HomeMy WebLinkAbout20100596 Ver 1_Emails_20080311RE: Bat Fork Mitigation Bank Meeting
Subject: RE: Bat Fork Mitigation Bank Meeting
From: "Anna Salzberg" <asalzberg@cwenv.com>
Date: Tue, 11 Mar 2008 08:02:56 -0400
To: <amanda.d.jones@saw02.usace.army. mil>, "'David McHenry"' <david.mchenry@ncwildlife.org>,
<bryan_tompkins@fws.gov>, <Fox.Rebecca@epamail.epa.gov>, <eric.kulz@ncmail.net>, "Kevin
Barnett" <kevin.barnett@ncmail.net>, "'Tammy L Hill"' <Tammy.L.Hill@ncmail.net>
CC: "'clement riddle"' <clement@cwenv.com>
Good morning,
The first MBRT meeting is scheduled for April 1, 2008 at 11:00am Qokes, pranks are welcome7). The meeting
will be held on-site at the proposed Bat Fork Wetland Mitigation Bank site in downtown Hendersonville. You
should all receive hard copies of the Prospectus this week, which includes preliminary information of the site
and multiple maps. Please review this material prior to the April 1, 2008 meeting.
Please do not hesitate to contact me at (828) 698-9800 if you have any questions.
Thank you,
Anna
Anna Salzberg
Clearwater Environmental Consultants, Inc.
718 Oakland Street
Hendersonville, N.C. 28791
Phone: 828-698-9800
Mobile: 828-606-1200
Fax: 828-698-9003
asalzberg@cwenv.com
1 of 1 3/31/2008 11:59 AM
FW: Stone Farm information
Subject: FW: Stone Farm information
From: "Sugg, Mickey T SAW" <Mickey.T.Sugg@saw02.usace.army.mil>
Date: Mon, 28 Jan 2008 12:04:32 -0500
To: <howard_hall@fws.gov>, "smtp-Sechler, Ron" <ron.sechler@noaa.gov>, "Tammy Hill"
<Tammy.L.Hill@ncmail.net>, <steven. everhart@ncmail. net>, <matthews.kathy@epamail.epa.gov>
CC: <cpreziosi@lmgroup.net>, "Brent Manning" <bmanning@lmgroup.net>
Good Morning-
I know I sent this last week, but didn't review it prior to sending. This is a quick summary of my thoughts after
reading the documents. In my 11/26 e-mail, I had agreed with Kathy that the 339 acres of preservation should
have a 10:1 credit ratio unless LMG provided information to demonstrate a lower ratio. The second attachment
is their analysis of each preservation area where they designated a ratio for each and then averaged the credit
ratio to a final 7.1:1, resulting in 47.7 credits. In my review of their report, along with my cursory onsite
observations, I have no problem concurring with the 7.1:1. 1 would prefer to make it an even 48 credits to
simplify and make the accounting more manageable; and give minor credit for the 50' upland buffer.
For the credit release schedule (the first attachment), there will have to be a few changes in keeping with the
NCIRT agreed schedule upon late last summer. This would correlate to the following:
WETLANDS- Riverine and non-riverine
1) 15%- signing of MBI, good
2) 15%-completion of physical and biological improvements, good
3) 10%-first year, good
4) 10%-second year, not 15%
5) 20%-third year, not 10%
6) 10%-fourth year, good
7) 10%-five year, not 20%
8) 10%- could be combined with #7 at year five if MBRT agrees that the bank meets the overall objectives
and the Success Criteria set forth in the plan.
STREAMS
1) 15%- signing of MBI, good
2) 15%- completion of physical and biological improvements, good
3) 10%- first year, good
4) 10%- second year, not 15%
5) 10%- third year, not 15%
6) 10%- fourth year, good
7) 15%- fifth year, not 20%
8) 15%- MBRT agrees bank meets overall obj. and S.C. - two bank full events in different years of the
monitoring period.
Lastly, in my conversations with LMG, they will not have the stream component fully completed at the same time
the Carolina Bay is finished, receiving only the 15% credits when the MBI is signed. The projected completion
dates for each are disclosed in the release schedule attachment. I instructed LMG that only one annual
monitoring report should be sent out, but the report should be concise and clear in separating the two areas.
Take a look at this and let me know what you think. If possible, could you provide me any comments within the
next two weeks? Also, I have enclosed a copy of the Nationwide Permit No. 27 construct the site that was
issued last week.
Thanks and hope you have a good week,
-Mickey Sugg (910) 251-4811
1 of 2 3/31/2008 9:16 AM
FW: Stone Farm information
From: Brent Manning [mailto:bmanning@lmgroup.net]
Sent: Monday, January 21, 2008 1:51 PM
To: Sugg, Mickey T SAW
Cc: Christian Preziosi
Subject: Stone Farm information
Hello Mickey,
I've attached the updated credit release schedule and preservation narrative. The release schedule is present
in three tables, one for Carolina bay which will be complete in 2008 and other two for the riverine and stream
portions which will be completed in 2009. Please let me know if you need anything else. Thanks.
Brent Manning, PWS
Environmental Scientist
LMG
IAN TO ?n x?tt!+*'A?r?'?d411 C,AN`A ?itl.rn!l
3805 Wrightsville Ave.
Wilmington, NC 28403
c: 910.471.0005
o: 910.452.0001
f: 910.452.0060
Content-Description: Stone Farm Credit Release
Schedule.pdf
Stone Farm Credit Release Schedule.pdf Content-Type: application/octet-stream
Content-Encoding: base64
Content-Description: Stone Farm Preservation.pdf
Stone Farm Preservation. pdf Content-Type: application/octet-stream
Content-Encoding: base64
Content-Description: stonefarm.nw27.doc
stonefarm.nw27.doc Content-Type: application/msword
Content-Encoding: base64
2 of2 3/31/2008 9:16 AM
Driving Directions from 2104 Raj Dr, Durham, NC to Hendersonville, NC
MAPOWEST'N
A: 2104 Raj Dr, Durham, NC 27703-9384
Page 1 of 2
?L
Qti.
` Y
Y ' s OT
P _7A L T Y
OUTER BANKS. NC:
earn more
1: Start out going EAST on RAJ DR toward PAGE RD. 0.0 mi
2: Turn RIGHT onto PAGE RD. 0.2 mi
3: Turn RIGHT onto TW ALEXANDER DR. 2.6 mi
?H M
14T 4: Merge onto NC-147 N toward DURHAM. 10.9 mi
5: NC-147 N becomes 1-85 S. 40.5 mi
6: Keep RIGHT to take 1-40 W/1-85 BR S via EXIT 131 toward US- 7.7 mi
70/GREENSBORONVINSTON-SALEM.
7: Keep RIGHT to take 1-40 W via EXIT 36A toward WINSTON-SALEM. 17 mi
2.9
•
mi
8: Merge onto 1-26 E/US-74 E via the exit on the LEFT toward 18.4 mi
HENDERSONVILLE/SPARTANBURG/ASHEVILLE AIRPORT.
was,
64 9: Merge onto US-64 W via EXIT 49B toward HENDERSONVILLE. 2.3 mi
ovr
zs 10: Turn LEFT onto N CHURCH ST/US-25 S. 0.1 mi
Exs1.
64 11: Turn LEFT onto 6TH AVE W/US-64 E. 0.0 mi
12: End at Hendersonville, NC
Estimated Time: 4.0 hours 7 minutes Estimated Distance: 255.70 miles
B: Hendersonville, NC
Total Time: 4.0 hours 7 minutes Total Distance: 255.70 miles
http://www.mapquest.com/maps/2104+Raj+Dr+Durham+NC+27703-9384IHendersonville+NC/ 3/31/2008
Driving Directions from 2104 Raj Dr, Durham, NC to Hendersonville, NC Page 2 of 2 >
tA1Af'Q?JEST'+??e Huntin `fOtt `-* i"5't ? ?° WebsterS Z ' Marrisonbyrc*o ao m;e
9 3 ' liarleston o
vile Fr?}nkfort E '-'n9 ` Five Mile For
g fviprphead c o ' UI s #,
o Alum Creek Ma Summerawille#? Charlottesvlller Lexin
„,Pates West Lib*yB Nallen ?.. Port RoyJ
,,. p txiii?qtloin ><1n Sparta
Lovingstbn Ashiand
dstown g '; Richmond Langley Union t isburg Richmond , Rai,
` ? -
3 ?Pi1c laepet ° ,? Mlidtothian
Lebanon ,Mount Vernon c tiefins
rarmville
b Hazard plch C! nolCt 0, AetersbUrg
' Liberty ?,N London ns Forest >
P n $lackstcrn,? He
1.., ?....o SA ...w. as
se aski ?' $m,thfield
u Christiaosburg
5omeriet Barbourville o Q
Marion
W)I,thevdle Lunenbur9 Emporea SUffolk 0
Monticeliio
q
o 10 '1 Danville 0
lelliw La FolletteQ
„° Spuf?pon Eliza ton
C O,tfordNentlersort Hatr#ax ,Ahoskie El
0
Aevitle Owme liittston-Salem'
Louurg
b4
Powell Knoxville a? " c
RocS:y Mount (dente
.? ?.?
5 Ofb_ a a41?1?,
Oak'Ridge. Maryville Ne Post H?Cko `Taacoturnbka
c a C`. _ S,nrthfietd Goldsboro c wi
Dayton Ma onvllle.. Way, Ile !16n C3.
Gastonia' CharlottA
70?
d?p? f Bayboro
CF Ot ano A Brevar? rrdCR k` " w° Fayetteville
Franklink Hill Pine first
rl: Atli
Dalton Copperla? Easley _Ur tr?iile Cl?n;otf Mcksonville
xt?
C." a C a. ,Lumberton --. '
,a Fayette$us Cornelia occoa° Andersvh Chester a t' Holly Rio a Morehea
GW ..
?a Bennettsvalte o
Fairmont
Rcitpe r5;
It >ilmington
CumR,m Ab ille Greenvyb9d
3 f D,tal,l5n 0 S Bolivia
?larletfa' Athens Lexington f?l Marion 2? c Silver Lake
Eatesb Leesv,lte?, ,.w. 5fo?tTlt@r mYFle Beach
;wbietch ' Oecatur .,. Evan ? . ;
uman ust
"Peichtree City 4T.f. d Andrews Garden City
« i +" Gabson Bamberg, OmNeburg !_
Catonton
t Ugrangevt nesviile 4? esboro`MoncksCornsro
Forsyth Masten O Ha on
City Sandersville c Coarleston
0
2'00$ tai' ?t Irwinton Luray MapQuest Inc Map Data 0 2008 MapQuest Inc. or AND
All rIgMs reserved. _Use subject to License/Copyrigh_t I Mai Legend
Directions and maps are informational only. We make no warranties on the accuracy of their content, road conditions or
route usability or expeditiousness. You assume all risk of use. MapQuest and its suppliers shall not be liable to you for
any loss or delay resulting from your use of MapQuest. Your use of MapQuest means you agree to our Terms of Use
http://www.mapquest.com/maps/2104+Raj+Dr+Durham+NC+27703-9384/Hendersonville+NC/ 3/31/2008