Loading...
HomeMy WebLinkAboutWQ0042093_Application (FTSE)_20201104State of North Carolina Department of Environmental Quality DWR Division of Water Resources 15A NCAC 02T .0300 — FAST TRACK SEWER SYSTEM EXTENSION APPLICATION Division of Water Resources FTA 04-16 & SUPPORTING DOCUMENTATION Application Number: (to be completed by DWR) All items must be completed or the application will be returned I. APPLICANT INFORMATION: 1. Applicant's name: Town of Gibsonville (company, municipality, HOA, utility, etc.) 2. Applicant type: ❑ Individual ❑ Corporation ❑ General Partnership ❑ Federal ❑ State/County ® Municipal 3. Signature authority's name: Ben Baxley per 15A NCAC 02T .0106(b) Title: Town Manager 4. Applicant's mailing address: 129 West Main Street City: Gibsonville State: NC Zip: 27249- 5. Applicant's contact information: Phone number: (336) 449-4144 Email Address: bbaxleykgibsonville.net II. PROJECT INFORMATION: ❑ Privately -Owned Public Utility ❑ Other 1. Project name: Hwy. 61/70 Water & Sewer Extension 2. Application/Project status: ® Proposed (New Permit) ❑ Existing Permit/Project If a modification, provide the existing permit number: WQ00 and issued date: If new construction but part of a master plan, provide the existing permit number: WQ00 3. County where project is located: Guilford 4. Approximate Coordinates (Decimal Degrees): Latitude: 36.08' Longitude:-79.55' 5. Parcel ID (if applicable): 104759 (or Parcel ID to closest downstream sewer) III. CONSULTANT INFORMATION: 1. Professional Engineer: Brent Mills License Number: 048946 Firm: Alley, Williams, Carmen & King Inc. Mailing address: 740 Chapel Hill Road, P.O. Box 1179 City: Burlin tgton State: NC Zip: 27216- Phone number: (336) 226-5534 Email Address: bmills9awck.com IV. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION: 1. Facility Name: South Burlington Wastewater Treatment Plant Permit Number: NC 0023876 Owner Name: City of Burlington V. RECEIVING DOWNSTREAM SEWER INFORMATION (if different than WWTF): 1. Permit Number(s): WQN/A Downstream (Receiving) Sewer Size: 16 inch System Wide Collection System Permit Numbers (applicable): WQCS00349 Owner Name(s): Town of Gibsonville FORM: FTA 04-16 Page 1 of 5 VI. GENERAL REQUIREMENTS 1. If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached? ❑ Yes ❑No ®N/A 2. If the Applicant is a Developer of lots to be sold, has a Developer's Operational Agreement (FORM: DEV) been attached? ❑ Yes ❑No ®N/A 3. If the Applicant is a Home/Property Owners' Association, has an Operational Agreement (FORM: HOA) been attached? ❑ Yes ❑No ®N/A 4. Origin of wastewater: (check all that apply): ® Residential Owned ❑ Retail (stores, centers, malls) ❑ Car Wash ❑ Residential Leased ❑ Retail with food preparation/service ❑ Hotel and/or Motels ❑ School / preschool / day care ❑ Medical / dental / veterinary facilities ❑ Swimming Pool /Clubhouse ❑ Food and drink facilities ❑ Church ❑ Swimming Pool/Filter Backwash ❑ Businesses / offices / factories ❑ Nursing Home ❑ Other (Explain in Attachment) 5. Nature of wastewater: 100 % Domestic/Commercial N/A % Commercial % Industrial (See 15A NCAC 02T .0103(20)) 4,Is there a Pretreatment Program in effect? ❑ Yes ❑ No 6. Hasa flow reduction been approved under 15A NCAC 02T .0114(f)? ❑ Yes ®No ➢ If Yes, provide a copy of flow reduction approval letter 7. Summarize wastewater generated by project: Establishment Type (see 02T.0114(f)) Daily Design Flow a,b No. of Units Flow Single Family Home, 3-bedroom 360 gal/day 3 1,080 GPD gal/ GPD gal/ GPD gal/ GPD gal/ GPD gal/ GPD Total 1,080 GPD a See 15A NCAC 02T .0114(b),d), (e)(1) and (e)(2) for caveats to wastewater design flow rates (i.e., minimum flow per dwelling; proposed unknown non-residential development uses; public access facilities located near high public use areas; and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in G.S. 42A-4). b Per 15A NCAC 02T .0114(c), design flow rates for establishments not identified [in table 15A NCAC 02T.01141 shall be determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data. 8. Wastewater generated by project: 1,080 GPD (per 15A NCAC 02T .0114) ➢ Do not include future flows or previously permitted allocations If permitted flow is zero, indicate why: ❑ Pump Station or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line ❑ Flow has already been allocated in Permit Number: ❑ Rehabilitation or replacement of existing sewer with no new flow expected ❑ Other (Explain): FORM: FTA 04-16 Page 2 of 5 VII. GRAVITY SEWER DESIGN CRITERIA (If Applicable) - 02T .0305 & MDC (Gravity Sewers): 1. Summarize gravity sewer to be permitted: Size (inches) Length (feet) Material 16 3,862 DIP 8 2,456 DIP ➢ Section II & III of the MDC for Permitting of Gravity Sewers contains information related to design criteria ➢ Section III contains information related to minimum slopes for gravity sewer(s) ➢ Oversizing lines to meet minimum slope requirement is not allowed and a violation of the MDC VIII. PUMP STATION DESIGN CRITERIA (If Applicable) — 02T .0305 & MDC (Pump Stations/Force Mains): COMPLETE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT 1. Pump station number or name: 2. Approximate Coordinates (Decimal Degrees): Latitude: Longitude: - ° 3. Design flow of the pump station: millions gallons per day (firm capacity) 4. Operational point(s) of the pump(s): gallons per minute at feet total dynamic head (TDH) 5. Summarize the force main to be permitted (for this Pump Station): Size (inches) Length (feet) Material 6. Power reliability in accordance with 15A NCAC 02T .0305(h)(1): ❑ Standby power source or pump with automatic activation and telemetry - 15A NCAC 02T .0305(h)(1)(B)_ ➢ Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day ➢ Must be permanent to facility Or if the pump station has an average daily flow less than 15,000 gallons per day: ❑ Portable power source with manual activation, quick -connection receptacle and telemetry - 15A NCAC 02T .0305(h)(1)(C) or ❑ Portable pumping unit with plugged emergency pump connection and telemetry - 15A NCAC 02T .0305(h)(1)(C): ➢ It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant (draft agreement) and is compatible with the station. ➢ If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided in the case of a multiple station power outage. FORM: FTA 04-16 Page 3 of 5 IX. SETBACKS & SEPARATIONS — (02B .0200 & 15A NCAC 02T .0305(f)): 1. Does the project comply with all separations found in 15A NCAC 02T .0305(D & (g) ➢ 15A NCAC 02T.0305 contains minimum separations that shall be provided for sewers stems: ® Yes ❑ No Setback Parameter* Separation Required Storm sewers and other utilities not listed below vertical 24 inches Water mains vertical -water over sewer including in benched trenches 18 inches Water mains horizontal 10 feet Reclaimed water lines vertical - reclaimed over sewer 18 inches Reclaimed water lines horizontal - reclaimed over sewer 2 feet **Any private or public water supply source, including any wells, WS-I waters of Class I or Class II impounded reservoirs used as a source of drinking water 100 feet **Waters classified WS (except WS-I or WS-V), B, SA, ORW, HQW, or SB from normal high water or tide elevation and wetlands see item IX.2 50 feet **Any other stream, lake, impoundment, or ground water lowering and surface drainage ditches 10 feet Any building foundation 5 feet Any basement 10 feet Top slope of embankment or cuts of 2 feet or more vertical height 10 feet Drainage systems and interceptor drains 5 feet Any swimming pools 10 feet Final earth grade vertical 36 inches ➢ 15A NCAC 02T.0305W contains alternatives where separations in 02T.0305(t) cannot be achieved. ➢ **Stream classifications can be identified using the Division's NC Surface Water Classifications webpage ➢ If noncompliance with 02T.0305( or (g), see Section X of this application 2. Does the project comply with separation requirements for wetlands? (50 feet of separation) ® Yes ❑ No ❑ N/A ➢ See the Division's draft separation requirements for situations where separation cannot be meet ➢ No variance is required if the alternative design criteria specified is utilized in design and construction ➢ As built documents should reference the location of areas effected 3. Does the project comply with setbacks found in the river basin rules per 15A NCAC 0213.0200? ®Yes ❑ No ❑ N/A ➢ This would include Trout Buffered Streams per 15A NCAC 2B.0202 4. Does the project require coverage/authorization under a 404 Nationwide or ® Yes [—]No individual permits or 401 Water Quality Certifications? ➢ Information can be obtained from the 401 & Buffer Permitting Branch 5. Does project comply with 15A NCAC 02T.0105(c)(6) (additional permits/certifications)? ® Yes ❑ No Per 15A NCAC 02T.0 I 05(c)(6), directly related environmental permits or certification applications are being prepared, have been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and sedimentation control plans, stormwater management plans, etc.). 6. Does this project include any sewer collection lines that are deemed "high -priority?" Per 15A NCAC 02T.0402, "high -priority sewer" means "any aerial sewer, sewer contacting surface waters, siphon, or sewer positioned parallel to streambanks that is subject to erosion that undermines or deteriorates the sewer. ❑ Yes ® No ❑ N/A ➢ If yes, include an attachment with details for each line, including type (aerial line, size, material, and location). High priority lines shall be inspected by the permittee or its representative at least once every six -months and inspections documented per 15A NCAC 02T.0403(a)(5) or the permitee's individual System -Wide Collection permit. FORM: FTA 04-16 Page 4 of 5 X. CERTIFICATIONS: 1. Does the submitted systeni comply with 15A NCAC 02T. the Minimum Design Criteria for the Permittine of Pumn Stations anu cuicc ivlaiAla (iaiwi vcwiuii), and tiro Glavii acwcl Nliniguum DrG ii ii C6ictia 1atcai vclaiun' as appii,.�ablc: ® Yes ❑ No IfNo, complete and submit the Variance/Alternative Design Request application (VADC 10-14) and supporting documents for review. Approval of the request is required prior to submittal of the Fast Track Application and supporting documents. 2. Professional Engineer's Certification: 3. I S. Brent Mills attest that this application for (Professional Engineer's name from Application Item I11.1.) has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications, engineering calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer Minimum Design Criteria for Gravity Sewers (latest version), and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains (latest version). Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and have judged it to be consistent with the proposed design. NOTE -- In accordance with General Statutes 143-215.6A and 143-215.613, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000, as well as civil penalties up to $25,000 per violation. North Carolina Professional Engineer's seal, signature, and date: Applicant's Certification per 15A NCAC 02T .0106(b): I, ,gin Baxley , own (Signature mouger & title from Application Item I.3.) �rSr�1 L �� � •••• F� 1 NEB • � �� j,Fiv B. that this application for has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. f understand that any discharge of wastewater from this non - discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties, injunctive relief, and/or criminal prosecution. I will make no claim against the Division of Water Resources should a condition of this permit be violated. I also understand that if all required parts of this application package are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete. NOTE — In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation. "4 Signature: Date: I11,310 Q 2 FORM: FTA 04-16 Page 5 of 5 State of North Carolina QWR Division of Water Resources Entity Requesting Allocation: Department of Environmental Quality Division of Water Resources Flow Tracking for Sewer Extension Applications (FTSE 10-18) Town of Gibsonville Project Name for which flow is being requested: Hwy. 61/70 Water & Sewer Extension More than one FTSE may be required for a single project if the owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: Town of Gibsonville Collection System b. WWTP Facility Permit #: WQS 00349 All flows are in MGD c. WWTP facility's permitted flow .800 - Gib South Allocation d. Estimated obligated flow not yet tributary to the WWTP e. WWTP facility's actual avg. flow £ Total flow for this specific request g. Total actual and obligated flows to the facility h. Percent of permitted flow used .011540 - Gib South .402000 - Gib South .001080 .413540 - Gib South 51.7% of Gib South Alloc. II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: (A) (B) Design Pump Pump Average Approx. Station Station Firm Daily Flow** Current (Name or Permit Capacity, * (Firm / pf), Avg. Daily Number) No. MGD MGD Flow, MGD (C) (D)=(B+C) (E)=(A-D) Obligated, Not Yet Total Current Tributary Flow Plus Daily Flow, Obligated Available MGD Flow Capacity*** * The Firm Capacity (design flow) of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not less than 2.5, per Section 2.02(A)(4)(c) of the Minimum Design Criteria. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < 0. Downstream Facility Name (Sewer): Town of Gibsonville Downstream Permit Number: WQS00349 Page 1 of 6 FTSE 10-18 III. Certification Statement: I Ben Baxley certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and Il plus all attached planning assessment addendums for which I am the responsible party. Signature of this form certifies that the receiving collection system or treatment works has adequate capacity to transport and treat the proposed new wastewater. Signing Official Signature Title of Signing OjJicial Page 2 of 6 FTSE 10-18 Town of Gibsonville USE - Total WWTP - FY 19-20 Flows GPD Total Flow 660,378 Total Allocation 1,550,000 WWTP - Allocated Flows - Non -Tributary Project Name GPD East Plant Total 66,360 South Plant Total 11,540 Total Allocated - Non Tributary Flows 77,900 Proposed Flows Project Name GPD HWY 61/70 Water&Sewer Extension 1,080 Total Flows 739,358 Permitted Flows 1,550,000 Percentage of Permitted Flow 47.7% Town of Gibsonville - East Plant (North) Allocation East Plant - FY 19-20 Flows Station Name GPD % of Allocation Gibsonville Flow 258,378 34.5% East Plant Allocation 750,000 Travis Creek - Calendar Year 2017 Flows Station Name GPD % of Station Capacity Travis Creek Pump Station 472,378 59.0% Total Flow 472,378 Elon Flow 214,000 Manning Meter Flow (GIB to Elon) 18,000 Gibsonville Flow 258,378 WWTP - Allocated Flows - Non -Tributary Project Name GPD Joseph's Claim - Phase 2, Section 3 36,480 Manning Crossing Phase 5 15,840 Stone Ridge - Preserve 14,040 Total Allocated - Non Tributary Flows 66,360 Total Allocated - Non Tributary Flows - Elon 37,220 Proposed Flows Project Name GPD Total Allocation Flows 338,778 45.2% Total Pump Station Flows (Elon & Gib) 589,998 73.7% Situation GPD % of Capacity Peak Capacity of Station - Current 2,000,000 29.5% Average Daily Flow Capacity - Current 800,000 73.7% Town of Gibsonville - South Plant Allocation South Plant - FY 19-20 Flows Station Name GPD Gibsonville Flow 402,000 South Plant Allocation 800,000 South Plant - Calendar Year 2017 Flows Description GPD Total Flow - South 402,000 Gibsonville Flow - Back Creek 328,000 Gibsonville Flow - Westbrook 74,000 WWTP - Allocated Flows - Non -Tributary Project Name GPD Ashley Woods Phase 3 - (1/2) 4,340 Savannah Glen Phase 4 - (Partial) 7,200 Total Allocated - Non Tributary Flows 11,540 Proposed Flows Project Name GPD HWY 61/70 Water&Sewer Extension 1,080 Total Flows to South Plant 414,620 51.8% Situation GPD % of Capacity Peak Capacity of Station - Current N/A Average Daily Flow Capacity - Current N/A DWR State of North Carolina Department of Environment and Natural Resources Division of Water Resources Mvi-Jon of Water Resiaciytcz., Flow Tracking/Acceptance for Sewer Extension Permit Applications (FTSE 10-18) Entity .Requesting Allocation City of Burlington Project Name for which flow is being requested: Town of Gibsonville Alare than one FTSE may be required for a single project if the owner of the WWTP is not responsible for all pump stations along the route ofthe proposed wastewater flow. 1. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: b. WWTP Facility Permit #: South Burlington WWTP NC0023876 All flows are in MGD c. WWTP facility's permitted flow 12.00 d. Estimated obligated flow not yet tributary to the WWTP 1.783309 e. WWTP facility's actual avg. flow 8,752000 f. Total flow for this specific request .00108 (Gibsonville) g. Total actual and obligated flows to the facility 10.535309 h. Percent of permitted flow used 87.79% H. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP (A) (B) (C) (D)=(B+C) (B)=(A-D) Design Obligated, Average Daily Approx. Not Yet Total Current Pump Station Firm Flow** Current Avg. Tributary Flow Plus (Name or Capacity, * (Firmlpf), Daily Flow, Daily Flow, Obligated Available Number) GPD GPD GPD GPD Flow Capacity*** NONE * The Firm Capacity of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pumpstation divided by a peaking factor (pf) not less than 2.5. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity 5 0. Downstream Facility Name (Sewer) Downstream Permit Number: Unknown 1 of 6 FTSE 10-18 III. Certification Statement: I, W. Todd Lambert, P.E. certify to the best of my knowledge that the addition of the volume of wastewater to e permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning asssessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections 1 and H plus all attached planning assessment addendums for which I am the responsible party. Signature of this form certifies that the receiving collection system or treatment works has adequate capacity to transport and treat the proposed new wastewater. Signing Official Signature Date City Engineer Title of Signing Oficial 2 of 6 FTSE 10-18 aW alley, williams, carmen & king, inc® OKI-ngineering • Architecture • Ltind Sui-vcYing November 16, 2020 Mr. Justin Henderson North Carolina Department of Environmental Quality Division of Water Resources 450 West Hanes Mill Road, Suite 300 Winston-Salem, NC 27105 Subject: Fast Track Application for Gravity Sewers, Pump Stations & Force Mains Town of Gibsonville — Hwy. 61/70 Water & Sewer Extension AWCK Project No. 19016 Dear Mr. Henderson: On behalf of the Town of Gibsonville please find enclosed for your review and approval the following: 1. One (1) Electronic copy of Fast Track Application with required certification. 2. One (1) Electronic copy of Flow Tracking for Sewer Extension Application. 3. Color USGS map showing project and surrounding areas 4. Street Level Map The Town of Gibsonville is installing 3,862 LF of 16" DIP sewer main and 2,456 LF of 8" DIP sewer main to serve future development areas within Town limits. In addition to serving short term developments, the 16" sewer main is sized to be extended to long-term development areas. Should you have any questions or need any additional information, please feel free to contact me. With Best Regards, Alley, Williams, Carmen and King, Inc. S. Brent Mills, P.E. cc: Ben Baxley, Town of Gibsonville 740 Chapel Hill Road (27215) • P.O. Box 1179 • Burlington, North Carolina 27216 Tel. - (336) 226-5534 • Fax - (336) 226-3034 • awck.com ESTABLISHED * 1960 DOWNSTREAM N CONNECTION MANHOLE 70 A.. f j'. Esri CW- lu,r,ir Ma s Contributors, State of North Carolina Legend �y ,,,,,, i . �._ ,� a �4 HERE, Garl�i'n�'� afe' raph, IrNCR'E""-MENT P,'METI/NASAII, USGS, EPA„ +r is Beir?ea U PA, NC CG'I !:Ge �fEye, Ma.a , Proposed Sewer µ; ; . m AR alley, williams, carmen, & king, Inc. HWY 61170 WATER & SEWER EXTENSION EXHIBIT. ENGINEERS & ARCHITECTS STREET LEVEL MAP GIBSONVILLE, GUILFORD COUNTY, N.C. OF 740 chapel hill road p.o. box 1179 SCALE: 1 " = 500' DATE: MAPBY. ton nc 27216 336 226-5534 4 i �•1 t Imo. r ! 47 �• r 1 i + a , f ' •� ance MQiii l r - J �� �=STB -'' LAN 76 - �4 �14 H S ••if I`�J' �' LI r� L �_I u �' t3.tA, Legend Project Site Proposed Sewer- 4J �M , alley, williams, carmen, & king, Inc. HWY 61170 WATER & SEWER EXTENSION EXHIBIT. USGS TOPOGRAPHIC MAP ENGINEERS &ARCHITECTS GIBSONVILLE, GUILFORD COUNTY, N.C. OF 740 chapel hill road p.o. box 1179 SCALE: 1 " = 2, 00WDATE:10112120 MAP BY. SBM burlin ton nc 27216 336 226-5534