HomeMy WebLinkAbout740109_Plan of Action_20201116II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24
HR. STORM
STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1.
Structure ID: d and Jack, Inc (#1) 74-109
line m = 677.7 lb PAN
2.
Structure ID:
line m =
lb PAN
3.
Structure ID:
line m =
lb PAN
4.
Structure ID:
line m =
lb PAN
5.
Structure ID:
line m =
lb PAN
6.
Structure ID:
line m =
lb PAN
n. lines 1 +2+3+4+5+6= 677.7 lb PAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD.
o. tract #
p. field #
q. crop
r. acres
s. remaining
IRR-2 PAN
balance
(lb/acre)
t. TOTAL PAN
BALANCE FOR
FIELD (Ibs.)
column r x s
u. application window'
1 B
Wheat
6.26
91.92
575.4
Sept -Apr
1 A
WHEAT
9.04
112.00
1012.5
Sept -Apr
2A
Wheat
9.62
93.00
894.7
Sept -Apr
2B
Wheat
8.60
93.00
799.8
Sept -Apr
2C
Wheat
9.01
112.00
1009.1
Sept -Apr
2D
Wheat
4.71
96.00
452.2
Sept -Apr
N-1 A
Wheat
7.45
112.00
834.4
Sept -Apr
N 1 B
Wheat
15.62
93.00
1452.7
Sept -Apr
'State current crop ending application date or next crop application beginning date for available
receiving crops during 30 day draw down period.
v. Total PAN available for all fields (sum of column t) = 7030.7 Ib. PAN
PoA (30 Day) 2/21/00
IV. FACILITY'S PoA OVERALL PAN BALANCE
w. Total PAN to be land applied (line n from section II) = 677.7 lb. PAN
x. Crop's remaining PAN balance (line v from section III) = 7030.7 lb. PAN
y. Overall PAN balance (w - x) _ -6353 lb. PAN
Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and
haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN
based on new information. If new fields are to be included as an option for lowering lagoon level, add these
fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to
another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the
receiving facility.
NARRATIVE:
Date:_ _11/16/20
Eve H. Honeycutt
Extension Agent
Agriculture, Livestock
Certified Technical Specialist
PoA (30 Day) 2/21/00
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24
HR. STORM
STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1.
Structure ID: d and Jack, Inc (#1) 74-109
line m = 677.7 lb PAN
2.
Structure ID:
line m =
lb PAN
3.
Structure ID:
line m =
lb PAN
4.
Structure ID:
line m =
lb PAN
5.
Structure ID:
line m =
lb PAN
6.
Structure ID:
line m =
lb PAN
n. lines +2+3+4+5+6= 677.7 lb PAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD.
o. tract #
p. field #
q. crop
r. acres
s. remaining
IRR-2 PAN
balance
(lb/acre)
t. TOTAL PAN
BALANCE FOR
FIELD (Ibs.)
column r x s
u. application window'
1 B
Wheat
6.26
91.92
575.4
Sept -Apr
1 A
WHEAT
9.04
112.00
1012.5
Sept -Apr
2A
Wheat
9.62
93.00
894.7
Sept -Apr
213
Wheat
8.60
93.00
799.8
Sept -Apr
2C
Wheat
9.01
112.00
1009.1
Sept -Apr
2D
Wheat
4.71
96.00
452.2
Sept -Apr
N-1 A
Wheat
7.45
112.00
834.4
Sept -Apr
N 1 B
Wheat
15.62
93.00
1452.7
Sept -Apr
'State current crop ending application date or next crop application beginning date for available
receiving crops during 30 day draw down period.
v. Total PAN available for all fields (sum of column t) = 7030.7 Ib. PAN
PoA (30 Day) 2/21/00
IV. FACILITY'S PoA OVERALL PAN BALANCE
w. Total PAN to be land applied (line n from section II) = 677.7 lb. PAN
x. Crop's remaining PAN balance (line v from section III) = 7030.7 lb. PAN
y. Overall PAN balance (w - x) _ -6353 lb. PAN
Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and
haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN
based on new information. If new fields are to be included as an option for lowering lagoon level, add these
fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to
another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the
receiving facility.
Date:_ _11/16/20
Eve H. Honeycutt
Extension Agent
Agriculture, Livestock
Certified Technical Specialist
PoA (30 Day) 2/21/00
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID): ITed and Jack, Inc (#1) 74-109
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker 17.01 inches
b. designed 25 yr./24 hr. storm &structural freeboard 19.01 inches
c. line b - line a (inches in red zone) = 2.0 inches
d. top of dike surface area according to design
(area at below structural freeboard elevation) 151436 ft2
e. line c/12 x line d x 7.48 gallons/W 188790 gallons
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design 155935 1ft3
h. current herd # 1 4700 certified herd # 4800
actual waste produced = current herd # x line g =
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated
m. ((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
152686 ft'
0 ft3
148912 1ft3
375993 gallons
1.20 Ibs/1000 gal.
677.7 lbs. PAN
PoA (30 Day) 2/21/00