HomeMy WebLinkAboutNC0064734_Compliance Evaluation Inspection_20201103United States Environmental Protection Agency
Form Approved.
EPA Washington, D.C. 20460
OMB No. 2040-0057
Water Compliance Inspection Report
Approval expires 8-31-98
Section A: National Data System Coding (i.e., PCS)
Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type
1 IN 1 2 u 3 I NCO064734 I11 121 20/11/03 I17 18I � I 19 I s I 20L]
21111I I I I I I I II I I I I I I I I I I I I I I I I I I I I I I I II I I I I I r6
Inspection
Work Days Facility Self -Monitoring Evaluation Rating B1 QA ---------------------- Reserved -------------------
67
I 72 I n, I 71 I 74 79 I I I I I I I80
701� I 711 L
LJ L -1 I I
Section B: Facility Data
Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include
Entry Time/Date
Permit Effective Date
POTW name and NPDES permit Number)
09:53AM 20/11/03
19/02/01
Bradfield Farms WWTP
3822 Tearoyal Ct
Exit Time/Date
Permit Expiration Date
Charlotte NC 28215
11:14AM 20/11/03
23/11/30
Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s)
Other Facility Data
Larry Darnell Henry/ORC/704-361-0641/
Name, Address of Responsible Official/Title/Phone and Fax Number
Contacted
Tony Konsul,PO Box 240908 Charlotte NC 282240908/Operations
Director/704-319-0523/7045258174 No
Section C: Areas Evaluated During Inspection (Check only those areas evaluated)
Permit 0 Flow Measurement Operations & Maintenar Records/Reports
Self -Monitoring Progran 0 Sludge Handling Dispo: Facility Site Review Effluent/Receiving Wate
Laboratory
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
(See attachment summary)
Name(s) and Signature(s) of Inspector(s) Agency/Office/Phone and Fax Numbers Date
Roberto Scheller DoC�Y'IS.".14 DWR/MRO WQ/252-946-6481/
11/5/2020
E 43E...
Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date
W. Corey Basinger DWR/Division of Water Quality/704-235-2194/
EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete.
Page#
NPDES yr/mo/day Inspection Type
NCO064734 I11 12I 20/11/03 117 18 i c i
(Cont.)
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
Treatment facility consist of two 0.23 MGD treatment plants operated in parallel with common
discharge via outfall #001. Facility discharges into McKee Creek which is Class C waters in the Yadkin
Pee -Dee River Basin. Current NPDES permit #NC0064734 became effective on February 1, 2019 and
expires on November 30, 2023. Compliance history was reviewed from September 2019 through
August 2020. Facility reported a Fecal Coliform violation on 9/2019. At time of inspection facility
appeared to be well operated and maintained. Effluent was clear with no visible suspended solids. No
foam or solids were noted at point of discharge into McKee Creek.
Page#
Permit: NCO064734 Owner -Facility: Bradfield Farms WWTP
Inspection Date: 11/03/2020 Inspection Type: Compliance Evaluation
Permit
Yes
No
NA
NE
(If the present permit expires in 6 months or less). Has the permittee submitted a new
❑
❑
0
❑
application?
Is the facility as described in the permit?
0
❑
❑
❑
# Are there any special conditions for the permit?
0
❑
❑
❑
Is access to the plant site restricted to the general public?
0
❑
❑
❑
Is the inspector granted access to all areas for inspection?
M
❑
❑
❑
Comment:
Record Keeping
Yes
No
NA NE
Are records kept and maintained as required by the permit?
0
❑
❑
❑
Is all required information readily available, complete and current?
0
❑
❑
❑
Are all records maintained for 3 years (lab. reg. required 5 years)?
0
❑
❑
❑
Are analytical results consistent with data reported on DMRs?
0
❑
❑
❑
Is the chain -of -custody complete?
0
❑
❑
❑
Dates, times and location of sampling
Name of individual performing the sampling
Results of analysis and calibration
Dates of analysis
Name of person performing analyses
Transported COCs
Are DMRs complete: do they include all permit parameters?
❑
❑
❑
Has the facility submitted its annual compliance report to users and DWQ?
❑
❑
❑
(If the facility is = or > 5 MGD permitted flow) Do they operate 24/7 with a certified operatc
❑
❑
0
❑
on each shift?
Is the ORC visitation log available and current?
❑
❑
❑
Is the ORC certified at grade equal to or higher than the facility classification?
❑
❑
❑
Is the backup operator certified at one grade less or greater than the facility classification'
❑
❑
❑
Is a copy of the current NPDES permit available on site?
0
❑
❑
❑
Facility has copy of previous year's Annual Report on file for review?
❑
❑
❑
Comment:
Operations & Maintenance Yes No NA NE
Is the plant generally clean with acceptable housekeeping? 0 ❑ ❑ ❑
Page# 3
Permit: NCO064734
Inspection Date: 11/03/2020
Owner -Facility: Bradfield Farms WWTP
Inspection Type: Compliance Evaluation
Operations & Maintenance
Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable
Solids, pH, DO, Sludge Judge, and other that are applicable?
NOT, 171,"M
Laboratory
Are field parameters performed by certified personnel or laboratory?
Are all other parameters(excluding field parameters) performed by a certified lab?
# Is the facility using a contract lab?
# Is proper temperature set for sample storage (kept at less than or equal to 6.0 degrees
Celsius)?
Incubator (Fecal Coliform) set to 44.5 degrees Celsius+/- 0.2 degrees?
Incubator (BOD) set to 20.0 degrees Celsius +/- 1.0 degrees?
Yes No NA NE
■ ❑ ❑ ❑
Yes
No
NA
NE
•
❑
❑
❑
•
❑
❑
❑
•
❑
❑
❑
•
❑
❑
❑
❑
❑
❑
■
❑
❑
❑
■
Comment: Labatory analysis are performed by K&W Labatories in Midland, NC (Lab Cert#559). Field
prameters are performed under field lab certification #5228.
Bar Screens
Yes
No
NA
NE
Type of bar screen
a.Manual
❑
b.Mechanical
Are the bars adequately screening debris?
0
❑
❑
❑
Is the screen free of excessive debris?
0
❑
❑
❑
Is disposal of screening in compliance?
0
❑
❑
❑
Is the unit in good condition?
0
❑
❑
❑
Comment:
Equalization Basins
Yes
No
NA NE
Is the basin aerated?
0
❑
❑
❑
Is the basin free of bypass lines or structures to the natural environment?
0
❑
❑
❑
Is the basin free of excessive grease?
0
❑
❑
❑
Are all pumps present?
0
❑
❑
❑
Are all pumps operable?
0
❑
❑
❑
Are float controls operable?
❑
❑
❑
Are audible and visual alarms operable?
❑
❑
❑
# Is basin size/volume adequate?
0
❑
❑
❑
Page# 4
Permit: NCO064734 Owner -Facility: Bradfield Farms WWTP
Inspection Date: 11/03/2020 Inspection Type: Compliance Evaluation
Equalization Basins Yes No NA NE
Comment:
Aerobic Digester
Yes
No
NA
NE
Is the capacity adequate?
0
❑
❑
❑
Is the mixing adequate?
0
❑
❑
❑
Is the site free of excessive foaming in the tank?
0
❑
❑
❑
# Is the odor acceptable?
0
❑
❑
❑
# Is tankage available for properly waste sludge?
0
❑
❑
❑
Comment: Solids are removed by L&L Environmental for final disposal.
Aeration Basins
Yes
No
NA NE
Mode of operation
Ext. Air
Type of aeration system
Diffused
Is the basin free of dead spots?
0
❑
❑
❑
Are surface aerators and mixers operational?
❑
❑
0
❑
Are the diffusers operational?
0
❑
❑
❑
Is the foam the proper color for the treatment process?
0
❑
❑
❑
Does the foam cover less than 25% of the basin's surface?
0
❑
❑
❑
Is the DO level acceptable?
❑
❑
❑
Is the DO level acceptable?(1.0 to 3.0 mg/1)
❑
❑
❑
. NTOWITT'ii�
Secondary Clarifier
Yes
No
NA
NE
Is the clarifier free of black and odorous wastewater?
0
❑
❑
❑
Is the site free of excessive buildup of solids in center well of circular clarifier?
0
❑
❑
❑
Are weirs level?
0
❑
❑
❑
Is the site free of weir blockage?
0
❑
❑
❑
Is the site free of evidence of short-circuiting?
0
❑
❑
❑
Is scum removal adequate?
0
❑
❑
❑
Is the site free of excessive floating sludge?
0
❑
❑
❑
Is the drive unit operational?
0
❑
❑
❑
Is the return rate acceptable (low turbulence)?
❑
❑
❑
Is the overflow clear of excessive solids/pin floc?
0
❑
❑
❑
Page# 5
Permit: NC0064734
Inspection Date: 11/03/2020
Owner -Facility: Bradfield Farms WWTP
Inspection Type: Compliance Evaluation
Secondary Clarifier
Is the sludge blanket level acceptable? (Approximately'/ of the sidewall depth)
Comment:
Pumps-RAS-WAS
Are pumps in place?
Are pumps operational?
Are there adequate spare parts and supplies on site?
Comment: RAS, WAS operated by airlift pumps.
Filtration (High Rate Tertiary)
Type of operation:
Is the filter media present?
Is the filter surface free of clogging?
Is the filter free of growth?
Is the air scour operational?
Is the scouring acceptable?
Is the clear well free of excessive solids and filter media?
Comment:
Disinfection - UV
Are extra UV bulbs available on site?
Are UV bulbs clean?
Is UV intensity adequate?
Is transmittance at or above designed level?
Is there a backup system on site?
Is effluent clear and free of solids?
Comment:
Effluent Sampling
Is composite sampling flow proportional?
Is sample collected below all treatment units?
Is proper volume collected?
Is the tubing clean?
Yes No NA NE
❑ ❑ ❑ ■
Yes No NA NE
■ ❑ ❑ ❑
■ ❑ ❑ ❑
❑ ❑ ■ ❑
Yes No NA NE
Cross flow
■ ❑ ❑ ❑
■ ❑ ❑ ❑
■ ❑ ❑ ❑
❑ ❑ ■ ❑
❑ ❑ ■ ❑
❑ ❑ ■ ❑
Yes No NA NE
❑ ❑ ❑ ■
❑ ❑ ❑
■ ❑ ❑ ❑
❑ ❑ ❑ ■
■ ❑ ❑ ❑
■ ❑ ❑ ❑
Yes No NA NE
■ ❑ ❑ ❑
■ ❑ ❑ ❑
■ ❑ ❑ ❑
■ ❑ ❑ ❑
Page# 6
Permit: NCO064734
Inspection Date: 11/03/2020
Owner -Facility: Bradfield Farms WWTP
Inspection Type: Compliance Evaluation
Effluent Sampling
# Is proper temperature set for sample storage (kept at less than or equal to 6.0 degrees
Celsius)?
Is the facility sampling performed as required by the permit (frequency, sampling type
representative)?
Comment: At time of inspection sampler was recorded at 1 degree Celsius.
Flow Measurement - Effluent
# Is flow meter used for reporting?
Is flow meter calibrated annually?
Is the flow meter operational?
(If units are separated) Does the chart recorder match the flow meter?
Comment: Flow meter was calibrated on June 23, 2020 by B.W. Allen Co.
Effluent Pipe
Is right of way to the outfall properly maintained?
Are the receiving water free of foam other than trace amounts and other debris?
If effluent (diffuser pipes are required) are they operating properly?
Comment:
Standby Power
Is automatically activated standby power available?
Is the generator tested by interrupting primary power source?
Is the generator tested under load?
Was generator tested & operational during the inspection?
Do the generator(s) have adequate capacity to operate the entire wastewater site?
Is there an emergency agreement with a fuel vendor for extended run on back-up power?
Is the generator fuel level monitored?
Comment:
Yes No NA NE
■ ❑ ❑ ❑
■ ❑ ❑ ❑
Yes No NA NE
❑ ❑ ❑
❑ ❑ ❑
❑ ❑ ❑
❑ ❑ ❑
Yes
No
NA NE
■
❑
❑
❑
■
❑
❑
❑
❑
❑
■
❑
Yes No NA NE
❑ ❑ ❑
❑ ❑ ❑
❑ ❑ ❑
❑ ❑ ❑ ■
❑ ❑ ❑
❑ ❑ ❑
❑ ❑ ❑
Page# 7