Loading...
HomeMy WebLinkAboutNCC200498_NOT Closeout Documents_20201124North Carolina Department of Environmental Quality Land Resources: 943 Washington Square Mall, Washington, NC 27889 (252) 946-6481 County: Craven Project: New Bern City 115KV Feeder River basin: Neuse Person financially responsible: DUKE ENERGY PROGRESS LLC - Thomas C Project #: CRAVE-2020-020 Williams, Manager of Transmission Engineering Address: 410 S. Wilmington Street, Raleigh, NC 27601 1. Project Location: Trent Road, New Bern Pictures: No 2. Weather and soil conditions: sunny, cool, dry 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes 5. Violations: 6. Is the site in compliance with the NPDES Permit? Yes Describe: Initial inspection: No If no, check violations below: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): No one. Title: Inspection report: Sent Report Date given/sent: August 13, 2020 9. Corrective action needed: Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is released, remove 10. Comments: from active files. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities should be requested by the permittee via a Notice of Termination. Reported by: James Edwards Others present: No one. Date of inspection: August 06, 2020 Time arriving on site: 1:35 PM Time leaving site: 1:45 PM cc: