Loading...
HomeMy WebLinkAboutNCC205211_ESC Approval Submitted_20201124ROY COOPER Governor MICHAEL S. REGAN Secretary BRIAN WRENN Director Kattz Corner, LLC ATTN: Mr. Mark Morgan PO Box 16038 High Point, NC 27261 NORTH CAROLINA Environmental Quality November 10, 2020 LETTER OF APPROVAL RE: Project Name: Kattz Corner Apartments Acres Approved: 5.57 Project ID: CALDW-2021-007 County: Caldwell City: Lenoir Address: 316 Lower Creek Drive River Basin: Catawba Stream Classification: Lower Creek C Submitted By: Mr. T. Eugene Mustin, P.E. Date Originally Received by LQS: November 9, 2020 Plan Type: Residential multi -family Dear Mr. Morgan, This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval. The enclosed Certificate of Approval must be posted at the job site. This plan shall expire three (3) years following the date of approval, if no land disturbing activity has been undertaken, as is required by Title 15A NCAC 413.0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCGO 10000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is received, you will receive the COC via email. You MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the eNOI form to Annette Lucas at Annette.lucas@ncdenr.gov or Paul Clark at D Q �� North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Asheville Regional Office 1 2090 U.S. Highway 70 1 Swannanoa, North Carolina 28778 O.P�NORTH CAROLIN � nmenml auday 828.296.4500 Letter of Approval Kattz Corner, LLC ATTN: Mr. Mark Morgan November 10, 2020 Page 2 of 3 Paul.clark@ncdenr.gov. If the owner/operator of this project changes in the future, the new responsible party is required to apply for his/her own COC. Title, 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: i. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A- 51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality Iaws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form Your cooperation is appreciated. rr, hgional Engineer Division of Energy, Mineral, and Land Resources Enclosures: Certificate of Approval NPDES NCG01 Fact Sheet Letter of Approval Kattz Corner, LLC ATTN: Mr. Mark Morgan November 10, 2020 Page 3 of 3 ec: Mr. T. Eugene Mustin, P.E. genemustin@borum-wade.com Mr. Steve Schlegelmilch steves@borum-wade.com cc: Regional Office file