Loading...
HomeMy WebLinkAbout20201692 Ver 1_CAMA Application_20201113 • Major Permit Fee Schedule Project Name: c-rb e l County: ().;,T��S i- Check No &Amount: { �G` r` n- y C t Development Type Fee DCM % DWQ (14300160143510009316256253) (2430016024351000952341) I. Private, non-commercial development that does not involve the filling or $250 100% ($250) 0% ($0) excavation of any wetlands or open water areas: II. Public or commercial development that does not involve the filling or excavation $400 100% ($400) 0% ($0) of any wetlands or open water areas: III. For development that involves the filling and/or excavation of up to 1 acre of wetlands and/or open water areas, determine if A,B, C,or D below applies: 111(A). Private,non-commercial development,if General Water Quality $250 100% ($250) 0% ($0) Certification No 4175 can be applied: 11I(B). Public or commercial development, if General Water Quality Certification $400 100% ($400) 0% ($0) No.4175 can be applied: III(C)_ If General Water Quality i (5fr Certification No.4175 could be applied, �f. � but DCM staff determined that additional $400 ' \/ 60% ($240) 40% ($160) review and written DWQ concurrence needed because of concerns relate. to water quality or aquatic life: • III(D)_ If General Water Quality $400 60% ($240) 40% ($160) Certification No.4175 cannot be applied: IV. Development that involves the filling and/or excavation of more than one acre $475 60% ($285) 40% ($190) of wetlands and/or open water areas: DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT I. APPLICANT'S NAME: Oyster Harbour HOA PROJECT NAME: Oyster Harbour Boat Ramp Replacement 2. LOCATION OF PROJECT SITE: Boones Neck Road @ Windy Point Road, Supply, Brunswick County Coordinates: Latitude N 33°54'45.47" Longitude W 78°20'55.45" 3. INVESTIGATION TYPE: CAMA/Dredge & Fill 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit— 1-8-2020 Was Applicant Present—Yes 5. PROCESSING PROCEDURE: Application Received— 8-11-20 Application Complete-- 11-2-20 Office - Wilmington 6. SITE DESCRIPTION: (A) Local Land Use Plan - Brunswick County Land Classification From LUP - Conservation (B) AEC(s)Involved: PT, CW,EW, ES (C) Water Dependent: Yes (D) Intended Use: Residential Water Access (E) Water and Wastewater Treatment: Existing- None Planned- None (F) Type of Structures: Existing - Parking Lot, Gazebo, Bulkhead, Boat Ramp, Docking Facility Planned - Boat Ramp Replacement (G) Estimated Annual Rate of Erosion: N/A 7. HABITAT DESCRIPTION: [AREA] DREDGED FILLED OTHER N/A N/A N/A (A) Uplands (B) Vegetated Wetlands N/A N/A 1,040 sq. ft. (Shaded) (C) Open Water 215 CY N/A 3,120 sq. ft. (Temporary) (Shallow Bottom Impacts) (D) Total Area Disturbed: 4,160 sq. ft. (.09 acres) (E) Primary Nursery Area: No (F) Water Classification: SA; HQW Open: Yes 8. PROJECT SUMMARY: The applicant proposes to replace the existing boat ramp in the same footprint to serve the Oyster Harbour subdivision. Oyster Harbour Boat Ramp Replacement November 9, 2020 Page 2 9. PROJECT DESCRIPTION The proposed project is located on the mainland side of the AIWW at the end of Boones Neck Rd in Supply, Brunswick County. The property can be reached by traveling NC HWY 17 south towards Shallotte. Take a left hand turn onto Mt. Pisgah Rd SW. Continue for 4 miles onto NC HWY 130 E. Take the first right-hand turn onto Oxpen Rd SW and continue for 1.7 miles. Take a right onto Boones Neck Rd SW and continue for 1.9 miles until the road dead ends into the Oyster Harbour private boat ramp located on the AIWW. The Oyster Harbour HOA began construction of the Oyster Harbour Waterway Park under State Permit# 145- 03, consisting of a parking lot,playground, deck, gazebo,bulkhead, boat ramp, and 9 slip docking facility. A minor modification was issued for State Permit# 145-03 on 7/16/2004 to construct a kayak launching facility consisting of an access pier,ramp, and floating dock. A letter of refinement dated 8/5/2004 authorized the Oyster Harbour HOA to straighten the curve in the elevated portion of the ramp to improve safety and usability. An express major permit was issued on 5/13/2009 (State Permit# 50-09)to add two additional finger piers to the existing docking facility and perform maintenance dredging around the existing boat ramp and boat slips. A maintaince-5 renewal was issued on 4/26/2016 to continue dredging within the existing dredge footprint. Another maintaince-5 renewal was requested on 8/12/2020 but has not been issued as of the complete date of this application. The property consists of a gated,private docking facility, boat ramp,parking lot, and high-ground gazebo. The project site is located on a .72-acre parcel approximately 15' above normal high water(NHW) and is vegetated with typical coastal plain tree species. The parcel has approximately 100' of shoreline frontage along the southern edge of the property and is stabilized by bulkhead. The shoreline is comprised of 404-type wetlands and Coastal Wetlands. Coastal wetlands consisting primarily of Smooth Cord Grass (Spartina alterniflora) and patches of Black Needlerush (Juncus romarianus spp) extend waterward approximately 60' beyond the 404- type wetlands. The width of the waterbody measures approximately 583' from marsh to marsh in the vicinity of the proposed boat ramp. The waters of the AIWW are classified SA by the Division of Water Quality and ARE NOT designated as a Primary Nursery Area(PNA)by the N.C. Division of Marine Fisheries. They are OPEN to the harvest of shellfish. PROPOSED PROJECT The applicant proposes to replace the existing boat ramp in the same footprint to serve the Oyster Harbour subdivision. The applicant proposes to replace the existing 16' x 220' elevated boat ramp in the same footprint as previously permitted (State Permit# 145-03). The boat ramp would consist of 2 sections; a 16' x 114' timber portion that would originate from an upland point and extend due south, and a 16' x 107' cast-in-place concrete portion that would connect to the timber section and continue waterward(See Sheet# 3 of 6). The applicant states that due to the close proximity of the boat ramp to the docking facility, much of the existing fixed pier,pilings, and floating docks would have to be temporarily removed prior to the demolition of the existing boat ramp. Following the demolition of the existing boat ramp, the applicant proposes to install a 28' x 120' temporary sheet-pile coffer dam around the perimeter of the proposed concrete portion of the boat ramp to allow the concrete slabs to be cast in place. Approximately 215 CY of material would be temporarily excavated (maximum depth-8' MLW)from an area of approximately 2,120 sq. ft. within the coffer dam and stored on a floating barge (See Sheet# 5 of 6). The applicant states that the excavation would be necessary to ensure the Oyster Harbour Boat Ramp Replacement November 9,2020 Page 3 lower portion of the proposed concrete elevated boat ramp structure could be constructed at the specified elevations to ensure proper functionality and access during all tide cycles and water levels. Prior to the removal of the coffer dam, the 215 CY of excavated material would be replaced back in the same footprint. The applicant states that upon completion of the proposed boat ramp, all components of the existing docking facility would be reinstalled in the same footprint. All demolition and new construction work would be conducted from the water using floating barges and other small work floats. According to the application, the property has approximately 100 linear feet of shoreline. The proposed boat ramp would encroach within 2' of the adjacent riparian line to the east and within 69' of the adjacent riparian line to the west. Water depths in the vicinity of the proposed boat ramp range from+12.3' MLW to -5.5' MLW near the waterward end of the boat ramp (See Sheet# 5 of 6). The applicant's proposed design extends beyond the 1/4 width limit (approx. 26% of waterbody width)but terminates approximately 98' landward of the USACE 80' Federal Channel setback. 10. ANTICIPATED IMPACTS The proposed boat ramp would result in the shading of approximately 1,040 sq. ft. of Coastal Wetlands and approximately 3,120 sq. ft. of shallow bottom impacts within Estuarine Waters and the Public Trust Area. According to the application, 215 CY of soft bottom would be temporarily excavated near the waterward end of the boat ramp to set concrete slabs in place. The excavated material would be placed back in the same footprint prior to the removal of the coffer dam. As proposed, the boat ramp would be located entirely within the existing boat ramp footprint resulting in no additional impacts that were not previously accounted for under State Permit # 145-03 and State Permit# 50-09. There appears to be no Submerged Aquatic Vegetation nor shellfish beds in the project area. This area is a not a Primary Nursery Area and is open to the harvest of shellfish by the Division of Marine Fisheries. The proposed development would be located outside of the adjacent 15' riparian corridor setback to the west and a waiver was obtained to encroach within the 15' riparian corridor setback to the east. Although the proposed boat ramp length would exceed the 1A width of the waterbody (See Sheet# 3 of 6),the last 70 linear feet of the boat ramp would sit below the MLW mark, allowing for public trust use during normal tidal cycles. As proposed,the boat ramp would remain landward of the 80' Federal Channel setback. Turbidity associated with demolition and new piling installation should be expected. Submitted by: Brendan Brock Date: November 9, 2020 Office: Wilmington Mike Kirby, P.E 1158-1 Village Creek Lane Mount Pleasant SC 29464 mobile: (864)590-0256 mkirby200@comcast.net N.C. P.E,License#: 049560 August 3, 2020 Page 1 of 1 PROJECT NARRATIVE (Oyster Harbour Elevated Boat Ramp Replacement 2020) The property owner, Oyster Harbour Homeowner's Association, Inc. (OHHOA) intends to replace the existing private- community elevated boat ramp. The existing elevated boat ramp has deteriorated over the years to the point that replacement is needed in the near future in order to ensure that community residents can safely launch boats for access to navigable waters for fishing and other recreational purposes. The existing elevated boat ramp consists of two portions. The first portion is constructed of timber support piling, timber pile caps,timber stringers, and timber decking. It begins at the bulkhead that runs along the edge of the upland and extends approximately 114 feet in length out towards the Atlantic Intracoastal Waterway (AIWW). The second portion is constructed of a cast-in-place concrete slab that is supported on timber piling. The existing elevated concrete boat ramp begins at the end of the timber boat ramp (Sta. 1+14) and extends approximately 107 feet; ending at Sta. 2+21. The entire elevated boat ramp, timber and concrete, is approximately 16-feet. in width. A 6"x 8" timber curb guard runs along both sides of the existing boat ramp for the full length. Also, timber guard rails run along both sides of the elevated boat ramp for approximately the first 143 feet. In order to construct the new replacement elevated boat ramp, the existing dilapidated elevated boat ramp will be demolished and disposed offsite. The new replacement elevated boat ramp will be constructed, in place, to the same dimensions(length and width),top elevations, and slopes as the existing structure. The top elevation at the beginning of the new elevated boat ramp will be at+12.3 feet Mean Low Water(MLW) and the top elevation at the lower end of the new elevated boat ramp is-5.5 feet MLW; existing and proposed. The first 114 lineal feet of the new replacement elevated boat ramp will be constructed with treated timber;same as the existing timber elevated boat ramp. The new replacement concrete elevated boat ramp(approximately 107 feet in length)will be constructed of reinforced concrete slabs supported on reinforced concrete pile caps and prestressed concrete piles. A temporary steel sheet piling cofferdam will be installed around the perimeter of the area where the concrete portion of the elevated boat ramp is located. This will allow water to be pumped out to provide dry working access to this below-water area during construction. Additionally, approximately 215 cubic yards of mud will need to be temporarily excavated from an area of approximately 2,120 square feet from within the cofferdam. This is necessary so that the lower portion of the new concrete elevated boat ramp structure can be constructed at the specified elevations to ensure proper functionality and access during all tide cycles and water levels. The excavated material will be temporarily stored on the floating work barge during construction and then will be replaced back in its original locations after construction of the new concrete elevated boat ramp is complete. The temporary cofferdam structure will be removed when construction is complete. Existing adjacent fixed access decks, gangway ramps, and portions of the floating dock will need to be temporarily removed to allow access to the work area during construction. These structures will be replaced back in their original locations once all boat ramp construction is completed. All demolition and new construction work will be conducted from the water using one or two floating barges and other small work floats. As noted above,the proposed new replacement elevated boat ramp structure will be constructed in the same location as the existing structure. The existing elevated boat ramp structure is located within the range of approximately 2-feet to 14-feet from the eastern riparian property line and within the range of approximately 69-feet to 80-feet from the western riparian property line. A riparian property owner waiver will be requested from the neighbor located on the eastern side of the elevated boat ramp property to give permission for the new replacement eleva. oat ramp being constructed inside of the 15-feet riparian offset line. ti ,0l..t\1 END '-)n,ll AUG0 � r t`^^ ;V. ACM Mr-] APPLICATION for Mawr Development Permit (last revised 12/27106) North Carolina DIVISION OF COASTAL MANAGEMENT 1. Primary Applicant/Landowner Information Business Name Project Name(it applicable) Oyster Harbour Homeowner's Association, Inc. Oyster Harbour Boat Ramp Replacement 2020 Applicant 1: First Name MI Last Name JoAnne Schiavone(representative of Oyster Harbour, HOA, Inc.) Applicant 2: First Name MI Last Name If additional applicants,please attach an additional page(s)with names listed. Mailing Address PO Box City State 2182 Clambake Court SW Supply NC ZIP Country Phone No. FAX No. 28462 USA 914-805-3264 ext. - Street Address(if different from above) City State ZIP same Email joanneoh2182@gmaii.com 2. Agent/Contractor information Business Name Mike Kirby, P.E. Agent!Contractor t: First Name MI Last Name Mike W. Kirby Agent/Contractor 2: First Name MI Last Name Mike W. Kirby Mailing Address PO Box City State 1158-1 Village Creek Lane Mount Pleasant SC ZIP Phone No. 1 Phone No. 2 29464 864-590-0256 ext. - - ext. FAX No. Contractor#t N.C. P.E. License#: 049560 Street Address(if different from above) City State ZIP N/A Email mkirby200@comcast.net <Form continues on back? '%1 1 Li �! 7 -1, i 5r, .. 1-888- , __COAST Form DCM MP-1 (Page 2 of 5) APPLICATION for Major Development Permit 3 Project Location County(can be multiple) Street Address State Rd.# Brunswick 3483 Windy Point Road SW 1137 Subdivision Name City State Zip Oyster Harbour Supply NC 28462- Phone No. Lot No.(s) (if many,attach additional page with list) 914-805-3264 ext. #1, a. In which NC river basin is the project located? b. Name of body of water nearest to proposed project Atlantic Intracoastal Waterway(AIWW) AIWW c. is the water body identified in(b)above,natural or manmade? d. Name the closest major water body to the proposed project site. ['Natural ®Manmade ❑Unknown AIWW e. Is proposed work within city limits or planning jurisdiction? f. If applicable,list the planning jurisdiction or city limit the proposed [Yes ®No work falls within. N/A 4. Site Description a. Total length of shoreline on the tract(ft.) b. Size of entire tract(sq.ft.) 100.87 ft. 39,062.51 sq.ft. c. Size of individual lot(s) d. Approximate elevation of tract above NHW(normal high water)or same as above(b), NWL(normal water level) (If many lot sizes,please attach additional page with a list) +15.5 ft. ®NHW or CINWL e. Vegetation on tract Upland:Grass,trees, landscaping,shrubs. Water side: critical area grass f. Man-made features and uses now on tract Currently used as boat landing facility for private/gated community(Oyster Harbour HOA). Features include:paved access road and parking areas,gazebo,fixed pier,floating dock,and boat ramp. g. Identify and describe the existing land uses adiacent to the proposed project site. Residential. h. How does local government zone the tract? i. Is the proposed project consistent with the applicable zoning? R75 (Attach zoning compliance certificate,if applicable) ❑Yes ❑No ):NA j. Is the proposed activity part of an urban waterfront redevelopment proposal? ❑Yes ®No k. Has a professional archaeological assessment been done for the tract? If yes,attach a copy. [Yes ❑No IONA If yes,by whom? I. Is the proposed project located in a National Registered Historic District or does it involve a :Wes ❑No ®NA National Register listed or eligible property? .Form continues on next pages . Ui 252-808-2808 .. 1-888-4RCOAST www.nccoastalmanagement.net Form DCM MP-1 (Page 3 of 5) APPLICATION for Major Development Permit m. (I) Are there wetlands on the site? ❑Yes No (ii)Are there coastal wetlands on the site? ®Yes ❑No (iii)It yes to either(i)or(ii)above,has a delineation been conducted? ❑Yes No (Attach documentation,if available) n. Describe existing wastewater treatment facilities. N/A o. Describe existing drinking water supply source. N/A p. Describe existing storm water management or treatment systems. N/A 5. Activities and Impacts a. Will the project be for commercial,public,or private use? ❑Commercial ❑Public/Govemment ®Private/Community b. Give a brief description of purpose,use,and daily operations of the project when complete. The existing community elevated boat ramp is in a deteriorated condition and needs to be replaced in the near future. The Oyster Harbour HOA intends to replace the existing elevated boat ramp as soon as agency approval can be obtained and a contractor can be selected. The elevated boat ramp is contained within a private gated facility and used by members of the Oyster Harbour community for boating access to navigable waters for recreation and fishing. c. Describe the proposed construction methodology,types of construction equipment to be used during construction,the number of each type of equipment and where it is to be stored. Barge-mounted crane and equipment will be used to demolish the existing elevated boat ramp,load onto a barge, and transport to an offsite disposal facility. Timber and concrete support piles for the new replacement elevated boat ramp will be driven by a pile-driving hammer that is attached to a barge-mounted crane. A temporary steel sheet piling cofferdam will be installed around the lower portion of the elevated boat ramp(concrete portion)so that the concrete ramp can be constructed to the required below-water elevations. Approx.215 CY of material(mud)will need to be excavated temporarily from within the cofferdam to allow access for construction. After construction of the new concrete elevated boat ramp is complete,the excavated material will be replaced back in its original locations;and prior to removal of the temporary cofferdam. The upper(timber)portion of the new replacement elevated boat ramp will consist of pile-supported heavy timber framing/stringers with timber decking. The lower(concrete)portion of the new replacement elevated boat ramp will be supported on prestressed concrete piles and reinforced concrete pile caps,and the boat ramp surface will consist of reinforced concrete slabs. The temporary sheet piling cofferdam will be removed once construction of the lower(concrete) portion of the new elevated boat ramp is complete. Construction equipment will consist of:one or two floating barge(s)for equipment and material,one tracked crane with diesel-powered pile-driving hammer,one vibratory hammer for sheeting piling installation and extraction,one tracked excavator,one tug boat,one small dingy for access to land,two small floating work platforms,and various small power tools. All demolition and construction will be performed by water-working from the equipment and material barge(s). d. List all development activities you propose. Demolition/disposal of existing elevated timber and concrete boat ramp and construction of a new elevated timber and concrete replacement boat ramp. The new replacement elevated boat ramp will be constructed in the same location and to the same lines and grades/elevations as the existing dilapidated elevaetd boat ramp. e. Are the proposed activities maintenance of an existing project,new work,or both? both:(demolition of the existing structure and replacement with new) f. What is the approximate total disturbed land area resulting from the proposed project? 5,142 ®Sq.Ft or DAcres g. Will the proposed project encroach on any public easement,public accessway or other area ❑Yes ®No DNA that the public has established use of? 252-808-2808 1-888-4RCOAST www.nccoastalmari-agermettt,n'et Form DCM MP-1 (Page 4 of 5) APPLICATION for Major Development Permit h. Describe location and type of existing and proposed discharges to waters of the state. None i. Will wastewater or stormwater be discharged into a wetland? Yes ®No DNA If yes,will this discharged water be of the same salinity as the receiving water? Dyes ❑No ®NA j. Is there any mitigation proposed? ❑Yes ®No DNA If yes,attach a mitigation proposal. <Form continues on back> 6. Additional information In addition to this completed application form,(MP-1)the following items below,if applicable,must be submitted in order for the application package to be complete. Items(a)—(t)are always applicable to any major development application. Please consult the application instruction booklet on how to property prepare the required items below. a. A project narrative. b. An accurate,dated work plat(including plan view and cross-sectional drawings)drawn to scale. Please give the present status of the proposed project. Is any portion already complete? If previously authorized work,clearly indicate on maps,plats,drawings to distinguish between work completed and proposed. c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site. d. A copy of the deed(with state application only)or other instrument under which the applicant claims title to the affected properties. e. The appropriate application fee. Check or money order made payable to DENR. f. A list of the names and complete addresses of the adjacent waterfront(riparian)landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Name North Carolina Department of Transportation(c/o: Angel Hammers) Phone No.(910)398-9100 Address 300 Division Drive; Wilmington,NC; 28401 Name William Neil&Heather Seater Phone No.N/A Address 3491 Windy Point Rd.SW;Supply,NC 29462 Name Phone No. Address g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers,permittee,and issuing dales. NC DCM#:145-03;Oyster Harbour,LLC; 10-16-03 DWQ Cert#:3351;Proj.#:021590;Oyster Harbour LLC;8-2-03 DLR Proj.#:BR-02185;Oyster Harbour,LLC; 04-17-02 SW#:8020411;Oyster Harbour,LLC; 08-01-02 h. Signed consultant or agent authorization form,if applicable. i. Wetland delineation,if necessary. j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by properly owner) k. A statement of compliance with the N.C.Environmental Policy Act(N.C.G.S.113A 1-10),ii necessary. If the project involves expenditure of public funds or use of public lands,attach a statement documenting compliance with the North Carolina Environmental Policy Act. 7. Certification and Permission to Enter on Land I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to the conditions and restrictions contained in the permit. I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and,follow-up,^; monitoring of the project. -w I further certify that the information provided in this application is truthful to the best of my knowledge. rllii (1 `.� i 252.808-2808 .. 1-888-4RCOAST :: www.nccoastalmanagement.net Form DCM MP-1 (Page 5 of 5) APPLICATION for Major Development Permit Date; g-17-Rawo Print Name jOiti)?1 e. Set 4VO/Vt. O 4' lee() Signature goligixe AttecidOr-e., Please indicate application attachments pertaining to your proposed project. ®DCM MP-2 Excavation and Fill Information ❑DCM MP-5 Bridges and Culverts ❑DCM MP-3 Upland Development EIDCM MP-4 Structures Information RECEIVES D, CI\YM WILMF VGTON, NG 252 8®8-2 8 .. 1-888-4RCOAST e, vi ww.ticcogast ainaanagente wt.net RECEIVE° Form DCM MP-2 p,�G �'0 VON EXCAVATION and FILL QGb,w«.M�+ °`C (Except for bridges and culverts) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. Describe below the purpose of proposed excavation and/or fill activities. All values should be given in feet. Access ' Other Channel Canal Boat Basin Boat Ramp Rock Groin Rock {excluding (NLW or Breakwater shoreline NWL) stabilization) Length 75.7 ft. Width 28 ft. Avg, Existing .. . .� Depth -3.5'MLW ;. NA NA: Final Project -3.5'MLW. NA NA Depth -.,_.u. a. Amount of material to be excavated from below NHW or NWL in b. Type of material to be excavated. cubic yards. Mud Approx.215 CY of mud to be temporarily excavated down to a maximun depth of approx.-8.0'MLW(temporary);then replaced back in original location at completion of construction. c. (i)Does the area to be excavated include coastal wetlands/marsh d. High-ground excavation in cubic yards. (CW),submerged aquatic vegetation(SAV),shell bottom(SB), none or other wetlands(WL)? If any boxes are checked,provide the number of square feet affected. ❑CW ❑SAV ❑SB OWL ®None (ii)Describe the purpose of the excavation in these areas: bi r ® - w :... F . ,'� 3aa. ; ..-- Q se • e .r a. Location of disposal area. b. Dimensions of disposal area. c. (i)Do you claim title to disposal area? d. (i) Will a disposal area be available for future maintenance? Oyes ❑No DNA ❑Yes ❑No DNA (ii) If no,attach a letter granting permission from the owner. (ii) If yes,where? e. (i)Does the disposal area include any coastal wetlands/marsh f. (i)Does the disposal include any area in the water? (CW).submerged aquatic vegetation(SAV),shell bottom(SB), ❑Yes ❑No DNA or other wetlands(WL)? If any boxes are checked,provide the number of square feet affected. (ii) If yes, how much water area is affected? ❑CW ❑SAV ❑SB OWL ❑None (ii)Describe the purpose of disposal in these areas: 252-808-2808 :: 1-888-4RCOAST :: www,nccoastalmanagement.net revised:42/26/06 Foie DGr 12a2 (Excavation and Fiii, Page. 2 of 2) 3. SHORELINE-STA$ILIZ il11 - ®-this seo Porn slidapplir* (if development is s wad grOoln, rise MP-4 Stntctf } a. Type of shoreline stabilization: b. Length: ❑Bulkhead ❑Riprap ❑Breakwater/Sill ❑Other: Width: c. Average distance waterward of NHW or NWL: d. Maximum distance waterward of NHW or NWL: e. Type of stabilization material: f. (I) Has there been shoreline erosion during preceding 12 months? ❑Yes DNo DNA (ii)If yes,state amount of erosion and source of erosion amount information. g. Number of square feet of fill to be placed below water level. h. Type of fill material. Bulkhead backfill Riprap Breakwater/Sill Other i. Source of fill material. 4-.QTHE# FJi l:L AcriAt7L : - to his section(1.6401.6rifige. (Exclr trh t$Tror-etrrie•Sta iilizaton) - a. (i) Will fill material be brought to the site? ❑Yes ❑No DNA b. (i)Will fill material be placed in coastal wetlands/marsh(CW), If yes, submerged aquatic vegetation(SAV),shell bottom(SB),or other wetlands(WL)? If any boxes are checked,provide the (ii)Amount of material to be placed in the water number of square feet affected. (iii)Dimensions of fill area ❑CW ❑SAV ❑SB (iv)Purpose of fill OWL ❑None (ii)Describe the purpose of the fill in these areas: 5- GENEi11 k4 a. How will excavated or fill material be kept on site and erosion b. What type of construction equipment will be used(e.g.,dragline, controlled? backhoe,or hydraulic dredge)? It will be temporarily placed on a floating material barge-then Barge-mounted track hoe(excavator) replaced back in its original location upon project completion. c. (i) Will navigational aids be required as a result of the project? d. (i) Will wetlands be crossed in transporting equipment to project ❑Yes ®No DNA site? ❑Yes No DNA (ii)If yes,explain what type and how they will be implemented. (ii)if yes,explain steps that will be taken to avoid or minimize environmental impacts. : O 0. �er; larl5oifc HOAy'irio Dat@ i Name Oyster Harbour Replacement .- . 0 ., aft' na Project Na»te.. AUG 0 3 202n 2524C8-2808 n:1-88 RCOAST::imAtwArseccastata axanonierit.net „r ,..,r.(�w' zevesath 12126?lir Iry, :4` ON, ,r Form DCM MP-4 STRUCTURES (Construction within Public Trust Areas) Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. X. DOCKING FACILITY/MARINA CHARACTERISTICS ■ is section not a •noble a. (i) is the docking facility/marina: b. (i)Will the facility be open to the general public? El Commercial ❑Public/Government EIPrivate/Community ❑Yes No c. (i) Dock(s)and/or pier(s) d. (i)Are Finger Piers included? Oyes ®No (ii) Number If yes: (iii) Length (ii)Number (iv)Width (iii)Length (v)Floating Oyes No (iv)Width (v)Floating ❑Yes ❑No e. (i) Are Platforms included? ❑Yes No f. (i) Are Boatlifts included? Oyes ®No If yes: If yes: (ii)Number (ii)Number (Hi)Length (iii)Length (iv)Width (iv)Width • (v) Floating ❑Yes ❑No Note: Hoofed areas are calculated from dripline dimensions. g. (i) Number of slips proposed h. Check all the types of services to be provided. N/A ❑ Full service,including travel lift and/or rail,repair or (ii)Number of slips existing maintenance service N/A ❑ Dockage,fuel,and marine supplies ❑ Dockage(' vet slips")only, number of slips: ❑ Dry storage;number of boats: ® Boat ramp(s); number of boat ramps: 1 ❑Other,please describe: i. Check the proposed type of siting: j. Describe the typical boats to be served(e.g.,open runabout, ❑ Land cut and access channel charter boats,sail boats,mixed types). ❑Open water;dredging for basin and/or channel mixed types: (fishing boats,sail boats,various pleasure ❑Open water;no dredging required recreational boats, etc.) ®Other;please describe: Replace existing elevated boat ramp. k. Typical boat length: approx. 16'to 45' I. (i)Will the facility be open to the general public? Oyes ®No m. (i)Will the facility have tie pilings? ❑Yes ®No (ii) If yes number of tie pilings? AV1txx55 2 � r . 252-808-2808 :: 1-888-4RCOAST :: www.nccoastalmanagement.net revised: 12/27/06 Form DCM MP-4 (Structures, Page 2 of 4) >i t fNG CYLITY 'WM • ' ' 1-. • r � . „. a. Check each of the following sanitary facilities that will be included in the proposed project. ❑Office Toilets El Toilets for patrons;Number: ; Location: El Showers ❑ Boatholding tank pumpout;Give type and location: b. Describe treatment type and disposal location for all sanitary wastewater. c. Describe the disposal of solid waste,fish offal and trash. d. How will overboard discharge of sewage from boats be controlled? e. (i)Give the location and number of"No Sewage Discharge'signs proposed. (ii)Give the location and number of"Pumpout Available"signs proposed. f. Describe the special design,if applicable,for containing industrial type pollutants,such as paint,sandblasting waste and petroleum products. g. Where will residue from vessel maintenance be disposed of? h. Give the number of channel markers and"No Wake'signs proposed. i. Give the location of fuel-handling facilities,and describe the safety measures planned to protect area water quality. j. What will be the marina policy on overnight and live-aboard dockage? k. Describe design measures that promote boat basin flushing? I. If this project is an expansion of an existing marina,what types of services are currently provided? CZINIC - m. Is the marina/docking facility proposed within a primary or secondary nursery area? AUG 0 8 2020 ❑Yes END DC �T���� TON.,NC 252-808-2808 :: 1-888-4RCOAST:: www.nccvastalmanapement-net revised: 12/27/06 Form DCM MP-4 (Structures, Page 3 of 4) n. Is the marina/docking facility proposed within or adjacent to any shellfish harvesting area? ❑Yes ❑No o. Is the marina/docking facility proposed within or adjacent to coastal wetlands/marsh (CW),submerged aquatic vegetation(SAV),shell bottom (SB),or other wetlands(WL)? If any boxes are checked,provide the number of square feet affected. ❑CW ❑SAV ❑SB OWL ❑None p. Is the proposed marina/docking facility located within or within close proximity to any shellfish leases? ❑Yes ❑No If yes,give the name and address of the leaseholder(s),and give the proximity to the lease. BOATHOUSE(including covered li ) ElThis section not apple able a. (i) Is the boathouse structure(s): ❑Commercial ❑Public/Government ['Private/Community (ii)Number (iii)Length (iv)Width Note: Roofed areas are calculated from dripline dimensions. GROIN(e.g., wood,sheetpile, etc_ If a rock groin use MP-2 Excavation and FA) s+ ,,ti a. (i) Number (ii)Length (iii)Width . BREAKWATER(e.g.,vlood, eta) EI This section not vplicable 5 k a. Length b. Average distance from NHW,NWL,or wetlands c. Maximum distance beyond NHW,NWL or wetlands !Ie. MOORING PILINGS and BUOYS a. Is the structure(s): b. Number ❑Commercial ❑Public/Government ❑Private/Community c. Distance to be placed beyond shoreline d. Description of buoy(color,inscription,size, anchor,etc.) Note: This should be measured from marsh edge,if present. p.etvxt) 4vLt��- e. Arc of the swing .F-fir:+4 • >7 GENERAL 252-806-2808 :: 1-888-4RCOAST:: www.nccaastalmanagement.net revised: 12/27/06 Form DCtl(1 MP-4 (Structures, Page 4 of 4) a. Proximity of structure(s)to adjacent riparian property lines b. Proximity of structure(s)to adjacent docking facilities, N/A2 ft to 14 ft,from eastern riparian line 80 ft.to 69 ft.from western riparian line Note: For buoy or mooring piling,use arc of swing including length of vessel. c. Width of water body d. Water depth at waterward end of structure at NLW or NW[. approx.580 ft. (arassline to arassline) aoorox 3.5 ft.MLW (NLW) e. (i) Will navigational aids be required as a result of the project? ❑Yes ®No DNA (ii)If yes,explain what type and how they will be implemented. m... -, ,-.2...:.----:::-.:, ..-..f .-. . y am,.'��..:+.> af ..;;, :,t.v v�.Y�a'L ?�� , a. Give complete description: . a OMY ..,":.:10i:;"';:..:..",::;:f:: ::::j.,4-4, ..,-,-- ,,,,_,„,:::::,-.::,:.,„...„..-„,..,,..,,..:,::,,,,,„„.,„..,.:,,,:„,,,s.,„„,„,„. / / - --: .• wor:-,„=:,,-..--:,,,,.i.,:::,,.!- -..,,,;„.„... .,,,,,,,,,,A,,,,,47t,_„,.,..„:::,,,,-,„!..,---1,,,,;::,,,,,,,,,,,,,,,,,„ ...,,,.„:„.„:„..„,:,„.,,, ,,,„,_,,,,,..,,a,,,.::,,,,-.--,:.,,,,,,,„,,..„,„,„_,, 0i-goi:;:04,,,.,, ,PTI:.::::,-,,,.. :_fo,:-.!,, ,',,,01',--, T;:71-7 <=i'L.,,:j7:?7,T''" .",,".:,..:;.f:::,'",:r.-'",- Pr 1'ar ::::-' : :'-'2,- —r-'-'7' ,046.?„-..y,-.. :0,.;_: :x4g7.--,._ _-„,,,,,,.,,,,.„,..x-i,:-;,,..,,,..„,t., ,_, _ ,,,...:,..:, 7,__..,,*,,,4-0.1,,.,-q,,..: 4,1-::::;,,_.,,,„,;..„.z.....„:z,,53:::,,.. ,,-,:-,..v .4.,;-;,,,.,__Tn„,,,: i;,..„,..,,:":;_,;;; . ,„.„...-. , .....;::„.,..:.,:-...,..i:„..7,.f:tz..,_,.,. ...,E.,,,;:i..,;,::,,..,...:,.„.•:.:7::„,,;::"„iyi..„..„,„:7„.c.„..5„.„,,:,..r.:...:,:„.._... _,,.. - ,_,...... ........., I !. i Q n-'. €;I .... , _.. .1 A, ,•. ,......, 23 -8O - 8O ee 1•a3&-4RCOAST n www.ncccestattnarragemeat.reet revised: #2l 7iG i ______) ROY COOPER NORTH'CAROLINA Governor Environmental Quality MICHAEL S.REGAN Secretary November 9`h,2020 BRAXTON C.DAVIS Director SENT VIA EMAIL Mike Kirby,P.E. c/o Mike Kirby 115 S-1 Village Creek Lane, Mt.Pleasant,SC 29464 SENT VIA EMAIL RE: CAMA Major Development Permit Application—Oyster Harbour Boat Ramp Replacement Dear Mr.Kirby: The Division of Coastal Management hereby acknowledges receipt of your application,acting as agent for Oyster Harbour HOA, for State approval for the construction of a community boat ramp, located at 3483 Windy Point Rd SW, Supply,Brunswick County,NC.It was received complete on November 2nd,2020,and appears to be adequate for processing at this time.The projected deadline for making a decision is January 16th,2021.An additional 75-day review period is provided by law when such time is necessary to complete the review.If you have not been notified of a final action by the initial deadline stated above,you should consider the review period extended. Under those circumstances,this letter will serve as your notice of an extended review. However,an additional letter will be provided on or about the 75th day. If this agency does not render a permit decision within 70 days from November 2"d,2020 you may request a meeting with the Director of the Division of Coastal Management and permit staff to discuss the status of your project. Such a meeting will be held within five working days from the receipt of your written request and shall include the property owner,developer,and project designer/consultant NCGS 113A-119(b)requires that Notice of an application be posted at the location of the proposed development. Enclosed you will find a"Notice of Permit Filing"postcard which must be posted at the property of your proposed development. You should post this notice at a conspicuous point along your property where it can be observed from a public road. Some examples would be:Nailing the notice card to a telephone pole or tree along the road right-of- way fronting your property;or at a point along the road right-of-way where a private road would lead one into your property. Failure to post this notice could result in an incomplete application. An onsite inspection will be made,and if additional information is required,you will be contacted by the appropriate State or Federal agency. Please contact me if you have any questions and notify me in writing if you wish to receive a copy of my field report and/or comments from reviewing agencies. J c�Sincerely, Brendan Brock Field Representative cc: Curt Weychert,MHC Connie Marlow,LPO WIRO DCM USACE Robb Mairs,DWR Mike Kirby,Authorized Agent ECG North Carolina Department of Environmental Quality I Division of Coastal Management Wilmington Office 1127 Cardinal Drive Extension I Wilmington.North Carolina 28405 910.196.7215 NoTi (iF cAmA PERMIT APPLIED FOR PROJECT: Applicant proposes to replace the existing Harbour Subdivision at Boones Neck Rd. & - - - - - A a A Brunswick County. COMMENTS ACCEPTED THROUGH December 10, 2020 APPLICANT: FOR MORE DETAILS CONTACT THE LOCAL PERMIT OFFICER BELOW: Oyster Harbour Homeowners Assoc., Inc.clo JoAnne Schiavone NC Div. of Cvastcd Management 2182 Clambake Court SW 127 Cardinal Dr. Ext. Supply, NC 28462 Wilmington, NC 28405 Agent: Mike Kirby, P.E. Brendan B-ros.k ('91-0) 79�6-7270 (864) 590-0256 (05:1c ROY COOPER . Governor . * r--,p. - v`_ MICHAEL S. REGAN "_r --' Secretary NOF..7 .O LINA. BRAXTON DAVIS m b-otvnc:;uat Owla] Director,Division of Coastal Management November 13, 2020 Advertising@starnewsonline.com 2 Pages Star News Legal Advertisement Section Post Office Box 840 Wilmington,North Carolina 28402 Re: Major Public Notice for: • Robed Barnhill I New Hanover County • Oyster Harbour HOA/Brunswick County Hello Angie: Please publish the attached Notice in the Thursday,November 19,2020 issue. The State Office of Budget & Management requires an original Affidavit of Publication prior to payment for newspaper advertising. Please send the original affidavit and invoice for payment to Tanya Pietila at the NC Division of Coastal Management, 127 Cardinal Drive Extension, Wilmington,NC 28405, 910-796-7226. Paying by credit card to the attention of Jarimy Springer,(Customer No. 70100342). Please email a copy of the credit card receipt to me. Thank you for your assistance in this matter. If you should have any questions,please contact me at our Wilmington office. Si erely, Tan K. Pietila Penn mg Support&Customer Assistance cc: MHC Files Curt Weychert—MHC USACE State of North Carolina Environmental Quality I Coastal Management 127 Cardinal Drive Ext.,Wilmington,NC 28405 919 795 7215 NOTICE OF FILING OF APPLICATION FOR CAMA MAJOR DEVELOPMENT PERMIT The Department of Environmental Quality hereby gives public notice as required by NCGS 113A- 119(b) that the following applications were submitted for a development permits in Areas of Environmental Concern as designated under the CAMA: On November 4,2020,Robert Barnhill proposed to expand an existing floating dock & add a second boatl ft for a total of four (4) slips at 51 Pipers Neck Rd., adjacent to Banks Channel in Wilmington,New Hanover County; and on November 9, 2020, Oyster Harbour HOA proposed to replace an existing boat ramp in the same footprint at Boones Neck& Windy Point Rd., adjacent to the AIWW in Supply,Brunswick County. Copies of these applications can be examined or copied at the office of Katharine Elks (New Hanover County) or Brendan Brock (Brunswick County) N.C. Dept. of Environmental Quality, Division of Coastal Management, 127 Cardinal Drive Ext., Wilmington, NC 28405, (910) 796-7424 for New Hanover County or(910) 796-7270 for Brunswick County during normal business hours. Comments mailed to Braxton C. Davis, Director, Division of Coastal Management, 400 Commerce Avenue,Morehead City,NC 28557-3421,prior to December 10,2020 will be considered in making the permit decision. Later comments will be accepted and considered up to the time of permit decision. Project modification may occur based on review and comment by the public and state and federal agencies. Notice of the permit decision in these matters will be provided upon written request. AGENT AUTHORIZATION FOR CAMA PERMIT APPLICATION Name of Property Owner Requesting Permit Oyster Harbour Homeowner's Assoc, Inc. Mailing Address: 2182 Clambake Court SW Supply, NC 28462. Phone Number: (914) 805-3264 Email Address: joanneoh2182@gmail.com l certify that I have authorized Mike Kirby, P.E. Agent/Contractor to act on my behalf, for the purpose of applying for and obtaining all CAMA permits necessary for the following proposed development: Oyster Harbour Boat Ramp Replacement, 2020 at my property located at 3483 Windy Point Rd, SW; Supply, NC 28462 in Brunswick County. I furthermore certify that I am authorized to grant, and do in fact grant permission to Division of Coastal Management staff, the Local Permit Officer and their agents to enter on the aforementioned lands in connection with evaluating information related to this permit application. Property Owner Information: CdAu G°atz, Signature JoAnne Schiavone Print or Type Name /ski!J,1ttaz i- oil refresffitzHe, Title 08 1 10,94W Date AUG 0 3 2020 This certification is valid through (2- 1 2-e> TTO,N, . ADJACENT RIPARIAN PROPERTY OWNER STATEMENT- ,, .- = r. 1 hereby certify that I own property adjacent to Oyster Harbour Homeowner As tdl�sn, Irnc.'s :;,,r:s<. _'i:Zzi (Name of Property Owner) liG,r ra : 1 property located at 3483 Windy Point Fed. SW (lot#i 1, (Address, Lot, Block, Road,etc.) on Atlantic Intracoastal Waterway (AIWW1, in Su , N.C. OC Y ILMI t - r (Wa r trt#y) (City/Town and/or County) . : . - ' - - The applicant has described to me, as shown below,the development proposed at the above locidti•� :' ., I have no objection to this proposal. I have objections to this proposal: .4w:, •: ;KKK..-::; T,p.:..:. . DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT�-:_y,:- (individual proposing development must fifl in description below or attach a site'�fng} ., ., :.:. : a4 _.= Oyster Harbour Homeowners Association, Inc. proposes to construct a new replacement boat ramp :; .. . structure on their property located at 34€63 Windy Point Rd. SW; Supply, NC, 28462; tent to your. : .: < 4_. property at the address: 3491 Windy Point Rd. SW,Supply,NC 28462, ,•; The proposed new replacement boat ramp will be constructed at the same location itild to the same `," ;': r . dimensions (length and width), top elevations, and slopes as the existing structure. The existing boat .,r.` '"_ >° :-.r' ramp structure will be demolished and disposed of at an offsite facility prior to constructing the new -`° ,;, replacement boat ramp. All construction Work will be constructed from the water using floating barges' '',; ,4;;,,~ and other water-going equipment. `e gay. .. Refer to the accompanying pertrtit.drawings plan. la outs and other details"ctt' a eti--. proposed work for this project ..,. .; WAIVER SEGTI01 _ .. g I understand that a pier, dock, mooringpilings, breakwater, boathouse Ilk or groin must ack a y, ' r=aa.,. minimum distance of tb' from my area of riparian access unless waived by me: (If you wish to waive ,- the setback you must Initial-the appropriate blank below.) .-` . 1. -_ , .:: I eta>wf tt�swami t setba�rtlrt ent. , s _�- I do not wish to waive the t setback re �rirertnt. r - ... .. ' Property z ..... (Property Owner Information) :, -: � <;",; (Adjacent P Owner It tot at`to-.V : ccr re ::: 9, ,: '. , , , .:r,,dsg William N iI` It t r2 TN . ,:. JoAnne Schiavone aN e Sce # t s,: -Print or Type Name TypeN , k :... Print ora T 2182 Clambake Court SW ' 349 VWindv Pont d: SW =-.`: , �w :�.g: .. ». 'Mailing Address. a g- llii Supply-NC 28462 -. -. NQ 4462 - : City State,Zip Cit °�rt�p --l. s 3 :.. .... .- `.k°:. T it t� :�. Tel e ne Number .. ; ;. p n Dare _ gym; . ( cased��12 M : " g 4 rp"" , .:-... .:. . _ : . .,, '� ;:,�.:.5 • . n. �. . .... .. ...A-.:- � s_..... .=�5,_:"��.':;-._":_ a : > .- :.: ur", : � '' h-, .. ��::k"..:?'-. � `x ::: ,,,f.rt,_ _-r3.� . ,';._- a -..--;—=..<7, --7 _ .:.��- � . ..:��:A.�_x:�. �r ; " .- -�= �a: ,�-x �xw € REctrvED CERTIFIED MAIL • RETURN RECEIPT REQUESTED 220. DIVISION OF COASTAL MANAGEMENT ADJACENT ADJACENT RIPARIAN PROPERTY OWNER NOTIFICATION/WAIVER FORM pNC T DISTRICT Name of Property Owner: Oyster Harbour Homeowner's Association, Inc. Address of Property: (Lot #1): 3493 Windy Point Rd. SW: Supply. NC 28462 (Lot or Street#, Street or Road, City & County) Agent's Name : Mike Kirby, P.E. Mailing Address: 1158-1 Village Creek Lane Agent's phone#: _(864) 590-0256 Mount Pleasant, SC 29454 ( I hereby certify that I own property adjacent to the above referenced property. The individual applying for this permit has described to roe as shown on the attached drawing_the development they are proposing. A description or drawing, with dimensions, is provided with this letter. x 1=have no objections to this proposal. I have objections to this proposal, If you have objections to what is being proposed,you must notify the Division of Coastal Management(DCM)in writing within 30 days of receipt of this notice. Correspondence should be mailed to 127 Cardinal Drive Ext., Wilmington, NC, 28405-3845. DCM representatives can also be contacted at(910) 796-7215. No response is considered the same as no objection if you have been notified by Certified Mail. WAIVER SECTION I understand that a pier. dock, mooring pilings, breakwater, boathouse, lift, or groin must be set back a minimum distance of 15' from my area of riparian access unless waived by me. (If you wish to waive the setback, you must initial the appropriate blank below.) I do wish to waive the 15' setback requirement. I do not wish to waive the 15' setback requirement. (Property Owner Information) (Adjacent Property Owner.1( Information) � DacuSgned by' ''., auk,Jc CV 1yQi A,r44,4 r.4.4 S'i natiLre Signature. "- BE7-073447a154F3.. JoAnne Schiavone 01-414ii Rif)I) North Carolina Department of Transportation Print or Type Name Print or Type Name 2182 Clambake Court SW 300 Division Drive Mailing Address Mailing Address Supply, NC 28462 Wilmington, NC 28462 city/State/Zip — City/State/Zip NO) 1914 .805-3264 (910). 398-9100 �p2� Telephone Number Telephone Number lilio,20 g/z/zozo 404 OG1 ' 4' Date 1 Date V Revised 6/ 017 RECEIVED NOV 02 ZOZO DCM WILMINGTON, NC From: Hammers, Angela K <akhammersncdot.gov> Sent: Wednesday, September 2, 2020 3:11 PM To: mkirby200@comcast.net Cc: Anderson, Barbara E <beanderson2@ncdot.gov>; LeBeau, Aaron R <arlebeau@ncdot.gov>; Hughes, Benjamin T <bthughes@ncdot.gov> Subject: RE: Thank you for your mail Hello Mr. Kirby, Upon further investigation the NCDOT still has not objection to this project, however, the waiver of the 15ft. setback has been checked. Please let me know if you have any other questions. Sincerely, Angel Hammers Engineering Technician NCDOT Div 3 District 3 910-398-9100 akhammers(ncdot.gQ Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. FOR PERMITTING PURPOSES ONLY; DO NOT USE FOR CONSTRUCTION a t ' SHALLOTTE , _ q`� , l; a d v °L6-4 Fr r� <ye di ! \,.kilp:nei'''' ,. w 8 y F9C' • .:> '1,6; i, a ti .ms,; A� , y} w �{ Y tt , w • tc,. \ : > (71/ ' ''''' , , „, ., �y 11. Y�� L� 11 s.y.Ct 1t4...�`Y `56d�i��..�sJ - E a by { -t4 V-„„,.,,..,,,,,,,,,,,, t,,,,,,--1":„..‘1, 0 R s 1,,fti 0,,:..,1::,. _,:::,,4::...0,., „.„_ .. .:.,,,d,:;.:.,..1,,,. 4. ,.2::.\..0,:s. ,,,. :,i3, ,..:,.,..,,,e...:0,..,_ ,,i...„, ‘,oicrA,, .-'''' - _ ---11,,,'(',...„...., ,,,--,1r "- _vrivo _. _ --... -- _ y y �•�C� Holden {C PROJECT SITE �..--.. m~-"_, -'� fit - �� 3483 BOONES NECK RD. ATLANTIC SUPPLY, NC 28462 1 ti))a1.7r Ocean Isle OCEAN 0 5,000' Gold ?amt.. €ranal �'B eau GRAPHIC SCALE: 1" = 5,000' CE1VE° (PLAN VIEW) LOCATION MAP AUG ? 'J - -- 3OM' lI- 1N�a ►N APPLICANT: PROJECT NAME: PROPOSED ACTIVITY: w~,1ktilmlrllii;,� FILE: OYSTER HARBOUR HOMEOWNER'S ASSOCIATION, INC. OYSTER HARBOUR BOAT RAMP REPLACEMENT PERMIT APPLICATION DEMOLISH THE EXISTING DILAPIDATED �.\``��H CAROB''% Oyster Harbour Boat Ramp P base 2191 OYSTER HARBOUR PARKWAY BOAT RAMP (TO BE DISPOSED OFFSITE) _� a yy' SUPPLY, NC 28462 WATER BODY: AND RE-CONSTRUCT A NEW BOAT RAMP = $n• II' •i r�i ; APPROVED BY: MWK ATLANTIC INTRACOASTAL WATERWAY (AIWW) IN THE SAME LOCATION IN ORDER TO jr - SCALE: A5 SHOWN AGENT: PROVIDE RESIDENTS OF THE OYSTER 04MIKE KIRBY, P.E. CITY / TOWN: SUPPLY HARBOUR HOMEOWNER'S ASSOCIATION = $-1158-1 VILLAGE CREEK LANE COUNTY: BRUNSWICK LAT.: 33' 54' 43.59" N WITH SAFE ACCESS TO NAVIGABLE %'�iG, FNG �� ISSUE DATE, August 3, 2020 r MOUNT PLEASANT, SC 29464 STATE: N.C. LONG.:_ -78' 20' 54.94" W WATERS FOR FISHING AND °`, 1 L W. t\ \\\\ SHEET: P 1 of 6 �/!lllfllklu4'" (864) 590-0256 email: mkirbyQsigiellc.com RECREATIONAL PURPOSES. FOR PERMITTING PURPOSES ONLY; DO NOT USE FOR CONSTRUCTION MLW = MEAN LOW WATER OYSTER HARBOUR HOMEOWNER'S I g APPROX. EDGE OF •ASSOCIATION BOAT LANDING FACILITY MARSH GRASS 1 o i I MHW = MEAN HIGH WATER `a I�IWW(TYPICAL} i \ 60l"" • . REFER TO SHEET P-3 & o z 0 z ' IFS \ ADJACENT PROPERTY OWNER: • P-4 FOR FOR ENLARGED I z -MHHW - +5.22' MEW NF�,k. NORTH CAROLINA DEPARTMENT PLAN VIEWS OF PROJECT a c. I t ara. 4' a.-----.. NORTH OF TRANSPORTATION; AREA I I AID R• 5 —MHW = +4.85' MLW 300 DIVISION DRIVE _ EXTENDED RIPARIAN \. WILMINGTON, NC; 2B401 PROPERTY LINE • �` \ • f o \ o i c:, in a 0 l I v n N . I I fir)INi I I } p4)Op I I I I ' • F� APPROX. 98 FT. FROM END OF • 4 —'`- ; ' -'4/bF `, �' I EXISTING BOAT RAMP TO EDGE If `'— / ' ;,' \ r �• !I I ',' , OF CORPS CHANNEL • cL 11 ` ) 'RopF T•y'y �� 13jf+ `hIr r .> �1 �� I 290.48' (APPROX.) FROM ' R ��f C o AIWW CORPS CHANNEL / `` + CENTERLINE TO APPROX.��• 3 I z E , '', f I) I EDGE OF MARSH GRASS — NAVD88 = +2.85' MLW ADJACENT PROPERTY OWNER: 1... . ,h 1 WWAM NEIL & HEATHER SEWER b i I I 1 I I I . 3491 WINDY POINT RD. SW o } I o^ SUPPLY, NC. 28462 - -,`. I �ci"a I r3 �W-1 SURVEY REFERENCES 'IIL f Q 2 1. PLAT BY HOBBS SURVEYING COMPANY, INC. TITLED BELLAMYI N laPLACE MNOR SUBDIVISION DATED 1-3-2000 RECORDED 0 I * '¢ q ' BOOK 22 PAGE 259; DATE 2-7---2000 i' I I 1 IT i I I ; EXTENDED RIPARIAN ��APPROX. CHANNEL WIDTH = 72 FT. l (APPROX.) 2. TMS: 230-00-06 506 - PROPERTY LINE SURVEY NOTES WIDTH FROM 1 1. HORIZONTAL DATUM: NAD83 (2011) NORTH CAROLINA STATE MARSHOF APPROX. EDGE OF Q i =1 EDGE GRASS �`� MARSH GRASS � 1 MARSHHEDGE PLANE SURVEY FEET. (TYPICAL) �.� 2. THIS MAP IS AN PARTIAL AS-BUILT AND HYDROGRAPHIC ox z j OF MARSH SURVEY OF A RESIDENTIAL DOCK. NO LOT SURVEY HAS. REFER TO SHEET P-3 Q f AIWW GRASS BEEN PROVIDED AT THIS TIME, PROPERTY LINES & OTHER & P-4 FOR FOR a i RI INFORMATION WERE TAKEN FROM THE REFERENCE PLAT. ENLARGED PLAN VIEWS I 0 —MLW = 0.0' OF PROJECT AREA AIWW + I / —MLLW = -0.17' MEW 3. CONTOURS SHOWN HEREON ARE REFERANCED TO MEAN LOW WATER (MLW) /(Co Ob'N) QT�a RECEik. 4. CONTROL MONUMENT UTILIZED: HYDROGRAPHIC SURVEY DATA, AIWW BOTTOM CONTOUR ELEVATIONS, 3tb'1S oN - AND ELEVATIONS OF EXISTING & PROPOSED BOAT RAMP STRUCTURE BAILEY a PID:AJ4929 ARE REFENCED TO MEAN LOW WATER (MLW) VERTICAL DATUM; IN FEET. / ��' NC/BRUNSWICK IIIIII I -1 N:85,841.37 (PLAN VIEW) 0 100' TIDE S .WF LMINGT019, 4 E:2,186,627.19 ELEV:41.5 NAVD 88 OVERALL PROJECT SITE & KEY SHEET GRAPHIC SCALE, 1" = 100' APPLICANT: PROJECT NAME: PROPOSED ACTIVITY: I_- \owitir�rlloiii,;�-__-.-1 FILE: OYSTER HARBOUR HOMEOWNER'S ASSOCIATION, INC. OYSTER HARBOUR BOAT RAMP REPLACEMENT PERMIT APPLICATION DEMOLISH THE EXISTING DILAPIDATED i �,.�`N •\H CA Roe'1/4� Oyster Harbour Boat Ramp P-base 2191 OYSTER HARBOUR PARKWAY BOAT RAMP (TO BE DISPOSED CFFSITE) I =� E : 0 4 2. SUPPLY, NC 28462 WATER BODY: AND RE—CONSTRUCT A NEW BOAT RAMP V pS AL r� S� APPROVED BY: MWK ATLANTIC INTRACOASTAL WATERWAY (AIWW) IN THE SAME LOCATION IN ORDER TO AGENT: PROVIDE RESIDENTS OF THE OYSTER 049560 SCALE: AS SHOWN MIKE KIRBY, P.E. CITY / TOWN: SUPPLY HARBOUR HOMEOWNER'S ASSOCIATION 8-3-20 1158-1 VILLAGE CREEK LANE COUNTY:, BRUNSWICK LAT.: 33. 54' 43.59" N p FNGIN6'� a. ISSUE DATE: August 3, 2020 WITH SAFE ACCESS TO NAVIGABLE �%i046, 0 MOUNT PLEASANT, SC 29464 LONG.; -78. 20' 54.94" W ; '%i /E,... w ����`� G (864) 590-0256 email: mkirby©sigiellc.cam STATE: N.C. ECREATIONAL PURPOSES. i %� =�-n.ILu ok\\ ' SHEET'' P-2 of U FOR PERMITTING PURPOSES ONLY; DO NOT USE FOR CONSTRUCTION Pt, NORTH CAROLINA DEPARTMENT 1 1EXISTINGBERBOATRAMPX114). j EXISTING �FiQi), OF TRANSPORTATION; PROPOSED:MpEMOL15H/OISPOSEIAND CONSTRUCT EXISTING CONCRETE BOAT RAMP (16' X 107'). a jjj BULKHEAD 44 300 DIVISION DRIVE APPROX. EDGE OFPROPOSED: DEMOLISH/DISPOSE AND CONSTRUCT r # MARSH GRASS NEW REPLACEMENT TIMBER BOAT RAMP IN THE NEW REPLACEMENT CONCRETE BOAT RAMP IN THE j _` F WILMI�NGTON, NC; 28401 (TYPICAL) SAME FOOTPRINT. SAME FOOTPRINT. �? z LOCATION OF TRANSITION APPROX. 98 FT. FROM END EXISTING us I o OF EXISTING BOAT RAMP TO PAVED ,� I FROM TIMBER TO CONCRETE • ACCESS f M BOAT RAMP EDGE OF CORPS CHANNEL ROAD I ri� I� �— .—.— — i— — 2:\ 11111117 1.Q — — —•—'— ,_,_•.EXTENDED RIPARIAN(UPLAND) Q Ir II� — —.—._. PROPERTY LINE _.—._ —. e_ i 0+20 1 f , 1 i -� —._._EXTENDED—EXTENDED RIPARIAN PROPERTY LINE 40 -----------____j 1 , , i 1 1 4.0 1 0+60 I TiI d ' I 14 • 16 FT. RIPARIAN i r -� F !1+D ,_ ,,.�; :�-�.-�, �" CORRIDOR-)o 15 FT, I- \ z sryl "LI Li d —✓�d�I 1 d { i i �,� • 60 ��' " c:_:. •,.,`_y.: �._..—.. 1 1 '° y ' f �� :a• F... ::,.1.,'_ . :,,:- .;; ;2--op, :r i!:ry �7 15-FT. OFFSET LINE II 7 \ +� 16 FT, .: -=s•- .• r`.•• � ' r.F-r ;•9'•:x f:-F,. 7 ��; , 1 EXISTING 1 ♦t 1 \1 'i Iffh' '_.. } 't6-'I I ':;.C..;;;:.+" !:-/,:.': ? - " 72+2V.2 2+ 2 +60 _ GAZEBO i i�#td#i iI o lI'! i i� i� i �� i i i i I — �.. .� J 40 MOIONNEW JJI(UPLAND) 1 ,: I I i 11. I MONIMENNOMMIlaprill° ItIi i i i i i i il ! L # NM ' � I 1{:, . InIIIMMO 1I E :I I l 1. 1 1i i : Id Flid l d l d l d l d f d ld id, ld Fd.HIIII II1 I i "II # EXISTING EXISTING 1 EXISTING FIXED I I I FLOATING BULKHEAD 3 1 : ACCESS RAMP t I1 II 1 Illar DOCK APPROX. EDGE OF • MARSH GRASS EXISTING FIXED EXISTING 4' X 28' I i i GANGWAY / RAMP II 1 1-. coI i ►� 11 I1 1. • (TYPICAL) ACCESS DECK I1 I / O1 an ` • EXISTING 3' X 15 [� i r' EXISTING FIXED GANGWAY / RAMP I FLOATING N k\ 1 I N 65'5 '35" E ACCESS WALKWAY 7I I I F DOCK f 1 � O III ---\ _ _ _ _ _ _•._.. 15-FT, OFFSET LINE pR1 _.._.._.._. _.._.._. _. _ Op�R ___,7 � a e t \ \ fg .._.,_.._.._.._.._. U, 15 FT. RIPARIAN - _.._.._..�.. . WIWAM NEIL & HEATHER SENTER CORRIDOR"WIWAM 3491 WINDY POINT RD. SW —'—'�, l `— — —•,•—•_.EXTENDED RIPARIAN PROPERTY LINE SUPPLY, NC; 28462 — — — — — — —'— — _.—,_. ,—I.— EXTENDED RIPARIAN PROPERTY LINE , HYDROGRAPHIC SURVEY DATA, AIWW BOTTOM CONTOUR ELEVATIONS, (PLAN VIEW) MLW = MEAN LOW WATER ( , , , , iCry cn,- AEG a.. 2020 AND ELEVATIONS OF EXISTING & PROPOSED BOAT RAMP STRUCTURE MHw = MEAN HIGH WATER 0 20' e1s N' ARE REFENCED TO MEAN LOW WATER (MLW) VERTICAL DATUM; IN rai. EXISTING CONDITIONS GRAPHIC SCALE: 1" = 20' / IL WILIV11145TQN) Tic APPLICANT: PROJECT NAME: PROPOSED ACTIVITY: \��,;`ucj+FIFiiirrr,��yi FILE: OYSTER HARBOUR HOMEOWNERS ASSOCIATION, INC. OYSTER HARBOUR BOAT RAMP REPLACEMENT PERMIT APPLICATION DEMOLISH THE EXISTING DILAPIDATED ,.\`��H CAROB :��� Oyster Harbour Boat Ramp P-base 2191 OYSTER HARBOUR PARKWAY BOAT RAMP (TO BE DISPOSED OFFSITE) ?� E • p i1'.� SUPPLY, NC 28462 WATER BODY: AND RE-CONSTRUCT A NEW BOAT RAMP tkillf AL' s�,t/ APPROVED BY: MWK ATLANTIC INTRACOASTAL WATERWAY (AIWW) IN THE SAME LOCATION IN ORDER TO /' SCALE: AS SHOWN AGENT: PROVIDE RESIDENTS OF THE OYSTER 049560 MIKE KIRBY, P.E. CITY / TOWN: SUPPLY HARBOUR HOMEOWNER'S ASSOCIATION B-3-49 1158-1 VILLAGE CREEK LANE COUNTY: BRUNSWICK I"9.L_ 33' 54' 43.59" N WITH SAFE ACCESS TO NAVIGABLE "��, F E �� ISSUE DATE: August 3, 2020 NGIN� MOUNT PLEASANT, SC 29464 STATE: N.C. LONG.: —78' 20' 54.94" W WATERS FOR FISHING AND 114e ���'`��` SHEET: �] [ (864) 590-0256 email: mkirby@sigiellc,com RECREATIONAL PURPOSES. ���,'rrL W4"��`,, - P-3 �f V FOR PERMITTING PURPOSES ONLY; DO NOT USE FOR CONSTRUCTION NORTH CAROLINA DEPARTMENT iPROPOSED: CONSTRUCT NEW 16' X 114' REPLACEMENT PROPOSED: TEMPORARY EXCAVATION WITHIN THE LIMITS OF • EXISTING OF TRANSPORTATION; TIMBER BOAT RAMP IN THE SAME FOOTPRINT AS EXISTING. THE TEMPORARY COFFERDAM IN ORDER TO CONSTRUCT THE `v BULKHEAD_ 300 DIVISION DRIVE r } '�pp WILMINGTDN, NC; 28401 CONCRETE PORTION OF THE NEW BOAT RAMP. APPROX, 215 FR,y LOCATION OF TRANSITION FROM CY OF MATERIAL WILL BE EXCAVATED FROM AN AREA OF EXISTING UHF . to i _ ' • TIMBER TO CONCRETE BOAT RAMP APPROX. 2,120 SF IS ESTIMATED. THE EXCAVATED MATERIAL APPROX. 98 FT. FROM END r i to WILL BE TEMPORARILY STORED ON THE FLOATING BARGE AND PAVED ' 0) n N 5E SHEET a THEN REPLACED BACK IN THE SAME ORIGINAL LOCATIONS OF EXISTING BOAT RAMP TO �16FT. .< A ACCESS ' - _. _. - _ - I:_._._._ ► * j CROSS:SECTION ROAD B AFTER PILING AND PILE CAPS ARE INSTALLED AND AFTER EDGE OF CORPS CHANNEL .M(UPLAND) Q� - - -•-•-• - _ - - INSTAWNG THE NEW CONCRETE BOAT RAMP SLAB. 0 _`. _ B-B ---''-------,..„____ i 10+20 1 I 0+Q 0 - - - - - - - ------- / 0+60 0+80` i ' I I 16 �. 15 FT. RIPARIAN _ } maittr..,L,F./.64,, 6"L. . b,e•• CORRIDOR r 1+60` ^ I ; '° }\ 1 / . m ?"� :...,„ ,r. y .., ,2+Op•° — �15-FT. OFFSET LINE — _.._..- f�..• . .. f • ,.tip x 2+60 EXISTING $ — FD ,, )I I _ r ,.. •2 2 SEE MET P 6 FDR I 0.2 — _ GAZEBO I ¢ !!CROSS-StECTION A-A .- € i i i i it rl +I III III i `' :` e,•, 2+40 — — (UPLAND) ° I+ �> E E I I I F I i ! ` .�1111111111MMIL:7:"- 5EE SHEET P-5 FORI r I , r 1I I 11 1 Ii 1 { I I{ I I I I I I i 1H i} 1f ; r� 11 SIDE-VIEW OF BOAT mom. it�I EI EI� 4 4411 � 1I J AI `- RAMP L - - - - — J „ • (! (EASING / PROPOSED) r I EXISTING PROPOSED; EXISTING GANGWAYS / RAMPS, I EXISTING ; / FIXED FLOATING DOCK, FIXED ACCESS RAMP, & FlXED • BULKHEAD ACCESS DECK TO BE TEMPORARILY REMOVED DURING BOAT l I i� WALKWAY RAMP DEMOLITION / CONSTRUCTION ACTIVITIES (} + ; rr to AND RE—INSTALLED IN SAME EXISTING LOCATION III (Ii { AFTER THE NEW BOAT RAMP REPLACEMENT i r { f` '` '' ' �, APPROX. EDGE OF PROJECT IS COMPLETE PROPOSED: CONSTRUCT NEW 1fi' X 107' ,n 1 °0 MARSH GRASS REPLACEMENT CONCRETE BOAT RAMP IN r I I (TYPICAL) THE SAME FOOTPRINT AS EXISTING, r PROPOSED: APPROX. LOCATION/LAYOUT LIMITS OF • z TEMPORARY SHEET PILE COFFERDAM FOR NEW BOAT - o RAMP CONSTRUCTION (APPROX. 120' X 28' = 3,360 SF). 15-FT. OFFSET LINE TO BE REMOVED UPON PROJECT COMPLETION. P fR�CINf $c. _.._.._. _.. .. .._.._.._.._. RIPARIAN'" .. "' . ._. _ ._ .-.-.- - - _ -�. '.-.-. _.,. _._.-. SUPPLY, NC; 28462 �� - -.-._._,- _ EXTENDED RIPARIAN PROPERTY LINE--a HYDROGRAPHIC SURVEY DATA, AIWW BOTTOM CONTOUR ELEVATIONS, (PLAN VIEW) MLW = MEAN LOW WATER I 1 1 1 1 i i 412 OvA0 01 AND ELEVATIONS OF EXISTING & PROPOSED BOAT RAMP STRUCTURE 0 20' �_�ls _,.• ARE REFENCED TO MEAN LOW WATER (MLW) VERTICAL DATUM; IN FEET, PROPOSED NEW BOAT RAMP MHw — MEAN HIGH WATER GRAPHIC SCALE: 1" = 20' ��� APPLICANT:.•, PROJECT NAME: PROPOSED ACTIVITY: `�,,,� rr,,rrr;� FILE. OYSTER HARBOUR HOMEOWNER'S ASSOCIATION, INC, OYSTER HARBOUR BOAT RAMP REPLACEMENT PERMIT APPLICATION DEMOLISH THE EXISTING DILAPIDATED ��.�``�ZH OARO�''' Oyster Harbour Boat Ramp P—base 2191 OYSTER HARBOUR PARKWAY BOAT RAMP (TO BE DISPOSED OFFSITE) ���_�' � ► p 4./''', SUPPLY, NC 28462 WATER BODY:. AND RE—CONSTRUCT A NEW BOAT RAMP = r:;►� AL' �� APPROVED BY: MWK ATLANTIC INTRACOASTAL WATERWAY (AIWW) IN THE SAME LOCATION IN ORDER TO �� SCALE: AS SHOWN AGENT: PROVIDE RESIDENTS OF THE OYSTER 049560 MIKE KIRBY, P.E. CITY / TOWN: SUPPLY HARBOUR HOMEOWNER'S ASSOCIATION $_3'20 1158-1 VILLAGE CREEK LANE COUNTY: BRUNSWICK LAT.: 33' 54' 43.59" N WITH SAFE ACCESS TO NAVIGABLE % G, FNGINE�� ���` ISSUE DATE. August 3, 2020 MOUNT PLEASANT, SC 29464 STATE: N.C. LONG.: -78' 20' 54.94" W WATERS FOR FISHING AND ,„„i '��``� of G (864) 590-0256 email: mkirby©sigiellc.com RECREATIONAL PURPOSES. ��i' YV'y"�`�� .- SHEET: P-4 U FOR PERMITTING PURPOSES ONLY; DO NOT USE FOR CONSTRUCTION MLW = MEAN LOW WATER MHW = MEAN HIGH WATER EXISTING: TIMBER CURB PROPOSED: CONSTRUCT NEW 16' X 114' REPLACEMENT TIMBER PROPOSED: INSTALL NEW TIMBER CURB TO MATCH BOAT RAMP IN THE SAME FOOTPRINT AS EXISTING. THE EXISTING WHEN THE NEW REPLACEMENT BOAT (VARYING ELEVATION / SLOPE THROUGHOUT). RAMP IS CONSTRUCTED (TYPICAL) APPROX. EXTENTS OF PROPOSED TEMPORARY SHEET PILE TOP ELEVATION OF THE EXISTING / PROPOSED REPLACEMENT COFFERDAM. ACTUAL LOCATION MAY VARY DURING TIMBER BOAT RAMP RANGES FROM APPROX. +12.3' MLW DOWN CONSTRUCTION DEPENDING ON CONTRACTOR'S EQUIPMENT TO APPROX. +8.4' MLW; AS SHOWN BELOW. PROPOSED: CONSTRUCT NEW 16' X 107' REPLACEMENT CONCRETE ACCESS REQUIREMENTS. BOAT RAMP IN THE SAME FOOTPRINT AS EXISTING. TOP ELEVATION OF THE EXISTING / PROPOSED REPLACEMENT EASING: TIMBER GUARDRAIL CONCRETE BOAT RAMP RANGES FROM APPROX. +8.4' MLW DOWNCE'IVED PROPOSED: INSTALL NEW GUARDRAIL TO APPROX. -5.5' MLW; AS SHOWN BELOW. TO MATCH THE EXISTING WHEN THE AUG 0 NEW REPLACEMENT BOAT RAMP IS LOCATION OF TRANSITION OFEXISAPPROX. 98 FT. FROM END EXISTING BOAT RAMP TO CONSTRUCTED (TYPICAL) FROM TIMBER TO EDGE OF CORPS CHANNEL CONCRETE BOAT RAMP / C 11L 111�GT{�1r1, I�C (APPROX. STA. 1+114) ` 7 +20 _ �_ �.._\ _... _. .. _. W...... -+20 11.IN IN TOP OF BOAT RAMP_ ®® ®101>110®111111FA t�,l �®I®I ®Iel�l-- ' "+ = "'�"II1"I'�- -- EXISTING BOTTOM (TYPICAL) ELEV, -+12.3' MLW Y,y jTTTTT1 i ` �E 1� 1 Ill I " r... l �4/�� —+10 fw1H _ I . .._.:. I 1I I I Y Y, , ,;—- ___.c"�"= tEXISrrw soar RAMP cww ( ►� I I I I. „' :: .,.f . .."'^�`.w.w : v PROPOSED c +4.85' MLW -. 7# PI! I . .I JL ! t1 Ji I .:. Ij .... APAROX. 73 ) IMMIIIIIIM +485' MLW I.II 11r.. I. I I tl 11 " 5� (moo 0— {1 1 -i i: I I Il II I I.: '.-H-.. - I'11 - . �_ , � M 0 (1�Lv►� _ 1� I II I 11 ii m 41..... q I-I �..�_ I I I r1 II . BQTIOM OF BOAT RAMP :; EXISTING BOTTOM TYPICAL -I: J:I II Tf_- °I C _:i..j ..�. 1 _ Fmir ELEV. 4-5.5' w I I I I I l I ■ u �1- II I aEl mewl �I 0+00 0+20 0+40 0+60 0+80 1+00 1+20 1+40 1+60 1+80 2+00 2+20 2+40 2+60 PROPOSED; EXISTING TIMBER PIUNG AND APPROX. LIMIT/LOCATION OF LOWER END OE SHEET PROPOSED: EXISTING TIMBER PILING AND BOAT CONCRETE BOAT RAMP TO BE REMOVED AND PILE COFFERDAM. ACTUAL LOCATION MAY VARY RAMP TO BE REMOVED AND REPLACED WITH REPLACED WITH NEW CONCRETE PIUNG AND DURING CONSTRUCTION DEPENDING ON THE NEW TIMBER PILING AND BOAT RAMP (TYPICAL) PROPOSED: NEW TIMBER CONCRETE BOAT RAMP (TYPICAL) CONTRACTOR'S EQUIPMENT ACCESS REQUIREMENTS. PILING FOR NEW TIMBER APPROX. LIMIT OF PROPOSED TEMPORARY EXCAVATION TO BOAT RAMP (TYPICAL) PROPOSED: NEW CONCRETE PIUNG FOR ALLOW ADEQUATE DEPTH FOR DEMOLITION OF EXISTING NEW CONCRETE BOAT RAMP (TYPICAL) CONCRETE BOAT RAMP AND CONSTRUCTION OF THE NEW REPLACEMENT BOAT RAMP. APPROX. 215 CY OF CONCRETE BOAT RAMP BEGINS AT MATERIAL TO BE EXCAVATED FROM AN AREA OF APPROX. TIMBER BOAT RAMP BEGINS AT STA. 0+00 APPROX. STA. 1+14 AND CONTINUES 2,120 SF. THE EXCAVATED MATERIAL WILL BE TEMPORARILY —� AND CONTINUES TO APPROX. STA. 1+14 in. STORED ON THE FLOATING BARGE AND THEN REPLACED (EXISTING & PROPOSED REPLACEMENT) TO THE END AT APPROX. STA. 2+21 BACK IN THE SAME ORIGINAL LOCATIONS AFTER SUPPORT (EXISTING & PROPOSED REPLACEMENT) PILING AND PILE CAPS ARE INSTALLED AND AFTER INSTALLING THE NEW CONCRETE BOAT RAMP SLAB. HYDROGRAPHIC SURVEY DATA, AIWW BOTTOM CONTOUR ELEVATIONS, 1 1 1 NOTE: AND ELEVATIONS OF EXISTING & PROPOSED BOAT RAMP STRUCTURE (SIDE VIEW) I I I PROPOSED NEW REPLACEMENT BOAT RAMP TO BE CONSTRUCTED TO ARE REFENCED TO MEAN LOW WATER (MLW) VERTICAL DATUM; IN FEET. 0 20' APPROXIMATELY THE SAME TOP ELEVATIONS, SLOPES, AND PLAN—VIEW PROPOSED NEW BOAT RAMP GRAPHIC SCALE: 1" = 20' FOOTPRINT AS THE EXISTING BOAT RAMP. APPLICANT: PROJECT NAME: PROPOSED ACTIVITY: u��rrrrrri7r� FILE: OYSTER HARBOUR HOMEOWNER'S ASSOCIATION, INC. OYSTER HARBOUR BOAT RAMP REPLACEMENT PERMIT APPLICATION DEMOLISH THE EXISTING DILAPIDATED ,.�`�ZN CARp� ��,, E Oyster Harbour Boat Ramp P—base 2191 OYSTER HARBOUR PARKWAY BOAT RAMP (TO BE DISPOSED OFFSITE) 1 '4 4-9' ± SUPPLY, NC 28462 WATER BODY: AND RE—CONSTRUCT A NEW BOAT RAMP ,f ' '4�'%•, APPROVED BY: MWK i ATLANTIC INTRACOASTAL WATERWAY (AIWW) IN THE SAME LOCATION IN ORDER TO 'L / a AGENT: PROVIDE RESIDENTS OF THE OYSTER 049560 SCALE: AS SHOWN MIKE KIRBY P.E. `` $-3-20 CITY / TOWN: SUPPLY HARBOUR HOMEOWNER'S ASSOCIATION I- 1158-1 VILLAGE CREEK LANE COUNTY: BRUNSWICK LAT; 33' 54' 43.59" N 1 , FNGIH�F-� ��� ISSUE DATE: August 3, 2026 WITH SAFE ACCESS TO NAVIGABLE MOUNT PLEASANT, SC 29464 LONG.: —7a' 20' 54.94" W �,'��,/Y — 0 \\ STATE: N.C. WATERS FOR FISHING AND �///,, L W' „.\\N SHEET: P-5 of 6 (864) 590-0256 email: mkirb i iellc.com r... --..'''i rui«si+ku`�._..y�9 RECREATIONAL PURPOSES. FOR PERMITTING PURPOSES ONLY; DO NOT USE FOR CONSTRUCTION PROPOSEDPR NEW REPLACEMENT BOAT RAMP TO BE CONSTRUCTED TO MLW = MEAN LOW WATER APPROXIMATELY THE SAME TOP ELEVATIONS, SLOPES, AND PLAN—VIEW MHW = MEAN HIGH WATER FOOTPRINT AS THE EXISTING BOAT RAMP. CONCRETE BOAT RAMP; APPROX. 16—FT. WIDTH TIMBER BOAT RAMP; APPROX. 16—FT. WIDTH (EXISTING & PROPOSED REPLACEMENT) ` (EXISTING & PROPOSED REPLACEMENT) N. EXISTING: TIMBER GUARDRAIL EXISTING: TIMBER GUARDRAIL PROPOSED: INSTALL NEW GUARDRAIL TO MATCH THE PROPOSED: INSTALL NEW GUARDRAIL TO MATCH THE EXISTING WHEN THE NEW REPLACEMENT BOAT RAMP TOP HEIGHT OF THE EXISTING EXISTING WHEN THE NEW REPLACEMENT BOAT RAMP IS CONSTRUCTED (TYPICAL) TIMBER BOAT RAMP RANGES IS CONSTRUCTED (TYPICAL) TOP HEIGHT OF THE EXISTING FROM APPROX. +12.3' MLW POSING: 6" X 8" TIMBER CURB CONCRETE BOAT RAMP RANGES TO +8.4' MLW. PROPOSED EXISTING: 6" X 8" TIMBER CURB FROM APPROX. +8.4' MLW DOWN PROPOSED: INSTALL NEW TIMBER CURB TO MATCH PROPOSED: INSTALL NEW TIMBER CURB TO MATCH NEW REPLACEMENT TIMBER THE EXISTING WHEN THE NEW REPLACEMENT BOAT THE EXISTING WHEN THE NEW REPLACEMENT BOAT TO —5.5' MLW. PROPOSED NEW BOAT RAMP TO BE RAMP IS CONSTRUCTED (TYPICAL) RAMP IS CONSTRUCTER (TYPICAL) $ REPLACEMENT CONCRETE BOAT CONSTRUCTED TO MATCH RAMP TO BE CONSTRUCTED TO WITH SAME ELEVATIONS. Z1 EXISTING / PROPOSED TIMBER DECKING Icy MATCH WITH SAME ELEVATIONS. �/V V M M M Iv 6'` ;•r'' EXISTING/PROPOSED CONCRETE JBOAT RAMP SLAB" a:':'•;ram'' IX N IX! I/�J I/L, va!1.°e, ,e�Cti .. !�T• =';f''.;!p i�•s v EXISTING TIMBER �<q•. 1 : �; ;�i4''..;r V•N.,. ,`,.-. ... .. .. :.,a. '.:', ,a 5s �' , PBS,## 4° EXISTING TIMBER EXISTING / PROPOSED TIMBER PILE CAP HUNG (TYPICAL) `a `:•PROPOSEb CONC ETA PN..k.CAP FOR NEW C ,N. ..BOAT RAMP' r PWNG AND CONCRETE BOAT ' ` "._.' ::. I a ..,. ,', €''''•''•.... . •; I•••'• . RAMP TO BE REMOVED AND PROPOSED; EXISTING TIMBER PILING — • � `� ' �•�`�. AND BOAT RAMP TO BE REMOVED I I I. 1 I '• . 1` J REPLACED WITH NEW CONCRETE AND REPLACED WITH NEW TIMBER EXISTING & PROPOSED RPOPOSED NEW I: ' I �*. .r Ins. I. PWNG AND CONCRETE BOAT PILING AND BOAT RAMP (TYPICAL) _ TIMBER STRINGERS / CONCRETE I '�I 1. I' I .,`I RAMP (TYPICAL) BOAT RAMP FRAMING PILING (TYPICAL) (TYPICAL) s I' •<I I .I L.J I, EXISTING BOTTOM• • ` � ` ` �� / /\ . // . �'%/\/ '\ `\,/ ›// -/ /✓/, /. \ /J /,' r /� / , ' /` / / / / i �/.' \/ r`� / /' !!• � / ✓ / .� ELEVATION VARIES � //',✓ /'./ f,f 1,f• �'k, / , i r;��. �• � i' / . f l\/,.;��/ � �/, EXISTING BOTTOM; \\\, ` \ \\' ���. \\\\\,, \� �\ \ ` ` \ WITH LOCATION , . .6, s . . . .\ .. , r F.\7, \, ;\' ' //''' `•✓ \s" /' ELEVATION VARIES WITH • • ,•. \ ` �, ✓.,�1 � �` ♦,/�` -,/ , � � `\ ���/ %�� r/�/.,/�;�/�.,�\,;-�/�.;�%`� r ♦/ (TYPICAL) .` � • LOCATION (TYPICAL) \ \♦ �♦ 4 : `�., .. \, \ \ I. \/ �J';\/�� /:\i/V/Aly' V/\>'//>/.l>/)iI\f4:'//'\/'�j/;/;.' ///\% :,V L' -'`i`. 4.�t; SECTION B-B SECTION A-A (TYPICAL CROSS-SECTION AUG 0 (TYPICAL CROSS-SECTION) CONCRETE BOAT RAMP TIMBER BOAT RAMP HYDROGRAPHIC SURVEY DATA, AIWW BOTTOM CONTOUR ELEVATIONS, 0CM VVIL :'INC,:;TC N1, I AND ELEVATIONS OF EXISTING & PROPOSED BOAT RAMP STRUCTURE (EXISTING & PROPOSED) (EXISTING & PROPOSED} ARE REFENCED TO MEAN LOW WATER (MLW) VERTICAL DATUM; IN FEET. I , , , , 0 4' (COSS—SECT1ON VIEWS) GRAPHIC SCALE: 1" - 4' PROPOSED NEW BOAT RAMP APPjJCANT: PROJECT NAME: PROPOSED ACTIVITY: \`�' rrrrr�r� FILE; OYSTER HARBOUR HOMEOWNER'S ASSOCIATION, INC. OYSTER HARBOUR BOAT RAMP REPLACEMENT PERMIT APPLICATION DEMOLISH THE EXISTING DILAPIDATED �.�`��N CAR071.,,� Oyster Harbour Boat Ramp P—base 2191 OYSTER HARBOUR PARKWAY BOAT RAMP (TO BE DISPOSED OFFSITE) ;*s , 4: SUPPLY, NC 28462 WATER BODY: AND RE—CONSTRUCT A NEW BOAT RAMP = /R' • �' !�q APPROVED BY: MWK ATLANTIC INTRACOASTAL WATERWAY (AIWW) IN THE SAME LOCATION IN ORDER TO L di SCALE: AS SHOWN AGENT: PROVIDE RESIDENTS OF THE OYSTER 049560 MIKE KIRBY, P.E. CITY / TOWN: SUPPLY HARBOUR HOMEOWNER'S ASSOCIATION 8-3-2.0 1158-1 VILLAGE CREEK LANE COUNTY: BRUNSWICK LEI.33' 54' 43.59" N WITH SAFE ACCESS TO NAVIGABLE ,4.. F�'GIKE�9 �A ,� ISSUE DATE: August 3, 2020 MOUNT PLEASANT, SC 29464 STATE: N.C. LONG.: —78' 20' 54.94" w WATERS FOR FISHING AND ",64�`r '����``�� ¢ (864) 590-0256 email: mkirby©sigiellc.com RECREATIONAL PURPOSES. �rrr'1jL 1\0\ SHEET: P-6 01 f• ROY COOPER y� C;nrr,um Olt ' ' •• ••1 MICHAEL S. REGAN a Srcrrunr BRAXTON DAVIS l)irrcm,l)nr.vo,,o1 Caoslol Managemc November 13, 2020 MEMORANDUM: FROM: Curt Weychert, Assistant Major Permits Coordinator NCDEQ- Division of Coastal Management 400 Commerce Avenue, Morehead City, NC 28557 Fax: 252-247-3330 (Courier 11-12-09) curt.weychert@NCDENR.gov SUBJECT: CAMA/Dredge &Fill Applicant: Oyster Harbour HOA Project Location: Boones Neck Rd. & Windy Point Rd., adjacent to the AIWW in Supply, Brunswick County Proposed Project: Proposal to replace the existing boat ramp in the same footprint to serve the Oyster Harbour subdivision. Please indicate below your agency's position or viewpoint on the proposed project and return this form to Curt Weychert at the address above by December 10, 2020. If you have any questions regarding the proposed project, contact Brendan Brock at (910) 796-7270 when appropriate, in- depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. **Additional comments may be attached** This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. PRINT NAME AGENCY SIGNATURE DATE State of North Carolina I Environmental Quality I Coastal Management 127 Cardinal Drive Ext.,Wilmington,NC 28405 919 796 7215 arunoierick County-Register of Deeds Robert J. Robinson Inst 1337810 Book 2417Page 538 06/26/2006 04:35:13pm Reek 54:,5, STATE fIF ff 1 CAlit il, COUNTY OF BRIIRSwl " This Inirupont8u Inert tiled fni; �a Rq�'stralioanaihtitai9','llmeandinl�s Bholup,4.,14 4,,K- JAefit Itignr;El �.. re(nreedtor di ourtak74 RET saa '...tasnn ear TOTA is REV....__TC# .�.� RED CK AMT% K'ASA CASH REF--SY Mail To: Jeffcoat,Pike,&Nappier,LLC,P.O.Box 44000,Calabash,NC 28467 Prepared by: J.Harrison Rushton WITHOUT OPINION OF TITLE QUITCLAIM DEED 06787.034 STATE OF NORTH CAROLINA, Brunswick County. THIS DEED, made and entered into this 2 7":!:'day of /� r`1 , 2006,by and between OYSTER HARBOUR, LLC, a North Carolina Limited Li bility Company, hereinafter called `Grantor,and OYSTER HARBOUR HOMEOWNERS ASSOCIATION,INC,of Brunswick County and State of North Carolina,hereinafter called Grantee,whose permanent mailing address is c/o 1630 Military Cutoff Road,Suite 108,Wilmington,NC 28403. WITNESSETH: That said Grantor,for and in consideration of the sum of Ten Dollars($10.00)to him in hand paid, the receipt of which is hereby acknowledged, has remised and released and by these presents does remise, release, convey, and forever quitclaim unto the Grantee, his heirs and/or successors and assigns, all right,title, claim and interest of the Grantor in and to a certain lot or parcel of Iand lying and being in Lockwood Folly Township, Brunswick County, North Carolina, and more particularly described as follows: See Attached Exhibit"A" WITHOUT OPINION OF TITLE To have and hold the aforesaid lot or parcel of land and all privileges thereunto belonging to him, the Grantee in fee simple. The Grantor makes no warranty, express or implied, as to the title to the property hereinabove described The designation Grantor and Grantee as used herein shall include said parties, their heirs, successors,and assigns,and shall include singular,plural,masculine,feminine or neuter as,required by content. BUG 0.3 2C20 Inst 1 337810 Book 2417Page: 539 IN WITNESS WHEREOF,the GRANTOR has hereunto set his hand and seal, or if corporate, has caused this instrument to be signed in its corporate name by its duly authorized officers and its seal to be hereunto affixed by authority of its Board of Directors,the day and year first above written. OYSTER HARBOUR,LLC By William G.Allen It's MEMBER/MANAGER STATE: Wor1-11 1.0.+o1i na COUNTY: knion I ybA.r0. Se oir+' , a Notary Public of the County and State aforesaid, certify that V)1k ia.n, G. A\lo'1 ,personally came before me this day, and(I have personal knowledge of the identity of the principal(s))(I have seen satisfactory evidence of the principal's identity, by current state or federal identification with the principal's photograph in the form of a )(a credible witness has sworn to the identity of the principal's))and acknowledged that he/she is member/manager of Oyster Harbour,LLC, a North Carolina LLC,and that by authority duly given and as the act of such entity,he signed the f regoing instrument in its name on its behalf as its act and deed. Witness my hand and official seal,this the off'i^dayyoof e i( _,2005. Nty commission expires: O4-1��c7O '��$2• Its.t I o .1b}'Public �J gy�rro-#�' e.d.r.a Schott jg arn 12. JC-hit (print notary's name here) r• 1e pp,e 15.Dori ) The foregoing Certificate(s) of is/are certified to be correct. This instrument and this certificate are duly registered at the date and time and in the Book and Page shown on the Register of Deeds for County. By: , Deputy/Assistant —Register of Deeds Inst # 337810 Book 2417Page: 540 EXHIBIT"A" Twenty Tracts Tract 1: 0.46 acres of open space as shown on plat by Brian Hobbs,RLS,dated April 8,2002,and entitled"Oyster Harbour,Revision Plat Phase III,Section 3"recorded in Map Book 26 at Page 80 in the Brunswick County Register of Deeds. Tract 2: 3.02 acres of open space,shown as a pond,as shown on plat by Brian Hobbs,RLS,dated June 3,2002,and entitled"Oyster Harbour,Correction Plat,Phase IV,Section 2"recorded in Map Book 26 at Page 271 in the Brunswick County Register of Deeds. Tract 3: 0.25 acres of open space,as shown on a plat by Brian Hobbs,RLS,dated August 4,2000,and entitled"Oyster Harbour,Record Plat of Phase II"recorded in Map Book 23 at Page 170 in the Brunswick County Register of Deeds. Tract 4: 2.24 acres of open space,shown as a pond,as shown on plat by Brian Hobbs,RLS,dated July 8,2002,and entitled"Oyster Harbour,Final Plat Phase IV, Section 3"recorded in Map Book 26 at Page 326 in the Brunswick County Register of Deeds. Tract 5: 2.92 acres of open space,as shown on plat by Brian Hobbs,RLS,dated August 28,2002,and.entitled"Oyster Harbour,Final Plat,Open Space 1"recorded in Map Book 26 at Page 505 in the Brunswick County Register of Deeds. Tract 6: 0.31 acres shown as a Buffer Area,as shown on plat by Hobbs Surveying Company,Inc.and entitled"Oyster Harbour,Record Plat,Phase ITT,Section 4"recorded in Map Book 27 at Page 164 in the Brunswick County Register of Deeds. Tract 7: 11.66 acres of open space as shown on plat by Brian Hobbs,RLS,dated April 8,2002,and entitled"Oyster Harbour,Revision Plat,Phase III,Section 3"recorded in Map Book 26 at Page 82 in the Brunswick County Register of Deeds. Tract 8: Open Space shown as"OP 1",as shown on plat by Hobbs Surveying Company,Inc.,dated August 21,2003,and entitled"Oyster Harbour,Phase V,Revision Plat"recorded in Map Book 28 at Page 435 in the Brunswick County Register of Deeds. Tract 9: 1.17 acres shown as Conservation Area`B",as shown on plat by Hobbs Surveying Company,Inc.,dated August 21,2003,and entitled"Oyster Harbour,Phase V,Revision Plat"recorded in Map Book 28 at Page 434 in the Brunswick County Register of Deeds. Tract 10: Parcel identified as tax parcel#230KC00106,shown on plat as the parcel located just west of Conservation Area"B",on plat dated August 21,2003,and entitled AUG 032020 pcpill :LMi ;QTQN, I'J�C Inst # 337810 Book 2417Page: 541 "Oyster Harbour,Phase V,Revision Plat"recorded in Deed Book 28 at Page 434 in the Brunswick County Registry. Tract 11: BEING that tract indicated as"Lake"as shown on plat by Hobbs Surveying Company,Inc.,dated August 21,2003,and entitled"Oyster Harbour,Phase V,Revision Plat",recorded in Map Book 28 at Page 434 in the Brunswick County Register of Deeds. Tract 12: BEING that tract labeled as"SP 3"as shown on plat by Hobbs Surveying Company,Inc.,dated August 21,2003,and entitled"Oyster Harbour,Phase V,Revision Plat",recorded in Map Book 28 at Page 434 in the Brunswick County Register of Deeds. Tract 13: BEING that 6.88 acre parcel shown as Open Space,as shown on plat by Brian Hobbs,RLS,dated August 28,2002,and entitled"Oyster Harbour,Final Plat, Open Space 2"and recorded in Map Book 26 at Page 504 in the Brunswick County Register of Deeds. Tract 14: BEING 0.07 acres shown as"Tract 3"as shown on plat by Hobbs Surveying Company,Inc.,dated February 4,2003,and entitled"Hewett Tract,Boundary Survey",and recorded in Map Book 27,at Pages 291-292,inclusive,in the Brunswick County Registry. Tract 15: BEING 0.16 acres shown as"Tract 4"as shown on plat by Hobbs Surveying Company,Inc.,dated February 4,2003,and entitled"Hewett Tract,Boundary Survey",and recorded in Map Book 27,at Pages 291-292,inclusive,in the Brunswick County Registry. Tract 16: BEING 5.30 acres shown as"Russell's Lake",as shown on plat by Hobbs Surveying Company,Inc.,dated February 4,2003,and entitled"Hewett Tract,Boundary Survey",and recorded in Map Book 27,at Pages 291-292,inclusive,in the Brunswick County Registry. Tract 17: BEING 0.71 acres shown as"Septic Area 4",as shown on plat by Brian Hobbs,RLS dated August 29,2001,and entitled"Oyster Harbour,Easement Plat,Septic Area 4",and recorded in Map Book 26 at Page 270 in the Brunswick County Registry. Tract 18: BEING 0.46 acres shown as"Septic Area 6"as shown on plat by Hobbs Surveying Company,Inc.,dated December 5,2002 and entitled"Oyster Harbour, Easement Plat,Septic Area 6&Lot 434R",and recorded in Map Book 27 at Page 158 in the Brunswick County Registry. Tract 19: BEING 0.99 acres shown as"Septic Area 3",as shown on plat by Brian Hobbs,RLS,dated September 20,2001 and entitled"Oyster Harbour,Easement Plat, Septic Area 3"and recorded in Map Book 25 at Page 1 in the Brunswick County Registry. 5/27/2020 Brunswick County,NC Register of Deeds.map Book 22,Page 259.lusrl/Brunswicklbcrod-images/Jmap10o22fo022o259.tif a 1",' ,:ZOOM out II Zoom in I First Instrument 1 Previous Instrument Instrument t i I Book:22 Page:259 Next Instrument 1 Last Instrument P I First Page 1 Previous Page Next Page Last Page > **DISCLAIMER:All legacy instrument page counts are estimates.Be sure to check images after the estimated last page.** ....r.M a.�.�..�.w. � ail [ 1 N.r.i....y.a•Le,ciu+,:k.,.n.ii II �......ra..i ... v =fs F _ --_Ate "++€ J O$& # f ],t si Y9 :wt �'�kt Ob. N. .° 'Ir y b - - ,AN- l fin, i.-0 ryrya�� e6� i WI 11.1 arrt. Fra.l.“ff...Aiwa+",EklE - aT. _ ZF Vt£Ir'rR'1" MAP �s"Y _ ref NSW li+"li si,a.e.� w.w,.morn. Mw.oM" 'A _ 7 p }i Vf..s+++Y.••'a.11•....mks i+4�}.J..J 5: kiln F ...tit:" %� a }. E Sbe _ 1 1 f ra.d I.oe R•.. r Pr QA 1 . Aua• t .f �yj .I,ii34e. �iEX� €--.-'—. ■._ r i 3 IV,IC � �'�' s..r+..,w 1• i ZSiV a. 1• f t Y r? 1T.Etl.. I- ��.i A'-- • I _r ,r+I ,a is.n.� ,� r — — — — cl i I 4.au...aia¢m. r. r I fl e Wife a-.�.•�..,�..,..»....+... - e f F ��....ww a�m.a e.C'i.""a.""" i - ▪ ;a. .. rN�••s�syMe� i i}FrnlilE p..... 1 �-,.yam-✓ Q ',En.a...E... Awn/w.M.MWb4ri`.A. w ▪ ...'1 Ans.n..,--r- B.WAN I Zit r • YcBellasny Place .,, Y ' + ,.vl+ •w.� €«'Ms!F., ......14.1k n.-E.=...Y« • Sil7,S.R...E.d..m. �-" , .............ea r...-.*W.Al-a.- E,..w '-,.H... -.� Y- Pr.I _• ra...�.•�, �"�w rw, CvF i f"L C?r 1 M 1 En la"wpm at NW w�.•lwrs M Ile r.� ralls"ME °" �.sy. .r. +a+........ n�ra1.,... Cuhdsvieion,__,,, ti W. "":.= .r..z ... wn c.ror 0t0114r hioo,r.tiC ' '. =.t om » .,r..rw.r..re u.a..a....rrew :end ll1.nlritlt LevCli✓2 762'; El°111181811 ij;AlY rE_ Al4Y. INC. jy\/� �} �,y.��y wy /} ��y y y� / Peg /ry �y�o.e.nE4,0,0 Lamar...1u. Ma.Nol /n.,..,. 1 1 fAp c j .GN d. -i i 2 o ♦1t Peg IK I"i.{/ k 1 First Instrument 1 Previous Instrument Instrument[ l]Book:22 Page:259 Next Instrument ). Last Instrument P. 1 First Page -1 Previous Page Next Page >► Last Page P. View as PDF I Zoom but I[Zoom in ) ECE1VED AUG O32 223 pcIve IVI-MI vGToN, NC Brunswick-iive.innek.net/Iocal-popup-group-view-image.ntk?s=ZGb44jDRST1LAD 1 RQ41B ell 7iSIhzPYeGL3R 1RGjeIXpLEjoskuCNV97bolwYAvAmz WR@fzx7RhJH... 1/1 • Lost # 337810 Book 2417Page: 592 Tract 20: BEING 0.90 acres shown as Lot 1 as shown on plat by Hobbs Surveying Company,Inc.dated January 3,2000 and entitled"Bellamy Place"and recorded in Map Book 22 at Page 259.