Loading...
HomeMy WebLinkAboutNCG160025_Inspection_20201118Compliance Inspection Report Permit: NCG160025 Effective: 08/01/19 Expiration: 05/31/24 Owner: Carl Rose & Sons Inc SOC: Effective: Expiration: Facility: Carl Rose and Sons - Elkin Asphalt #3 County: Surry 155 Asphalt Trl Region: Winston-Salem Elkin NC 28621 Contact Person: Joel Greene Title: Phone: Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 11/18/2020 Primary Inspector: Zac Lentz Secondary Inspector(s): Certification: Phone: Entry Time 10:OOAM Exit Time: 11:40AM Phone: 336-776-9661 Reason for Inspection: Complaint Inspection Type: Compliance Evaluation Permit Inspection Type: Asphalt Paving Mixture Stormwater Discharge COC Facility Status: Compliant ❑ Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 4 Permit: NCG160025 Owner - Facility: Carl Rose & Sons Inc Inspection Date: 11/18/2020 Inspection Type: Compliance Evaluation Reason for Visit: Complaint Inspection Summary: The facility was inspected for compliance on November 18, 2020 following complaints of sedimentation to the downstream watercourse. The inspection revealed no compliance issues, and analytical monitoring did not show any samples beyond the benchmark. Notably, the area downstream of the outfall, as described in the "Permit and Outfalls" section of this report, appeared to be eroded and may result in sedimentation of the receiving watercourse, but it appeared highly unlikely that the nature and size of this disturbed area could lead to the degree of sedimentation reported downnstream. Nonetheless, the facility representative was advised to stabilize the area immediately. The facility will be re -inspected after 30 days to evaluate repairs associated with the outfall. A remote audit of the SWPPP will be conducted prior to the next inspection. Page 2 of 4 Permit: NCG160025 Owner - Facility: Carl Rose & Sons Inc Inspection Date: 11/18/2020 Inspection Type: Compliance Evaluation Reason for Visit: Complaint Stormwater Pollution Prevention Plan Does the site have a Stormwater Pollution Prevention Plan? # Does the Plan include a General Location (USGS) map? # Does the Plan include a "Narrative Description of Practices"? # Does the Plan include a detailed site map including outfall locations and drainage areas? # Does the Plan include a list of significant spills occurring during the past 3 years? # Has the facility evaluated feasible alternatives to current practices? # Does the facility provide all necessary secondary containment? # Does the Plan include a BMP summary? # Does the Plan include a Spill Prevention and Response Plan (SPRP)? # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? # Does the facility provide and document Employee Training? # Does the Plan include a list of Responsible Party(s)? # Is the Plan reviewed and updated annually? # Does the Plan include a Stormwater Facility Inspection Program? Has the Stormwater Pollution Prevention Plan been implemented? Yes No NA NE ■❑❑❑ ❑❑❑■ ❑❑❑■ ■❑❑❑ ❑❑❑■ ❑❑❑■ ❑❑❑■ ❑❑❑■ ❑❑❑■ ❑❑❑■ ❑❑❑■ ❑❑❑■ Comment: The SWPPP was observed to be on site, but individual components were not reviewed for compliance with the permit. The outfall map was utilized during the inspection. Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? 0 ❑ ❑ ❑ Comment: Monitorina has been conducted as reauired by the Dermit: records were observed durina the inspection. Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? 0 ❑ ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ 0 ❑ Comment: Monitoring has been conducted as required by the permit. Records observed during the inspection did not show values beyond the benchmark. Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? ❑ ❑ ❑ # Were all outfalls observed during the inspection? ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ❑ # Has the facility evaluated all illicit (non stormwater) discharges? ❑ ❑ ❑ Page 3 of 4 Permit: NCG160025 Owner - Facility: Carl Rose & Sons Inc Inspection Date: 11/18/2020 Inspection Type: Compliance Evaluation Reason for Visit: Complaint Comment: The only outfall, the dam of a settling pond, was observed during the inspection. The facility representative present during the inspection stated that he samples oust upstream of the dam, which led to a discussion regarding the use of a discharge pipe or weir to create a more defined outfall. The top of the dam's spillway was observed to consist of gravel and disturbed soil, which the facilitv representative was advised to stabilize immediatelv. Page 4 of 4