Kimley-Horn and Associates, on behalf of the City of Henderson, would like to request a
Permit Application Correction to the joint 404/401 Preconstruction Notification
Application submitted on July 1, 2010 for the above reference project. Prior to
submitting the application package, NCDOT's Division Environmental Department and
Hydraulics Unit reviewed the drainage plan and made a few minor comments. Their
comments resulted in modifications to both stream crossings/impacts. These
modifications were reflected in the permit drawings submitted with the application, but
did not get updated on sheet 5 of the Pre-Construction Notification Application Form.
The correct stream impacts are as follows:
• 26 linear feet of intermittent stream impact (original application indicated 21 If)
• 89 linear feet of perennial stream impact (original application indicated 59 If)
The revised total stream impact is 115 linear feet which still falls below 150 linear feet
threshold and results in no anticipated mitigation.
Per your conversation with Beth Reed on July 19, 2010 we are sending you 5 copies of
revised sheet 5 of the PCN to replace in the original application package.
If there is any additional information you need to assist in the processing of this
application, please do not hesitate to contact me at (919) 677-2175.
Very truly yours,
KIMLEY-HORN AND ASSOCIATES, INC.
d'-4 v? r%4,•,
Jeffrey Moore, P.E.
Project Manager
cc: Frank Frazier, City of Henderson
Eric Alsmeyer, U.S. Army Corps of Engineers
? ? Kimley-Horn
and Associates, Inc.
Project Summary Sheet
Project Name: U-4916 Beckford Drive Widening
Applicant Name and Address: City of Henderson
Attn: Mr. Frank Frazier, Deputy City Manager
134 Rose Avenue
Henderson- NC 27536
Telephone Number: (252) 430-5703
Type of Request: ® Nationwide PCN (NWP # 14 ? Indivir
® Preliminary Jurisdictional Determination ? Other:
Included Attachments: ® Project Plans ® USGS Map
® Agent Authorization ® Delineation Sketch
? Data Forms (Up & Wet) ® NCDWQ Stream Forms
? NCEEP Confirmation ® Aerial Photo
® Agency Correspondence ? Other:
lual Permit Application
® NRCS Soil Survey
® Delineation Survey
® USACE Stream Forms
? Site Photos
? Other:
Check if applicable: ? CAMA County ? Trout County ? Isolated Waters
? Section 7, ESA ? Section 106, NHPA ? EFH
? Mitigation Proposed (? NC EEP ? On-Site ? Off-Site ? Other)
County: Vance Nearest City/Town: Henderson
Waterway: UT Nutbush Creek River Basin: Roanoke
H.U.C.:03010102
USGS Quad Name: Henderson
Property Size (acres): -0.5 mile long project corridor
Approx. Size of Jurisdiction on Site (acres): - 300 If of jurisdictional stream within project corridor
Site Coordinates (in decimal degrees): 36.3364 °N 78.4275 ow
Project Location: The project is located on existing Beckford Drive between Harrison Street and North Park Drive
Site Description: The project corridor is primarily commercial development with pockets of undeveloped forest.
Impact Summary (if applicable): As part of the roadway widening- an existing 72" pipe at a UT to Nutbush Creek
will be replaced with a 9'x 6' RCBC (buried I-foot), resulting in 59 If of perennial stream impact. In addition- a 24"
RCP at a second UT to Nutbush Creek will be extended resulting in 21 If of unimportant stream impact.
i
i W
l
d Stream Channel
par
an
R et
an
NWP Buffer (sq ft) (acres) Intermittent and/or Unimportant Perennial and/or Important
to Aquatic Function Aquatic Function
Temp. Perm. Tem P. Perm.
Temp. Perm. Temp. Perm. If If If If A
ac ac Re c
14 0 0 0 0 0 0 26 0 0 0 89 0
Total Permanent Impact to Waters of the U.S. (10 115
Kimley-Horn Contact: Jeff Moore
Direct Number: 919-677-2175
¦ ¦
P.0 Box 33066 TEL 919 677 2000
Raleigh, North Carolina FAX 919 677 2050
27636-3066
C. Proposed Impacts Inventory
1. Impacts Summary
1a. Which sections were completed below for your project (check all that apply):
? Wetlands ® Streams - tributaries ? Buffers
? Open Waters ? Pond Construction
2. Wetland Impacts
If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted.
2a. 2b. 2c. 2d. 2e. 2f.
Wetland impact Type of jurisdiction
number- Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact
Permanent (P) or (if known) DWQ - non-404, other) (acres)
Tem ora T
W1 ? P ? T ? Yes ? Corps
? No ? DWQ
W2 ? P ? T ? Yes ? Corps
? No ? DWQ
W3 ? P ? T ? Yes ? Corps
? No ? DWQ
W4 ? P ? T ? Yes ? Corps
? No ? DWQ
W5 ? P ? T ? Yes ? Corps
? No ? DWQ
W6 ? P ? T ? Yes ? Corps
? No ? DWQ
2g. Total wetland impacts 0 ac
2h. Comments:
3. Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this
question for all stream sites impacted.
3a. 3b. 3c. 3d. 3e. 3f. 3g.
Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact
number - (PER) or (Corps - 404, 10 stream length
Permanent (P) or intermittent DWQ - non-404, width (linear
Temporary (T) (INT)? other) (feet) feet)
Replacement of ® PER N Corps
S1 N P ? T existing 72" CMP
'
' UT Nutbush Creek ?INT ®DWQ 10 89
with g
x6
RCBC
S2 N P ? T 24"RCP Extension UT Nutbush Creek ? PER
N INT N Corps
? DWQ 5 26
S3 ? P ? T ? PER ? Corps
? INT ? DWQ
S4 ? P ? T ? PER ? Corps
? INT ? DWQ
S5 ? P ? T ? PER ? Corps
? INT ? DWQ
S6 ? P ? T ? PER ? Corps
? INT ? DWQ
3h. Total stream and tributary impacts 115
3i. Comments:
Page 5 of 12
PCN Form - Version 1.3 December 10, 2008 Version
C. Proposed Impacts Inventory
1. Impacts Summary
1a. Which sections were completed below for your project (check all that apply):
? Wetlands ® Streams - tributaries ? Buffers
? Open Waters ? Pond Construction
2. Wetland Impacts
If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted.
2a. 2b. 2c. 2d. 2e. 2f.
Wetland impact Type of jurisdiction
number - Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact
Permanent (P) or (if known) DWQ - non-404, other) (acres)
Temporary T
W1 ? P ? T ? Yes ? Corps
? No ? DWQ
W2 ? P ? T ? Yes ? Corps
? No ? DWQ
W3 ? P ? T ? Yes ? Corps
? No ? DWQ
W4 ? P ? T ? Yes ? Corps
? No ? DWQ
W5 ? P ? T ? Yes ? Corps
? No ? DWQ
W6 ? P ? T ? Yes ? Corps
? No ? DWQ
2g. Total wetland impacts 0 ac
2h. Comments:
3. Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this
question for all stream sites impacted.
3a. 3b. 3c. 3d. 3e. 3f. 3g.
Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact
number- (PER) or (Corps - 404, 10 stream length
Permanent (P) or intermittent DWQ - non404, width (linear
Temporary (T) (INT)? other) (feet) feet)
Replacement of ® PER ® Corps
S1 ® P ? T existing 72" CMP
'
' UT Nutbush Creek ?INT ®DWQ 10 89
with 9
x6
RCBC
? PER ® Corps
S2 ®P ? T 24"RCP Extension UT Nutbush Creek
® INT
? DWQ 5 26
? PER ? Corps
S3 ? P ? T ? INT ? DWQ
S4 ? P ? T ? PER ? Corps
? INT ? DWQ
S5 ? P ? T ? PER ? Corps
? INT ? DWQ
? PER ? Corps
S6 ? P ? T ? INT ? DWQ
3h. Total stream and tributary impacts 115
3i. Comments:
Page 5 of 12
PCN Form - Version 1.3 December 10, 2008 Version
C. Proposed Impacts Inventory
1. Impacts Summary
1a. Which sections were completed below for your project (check all that apply):
? Wetlands ® Streams - tributaries ? Buffers
? Open Waters ? Pond Construction
2. Wetland Impacts
If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted.
2a. 2b. 2c. 2d. 2e. 2f.
Wetland impact Type of jurisdiction
number- Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact
Permanent (P) or (if known) DWQ - non-404, other) (acres)
Temporary T
W 1 ? P ? T ? Yes ? Corps
? No ? DWQ
W2 ? P ? T ? Yes ? Corps
? No ? DWQ
W3 ? P ? T ? Yes ? Corps
? No ? DWQ
W4 ? P ? T ? Yes ? Corps
? No ? DWQ
W5 ? P ? T ? Yes ? Corps
? No ? DWQ
W6 ? P ? T ? Yes ? Corps
? No ? DWQ
2g. Total wetland impacts 0 ac
21h. Comments:
3. Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this
question for all stream sites impacted.
3a. 31b. 3c. 3d. 3e. 3f. 3g.
Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact
number- (PER) or (Corps-404,10 stream length
Permanent (P) or intermittent DWQ - non-404, width (linear
Temporary (T) (INT)? other) (feet) feet)
Replacement of ® PER ® Corps
S1 ®P ? T existing 72" CMP
'
' UT Nutbush Creek ? INT ® DWQ 10 89
RCBC
with 9
x6
? PER ® Corps
S2 ® P ? T 24"RCP Extension UT Nutbush Creek
® INT
? DWQ 5 26
S3 ? P ? T ? PER ? Corps
? INT ? DWQ
S4 ? P ? T ? PER ? Corps
? INT ? DWQ
S5 ? P ? T ? PER ? Corps
? INT ? DWQ
S6 ? P ? T ? PER ? Corps
? INT ? DWQ
3h. Total stream and tributary impacts 115
3i. Comments:
Page 5 of 12
PCN Form - Version 1.3 December 10, 2008 Version
C. Proposed Impacts Inventory
1. Impacts Summary
1a. Which sections were completed below for your project (check all that apply):
? Wetlands ® Streams - tributaries ? Buffers
? Open Waters ? Pond Construction
2. Wetland Impacts
If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted.
2a. 2b. 2c. 2d. 2e. 2f.
Wetland impact Type of jurisdiction
number - Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact
Permanent (P) or (if known) DWQ - nonA04, other) (acres)
Temporary T
W1 ? P ? T ? Yes ? Corps
? No ? DWQ
W2 ? P ? T ? Yes ? Corps
? No ? DWQ
W3 ? P ? T ? Yes ? Corps
? No ? DWQ
W4 ? P ? T ? Yes ? Corps
? No ? DWQ
W5 ? P ? T ? Yes ? Corps
? No ? DWQ
W6 ? P ? T ? Yes ? Corps
? No ? DWQ
2g. Total wetland impacts 0 ac
2h. Comments:
3. Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this
question for all stream sites impacted.
3a. 31b. 3c. 3d. 3e. 3f. 3g.
Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact
number- (PER) or (Corps - 404, 10 stream length
Permanent (P) or intermittent DWQ - non-404, width (linear
Temporary (T) (INT)? other) (feet) feet)
Replacement of ® PER ® Corps
S1 ®P ? T existing 72" CMP
'
' UT Nulbush Creek
?INT
®DWQ 10 89
with 9
x6
RCBC
S2 ® P ? T 24"RCP Extension UT Nutbush Creek ? PER
® INT ® Corps
? DWQ 5 26
S3 ? P ? T ? PER ? Corps
? INT ? DWQ
S4 ? P ? T ? PER ? Corps
? INT ? DWQ
S5 ? P ? T ? PER ? Corps
? INT ? DWQ
S6 ? P ? T ? PER ? Corps
? INT ? DWQ
3h. Total stream and tributary impacts 115
3i. Comments:
Page 5 of 12
PCN Form - Version 1.3 December 10, 2008 Version
C. Proposed Impacts Inventory
1. Impacts Summary
1a. Which sections were completed below for your project (check all that apply):
? Wetlands ® Streams - tributaries ? Buffers
? Open Waters ? Pond Construction
2. Wetland Impacts
If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted.
2a. 2b. 2c. 2d. 2e. 2f.
Wetland impact Type of jurisdiction
number- Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact
Permanent (P) or (if known) DWQ - non-404, other) (acres)
Temporary T
W1 ? P ? T ? Yes ? Corps
? No ? DWQ
W2 ? P ? T ? Yes ? Corps
? No ? DWQ
W3 ? P ? T ? Yes ? Corps
? No ? DWQ
W4 ? P ? T ? Yes ? Corps
? No ? DWQ
W5 ? P ? T ? Yes ? Corps
? No ? DWQ
W6 ? P ? T ? Yes ? Corps
? No ? DWQ
2g. Total wetland impacts 0 ac
2h. Comments:
3. Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this
question for all stream sites impacted.
3a. 3b. 3c. 3d. 3e. 3f. 3g.
Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact
number - (PER) or (Corps - 404, 10 stream length
Permanent (P) or intermittent DWQ - non-404, width (linear
Temporary (T) (INT)? other) (feet) feet)
Replacement of ® PER ® Corps
S1 ®P ? T existing 72" CMP
'
' UT Nulbush Creek
?INT
®DWQ 10 89
with 9
x6
RCBC
S2 ® P ? T 24"RCP Extension UT Nutbush Creek ? PER
® INT ® Corps
? DWQ 5 26
S3 ? P ? T ? PER ? Corps
? INT ? DWQ
S4 ? P ? T ? PER ? Corps
? INT ? DWQ
S5 ? P ? T ? PER ? Corps
? INT ? DWQ
S6 ? P ? T ? PER ? Corps
? INT ? DWQ
3h. Total stream and tributary impacts 115
3i. Comments:
Page 5 of 12
PCN Form - Version 1.3 December 10, 2008 Version