HomeMy WebLinkAbout20090944 Ver 2_Application_20100721I? STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION BEVERLY PURDUE P. O. Box 25201, Raleigh, NC 27611-5202 GOVERNOR PHONE: 919-733-2520 July 12, 2010 Mr. Monte Matthews U. S. Army Corps of Engineers Raleigh Regulatory Field Office 3331 Heritage Trade Drive, Suite 105 Wake Forest, NC 27587 e% EUGENE CONTI, JR. SECRETARY C)q-ogyc{V.Z Subject: Nationwide Permit #14 MODIFICATION SR 1367B (Globe Road) Caldwell County, North Carolina Project Number: 11C.014082 (DWQ Permit Fee: $570) Dear Mr. Matthews: Due to language in our right-of-way agreement, we will need to eliminate the curve at approximate station 112+00 by shifting the roadway to the east (see attached plan sheets). This area is currently being used as a nursery. There will be no wetland impacts but there is an existing stream crossing in the curve at station 112+75. Instead of replacing this pipe as previously permitted, we are now proposing to retain this pipe for driveway access for the adjacent property owners and install a new one downstream under the new roadway alignment. Revised project impacts are tabulated below. Stream Impacts: Station Number ExistingPi.Pe Size ', Pro Pipe, ti pose Size'MC '- Riprap ' Im acts feet „ Jotal.Impacts at, . this Sfafion' ft 27+56 32'x 18" 50'x 18" 10 28 31+19 38'x 18" 50'x 18" 10 22 53+00 60'x 24" 60'x 24" 10 10 112+75 40'x 18" RETAIN 0 0 112+75 (downstream) None 75'x 36" 10 85 119+97 33'x 24" 62'x 24" 10 39 128+04 26'x 18" 40'x 24" 10 24 Total Stream Impacts = 208 feet P. 0. Box 250, N. WILKESBORQ, NC 28659 PHoNE (336)667-9111 FAX (336) 667-4549 Mr. Monte Matthews SR 1367B (Globe Road MODIFICATION) Page 2 July 12, 2010 Please note that pipes showing 6% slopes on the pipe data sheets may remain perched after replacement due to excessive slope. The replacement of the above noted wet pipes will require temporary dewatering. An impervious sandbag dike will be constructed upstream of the existing culverts to create a small pool. Clean water will temporarily be pumped around the construction areas and will be discharged downstream. Any dirty water located inside of the construction areas will be pumped into a silt bag if necessary. Total dewatered area for all wet pipe replacement areas will be approximately 240 linear feet (40 ft each). Once the new pipes are in place, the impervious dikes will be removed and preconstruction streambed elevations will be restored. The wet pipes in question carry different unnamed tributaries to the John's River (Class: C, Trout). This project. was reviewed for the presence of threatened and endangered species on February 18, 2009. This project will have no effect on any federally listed endangered plant or animal species. The State Historic Preservation Office has reviewed this project and did not request any survey work. The project impacts are not significant in nature and should not remove or degrade existing water quality uses. Pipe sizes used will be the minimum necessary to create a safe roadway. By utilizing the erosion control measures outlined in the attachments to this application, downstream water quality standards will be protected. All appropriate BMPs will be used during construction. Attached is a Preconstruction Notification Form, plan sheets with proposed erosion control measures, a marked county map, a marked topography map and photographs. By copy of this letter, it is requested that Mr. Ron Linville, Mountain Region Coordinator, with the North Carolina Wildlife Resources Commission comment directly to you concerning the 404 Nationwide Permit application with a copy sent to me. By copy of this letter, I am forwarding five (5) copies of this application package to Brian Wrenn, NCDENR, Division of Water Quality, 401/Wetlands Unit, for his review. It is requested that any comments related to the 401 certification be forwarded directly to me with a copy sent to the US Army Corps of Engineers. We would like to begin construction as soon as possible. If further information is required, please let me know. Your early review and consideration will be appreciated. Sincerely, Heath Slaughter Division Environmental Officer Mr. Monte Matthews SR 1367B (Globe Road MODIFICATION) Page 3 July 12, 2010 Enclosures cc: Monte Matthews, US Army Corps of Engineers (1 additional copy) Ron Linville, Western Piedmont Region Coordinator, NCWRC Brian Wrenn, Division of Water Quality (5 copies) Mike Parker, Division of Water Quality Mike Pettyjohn, PE, Division Engineer Michael Poe, PE, District Engineer Caldwell County Maintenance Engineer Heath Slaughter, Division Environmental Officer Scott Pipes, Roadside Environmental Field Operations Technician o20p WA Tf,5, o Office Use Only: Corps action ID no. DWQ project no. Form Version 1.3 Dec 10 2008 Pre-Construction Notification (PCN) Form A. Applicant Information 1. Processing 1a. Type(s) of approval sought from the Corps: X Section 404 Permit ? Section 10 Permit 1 b. Specify Nationwide Permit (NWP) number: 14 or General Permit (GP) number: 1c. Has the NWP or GP number been verged by the Corps? ? Yes X No 1d. Type(s) of approval sought from the DWQ (check all that apply): X 401 Water Quality Certification - Regular ? Non-404 Jurisdictional General Permit ? 401 Water Quality Certification - Express ? Riparian Buffer Authorization le. NO Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: Yes No X _ For the record only for Corps Permit: ? Yes X No 1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu fee program. ? Yes X No 1g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. ? Yes X No 1h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ? Yes X No 2. Project Information 2a. Name of project: SR 13678, Globe Road 2b. County: Caldwell 2c. Nearest municipality / town: Globe 2d. Subdivision name: 2e. NCDOT only, T.I.P, or state project no: 11C.014082 3. Owner Information 3a. Name(s) on Recorded Deed: NCDOT 3b. Deed Book and Page No. 3c. Responsible Party (for LLC if applicable): 3d. Street address: 801 Statesville Road 3e. City, state, zip: North Wilkesboro, NC 28659 3f. Telephone no.: (336) 903-9202 3g. Fax no.: (336) 6674549 3h. Email address: hslaughter@ncdotgov Page 1 of 10 PCN Form - Version 1.3 December 10, 2008 Version 4. Applicant Information (if different from owner) 4a. Applicant is: ? Agent ? Other, specify: 4b. Name: 4c. Business name (if applicable): 4d. Street address: 4e. City, state, zip: 4f. Telephone no.: 4g. Fax no.: 4h. Email address: 5. Agent/Consultant Information (if applicable) 5a. Name: 5b. Business name (if applicable): 5c. Street address: 5d. City, state, zip: 5e. Telephone no.: 5f. Fax no.: 5g. Email address: Page 2 of 10 B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): 1b. Site coordinates (in decimal degrees): Latitude: 36.06522 Longitude: - 81.69624 (DD.DDDDDD) (-DD.DDDDDD) 1c. Property size: 14.7 acres 2. Surface Waters 2a. Name of nearest body of water (stream, river, etc.) to proposed project: UTs to John's' River 2b. Water Quality Classification of nearest receiving water: C, Trout 2c. River basin: Catawba 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: Unpaved Road in Rural Area 3b. List the total estimated acreage of all existing wetlands on the property: Wetlands areas adjacent to our project are estimated at 0.05 acres. No proposed impacts. 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 400 feet 3d. Explain the purpose of the proposed project: Grade, drain, base and pave SR 1367B. 3e. Describe the overall project in detail, including the type of equipment to be used: See attached cover letter 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (including all prior phases) in the past? Comments: ? Yes X No ? Unknown 4b. If the Corps made the jurisdictional determination, what type of determination was made? El Preliminary El Final 4c. If yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5. Project History 5a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? ? Yes X No ? Unknown 5b. If yes, explain in detail according to "help file" instructions. 6. Future Project Plans 6a. Is this a phased project? ? Yes X No 6b. If yes, explain. Page 3 of 10 PCN Form - Version 1.3 December 10, 2008 Version C. Proposed Impacts Inventory 1. Impacts Summary la. Which sections were completed below for your project (check all that apply): Wetlands X Streams - tributaries ? Buffers Open Waters ? Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction number - Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ - non-404, other) (acres) Temporary ? Yes Corps W1 P ? T No DWQ ? Yes Corps W2 P D T No DWQ ? Yes Corps W3 P ? T No DWQ ? Yes Corps W4 P ? T No DWQ ? Yes Corps W5 P ? T No DWQ ? Yes ? Corps W6 ? P ? T ? No ? DWQ 2g. Total wetland impacts 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a 3b. 3c. 3d. 3e. 3f. 3g. . Stream impact Type of impact Stream name Perennial Type of jurisdiction Average m t Impact length number - (PER) or (Corps - 404, 10 s rea Permanent (P) or intermittent DWQ - non-404, width (linear feet) Temporary (T) (INT)? other) (feet) S1 XP?T Pipe UT#1 to John's X PER X Corps 1 1e pipe, to RR, 40 Replacement River INT X DWQ dewater S2 X P ? T Pipe UT#2 to John's X PER X Corps 1 12RRpipe, , 40 0 Replacement River INT X DWQ dewater S3 X P ? T Pipe UT#3 to John's X PER X Corps 2 RR, 400 Replacement River INT X DWQ dewater S4 X P ? T Pipe Addition UT #4 to John's X PER INT X Corps X DWQ 1 75 pipe, 10 RR, 40 River dewater S5 X P ? T Pipe UT #5 to John's X PER X Corps 1 29 pipe, 0 RR, 40 Replacement River INT X DWQ dewater S6 X P ? T Pipe UT #6 to John's X PER X Corps 1 14 pi 40, RR, Replacement River INT X DWQ dewater 3h. Total Permanent stream and tributary impacts 208 3i. Comments: Additional 240 linear feet of temporary dewatering (40 feet each). Page 4 of 10 PCN Form -Version 1.3 December 10, 2008 Version 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individual) list all open water im pacts below. 4a. 4b. 4c. 4d. 4e. Open water Name of waterbody impact number - (if applicable) Type of impact Waterbody type Area of impact (acres) Permanent (P) or Temporary T 01 ?PT 02 P T 03 ?P?T 04 ?P?T 4f. Total open water impacts 4g. Comments: 6. Pond or Lake Construction If and or lake construction proposed, then complete the chart below. 5a. 5b. 5c. 5d. 5e. Wetland Impacts (acres) Stream Impacts (feet) Upland Pond ID Proposed use or purpose (acres) number of pond Flooded Filled Excavated Flooded Filled Excavated Flooded P1 P2 6f. Total 5g. Comments: 5h. Is a dam high hazard permit required? ? Yes ? No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If an impacts require mitigation, then ou MUST fill out Section D of this form. 6a. ? Neuse ? Tar-Pamlico ? Other: Project is in which protected basin? ? Catawba ? Randleman 6b. 6c. 6d. 6e. 6f. 6g. - Buffer impact number- Reason Buffer Zone 1 impact Zone 2 impact Permanent (P) or for Stream name mitigation (square feet) (square feet) Temporary T impact required? ?Yes B1 ?P?T ? No ?Yes B2 ?P?T ? No ?Yes B3 ?P?T ? No 6h. Total buffer impacts 6i. Comments: Page 5 of 10 D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. All impacts are necessary to improve this roadway. All appropriate BMPs will be used during construction. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. All appropriate BMPs will be used during construction 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? Yes X No 2b. If yes, mitigation is required by (check all that apply): ? DWQ Corps 2c. If yes, which mitigation option will be used for this project? ? Mitigation bank Payment to in-lieu fee program ? Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type Quantity 3c. Comments: 4. Complete if Making a Payment to In-lieu Fee Program 4a. Approval letter from in-lieu fee program is attached. ? Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: ? warm ? cool ?cold 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non-riparian wetland mitigation requested: 4g. Coastal (tidal) wetland mitigation requested: acres 41h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 6 of 10 PCN Form -Version 1.3 December 10, 2008 Version 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) -required by DWQ 6a. Will the project resutt in an impact within a protected riparian buffer that requires ? Yes ? No buffer mitigation? 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone 6c. Reason for impact 6d. Total impact Multiplier 6e. Required mitigation (square feet) (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund). 6h. Comments: Page 7 of 10 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? ? Yes X No 1b. If yes, then is a diffuse flow plan included? If no, explain why. ? Yes ? No Comments: 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? 40% 2b. Does this project require a Stormwater Management Plan? ? Yes X No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: Linear Secondary Roadway Project 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: ? Certified Local Government 2e. Who will be responsible for the review of the Stormwater Management Plan? ? DWQ Stormwater Program ? DWQ 401 Unit 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? ? Phase II 3b. Which of the following locally-implemented stormwater management programs ? NSW ? USMP apply (check all that apply): ? Water Supply Watershed ? Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ? Yes ? No attached? 4. DWQ Stonnwater Program Review ? Coastal counties 4a . Which of the following state-implemented stormwater management programs apply (check all that apply): ? HQW ? ORW ? Session Law 2006-246 ? Other: 4b . Has the approved Stormwater Management Plan with proof of approval been attached? ? Yes ? No 6. DWQ 401 Unit Stormwater Review 5a . Does the Stormwater Management Plan meet the appropriate requirements? ? Yes ? No 5b . Have all of the 401 Unit submittal requirements been met? ? Yes ? No Page 8 of 10 PCN Form -Version 1.3 December 10, 2008 Version F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) Ia. Does the project involve an expenditure of public (federal/state/local) funds or the ® Yes ? No use of public (federal/state) land? 1b. If you answered "yes" to the above, does the project require preparation of an t l St ? Yes ® No e or a environmental document pursuant to the requirements of the Nationa (North Carolina) Environmental Policy Act (NEPA/SEPA)? tc. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval ? yes El No letter.) Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated d d S ? Yes ®No ar tan s, Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. Is this an after-the-fact permit application? ? Yes ®No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in additional development, which could impact nearby downstream water quality? ? Yes ® No 3b . If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. Paving an existing road 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. N/A Page 9 of 10 PCN Form -Version 1.3 December 10, 2008 Version 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or ? Yes ® No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act ? Yes ® No impacts? El Raleigh 5c. If yes, indicate the USFWS Field Office you have contacted. ? Asheville 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? GIS and Visual Inspection 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ? Yes ® No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? WRC will comment 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ? Yes ® No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain? ® Yes ? No 8b. If yes, explain how project meets FEMA requirements: We have shortened the project to eliminate impacts to the floodway. 8c. What source(s) did you use to make the floodplain determination? ncfloodmaps.com J. Heath Slaughter Z 29d 7/12/10 Applicant/Agent's Printed Name Applicant/Agent's Si ire Date (Agent's nature is valid only if an authorize i letter from the applicant is rovided. Page 10 of 10 q V ? ?? FR r R m? u? A o co?N g• / f,l ? J r? `V \?lo ® 1 of 6lou I / ? JD'W9 ° _e O N 0(ppE ? @@ p D as a 46 iN :I/I to 4? J ! .•n . g I i t I$. q? f i V-A r/ ;; , Estes Carts' - I A\ v I f r' i +7 4 I r 1 f i V' .i \. ?/ l /!•? /f \ v ? V ? T \?. --_-. \?• ? rJ y) 't 4 , I ? I \? 17 , \ / I i M1/ f r `\ 1. T y. \ -. - I ?if? o •ti'? , \ <\ .T\. it \ vet \ i + ' ? I`i9f - ``\ .. `\?VV. `?\ \?? r \',` "t` \" }, V ? ?? v` ..?`/ l;'? J / ? i ? 4 ? .. Imo. ?`I?,j /?:• ?\ \\.`?..fi -, _,V (?? w.\?? \?5 t41 lO l !1? `? 1. 'tee ?\ • -? ', \\\\.?! i t ?I+I? /%' /%??I1 i ??!O, '+ ' ` ?-?/? ?- `\ ?? ` \ r,`\ + ,r .? ?wf?• ? \\ 1?1, /r ?/ , ?`I "Ir ?'/?'- + r I I f / rf, lt!}/ % l-? \ M•? ' - '/ "-F"•Z- .?1'???+Lr?ny.1;,±???,/,++ ;i ?1,?1 ; rr ' `r' /,'!r ,,r?,?, ?, l,f '; ; V ?L?.?,? ?"'?_.+-_ \+15 ? { ? V1 ?? \. J/r+?i to /)` l n , ?\`',,` T^-}} / ! ;.) ! 5 11 .J•?P 7\ • lj f - \?',•._") \.1`'\4 ` e ?? f t ,. •• . a:. !!! End SR --?'~,' 1 ,`•\ ?•/ ) ?T , 13678 ,t ' ,? ` \ ?/ .. • ?_. 128+04 .r r ? ' 1 , /r' (?"-j 119+97 1 v\ { ? " ( I r / / C. I , / S \? 7 All f?m? ,} I i ( 4C) ry\?1 ' ?.=` '?'1`._ ?\\ \5,,?4 ? 1Vv? ? l` - v { r?+O?I V'vv vi ?"//?% •/ .? `ti. ?1 vV t (/?+?1i i -i ?` .. rf.'„1 )!5 `•'?'. f+ri? 11 '! ??ti ?? ,.? `? 1 !}`)? j ^ vt5 11' // t I', \,_j ?1?1,`\,, ' i?^ ? ' --?1_'',,v ?'=-!•!'A' '\`1\ `\`'.. ?!• ?. ? ' J;'+/` I Ul (( ///r'\-; --.'? -:= r r%'! I+1111 f!,/ 112+75 • 1 9( el ,1(=..'\ `?\'' 911 Y`-.r h p V °. ) + \\_. `IJ+ ??\1\? ? I11l,.? -`y 4.`.\, 1 l? \ /: rf+Jf ! / r°"` 'I.1( ,h IV, r ?` 511 •' 3 I , ? s.>, { •! , ++? +t?r? - ? , i . ? ? /, ??V,? ...tl Ir? .?`'i ?.\?`? ?, i' ,??5 vi ^lS?tl f ?7` \^` ?, ??? !I '1'?J. Z-I -zz J} i f J7 i?/ f ? - _ _-? `?_ 7 ?1??? (,; •1` a,? I -T y h , a; " F, I + t,.. ? :l t I _ ??/ ? ,l? /1+?/? ? ? __--"' y^'?Jr e-.? ,?`?;?+ ?\, • `\,_J J? ( ST i ? v1 ? Ir,/{ r? /( ?, 1. ? 111 ((!!,t ?v J_-,-???1 ?-?+?•?---•/.__? t \ } ?J i S ,? ( ' f i?';f, ! I /Vt r ti_r?-?iJ ? ? ?' ??f1 4` ?~-?.\?``-?\J'L J +±/ (` 1 1 f"?. i j i ? ` /• ? Name: GLOBE Location: 036.0660407° N 081.6951581° W Date: 7/12/2010 Scale: 1 inch equals 1000 feet Copyright (C) 1998, Maptech, Inc 11C.014021 (R/W) RRuJECT: (CONST) CENTER LINE PROPOSED RiW ROAD; SR I367B GLOBE RD. NEW EDGE PAVE'NENT COUNTY: CALOWELL - - - - EXISTING EDGE ROADNAY TYPE: WET PIPE SURVEY STA. 112+75 NEW PIPE SCALE: lO' SHEET 4 OF 8 ATE: 02-20-09 STREAM NAME: UNNAMED TRIBUTARY TO JOHN'S RIVER - I EXISTING PIPE - r RATING. C;TR 2 ft Stream R R STA. 112+60 f ----- ------------------ -------------------- - --------------- Q ----- ----------------- ------------------- / --- ° --------------- 0- r[ .K u?sfiaz •? EXISTING PIPE SIZE: 40'x 18" PIPE T O BE LAID ON A 118°SKEW WITH 6.l FALL NEW PIPE SIZE: 75' x 36" PIPE WILL BE PERCHED - INSTALL IN STREAM PAD AT OUTLET ? Co?awn . 11 11 . . - -1111- r ? l -i 11-11-?-11'11- - II- T- l-i'f 1-,i-11'11- -T-ri- i -r -T-.-11- i- i -i-i-ri-i- i-T-iI-r-.-I-11-i- -r-1111 -r-1111 - r -i-i - . - - - - f - - T 1 1 f , i I 1 ~ r l i , T f - - _ - -f - - - - - -T-fI-TT fl i . . . . . I'T Fl-T l-i l-T fl-T-f Y -i ?l 11'11 i T- l p-T - 1- l-i f - - -i-f - ? l T f . T fl T fl T fl T T LJ 1_L L L J LJ_1_L J_L_L _ -LJ-I-LJ-l _ _ _ _ _ _ _ _ i T 1 1 11 11 1 1 - T'i i- i - --T-11 - T-1111-T'f i-T-r -T-1111 -11'11 i - T -r i - ~i-r'Y 11 - I -ri- r - i-r-f -rY i-I.....-ri- - - - 11 - - 1 -- 1 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ?j 11 1, _ _ _ _ _ _LJ_L_u_ _ _ _ _ _ _ _ _ _ _ _ _ - - - 'i T 'f - ' f - P -T fl-i-fl - Tf -T f-T-f i Fl f l-T -Fl-T f l-T- -1-T (l-ii l-t'i l' i i-fl-T f l-T f fl- i - fl - - li l i I f I l 1 2 - - - - r 1 - l-T-fl t f i fl-T-il-i 1 11 - ?l-T ?11 -T f l-T- l - T-fl- i -i l-T 1 'T 11-11 fl-T 11 .- T f l-T-f 1 - 1 -T-fI-T fl- T - fl T fl T Tf l l 1 ? ? ?? - -r?-i-r 1 - - I? - ?T ?l -T rl- i r V , ?l rl-i ?l-T- l i fl-i ?l-i -f i ?l-1 l-T ?l -i-fl-i f -T-f fl-T fl-i l -i i 1 -fl-T f l T l T . I 7Z7 ? ? - - - ?l- ?l-T ?l T-fl ?l-T '1 f T-f -i-f -T -fl l i fl T fl-T 1 i r - -1 1 - l- i - - - - -i T-fl-T-' -T-fl- T -fl-T-fl - ?l-T i-T -T ?l-i i-f -T-f - T f T fl 41 -T T fl i f _ -11- _ _ _ _L J _ _ _LJ_L_LJ L_L l _1 - r,- - l'T- - - - l-T-i l-i fl-T ~ -T - f l'T-f 1-T 'l -11-T-11- T l-T- l-T l - i ? 'l-T-f -T-fJ_T l-1 fl- -i-il-T -T-f -T - T i T fl f fl i i . . . r i 11 i 11 11 11 11 11 i_ 11 11 11 11 11 11 _i _11_11 _11_ - - i i _ r - - - _ _i _11_11 -T i r _______ i _ _ _ __ T -i T f 11-11 ?-i i _ _ _ _ _ _ -T . T T i i T i t T i r . r r r r -?-r?-r-r?-.-r 11 11_11 11 r r r -. . . .-. . . . _. r i_ - - ' - - - -. . . 11 rte 11 11 - T. rte-r 11_11_ T-f . _ . . ? r i-i-i •-??-r-r- _____ 11 _11_11 . _ r g-T -i ? 11-11 i r-r?-r-r -r-. _ . . . ! ___ _ - i -??-i-i __ __________ ________________ _ l-T -i L i i l i i i i l i 7 - -? l_T _i LJ_. i u a u-a u - T L _ _ r r r r r r _ 1 _ _ _ .-r? ?-.-r?-r-ry-.=r -?-r ?-?-rv.-r ?- _ _ - r ?. r 1 ! ! i t 11_11 r i _ i i i r _ _ _ _ _ _ _? _?-r?-r-r r. . r? ? r? - 1 _ _ _ _ _ _ _ _ _ . -T -T?i -- _i _ i -11 J r r r r r r r i i -r-r?-.-r?-.-r• -r-r+-.-??-. -r ?- -r-r-?-r?-?-?v-r- i r r ? r ' - - - '_ ___ _i 11_11_ r i i, r r r ________________ , ____ _______ l i . -i -f r i T T -i l i r i i r i i SURVEY DATE: 219106 NOTE:TEMPORARY EROSION CONTROL DEVICES NOT SHOWN. TCN,,jNE"112 + (,6 r }p I ' ? I ??I U ' 'o I ?oip, I? J Q O O f- O W N a5 } (7 ? C? ro Q M lY ? C7 ? m ? m ? o d J I / ? 40 ?. ? bb f z ?e mg 09++6L(„? IHD.LVW I I I I y I ?N W Q w ? W Q m U ? N 1f1 O O? Co C a Q w N 1 l ? V N ^ W " +09 ? I ? i ? I LL. N / I I I I 1L 1 I 1 I 1 1 I 0 0 I I 1 ? O 1 1 1 O O 1 U N 1 o __ 1 1 g N ? 1 1 0 CD dl +11 1 U 1 (L y£ L5 I tl z o d? dls 1 11 ?U9Z+S 1 1 o «s 1 1 CO N 1 I 1 C 0+ Gil 1 I o 0 Q ) \ 1 0 U N I 1 N? O 1 4- L U 000 1 Z pJ W O O d 4- ? N M CD 0 N td 1 ai n a oQ ?N 1 I I 1 ? m 1 ? / 1 i Soil Soll a oPO50 ? pr 26 2 Q j - LIP