Loading...
HomeMy WebLinkAbout20052245 Ver 1_Certification of Completion_20070320Certification of Completion DWQ Project No.: ~ CAS -Z'2-4-'~ County: 1 ~ ~ C~duJ ~u Applicant: ~ d ~EP 1`} ~. ~ ~1r~,rY-!~'K-~~`2 Project Name: ~~oR~~.~,~~ <~~iLl~+~nc~.:~ - ~yn1s~1- ~o~~;~ IS~Titlnt2-1 ~T'~.3`~ Date of Issuance of Isolated Wetland Permit: ~ - 4-- (~ ho Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification and Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401/Wetlands Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC 27699-1650. This form may be returned to DWQ by the applicant, the applicant's authorized agent or the project engineer. It is not necessary to send certificates from all of these. Appi licant's Certification I Jr~S~:PN ~. W ~ ~~~ hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance d intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specificatio s and other sup/p~ort~ing materials. p Signature: 1, IJIfC~ Date: 0 /2- ~~ 6 Agent's Certification I hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: If this project was designed by a Certified Professional I , as a duly registered Professional (i.e., Engineer, Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project, for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: D ~ ~ ~ ~ 1:./ \V/J {~ MAR 2 0.2007 pEWR • WATER QUALITY VIlETlAN03 AND STORMWATER BRANCH Certification of Corr~pletion DWQ Project No.: ~c~5 - Z2~-s 4 \ County: ~C.', o ~ ~~.- Applicant: jc,5 ~ p F~ ~ ~V A-rs R-~'- ~'~t'~- Project Name: SN-o@EL.i~ ~~~+a~t~~ ~~o~ ~ F-~fLt~o~.~pti+~s~~ ~L_ar~&~ Date of Issuance of Isolated Wetland Permit: l - 4 - Zoo fo Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification and Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401/Wetlands Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC 27699-1650. This form may be returned to DWQ by the applicant, the applicant's authorized agent or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification I .~JUSC.~QN ~. ~ p*c~~cY-so,~K-tom hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specification and other supp)o~rti~ng material . Signature: ~ 1/t`' Date: ~ ~ ~O Agent's Certification I hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: If this project was designed by a Certified Professional I , as a duly registered Professional (i.e., Engineer, Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project, for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: ~C~t~d~I(~ p MAR 2 0 2007 ~ENR -WATER 4UALITY WETLANDS AND STORAIWATER BRANCH