Pre-Construction Notification (PCN) Form
For Nationwide Permits and Regional General Permits
(along with corresponding Water Quality Certifications)
September 1, 2020 Ver 3.2
Please note: fields marked with a red asterisk * below are required. You will not be able to submit the form until all mandatory questions are answered.
Also, if at any point you wish to print a copy of the E-PCN, all you need to do is right-click on the document and you can print a copy of the form.
Below is a link to the online help file.
https://edocs.deq.nc.gov/WaterResources/0/edoc/624704/PCN%20Help%20File%202018-1-30.pdf
County (or Countie s) where the proje ct is locate d:*
Is this a NCDM S Proje ct *
Is this project a public transportation project?*
Is this a NCDOT Proje ct?*
(NCDOT only) T.I.P. or state proje ct numbe r:
WBS #*
1a. Type (s) of approv al sought from the Corps:*
1b. What type (s) of pe rmit(s) do you wish to se e k authorization?*
This form may be used to initiate the standard/individual permit process with the Corps. Please contact your Corps representative concerning submittals for standard permits. All required items that
are not provided in the E-PCN can be added to the miscellaneous upload area located at the bottom of this form.
1c. Has the NWP or GP numbe r be e n v e rifie d by the Corps?*
Nationwide Pe rmit (NWP) Numbe r:
NWP Numbe rs (for multiple NWPS):
1d. Type (s) of approv al sought from the DWR:*
1e . Is this notification sole ly for the re cord be cause writte n approv al is not re quire d?
*
For the re cord only for DWR 401 Ce rtification:
For the re cord only for Corps Pe rmit:
A. Processing Information
Brunswick
Yes No
Click Yes, only if NCDMS is the applicant or co-applicant.
Yes No
This is any publicly funded by municipal,state or federal funds road, rail, airport transportation project.
Yes No
DF16616.2170012
(for NCDOT use only)
Section 404 Permit (wetlands, streams and waters, Clean Water Act)
Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act)
Nationwide Permit (NWP)
Regional General Permit (RGP)
Standard (IP)
Yes No
13 - Bank Stabilization
List all NW numbers you are applying for not on the drop dow n list.
check all that apply
401 Water Quality Certification - Regular 401 Water Quality Certification - Express
Non-404 Jurisdictional General Permit Riparian Buffer Authorization
Individual Permit
Yes No
Yes No
1f. Is this an afte r-the -fact pe rmit application?*
1g. Is payme nt into a mitigation bank or in-lie u fe e program propose d for mitigation of impacts?
Acce ptance Le tte r Attachme nt
1h. Is the proje ct locate d in any of NC's twe nty coastal countie s?*
1i. Is the proje ct locate d within a NC DCM Are a of Env ironme ntal Conce rn (AEC)?*
1j. Is the proje ct locate d in a de signate d trout wate rshe d?*
Link to trout information: http://www.saw.usace.army.mil/Missions/Regulatory-Permit-Program/Agency-Coordination/Trout.aspx
1a. Who is the Primary Contact?*
1b. Primary Contact Email:*
1c. Primary Contact Phone :*
1d. Who is applying for the pe rmit?*
1e . Is the re an Age nt/Consultant for this proje ct?*
2. Owner Information
3. Applicant Information (if different from owner)
Yes No
If so, attach the acceptance letter from mitigation bank or in-lieu fee program.
Yes No
Click the upload button or drag and drop files here to attach document
FILE TYPE MUST BE PDF
Yes No
Yes No Unknown
Yes No
B. Applicant Information
Brian Doliber
bcdoliber@ncdot.gov
(xxx)xxx-xxxx
(252)621-6251
Owner Applicant (other than owner)
(Check all that apply)
Yes No
2a. Name (s) on re corde d de e d:*
2b. De e d book and page no.:
2c. Re sponsible party:
2d. Addre ss *
2e . Te le phone Numbe r:*
2f. Fax Numbe r:
2g. Email Addre ss:*
North Carolina Department of Transportation
01147, 1145
(for Corporations)
City
Powells Point
State / Province / Region
NC
Postal / Zip Code
27966
Country
USA
Street Address
159 Lucinda Lane
Address Line 2
(xxx)xxx-xxxx
(252)621-6251
(xxx)xxx-xxxx
bcdoliber@ncdot.gov
3a. Name :*
3b. Business Name :
Brian Doliber
(if applicable)
1a. Name of proje ct:*
1b. Subdivision name :
1c. Ne are st municipality / town:*
2a. Prope rty Identification Numbe r:2b. Prope rty size :
2c. Proje ct Addre ss
2d. Site coordinate s in de cimal de gre e s
Please collect site coordinates in decimal degrees. Use between 4-6 digits (unless you are using a survey-grade GPS device) after the decimal place as appropriate, based on how the location was
determined. (For example, most mobile phones with GPS provide locational precision in decimal degrees to map coordinates to 5 or 6 digits after the decimal place.)
Latitude :*Longitude :*
3. Surface Waters
3a. Name of the ne are st body of wate r to propose d proje ct:*
3b. Wate r Re source s Classification of ne are st re ce iv ing wate r:*
Surface Water Lookup
3c. What riv e r basin(s) is your proje ct locate d in?*
3d. Ple ase prov ide the 12-digit HUC in which the proje ct is locate d.*
River Basin Lookup
4. Project Description and History
4a. De scribe the e xisting conditions on the site and the ge ne ral land use in the v icinity of the proje ct at the time of this application:*
3c. Addre ss *
3d. Te le phone Numbe r:*
3e . Fax Numbe r:
3f. Email Addre ss:*
City
Powells Point
State / Province / Region
NC
Postal / Zip Code
27966
Country
USA
Street Address
159 Lucinda Lane
Address Line 2
(252)621-6251
(xxx)xxx-xxxx (xxx)xxx-xxxx
bcdoliber@ncdot.gov
C. Project I nformation and Prior Project History
1. Project Information
Southport Spoil Site Shoreline Stabilization 2020
(if appropriate)
Southport
2. Project Identification
(tax PIN or parcel ID)
22200009
(in acres)
12.18
City
Southport
State / Province / Region
NC
Postal / Zip Code
28401
Country
USA
Street Address
1650 Ferry Road SE
Address Line 2
39.932887
ex: 34.208504
-77.991897
-77.796371
Cape Fear River
Cape Fear
Cape Fear
030300050803
4b. Hav e Corps pe rmits or DWR ce rtifications be e n obtained for this project (including all prior phase s) in the past?*
4c. If ye s, ple ase giv e the DWR Ce rtification numbe r or the Corps Action ID (e xp. SAW-0000-00000).
Proje ct History Upload
4d. Attach an 8 1/2 X 11 e xce rpt from the most re ce nt v e rsion of the USGS topographic map indicating the location of the proje ct site . (for DWR)
4e . Attach an 8 1/2 X 11 e xce rpt from the most re ce nt v e rsion of the publishe d County NRCS Soil Surv e y map de picting the proje ct site . (for DWR)
4f. List the total e stimate d acre age of all e xisting we tlands on the prope rty:
4g. List the total e stimate d line ar fe e t of all e xisting stre ams on the prope rty:
4h. Explain the purpose of the propose d proje ct:*
4i. De scribe the ov e rall proje ct in de tail, including indirect impacts and the type of e quipme nt to be use d:*
4j. Ple ase upload proje ct drawings for the propose d proje ct.
5. Jurisdictional Determinations
5a. Hav e the we tlands or streams be e n de line ate d on the prope rty or propose d impact are as?*
Comme nts:
5b. If the Corps made a jurisdictional de te rmination, what type of de te rmination was made ?*
Corps AID Numbe r:
5c. If 5a is ye s, who de line ate d the jurisdictional are as?
The land in the vicinity of this project is used for disposal of dredging material. No development exists on the piece of land being used for the spoil site. The ferry terminal is adjacent to
the spoil site and includes paved roads, ferry operations buildings and ferry ramps.
Yes No Unknown
SAW-2005-9988983
20190745
Click the upload button or drag and drop files here to attach document
DWR Permit 6-27-19.pdf 3.82MB
USACE Permit.pdf 795.08KB
File type must be PDF
Click the upload button or drag and drop files here to attach document
NC_Kure_Beach_20160621_TM_geo.pdf 21.7MB
File type must be pdf
Click the upload button or drag and drop files here to attach document
20190606_09121109582_84_Soil_Report.pdf 708.28KB
File type must be pdf
0
(intermittent and perennial)
1700
Storm events in 2018 and 2019 damaged the spoil site berm around the perimeter of the site and impacted the shoreline where no rip rap was present. In 2019, we received permits to
stabilize the section to the southwest of the existing rip rap to prevent further erosion. However, due to budgetary constraints we were not able to complete the project as planned.
In August 2020, Hurricane Isaias caused additional damage to the spoil site southwest of the existing rip rap and also impacted the section to the northwest of existing rip rap. Rather
than only stabilize the currently permitted section, we felt it would be prudent to stabilize all sections that have incurred damage during recent storms, so that additional projects are not
needed in the future.
The NCDOT Ferry Division is looking to stabilize a 100’ section in front of the berm on the eastern side and a 266’ section in front of the berm on the northern end of the Southport spoil
site. Rip rap already exists along the perimeter of much of the spoil site but these sections being referenced have never been stabilized and significant erosion has occurred as a result
of recent storm events. Class 2 rip rap would extend 100’ to the southwest from the current rip rap on the eastern side. On the northern end, Class 2 rip rap would extend 189’ to the
northwest before making a hard turn due west, towards the interior, and extending an additional 77’. The rip rap would be placed on filter fabric, with the toe following the points
established on the drawing and confirmed during the pre-construction meeting. The width of the new rip rap would be 20’ and the overall length of both new and existing rip rap would
be 803’. At no point will the rip rap extend further than 10’ waterward from the NHW line. The proposed open water impacts would prevent additional material loss from the spoil site and
allow it to stay intact in its current form. Following placement of the rip rap, the section of the berm that has experienced significant erosion would be brought back to its pre-storm profile
to match the rest of the spoil site by backfilling with material located on site.
b) The 366' of proposed shoreline stabilization would result in 803' of total shoreline stabilized around the spoil site.
c) The activity will not exceed an average of one cubic yard per running foot. Rip rap placed below the high water mark will average 0.48 cubic yards per running foot cumulatively.
d) Aquatic sites: In order to complete this project as designed, approximately 295 square feet of Spartina alterniflora marsh would need to be impacted. This shoreline is subjected to
large fetch and is oriented in predominate strong seasonal wind directions (Southwest and Northeast). Furthermore, large shipping vessels traverse the Cape Fear and substantial
wake also impacts the shoreline. Evidence of strong erosive forces are visible in the erosion escarpment in the berm wall where the riprap revetment ends. Therefore, the slope of the
berm needs to be maintained in its current location to facilitate a flatter, more stable slope. The riprap revetment with a flatter slope will dissipate wave energy with less toe scour.
Extensions of the existing riprap revetment must begin/tie into the existing toe to eliminate the possibility of new erosion undermining the new and older section of riprap revetment.
Unfortunately, the fringe of marsh on the northeast corner/end of the existing riprap revetment is not large enough to provide the benefit of wave attenuation that the riprap will provide.
The habitat benefits that this small area of marsh provides will be short lived when located seaward of a hardened shoreline in this high wave energy environment.
Click the upload button or drag and drop files here to attach document
SOUTHPORT RIPRAP_LS_SSG_201109 11-09-20.pdf 4.53MB
File type must be pdf
Yes No Unknown
Preliminary Approved Not Verified Unknown N/A
Example: SAW-2017-99999
Name (if known):
Age ncy/Consultant Company:
Othe r:
5d. List the date s of the Corp jurisdiction de te rmination or State de te rmination if a de te rmination was made by the Corps or DWR.
5d1. Jurisdictional de te rmination upload
6. Future Project Plans
6a. Is this a phase d proje ct?*
Are any othe r NWP(s), re gional ge ne ral pe rmit(s), or indiv idual pe rmits(s) use d, or intende d to be use d, to authorize any part of the propose d project or re lated activ ity? This
include s othe r se parate and distant crossing for line ar proje cts that re quire De partme nt of the Army authorization but don’t re quire pre -construction notification.
1. Impacts Summary
1a. Whe re are the impacts associate d with your proje ct? (che ck all that apply):
4. Open Water Impacts
If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water
impacts below.
4a. Site #*(?)4a1. Impact Re ason 4b. Impact type *(?)4c. Name of wate rbody (?)4d. Activ ity type *4e . Wate rbody type *4f. Impact
are a *
4g. Total te mporary ope n wate r Impacts:
4g. Total pe rmane nt ope n wate r impacts:
4g. Total ope n wate r impacts:
4h. Comme nts:
1. Avoidance and Minimization
1a. Spe cifically de scribe me asure s take n to av oid or minimize the propose d impacts in de signing the proje ct:*
1b. Spe cifically de scribe me asure s take n to av oid or minimize the propose d impacts through construction te chnique s:*
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Doe s the proje ct re quire Compe nsatory M itigation for impacts to Wate rs of the U.S. or Wate rs of the State ?
2b. If this proje ct DOES NOT re quire Compe nsatory M itigation, e xplain why:
NC Stream Temperature Classification Maps can be found under the Mitigation Concepts tab on the Wilmington District's RIBITS website.
Brad Shaver
US ACE
10/27/2020
Click the upload button or drag and drop files here to attach document
File type must be PDF
Yes No
D. Proposed Impacts Inventory
Wetlands Streams-tributaries Buffers
Open Waters Pond Construction
Southport Spoil
Site
Shoreline Stabilization P Cape Fear Stabilization Estuary 0.05
(acres)
0.00
0.05
0.05
Approximately 180 cubic yards of rip rap would be placed below MHW along the proposed additional 366' of shoreline to be stabilized.
E. Impact Justification and Mitigation
The extension of the rip rap was designed to limit its placement to only the area in which damage has occurred and is likely to continue to occur in the
future if shoreline stabilization is not performed. Hurricane Isaias proved that what was proposed and permitted in 2019 was too minimal and would not
be sufficient to protect against future storms.
All equipment will perform the work while stationed on a stable, benched berm above MHW.
Yes No
Land disturbance will be minimal and construction activities will temporary and brief.
*** Recent changes to the stormwater rules have required updates to this section .***
1. Diffuse Flow Plan
1a. Doe s the proje ct include or is it adjace nt to prote cte d riparian buffers ide ntifie d within one of the NC Riparian Buffe r Prote ction Rule s?
For a list of options to meet the diffuse flow requirements, click here.
If no, e xplain why:
2. Stormw ater Management Plan
2a. Is this a NCDOT proje ct subje ct to compliance with NCDOT’s Indiv idual NPDES pe rmit NCS000250?*
2b. Doe s this proje ct me e t the re quire me nts for low de nsity proje cts as de fine d in 15A NCAC 02H .1003(2)?*
To look up low density requirement click here 15A NCAC 02H .1003(2).
Comme nts:
1. Environmental Documentation
1a. Doe s the proje ct inv olv e an e xpe nditure of public (fe de ral/state /local) funds or the use of public (fe de ral/state ) land?*
1b. If you answe re d “ye s” to the abov e , doe s the proje ct re quire pre paration of an e nv ironme ntal docume nt pursuant to the re quireme nts of the National or State (North Carolina)
Env ironme ntal Policy Act (NEPA/SEPA)?*
Comme nts:*
2. Violations (DWR Requirement)
2a. Is the site in v iolation of DWR Wate r Quality Ce rtification Rule s (15A NCAC 2H .0500), Isolate d We tland Rule s (15A NCAC 2H .1300), or DWR Surface Wate r or We tland Standards or
Riparian Buffe r Rule s (15A NCAC 2B .0200)?*
3. Cumulative Impacts (DWR Requirement)
3a. Will this proje ct (base d on past and re asonably anticipate d future impacts) re sult in additional de v e lopme nt, which could impact ne arby downstre am wate r quality?*
3b. If you answe re d “no,” prov ide a short narrativ e de scription.
4. Sewage Disposal (DWR Requirement)
4a. Is se wage disposal re quire d by DWR for this proje ct?*
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this proje ct occur in or ne ar an are a with fe de rally prote cte d spe cie s or habitat?*
5b. Hav e you che cke d with the USFWS conce rning Endange re d Spe cie s Act impacts?*
5d. Is anothe r Fe de ral age ncy inv olv e d?*
5e . Is this a DOT proje ct locate d within Div ision's 1-8?*
F. Stormwater M anagement and Diffuse Flow Plan (required by DWR)
Yes No
Yes No
Yes No
G. Supplementary Information
Yes No
Yes No
Modification to an existing permit
Yes No
Yes No
Yes No N/A
Yes No
Yes No
Yes No Unknown
Yes No
5j. What data source s did you use to de te rmine whe the r your site would impact Endange re d Spe cie s or De signate d Critical Habitat?*
Consultation Docume ntation Upload
6. Essential Fish Habitat (Corps Requirement)
6a. Will this proje ct occur in or ne ar an are a de signate d as an Esse ntial Fish Habitat?*
Are the re subme rge d aquatic v e ge tation (SAV) around the proje ct v icinity?*
6b. What data source s did you use to de te rmine whe the r your site would impact an Esse ntial Fish Habitat?*
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
Link to the State Historic Preservation Office Historic Properties Map (does not include archaeological data: http://gis.ncdcr.gov/hpoweb/
7a. Will this proje ct occur in or ne ar an are a that the state , fe de ral or tribal gov e rnme nts hav e de signate d as hav ing historic or cultural pre se rv ation status (e .g., National Historic
Trust de signation or prope rtie s significant in North Carolina history and archae ology)?*
7b. What data source s did you use to de te rmine whe the r your site would impact historic or arche ological re source s?*
7c. Historic or Pre historic Information Upload
8. Flood Zone Designation (Corps Requirement)
Link to the FEM A Floodplain M aps: https://msc.fema.gov/portal/search
8a. Will this proje ct occur in a FEM A-designate d 100-ye ar floodplain?*
8b. If ye s, e xplain how proje ct me e ts FEM A require me nts:
8c. What source (s) did you use to make the floodplain de te rmination?*
Comme nts
M isce llane ous attachme nts not pre v iously re que ste d.
*
I have given true, accurate, and complete information on this form;
I agree that submission of this PCN form is a “transaction” subject to Chapter 66, Article 40 of the NC General Statutes (the “Uniform Electronic Transactions Act”);
I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the “Uniform Electronic Transactions Act”);
I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND
I intend to electronically sign and submit the PCN form.
Full Name :*
Signature *
Consultation with permitting agencies, limited/brief open water impacts and no major land disturbances to occur
Click the upload button or drag and drop files here to attach document
File type must be PDF
Yes No
Yes No Unknown
https://www.habitat.noaa.gov/protection/efh/efhmapper/
Familiarity with construction practices involved in shoreline stabilization
Yes No
The land will not be disturbed in a manner that could impact any potential nearby areas that have such designations.
Click the upload button or drag and drop files here to attach document
File must be PDF
Yes No
https://msc.fema.gov/portal/search?AddressQuery=southport%20nc#searchresultsanchor
M iscellaneous
Click the upload button or drag and drop files here to attach document
DWR Pre-Filing Meeting Request Form.pdf 57.45KB
File must be PDF or KMZ
Signature
By checking the box and signing below, I certify that:
Brian Doliber
Date
11/9/2020