HomeMy WebLinkAboutNCC205454_NOI Application_20201125Action History (UTC-05:00) Eastern Time (US & Canada)
Subrrit by Anonymous User 11/24/2020 11:23:37 AM (NCG01 NOI Submission)
Approve by Meloy, Michael 11/24/2020 1:25:45 PM (Review- Construction NOI 37214)
• The task was assigned to Meloy, Michael by round robin distribution 11/24/2020 11:24 AM
The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: November 26, 2020 5:00
PM 11/24/2020 11:24 AM
Submit by Selkane, Aziza 11/25/2020 9:58:41 AM (Payment Verification for NCC205454)
* Bradley Reinhardt
• Selkane, Aziza assigned the task to Selkane, Aziza 11/25/2020 9:57 AM
The task was assigned to DEMLR NCG01 Payment Team. The due date is: January 5, 2021 5:00 PM
11/24/2020 1:26 PM
.• SThF� ';
1
NORTH CAROLINA
EnrlronmertW quallly
A. Project Information
Part A.
Project Location and Waterbody Information
Are you submitting IT No
an NOI that was r Yes
rejected before?
1a. Project Name * Lots @ Windy Hill
1 b. Specific Lot This field any be used to list specifc lot numbers.
Numbers 2 & 3
2. County* Lincoln
3. Highway or Street Windy Hill Road
Address* Street narre only is acceptable if no address number assigned yet
4. City or Township* Lincolnton
5. State * NC
6. Zip Code * 28092
7. Latitude* Enter the latitude in decimal degrees
35.4127
8. Longitude* Enter the longitude in decimal degrees (MUST be negative)
-81.2086
If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of
North Carolina. Look for the coordinates in the bottom left corner.
9. Date to Begin*
12/01/2020
Estimated Construction Project Start Date
10. Date to End*
08/31/2021
Estinated Construction Project End [date
11. SIC (Primary)*
Residential, Single Family Houses (SFE) (1521)
Standard Industrial Classification for Developrrent
12. Acres to be
2.00
disturbed*
(including off -site borrow and waste areas)
13. Total site area 5.50
(acres) *
14. Post- 0.25
construction (Estirrated)
impervious area
(acres) *
NCC Project NCC-LINCO-2020-Lots @ Windy Hill
Tracking ID Assignedautorraticaly
Below you must enter waterbody information for surface waters affected by this project. Please consult
DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. Please
enter only immediate receiving waterbodies - not waters downstream of those unless the project extends there. You
may enter up to 3 waterbodies if needed.
15a. Receiving South Fork Catawba River
Waterbody* Nsrm of waterbody into which stornwater runoff will discharge
15b. Waterbody 11-129-(9.5)
Index No.* NCWaterbody Index Nunber
Stormwater V No
discharges will flow r Yes
to additional
wate rs *
16a. Is this project F Yes
subject to the NC r No, not subject to NC SPCA
Sediment Pollution
Control Act?*
B. Permittee Information
Part B. ^
F2rnittee Inforrration - Legally Fbsponsible Entity and Individual
Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application
form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same
organization. That person must be a responsible corporate officer who owns or operates the construction activity, such
as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV,
Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part
IV, Section B, Item (6) of that permit.
1. Organization Legally Pesponsible Entity
Name * Bradley Reinhardt
It pernittee is an individual (i.e., organization does not apply), enter first and last narre in this field.
Note: The organization name must match the business entity name registered with the NC Secretary of State. You can
verify the registration here.
2. First Name * Bradley
If Corporation, enter Faegistered Agent First %rre
3. Last Name* Reinhardt
It Corporation, enter Pbegistered Agent Last %rre
3b. Title Contractor
4. Permitee E-mail reinhardtl109@att.net
Address*
5. Permittee 704-913-5137
Telephone No.*
6. Permittee Mailing Street Address
Address* 7957 Lucky Creek lane
Address Line 2
City State / Frovince / Fbgion
Denver NC
Fbstal / Zip Code Country
28037 USA
Check box if the V Yes
street address the
same as mailing
address
7. Permittee Street
Street Address
Address*
7957 Lucky Creek lane
Address Line 2
City
State / Frovince / Region
Denver
NC
Fbstal / Zip Code
Country
28037
USA
8. Type of
Individual
Ownership
C. Site Contact Information
Part C.
Roject Site Contact Inforrration
....................................................................................................................................................................................................
1. Primary Site
Bradley
Contact - First
Name *
2. Primary Site
Reinhardt
Contact - Last
Name *
3. Title
Contractor
4. Site Contact E-
reinhardt1109@att.net
mail Address*
5. Site Contact
704-913-5137
Telephone No.
6. Organization
Name
7. Site Contact
Street Address
Mailing Address*
7957 Lucky Creek Lane
Address Line 2
city
Denver
Fbstal / Zip Code
28037
8. Consultant Name
(Optional)
First and Last nacre
9. Consultant E-mail
This person will be copied on all correspondence.
10. Consultant
Telephone No.
State / Rovince / Region
NC
Country
USA
D. E&SC Plan
Part D. ^
Erosion & Sediment Control (E&SC) Ran Approval Information
......................................................................................................................................................................................................................................................................................................................................
1. Date E&SC Plan 11/09/2020
Approved *
2. E&SC Plan Project 20-ML-06
Number/ID * Assigned by agency or local program
3. E&SC Plan f State DEQ Office
Approved by* r Local Program
4. Local Program* Lincoln County
Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a
complete application. For linear projects, please also upload a site map showing the overall extent of the project or
include the beginning point and end point coordinates in the "Notes" box below.
5. E&SC Plan DOC112420.pdf
Approval letter or Mast beRDFformat
Grading Permit
6. Site Location Map Mist be RDFforrrat (lint 20 NB)
1.19MB
Lots @ Windy Hill.pdf 387.46KB
Rease do not upload entire set of E&SC plans.
7. Notes (Optional) Frovide any additional information that night help the reviewer better understand how uploaded documents support
the application. Include additional waterbodies for linear projects if necessary.
8. NOI Certification DOC112420-001.pdf 482.09KB
Form Wst be RDFforrrat
This is an Express r No
Review Project* r Yes
E. Certification
North Carolina General Statute 143-215.66 (1) provides that:
Any person who knowingly makes anyfalse statement, representation, or certification in any application, record, report, plan, or other
document filed or required to be maintained under this Article or a rule implementing this Atide; or who knowingly makes a false statement
of a material fact in a rulemaking proceeding or contested case under this Atcle; or who falsifies, tampers with, or knowingly renders
inaccurate any recording or monitoring device or method required to be operated or maintained under this Atide or rules of the
Commission implementing this Atcle shall be guilty ofa Class 2 misdemeanor which may include a fine not to exceed ten thousand
dollars ($10,000).
Under penalty of law, I certify that:
17 I am the person responsible for the construction activities of this project, for
satisfying the requirements of this permit, and for any civil or criminal penalties
incurred due to violations of this permit.
rJ The information submitted in this NOI is, to the best of my knowledge and belief,
true, accurate, and complete based on my inquiry of the person or persons who
manage the system, or those persons directly responsible for gathering the
information.
* 17 I will abide by all conditions of the NCG010000 General Permit and the
approved Erosion and Sediment Control Plan.
* rJ If the Erosion and Sediment Control Plan approved by the delegated program is
not compliant with Part II (Stormwater Pollution Prevention Plan) of the
NCG010000 General Permit. I will nonetheless ensure that all conditions of Part
II of the permit are met on the project at all times.
* 17 I hereby request coverage under the NCG010000 General Permit and
understand that coverage under this permit will constitute the permit
requirements for the discharge(s) and is enforceable in the same manner as an
individual permit.
Specify if you are:* r The Responsible Person named on this Notice of Intent
f Authorized Responsible Person*
Important: The person who electronically signs this Certification above must be the same person who signs the NOI
Certification Form. If that person is signing on behalf of the Permittee, that individual must be an authorized responsible
person within the same organization as the Permittee. *An authorized individual is a responsible corporate officer who
owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager
that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more
information on signatory requirements, see Part IV, Section B, Item (6) of that permit.
Signature
t. rz��� �:�rrz• t r. ��
Type Name* Bradley Reinhardt
Title Contractor
Organization Legally Iesponsible Entity
Bradley Reinhardt
Date * 11 /24/2020
F. Tracking and COC Info
NOI Tracking No. 37214
NC Reference No.
NCG01-2020-5454
Uses 'count_nurrber' variable (increrrented by SP)
Certificate of
NCC205454
Coverage (COC)
Uses 'count_nurrber' variable (increrrented by SP)
No.*
Count Number 5454
Sequential nurrber for subrrittal that is incremented by Stored Frocedure
COC Year 2020
Year of date reviewed (used to assign YY digits after "NOC' in COCno.)
Initial Invoice No. NCC205454-2020
Invoice Due Date 12/24/2020
Initial Fee $ 100.00
Invoice Status OPEN