HomeMy WebLinkAboutNCC205211_ESC Approval Submitted_20201124ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
BRIAN WRENN
Director
Kattz Corner, LLC
ATTN: Mr. Mark Morgan
PO Box 16038
High Point, NC 27261
NORTH CAROLINA
Environmental Quality
November 10, 2020
LETTER OF APPROVAL
RE: Project Name: Kattz Corner Apartments
Acres Approved: 5.57
Project ID: CALDW-2021-007
County: Caldwell
City: Lenoir
Address: 316 Lower Creek Drive
River Basin: Catawba
Stream Classification: Lower Creek C
Submitted By: Mr. T. Eugene Mustin, P.E.
Date Originally Received by LQS: November 9, 2020
Plan Type: Residential multi -family
Dear Mr. Morgan,
This office has reviewed the subject erosion and sedimentation control plan. We find
the plan to be acceptable and hereby issue this Letter of Approval. The enclosed
Certificate of Approval must be posted at the job site. This plan shall expire three (3)
years following the date of approval, if no land disturbing activity has been
undertaken, as is required by Title 15A NCAC 413.0129.
As of April 1, 2019, all new construction activities are required to complete and
submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage
(COC) under the NCGO 10000 Construction General Permit. After the form is reviewed
and found to be complete, you will receive a link with payment instructions for the
$100 annual permit fee. After the fee is received, you will receive the COC via email.
You MUST obtain the COC prior to commencement of any land disturbing activity.
The eNOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about
the eNOI form to Annette Lucas at Annette.lucas@ncdenr.gov or Paul Clark at
D Q
�� North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
Asheville Regional Office 1 2090 U.S. Highway 70 1 Swannanoa, North Carolina 28778
O.P�NORTH CAROLIN �
nmenml auday 828.296.4500
Letter of Approval
Kattz Corner, LLC
ATTN: Mr. Mark Morgan
November 10, 2020
Page 2 of 3
Paul.clark@ncdenr.gov. If the owner/operator of this project changes in the future,
the new responsible party is required to apply for his/her own COC.
Title, 15A NCAC 4B .0118(a) and the NCG01 permit require that the following
documentation be kept on file at the job site:
i. The approved E&SC plan as well as any approved deviation.
2. The NCG01 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic
inspection to insure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance -oriented,
requiring protection of existing natural resources and adjoining properties. If,
following the commencement of this project, it is determined that the erosion and
sedimentation control plan is inadequate to meet the requirements of the
Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-
51 through 66), this office may require revisions to the plan and implementation of
the revisions to ensure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with
Federal and State water quality Iaws, regulations, and rules. In addition, local city or
county ordinances or rules may also apply to this land -disturbing activity. This
approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information
provided in the Financial Responsibility Form, which you provided. You are
requested to file an amended form if there is any change in the information included
on the form
Your cooperation is appreciated.
rr,
hgional Engineer
Division of Energy, Mineral, and Land Resources
Enclosures: Certificate of Approval
NPDES NCG01 Fact Sheet
Letter of Approval
Kattz Corner, LLC
ATTN: Mr. Mark Morgan
November 10, 2020
Page 3 of 3
ec: Mr. T. Eugene Mustin, P.E. genemustin@borum-wade.com
Mr. Steve Schlegelmilch steves@borum-wade.com
cc: Regional Office file