Loading...
HomeMy WebLinkAbout20100536 Ver 1_401 Application_20100710? ? Kimley-Horn and Associates, Inc. July 20, 2010 Mr. Rob Riding NC Division of Water Quality 2321 Crabtree Blvd.,5uik Z50 Raleigh, North Carolina 27602 Re: U-4916 Beckford Drive Widening Nationwide Permit Application Correction Request Vance County, North Carolina Dear Mr. Riding: v_o53C9 Kimley-Horn and Associates, on behalf of the City of Henderson, would like to request a Permit Application Correction to the joint 404/401 Preconstruction Notification Application submitted on July 1, 2010 for the above reference project. Prior to submitting the application package, NCDOT's Division Environmental Department and Hydraulics Unit reviewed the drainage plan and made a few minor comments. Their comments resulted in modifications to both stream crossings/impacts. These modifications were reflected in the permit drawings submitted with the application, but did not get updated on sheet 5 of the Pre-Construction Notification Application Form. The correct stream impacts are as follows: • 26 linear feet of intermittent stream impact (original application indicated 21 If) • 89 linear feet of perennial stream impact (original application indicated 59 If) The revised total stream impact is 115 linear feet which still falls below 150 linear feet threshold and results in no anticipated mitigation. Per your conversation with Beth Reed on July 19, 2010 we are sending you 5 copies of revised sheet 5 of the PCN to replace in the original application package. If there is any additional information you need to assist in the processing of this application, please do not hesitate to contact me at (919) 677-2175. Very truly yours, KIMLEY-HORN AND ASSOCIATES, INC. d'-4 v? r%4,•, Jeffrey Moore, P.E. Project Manager cc: Frank Frazier, City of Henderson Eric Alsmeyer, U.S. Army Corps of Engineers ? ? Kimley-Horn and Associates, Inc. Project Summary Sheet Project Name: U-4916 Beckford Drive Widening Applicant Name and Address: City of Henderson Attn: Mr. Frank Frazier, Deputy City Manager 134 Rose Avenue Henderson- NC 27536 Telephone Number: (252) 430-5703 Type of Request: ® Nationwide PCN (NWP # 14 ? Indivir ® Preliminary Jurisdictional Determination ? Other: Included Attachments: ® Project Plans ® USGS Map ® Agent Authorization ® Delineation Sketch ? Data Forms (Up & Wet) ® NCDWQ Stream Forms ? NCEEP Confirmation ® Aerial Photo ® Agency Correspondence ? Other: lual Permit Application ® NRCS Soil Survey ® Delineation Survey ® USACE Stream Forms ? Site Photos ? Other: Check if applicable: ? CAMA County ? Trout County ? Isolated Waters ? Section 7, ESA ? Section 106, NHPA ? EFH ? Mitigation Proposed (? NC EEP ? On-Site ? Off-Site ? Other) County: Vance Nearest City/Town: Henderson Waterway: UT Nutbush Creek River Basin: Roanoke H.U.C.:03010102 USGS Quad Name: Henderson Property Size (acres): -0.5 mile long project corridor Approx. Size of Jurisdiction on Site (acres): - 300 If of jurisdictional stream within project corridor Site Coordinates (in decimal degrees): 36.3364 °N 78.4275 ow Project Location: The project is located on existing Beckford Drive between Harrison Street and North Park Drive Site Description: The project corridor is primarily commercial development with pockets of undeveloped forest. Impact Summary (if applicable): As part of the roadway widening- an existing 72" pipe at a UT to Nutbush Creek will be replaced with a 9'x 6' RCBC (buried I-foot), resulting in 59 If of perennial stream impact. In addition- a 24" RCP at a second UT to Nutbush Creek will be extended resulting in 21 If of unimportant stream impact. i i W l d Stream Channel par an R et an NWP Buffer (sq ft) (acres) Intermittent and/or Unimportant Perennial and/or Important to Aquatic Function Aquatic Function Temp. Perm. Tem P. Perm. Temp. Perm. Temp. Perm. If If If If A ac ac Re c 14 0 0 0 0 0 0 26 0 0 0 89 0 Total Permanent Impact to Waters of the U.S. (10 115 Kimley-Horn Contact: Jeff Moore Direct Number: 919-677-2175 ¦ ¦ P.0 Box 33066 TEL 919 677 2000 Raleigh, North Carolina FAX 919 677 2050 27636-3066 C. Proposed Impacts Inventory 1. Impacts Summary 1a. Which sections were completed below for your project (check all that apply): ? Wetlands ® Streams - tributaries ? Buffers ? Open Waters ? Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction number- Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ - non-404, other) (acres) Tem ora T W1 ? P ? T ? Yes ? Corps ? No ? DWQ W2 ? P ? T ? Yes ? Corps ? No ? DWQ W3 ? P ? T ? Yes ? Corps ? No ? DWQ W4 ? P ? T ? Yes ? Corps ? No ? DWQ W5 ? P ? T ? Yes ? Corps ? No ? DWQ W6 ? P ? T ? Yes ? Corps ? No ? DWQ 2g. Total wetland impacts 0 ac 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number - (PER) or (Corps - 404, 10 stream length Permanent (P) or intermittent DWQ - non-404, width (linear Temporary (T) (INT)? other) (feet) feet) Replacement of ® PER N Corps S1 N P ? T existing 72" CMP ' ' UT Nutbush Creek ?INT ®DWQ 10 89 with g x6 RCBC S2 N P ? T 24"RCP Extension UT Nutbush Creek ? PER N INT N Corps ? DWQ 5 26 S3 ? P ? T ? PER ? Corps ? INT ? DWQ S4 ? P ? T ? PER ? Corps ? INT ? DWQ S5 ? P ? T ? PER ? Corps ? INT ? DWQ S6 ? P ? T ? PER ? Corps ? INT ? DWQ 3h. Total stream and tributary impacts 115 3i. Comments: Page 5 of 12 PCN Form - Version 1.3 December 10, 2008 Version C. Proposed Impacts Inventory 1. Impacts Summary 1a. Which sections were completed below for your project (check all that apply): ? Wetlands ® Streams - tributaries ? Buffers ? Open Waters ? Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction number - Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ - non-404, other) (acres) Temporary T W1 ? P ? T ? Yes ? Corps ? No ? DWQ W2 ? P ? T ? Yes ? Corps ? No ? DWQ W3 ? P ? T ? Yes ? Corps ? No ? DWQ W4 ? P ? T ? Yes ? Corps ? No ? DWQ W5 ? P ? T ? Yes ? Corps ? No ? DWQ W6 ? P ? T ? Yes ? Corps ? No ? DWQ 2g. Total wetland impacts 0 ac 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number- (PER) or (Corps - 404, 10 stream length Permanent (P) or intermittent DWQ - non404, width (linear Temporary (T) (INT)? other) (feet) feet) Replacement of ® PER ® Corps S1 ® P ? T existing 72" CMP ' ' UT Nutbush Creek ?INT ®DWQ 10 89 with 9 x6 RCBC ? PER ® Corps S2 ®P ? T 24"RCP Extension UT Nutbush Creek ® INT ? DWQ 5 26 ? PER ? Corps S3 ? P ? T ? INT ? DWQ S4 ? P ? T ? PER ? Corps ? INT ? DWQ S5 ? P ? T ? PER ? Corps ? INT ? DWQ ? PER ? Corps S6 ? P ? T ? INT ? DWQ 3h. Total stream and tributary impacts 115 3i. Comments: Page 5 of 12 PCN Form - Version 1.3 December 10, 2008 Version C. Proposed Impacts Inventory 1. Impacts Summary 1a. Which sections were completed below for your project (check all that apply): ? Wetlands ® Streams - tributaries ? Buffers ? Open Waters ? Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction number- Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ - non-404, other) (acres) Temporary T W 1 ? P ? T ? Yes ? Corps ? No ? DWQ W2 ? P ? T ? Yes ? Corps ? No ? DWQ W3 ? P ? T ? Yes ? Corps ? No ? DWQ W4 ? P ? T ? Yes ? Corps ? No ? DWQ W5 ? P ? T ? Yes ? Corps ? No ? DWQ W6 ? P ? T ? Yes ? Corps ? No ? DWQ 2g. Total wetland impacts 0 ac 21h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 31b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number- (PER) or (Corps-404,10 stream length Permanent (P) or intermittent DWQ - non-404, width (linear Temporary (T) (INT)? other) (feet) feet) Replacement of ® PER ® Corps S1 ®P ? T existing 72" CMP ' ' UT Nutbush Creek ? INT ® DWQ 10 89 RCBC with 9 x6 ? PER ® Corps S2 ® P ? T 24"RCP Extension UT Nutbush Creek ® INT ? DWQ 5 26 S3 ? P ? T ? PER ? Corps ? INT ? DWQ S4 ? P ? T ? PER ? Corps ? INT ? DWQ S5 ? P ? T ? PER ? Corps ? INT ? DWQ S6 ? P ? T ? PER ? Corps ? INT ? DWQ 3h. Total stream and tributary impacts 115 3i. Comments: Page 5 of 12 PCN Form - Version 1.3 December 10, 2008 Version C. Proposed Impacts Inventory 1. Impacts Summary 1a. Which sections were completed below for your project (check all that apply): ? Wetlands ® Streams - tributaries ? Buffers ? Open Waters ? Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction number - Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ - nonA04, other) (acres) Temporary T W1 ? P ? T ? Yes ? Corps ? No ? DWQ W2 ? P ? T ? Yes ? Corps ? No ? DWQ W3 ? P ? T ? Yes ? Corps ? No ? DWQ W4 ? P ? T ? Yes ? Corps ? No ? DWQ W5 ? P ? T ? Yes ? Corps ? No ? DWQ W6 ? P ? T ? Yes ? Corps ? No ? DWQ 2g. Total wetland impacts 0 ac 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 31b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number- (PER) or (Corps - 404, 10 stream length Permanent (P) or intermittent DWQ - non-404, width (linear Temporary (T) (INT)? other) (feet) feet) Replacement of ® PER ® Corps S1 ®P ? T existing 72" CMP ' ' UT Nulbush Creek ?INT ®DWQ 10 89 with 9 x6 RCBC S2 ® P ? T 24"RCP Extension UT Nutbush Creek ? PER ® INT ® Corps ? DWQ 5 26 S3 ? P ? T ? PER ? Corps ? INT ? DWQ S4 ? P ? T ? PER ? Corps ? INT ? DWQ S5 ? P ? T ? PER ? Corps ? INT ? DWQ S6 ? P ? T ? PER ? Corps ? INT ? DWQ 3h. Total stream and tributary impacts 115 3i. Comments: Page 5 of 12 PCN Form - Version 1.3 December 10, 2008 Version C. Proposed Impacts Inventory 1. Impacts Summary 1a. Which sections were completed below for your project (check all that apply): ? Wetlands ® Streams - tributaries ? Buffers ? Open Waters ? Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction number- Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ - non-404, other) (acres) Temporary T W1 ? P ? T ? Yes ? Corps ? No ? DWQ W2 ? P ? T ? Yes ? Corps ? No ? DWQ W3 ? P ? T ? Yes ? Corps ? No ? DWQ W4 ? P ? T ? Yes ? Corps ? No ? DWQ W5 ? P ? T ? Yes ? Corps ? No ? DWQ W6 ? P ? T ? Yes ? Corps ? No ? DWQ 2g. Total wetland impacts 0 ac 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number - (PER) or (Corps - 404, 10 stream length Permanent (P) or intermittent DWQ - non-404, width (linear Temporary (T) (INT)? other) (feet) feet) Replacement of ® PER ® Corps S1 ®P ? T existing 72" CMP ' ' UT Nulbush Creek ?INT ®DWQ 10 89 with 9 x6 RCBC S2 ® P ? T 24"RCP Extension UT Nutbush Creek ? PER ® INT ® Corps ? DWQ 5 26 S3 ? P ? T ? PER ? Corps ? INT ? DWQ S4 ? P ? T ? PER ? Corps ? INT ? DWQ S5 ? P ? T ? PER ? Corps ? INT ? DWQ S6 ? P ? T ? PER ? Corps ? INT ? DWQ 3h. Total stream and tributary impacts 115 3i. Comments: Page 5 of 12 PCN Form - Version 1.3 December 10, 2008 Version