Loading...
HomeMy WebLinkAboutNCC205388_ESC Approval Submitted_20201124ROY COOPER Governor MICHAEL S. REGAN Secretary BRIAN WRENN Director NORTH CAROLINA Environmental Quality November 6, 2020 LETTER OF APPROVAL Dominion Energy of North Carolina, Inc. ATTN: Michael S. Randall 2020 Energy Drive Apex, NC 27502 RE: Project Name: Wendell-Knightdale Connection Acres Approved: 4.8 Project ID: WAKE-2021-034 County: Wake City: Knightdale Address: Poole Rd River Basin: Neuse Stream Classification: Other Submitted By: S&ME, ATTN: James McNash, PE Date Received by LQS: November 5, 2020 Plan Type: New — Utility — Express Dear Mr. Randall: The subject erosion and sedimentation control plan has been approved. The enclosed Certificate of Approval must be posted at the job site. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 413.0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is received, you will receive the COC via email. You MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCGOI. Please direct questions about the eNOI form to Annette Lucas at Annette.Lucas(2ncdenr.gov or Paul Clark at Paul.Clark(a�ncdenr.gov. If the owner/operator of this project changes in the future, the new responsible party is required to apply for his/her own COC. DEQ ,_ North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources 4��R'��/� Raleigh Regional Office 11628 Mail Service Center 13800 Barrett Drive I Raleigh, North Carolina 27609 NOR%H GAROLINA � 919.791.4200 Letter of Approval Dominion Energy of North Carolina, Inc. November 6, 2020 Page 2 of 3 Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCGO1 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. Title 15A NCAC 4B .0118(a) requires that a copy of the approved erosion control plan be on file at the job site. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. This permit allows for a land - disturbance, as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Rev. 05222020 Letter of Approval Dominion Energy of North Carolina, Inc. November 6, 2020 Page 3 of 3 Your cooperation is appreciated. Sincerely, L L-z- Dylan Reinhardt Assistant Regional Engineer Land Quality Section Enclosures: Certificate of Approval NPDES NCGO1 Fact Sheet cc: S&ME, ATTN: James McNash, PE (jmcnash(2smeinc.com) Regional Office file Rev. 05222020