Loading...
HomeMy WebLinkAbout20100506 Ver 1_More Info Received_20100720FW: Kingsbridge DWQ # 2010 0506 PW: Kingsbridge DWQ # 2010 0506 Steenhuis, Joanne Sent: Tuesday, July 20, 2010 4:58 PM To: Strickland, Bev Attachments: NATIONWIDE 18 PAGE I1.pdf (30 KB) From: engineering)@ec.rr.com [mailto:engineerl@ec.rr.com] Sent: Tuesday, July 20, 2010 4:56 PM To: Steenhuis, Joanne Subject: Re: Kingsbridge On 7/20/2010 4:34 PM, Steenhuis, Joanne wrote: Mr. Dunnehoo, Page 1 of 1 Could you please e-mail me the last page of the revised application (dated July 2, 2010) with your signature. That is all I need to complet Thank you. Joanne No virus found in this incoming message. Checked by AVG - www.avg.com Version: 9.0.839 / Virus Database: 271.1.1/3017 - Release Date: 07/20/10 02:36:00 HERE IS THE PAGE YOU REQUESTED. THANKS JOE https://mail.nc.gov/owa/?ae=Item&t=IPM.Note&id=RgAAAAAAOgPoLNIPQZ06vHVR... 7/21/2010 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or ? Yes habitat? I 5b. Have you checked with the USFWS concerning Endangered Species Act ? Yes impacts? ------------- -------- 5c. If yes, indicate the USFWS Field Office you have contacted. F-1 Raleigh ? Asheville 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? 6. THE NC NATURALHERITAGE PROGRAM GIS LAYER WAS USED TO DETERM€NE THE PRESENCE OF FEDERALLY LISTED SPECIES. NO RARE (STATE OR FEDERAL PROTECTED)SPECIES ARE KNOWN TO OCCUR ON OR WITHIN A HALF MILE RADIUS OF THE SITE. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ? Yes ® No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? THE NOAA FISHERIES ESSENTIAL FISH HABITAL MAPER GIS PROGRAM WAS USED TO DETERMINE THE PRESENCE OF ESSENTIAL FISH HABITAL. NO DATA WAS DEPICTED FOR THE PROJECT AREA. 7. Historic or Prehistoric Cultural Resources (Corps Requirement) j 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ? Yes ® No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 140-year flood plain? ® Yes ? No 8b. If yes, explain how project meets FEMA requirements: ALL CONSTRUCTION OF RESIDENTIAL UNITS MUST BE OUTSIDE LIMITS OF 100 YEAR FLOOD AND HOMES MUST BE BUILT TWO FEET ABOVE THE 100 YEAT FLOOD ELEVATION. I 8c. What source(s) did you use to make the floodplain determination? .JOSEPH F. DUNNE11OO Applicant/Agent's Printed Name ApplicantlAgent's Signature [Agent's signature is valid only if an authorization letter from the applicant ® No ® No 2 JULY 2010 Date Page ] 1 of 11 PCN Form - Version 1.3 December 10, 2008 Version