION. (IMPORTANT: REMOVE ALL LARGE ROCKS, DIRT CLODS, STUMPS, ROOTS, GRASS CLUMPS, TRASH, AND OTHER OBSTRUCTIONS FROM THE SOIL SURFACE TO ALLOW FOR DIRECT CONTACT BETWEEN THE SOIL SURFACE AND THE RECP.) TERMINAL ANCHOR TRENCHES ARE REQUIRED AT RECP ENDS AND INTERMITTENT TRENCHES MUST BE CONSTRUCTED ACROSS CHANNELS AT 25-FOOT INTERVALS. TERMINAL ANCHOR TRENCHES SHOULD BE A MINIMUM OF 12 INCHES IN DEPTH AND 6 INCHES IN WIDTH, WHILE INTERMITTENT TRENCHES NEED BE ONLY 6 INCHES DEEP AND 6 INCHES WIDE. PLACE THE RECP 2-3 FEET OVER THE TOP OF THE SLOPE AND INTO AN EXCAVATED END TRENCH MEASURING APPROXIMATELY 12 INCHES DEEP BY 6 INCHES WIDE. PIN THE RECP AT 1 FOOT INTERVALS ALONG THE BOTTOM OF THE TRENCH, BACKFILL, AND COMPACT. UNROLL THE RECP DOWN (OR ALONG) THE SLOPE MAINTAINING DIRECT CONTACT BETWEEN THE SOIL AND THE RECP. OVERLAP ADJACENT ROLLS A MINIMUM OF 3 INCHES. PIN THE RECP TO THE GROUND USING STAPLES OR PINS IN A 3 FOOT CENTER -TO -CENTER PATTERN. LESS FREQUENT STAPLING/PINNING IS ACCEPTABLE ON MODERATE SLOPES. MAINTENANCE NOTES: 1. INSPECT ROLLED EROSION CONTROL PRODUCTS AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (1 INCH OR GREATER) RAIN FALL EVENT REPAIR IMMEDIATELY. 2. GOOD CONTACT WITH THE GROUND MUST BE MAINTAINED, AND EROSION MUST NOT OCCUR BENEATH THE RECP. 3. ANY AREAS OF THE RECP THAT ARE DAMAGED OR NOT IN CLOSE CONTACT WITH THE GROUND SHALL BE REPAIRED AND STAPLED. 4. IF EROSION OCCURS DUE TO POORLY CONTROLLED DRAINAGE, THE PROBLEM SHALL BE FIXED AND THE ERODED AREA PROTECTED. 5. MONITOR AND REPAIR THE RECP AS NECESSARY UNTIL GROUND COVER IS ESTABLISHED. DETAIL SCALE: NTS ROLLED EROSION CONTROL PRODUCTS 6" X 6" RUNNING BOARD - WATTLE BARRIER 5 8" MIN. NCDOT RIP -RAP CLASS A NCDOT GEOTEXTILE FOR DRAINAGE, TYPE 2 � 3�X TIMBER MATS NCDOT GEOTEXTILE FOR DRAINAGE, TYPE 2 TEMPORARY FILL 1. CONSTRUCT COIR WATTLES PARALLEL TO THE ENTIRE CONSTRUCTION R.O.W. TO PREVENT SILT LADEN WATER AND SPOIL FROM FLOWING BACK INTO WATERBODY. 2. REMOVE TEMPORARY FILL AND STABILIZED SLOPE MATERIAL AS SOON AS POSSIBLE AFTER CONSTRUCTION ACCESS IS NO LONGER REQUIRED OR AS OTHERWISE DIRECTED BY COMPANY REPRESENTATIVE. ALL DISTURBED AREAS SHALL BE RETURNED TO ORIGINAL CONDITIONS. 3. DISPOSE OF ANY ROCK AS DIRECTED BY COMPANY REPRESENTATIVE. 4. RESTORE AND STABILIZE BED AND BANKS TO APPROXIMATE PRE -CONSTRUCTION CONDITIONS. 5. TIMBER MATTING BOARDS SHALL BE PLACED IN TWO LAYERS, ONE AFTER ANOTHER ALONG THE ENTIRE LENGTH OF THE STABILIZED SLOPE SUCH THAT THE TWO LAYERS ARE PERPENDICULAR TO EACH OTHER 6. GEOSYNTHETIC FABRIC SHALL BE PLACED BETWEEN THE TWO PERPENDICULAR LAYERS OF MATS AND WRAPPED UP THE SIDES OF THE TOP MAT. RUNNING BOARDS SHALL BE INSTALLED ALONG THE LENGTH OF STABILIZED SLOPE TO PREVENT SEDIMENT LOSS OVER THE EDGES OF THE TOP MAT. 7. RIP -RAP SHALL BE IN ACCORDANCE WITH NCDOT STANDARD SPECIFICATIONS SECTION 876. ALL SUBSEQUENT SECTIONS SHALL APPLY. 8. SHEET PILING MAY BE USED IN PLACE OF STABILIZED SLOPE. SEE SHEET PNG-C-129-0001025. CONSTRUCTION SPECIFICATIONS 5. ENSURE THAT ALL SLOPE DRAIN CONNECTIONS ARE WATERTIGHT. A COMMON FAILURE OF SLOPE DRAINS IS 6. ENSURE THAT ALL FILL MATERIAL IS 4 , CAUSED BY WATER SATURATING THE SOIL AND WELL -COMPACTED. SECURELY FASTEN Diversion -F min ->I Island over inlet SEEPING ALONG THE PIPE. THIS CREATES THE EXPOSED SECTION OF THE DRAIN Dike I.....,:,,;.':�•.;:•':•�i.: ,,,. / k 3;1 VOIDS FROM CONSOLIDATION AND PIPING AND WITH GROMMETS OR STAKES SPACED Hold -dam stakes . ` '`.•':'`� t ;': 1.5r min CAUSES WASHOUTS. PROPER BACKFILLING NO MORE THAN 10 FEET APART. ir•• ".: - j IIII 11 IIII I AROUND AND UNDER THE 7. EXTEND THE DRAIN BEYOND THE TOE OF PIPE "HAUNCHES" WITH STABLE SOIL MATERIAL THE SLOPE, AND ADEQUATELY PROTECT r = H/I I I I IIII��IIICI 1 i , AND HAND COMPACTING IN 6-INCH LIFTS TO THE OUTLET FROM EROSION. 10' spacing IIII- IIII=IfI Inlet IIII-II�«11= ACHIEVE FIRM CONTACT BETWEEN THE PIPE 8. MAKE THE SETTLED, COMPACTED DIKE �,. = III(II11= lilt I I j iIiI=1T AND THE SOIL AT ALL POINTS WILL ELIMINATE RIDGE NO LESS THAN 1 FEET ABOVE THE .. I=IIIIi� =1(� THIS TYPE OF FAILURE. TOP OF THE PIPE AT EVERY POINT. Plastic 9. IMMEDIATELY STABILIZE ALL DISTURBED corrugated 1 IIII(= - pipe A 1. PLACE SLOPE DRAINS ON UNDISTURBED AREAS FOLLOWING CONSTRUCTION. Top of SOIL OR WELL COMPACTED FILL AT IT hand -compacted LOCATIONS AND ELEVATIONS SHOWN ON MAINTENANCE R'nI I I fill (island) THE PLAN. Stabilize `� 1�II= Top of 4' min outlet d 2. SLIGHTLY SLOPE THE SECTION OF PIPE INSPECT THE SLOPE DRAIN AND SUPPORTING Q IIII- iversion U (�' 'A . , .. 0.5' min I` Natural A A UNDER THE DIKE TOWARD ITS OUTLET. DIVERSION AFTER EVERY RAINFALL, AND 1.5'min ground 3:1 3. HAND TAMP THE SOIL UNDER AND PROMPTLY MAKE NECESSARY REPAIRS. WHEN IJ r- -ITT_ d y -1' min >; IIII-IIIII_IIIII- V:`�;'>`..,.:;•._:::;;`:.�":;-�:.,;:�>._<�':,_--_k=11111=IIII= 4 ' min Diversion - = - - - = AROUND THE ENTRANCE SECTION IN THE PROTECTED AREA HAS BEEN I`level section I channel _ _ _ _ _ _ _ _ _ _' LIFTS NOT TO EXCEED 6 INCHES. PERMANENTLY STABILIZED, TEMPORARY 4. ENSURE THAT FILL OVER THE DRAIN AT MEASURES MAY BE REMOVED, MATERIALS THE TOP OF THE SLOPE HAS MINIMUM DISPOSED OF PROPERLY, AND ALL DISTURBED DIMENSIONS OF 1.5 FEET DEPTH, 4 FEET AREAS STABILIZED APPROPRIATELY. TOP WIDTH, AND 3:1 SIDE SLOPES. BURNS & McDONNELL CONSULTANTS, INC. STATE LICENSE # G1435 CLAUDE A McMULLAN IFC SUBMITTAL DATE NORTH CAROLINA SEAL 047852 PROFESSIONAL ENGIARCH STAMP DETAIL 4 SCALE: NTS TEMPORARY SLOPE DRAIN DETAIL 2 SCALE: NTS STABILIZED SLOPE Compacted soil 2' ,< min >I 18 min �l =i >+ ��tllll�lll _•III�IIi II��ilfl - � ��- �� lid Ill�llill't=IIII=�� �II� Illli �T11=1f1i 6' typical -� CONSTRUCTION SPECIFICATIONS 1. REMOVE AND PROPERLY DISPOSE OF ALL TREES, BRUSH, STUMPS, AND OTHER OBJECTIONABLE MATERIAL. 2. ENSURE THAT THE MINIMUM CONSTRUCTED CROSS SECTION MEETS ALL DESIGN REQUIREMENTS. 3. ENSURE THAT THE TOP OF THE DIKE IS NOT LOWER AT ANY POINT THAN THE DESIGN ELEVATION PLUS THE SPECIFIED SETTLEMENT. 4. PROVIDE SUFFICIENT ROOM AROUND DIVERSIONS TO PERMIT MACHINE REGRADING AND CLEANOUT. 5. VEGETATE THE RIDGE IMMEDIATELY AFTER CONSTRUCTION, UNLESS IT WILL REMAIN IN PLACE LESS THAN 30 WORKING DAYS. MAINTENANCE INSPECT TEMPORARY DIVERSIONS ONCE A WEEK AND AFTER EVERY RAINFALL. IMMEDIATELY REMOVE SEDIMENT FROM THE FLOW AREA AND REPAIR THE DIVERSION RIDGE. CAREFULLY CHECK OUTLETS AND MAKE TIMELY REPAIRS AS NEEDED. WHEN THE AREA PROTECTED IS PERMANENTLY STABILIZED, REMOVE THE RIDGE AND THE CHANNEL TO BLEND WITH THE NATURAL GROUND LEVEL AND APPROPRIATELY STABILIZE IT. DETAIL 3 SCALE: NTS TEMPORARY DIVERSION PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO ENSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 NO. DATE IREVISION(S) DESCRIPTION A 08-28-20201 ISSUED FOR 90% REVIEW B 10-12-20201 ISSUED FOR BID BY CHK JAPPD DESCRIPTION ABR JTG CAM AREA CODE 1841 NPR KVG CAM ACCOUNT NUMBER PROJECT NUMBER 0231792 DRAWING BY ABR STATION ID CHECKER INITIALS JTG APPROVALS DATE INITIALS NIA N/A REGIONAL ENGINEER DATE INITIALS MGR TECH NIA N/A REC & STD DATE INITIALS PRINCIPAL 08/25/2020 CAM ENGINEER �(' DUKEr6111 Piedmont V ENERGY Natural Gas COPYRIGHT 2018 LINE 129 SECTION 1 ROCKY RIVER H DD ES&PC DETAILS CABARRUS COUNTY, NC INDIAN TRAIL RESOURCE CENTER, INDIAN TRAIL, NORTH CAROLINA REF. DWG(S) SHEET(S) 20 OF 27 1 DWG SCALE NONE DWG DATE 08/28/2020 SUPERSEDED DRAWING NUMBER REVISION PNG-C-129-0001029 B DISCIPLINE / RESOURCE CENTER / LINE NUMBER Inlet zone 25%cif surface area 5'Crest Width I nflc w Structure Riprap ol or Slope Drain Earthen o embankment with stabilized side slopes First Chamber 25% of surface area Second Chamber 25%of surface area Baffles Outlet zone 25% of surface area Skimmer *Dewatering Device Emergency Spillway jmbbz �� Baffles need to be installed correctly in order to fully provide their benefits. Refer to Figure 6.65b and the following key points: • The baffle material needs to be secured at the bottom and sides using staples. • Most of the sediment will accumulate in the first bay, so this should be readily accessible for maintenance. Drape baffle material over wire strand and secure with plastic ties at posts and on wire every 12' 9 Gauge Min High ___-,_� T Tension Wire Strand 3''A1N.' Shall Be Secured To Post To Support Baffle Material JRFFRI Baffle Material * If the temporary sediment basin will be converted to a permanent stormwater basin of greater depth, the baffle height should be based on the pool depth during use as a temporary sediment basin. Note: Install three (3) coir fiber baffles in basins at drainage outlets with a spacing of 1 /4 the basin length. Two (2) coir fiber baffles can be installed in the basins less than 20 ft. in length with a spacing of 113 the basin length. BURNS & McDONNELL CONSULTANTS, INC. STATE LICENSE # G1435 CLAUDE A McMULLAN IFC SUBMITTAL DATE NORTH CAROLINA SEAL 047852 PROFESSIONAL ENG/ARCH STAMP Extend 9 gauge wire to basin side or install T-post to anchor baffle to side of basin and secure to vertical post 4' Max. i Variable Depth Secure bottom of baffle to ground with i 12"staplesat 12Nmaximum spacing. Baffle Material 11 Gauge Landscaping Staple Steel Post T-0" Depth I Baffle Material should be secured to the bottom and sides of basin using 121andscape staples DETAIL SCALE: NTS POROUS BAFFLES POROUS BAFFLE CONSTRUCTION NOTES: 1. USE MATTING MADE OF 100% COCONUT FIBER (COIR) TWINE WOVEN INTO HIGH STRENGTH MATRIX WITH THE PROPERTIES SHOWN IN TABLE 6.65A. 2. STAPLES SHOULD BE MADE OF 0.125 INCH DIAMETER NEW STEEL WIRE FORMED INTO A `U' SHAPE NOT LESS THAN 12 INCHES IN LENGTH WITH A THROAT OF 1 INCH IN WIDTH. THE STAPLES ANCHOR THE POROUS BAFFLES INTO THE SIDES AND BOTTOM OF THE BASIN. 3. ENSURE THAT STEEL POSTS FOR POROUS BAFFLES ARE OF A SUFFICIENT HEIGHT TO SUPPORT BAFFLES AT DESIRED HEIGHT. POSTS SHOULD BE APPROXIMATELY 1-3/8" WIDE MEASURED PARALLEL TO THE FENCE, AND HAVE A MINIMUM WEIGHT OF 1.25 LB/LINEAR FT. THE POSTS MUST BE EQUIPPED WITH AN ANCHOR PLATE HAVING A MINIMUM AREA OF 14.0 SQUARE INCHES AND BE OF THE SELF -FASTENER ANGLE STEEL TYPE TO HAVE A MEANS OF RETAINING WIRE AND COIR FIBER MAT IN THE DESIRED POSITION WITHOUT DISPLACEMENT. 4. USE 9-GAUGE HIGH TENSION WIRE FOR SUPPORT WIRE. 5. GRADE THE BASIN SO THAT THE BOTTOM IS LEVEL FRONT TO BACK AND SIDE TO SIDE. 6. INSTALL THE COIR FIBER BAFFLES IMMEDIATELY UPON EXCAVATION OF THE BASINS. 7. INSTALL POSTS ACROSS THE WIDTH OF THE SEDIMENT TRAP (PRACTICE 6.62, SEDIMENT FENCE). 8. STEEL POSTS SHOULD BE DRIVEN TO A DEPTH OF 24 INCHES AND SPACED A MAXIMUM OF 4 FEET APART. THE TOP OF THE FABRIC SHOULD BE A MINIMUM OF 6 INCHES HIGHER THAN THE INVERT OF THE SPILLWAY. TOPS OF BAFFLES SHOULD BE A MINIMUM OF 2 INCHES LOWER THAN THE TOP OF THE EARTHEN EMBANKMENT. 9. INSTALL AT LEAST THREE ROWS OF BAFFLES BETWEEN THE INLET AND OUTLET DISCHARGE POINT. BASINS LESS THAN 20 FEET IN LENGTH MAY USE 2 BAFFLES. 10. ATTACH A 9 GAUGE HIGH TENSION WIRE STRAND TO THE STEEL POSTS AT A HEIGHT OF 6 INCHES ABOVE THE SPILLWAY ELEVATION WITH PLASTIC TIES OR WIRE FASTENERS TO PREVENT SAGGING. IF THE TEMPORARY SEDIMENT BASIN WILL BE CONVERTED TO A PERMANENT STORMWATER BASIN OF A GREATER DEPTH, THE BAFFLE HEIGHT SHOULD BE BASED ON THE POOL DEPTH DURING USE AS A TEMPORARY SEDIMENT BASIN. 11. EXTEND 9 GAUGE MINIMUM HIGH TENSION WIRE STRAND TO SIDE OF BASIN OR INSTALL STEEL T-POSTS TO ANCHOR BAFFLE TO SIDE OF BASIN AND SECURE TO VERTICAL END POSTS AS SHOWN IN FIGURE 6.65B. 12. DRAPE THE COIR FIBER MAT OVER THE WIRE STRAND MOUNTED AT A HEIGHT OF 6 INCHES ABOVE THE SPILLWAY ELEVATION. SECURE THE COIR FIBER MAT TO THE WIRE STRAND WITH PLASTIC TIES OR WIRE FASTENERS. ANCHOR THE MATTING TO THE SIDES AND FLOOR OF THE BASIN WITH 12 INCH WIRE STAPLES, APPROXIMATELY 1 FT APART, ALONG THE BOTTOM AND SIDE SLOPES OF THE BASIN. 13. DO NOT SPLICE THE FABRIC, BUT USE A CONTINUOUS PIECE ACROSS THE BASIN 14. ADJUSTMENTS MAY BE REQUIRED IN THE STAPLING REQUIREMENTS TO FIT INDIVIDUAL SITE CONDITIONS. POROUS BAFFLE MAINTENANCE NOTES: 1. INSPECT BAFFLES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. MAKE ANY REQUIRED REPAIRS IMMEDIATELY. 2. BE SURE TO MAINTAIN ACCESS TO THE BAFFLES. SHOULD THE FABRIC OF A BAFFLE COLLAPSE, TEAR, DECOMPOSE, OR BECOME INEFFECTIVE, REPLACE IT PROMPTLY. 3. REMOVE SEDIMENT DEPOSITS WHEN IT REACHES HALF FULL, TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND TO REDUCE PRESSURE ON THE BAFFLES. TAKE CARE TO AVOID DAMAGING THE BAFFLES DURING CLEANOUT, AND REPLACE IF DAMAGED DURING CLEANOUT OPERATIONS. SEDIMENT DEPTH SHOULD NEVER EXCEED HALF THE DESIGNED STORAGE DEPTH. 4. AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED, REMOVE ALL BAFFLE MATERIALS AND UNSTABLE SEDIMENT DEPOSITS, BRING THE AREA TO GRADE, AND STABILIZE IT. STEEL POSTS (QUANTITY VAR.) PLASTIC SLOPE DRAIN PIPE (PRACTICE STANDARD 6.32) OR GEOTEXTILE LINING -_� I°,MAx TEMPORARY OR PERMANENT DITCH SKIMMER-> COIR FIBER BAFFLES - (PRACTICE STANDARD 6.65) RISER STRUCTURE ANTI D1 A nll IIII TOP OF EMBANKMENT SKIMMER (SIZE VAR.) STONE PAD (below skimmer) L TRENCH SECTIONAL VIEW 2' DEEP oiern 1 ��TURE NKMENT STONE ENERGY DISSIPATOR .=i ....-0- MERGENCY SPILLWAY ex WOOD STAKE OR METAL POST MERGENCY SPILLWAY HIV 1 1-JCCF" COLLAR NOTES: 1. SEED AND PLACE MATTING FOR EROSION CONTROL ON INTERIOR AND EXTERIOR SIDESLOPES. 2. INSTALL A MINIMUM OF 3 COIR FIBER BAFFLES IN ACCORDANCE WITH PRACTICE STANDARD 6.65. 3. INSTALL SKIMMER AND COUPLING TO RISER STRUCTURE OR DIRECTLY INTO EMBANKMENT 1 FT. FROM BOTTOM OF BASIN. 4. THE ARM PIPE SHALL HAVE A MINIMUM LENGTH OF 6 FT. BETWEEN THE SKIMMER AND COUPLING. BARREL PIPE STABILIZED OUTLET DETAIL 2 SCALE: NTS SKIMMER SEDIMENT BASIN SKIMMER SEDIMENT BASIN CONSTRUCTION NOTES: 1. Clear, grub, and strip the area under the embankment of all vegetation and root mat. Remove all surface soil containing high amounts of organic matter and stockpile or dispose of it properly. Haul all objectionable material to the designated disposal area. Place temporary sediment control measures below basin as needed 2. Ensure that fill material for the embankment is free of roots, woody vegetation, organic matter, and other objectionable material. Place the fill in lifts not to exceed 9 inches, and machine compact it. Over fill the embankment 6 inches to allow for settlement. 3. Shape the basin to the specified dimensions. Prevent the skimming device from settling into the mud by excavating a shallow pit under the skimmer or providing a low support under the skimmer of stone or timber. 4. Place the barrel (typically 4-inch Schedule 40 PVC pipe) on a firm, smooth foundation of impervious soil. Do not use pervious material such as sand, gravel, or crushed stone as backfill around the pipe. Place the fill material around the pipe spillway in 4-inch layers and compact it under and around the pipe to at least the same density as the adjacent embankment. Care must be taken not to raise the pipe from the firm contact with its foundation when compacting under the pipe haunches. Place a minimum depth of 2 feet of compacted backfill over the pipe spillway before crossing it with construction equipment. In no case should the pipe conduit be installed by cutting a trench through the dam after the embankment is complete. 5. Assemble the skimmer following the manufacturers instructions, or as designed. 6. Lay the assembled skimmer on the bottom of the basin with the flexible joint at the inlet of the barrel pipe. Attach the flexible joint to the barrel pipe and position the skimmer over the excavated pit or support. Be sure to attach a rope to the skimmer and anchor it to the side of the basin. This will be used to pull the skimmer to the side for maintenance. 7. Earthen spillways -Install the spillway in undisturbed soil to the greatest extent possible. The achievement of planned elevations, grade, design width, and entrance and exit channel slopes are critical to the successful operation of the spillway. The spillway should be lined with laminated plastic or impermeable geotextile fabric. The fabric must be wide and long enough to cover the bottom and sides and extend onto the top of the dam for anchoring in a trench. The edges may be secured with 8-inch staples or pins. The fabric must be long enough to extend down the slope and exit onto stable ground. The width of the fabric must be one piece, not joined or spliced; otherwise water can get under the fabric. If the length of the fabric is insufficient for the entire length of the spillway, multiple sections, spanning the complete width, may be used. The upper section(s) should overlap the lower section(s) so that water cannot flow under the fabric. Secure the upper edge and sides of the fabric in a trench with staples or pins. (Adapted from "A Manual for Designing, Installing and Maintaining Skimmer Sediment Basins." February, 1999. J. W. Faircloth & Son.). 8. Inlets -Discharge water into the basin in a manner to prevent erosion. Use temporary slope drains or diversions with outlet protection to divert sediment - laden water to the upper end of the pool area to improve basin trap efficiency (References: Runoff Control Measures and Outlet Protection). 9. Erosion control -Construct the structure so that the disturbed area is minimized. Divert surface water away from bare areas. Complete the embankment before the area is cleared. Stabilize the emergency spillway embankment and all other disturbed areas above the crest of the principal spillway immediately after construction (References: Surface Stabilization). 10. Install porous baffles as specified in Practice 6.65, Porous Baffles. 11. After all the sediment -producing areas have been permanently stabilized, remove the structure and all the unstable sediment. Smooth the area to blend with the adjoining areas and stabilize properly (References: Surface Stabilization). SKIMMER SEDIMENT BASIN MAINTENANCE NOTES: Inspect skimmer sediment basins at least weekly and after each significant (one-half inch or greater) rainfall event and repair immediately. Remove sediment and restore the basin to its original dimensions when sediment accumulates to one-half the height of the first baffle. Pull the skimmer to one side so that the sediment underneath it can be excavated. Excavate the sediment from the entire basin, not just around the skimmer or the first cell. Make sure vegetation growing in the bottom of the basin does not hold down the skimmer. Repair the baffles if they are damaged. Re -anchor the baffles if water is flowing underneath or around them. If the skimmer is clogged with trash and there is water in the basin, usually jerking on the rope will make the skimmer bob up and down and dislodge the debris and restore flow. If this does not work, pull the skimmer over to the side of the basin and remove the debris. Also check the orifice inside the skimmer to see if it is clogged; if so remove the debris. If the skimmer arm or barrel pipe is clogged, the orifice can be removed and the obstruction cleared with a plumber's snake or by flushing with water. Be sure and replace the orifice before repositioning the skimmer. Check the fabric lined spillway for damage and make any required repairs with fabric that spans the full width of the spillway. Check the embankment, spillways, and outlet for erosion damage, and inspect the embankment for piping and settlement. Make all necessary repairs immediately. Remove all trash and other debris from the skimmer and pool areas. Freezing weather can result in ice forming in the basin. Some special precautions should be taken in the winter to prevent the skimmer from plugging with ice. PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY REF. DWG(S) PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO ENSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 NO. DATE REVISION(S) DESCRIPTION BY CHK APPD I DESCRIPTION APPROVALS *811 'GR ENY:: � VENERGDUKE Piedmont Natural Gas COPYRIGHT 2018 LINE 129 SECTION 1 ROCKY RIVER H D D ES&PC DETAILS CABARRUS COUNTY , NC INDIAN TRAIL RESOURCE CENTER, INDIAN TRAIL, NORTH CAROLINA SHEET(S) 21 OF 27 DWG SCALE NONE A 08-28-2020 ISSUED FOR 90% REVIEW ABR JTG CAM AREA CODE 1841 DATE NIA NITIALS NIA REGIONAL ENGINEER DWG DATE 08128/2020 SUPERSEDED B 10-12-2020 ISSUED FORBID NPR KVG CAM ACCOUNT NUMBER PROJECT NUMBER 0231792 DATE NIA INITIALS NIA MTECH REC&STD DRAWING NUMBER PNG-C-129-0001030 REVISION B DRAWING BY ABR STATION ID DATE 08/25/2020 INITIALS CAM PRINCIPAL ENGINEER CHECKER INITIALS JTG DISCIPLINE / RESOURCE CENTER / LINE NUMBER un \ OH / \ \\ \ OH OH \ OH OH 526 \ �s _ \ / off OH - 531 \ \ sal co 77 / \ U / c; _ LID .30 o SOIL STOCKPILE AREA APPROX. 8,600 CYLo / \ N ------_-- \ \ \S2 p -- -_�-�- Lo - ,__� /� a 528 \ � p _ 20, IJ \ o , co j \\518- --7`- -- N11 1 I I \ \ — p\_-- —— — — — — — — NNN \- -- \\\LO \ \ \ \ \ \ \ \ \ \ O \\ \ \ \\ \ \ \\ \ \ \ \\ \ ` \\ \\ NNN \ \ -- — ------------ � \ \ \ \\ \\ \ \ \ \ \ \ \ \ \ 2.90/0 \- - � \� \� \ \ \ \\ \ \ \ \ \\ \ _----------- / 8+00 51^1 SEE PROFILE 1 - _ ---- � ®, PNG-C-129-0001034 NNN NNN —--------�\ �\ �\\\ \\\\� \\\ \ \ \ \-509— O 0x00 a a A Awn \ — — --G---- `�J G-- —G \ G-----G�—\ \\ \ \ \\ \ \ \ \ \ \ \ \ 2 _�—G——G—�\ —� G — ----- �� \ 3\ \ \ �— _8 1 I I \ \ \ \ \\\\\ \ \ \NNN \ 1 / NO NN,NNN / \ \ \ / 31+00 \ \ \ \ \ \ \ \ \\\ \ \ I \ / 1-1 30+00 \ \\ \\ \� \ \\ 20+00 \ \ \� \��� \\ \\\\� \\\ ice/ ���\ \\ \\ \� \\ \ \ �\ \ \\ WOODED /AREA \ \ \ \\ s 7 \ - \ \ \ \ \• \ \ \ \ \ \\ \ \\\\ \\\\� �� �\ S2 \�� �� \\ \ \ \\\\. \ \ \ \ \`S� �� , // \ �Oo• ) �/ /)p / O� 12 00 12+15 \ \ \ \ \ c9 \ \ • 11_ - 0 \ % \ s \ \ \ \ \ \ \\ \\ \ \ I \ \\ \ - - -- - '----- - --- - SEE PROFILE 2 . I \\ \\ \\ \\ \\ \ \ \ \ \ \ \ \ \ \I 11 I- - \ - - �j_ _ _; \ \ ; _ o� - - - - PNG-C-129-0001034 I \ \ — \ \ �� % - SEE PROFILE 1 - � \ ��\\ \ \\��� PNG-C-129-0001034 I \ \ \ A n � . \ BURNS & McDONNELL CONSULTANTS, INC. STATE LICENSE # C-1435 CLAUDE A McMULLAN IFC SUBMITTAL DATE NORTH CAROLINA SEAL 047852 PROFESSIONAL ENG/ARCH STAMP PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO ENSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 NO. DATE REVISION(S) DESCRIPTION BY CHK APPD I DESCRIPTION APPROVALS +r� DUKE Piedmont ied Natural Gas � ENERGY,. COPYRIGHT 2018 LINE 129 SECTION 1 ROCKY RIVER H D D TEMPORARY GRADING PLAN CABARRUS COUNTY NC INDIAN TRAIL RESOURCE CENTER, INDIAN TRAIL, NORTH CAROLINA A 08-28-2020 ISSUED FOR 90% REVIEW ABR JTG CAM AREA CODE 1841 DATE N/A INITIALS N/A REGIONAL ENGINEER B 10-12-2020 ISSUED FORBID NPR KVG CAM ACCOUNT NUMBER PROJECT NUMBER 0231792 DATE N/A INITIALS NIA MGR TECH REC&STD DRAWING BY ABR STATION ID DATE 08/25/2020 INITIALS CAM PRINCIPAL ENGINEER CHECKER INITIALS JTG Q O NOTES: GRAI 1. NET CUT FROM HDD WORK AREA AND ACCESS ROAD = 8,600 CY 2. EXISTING GRADE OF SOIL STOCKPILE AREA = 6% - 7% / 3. STOCKPILE HEIGHT ON SOUTH END = 10' — off 4. STOCKPILE HEIGHT ON NORTH END = 4' 5. SIDE SLOPES OF STOCKPILE = 3:1 PRELIMINARY - NOT 0 30 60 FOR CONSTRUCTION 90% DESIGN REVIEW 1IN = 30FT REF. DWG(S) SHEET(S) 22 OF 27 1 DWG SCALE NONE DWG DATE 08/28/2020 SUPERSEDED DRAWING NUMBER REVISION PNG-C-129-0001033 B DISCIPLINE / RESOURCE CENTER / LINE NUMBER 530 0 .................. .................. ............. o............... 0 ...................... ...................... ..................... ...................... ...................... ........... .... ...... + 0 N. -. . .' . . . . '. . . . . .'. . . . . . . . . . . . ... . . . . . . . . . . . '. . . . . . . . . . . . . . . . . . . . . .'. . . . . '. . . . . . . . . . . . . . . . . . ... . . . . . . . . . . . '. . . . . . . . . . . . . ... . . . . . . . . . . . 525-- co . w LU ..... w ... ........ ....... 85.00'VC ........... ........... 45.00 VC ... ...... . .. ...... o PVI STA. = 23+04.30 0 EVCS = 23+97.51 100.00' VC 60.00 VC PVI ELEV. = 506.13 . EVCE = 508.21 ao . . . . . . PVI STA. = 25+25.89 co 60.00' VC 520 + o CD K = 18.48 + o CD BVCS = 23+52.51 co 6 oo PVI ELEV. = 508.00 co 6 — O PVI STA. = 26+72.65 co - PVI STA. - 21+55.92 M rn N II II N II II BVCE = 507.57 ti + O 00 K = 27.90 + M N rn PVI ELEV. = 513.02 N O o . . . . . . . . . . . . . . . . . . . L6 N co PVI ELEV. = 508.50 N U) C) w C) u) C) w . . C) PVI.ST = 23+75.00 N �� L� . . . . �� N �� o Ln �� + �, K = 18.27 o 1- . . . . . . . . . . + N o LO K = 27.66 + N o LO . . . . . . . . . . > . . . . . . . m > . . m . . . . . . . . . . . . . . . . . . . . .' . > w w . PVI ELEV. = 508.25. . '. v v v . . v . . . . nl N 515 �w �w K=14.22 mm ww Uv Uv m m w w 510 505 500 525 520 515 510 505 500 530 525 M 65.00' VC . . . . . o + � PVI STA. = 27+88.43 co PVI ELEV. = 513.18 N �, " '. " ' `;' o Lo + °r' K = 20.85 00 ¢ `;' 520 N L0 N L0... .......... ... U) U U U U 0- w w m cn w w w.......... ....m m w w . .............. ........ .......... ........ .. ...... .... ..... ...... ...... ..... ........ ..... 0.14% ... ........................ .... .......................... .................... .................... : .I. j. . . .' . . . . . . . . . . '. . . . . . .' . . . : . . . . . . . . . . .' . . . . : . . . . . . '. . . . . . . PROPOSED GRADE . . . . . . . . . . . . '. . . . . . . . . . . . . . 3_ . . . . . . . . 2.98 o' o � ......... ....... ....... 1.60% ................. .... . .3. 0°/0 . .. 0.16% . �. �. .......... ..... z^. w . — . in................. _ ........................ ........�............. �— .... f—.. \/. . TIE TO EXISTING ROAD ...... .......... ...................................... — EXISTING GRADE..... ...... ..... .......... ..... ............. ........................ ........................ CO lzzt L-) O M O Cs LO Lo 0, CA CO 00 f-- 1l- co o0 M CA 00 'I*- N 1l- N Lf) O 00 O CO O co O O co CO CSC LO O 00 CN o0 Lf O O LO I'l- f-- O f-- CN CO M — M— N CA LO OO O O— LO (D U') co MM LO M O co Lf CO cc co Lf) Lr Mf-- M M M O LOLoM M M O U') MN O CO N I` co I` co N ti MCZ)6 O LO co cc CDLO co C 00 CT) I` cn co CV LC cr, O Cn Cn O O CD o6 O O C6 I` O O ti ti O O ti L6 O O I` 4 O O CO L6 O O CO CO O O CO CC O C I` CO O O 06 O O O CO CO O O 06 ti O O 06 06 O O 06 06 (D O 00 ti O O 06 06 O O 06 O O O CT> C O O N N M N cV M N M N M cM M CV N N N C O C O O O O O O Lf7 Lf) LO Lf) Lo Lf Lf7 Lf; LO Lfi LO LO LO Lf") LO LO Lf") Lf) Lf") Lf) Lf") Lf7 Lf") Lf7 LO LO LO Lf Lf") Lf� Lf") L!7 Lf") Lf7 Lf") Lf") LO Lf") Lf") LO Lf") LO Lf") LO Lf") LO Lf") LC Lf") Lf. Lf") LO Lf") Lo Lf") Lf7 Lf") LO LO LO LO LO Lo LO LO LO LO LO LO LC LO Lc LO LO LO 20+00 21+00 22+00 LO ....................... ............. O.. o.. +. . o +. .. . .' . . . . . . '. . . . . . .'. . . . . . . II o � Q II II Ln ¢' II . . . . . . . . . . . . >. . . . . . c) > . . . . . . . . . . . . — w � J . . . . . . . . . . . . . . . . . . . . . . . . . . 0- w ............ ............ ............ .... .. ... ..................................... ... ....................... ..... ................. .....I .....I "Zt 00 co d O LO M O M tt O O :I- co I` CO CA Lq n N CC 00 C) Lf) I` Lf) CO co oC ai oC CS) O O O N CV C-5 O O O C O C O In LO LC) LC LO LC: Lo LO LO L-) LC) n Lf) LC) LC) LC) 10+00 11+00 PROFILE -2 12+00 12+25 525 520 515 510 505 500 23+00 24+00 PROFILE -1 25+00 26+00 27+00 r: N, 0 HORIZONTAL: G 0 VERTICAL: 95 BURNS&MCDONNELLCONSULTANTS, INC. PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY STATE LICENSE # C-1435 Y PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO ENSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 Y CLAUDEA. McMULLAN NO. DATE REVISION(S) DESCRIPTION BY CHK APPD DESCRIPTION APPROVALS IFC SUBMITTAL DATE LINE 129 SECTION 1 ROCKY RIVER H D D A 08-28-2020 ISSUED FOR 90% REVIEW ABR JTG CAM AREA CODE 1841 DATE NITIALS REGIONAL NORTH CAROLINA SEAL047852 N/A NIA ENGINEER rj�DUKE Piedmont l TEMPORARY GRADING PROFILES B 10-12-2020 ISSUED FORBID NPR KVG CAM ACCOUNT NUMBER DATE INITIALS - PROJECT NUMBER 0231792 N/A NIA MGR TECH '� ENERGY Natural Gas DRAWING BY ABR REC&STD CABARRUS COUNTY NC STATION ID DATE INITIALS PRINCIPAL E PROFESSIONAL ENG/ARCHSTAMP 08/25/2020 CAM ENGINEER COPYRIGHT2018 INDIAN TRAIL RESOURCE CENTER, INDIAN TRAIL, NORTH CAROLINA CHECKER INITIALS JTG 29+00 29+25 515 510 505 500 30 60 1IN=30FT PRELIMINARY - NOT 5 10 FOR CONSTRUCTION 1IN = 5FT 90% DESIGN REVIEW REF. DWG(S) SHEET(S) 23 OF 27 1 DWG SCALE NONE DWG DATE 08/28/2020 SUPERSEDED DRAWING NUMBER REVISION P N G-C-129-0001034 B DISCIPLINE / RESOURCE CENTER / LINE NUMBER nnnnr PIPE LOCATION DEPTH OF COVER (A) NORMAL OUTSIDE OF ROW 5'-0" NORMAL INSIDE OF ROW 5'-0" STREAM/WETLAND CROSSING 5'-0" GENERAL ROAD CROSSING 10'-0" STATE ROAD CROSSING 10'-0" PIPELINE DEPTH OF COVER SCALE: N.T.S. WARNING TAPE PIPELINE O,c��TOTh, ti BURNS & McDONNELL CONSULTANTS, INC. STATE LICENSE # G1435 CLAUDE A. McMULLAN IFC SUBMfTTAL DATE NORTH CAROLINA SEAL 047852 PROFESSIONAL ENG/ARCH STAMP ao N DETAIL SCALE: NTS UNDERGROUND WARNING TAPE INSTALLATION DETAIL NOTES: 1. ALL MATERIALS SHALL BE SUPPLIED BY CONTRACTOR. 2. WIDTH SHALL BE INCREASED PROPORTIONAL TO SPACING INCREASE IF REQUIRED. 3. SPACING SHALL BE IN ACCORDANCE WITH PIEDMONT NATURAL GAS STANDARD CM-ST-2060. 4. SUPPORT PILLOWS TO BE OF SUFFICIENT SIZE TO MAINTAIN 6" OF CLEARANCE BETWEEN THE PIPE AND TRENCH BOTTOM. DETAIL 3 SCALE: NTS TYPICAL PIPELINE SUPPORT PILLOWS DETAIL 12" MINIMUM AI THE WAY AROI APPRI OFRAIvil SEE NOTE 5 15.0 FT. MIN. 15.0 FT. MIN. 5.0 FT. TYPICAL SEE NOTE 6 PROFILE z LL 0 N 12" MINIMUM BOTH SIDES GRANULAR FILL, NATIVE FILL, OR MATTING TIMBER FOREIGN PIPE OR UTILITY NOTES: 1. CONTRACTOR TO NOTIFY EXISTING PIPELINE/UTILITY COMPANY PRIOR TO INSTALLATION OF CROSSING RAMP. 2. LENGTH OF RAMP TO VARY IN ACCORDANCE WITH CROSSING ANGLE MINIMUM CROSSING ANGLE TO BE 45 DEGREES. 3. VEHICLES OR EQUIPMENT USING CROSSINGS SHALL PROCEED SLOWLY AND WITH CAUTION TO MINIMIZE IMPACT LOADING AND REDUCTION ON DEPTH OF COVER OVER PIPE/UTILITY. 4. ON COMPLETION OF CONSTRUCTION, CONTRACTOR TO REMOVE COMPLETE RAMP AND RESTORE AREA TO THE SATISFACTION OF THE EXISTING PIPELINE/UTILTY COMPANY AND THE COMPANY'S INSPECTOR. 5. GEOTEXTILE FABRIC (AND GEOTEXTILE GRID WHERE REQUIRED) SHALL BE INSTALLED TO PROTECT NATIVE TOP SOIL AS DIRECTED BY COMPANY'S INSPECTOR WHEN IMPORTED GRANULAR FILL OR NATIVE SUBSOIL FILL MATERIAL IS UTILIZED. IMPORTED GRANULAR FILL MATERIAL OR NATIVE SUBSOIL FILL MATERIAL TO BE REMOVED AND DISPOSED OF AS DIRECTED BY COMPANY'S REPRESENTATIVE. 6. IN ROCK TERRAIN THE CONTRACTOR SHALL, UNDER THE EXISTING PIPELINE COMPANY'S SUPERVISION, EXPOSE THE TOP HALF OF THE PIPE AND BACKFILL WITH COMPACTED SAND OR APPROVED SOIL. DETAIL 2 SCALE: NTS TEMPORARY RAMP CROSSING ABOVE GRADE PIPELINE MARKER UNPAVED SURFACE NOTE: 1. ABOVE GRADE PIPELINE MARKERS TO BE INSTALLED IN GRASS OR UNPAVED AREAS WHEN PIPELINE MARKER IS REQUIRED. DETAIL 4 SCALE: NTS ABOVE GRADE PIPELINE MARKER PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO INSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 NO. DATE REVISION(S) DESCRIPTION A 07-07-2020 ISSUED FOR 60% REVIEW B 08-28-2020 ISSUED FOR 90% REVIEW C 10-12-2020 ISSUED FORBID BY CHK JAPPD DESCRIPTION NPR KVG MMT AREA CODE 1841 NPR KVG CAM ACCOUNT NUMBER NPR KVG CAM PROJECT NUMBER 0231792 DRAWING BY NPR STATION ID CHECKER INITIALS KVG DATE INITIALS NIA N/A DATE INITIALS NIA N/A DATE INITIALS 07/07/2020 CAM APPROVALS REGIONAL ENGINEER eL' DUKE r6111 Piedmont MGR TECH V ENERGY,, Natural Gas REC & STD PRINCIPAL ENGINEER COPYRIGHT 2018 LINE 129 SECTION 1 ROCKY RIVER HDD CONSTRUCTION DETAILS CABARRUS COUNTY, NC INDIAN TRAIL RESOURCE CENTER, INDIAN TRAIL, NORTH CAROLINA NOTES: 1. PIPELINE MARKERS SHALL BE PLACED AT: IN LINE -OF -SIGHT INTERVALS AND TURNING POINTS ALL PUBLIC ROAD CROSSINGS ALL RAILROAD CROSSINGS RIVER, STREAM, CREEK, DITCH AND CANAL CROSSINGS UTILITY CROSSINGS (PER DUKE DISCRETION) SWAMPS OR WETLANDS (ENTRY AND EXIT) ROAD MEDIANS ABOVE GROUND FACILITIES SUCH AS VALVE SETTINGS, BORDER STATIONS, REGULATOR STATIONS, AND PIPELINE INTERCONNECTS UNDERGROUND VALVES HDD ENTRY AND EXIT POINTS 2. PIPELINE MARKERS SHALL BE PLACES DIRECTLY ON TOP OR WITHIN 24 INCHES OF THE PIPELINE. 3. SET MARKERS AS SOON AS PRACTICAL AFTER THE INSTALLATION OF THE PIPELINE. MAKE EVERY EFFORT TO PROVIDE MARKERS BEFORE VEGETATION IS RE-ESTABLISHED AFTER CONSTRUCTION. DETAIL 5 SCALE: NTS PIPELINE MARKER LOCATIONS REF. DWG(S) PNG-G-129-0001016 SHEET(S) 24 OF 27 DWG SCALE AS NOTED DWG DATE 06/15/2020 SUPERSEDED DRAWING NUMBER REVISION PNG-C-129-0001035 C DISCIPLINE / RESOURCE CENTER / LINE NUMBER SIZE 'A' (NO. OF ROWS) CIRCUMFERENCE OF FINISHED LOOPS SIZE 'A' (NO. OF ROWS) CIRCUMFERENCE OF FINISHED LOOPS * PIPE GREATER THAN 20" WILL BE 4 ROWS. 4" 12 16" 18" 5 60" 6" 10 24" 20" 4 * 66" 8" 8 30" 24" 4 72" 10" 6 37" 30" 4 80" 12" 6 43" 32" 1 4 92" 16" 5 54" 36" 1 4 98" (7/8") THREE STRAND TWISTED POLYPROPYLENE HARD LAY ROPE 4"x8" SKIDS OR 2"x8" PLANKS SI TOGETHER R 0 z N �� NOTES: 1. ALL PIPE THAT IS SURPLUS AFTER A CONSTRUCTION PROJECT MUST BE PERMANENTLY STOCKPILED. 2. THE USE OF ALTERNATE METHODS FOR STOCKPILING PIPE AND/OR THE USE OF ALTERNATE MATERIALS FOR PREVENTING PIPE TO PIPE CONTACT SHALL REQUIRE THE APPROVAL OF THE COMPANY REPRESENTATIVE. 3. NUMBER OF ROWS TO BE SPECIFIED BY COMPANY. 4. ALL MATERIALS SHALL BE FURNISHED BY CONTRACTOR. 5. EARTH AND BERMS WILL BE ACCEPTABLE ALTERNATIVES AS APPROVED BY COMPANY REPRESENTATIVE. ROPE INSTALLATION ROPE SPACING SHOULD BE A MAXIMUM OF 6.0 FEET FROM THE PIPE ENDS AND A MAXIMUM OF 6.0 FEET FROM GIRTH WELDS. THE INTERVALS BETWEEN RINGS SHOULD BE BETWEEN 10.0 FEET AND 25.0 FEET WITH A MINIMUM OF FOUR LOOPS SPACED OVER A STANDARD DOUBLE JOINT LENGTH (40 FEET). THE INTERVALS MUST BE ADJUSTED TO INSURE THERE IS NO PIPE TO PIPE CONTACT. ROPE ENDS SHALL BE FUSED WITH A BLOW TORCH PRIOR TO SLIPPING THE LOOP OVER THE PIPE. BURNS & McDONNELL CONSULTANTS, INC. STATE LICENSE # G1435 CLAUDE A. McMULLAN IFC SUBMfTTAL DATE NORTH CAROLINA SEAL 047852 PROFESSIONAL ENG/ARCH STAMP DETAIL SCALE: NTS TYPICAL TEMPORARY PIPE STOCKPILE CONTINUOUS STRIPS OF FLAT RUBBER BELTING. MINIMUM OF 4" WIDE X 1/4" THICK INSTALLED IN LINE WITH THE SUPPORTING SKIDS WITH SHORT STRIPS INSERTED WHERE NECESSARY TO PREVENT PIPE TO PIPE CONTACT. t+rr Kinrr LOOP OF On= _ CHOCKS AT EACH END OF SKIDS EXTERNALLY COATED PIPE f SEE NOTE NO.2 RUBBER BELTING METHOD SPIKED TOGETHER FLAT RUBBER BELTING (NOTE 6) .01 (7/8")1 TWIST HARD 0 z N � Of SEE NOTE NO.5 3 MAX. SEE NOTE NO.5 CIRCUMFERENCE OF LOOPS THE CIRCUMFERENCE OF LOOPS (MINIMUM) SHALL BE IN ACCORDANCE WITH THE FOLLOWING TABLE PIPE O.D. 30" 24" 20" 16" 12" 10" 8" 6" 4" CIRCUMFERENCE OF 98" 80" 66" 54" 43" 37" 30" 34" 34" FINISHED LOOPS V /\ V %jIxI ✓%j VI\ LJVVULL L /\ V PLANKS EXTERNALLY COATED PIPE FLAT RUBBER BELTING (NOTE 6) 2% SLOPE 8" 10' MAX. I10' MAX. I10' MAX. ' T MAX. POLYPROPYLENE ROPE METHOD NOTES: 1. THE USE OF THE RUBBER BELTING METHOD OR THE POLYPROPYLENE ROPE METHOD TO PREVENT PIPE TO PIPE CONTACT IN THE STOCKPILE SHALL BE AS DIRECTED BY THE COMPANY. 2. SITE TO BE GRADED TO 2% SLOPE AND PADDED WITH 8" OF PIT RUN GRAVEL. 3. SKIDS TO BE CAREFULLY LEVELED TO MAINTAIN 2% SLOPE. PIPES TO MAINTAIN CLOSE CONTACT THROUGHOUT ENTIRE LENGTH TO PREVENT SPLITTING AND ROLLING OF THE STOCKPILE. 4. LONGITUDINAL WELDS TO BE ARRANGED AT TOP OF PIPE TO ALIGN WITH SPACES BETWEEN NESTED PIPES. 5. PIPE 4.5" TO 6.625" TO BE STOCKPILED A MAXIMUM OF 4 ROWS HIGH. PIPE 8.625" TO 18" TO BE STOCKPILED A MAXIMUM OF 3 ROWS HIGH. PIPE LARGER THAN 18" TO BE STOCKPILED A MAXIMUM OF 2 ROWS HIGH. 6. THE BOTTOM ROW OF PIPE SHALL REST ON SKIDS PROTECTED BY A CONTINUOUS STRIP OF FLAT RUBBER BELTING. 7. ALL MATERIAL TO BE SUPPLIED BY CONTRACTOR. ROPE INSTALLATION ROPE SPACING SHOULD BE A MAXIMUM OF 6.0 FEET FROM THE PIPE ENDS AND A MAXIMUM OF 6.0 FEET FROM GIRTH WELDS. THE INTERVALS BETWEEN RINGS SHOULD BE BETWEEN 10.0 FEET AND 25.0 FEET WITH A MINIMUM OF FOUR LOOPS SPACED OVER A STANDARD DOUBLE JOINT LENGTH (40 FEET). THE INTERVALS MUST BE ADJUSTED TO INSURE THERE IS NO PIPE TO PIPE CONTACT. ROPE ENDS SHALL BE FUSED WITH A BLOW TORCH PRIOR TO SLIPPING THE LOOP OVER THE PIPE. DETAIL 2 SCALE: NTS TYPICAL PERMANENT PIPE STOCKPILE PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO INSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 NO. DATE REVISION(S) DESCRIPTION BY CHK APPD I DESCRIPTION APPROVALS DUKE r611 Piedmont ENERGY,, Natural Gas COPYRIGHT 2018 LINE 129 SECTION 1 ROCKY RIVER H DD CONSTRUCTION DETAILS CABARRUS COUNTY NC INDIAN TRAIL RESOURCE CENTER, INDIAN TRAIL, NORTH CAROLINA A 07-07-2020 ISSUED FOR 60% REVIEW NPR KVG MMT AREA CODE 1841 DATE NIA INITIALS N/A REGIONAL ENGINEER B 08-28-2020 ISSUED FOR 90% REVIEW NPR KVG CAM ACCOUNT NUMBER C 10-12-2020 ISSUED FORBID NPR KVG CAM PROJECT NUMBER 0231792 DATE NIA INITIALS N/A MGR TECH REC&STD DRAWING BY NPR STATION ID I DATE 07/07/2020 INITIALS CAM PRINCIPAL ENGINEER CHECKER INITIALS KVG REF. DWG(S) PNG-G-129-0001016 SHEET(S) 25 OF 27 1 DWG SCALE AS NOTED DWG DATE 06/15/2020 ISUPERSEDED DRAWING NUMBER REVISION PNG-C-129-0001036 C DISCIPLINE / RESOURCE CENTER / LINE NUMBER BURNS & McDONNELL CONSULTANTS, INC. STATE LICENSE # C-1435 CLAUDE A McMULLAN IFC SUBMrTTAL DATE NORTH CAROLINA SEAL 047852 PROFESSIONAL ENGIARCH STAMP NOTES' 1. Transition piece required any time the wall thickness differential exceeds 3132 inches. 2. Drawing provides a general template for the design and machining of transition pieces on a size and service specific basis. All highlighted information blanks on the drawing must be oompleted prior to issue for construction, 3, Design based upon 49 CFR PART 192, API 1104 and ASME B 31.8 4. Transition piece to be: - Made from pipe with a wall thickness matching the thicker of PIPE 1 and PIPE 2. - Made from i wish a rade maltchin the hi her rade of PIPE 1 and PIPE 2 APPROXIMATELY 140' L PIEDMONT STATION ID - CATALOG NUMBER DISTALLOCATKM: A -DRILL RIG AREA CODE: B - DRILLER'S CONSOLE GENERATOR ACCOUNT NO C - DRILL PIPE 72 PROJECT NO: D - E CRANE PARTS VAN I]RA1NIhIG NO: _ F MUD CLEANING UNIT G -MUD MIXING TANK PIPE 2 DESIGN CONDITIONS DESIGN PRESSURE 1000 PSI FOR TYPICAL . I p pe g to 9 9 � I - Machined such that T1 matches the wall thickness of the thinner of PIPE 1 and PIPE 2. - Designed for an MAOP of 1,000 PSIG, with a design factor of 0.5 runless otherwise � Jf approved by PNG Engineering. 5. Minimum length should typically be the longer of three (3) feat or two times the nominal diameter. Alternative lengths can be investigated based on case specific field conditions.' 6. Transition piece must be pressure tested per PNG standards after machining the taper bore. 7_ Transition piece to be fabricated by a machine shop to ensure compliance with the DETAIL "A' dimensional tolerances. (TYP) S. Transition piece to be marked with the same information as the original pipe. MTR to be submittad to Project Manager or placed in Project ,lob BooK DETAIL SCALE: NTS TAPER BORE DETAIL PIPE 1 CONNECTION SPECIFICATIONS ITEM OUTER DIAMETER 30 INCHES WALL THK (T1) 0.358 INCHES GRADE X70 MAOP 835 PSIG PIPE 2 CONNECTION SPECIFICATIONS ITEM OUTER DIAMETER 30 INCHES WALL THK (T2) 0.500 INCHES GRADE X70 MAOP 1167 PSIG TRANSITION SPECIFICATIONS ITEM OUTER DIAMETER 30 INCHES WALL THK (T1) 0.438 INCHES WALL THK (T2) 0.500 INCHES GRADE X70 LENGTH (L)- SEE NOTE 5 1167 PSIG ENTRY POINT ENTRY POINT I - APPROXIMATELY 100' J C O Lu 0 OF Lu w Q U A u u u 70' _ EXIT POINT ©© I c H - MUD PUMPS A - EXIT PIT B LIFT EQUIPMENT I - MUD PIT ) )H - AREA J - FRAC TANKS D - MUD PITG K - DRILLING MUD E - MUD CLEANING (PALLETS) F - GENERATOR L - PARKING G - FRAC TANKS M - OFFICE TRAILER - CONTAINMENT BERM N - CONTAINMENT BERM PLAN CONCEPTUAL PIPE PROFILE NOTES: WATERBODY REQUIRED DEPTH I PROFILE 1. SET UP DRILLING EQUIPMENT A MINIMUM OF 30 FEET FROM THE EDGE OF THE WATERCOURSE. DO NOT CLEAR OR GRADE WITHIN THE 30 FOOT ZONE. 2. ENSURE THAT ONLY BENTONITE BASED DRILLING MUD IS USED. DO NOT ALLOW THE USE OF ANY ADDITIVES TO THE DRILLING MUD WITHOUT THE APPROVAL OF COMPANY'S INSPECTOR. 3. INSTALL SUITABLE DRILLING MUD TANKS OR SUMPS TO PREVENT CONTAMINATION OF WATERCOURSE. 4. INSTALL BERMS DOWNSLOPE FROM THE DRILL ENTRY AND ANTICIPATED EXIT POINTS TO CONTAIN ANY RELEASE OF DRILLING MUD. 5. DISPOSE OF DRILLING MUD IN ACCORDANCE WITH THE APPROPRIATE REGULATORY AUTHORITY REQUIREMENTS. DETAIL 2 SCALE: NTS CONCEPTUAL CROSSING METHOD FOR HORIZONTAL DIRECTIONAL DRILL EXIT POINT PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO INSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 NO. DATE REVISION(S) DESCRIPTION BY CHK APPD I DESCRIPTION APPROVALS `'DUKE Piedmont VENERGY, r6li: Natural COPYRIGHT 2018 LINE 129 SECTION 1 ROCKY RIVER H D D CONSTRUCTION DETAILS CABARRU S COUNTY, NC INDIAN TRAIL RESOURCE CENTER, INDIAN TRAIL, NORTH CAROLINA A 08-28-2020 ISSUED FOR 90% REVIEW NPR KVG CAM AREA CODE 1841 DATE NIA INITIALS N/A REGIONAL ENGINEER B 10-12-2020 ISSUED FORBID NPR KVG CAM ACCOUNT NUMBER PROJECT NUMBER 0231792 DATE NIA INITIALS N/A MGR TECH REC & STD DRAWING BY NPR STATION ID DATE 08/20/2020 INITIALS CAM PRINCIPAL ENGINEER CHECKER INITIALS KVG REF. DWG(S) SHEET(S) 26 OF 27 DWG SCALE AS NOTED DWG DATE 08/19/2020 SUPERSEDED DRAWING NUMBER REVISION PNG-C-129-0001037 B DISCIPLINE / RESOURCE CENTER / LINE NUMBER BURNS & McDONNELL CONSULTANTS, INC. STATE LICENSE # G1435 CLAUDE A. McMULLAN IFC SUBMITTAL DATE NORTH CAROLINA SEAL 047852 PROFESSIONAL ENG/ARCHSTAMP R/W BOUNDARY NOTES: C/L TRENCH TEMP ESMT SILT FENCE BOUNDARY AC1 nrnl 11 nrn SEE NOTE 7 OPTIONAL / ADDITIONAL TOPSOIL STORAGE HERMANEN I EAbEMEN I /UUNS I RUU I IUN RIUH I -OF-VVAY 1. CONSTRUCTION RIGHT-OF-WAY WILL TYPICALLY BE 60 FEET WIDE. EXTRA TEMPORARY WORK SPACE MAY BE NECESSARY AT MAJOR ROAD AND OTHER SPECIAL CIRCUMSTANCES, AS REQUIRED. CERTAIN SITUATIONS MAY REQUIRE A NARROWER WIDTH. 2. STOCKPILE TOPSOIL AS SHOWN OR IN ANY CONFIGURATION APPROVED BY THE COMPANY'S INSPECTOR. KEEP TOPSOIL CLEAN OF ALL CONSTRUCTION DEBRIS. 3. LEAVE GAPS IN TOPSOIL AND SPOIL PILES AT OBVIOUS DRAINAGE LOCATIONS. DO NOT PUSH TOPSOIL INTO CREEKS OR WETLANDS. DO NOT USE TOPSOIL FOR PADDING. 4. AVOID SCALPING VEGETATED GROUND SURFACE WHEN BACKFILLING SPOIL AND TOPSOIL PILES. 5. SAME LAYOUT APPLIES WHERE CONSTRUCTION R/W DOES NOT ABUT EXISTING R/W. 6. TEMPORARILY SUSPEND TOPSOIL HANDLING OPERATIONS DURING INORDINATELY WINDY CONDITIONS UNTIL MITIGATIVE MEASURES TO MINIMIZE WIND EROSION CAN BE IMPLEMENTED. 7. TOPSOIL AND TRENCH SPOIL RELATIVE POSITIONS CAN, AS DIRECTED BY THE COMPANY'S INSPECTOR, BE REVERSED. DETAIL SCALE: NTS TYPICAL WORKSPACE 2 LAYEF TIED BA 2" X 2" WOODEN STAKE (TYP.) \J 1 1 \rlV v LJrILL\J INSTALL GEOTEXTI LE FABRIC BENEATH ENTIRE DEWATERING STRUCTURE TO PREVENT SCOURING =D kLES. 1. STAKES SECURING "HIGH EFFICIENCY AIR FILTER MEDIA" AND CHICKEN WIRE FENCE ARE NOT SHOWN FOR CLARITY PROPOSES. SECTION A NOT TO SCALE A n11 r-%11 /r Pl Tr PI P7l1 Plr vr,1�v ui--wv SECTION B NOT TO SCALE NOTES: 1. STRUCTURE SHALL BE PLACED ON A SUITABLE, WELL VEGETATED SITE SUCH THAT WATER WILL FLOW AWAY FROM STRUCTURE AND ANY WORK AREAS. 2. FLOW RATES THROUGH DISCHARGE AND DIVERTER PIPES SHALL BE SUCH THAT STRUCTURE WILL NOT OVERFLOW OR AT A RATE NOT GREATER THAN SPECIFIED BY ANY AGENCY PERMIT IF APPLICABLE. 3. WHERE CONDITIONS WARRANTED, A 30" X 30" RECTANGULAR STRUCTURE MAY BE SUBSTITUTED FOR THE CIRCULAR CONFIGURATION SHOWN. 4. DIMENSIONS SHOWN ARE THE MINIMUM ACCEPTABLE VALUES AND MAY VARY DEPENDING ON SPECIFIC LOCATION. 5. CONTRACTOR SHALL PROPERLY REMOVE AND DISPOSE OF DEWATERING STRUCTURE IMMEDIATELY UPON COMPLETION OF DEWATERING PROCEDURE. UNDER NO CIRCUMSTANCES SHALL USED DEWATERING STRUCTURES BE LEFT IN PLACE FOR ANY PERIOD OF TIME GREATER THAN 48 HOURS AFTER TO COMPLETION OF DEWATERING PROCEDURE. DETAIL 2 SCALE: NTS DEWATER DETAIL PROPRIETARY & CONFIDENTIAL ALL RIGHTS RESERVED * DO NOT SCALE THIS DRAWING * USE DIMENSIONS ONLY PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM-1095) * DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE * TO INSURE THERE IS NO RISK OF INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS & INFO. MANAGEMENT (RIM) POLICY 1001 NO. DATE REVISION(S) DESCRIPTION BY CHK APPD I DESCRIPTION APPROVALS `NDUKE r611 Piedmont V ENERGY,: Natural Gas COPYRIGHT 2018 LINE 129 SECTION 1 ROCKY RIVER H D D CONSTRUCTION DETAILS CABARRUS COUNTY NC INDIAN TRAIL RESOURCE CENTER, INDIAN TRAIL, NORTH CAROLINA A 08-28-2020 ISSUED FOR 90% REVIEW NPR KVG CAM AREA CODE 1841 DATE NIA INITIALS N/A REGIONAL ENGINEER B 10-12-2020 ISSUED FORBID NPR KVG CAM ACCOUNT NUMBER PROJECT NUMBER 0231792 DATE NIA INITIALS N/A MGR TECH REC&STD DRAWING BY NPR STATION ID DATE 08/20/2020 INITIALS CAM PRINCIPAL ENGINEER CHECKER INITIALS KVG REF. DWG(S) SHEET(S) 27 OF 27 DWG SCALE AS NOTED DWG DATE 08/19/2020 SUPERSEDED DRAWING NUMBER REVISION P N G-C-129-0001038 i B DISCIPLINE / RESOURCE CENTER / LINE NUMBER ID#* 20201533 Version* 1 Regional Office * Mooresville Regional Office - (704) 663-1699 Reviewer List* Alan Johnson Pre -Filing Meeting Request submitted 10/20/2020 Contact Name* Jesse Brown Contact Email Address* jabrown3@burnsmcd.com Project Name* Rocky River HDD Project Owner* Piedmont Natural Gas Project County* Cabarrus Owner Address: Street Address 4720 Piedmont Row Drive Address Line 2 aty State / Province / Pegion Charlotte NC Postal / Zip axle Country 28210 United States Is this a transportation project?* r Yes r No Type(s) of approval sought from the DWR: * 401 Water Quality Certification - F 401 Water Quality Certification - Regular Express * Individual Permit F Modification F Shoreline Stabilization Does this project have an existing project ID#?* C Yes (-- No Do you know the name of the staff member you would like to request a meeting with? Please give a brief project description below.* The proposed Project includes the replacement of approximately 3,125 linear feet of 30-inch pipe adjacent to an existing Piedmont Natural Gas right of way (ROW). Approximately 725 feet of pipeline would be constructed and installed via open -cut method from the existing ROW to the Horizontal Directional Drill (HDD) entry and exit points and approximately 2,400 feet of pipeline will be installed via HDD method beneath Rocky River. The new pipeline will be approximately 52 feet below ground where it crosses the Rocky River. The portions of pipeline that will be installed via the open -cut method are in an existing active agriculture field on the west side of the Rocky River and in an existing maintained ROW of the east side of the Rocky River. Additional Project components include an approximately 1,800-foot-long temporary pipe string area, an approximately 16-acre temporary area, and 4,875 feet of extant access roads. Please give a couple of dates you are available for a meeting. 10/27/2020 10/28/2020 11 /3/2020 11 /5/2020 Please attach the documentation you would like to have the meeting about. pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. 1 understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. 1 also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature k& Oflftw Submittal Date 10/20/2020