Loading...
HomeMy WebLinkAbout20201782 Ver 1_Meeting Request Review_20201119 Ore° DWR Pre-Filing Meeting Request Form NORTH CAROLINA EnWmnnacnlrtl Quelfuy ID#* 20201782 Version* 1 Regional Office* Central Office-(919)707-9000 Reviewer List* Rob Ridings Pre-Filing Meeting Request submitted 11/19/2020 ......................................................................................................................................................................................................................................................................................................................................................................................................................................................... Contact Name* Jason Dilday Contact Email Address* jldilday@ncdot.gov Project Name* US 74 Broadband Project(WBS 36824.1.2) Project Owner* NCDOT Project County* Multi Owner Address: Street Address 1000 Birch Ridge Drive Address Line 2 City State/Rovince/Region Raleigh NC Fbstal/Zip Code Country 27610 USA Is this a transportation project?* r Yes r No Type(s)of approval sought from the DWR: rJ 401 Water Quality Certification- I— 401 Water Quality Certification- Regular Express I— Individual Permit I— Modification r- Shoreline Stabilization Does this project have an existing project ID#?* r Yes r No Do you know the name of the staff member you would like to request a meeting with? Kevin Mitchell Please give a brief project description below.* Installation of conduit within existing NCDOT right-of-way for fiber optic cable along US 74 from Wilmington to Charlotte. Please give a couple of dates you are available for a meeting. 12/14/2020 12/16/2020 12/18/2020 Please attach the documentation you would like to have the meeting about. Narrative US 74 NCDOT.pdf 6.21MB pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. . I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing meeting request. . I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty-day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty-day clock has expired,and you can submit an application. Signature 45dnf PILD,4Y Submittal Date 11/19/2020 Reviewer Meeting Request Decision ............................. Has a meeting been scheduled?* C Yes a No