Loading...
HomeMy WebLinkAbout20100615 Ver 1_Application_20100728 STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION BEVERLY EAVES PERDUE GOVERNOR July 26, 2010 Mr. David Baker US Army Corps of Engineers 151 Patton Avenue, Room 208 Asheville, NC 28801-5006 Subject: Bridge 156 General Permit #31 SR 1771 McDowell County, NC Dear Mr. Baker: e EUGENE A. CONTI, SECRETARY 100615 I have enclosed a design plan, a PCN application for RGP #31, and a vicinity map relative to the proposed bridge replacement project on SR 1771, McDowell County, NC. The proposed project replaces a 20 foot bridge that collapsed with a 40 foot aluminum box culvert with headwalls on Magazine Branch. Permanent impacts will be 40 linear feet. Cofferdams and impervious dikes will be used to divert the stream during construction. Magazine Brach is an approximately 10-foot wide stream with cobble/ gravel/sand substrate and prominent bed/bank features. No stream relocation will be performed for the project. Existing channel morphology will be maintained upstream and downstream of the bridge. Riparian vegetation will be reestablished along disturbed areas associated with the bridge replacement. Stormwater will be diverted through grass-lined ditches or vegetated buffers prior to entering streams. No effect on federally listed species (threatened or endangered) or their habitats is anticipated. Division Thirteen Office Phone: 828/251-6171 Post Office Box 3279 Office of the Division Engineer www.ncdot.gov/doh/operations/divisionl3 Asheville, NC 28802 Fax: 828/251-6709 Mr. Dave Baker Paae -2 Bride 156 McDowell County July 26, 2010 As a part of the 401 Certification process, a copy of the application will be forwarded to the NC State Historic Preservation Office as required by Section 106 of the National Historic Preservation Act of 1966 and GS 121-12(a). By copy of this letter. we request Dave McHenry. North Carolina Wildlife Resources Commission Coordinator. to comment directly to the Corps concerning the permit request. By copy of this letter, we are asking Ed Ingle, Area Roadside Field Operations Engineer, to comment on the above project. Magazine Branch is classified as C. A buffer variance will not be required for the project. By copy of this letter. I am forwarding tour (4) copies of the application package to Brian Wrenn, NC Division of Water Quality, 401/Wetland Unit and an additional copy to Mike Parker. NC DWQ Asheville Re`aional Office for review and comment. Please char-e the application fee of $240.00 to 1t'BS element # I' )B.20591 1. Please forward comments directly to the Corps with copy to Division 13 Environmental Officer. Your earliest consideration for this request would be greatly appreciated. If you have any questions or information needs. please contact me at (828) 251-6171. Sincerely, a Roger Bryan Division 13 Environmental Officcr Enclosures cc: J.J. Swain. .Jr., P.E. Garry Moore Ed In«le. CPESC David McI-Ienrv o Office Use Only. Corps action ID no. DWQ project no. Form Version 1.3 Dec 10 2008 Pre-Construction Notification (PCN) Form A. Applicant Information t 1. Processing 1 a. Type(s) of approval sought from the Corps: FXXection 404 Permit ? Section 10 Permit 1 b. Specify Nationwide Permit (NWP) number: or General Permit (GP) number: 31 1 c. Has the NWP or GP number been verified by the Corps? X Yes ? No 1 d. Type(s) of approval sought from the DWQ (check all that apply): X 401 Water Quality Certification - Regular ? Non-404 Jurisdictional General Permit ? 401 Water Quality Certification - Express ? Riparian Buffer Authorization 1 e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ? Yes X No For the record only for Corps Permit: ? Yes X No 1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu fee program. ? Yes X No 1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. ? Yes X No 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ? Yes X No 2. Project Information 2a. Name of project: Bridge 156 2b. County: McDowell 2c. Nearest municipality / town: Dysartsville 2d. Subdivision name: N/A 2e. NCDOT only, T.I P. or state project no: 13B.205911 3. Owner Information 3a. Name(s) on Recorded Deed: North Carolina Department of Transportation 3b. Deed Book and Page No. N/A 3c. Responsible Party (for LLC if applicable): N/A 3d. Street address: N/A 3e. City, state, zip: N/A 3f. Telephone no.: N/A 3g. Fax no.. N/A 3h. Email address: N/A Page 1 of 10 PCN Form -Version 1.3 December 10, 2008 Version 4. Applicant information (if different from owner) 4a. Applicant is: North Carolina Department of Transportation 4b Name: J.J. Swain, Jr., P.E., Division Engineer 4c. Business name (if applicable): N.C. Department of Transportation 4d. Street address: 55 Orange Street, P.O. Box 3279 4e. City, state, zip: I Asheville, NC 28802 4f. Telephone no.: 828-251-6171 4g. Fax no.: 828-251-6394 4h. Email address: rdbryan@ncdot.gov 5. Agent/Consultant Information (if applicable) 5a. Name: N/A 5b. Business name (if applicable): N/A 5c. Street address: N/A 5d. City, state, zip: N/A 5e. Telephone no.: N/A 5f. Fax no.: N/A 5g. Email address: N/A Page 2 of 10 B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): N/A 1 b. Site coordinates (in decimal degrees): Latitude: 35.60077" N Longitude. 81.85431'W 1c. Property size: 0.1 acres 2. Surface Waters 2a. Name of nearest body of water (stream, river, etc.) to proposed project: Magazine Branch 2b. Water Quality Classification of nearest receiving water: C 2c. River basin: Catawba 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: Rural, farmland, dairy, and residential 3b. List the total estimated acreage of all existing wetlands on the property: 0.0 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 100 3d. Explain the purpose of the proposed project: Bridge replacement 3e. Describe the overall project in detail, including the type of equipment to be used: Replace a collapsed 20 foot bridge with a 40 foot aluminum box culvert with headwalls The project will use crane, excavator, track hoes, dump trucks, and similar equipment. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (including all prior phases) in the past? Comments: Blue line stream, field confirmed by NCDOT ? Yes X No ? Unknown 4b. If the Corps made the jurisdictional determination, what type of determination was made? ? Preliminary ? Final 4c. If yes, who delineated the jurisdictional areas? Name (if known): N/A Agency/Consultant Company: Other: N/A 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5. Project History 5a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? ? Yes X No ? Unknown 5b. If yes, explain in detail according to "help file" instructions. 6. Future Project Plans 6a. Is this a phased project? ? Yes X No 6b. If yes, explain. Page 3 of 10 PCN Form - Version 1.3 December 10, 2008 Version U. Proposed impacts inventory 1. Impacts Summary 1a. Which sections were completed below for your project (check all that apply): ? Wetlands X Streams - tributaries ? Buffers ? Open Waters ? Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction number - Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or I (if known) DWQ - non-404, other) (acres) Temporary T f W1 ? P ? T ? Yes ? Corps ? No ? DWQ W2 ? P ? T ? Yes ? Corps ? No ? DWQ W3 ? P ? T ? Yes ? Corps ? No ? DWQ W4 ? P ? T ? Yes ? Corps ? No ? DWQ W5 ? P ? T ? Yes ? Corps ? No ? DWQ W6 ? P ? T ? Yes ? Corps ? No ? DWQ 2g. Total wetland impacts 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number - (PER) or (Corps - 404, 10 stream length Permanent (P) or intermittent DWQ - non-404, width (linear Temporary (T) _ (INT)? other) (feet) feet) S1 X P ? T Box Culvert Magazine Branch X PER X DWQ 10 40 S1 ? P X T Impervious dike Magazine Branch X PER X Corps 10 60 ? INT X DWQ S1 ? P ? T ? PER ? Corps ? IN T ? DWQ S2 ? P ? T _ _ ? PER ? Corps ? INT ? DWQ S3 ? P ? T ? PER ? Corps ? INT ? DWQ S4 ? P ? T ? PER ? Corps ? INT ? DWQ 3h. Total stream and tributary impacts 100 3i. Comments 40 feet of permanent and 60 feet of temporary impacts Page 4 of 10 PCN Form - Version 1.3 December 10. 2008 Version 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. 4b. 4c. 4d. 4e. Open water Name of waterbody impact number- (if applicable) Type of impact Waterbody type Area of impact (acres) Permanent (P) or Temporary T 01 ?P?T 02 ?P?T 03 ?P?T 04 ?P?T 4f. Total open water impacts 4g. Comments: 5. Pond or Lake Construction If and or lake construction proposed, then complete the chart below. 5a. 5b. 5c. 5d. 5e. Wetland Impacts (acres) Stream Impacts (feet) Upland Pond ID Proposed use or purpose (acres) number of pond Flooded Filled Excavated Flooded Filled Excavated Flooded P1 P2 5f. Total 5g. Comments: 5h. Is a dam high hazard permit required? ? Yes ? No if yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below, If an impacts require mitigation, then you MUST fill out Section D of this form. 6a. ? Neuse ? Tar-Pamlico ? Other: Project is in which protected basin? X Catawba ? Randleman 6b. 6c. 6d. 6e. 6f. 6g. Buffer impact number - Reason Buffer Zone 1 impact Zone 2 impact Permanent (P) or for Stream name j mitigation (square feet) (square feet) Temporary T impact required? B1 ?P?T ?Yes ? No B2 ?P?T ?Yes ? No 63 ?P?T ?Yes ? No 6h. Total buffer impacts 6i. Comments: Page 5 of 10 D. Impact Justification and Mitigation 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. Minimum culvert length to meet current safety standards. Headwalls constructed to minimize length of structure. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? ? Yes X No 2b. If yes, mitigation is required by (check all that apply): ? DWQ ? Corps 2c. If yes, which mitigation option will be used for this project? ? Mitigation bank El Payment to in-lieu fee program ? Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type Quantity 3c. Comments: 4. Complete if Making a Payment to In-lieu Fee Program 4a. Approval letter from in-lieu fee program is attached. ? Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: ? warm ? cool ?cold 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested. acres 4f. Non-riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a d escription of the proposed mitigation plan. Page 6 of 10 PCN Form - Version 1.3 December 10, 2008 Version 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) - required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ? Yes X No 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone 6c. Reason for impact i 6d. Total impact (square feet) Multiplier 6e. Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund). 6h. Comments: Page 7 of 10 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1 a Does the ro ect include or i it d t t t t d ff f p ) s a lacen o pro ec e npanan u ers ? enti ie within one of the NC Riparian Buffer Protection Rules? ? Yes X No 1b . If yes, then is a diffuse flow plan included? If no, explain why. El Yes No ? Comments: I 2. Stormwater Management Plan 2a . What is the overall percent imperviousness of this project? N/A 2b . Does this project require a Stormwater Management Plan? X Yes ? No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why'. 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, na rrative description of the plan: The project will use BMP's to the Maximum Extent Practicable (MEP) in compliance with NCDOT's NPDES Permit No. 000250 Post Construction Stormwater Program. ? Certified Local Government 2e. Who will be responsible for the review of the Stormwater Management Plan? X DWQ Stormwater Program ? DWQ 401 Unit 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? N/A ? Phase II 3b. Which of the following locally-implemented stormwater management programs ? NSW ? USMP apply (check all that apply): ? Water Supply Watershed ? Other: N/A 3c. Has the approved Stormwater Management Plan with proof of approval been ? Yes ? No attached? N/A 4. DWQ Stormwater Program Review ? Coastal counties ? HQW 4a. Which of the following state-implemented stormwater management programs apply ? ORW (check all that apply): ? Session Law 2006-246 X Other NA 4b. Has the approved Stormwater Management Plan with proof of approval been attached? ? Yes ? No 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? N/A ? Yes ? No 5b. Have all of the 401 Unit submittal requirements been met? N/A b d d ? Yes ? No Page 8 of 10 PCN Form -Version 1.3 December 10, 2008 Version 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or Y ? es No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act ? Yes ® No impacts? 5c. If yes, indicate the USFWS Field Office you have contacted. ? Raleigh ? Asheville 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? NC Natural Heritage distribution/habitat mapping, field survey 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ? Yes ® No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? Current Maps/Database 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ? Yes ® No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? I 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? Current Maps/Database 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain? ® Yes ? No 8b. If yes, explain how project meets FEMA requirements: Project will not affect hydrology 8c. What source(s) did you use to make the floodplain determination? Current FEMA Maps Roder Brvan 1 7/26/2010 J' r Applicant/Agent's Printed Name Applicant/Ageht's Signature Date (Agent's signature is valid only if an authorization letter from the applicant is provided ) Page 10 of 10 r %11.?..IJ It 7 r `f r ?MfJl f ^ ?tl _ s - P-111 ILA" .4 .t p ?_ • 1 • - + f +? - x 1352 ? I !f • s ? I ? 1 rrl _ $art .. idge 15 X? 01 \ r 1176 . -' ? X17. , ?. ?' C` -•,? ' ?+ ? '?• '', X1;4 ? . , .? ? ? : ., d on rn 01 'a I\ ? ?? ?? 1181 i , \ 11 ''rt • • • ,?11 YIX Name: DYSARTSVILLE Location: 035.6008726" N 081.857951 T W Date: 7/26/2010 Caption: Bridge 156 Scale: 1 inch equals 1000 feet SR 1771 McDowell County. NC Copyright (C) 1998. Maptech, Inc Figure I. Bridge 156, Magazine Branch upstream and downstream of collapsed bridge site, McDowell County, NC.